ML15096A014: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15096A014
| number = ML15096A014
| issue date = 04/20/2015
| issue date = 04/20/2015
| title = Arkansas Nuclear One, Unit 1 - Request for Withholding Information from Public Disclosure - 3/26/15 Affidavit Executed by G. Elliott, Areva Inc.; ANP-3300Q3P and Document No. 32-9220706-002 RCS Pressure/Temperature Amendment Request (TAC MF
| title = Request for Withholding Information from Public Disclosure - 3/26/15 Affidavit Executed by G. Elliott, Areva Inc.; ANP-3300Q3P and Document No. 32-9220706-002 RCS Pressure/Temperature Amendment Request
| author name = George A E
| author name = George A
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000313
| docket = 05000313
| license number = DPR-051
| license number = DPR-051
| contact person = George A E
| contact person = George A
| case reference number = TAC MF5292
| case reference number = TAC MF5292
| document type = Letter, Proprietary Information Review
| document type = Letter, Proprietary Information Review
| page count = 3
| page count = 3
| project = TAC:MF5292
| project = TAC:MF5292
| stage = Withholding Request
| stage = Withholding Request Acceptance
}}
}}


=Text=
=Text=
{{#Wiki_filter:Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 20, 2015
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 20, 2015 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802


==SUBJECT:==
==SUBJECT:==
ARKANSAS NUCLEAR ONE, UNIT NO. 1 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF5292)  
ARKANSAS NUCLEAR ONE, UNIT NO. 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF5292)


==Dear Sir or Madam:==
==Dear Sir or Madam:==
By letter dated March 25, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15086A023}, Entergy Operations, Inc., submitted supplemental information regarding a license amendment request to update the reactor coolant system pressure and temperature limits at Arkansas Nuclear One, Unit 1. The information included an affidavit executed by Gayle Elliott, AREVA Inc. (AREVA), dated March 25, 2015, requesting that information contained in the following documents be withheld from public disclosure pursuant to the Title 10 of the Code of Federal Regulations (10 CFR}, Part 2, Section 2.390:
 
By letter dated March 25, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15086A023}, Entergy Operations, Inc., submitted supplemental information regarding a license amendment request to update the reactor coolant system pressure and temperature limits at Arkansas Nuclear One, Unit 1. The information included an affidavit executed by Gayle Elliott, AREVA Inc. (AREVA), dated March 25, 2015, requesting that information contained in the following documents be withheld from public disclosure pursuant to the Title 10 of the Code of Federal Regulations (10 CFR}, Part 2, Section 2.390:
* ANP-3300Q3P, Revision 0, "Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1,'' dated March 2015.
* ANP-3300Q3P, Revision 0, "Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1,'' dated March 2015.
* Document No. 32-9220706-002, "AN0-1 L TOP P-T Limits for 54 EFPY," dated March 2015. A nonproprietary version of ANP-3300Q3P, Revision 0, has been added to the NRC Library at ADAMS Accession No. ML 15086A024.
* Document No. 32-9220706-002, "AN0-1 LTOP P-T Limits for 54 EFPY," dated March 2015.
A nonproprietary version of Document No. 32-9220706-002 was not provided, and was requested to be withheld in its entirety.
A nonproprietary version of ANP-3300Q3P, Revision 0, has been added to the NRC Library at ADAMS Accession No. ML15086A024. A nonproprietary version of Document No. 32-9220706-002 was not provided, and was requested to be withheld in its entirety.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA. (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.   ( e) The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA. We have reviewed your documents in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
(c)     The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
(d)     The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
 
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
(e)     The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA.
We have reviewed your documents in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1081.
If you have any questions regarding this matter, I may be reached at 301-415-1081.
Docket No. 50-313 cc: Gayle Elliott Manager, Product Licensing AREVA Inc. 3315 Old Forest Road Lynchburg, VA 24501 Additional distribution via Listserv Sincerely, Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation   (e) The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA. We have reviewed your documents in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Sincerely, Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-313 cc:   Gayle Elliott Manager, Product Licensing AREVA Inc.
Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
3315 Old Forest Road Lynchburg, VA 24501 Additional distribution via Listserv
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
 
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
ML15096A014 OFFICE      NRR/DORL/LPL4-1 /PM            NRR/DORL/LPL4-1 /LA            NRR/DE/EVIB/BC NAME         AGeorge                       JBurkhardt                      SRosenberg DATE         04/07/15                       04/07/15                        04/07/15 OFFICE      NRRIDSS/SRXB/BC                NRRIDORL/LPL4-1 /BC            NRR/DORL/LPL4-1 /PM NAME        CJackson                      MMarkley                       AGeorge DATE        04/20/15                       04/20/15                       04/20/15}}
In all review situations, ifthe NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1081.
Docket No. 50-313 cc: Gayle Elliott Sincerely, /RA/ Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Manager, Product Licensing AREVA Inc. 3315 Old Forest Road Lynchburg, VA 24501 Additional distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource ADAMS Accession No. ML15096A014 OFFICE NRR/DORL/LPL4-1  
/PM NAME AGeorge DATE 04/07/15 OFFICE NRRIDSS/SRXB/BC NAME CJackson DATE 04/20/15 RidsNrrDorlLpl4-1 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMANO Resource NRR/DORL/LPL4-1  
/LA JBurkhardt 04/07/15 NRRIDORL/LPL4-1  
/BC MMarkley 04/20/15 OFFICIAL RECORD COPY RidsRgn4MailCenter Resource NRR/DE/EVIB/BC SRosenberg 04/07/15 NRR/DORL/LPL4-1
/PM AGeorge 04/20/15}}

Latest revision as of 13:22, 31 October 2019

Request for Withholding Information from Public Disclosure - 3/26/15 Affidavit Executed by G. Elliott, Areva Inc.; ANP-3300Q3P and Document No. 32-9220706-002 RCS Pressure/Temperature Amendment Request
ML15096A014
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/20/2015
From: Andrea George
Plant Licensing Branch IV
To:
Entergy Operations
George A
References
TAC MF5292
Download: ML15096A014 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 20, 2015 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT NO. 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF5292)

Dear Sir or Madam:

By letter dated March 25, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15086A023}, Entergy Operations, Inc., submitted supplemental information regarding a license amendment request to update the reactor coolant system pressure and temperature limits at Arkansas Nuclear One, Unit 1. The information included an affidavit executed by Gayle Elliott, AREVA Inc. (AREVA), dated March 25, 2015, requesting that information contained in the following documents be withheld from public disclosure pursuant to the Title 10 of the Code of Federal Regulations (10 CFR}, Part 2, Section 2.390:

  • ANP-3300Q3P, Revision 0, "Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1, dated March 2015.
  • Document No. 32-9220706-002, "AN0-1 LTOP P-T Limits for 54 EFPY," dated March 2015.

A nonproprietary version of ANP-3300Q3P, Revision 0, has been added to the NRC Library at ADAMS Accession No. ML15086A024. A nonproprietary version of Document No. 32-9220706-002 was not provided, and was requested to be withheld in its entirety.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA.

(d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.

(e) The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA.

We have reviewed your documents in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1081.

Sincerely, Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-313 cc: Gayle Elliott Manager, Product Licensing AREVA Inc.

3315 Old Forest Road Lynchburg, VA 24501 Additional distribution via Listserv

ML15096A014 OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /LA NRR/DE/EVIB/BC NAME AGeorge JBurkhardt SRosenberg DATE 04/07/15 04/07/15 04/07/15 OFFICE NRRIDSS/SRXB/BC NRRIDORL/LPL4-1 /BC NRR/DORL/LPL4-1 /PM NAME CJackson MMarkley AGeorge DATE 04/20/15 04/20/15 04/20/15