ML17266A160: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/17/1980
| issue date = 03/17/1980
| title = RO 335-80-13:on 800314,while Plant Was in Cold Shutdown, Field Leads to Excitors on Both Diesel Generator Units Were Found Undersized.Caused by Design Error.Field Leads Will Be Replaced & Permanent Repair Studied
| title = RO 335-80-13:on 800314,while Plant Was in Cold Shutdown, Field Leads to Excitors on Both Diesel Generator Units Were Found Undersized.Caused by Design Error.Field Leads Will Be Replaced & Permanent Repair Studied
| author name = WETHY C M
| author name = Wethy C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.-ak.894 P.O.OOX 5ZG, FT.PIP fICP., FL 3345(Io+Ifr, J.P.O'Railly, Director Kegiorf Tl Uffice of Xnspection and Enforcef",.i'nt U.ST Nuclear Pcgulatory Co~issioT5.
{{#Wiki_filter:.-
Atlanta, Georgia 30303~::epics To.'I;IH', JHB, CAQ, G'.1V, MZ:.F,fsitc:
ak. 894                                                                                     P.O. OOX 5ZG, FT. PIP fICP.,                               FL 3345(
AIIS, Jaa, CQl~,>~S,.RZuENu t.0'+ii<"~~w l.g ygfffltlfI
~::epics To.'I;IH', JHB,                 CAQ, G'.1V, MZ
'SLORIfffl PO'A'Eff IL UGHTgQN'cb 17~1980~<ffV Ca VPW 4y-" rG.II.Vetlqr, Plant Manager t.Lucie Plant-DPK 67 gloxida Power 6 Lip'tft Cotlpany Ififcmi, l'lorida Lb)eat: k>UHO FOK FACSI'.IILE.'ERAIlSNISSiO." To Co".PIRIf PRO'=IPT REPO.".TABLP.
: t. 0'+ii<"
.OCCUR)'1'llf'F.
:.F,fsitc:           AIIS, Jaa, CQl~, >~S,.RZuENu
335-80-l3 0I Diesel Generator'Field hiring Error~~One to a.design,error the field.'l.aads, to the cffcitors on both 0 units are undersized; The.pl.ant vaa in cold shutdufw when this was discovered.
                                                                                                ~~w           l.                                                     ~    <ffV g ygfffltlfI 'SLORIfffl         PO'A'Eff                   IL   UGHT Ca VPW Io+      Ifr, J.      P. O'Railly, Director    Kegiorf Tl                          gQN Uffice of Xnspection and Enforcef",.i'nt                                                        'cb 17~                             1980 U. ST Nuclear Pcgulatory Co~issioT5.
I i'a i'~'On 3/14/80 tile D/G's vere run at design load for surveil?fiYice tasting.,"A" D/G woulcl not accept full design load.During investioation of this proble;ii it was noted that the firld leads vere hot and thon, that the in"ulation was burnt.The leads'86 wire)vere replaced and tha"A" D/G then accepted fulL design load, The leads cn"8" D/G frere inspected and no daf.".agc cr I5igk teu'.perature fo',ind.'lbs.engineering departrent vas asked to eva5uate thc problaf.-i
Atlanta, Georgia 30303 rG. II. Vetlqr, Plant Manager YoTi+ y
~On.3/L5/80 tha plant co~.".enced shut-dof'n and coal dovn for refueling." On'/17/8Q (Ikoffday) at about 1,0500&#xc3;I, engineering reported t'llfft the leads are in ffcct unflarfcizad.
: t. Lucie Plant DPK 67                                             4y-"                                                                        -f C:
They slfould be at least 3-oifpht size to handle the full field currant poiaible unde~high load/transient conditions.
gloxida Power 6 Lip'tft Cotlpany Ififcmi,       l'lorida Lb)eat:         k>UHO     FOK FACSI'.IILE.'ERAIlSNISSiO."       To Co".PIRIf       PRO'=IPT REPO.".TABLP.
Tld.s vas confirned on the D/G units vendor prints but tive A/E instff33Iitiori draciinps incorrectly specified tice fI6 wtrei This affects the lonp terfff reliability of the D/G units.Hovever, it sho>>ld be, noted that the A D/G wiring shof.cd darage only af ter 0 years of operation and 3 sti)1 shows noffe.Also on 3/l6/SQ the integrated safeguards/Diesa) generator test was per-.'or".~cd and both units accepted the loading sequence and (partial), load refection and restart, per the.applicable Tcchniea1 Specificati YoTi+y-f C: 90~P5 lg C)-3f")u),;."5 qir 5 ons,.oi rective Action: 1 5'>>The f&#xc3;e3d l.eadff 5:ill be im.".ediately replaced on at lefist" I D/G Due g'" to the size of the installed conduit it r:n>-be necessary initially to do this in a t'ai,porary r:armer.The perrfanent fix will be persued L~i on an erpidf-ted basis so the D/G cfcn be returned to full operability
90 OCCUR)'1'llf'F. 335-80-l3                                                                                               0            ~P5 I                                                                                                                    lg C)
'er the Technical Specifications.
Diesel Generator 'Field hiring Error                                                                                   ~ ~             -    3f")
The schedule for thip cannot be acaiirately estimated at this tif..e.A}so, other design by the indi"iduals involved will be investigated but the.details, scope.and schcdulc are currently unl'.nown V g I~~~8004030 I 6'Q H E L P I tV G f3 I/I f,.D~t 0 TI I O 6"."<<~~'~g~'g~tgg~-RKUlgg.A.
u),;
S~f'g'SfC7~Aggg,.ggggggfg!ggggggg Lm ggggFVAANAf~rr"A~p//gW//
  ."5 qir 5          One     to a. design,error the field .'l.aads, to the cffcitors on both 0 units are undersized; The. pl.ant vaa in cold shutdufw when this was     discovered.
g 0~g 5fg,5ggg'eV5 5 g~-.e'g}}
i'aI i'                           ~
                    'On 3/14/80 tile D/G's vere run at design load for surveil?fiYice tasting., "A" D/G woulcl not accept full design load. During investioation of this proble;ii             it   was noted that the firld leads vere hot and thon, that the in"ulation was burnt. The leads wire) vere replaced and tha "A" D/G then accepted fulL                                                 '86 design load, The leads cn "8" D/G frere inspected and no daf.".agc cr I5igk teu'.perature fo',ind. 'lbs. engineering departrent vas asked to eva5uate thc problaf.-i ~ On. 3/L5/80 tha plant co~.".enced shut-dof'n and coal dovn for refueling."
On'/17/8Q       (Ikoffday) at about 1,0500 &#xc3;I, engineering reported t'llfft the leads are in ffcct unflarfcizad. They slfould be at least 3-oifpht size to handle the full field currant poiaible unde~ high load/
transient conditions. Tld.s vas confirned on the D/G units vendor prints but tive A/E instff33Iitiori draciinps incorrectly specified tice fI6 wtrei This affects the lonp terfff reliability of the D/G units.
Hovever,     it   sho>>ld be, noted that the A D/G wiring shof.cd darage only af ter 0 years of operation and 3 sti) 1 shows noffe. Also on 3/l6/SQ the integrated safeguards/Diesa) generator test was and both units accepted the loading sequence and (partial),
per-.'or".~cd load refection and restart, per the. applicable Tcchniea1 Specificati ons,
  .oi rective Action:
1 5'>>   The f&#xc3;e3d l.eadff     5:ill be im.".ediately replaced on at lefist" I D/G                                                 Due g'" to the size of the installed conduit                           it r:n>- be necessary to do this in a t'ai,porary r:armer. The perrfanent fix will be persued initially
              ~i on an erpidf-ted basis so the D/G cfcn be returned to full operability L
the Technical Specifications. The schedule for thip cannot be                                                                   'er acaiirately estimated at this tif..e. A}so, other design by the indi"iduals involved will be investigated but the. details, scope
                    .and schcdulc are currently unl'.nown V
I                                       ~       ~ ~
g 8004030                                 I     6'Q
                  "   . "<<~'~g~'g~tgg~-RKUlgg.A. S~f
                          ~                            'g 'SfC7 ~Aggg,.ggggggfg!ggggggg   Lm H E L P I tV G f3 I/
ggggFVAANAf~rr "A~p//gW// g                 0
                                                                                                                                            ~
I f,. D ~
g 5fg,5ggg'eV5 t 0 TI 5 g ~
I O6
                                                                                                                                                                            -.e'g}}

Latest revision as of 10:04, 4 February 2020

RO 335-80-13:on 800314,while Plant Was in Cold Shutdown, Field Leads to Excitors on Both Diesel Generator Units Were Found Undersized.Caused by Design Error.Field Leads Will Be Replaced & Permanent Repair Studied
ML17266A160
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/17/1980
From: Wethy C
FLORIDA POWER & LIGHT CO.
To:
References
NUDOCS 8004030167
Download: ML17266A160 (2)


Text

.-

ak. 894 P.O. OOX 5ZG, FT. PIP fICP., FL 3345(

~::epics To.'I;IH', JHB, CAQ, G'.1V, MZ

t. 0'+ii<"
.F,fsitc: AIIS, Jaa, CQl~, >~S,.RZuENu

~~w l. ~ <ffV g ygfffltlfI 'SLORIfffl PO'A'Eff IL UGHT Ca VPW Io+ Ifr, J. P. O'Railly, Director Kegiorf Tl gQN Uffice of Xnspection and Enforcef",.i'nt 'cb 17~ 1980 U. ST Nuclear Pcgulatory Co~issioT5.

Atlanta, Georgia 30303 rG. II. Vetlqr, Plant Manager YoTi+ y

t. Lucie Plant DPK 67 4y-" -f C:

gloxida Power 6 Lip'tft Cotlpany Ififcmi, l'lorida Lb)eat: k>UHO FOK FACSI'.IILE.'ERAIlSNISSiO." To Co".PIRIf PRO'=IPT REPO.".TABLP.

90 OCCUR)'1'llf'F. 335-80-l3 0 ~P5 I lg C)

Diesel Generator 'Field hiring Error ~ ~ - 3f")

u),;

."5 qir 5 One to a. design,error the field .'l.aads, to the cffcitors on both 0 units are undersized; The. pl.ant vaa in cold shutdufw when this was discovered.

i'aI i' ~

'On 3/14/80 tile D/G's vere run at design load for surveil?fiYice tasting., "A" D/G woulcl not accept full design load. During investioation of this proble;ii it was noted that the firld leads vere hot and thon, that the in"ulation was burnt. The leads wire) vere replaced and tha "A" D/G then accepted fulL '86 design load, The leads cn "8" D/G frere inspected and no daf.".agc cr I5igk teu'.perature fo',ind. 'lbs. engineering departrent vas asked to eva5uate thc problaf.-i ~ On. 3/L5/80 tha plant co~.".enced shut-dof'n and coal dovn for refueling."

On'/17/8Q (Ikoffday) at about 1,0500 ÃI, engineering reported t'llfft the leads are in ffcct unflarfcizad. They slfould be at least 3-oifpht size to handle the full field currant poiaible unde~ high load/

transient conditions. Tld.s vas confirned on the D/G units vendor prints but tive A/E instff33Iitiori draciinps incorrectly specified tice fI6 wtrei This affects the lonp terfff reliability of the D/G units.

Hovever, it sho>>ld be, noted that the A D/G wiring shof.cd darage only af ter 0 years of operation and 3 sti) 1 shows noffe. Also on 3/l6/SQ the integrated safeguards/Diesa) generator test was and both units accepted the loading sequence and (partial),

per-.'or".~cd load refection and restart, per the. applicable Tcchniea1 Specificati ons,

.oi rective Action:

1 5'>> The fÃe3d l.eadff 5:ill be im.".ediately replaced on at lefist" I D/G Due g'" to the size of the installed conduit it r:n>- be necessary to do this in a t'ai,porary r:armer. The perrfanent fix will be persued initially

~i on an erpidf-ted basis so the D/G cfcn be returned to full operability L

the Technical Specifications. The schedule for thip cannot be 'er acaiirately estimated at this tif..e. A}so, other design by the indi"iduals involved will be investigated but the. details, scope

.and schcdulc are currently unl'.nown V

I ~ ~ ~

g 8004030 I 6'Q

" . "<<~'~g~'g~tgg~-RKUlgg.A. S~f

~ 'g 'SfC7 ~Aggg,.ggggggfg!ggggggg Lm H E L P I tV G f3 I/

ggggFVAANAf~rr "A~p//gW// g 0

~

I f,. D ~

g 5fg,5ggg'eV5 t 0 TI 5 g ~

I O6

-.e'g