RO 335-80-13:on 800314,while Plant Was in Cold Shutdown, Field Leads to Excitors on Both Diesel Generator Units Were Found Undersized.Caused by Design Error.Field Leads Will Be Replaced & Permanent Repair Studied
ML17266A160
Person / Time
Site: Saint Lucie 
Issue date: 03/17/1980
From: Wethy C
FLORIDA POWER & LIGHT CO.
To:
References
NUDOCS 8004030167
Download: ML17266A160 (2)


Text

.- ak.

894 P.O. OOX 5ZG, FT. PIP fICP., FL 3345(

Io+

Ifr, J.

P. O'Railly, Director Kegiorf Tl Uffice of Xnspection and Enforcef",.i'nt U.

ST Nuclear Pcgulatory Co~issioT5.

Atlanta, Georgia 30303

~::epics To.'I;IH', JHB,

CAQ, G'.1V, MZ
.F,fsitc:

AIIS, Jaa, CQl~, >~S,.RZuENu

t. 0'+ii<"~~w l.

g ygfffltlfI

'SLORIffflPO'A'Eff IL UGHT gQN

'cb 17~

1980

~ <ffV Ca VPW 4y-"

rG. II. Vetlqr, Plant Manager

t. Lucie Plant DPK 67 gloxida Power 6 Lip'tft Cotlpany Ififcmi, l'lorida Lb)eat:

k>UHO FOK FACSI'.IILE.'ERAIlSNISSiO." To Co".PIRIf PRO'=IPT REPO.".TABLP.

. OCCUR)'1'llf'F. 335-80-l3 0

I Diesel Generator 'Field hiring Error

~ ~

One to a. design,error the field.'l.aads, to the cffcitors on both 0 units are undersized; The. pl.ant vaa in cold shutdufw when this was discovered.

I i'a i'

~

'On 3/14/80 tile D/G's vere run at design load for surveil?fiYice tasting., "A" D/G woulcl not accept full design load.

During investioation of this proble;ii it was noted that the firld leads vere hot and thon, that the in"ulation was burnt.

The leads

'86 wire) vere replaced and tha "A" D/G then accepted fulL design load, The leads cn "8" D/G frere inspected and no daf.".agc cr I5igk teu'.perature fo',ind.

'lbs. engineering departrent vas asked to eva5uate thc problaf.-i ~

On. 3/L5/80 tha plant co~.".enced shut-dof'n and coal dovn for refueling."

On'/17/8Q (Ikoffday) at about 1,0500 ÃI, engineering reported t'llfft the leads are in ffcct unflarfcizad.

They slfould be at least 3-oifpht size to handle the full field currant poiaible unde~ high load/

transient conditions.

Tld.s vas confirned on the D/G units vendor prints but tive A/E instff33Iitiori draciinps incorrectly specified tice fI6 wtrei This affects the lonp terfff reliability of the D/G units.

Hovever, it sho>>ld be, noted that the A D/G wiring shof.cd darage only af ter 0 years of operation and 3 sti) 1 shows noffe.

Also on 3/l6/SQ the integrated safeguards/Diesa) generator test was per-.'or".~cd and both units accepted the loading sequence and (partial),

load refection and restart, per the. applicable Tcchniea1 Specificati YoTi+y

-fC:

90

~P5 lg C)

- 3f")

u),;

."5 qir 5

ons,

.oi rective Action:

1 5'>> The fÃe3d l.eadff 5:ill be im.".ediately replaced on at lefist" I D/G Due g'" to the size of the installed conduit it r:n>- be necessary initially to do this in a t'ai,porary r:armer.

The perrfanent fix will be persued L~i on an erpidf-ted basis so the D/G cfcn be returned to full operability

'er the Technical Specifications.

The schedule for thip cannot be acaiirately estimated at this tif..e.

A}so, other design by the indi"iduals involved will be investigated but the. details, scope

.and schcdulc are currently unl'.nown V g I

~

~ ~