.- ak.
894 P.O. OOX 5ZG, FT. PIP fICP., FL 3345(
Io+
Ifr, J.
P. O'Railly, Director Kegiorf Tl Uffice of Xnspection and Enforcef",.i'nt U.
ST Nuclear Pcgulatory Co~issioT5.
Atlanta, Georgia 30303
~::epics To.'I;IH', JHB,
- CAQ, G'.1V, MZ
- .F,fsitc:
AIIS, Jaa, CQl~, >~S,.RZuENu
- t. 0'+ii<"~~w l.
g ygfffltlfI
'SLORIffflPO'A'Eff IL UGHT gQN
'cb 17~
1980
~ <ffV Ca VPW 4y-"
rG. II. Vetlqr, Plant Manager
- t. Lucie Plant DPK 67 gloxida Power 6 Lip'tft Cotlpany Ififcmi, l'lorida Lb)eat:
k>UHO FOK FACSI'.IILE.'ERAIlSNISSiO." To Co".PIRIf PRO'=IPT REPO.".TABLP.
. OCCUR)'1'llf'F. 335-80-l3 0
I Diesel Generator 'Field hiring Error
~ ~
One to a. design,error the field.'l.aads, to the cffcitors on both 0 units are undersized; The. pl.ant vaa in cold shutdufw when this was discovered.
I i'a i'
~
'On 3/14/80 tile D/G's vere run at design load for surveil?fiYice tasting., "A" D/G woulcl not accept full design load.
During investioation of this proble;ii it was noted that the firld leads vere hot and thon, that the in"ulation was burnt.
The leads
'86 wire) vere replaced and tha "A" D/G then accepted fulL design load, The leads cn "8" D/G frere inspected and no daf.".agc cr I5igk teu'.perature fo',ind.
'lbs. engineering departrent vas asked to eva5uate thc problaf.-i ~
On. 3/L5/80 tha plant co~.".enced shut-dof'n and coal dovn for refueling."
On'/17/8Q (Ikoffday) at about 1,0500 ÃI, engineering reported t'llfft the leads are in ffcct unflarfcizad.
They slfould be at least 3-oifpht size to handle the full field currant poiaible unde~ high load/
transient conditions.
Tld.s vas confirned on the D/G units vendor prints but tive A/E instff33Iitiori draciinps incorrectly specified tice fI6 wtrei This affects the lonp terfff reliability of the D/G units.
Hovever, it sho>>ld be, noted that the A D/G wiring shof.cd darage only af ter 0 years of operation and 3 sti) 1 shows noffe.
Also on 3/l6/SQ the integrated safeguards/Diesa) generator test was per-.'or".~cd and both units accepted the loading sequence and (partial),
load refection and restart, per the. applicable Tcchniea1 Specificati YoTi+y
-fC:
90
~P5 lg C)
- 3f")
u),;
."5 qir 5
- ons,
.oi rective Action:
1 5'>> The fÃe3d l.eadff 5:ill be im.".ediately replaced on at lefist" I D/G Due g'" to the size of the installed conduit it r:n>- be necessary initially to do this in a t'ai,porary r:armer.
The perrfanent fix will be persued L~i on an erpidf-ted basis so the D/G cfcn be returned to full operability
'er the Technical Specifications.
The schedule for thip cannot be acaiirately estimated at this tif..e.
A}so, other design by the indi"iduals involved will be investigated but the. details, scope
.and schcdulc are currently unl'.nown V g I
~
~ ~