ML17209A978: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17209A978
| number = ML17209A978
| issue date = 07/28/2017
| issue date = 07/28/2017
| title = Sequoyah 2016301 - Draft Administrative Documents
| title = Draft Administrative Documents
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-401 PWR Examination Outline Form ES-401-2 SequoyahMarch, 2016
{{#Wiki_filter:ES-401                                     PWR Examination Outline                                     Form ES-401-2 Facility: Sequoyah                                                Date of Exam: March, 2016 RO K/A Category Points                                SRO-Only Points Tier          Group K    K  K  K    K  K    A    A  A    A    G*                A2            G*      Total 1    2  3  4    5    6  1    2    3    4          Total
: 1.              1        3    3  3                3    3              3      18          3            3        6 Emergency &
Abnormal            2        2    1  2      N/A        1    1    N/A      2      9          2            2        4 Plant Evolutions    Tier Totals    5    4  5                4    4              5      27          5            5        10 1        2    3  3  3    3    3  2    2    3    2    2      28          2            3        5 2.
Plant            2        1    1  1  1    1    1  1    1    0    1    1      10      1    -          2        3 Systems Tier Totals    3    4  4  4    4    4  3    3    3    3    3      38          3            5        8
: 3. Generic Knowledge and Abilities            1        2        3          4        10      1    2      3    4      7 Categories 2        2        3          3                  1    2      2    2 Note:    1. Ensure that at least two topics from every applicable K/A category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the Tier Totals in each K/A category shall not be less than two). (One Tier 3 Radiation Control K/A is allowed if the K/A is replaced by a K/A from another Tier 3 Category).
: 2. The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
: 3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted with justification; operationally important, site-specific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate K/A statements.
: 4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
: 5. Absent a plant-specific priority, only those K/As having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
: 6. Select SRO topics for Tiers 1 and 2 from the shaded systems and K/A categories.
: 7. The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable K/As.
: 8. On the following pages, enter the K/A numbers, a brief description of each topic, the topics importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in a category other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.
: 9. For Tier 3, select topics from Section 2 of the K/A catalog, and enter the K/A numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to K/As that are linked to 10 CFR 55.43.
G*    Generic K/As


ES-401 2 Form ES-401-2  
ES-401                                                         2                                         Form ES-401-2 ES-401                                                PWR Examination Outline                                              Form ES-401-2 Emergency and Abnormal Plant Evolutions - Tier 1/Group 1 (RO / SRO)
E/APE # / Name / Safety Function              K  K  K  A  A2      G*                      K/A Topic(s)                      IR    #
1  2  3  1 000007 (BW/E02&E10; CE/E02) Reactor              X                        007EK2.03; Knowledge of the interrelations          3.5 Trip - Stabilization - Recovery / 1                                        between a reactor trip and the following:
Reactor trip status panel.
X      007EG2.4.6; Knowledge of EOP mitigation            4.7 strategies.
000008 Pressurizer Vapor Space                                    X      008AG2.4.14; Knowledge of general                  4.5 Accident / 3                                                              guidelines for EOP usage.
000009 Small Break LOCA / 3                      X                        009EK2.03; Knowledge of the interrelations          3.0 between the small break LOCA and the following: S/Gs.
000011 Large Break LOCA / 3                                X              011EA2.06; Ability to determine or interpret        4.0 the following as they apply to a Large Break LOCA: That fan is in slow speed and dampers are in accident mode during LOCA.
000015/17 RCP Malfunctions / 4                      X                      015AK3.03; Knowledge of the reasons for the        3.7 following responses as they apply to the Reactor Coolant Pump Malfunctions (Loss of RC Flow): Sequence of events for manually tripping reactor and RCP as a result of an RCP malfunction.
000022 Loss of Rx Coolant Makeup / 2                              X      022AG2.2.4; (multi-unit license) Ability to        3.6 explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at al facility.
000025 Loss of RHR System / 4                X                            025AK1.01; Knowledge of the operational            3.9 implications of the following concepts as they apply to Loss of Residual Heat Removal System: Loss of RHRS during all modes of operation.
000026 Loss of Component Cooling                          X              026AA2.01; Ability to determine and interpret      2.9 Water / 8                                                                  the following as they apply to the Loss of Component Cooling Water: Location of a leak in the CCWS.
000027 Pressurizer Pressure Control                                X      027AG2.1.7; Ability to evaluate plant              4.4 System Malfunction / 3                                                    performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
000029 ATWS / 1                                  X                        029EK2.06; Knowledge of the interrelations          2.9 between the following and an ATWS:
Breakers, relays, and disconnects.
000038 Steam Gen. Tube Rupture / 3                                X      038EG2.1.23; Ability to perform specific            4.4 system and integrated plant procedures during all modes of plant operation.
000040 (BW/E05; CE/E05; W/E12)                            X              040AA2.04; Ability to determine and interpret      4.7 Steam Line Rupture - Excessive Heat                                        the following as they apply to the Steam Line Transfer / 4                                                              Rupture: Conditions requiring ESFAS initiation.
000054 (CE/E06) Loss of Main                            X                  054AA1.04; Ability to operate and / or monitor      4.4 Feedwater / 4                                                              the following as they apply to the Loss of Main Feedwater (MFW): HPI, under total feedwater loss conditions.
000055 Station Blackout / 6                            X                  055EA1.07; Ability to operate and monitor the      4.3 following as they apply to a Station Blackout:
Restoration of power from offsite.
000056 Loss of Off-site Power / 6                          X              056AA2.56; Ability to determine and interpret      3.7 the following as they apply to the Loss of Offsite Power: RCS T-ave.
000057 Loss of Vital AC Inst. Bus / 6                      X              057AA2.08; Ability to determine and interpret      3.4 the following as they apply to the Loss of Vital AC Instrument Bus: Reactor power digital display and remote flux meter.


ES-401 3 Form ES-401-2
000058 Loss of DC Power / 6                      X        058AA1.02; Ability to operate and / or monitor  3.1 the following as they apply to the Loss of DC Power: Static inverter dc input breaker, frequency meter, ac output breaker, and ground fault detector.
000062 Loss of Nuclear Svc Water / 4                  X  062AG2.4.47; Ability to diagnose and            4.2 recognize trends in an accurate and timely manner utilizing the appropriate control room reference material.
000065 Loss of Instrument Air / 8                  X      065AA2.07; Ability to determine and interpret    2.8 the following as they apply to the Loss of Instrument Air: Whether backup nitrogen supply is controlling valve position.
W/E04 LOCA Outside Containment / 3        X              WE04EK1.2; Knowledge of the operational          3.5 implications of the following concepts as they apply to the (LOCA Outside Containment):
Normal, abnormal and emergency operating procedures associated with (LOCA Outside Containment).
W/E11 Loss of Emergency Coolant                X          WE11EK3.2; Knowledge of the reasons for          3.5 Recirc. / 4                                                the following responses as they apply to the (Loss of Emergency Coolant Recirculation):
Normal, abnormal and emergency operating procedures associated with (Loss of Emergency Coolant Recirculation).
BW/E04; W/E05 Inadequate Heat              X              WE05EK1.1; Knowledge of the operational          3.8 Transfer - Loss of Secondary Heat Sink / 4                implications of the following concepts as they apply to the (Loss of Secondary Heat Sink):
Components, capacity, and function of emergency systems.
000077 Generator Voltage and Electric          X          077AK3.01; Knowledge of the reasons for the      3.9 Grid Disturbances / 6                                      following responses as they apply to Generator Voltage and Electric Grid Disturbances: Reactor and turbine trip criteria.
K/A Category Totals:                      3 3 3 3 3/3 3/3 Group Point Total:                                  18/6


ES-401 4 Form ES-401-2  
ES-401                                                         3                                                    Form ES-401-2 ES-401                                            PWR Examination Outline                                              Form ES-401-2 Emergency and Abnormal Plant Evolutions - Tier 1/Group 2 (RO / SRO)
E/APE # / Name / Safety Function                  K  K  K  A  A2      G*                    K/A Topic(s)                IR    #
1  2  3  1 000001 Continuous Rod Withdrawal / 1 000003 Dropped Control Rod / 1 000005 Inoperable/Stuck Control Rod / 1                                  X      005AG2.4.21; Knowledge of the              4.6 parameters and logic used to assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity, containment conditions, radioactivity release control, etc.
000024 Emergency Boration / 1                                            X      024AG2.1.31; Ability to locate control    4.6 room switches, controls, and indications, and to l determine that they correctly reflect the desired plant lineup.
000028 Pressurizer Level Malfunction / 2          X                              028AK1.01; Knowledge of the physical      2.5 connections and/or cause-effect relationships between the HRPS and the following systems: Containment annulus ventilation system (including pressure limits).
000032 Loss of Source Range NI / 7                              X                032AA2.09; Ability to determine and        2.9 interpret the following as they apply to the Loss of Source Range Nuclear Instrumentation: Effect of improper HV setting.
000033 Loss of Intermediate Range NI / 7 000036 (BW/A08) Fuel Handling Accident / 8        X                              036AK1.02; Knowledge of the                3.4 operational implications of the following concepts as they apply to Fuel Handling Incidents: SDM.
000037 Steam Generator Tube Leak / 3                            X                037AA2.12; Ability to determine and        3.3 interpret the following as they apply to a steam Generator Tube Leak: Flow rate of leak.
000051 Loss of Condenser Vacuum / 4                                      X        051AG2.1.34 Knowledge of primary          3.5 and secondary plant chemistry limits.
000059 Accidental Liquid Radwaste Rel. / 9 000060 Accidental Gaseous Radwaste Rel. / 9          X                          060AK2.01; Knowledge of the                2.6 interrelations between the Accidental Gaseous Radwaste Release and the following: ARM system, including the normal radiation-level indications and the operability status.
000061 ARM System Alarms / 7                                  X                  061AA1.01; Ability to operate and / or    3.1 monitor the following as they apply to the Loss of Nuclear Service Water (SWS): Nuclear service water temperature indications.
000067 Plant Fire On-site / 8 000068 (BW/A06) Control Room Evac. / 8 000069 (W/E14) Loss of CTMT Integrity / 5 000074 (W/E06&E07) Inad. Core Cooling / 4 000076 High Reactor Coolant Activity / 9                  X                      076AK3.06; Knowledge of the reasons        3.2 for the following responses as they apply to the High Reactor Coolant activity: Actions contained in EOP for high reactor coolant activity.
W/EO1 & E02 Rediagnosis & SI Termination / 3 W/E13 Steam Generator Over-pressure / 4 W/E15 Containment Flooding / 5


ES-401 5 Form ES-401-2  
W/E16 High Containment Radiation / 9                X      WE16EA2.1; Ability to determine and      3.3 interpret the following as they apply to the (High Containment Radiation):
Facility conditions and selection of appropriate procedures during abnormal and emergency operations.
BW/A01 Plant Runback / 1 BW/A02&A03 Loss of NNI-X/Y / 7 BW/A04 Turbine Trip / 4 BW/A05 Emergency Diesel Actuation / 6 BW/A07 Flooding / 8 BW/E03 Inadequate Subcooling Margin / 4 BW/E08; W/E03 LOCA Cooldown - Depress. / 4 BW/E09; CE/A13; W/E09&E10 Natural Circ. / 4            X  WE10EG2.4.20; Knowledge of the            3.8 operational implications of EOP warnings, cautions, and notes.
BW/E13&E14 EOP Rules and Enclosures CE/A11; W/E08 RCS Overcooling - PTS / 4        X          WE08EK3.4; Knowledge of the              3.4 reasons for the following responses as they apply to the (Pressurized Thermal Shock): RO or SRO function within the control room team as appropriate to the assigned position, in such a way that procedures are adhered to and the limitations in the facilitys license and amendments are not violated.
CE/A16 Excess RCS Leakage / 2 CE/E09 Functional Recovery K/A Category Point Totals:                  2 1 2 1 1/2 2/2 Group Point Total:                            9/4


ES-401 Generic Knowledge and Abilities Outline (Tier 3)
ES-401                                                       4                                                  Form ES-401-2 ES-401                                        PWR Examination Outline                                              Form ES-401-2 Plant Systems - Tier 2/Group 1 (RO / SRO)
Form ES-401-3SequoyahMarch, 2016
System # / Name                  K K K K    K  K  A  A2      A  A    G*                K/A Topic(s)                  IR    #
1 2 3 4    5  6  1          3  4 003 Reactor Coolant Pump                                              X      003G2.2.36; Ability to analyze the        3.1 effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations.
X                    003A2.04; Ability to (a) predict the      2.8 impacts of the following malfunctions or operations on the RCPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Effects of fluctuation of VCT pressure on RCP seal injection flow.
004 Chemical and Volume                        X                            004K6.27; Knowledge of the effect          3.4 Control                                                                      of a loss or malfunction on the following CVCS components:
Purpose of RHR relief and isolation valves.
X                                004K5.09; Knowledge of the                3.7 operational implications of the following concepts as they apply to the CVCS: Thermal shock: high component stress due to rapid temperature change.
005 Residual Heat Removal                  X                                005K5.05; Knowledge of the                2.7 operational implications of the following concepts as they apply the RHRS: Plant response during "solid plant": pressure change due to the relative incompressibility of water.
006 Emergency Core Cooling                            X                    006A2.05; Ability to (a) predict the      3.4 impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper amperage to the pump motor.
X                            006K6.18; Knowledge of the effect          3.6 of a loss or malfunction on the following will have on the ECCS:
Subcooling margin indicators.
007 Pressurizer Relief/Quench              X                                007K5.02; Knowledge of the                3.1 Tank                                                                        operational implications of the following concepts as they apply to PRTS: Method of forming a steam bubble in the PZR.
008 Component Cooling Water                                    X            008A3.08; Ability to monitor              3.6 automatic operation of the CCWS, Including: Automatic actions associated with the CCWS that occur as a result of a safety injection signal.
010 Pressurizer Pressure Control  X                                        010K2.01; Knowledge of bus power          3.0 supplies to the following: PZR heaters.
X      010G2.1.32; Ability to explain and        4.0 apply system limits and precautions.


ES-401 Record of Rejected K/As Form ES-401-4 Tier / Group Randomly Selected K/A Reason for Rejection 1/1 022G2.4.14 Overselected. Replaced by 08AG2.4.14.
012 Reactor Protection        X              012K1.05; Knowledge of the            3.8 physical connections and/or cause effect relationships between the RPS and the following systems:
1/1 WE12EK2.2 Overselected.
ESFAS.
Replaced by 029E2.0. 1/2 005AK1.06 Overselected. Replaced by 028AK1.01.
X    012A2.04; Ability to (a) predict the  3.1 impacts of the following malfunctions or operations on the RPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Erratic power supply operation.
1/2 051AA2.02 Overselected. Replaced by 0 37AA2.12. 1/2 61AA2.02 Overselected. Replaced by WE16EA2.1.
013 Engineered Safety Features            X  013A4.01; Ability to manually        4.5 Actuation                                      operate and/or monitor in the control room: ESFAS-initiated equipment which fails to actuate.
2/1 003K6.01 Overselected. Replaced by 061K6.01.
X            013K3.03; Knowledge of the effect    4.4 that a loss or malfunction of the ESFAS will have on the following:
2/1 005K5.09 Overselected. Replaced by 004K5.09.
Fuel.
2/1 062K3.01 Overselected. Replaced by 0 22K3.02. 2/1 078G2.1.27 Unable to write to SRO level. Replaced by 059G2.1.43.
022 Containment Cooling            X          022K4.05; Knowledge of CCS            2.6 design feature(s) and/or interlock(s) which provide for the following:
2/2 015G2.4.1 Unable to write to SRO level. Replaced by 014G2.1.. 2/2 068A3.01 Equipment not used. Replaced with 072A3.01.
Containment cooling after LOCA destroys ventilation ducts.
1/2 024AG2.1.3 Unable to write an operationally valid question. Replaced with 024AG2.1.31.
X            022K3.02; Knowledge of the effect    2.9 that a loss or malfunction of the CCS will have on the following:
1/2 051AG2.4.9 Unable to write an operationally valid question. Replaced with 0 51AG2.1.34.
Containment instrumentation readings.
ES-301 Administrative Topics Outline Form ES-301-1 A.1.a A.1.b A.2 A.3  A.4 
025 Ice Condenser 026 Containment Spray                  X      026A1.04; Ability to predict and/or  3.1 monitor changes in parameters (to prevent exceeding design limits) associated with operating the CSS controls including: Containment humidity.
039 Main and Reheat Steam      X              039K1.05; Knowledge of the            2.5 physical connections and/or cause-effect relationships between the MRSS and the following systems:
T/G.
X          039K4.02; Knowledge of MRSS          3.1 design feature(s) and/or interlock(s) which provide for the following:
Utilization of T-ave. program control when steam dumping through atmospheric relief/dump valves, including T-ave. limits.
059 Main Feedwater                          X 059G2.1.32; Ability to explain and    3.8 apply system limits and precautions.
X 059G2.1.43; Ability to use            4.3 procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc.
061 Auxiliary/Emergency          X            061K3.01; Knowledge of the effect    4.4 Feedwater                                      that a loss or malfunction of the AFW will have on the following:
RCS.
X        061K6.01; Knowledge of the effect    2.5 of a loss or malfunction of the following will have on the AFW components: Controllers and positioners.


ES-301 Administrative Topics Outline Form ES-301-1 A.1.a   
062 AC Electrical Distribution                    X      062A3.04; Ability to monitor          2.7 automatic operation of the ac distribution system, including:
Operation of inverter (e.g.,
precharging synchronizing light, static transfer).
X  062G2.2.38; Knowledge of              4.5 conditions and limitations in the facility license.
063 DC Electrical Distribution                      X    063A4.01; Ability to manually        2.8 operate and/or monitor in the control room: Major breakers and control power fuses.
064 Emergency Diesel Generator    X                      064K2.02; Knowledge of bus power      2.8 supplies to the following: Fuel oil pumps.
073 Process Radiation Monitoring            X            073A1.01; Ability to predict and/or  3.2 monitor changes in parameters (to prevent exceeding design limits) associated with operating the PRM system controls including: Radiation levels.
076 Service Water                              X          076A2.01; Ability to (a) predict the 3.5 impacts of the following malfunctions or operations on the SWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of SWS.
078 Instrument Air                X                      078K2.02; Knowledge of bus power      3.3 supplies to the following: Emergency air compressor.
078K4.01; Knowledge of IAS design    2.7 X                  feature(s) and/or interlock(s) which provide for the following:
Manual/automatic transfers of control.
103 Containment                                    X      103A3.01; Ability to monitor          3.9 automatic operation of the containment system, including:
Containment isolation.
K/A Category Point Totals:      2 3 3 3 3 3 2 2/2 3 2 2/3 Group Point Total:                        28/5


A.1.b A.2 A.3 A.4
ES-401                                                    5                                                  Form ES-401-2 ES-401                                      PWR Examination Outline                                            Form ES-401-2 Plant Systems - Tier 2/Group 2 (RO / SRO)
System # / Name                K K K K  K  K  A   A2      A  A    G*                  K/A Topic(s)                IR    #
1 2 3 4  5  6  1            3  4 001 Control Rod Drive                                                X      001G2.4.6; Knowledge of EOP              4.7 mitigation strategies.
002 Reactor Coolant                X                                      002K3.03; Knowledge of the effect        4.2 that a loss or malfunction of the RCS will have on the following:
Containment.
011 Pressurizer Level Control                        X                      011A2.03; Ability to (a) predict the      3.8 impacts of the following malfunctions or operations on the PZR LCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of PZR level.
014 Rod Position Indication                                          X      014G2.1.45; Ability to identify and      4.3 interpret diverse indications to validate the response of another indication.
015 Nuclear Instrumentation      X                                        015K2.01; Knowledge of bus power          3.3 supplies to the following: NIS channels, components, and interconnections.
016 Non-Nuclear Instrumentation 017 In-Core Temperature Monitor X                                          017K1.01; Knowledge of the physical      3.2 connections and/or cause-effect relationships between the ITM system and the following systems:
Plant computer.
027 Containment Iodine Removal 028 Hydrogen Recombiner and                      X                          028A1.02; Ability to predict and/or      3.4 Purge Control                                                              monitor changes in parameter (to prevent exceeding design limits) associated with operating the HRPS controls including: Containment pressure.
029 Containment Purge 033 Spent Fuel Pool Cooling 034 Fuel Handling Equipment                                          X      034G2.4.30; Knowledge of events          2.7 related to system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.
035 Steam Generator 041 Steam Dump/Turbine Bypass                X                            041K6.03; Knowledge of the effect of      2.7 Control                                                                    a loss or malfunction on the following will have on the SDS: Controller and positioners, including ICS, S/G, CRDS.
045 Main Turbine Generator                X                                045K5.23; Knowledge of the                2.7 operational implications of the following concepts as they apply to the MT/B System: Relationship between rod control and RCS boron concentration during T/G load increases.
055 Condenser Air Removal


ES-301 Control Room/In
056 Condensate                              X          056A2.04; Ability to (a) predict the  2.6 impacts of the following malfunctions or operations on the Condensate System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of condensate pumps.
-Plant Systems Outline Form ES-301-2  
068 Liquid Radwaste 071 Waste Gas Disposal 072 Area Radiation Monitoring                    X    072A3.01; Ability to monitor          2.9 automatic operation of the ARM system, including: Changes in ventilation alignment.
: a. b. c. d.
075 Circulating Water 079 Station Air                    X                  079K4.01; Knowledge of SAS design    2.9 feature(s) and/or interlock(s) which provide for the following: Cross-connect with IAS.
: e. f. g. h. i. j.  
086 Fire Protection K/A Category Point Totals:   1 1 1 1 1 1 1 1/1 0 1 1/2 Group Point Total:                       10/3
: k.
ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2  
: a. b. c.  
: d.  
: e.  
: f.  
: g.  
: h.
: i. j. k.


ES-301 Control Room/In
ES-401                    Generic Knowledge and Abilities Outline (Tier 3)                    Form ES-401-3 Facility: Sequoyah                                  Date of Exam: March, 2016 Category          K/A #                              Topic                          RO        SRO-Only IR    #    IR    #
-Plant Systems Outline Form ES-301-2  
Knowledge of the purpose and function of major 2.1.28                                                        4.1 system components and controls.
: a. b. c. d. e.  
: 1.                2.1.42  Knowledge of new and spent fuel movement              2.5 Conduct of                  procedures.
: f.  
Operations        2.1.30  Ability to locate and operate components, including                4.0 local controls.
: g. h. i.  
Subtotal                                                              2          1 Knowledge of < to one hour Technical Specification 2.2.39                                                        3.9 action statements for systems.
: j. k.}}
2.2.43  Knowledge of the process used to track inoperable    3.0 alarms.
2.
Equipment          2.2.5    Knowledge of the process for making design or                      3.2 Control                    operating changes to the facility.
2.2.14  Knowledge of the process for controlling equipment                4.3 configuration or status.
Subtotal                                                              2          2 2.3.4    Knowledge of radiation exposure limits under          3.2 normal or emergency conditions.
2.3.11  Ability to control radiation releases.                3.8 Knowledge of radiological safety principles 2.3.12                                                        3.2 pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation 3.
areas, aligning filters, etc.
Radiation Control            2.3.6    Ability to approve release permits.                                3.8 Knowledge of radiological safety procedures 2.3.13                                                                      3.8 pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.
Subtotal                                                              3          2 Knowledge of facility protection requirements, 2.4.26                                                        3.1 including fire brigade and portable fire-fighting equipment usage.
: 4.                2.4.29  Knowledge of the emergency plan.                      3.1 Emergency          2.4.46  Ability to verify that the alarms are consistent with 4.2 Procedures /                the plant conditions.
Plan 2.4.14  Knowledge of general guidelines for EOP usage.                    4.5 2.4.19  Knowledge of EOP layout, symbols, and icons.                      4.1 Subtotal                                                              3          2 Tier 3 Point Total                                                                      10          7
 
Initial rejection list following review with licensee ES-401                        Record of Rejected K/As                  Form ES-401-4 Tier /    Randomly                              Reason for Rejection Group    Selected K/A 1/1    022G2.4.14          Overselected. Replaced by 08AG2.4.14.
1/1    WE12EK2.2          Overselected. Replaced by 029EK2.06.
1/2    005AK1.06          Overselected. Replaced by 028AK1.01.
1/2    051AA2.02          Overselected. Replaced by 037AA2.12.
1/2    061AA2.02          Overselected. Replaced by WE16EA2.1.
2/1    003K6.01            Overselected. Replaced by 061K6.01.
2/1    005K5.09            Overselected. Replaced by 004K5.09.
2/1    062K3.01            Overselected. Replaced by 022K3.02.
2/1    078G2.1.27          Unable to write to SRO level. Replaced by 059G2.1.43.
2/2    015G2.4.1          Unable to write to SRO level. Replaced by 014G2.1.45.
2/2    068A3.01            Equipment not used. Replaced with 072A3.01.
1/2    024AG2.1.3          Unable to write an operationally valid question.
Replaced with 024AG2.1.31.
1/2    051AG2.4.9          Unable to write an operationally valid question.
Replaced with 051AG2.1.34.
 
ES-301                            Administrative Topics Outline                          Form ES-301-1 Facility: Sequoyah Nuclear Station 1 & 2                            Date of Examination: 3/7/2016 Exam Level: RO        SRO                                        Operating Test No: 2016-301 Administrative Topic (see          Type                  Describe activity to be performed Note)                Code*
Determine compliance with fatigue management and Conduct of Operations              R, N work hour limits. G 2.1.2 (3.0/4.0)
Calculate required amount and time for emergency Conduct of Operations              R, N boration in preparation for cool down. G 2.1 .25 (2.8)
Equipment Control                  R, N      Evaluate valve stroke testing results. G 2.2.12 (3.0)
Radiation Control                  N/A      Not examined Complete a state notification form and complete an Emergency Procedures/Plan          R, N initial state notification. G 2.4.25 NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
* Type Codes & Criteria:        (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
 
A.1.a The examinee is given the case where two operators are required to be called out for work. The examinee evaluate the work history between five different operators and will determine operator 3 may assume the shift in Unit 1 which is the operating unit and Operator 2 may assume the shift in Unit 2 which is the outage unit. This JPM is a common JPM with the SRO examinees.
A.1.b The examinee is given the case where Unit 1 is making preparations for an Emergency Boration while in MODE 3 and an RCS cool down to 350 degrees. The examinee will determine by looking up from a chart that 6280 gallons from the Boric Acid Tank and calculate a minimum boration time of 125.6 minutes is required for emergency boration prior to initiating the cool down to 350 degrees.
A.2 The examinee will complete and review data from a Section XI Valve Surveillance and determine the following:
* three valves are within the acceptable range.
* two valves are in the alert range.
* one valve is in the required action range.
The examinee will determine the valves not in the acceptable range require subsequent valve strokes. The examinee will determine the valve in the required action range is INOPERABLE.
A.3 Not examined.
A.4 While acting as the Site Communicator and given data for a plant emergency, the examinee will interpret the data and complete the EPIP-3 ALERT Appendix A ALERT INITIAL NOTIFICATION FORM within 15 minutes and perform a State of Tennessee Notification within the following 15 minutes.
 
ES-301                            Administrative Topics Outline                      Form ES-301-1 Facility: Sequoyah Nuclear Station 1 & 2                        Date of Examination: 3/7/2016 Exam Level: RO          SRO                                    Operating Test No: 2016-301 Administrative Topic (see          Type                Describe activity to be performed Note)                Code*
Determine compliance with fatigue management and Conduct of Operations              R, N work hour limits. G 2.1.2 (3.0/4.0)
Evaluate and approve a disabled alarm checklist. G Conduct of Operations              R, N 2.1.1 (3.8)
Evaluate a proposed clearance for the 1B Condensate Equipment Control                  R, N Demineralizer Booster Pump. G 2.2.13 (3.8)
Perform required administrative actions after a Radiation Control                  R, M      Radiation Monitor is removed from service. G 2.3.11 (3.2)
Classify the Event using the EPIP-1 and complete a Emergency Procedures/Plan          R, M TVA INITIAL NOTIFICATION. 2.4.41 (4.6)
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
* Type Codes & Criteria:        (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
 
A.1.a The examinee is given the case where two operators are required to be called out for work. The examinee evaluate the work history between five different operators and will determine operator 3 may assume the shift in Unit 1 which is the operating unit and Operator 2 may assume the shift in Unit 2 which is the outage unit. This JPM is a common JPM with the RO examinees.
A.1.b The examinee will evaluate a completed OPDP-4 Disabled Alarm Checklist, will identify three embedded errors and determine the correct entries for the embedded errors. The examinee will determine the following correct solutions for the embedded errors:
* the source for the annunciator panel XA-55-1A window C-1 is a multi point input and needs to have leads removed to maintain monitoring availability of the other inputs to the SER.
* determines a 50.59 review must be performed prior to disabling alarm.
* determines a technical evaluation must be performed.
A.2 The examinee evaluates the proposed clearance for the 1B Condensate Demineralizer Booster Pump and discovers the following four embedded errors:
* No vent or drain path is provided to establish conditions for work.
* The pump hand switch is tagged instead of the pump motor breaker.
* The discharge valve for the 1B Condensate Booster Pump is tagged instead of the 1B Condensate Demineralizer Booster Pump.
* The suction valve for the 1B Condensate Demineralizer Booster Pump is tagged locally at the MOV instead of the breaker for the MOV.
A.3 The examinee evaluates a work package and determines LCO 3.3.7 condition a must be entered and RM-90-125 is required to be blocked prior to removing RM-90-125 from service.
The examinee subsequently determines the isolation relay for 0-RE-90-125 must be removed prior to unblocking 0-RE-90-125.
A.4 During a dual unit event, the examinee will evaluate plant conditions and classifies the event as a SITE AREA EMERGENCY based on EAL 3.1 within 15 minutes and the examinee completes a TVA Initial Notification for Site Area Emergency form with no errors on items noted with an
* within the subsequent 15 minutes.
 
ES-301                            Control Room/In-Plant Systems Outline                          Form ES-301-2 Facility: Sequoyah Nuclear Station 1 & 2                              Date of Examination: 3/7/2016 Exam Level: RO          SRO-I          SRO-U                        Operating Test No:      2016-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title                                    Type Code*        Safety Function
: a. Withdraw Shutdown Banks. 001 A2.11 (4.4/4.7)                                          L, M, S                  1
: b. Terminate Emergency Boration. 004 A2.14 (3.8/3.9)                                      N, L,S                  2
: c. Align ECCS & CS Pumps to the Containment Sump with a Failure of a                A, EN, L, M, 3
Containment Sump Valve. EPE 011 EA1.11 (4.2/4.2)                                        S
: d. Establish Once Through Cooling by Initiating RCS Bleed and Feed with a Failure of a PORV and Blow Down Steam Generators. EPE E05                  A, L, M, S              4P EA 2.2 (3.7/4.3)
: e. Secure a Main Feed Pump with a Failure of a Main Feed Regulating A, N, S                4S Valve. 059 A4.10 (3.9/3.8)
: f. Perform Post Trip Equipment Checks with a Failure of Slave Relays A, M, S                  5 and EGTS Fans to Start. 103 A4.01 (4.5/4.8)
: g. Perform D/G Load Test on 1A-A D/G with a Subsequent High A, D,S                  6 Crankcase Pressure Alarm. 064 A4.01 (4.0/4.3)
: h. Shift Thermal Barrier Booster Pumps with a Subsequent Leak in the A, L, N, S                8 Component Cooling Water System. APE 026 AA1.05 (3.1/3.1)
In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. Control SG Atmospheric Dump Valves from the Aux CR. APE.068 E, M                  8 AA1.01 (4.3/4.5)
: j. Restore a 125 V Vital Battery Charger I During a Station Blackout. EPE E, N                  6 055 EA1.06 (4.1/4.5)
: k. Re-establish Nonessential AND Essential Control Air to Containment.
D, E, R                  2 004 A2.11 (3.6/4.2)
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                    Criteria for RO / SRO-I / SRO-U (A)lternate path                                                              4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                            9/8/4 (E)mergency or abnormal in-plant                                              1/1/1 (EN)gineered safety feature                                                  1 / 1 /  1 (control room system)
(L)ow-Power / Shutdown                                                        1/1/1 (N)ew or (M)odified from bank including 1(A)                                  2/2/1 (P)revious 2 exams                                                            3 /  3 /  2 (randomly selected)
(R)CA                                                                        1/1/1 (S)imulator
: a. During a reactor startup, the examinee will select and withdraw Shutdown Bank A Control Rods to the fully withdrawn (225 to 231) steps position.
: b. While in MODE 3 and Emergency Boration in progress, the examinee will terminate Emergency Boration using EA EA-68-4, Emergency Boration.
: c. With a LOCA is in progress, the examinee will stop Containment Spray pumps, and complete the alignment for Charging Pump and Safety Injection pump for sump recirculation using ES-1.3 TRANSFER TO RHR CONTAINMENT. While aligning the ECCS pumps, the Containment Sump Valve Isolation FCV-74-3 fails to close. The examinee will use the alternate path to manually close the RHR Pump Suction from RWST FCV-63-1, while maintaining RHR pump flow.
: d. With a Loss of Secondary Heat Sink, RCS Bleed and Feed required in progress, the examinee will start the A Safety Injection pump. The examinee will use the alternate path to open Reactor Vessel Head Vent valves to establish once through cooling. The examinee will subsequently open the A Train Essential Raw Cooling Water valves and depressurize at least one of the intact Steam Generators.
: e. With an AOP-C.03 RAPID SHUTDOWN OR LOAD REDUCTION in progress, the examinee will start to shutdown the B Main Feed Pump. When the shutdown the B Main Feed Pump commences a fault in the #2 SG Feed Regulating valve will occur. The examinee will use the alternate path and take manual control of the #2 SG Feed Regulating valve using the Immediate Operator Actions of AOP-S.01 MAIN FEEDWATER MALFUNCTIONS.
: f. Following a plant accident, the examinee will initiate performance of EA-0-1, EQUIPMENT CHECKS FOLLOWING ESF ACTUATION and manually start at least one Emergency Gas Treatment System fan. Subsequently the examinee will use the alternate path and transition to EA-65-1, EGTS OPERATION to re-align dampers which failed to re-position due to a slave relay failure.
: g. While performing a D/G Operability Test using 1-SI-OPS-082-007.A, the examinee will parallel the 1 A-A Diesel Generator to the 1A-A 6.9 kv Shutdown Board. Subsequently, a high crankcase temperature condition occurs. The examinee will transition to the alarm response and use the alternate path and emergency stop within 3 minutes of the receipt of the alarm.
: h. While shifting Thermal Barrier Booster pumps, a leak in the Component Cooling Water system occurs inside the containment. The examinee will transition to the alarm response and ultimately to AOP-M.03 Loss Of Component Cooling Water and use the alternate path to isolate the RCP oil coolers and trip the Reactor Coolant Pumps.
: i. While the main control room is abandoned using AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, the examinee will initiate a cool down of all Steam Generators from the Auxiliary Control Room.
: j. While recovering from a Station Blackout the examinee will align 125 V Vital Battery Charger I from the normal power supply and place the charger in service.
: k. While recovering from a Containment Isolation, both trains of Essential Control Air isolation valves and the Non-essential Control Air isolation valves are opened supplying air to containment.
 
ES-301                            Control Room/In-Plant Systems Outline                          Form ES-301-2 Facility: Sequoyah Nuclear Station 1 & 2                              Date of Examination: 3/7/2016 Exam Level: RO              SRO-I        SRO-U                        Operating Test No:      2016-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title                                    Type Code*        Safety Function
: a. Withdraw Shutdown Banks. 001 A2.11 (4.4/4.7)                                          L, M, S                  1
: b. Not Examined                                                                            N/A                  N/A
: c. Align ECCS & CS Pumps to the Containment Sump. EPE 011 EA1.11                    A, EN, L, M, 3
(4.2/4.2)                                                                                S
: d. Establish Once Through Cooling by Initiating RCS Bleed and Feed.
A, L, M, S              4P EPE E05 EA 2.2 (3.7/4.3)
: e. Secure a Main Feed Pump. 059 A4.10 (3.9/3.8)                                          A, N, S                4S
: f. Perform Post Trip Equipment Checks. 103 A4.01 (4.5/4.8)                              A, M, S                  5
: g. Perform D/G Load Test on 1A-A D/G. 064 A4.01 (4.0/4.3)                                A, D,S                  6
: h. Respond to a Leak in the Component Cooling Water System. APE 026 A, L, N, S                8 AA1.05 (3.1/3.1)
In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. Control SG Atmospheric Dump Valves from the Aux CR. APE.068 E, M                  8 AA1.01 (4.3/4.5)
: j. Restore 125 V Vital Battery Charger I During a Station Blackout. EPE E, N                  6 055 EA1.06 (4.1/4.5)
: k. Re-establish Nonessential AND Essential Control Air to Containment.
D, E, R                  2 004 A2.11 (3.6/4.2)
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                    Criteria for RO / SRO-I / SRO-U (A)lternate path                                                              4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                            9/8/4 (E)mergency or abnormal in-plant                                              1/1/1 (EN)gineered safety feature                                                  1 / 1 /  1 (control room system)
(L)ow-Power / Shutdown                                                        1/1/1 (N)ew or (M)odified from bank including 1(A)                                  2/2/1 (P)revious 2 exams                                                            3 /  3 /  2 (randomly selected)
(R)CA                                                                        1/1/1 (S)imulator
: a. During a reactor startup, the examinee will select and withdraw Shutdown Bank A Control Rods to the fully withdrawn (225 to 231) steps position.
: b. Not examined.
: c. With a LOCA is in progress, the examinee will stop Containment Spray pumps, and complete the alignment for Charging Pump and Safety Injection pump for sump recirculation using ES-1.3 TRANSFER TO RHR CONTAINMENT. While aligning the ECCS pumps, the Containment Sump Valve Isolation FCV-74-3 fails to close. The examinee will use the alternate path to manually close the RHR Pump Suction from RWST FCV-63-1, while maintaining RHR pump flow.
: d. With a Loss of Secondary Heat Sink, RCS Bleed and Feed required in progress, the examinee will start the A Safety Injection pump. The examinee will use the alternate path to open Reactor Vessel Head Vent valves to establish once through cooling. The examinee will subsequently open the A Train Essential Raw Cooling Water valves and depressurize at least one of the intact Steam Generators.
: e. With an AOP-C.03 RAPID SHUTDOWN OR LOAD REDUCTION in progress, the examinee will start to shutdown the B Main Feed Pump. When the shutdown the B Main Feed Pump commences a fault in the #2 SG Feed Regulating valve will occur. The examinee will use the alternate path and take manual control of the #2 SG Feed Regulating valve using the Immediate Operator Actions of AOP-S.01 MAIN FEEDWATER MALFUNCTIONS.
: f. Following a plant accident, the examinee will initiate performance of EA-0-1, EQUIPMENT CHECKS FOLLOWING ESF ACTUATION and manually start at least one Emergency Gas Treatment System fan. Subsequently the examinee will use the alternate path and transition to EA-65-1, EGTS OPERATION to re-align dampers which failed to re-position due to a slave relay failure.
: g. While performing a D/G Operability Test using 1-SI-OPS-082-007.A, the examinee will parallel the 1 A-A Diesel Generator to the 1A-A 6.9 kv Shutdown Board. Subsequently, a high crankcase temperature condition occurs. The examinee will transition to the alarm response and use the alternate path and emergency stop within 3 minutes of the receipt of the alarm.
: h. While shifting Thermal Barrier Booster pumps, a leak in the Component Cooling Water system occurs inside the containment. The examinee will transition to the alarm response and ultimately to AOP-M.03 Loss Of Component Cooling Water and use the alternate path to isolate the RCP oil coolers and trip the Reactor Coolant Pumps.
: i. While the main control room is abandoned using AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, the examinee will initiate a cool down of all Steam Generators from the Auxiliary Control Room.
: j. While recovering from a Station Blackout the examinee will align 125 V Vital Battery Charger I from the normal power supply and place the charger in service.
: k. While recovering from a Containment Isolation, both trains of Essential Control Air isolation valves and the Non-essential Control Air isolation valves are opened supplying air to containment.
 
ES-301                            Control Room/In-Plant Systems Outline                           Form ES-301-2 Facility: Sequoyah Nuclear Station 1 & 2                              Date of Examination: 3/7/2016 Exam Level: RO              SRO-I          SRO-U                    Operating Test No:      2016-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title                                    Type Code*        Safety Function
: a. Not Examined                                                                            N/A                  N/A
: b. Not Examined                                                                            N/A                  N/A
: c. Align ECCS & CS Pumps to the Containment Sump. EPE 011 EA1.11 A,EN,L,M,S                3 (4.2/4.2)
: d. Not Examined                                                                            N/A                  N/A
: e. Secure a Main Feed Pump. 059 A4.10 (3.9/3.8)                                          A,N,S                4S
: f. Perform Post Trip Equipment Checks. 103 A4.01 (4.5/4.8)                              A, M, S                  5
: g. Not Examined                                                                            N/A                  N/A
: h. Not Examined                                                                            N/A                  N/A In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. Control SG Atmospheric Dump Valves from the Aux CR. APE.068 E, M                  8 AA1.01 (4.3/4.5)
: j. Not Examined                                                                          N/A                  N/A
: k. Re-establish Nonessential AND Essential Control Air to Containment.
D, E, R                  2 004 A2.11 (3.6/4.2)
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                    Criteria for RO / SRO-I / SRO-U (A)lternate path                                                              4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                            9/8/4 (E)mergency or abnormal in-plant                                              1/1/1 (EN)gineered safety feature                                                  1 / 1 /  1 (control room system)
(L)ow-Power / Shutdown                                                        1/1/1 (N)ew or (M)odified from bank including 1(A)                                  2/2/1 (P)revious 2 exams                                                            3 /  3 /  2 (randomly selected)
(R)CA                                                                        1/1/1 (S)imulator
: a. Not examined.
: b. Not examined.
: c. With a LOCA is in progress, the examinee will stop Containment Spray pumps, and complete the alignment for Charging Pump and Safety Injection pump for sump recirculation using ES-1.3 TRANSFER TO RHR CONTAINMENT. While aligning the ECCS pumps, the Containment Sump Valve Isolation FCV-74-3 fails to close. The examinee will use the alternate path to manually close the RHR Pump Suction from RWST FCV-63-1, while maintaining RHR pump flow.
: d. Not examined.
: e. With an AOP-C.03 RAPID SHUTDOWN OR LOAD REDUCTION in progress, the examinee will start to shutdown the B Main Feed Pump. When the shutdown the B Main Feed Pump commences a fault in the #2 SG Feed Regulating valve will occur. The examinee will use the alternate path and take manual control of the #2 SG Feed Regulating valve using the Immediate Operator Actions of AOP-S.01 MAIN FEEDWATER MALFUNCTIONS.
: f. Following a plant accident, the examinee will initiate performance of EA-0-1, EQUIPMENT CHECKS FOLLOWING ESF ACTUATION and manually start at least one Emergency Gas Treatment System fan. Subsequently the examinee will use the alternate path and transition to EA-65-1, EGTS OPERATION to re-align dampers which failed to re-position due to a slave relay failure.
: g. Not examined.
: h. Not examined.
: i. While the main control room is abandoned using AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, the examinee will initiate a cool down of all Steam Generators from the Auxiliary Control Room.
: j. Not examined.
: k. While recovering from a Containment Isolation, both trains of Essential Control Air isolation valves and the Non-essential Control Air isolation valves are opened supplying air to containment.}}

Latest revision as of 01:02, 30 October 2019

Draft Administrative Documents
ML17209A978
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/28/2017
From:
NRC/RGN-II
To:
Tennessee Valley Authority
References
Download: ML17209A978 (22)


Text

ES-401 PWR Examination Outline Form ES-401-2 Facility: Sequoyah Date of Exam: March, 2016 RO K/A Category Points SRO-Only Points Tier Group K K K K K K A A A A G* A2 G* Total 1 2 3 4 5 6 1 2 3 4 Total

1. 1 3 3 3 3 3 3 18 3 3 6 Emergency &

Abnormal 2 2 1 2 N/A 1 1 N/A 2 9 2 2 4 Plant Evolutions Tier Totals 5 4 5 4 4 5 27 5 5 10 1 2 3 3 3 3 3 2 2 3 2 2 28 2 3 5 2.

Plant 2 1 1 1 1 1 1 1 1 0 1 1 10 1 - 2 3 Systems Tier Totals 3 4 4 4 4 4 3 3 3 3 3 38 3 5 8

3. Generic Knowledge and Abilities 1 2 3 4 10 1 2 3 4 7 Categories 2 2 3 3 1 2 2 2 Note: 1. Ensure that at least two topics from every applicable K/A category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the Tier Totals in each K/A category shall not be less than two). (One Tier 3 Radiation Control K/A is allowed if the K/A is replaced by a K/A from another Tier 3 Category).
2. The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted with justification; operationally important, site-specific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate K/A statements.
4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
5. Absent a plant-specific priority, only those K/As having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
6. Select SRO topics for Tiers 1 and 2 from the shaded systems and K/A categories.
7. The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable K/As.
8. On the following pages, enter the K/A numbers, a brief description of each topic, the topics importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in a category other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.
9. For Tier 3, select topics from Section 2 of the K/A catalog, and enter the K/A numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to K/As that are linked to 10 CFR 55.43.

G* Generic K/As

ES-401 2 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions - Tier 1/Group 1 (RO / SRO)

E/APE # / Name / Safety Function K K K A A2 G* K/A Topic(s) IR #

1 2 3 1 000007 (BW/E02&E10; CE/E02) Reactor X 007EK2.03; Knowledge of the interrelations 3.5 Trip - Stabilization - Recovery / 1 between a reactor trip and the following:

Reactor trip status panel.

X 007EG2.4.6; Knowledge of EOP mitigation 4.7 strategies.

000008 Pressurizer Vapor Space X 008AG2.4.14; Knowledge of general 4.5 Accident / 3 guidelines for EOP usage.

000009 Small Break LOCA / 3 X 009EK2.03; Knowledge of the interrelations 3.0 between the small break LOCA and the following: S/Gs.

000011 Large Break LOCA / 3 X 011EA2.06; Ability to determine or interpret 4.0 the following as they apply to a Large Break LOCA: That fan is in slow speed and dampers are in accident mode during LOCA.

000015/17 RCP Malfunctions / 4 X 015AK3.03; Knowledge of the reasons for the 3.7 following responses as they apply to the Reactor Coolant Pump Malfunctions (Loss of RC Flow): Sequence of events for manually tripping reactor and RCP as a result of an RCP malfunction.

000022 Loss of Rx Coolant Makeup / 2 X 022AG2.2.4; (multi-unit license) Ability to 3.6 explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at al facility.

000025 Loss of RHR System / 4 X 025AK1.01; Knowledge of the operational 3.9 implications of the following concepts as they apply to Loss of Residual Heat Removal System: Loss of RHRS during all modes of operation.

000026 Loss of Component Cooling X 026AA2.01; Ability to determine and interpret 2.9 Water / 8 the following as they apply to the Loss of Component Cooling Water: Location of a leak in the CCWS.

000027 Pressurizer Pressure Control X 027AG2.1.7; Ability to evaluate plant 4.4 System Malfunction / 3 performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

000029 ATWS / 1 X 029EK2.06; Knowledge of the interrelations 2.9 between the following and an ATWS:

Breakers, relays, and disconnects.

000038 Steam Gen. Tube Rupture / 3 X 038EG2.1.23; Ability to perform specific 4.4 system and integrated plant procedures during all modes of plant operation.

000040 (BW/E05; CE/E05; W/E12) X 040AA2.04; Ability to determine and interpret 4.7 Steam Line Rupture - Excessive Heat the following as they apply to the Steam Line Transfer / 4 Rupture: Conditions requiring ESFAS initiation.

000054 (CE/E06) Loss of Main X 054AA1.04; Ability to operate and / or monitor 4.4 Feedwater / 4 the following as they apply to the Loss of Main Feedwater (MFW): HPI, under total feedwater loss conditions.

000055 Station Blackout / 6 X 055EA1.07; Ability to operate and monitor the 4.3 following as they apply to a Station Blackout:

Restoration of power from offsite.

000056 Loss of Off-site Power / 6 X 056AA2.56; Ability to determine and interpret 3.7 the following as they apply to the Loss of Offsite Power: RCS T-ave.

000057 Loss of Vital AC Inst. Bus / 6 X 057AA2.08; Ability to determine and interpret 3.4 the following as they apply to the Loss of Vital AC Instrument Bus: Reactor power digital display and remote flux meter.

000058 Loss of DC Power / 6 X 058AA1.02; Ability to operate and / or monitor 3.1 the following as they apply to the Loss of DC Power: Static inverter dc input breaker, frequency meter, ac output breaker, and ground fault detector.

000062 Loss of Nuclear Svc Water / 4 X 062AG2.4.47; Ability to diagnose and 4.2 recognize trends in an accurate and timely manner utilizing the appropriate control room reference material.

000065 Loss of Instrument Air / 8 X 065AA2.07; Ability to determine and interpret 2.8 the following as they apply to the Loss of Instrument Air: Whether backup nitrogen supply is controlling valve position.

W/E04 LOCA Outside Containment / 3 X WE04EK1.2; Knowledge of the operational 3.5 implications of the following concepts as they apply to the (LOCA Outside Containment):

Normal, abnormal and emergency operating procedures associated with (LOCA Outside Containment).

W/E11 Loss of Emergency Coolant X WE11EK3.2; Knowledge of the reasons for 3.5 Recirc. / 4 the following responses as they apply to the (Loss of Emergency Coolant Recirculation):

Normal, abnormal and emergency operating procedures associated with (Loss of Emergency Coolant Recirculation).

BW/E04; W/E05 Inadequate Heat X WE05EK1.1; Knowledge of the operational 3.8 Transfer - Loss of Secondary Heat Sink / 4 implications of the following concepts as they apply to the (Loss of Secondary Heat Sink):

Components, capacity, and function of emergency systems.

000077 Generator Voltage and Electric X 077AK3.01; Knowledge of the reasons for the 3.9 Grid Disturbances / 6 following responses as they apply to Generator Voltage and Electric Grid Disturbances: Reactor and turbine trip criteria.

K/A Category Totals: 3 3 3 3 3/3 3/3 Group Point Total: 18/6

ES-401 3 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions - Tier 1/Group 2 (RO / SRO)

E/APE # / Name / Safety Function K K K A A2 G* K/A Topic(s) IR #

1 2 3 1 000001 Continuous Rod Withdrawal / 1 000003 Dropped Control Rod / 1 000005 Inoperable/Stuck Control Rod / 1 X 005AG2.4.21; Knowledge of the 4.6 parameters and logic used to assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity, containment conditions, radioactivity release control, etc.

000024 Emergency Boration / 1 X 024AG2.1.31; Ability to locate control 4.6 room switches, controls, and indications, and to l determine that they correctly reflect the desired plant lineup.

000028 Pressurizer Level Malfunction / 2 X 028AK1.01; Knowledge of the physical 2.5 connections and/or cause-effect relationships between the HRPS and the following systems: Containment annulus ventilation system (including pressure limits).

000032 Loss of Source Range NI / 7 X 032AA2.09; Ability to determine and 2.9 interpret the following as they apply to the Loss of Source Range Nuclear Instrumentation: Effect of improper HV setting.

000033 Loss of Intermediate Range NI / 7 000036 (BW/A08) Fuel Handling Accident / 8 X 036AK1.02; Knowledge of the 3.4 operational implications of the following concepts as they apply to Fuel Handling Incidents: SDM.

000037 Steam Generator Tube Leak / 3 X 037AA2.12; Ability to determine and 3.3 interpret the following as they apply to a steam Generator Tube Leak: Flow rate of leak.

000051 Loss of Condenser Vacuum / 4 X 051AG2.1.34 Knowledge of primary 3.5 and secondary plant chemistry limits.

000059 Accidental Liquid Radwaste Rel. / 9 000060 Accidental Gaseous Radwaste Rel. / 9 X 060AK2.01; Knowledge of the 2.6 interrelations between the Accidental Gaseous Radwaste Release and the following: ARM system, including the normal radiation-level indications and the operability status.

000061 ARM System Alarms / 7 X 061AA1.01; Ability to operate and / or 3.1 monitor the following as they apply to the Loss of Nuclear Service Water (SWS): Nuclear service water temperature indications.

000067 Plant Fire On-site / 8 000068 (BW/A06) Control Room Evac. / 8 000069 (W/E14) Loss of CTMT Integrity / 5 000074 (W/E06&E07) Inad. Core Cooling / 4 000076 High Reactor Coolant Activity / 9 X 076AK3.06; Knowledge of the reasons 3.2 for the following responses as they apply to the High Reactor Coolant activity: Actions contained in EOP for high reactor coolant activity.

W/EO1 & E02 Rediagnosis & SI Termination / 3 W/E13 Steam Generator Over-pressure / 4 W/E15 Containment Flooding / 5

W/E16 High Containment Radiation / 9 X WE16EA2.1; Ability to determine and 3.3 interpret the following as they apply to the (High Containment Radiation):

Facility conditions and selection of appropriate procedures during abnormal and emergency operations.

BW/A01 Plant Runback / 1 BW/A02&A03 Loss of NNI-X/Y / 7 BW/A04 Turbine Trip / 4 BW/A05 Emergency Diesel Actuation / 6 BW/A07 Flooding / 8 BW/E03 Inadequate Subcooling Margin / 4 BW/E08; W/E03 LOCA Cooldown - Depress. / 4 BW/E09; CE/A13; W/E09&E10 Natural Circ. / 4 X WE10EG2.4.20; Knowledge of the 3.8 operational implications of EOP warnings, cautions, and notes.

BW/E13&E14 EOP Rules and Enclosures CE/A11; W/E08 RCS Overcooling - PTS / 4 X WE08EK3.4; Knowledge of the 3.4 reasons for the following responses as they apply to the (Pressurized Thermal Shock): RO or SRO function within the control room team as appropriate to the assigned position, in such a way that procedures are adhered to and the limitations in the facilitys license and amendments are not violated.

CE/A16 Excess RCS Leakage / 2 CE/E09 Functional Recovery K/A Category Point Totals: 2 1 2 1 1/2 2/2 Group Point Total: 9/4

ES-401 4 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Plant Systems - Tier 2/Group 1 (RO / SRO)

System # / Name K K K K K K A A2 A A G* K/A Topic(s) IR #

1 2 3 4 5 6 1 3 4 003 Reactor Coolant Pump X 003G2.2.36; Ability to analyze the 3.1 effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations.

X 003A2.04; Ability to (a) predict the 2.8 impacts of the following malfunctions or operations on the RCPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Effects of fluctuation of VCT pressure on RCP seal injection flow.

004 Chemical and Volume X 004K6.27; Knowledge of the effect 3.4 Control of a loss or malfunction on the following CVCS components:

Purpose of RHR relief and isolation valves.

X 004K5.09; Knowledge of the 3.7 operational implications of the following concepts as they apply to the CVCS: Thermal shock: high component stress due to rapid temperature change.

005 Residual Heat Removal X 005K5.05; Knowledge of the 2.7 operational implications of the following concepts as they apply the RHRS: Plant response during "solid plant": pressure change due to the relative incompressibility of water.

006 Emergency Core Cooling X 006A2.05; Ability to (a) predict the 3.4 impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper amperage to the pump motor.

X 006K6.18; Knowledge of the effect 3.6 of a loss or malfunction on the following will have on the ECCS:

Subcooling margin indicators.

007 Pressurizer Relief/Quench X 007K5.02; Knowledge of the 3.1 Tank operational implications of the following concepts as they apply to PRTS: Method of forming a steam bubble in the PZR.

008 Component Cooling Water X 008A3.08; Ability to monitor 3.6 automatic operation of the CCWS, Including: Automatic actions associated with the CCWS that occur as a result of a safety injection signal.

010 Pressurizer Pressure Control X 010K2.01; Knowledge of bus power 3.0 supplies to the following: PZR heaters.

X 010G2.1.32; Ability to explain and 4.0 apply system limits and precautions.

012 Reactor Protection X 012K1.05; Knowledge of the 3.8 physical connections and/or cause effect relationships between the RPS and the following systems:

ESFAS.

X 012A2.04; Ability to (a) predict the 3.1 impacts of the following malfunctions or operations on the RPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Erratic power supply operation.

013 Engineered Safety Features X 013A4.01; Ability to manually 4.5 Actuation operate and/or monitor in the control room: ESFAS-initiated equipment which fails to actuate.

X 013K3.03; Knowledge of the effect 4.4 that a loss or malfunction of the ESFAS will have on the following:

Fuel.

022 Containment Cooling X 022K4.05; Knowledge of CCS 2.6 design feature(s) and/or interlock(s) which provide for the following:

Containment cooling after LOCA destroys ventilation ducts.

X 022K3.02; Knowledge of the effect 2.9 that a loss or malfunction of the CCS will have on the following:

Containment instrumentation readings.

025 Ice Condenser 026 Containment Spray X 026A1.04; Ability to predict and/or 3.1 monitor changes in parameters (to prevent exceeding design limits) associated with operating the CSS controls including: Containment humidity.

039 Main and Reheat Steam X 039K1.05; Knowledge of the 2.5 physical connections and/or cause-effect relationships between the MRSS and the following systems:

T/G.

X 039K4.02; Knowledge of MRSS 3.1 design feature(s) and/or interlock(s) which provide for the following:

Utilization of T-ave. program control when steam dumping through atmospheric relief/dump valves, including T-ave. limits.

059 Main Feedwater X 059G2.1.32; Ability to explain and 3.8 apply system limits and precautions.

X 059G2.1.43; Ability to use 4.3 procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc.

061 Auxiliary/Emergency X 061K3.01; Knowledge of the effect 4.4 Feedwater that a loss or malfunction of the AFW will have on the following:

RCS.

X 061K6.01; Knowledge of the effect 2.5 of a loss or malfunction of the following will have on the AFW components: Controllers and positioners.

062 AC Electrical Distribution X 062A3.04; Ability to monitor 2.7 automatic operation of the ac distribution system, including:

Operation of inverter (e.g.,

precharging synchronizing light, static transfer).

X 062G2.2.38; Knowledge of 4.5 conditions and limitations in the facility license.

063 DC Electrical Distribution X 063A4.01; Ability to manually 2.8 operate and/or monitor in the control room: Major breakers and control power fuses.

064 Emergency Diesel Generator X 064K2.02; Knowledge of bus power 2.8 supplies to the following: Fuel oil pumps.

073 Process Radiation Monitoring X 073A1.01; Ability to predict and/or 3.2 monitor changes in parameters (to prevent exceeding design limits) associated with operating the PRM system controls including: Radiation levels.

076 Service Water X 076A2.01; Ability to (a) predict the 3.5 impacts of the following malfunctions or operations on the SWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of SWS.

078 Instrument Air X 078K2.02; Knowledge of bus power 3.3 supplies to the following: Emergency air compressor.

078K4.01; Knowledge of IAS design 2.7 X feature(s) and/or interlock(s) which provide for the following:

Manual/automatic transfers of control.

103 Containment X 103A3.01; Ability to monitor 3.9 automatic operation of the containment system, including:

Containment isolation.

K/A Category Point Totals: 2 3 3 3 3 3 2 2/2 3 2 2/3 Group Point Total: 28/5

ES-401 5 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Plant Systems - Tier 2/Group 2 (RO / SRO)

System # / Name K K K K K K A A2 A A G* K/A Topic(s) IR #

1 2 3 4 5 6 1 3 4 001 Control Rod Drive X 001G2.4.6; Knowledge of EOP 4.7 mitigation strategies.

002 Reactor Coolant X 002K3.03; Knowledge of the effect 4.2 that a loss or malfunction of the RCS will have on the following:

Containment.

011 Pressurizer Level Control X 011A2.03; Ability to (a) predict the 3.8 impacts of the following malfunctions or operations on the PZR LCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of PZR level.

014 Rod Position Indication X 014G2.1.45; Ability to identify and 4.3 interpret diverse indications to validate the response of another indication.

015 Nuclear Instrumentation X 015K2.01; Knowledge of bus power 3.3 supplies to the following: NIS channels, components, and interconnections.

016 Non-Nuclear Instrumentation 017 In-Core Temperature Monitor X 017K1.01; Knowledge of the physical 3.2 connections and/or cause-effect relationships between the ITM system and the following systems:

Plant computer.

027 Containment Iodine Removal 028 Hydrogen Recombiner and X 028A1.02; Ability to predict and/or 3.4 Purge Control monitor changes in parameter (to prevent exceeding design limits) associated with operating the HRPS controls including: Containment pressure.

029 Containment Purge 033 Spent Fuel Pool Cooling 034 Fuel Handling Equipment X 034G2.4.30; Knowledge of events 2.7 related to system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.

035 Steam Generator 041 Steam Dump/Turbine Bypass X 041K6.03; Knowledge of the effect of 2.7 Control a loss or malfunction on the following will have on the SDS: Controller and positioners, including ICS, S/G, CRDS.

045 Main Turbine Generator X 045K5.23; Knowledge of the 2.7 operational implications of the following concepts as they apply to the MT/B System: Relationship between rod control and RCS boron concentration during T/G load increases.

055 Condenser Air Removal

056 Condensate X 056A2.04; Ability to (a) predict the 2.6 impacts of the following malfunctions or operations on the Condensate System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of condensate pumps.

068 Liquid Radwaste 071 Waste Gas Disposal 072 Area Radiation Monitoring X 072A3.01; Ability to monitor 2.9 automatic operation of the ARM system, including: Changes in ventilation alignment.

075 Circulating Water 079 Station Air X 079K4.01; Knowledge of SAS design 2.9 feature(s) and/or interlock(s) which provide for the following: Cross-connect with IAS.

086 Fire Protection K/A Category Point Totals: 1 1 1 1 1 1 1 1/1 0 1 1/2 Group Point Total: 10/3

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Facility: Sequoyah Date of Exam: March, 2016 Category K/A # Topic RO SRO-Only IR # IR #

Knowledge of the purpose and function of major 2.1.28 4.1 system components and controls.

1. 2.1.42 Knowledge of new and spent fuel movement 2.5 Conduct of procedures.

Operations 2.1.30 Ability to locate and operate components, including 4.0 local controls.

Subtotal 2 1 Knowledge of < to one hour Technical Specification 2.2.39 3.9 action statements for systems.

2.2.43 Knowledge of the process used to track inoperable 3.0 alarms.

2.

Equipment 2.2.5 Knowledge of the process for making design or 3.2 Control operating changes to the facility.

2.2.14 Knowledge of the process for controlling equipment 4.3 configuration or status.

Subtotal 2 2 2.3.4 Knowledge of radiation exposure limits under 3.2 normal or emergency conditions.

2.3.11 Ability to control radiation releases. 3.8 Knowledge of radiological safety principles 2.3.12 3.2 pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation 3.

areas, aligning filters, etc.

Radiation Control 2.3.6 Ability to approve release permits. 3.8 Knowledge of radiological safety procedures 2.3.13 3.8 pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.

Subtotal 3 2 Knowledge of facility protection requirements, 2.4.26 3.1 including fire brigade and portable fire-fighting equipment usage.

4. 2.4.29 Knowledge of the emergency plan. 3.1 Emergency 2.4.46 Ability to verify that the alarms are consistent with 4.2 Procedures / the plant conditions.

Plan 2.4.14 Knowledge of general guidelines for EOP usage. 4.5 2.4.19 Knowledge of EOP layout, symbols, and icons. 4.1 Subtotal 3 2 Tier 3 Point Total 10 7

Initial rejection list following review with licensee ES-401 Record of Rejected K/As Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected K/A 1/1 022G2.4.14 Overselected. Replaced by 08AG2.4.14.

1/1 WE12EK2.2 Overselected. Replaced by 029EK2.06.

1/2 005AK1.06 Overselected. Replaced by 028AK1.01.

1/2 051AA2.02 Overselected. Replaced by 037AA2.12.

1/2 061AA2.02 Overselected. Replaced by WE16EA2.1.

2/1 003K6.01 Overselected. Replaced by 061K6.01.

2/1 005K5.09 Overselected. Replaced by 004K5.09.

2/1 062K3.01 Overselected. Replaced by 022K3.02.

2/1 078G2.1.27 Unable to write to SRO level. Replaced by 059G2.1.43.

2/2 015G2.4.1 Unable to write to SRO level. Replaced by 014G2.1.45.

2/2 068A3.01 Equipment not used. Replaced with 072A3.01.

1/2 024AG2.1.3 Unable to write an operationally valid question.

Replaced with 024AG2.1.31.

1/2 051AG2.4.9 Unable to write an operationally valid question.

Replaced with 051AG2.1.34.

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Sequoyah Nuclear Station 1 & 2 Date of Examination: 3/7/2016 Exam Level: RO SRO Operating Test No: 2016-301 Administrative Topic (see Type Describe activity to be performed Note) Code*

Determine compliance with fatigue management and Conduct of Operations R, N work hour limits. G 2.1.2 (3.0/4.0)

Calculate required amount and time for emergency Conduct of Operations R, N boration in preparation for cool down. G 2.1 .25 (2.8)

Equipment Control R, N Evaluate valve stroke testing results. G 2.2.12 (3.0)

Radiation Control N/A Not examined Complete a state notification form and complete an Emergency Procedures/Plan R, N initial state notification. G 2.4.25 NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

A.1.a The examinee is given the case where two operators are required to be called out for work. The examinee evaluate the work history between five different operators and will determine operator 3 may assume the shift in Unit 1 which is the operating unit and Operator 2 may assume the shift in Unit 2 which is the outage unit. This JPM is a common JPM with the SRO examinees.

A.1.b The examinee is given the case where Unit 1 is making preparations for an Emergency Boration while in MODE 3 and an RCS cool down to 350 degrees. The examinee will determine by looking up from a chart that 6280 gallons from the Boric Acid Tank and calculate a minimum boration time of 125.6 minutes is required for emergency boration prior to initiating the cool down to 350 degrees.

A.2 The examinee will complete and review data from a Section XI Valve Surveillance and determine the following:

  • three valves are within the acceptable range.
  • two valves are in the alert range.
  • one valve is in the required action range.

The examinee will determine the valves not in the acceptable range require subsequent valve strokes. The examinee will determine the valve in the required action range is INOPERABLE.

A.3 Not examined.

A.4 While acting as the Site Communicator and given data for a plant emergency, the examinee will interpret the data and complete the EPIP-3 ALERT Appendix A ALERT INITIAL NOTIFICATION FORM within 15 minutes and perform a State of Tennessee Notification within the following 15 minutes.

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Sequoyah Nuclear Station 1 & 2 Date of Examination: 3/7/2016 Exam Level: RO SRO Operating Test No: 2016-301 Administrative Topic (see Type Describe activity to be performed Note) Code*

Determine compliance with fatigue management and Conduct of Operations R, N work hour limits. G 2.1.2 (3.0/4.0)

Evaluate and approve a disabled alarm checklist. G Conduct of Operations R, N 2.1.1 (3.8)

Evaluate a proposed clearance for the 1B Condensate Equipment Control R, N Demineralizer Booster Pump. G 2.2.13 (3.8)

Perform required administrative actions after a Radiation Control R, M Radiation Monitor is removed from service. G 2.3.11 (3.2)

Classify the Event using the EPIP-1 and complete a Emergency Procedures/Plan R, M TVA INITIAL NOTIFICATION. 2.4.41 (4.6)

NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

A.1.a The examinee is given the case where two operators are required to be called out for work. The examinee evaluate the work history between five different operators and will determine operator 3 may assume the shift in Unit 1 which is the operating unit and Operator 2 may assume the shift in Unit 2 which is the outage unit. This JPM is a common JPM with the RO examinees.

A.1.b The examinee will evaluate a completed OPDP-4 Disabled Alarm Checklist, will identify three embedded errors and determine the correct entries for the embedded errors. The examinee will determine the following correct solutions for the embedded errors:

  • the source for the annunciator panel XA-55-1A window C-1 is a multi point input and needs to have leads removed to maintain monitoring availability of the other inputs to the SER.
  • determines a 50.59 review must be performed prior to disabling alarm.
  • determines a technical evaluation must be performed.

A.2 The examinee evaluates the proposed clearance for the 1B Condensate Demineralizer Booster Pump and discovers the following four embedded errors:

  • No vent or drain path is provided to establish conditions for work.
  • The pump hand switch is tagged instead of the pump motor breaker.
  • The discharge valve for the 1B Condensate Booster Pump is tagged instead of the 1B Condensate Demineralizer Booster Pump.
  • The suction valve for the 1B Condensate Demineralizer Booster Pump is tagged locally at the MOV instead of the breaker for the MOV.

A.3 The examinee evaluates a work package and determines LCO 3.3.7 condition a must be entered and RM-90-125 is required to be blocked prior to removing RM-90-125 from service.

The examinee subsequently determines the isolation relay for 0-RE-90-125 must be removed prior to unblocking 0-RE-90-125.

A.4 During a dual unit event, the examinee will evaluate plant conditions and classifies the event as a SITE AREA EMERGENCY based on EAL 3.1 within 15 minutes and the examinee completes a TVA Initial Notification for Site Area Emergency form with no errors on items noted with an

  • within the subsequent 15 minutes.

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Sequoyah Nuclear Station 1 & 2 Date of Examination: 3/7/2016 Exam Level: RO SRO-I SRO-U Operating Test No: 2016-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. Withdraw Shutdown Banks. 001 A2.11 (4.4/4.7) L, M, S 1
b. Terminate Emergency Boration. 004 A2.14 (3.8/3.9) N, L,S 2
c. Align ECCS & CS Pumps to the Containment Sump with a Failure of a A, EN, L, M, 3

Containment Sump Valve. EPE 011 EA1.11 (4.2/4.2) S

d. Establish Once Through Cooling by Initiating RCS Bleed and Feed with a Failure of a PORV and Blow Down Steam Generators. EPE E05 A, L, M, S 4P EA 2.2 (3.7/4.3)
e. Secure a Main Feed Pump with a Failure of a Main Feed Regulating A, N, S 4S Valve. 059 A4.10 (3.9/3.8)
f. Perform Post Trip Equipment Checks with a Failure of Slave Relays A, M, S 5 and EGTS Fans to Start. 103 A4.01 (4.5/4.8)
g. Perform D/G Load Test on 1A-A D/G with a Subsequent High A, D,S 6 Crankcase Pressure Alarm. 064 A4.01 (4.0/4.3)
h. Shift Thermal Barrier Booster Pumps with a Subsequent Leak in the A, L, N, S 8 Component Cooling Water System. APE 026 AA1.05 (3.1/3.1)

In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. Control SG Atmospheric Dump Valves from the Aux CR. APE.068 E, M 8 AA1.01 (4.3/4.5)
j. Restore a 125 V Vital Battery Charger I During a Station Blackout. EPE E, N 6 055 EA1.06 (4.1/4.5)
k. Re-establish Nonessential AND Essential Control Air to Containment.

D, E, R 2 004 A2.11 (3.6/4.2)

  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator

a. During a reactor startup, the examinee will select and withdraw Shutdown Bank A Control Rods to the fully withdrawn (225 to 231) steps position.
b. While in MODE 3 and Emergency Boration in progress, the examinee will terminate Emergency Boration using EA EA-68-4, Emergency Boration.
c. With a LOCA is in progress, the examinee will stop Containment Spray pumps, and complete the alignment for Charging Pump and Safety Injection pump for sump recirculation using ES-1.3 TRANSFER TO RHR CONTAINMENT. While aligning the ECCS pumps, the Containment Sump Valve Isolation FCV-74-3 fails to close. The examinee will use the alternate path to manually close the RHR Pump Suction from RWST FCV-63-1, while maintaining RHR pump flow.
d. With a Loss of Secondary Heat Sink, RCS Bleed and Feed required in progress, the examinee will start the A Safety Injection pump. The examinee will use the alternate path to open Reactor Vessel Head Vent valves to establish once through cooling. The examinee will subsequently open the A Train Essential Raw Cooling Water valves and depressurize at least one of the intact Steam Generators.
e. With an AOP-C.03 RAPID SHUTDOWN OR LOAD REDUCTION in progress, the examinee will start to shutdown the B Main Feed Pump. When the shutdown the B Main Feed Pump commences a fault in the #2 SG Feed Regulating valve will occur. The examinee will use the alternate path and take manual control of the #2 SG Feed Regulating valve using the Immediate Operator Actions of AOP-S.01 MAIN FEEDWATER MALFUNCTIONS.
f. Following a plant accident, the examinee will initiate performance of EA-0-1, EQUIPMENT CHECKS FOLLOWING ESF ACTUATION and manually start at least one Emergency Gas Treatment System fan. Subsequently the examinee will use the alternate path and transition to EA-65-1, EGTS OPERATION to re-align dampers which failed to re-position due to a slave relay failure.
g. While performing a D/G Operability Test using 1-SI-OPS-082-007.A, the examinee will parallel the 1 A-A Diesel Generator to the 1A-A 6.9 kv Shutdown Board. Subsequently, a high crankcase temperature condition occurs. The examinee will transition to the alarm response and use the alternate path and emergency stop within 3 minutes of the receipt of the alarm.
h. While shifting Thermal Barrier Booster pumps, a leak in the Component Cooling Water system occurs inside the containment. The examinee will transition to the alarm response and ultimately to AOP-M.03 Loss Of Component Cooling Water and use the alternate path to isolate the RCP oil coolers and trip the Reactor Coolant Pumps.
i. While the main control room is abandoned using AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, the examinee will initiate a cool down of all Steam Generators from the Auxiliary Control Room.
j. While recovering from a Station Blackout the examinee will align 125 V Vital Battery Charger I from the normal power supply and place the charger in service.
k. While recovering from a Containment Isolation, both trains of Essential Control Air isolation valves and the Non-essential Control Air isolation valves are opened supplying air to containment.

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Sequoyah Nuclear Station 1 & 2 Date of Examination: 3/7/2016 Exam Level: RO SRO-I SRO-U Operating Test No: 2016-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. Withdraw Shutdown Banks. 001 A2.11 (4.4/4.7) L, M, S 1
b. Not Examined N/A N/A
c. Align ECCS & CS Pumps to the Containment Sump. EPE 011 EA1.11 A, EN, L, M, 3

(4.2/4.2) S

d. Establish Once Through Cooling by Initiating RCS Bleed and Feed.

A, L, M, S 4P EPE E05 EA 2.2 (3.7/4.3)

e. Secure a Main Feed Pump. 059 A4.10 (3.9/3.8) A, N, S 4S
f. Perform Post Trip Equipment Checks. 103 A4.01 (4.5/4.8) A, M, S 5
g. Perform D/G Load Test on 1A-A D/G. 064 A4.01 (4.0/4.3) A, D,S 6
h. Respond to a Leak in the Component Cooling Water System. APE 026 A, L, N, S 8 AA1.05 (3.1/3.1)

In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. Control SG Atmospheric Dump Valves from the Aux CR. APE.068 E, M 8 AA1.01 (4.3/4.5)
j. Restore 125 V Vital Battery Charger I During a Station Blackout. EPE E, N 6 055 EA1.06 (4.1/4.5)
k. Re-establish Nonessential AND Essential Control Air to Containment.

D, E, R 2 004 A2.11 (3.6/4.2)

  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator

a. During a reactor startup, the examinee will select and withdraw Shutdown Bank A Control Rods to the fully withdrawn (225 to 231) steps position.
b. Not examined.
c. With a LOCA is in progress, the examinee will stop Containment Spray pumps, and complete the alignment for Charging Pump and Safety Injection pump for sump recirculation using ES-1.3 TRANSFER TO RHR CONTAINMENT. While aligning the ECCS pumps, the Containment Sump Valve Isolation FCV-74-3 fails to close. The examinee will use the alternate path to manually close the RHR Pump Suction from RWST FCV-63-1, while maintaining RHR pump flow.
d. With a Loss of Secondary Heat Sink, RCS Bleed and Feed required in progress, the examinee will start the A Safety Injection pump. The examinee will use the alternate path to open Reactor Vessel Head Vent valves to establish once through cooling. The examinee will subsequently open the A Train Essential Raw Cooling Water valves and depressurize at least one of the intact Steam Generators.
e. With an AOP-C.03 RAPID SHUTDOWN OR LOAD REDUCTION in progress, the examinee will start to shutdown the B Main Feed Pump. When the shutdown the B Main Feed Pump commences a fault in the #2 SG Feed Regulating valve will occur. The examinee will use the alternate path and take manual control of the #2 SG Feed Regulating valve using the Immediate Operator Actions of AOP-S.01 MAIN FEEDWATER MALFUNCTIONS.
f. Following a plant accident, the examinee will initiate performance of EA-0-1, EQUIPMENT CHECKS FOLLOWING ESF ACTUATION and manually start at least one Emergency Gas Treatment System fan. Subsequently the examinee will use the alternate path and transition to EA-65-1, EGTS OPERATION to re-align dampers which failed to re-position due to a slave relay failure.
g. While performing a D/G Operability Test using 1-SI-OPS-082-007.A, the examinee will parallel the 1 A-A Diesel Generator to the 1A-A 6.9 kv Shutdown Board. Subsequently, a high crankcase temperature condition occurs. The examinee will transition to the alarm response and use the alternate path and emergency stop within 3 minutes of the receipt of the alarm.
h. While shifting Thermal Barrier Booster pumps, a leak in the Component Cooling Water system occurs inside the containment. The examinee will transition to the alarm response and ultimately to AOP-M.03 Loss Of Component Cooling Water and use the alternate path to isolate the RCP oil coolers and trip the Reactor Coolant Pumps.
i. While the main control room is abandoned using AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, the examinee will initiate a cool down of all Steam Generators from the Auxiliary Control Room.
j. While recovering from a Station Blackout the examinee will align 125 V Vital Battery Charger I from the normal power supply and place the charger in service.
k. While recovering from a Containment Isolation, both trains of Essential Control Air isolation valves and the Non-essential Control Air isolation valves are opened supplying air to containment.

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Sequoyah Nuclear Station 1 & 2 Date of Examination: 3/7/2016 Exam Level: RO SRO-I SRO-U Operating Test No: 2016-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. Not Examined N/A N/A
b. Not Examined N/A N/A
c. Align ECCS & CS Pumps to the Containment Sump. EPE 011 EA1.11 A,EN,L,M,S 3 (4.2/4.2)
d. Not Examined N/A N/A
e. Secure a Main Feed Pump. 059 A4.10 (3.9/3.8) A,N,S 4S
f. Perform Post Trip Equipment Checks. 103 A4.01 (4.5/4.8) A, M, S 5
g. Not Examined N/A N/A
h. Not Examined N/A N/A In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. Control SG Atmospheric Dump Valves from the Aux CR. APE.068 E, M 8 AA1.01 (4.3/4.5)
j. Not Examined N/A N/A
k. Re-establish Nonessential AND Essential Control Air to Containment.

D, E, R 2 004 A2.11 (3.6/4.2)

  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator

a. Not examined.
b. Not examined.
c. With a LOCA is in progress, the examinee will stop Containment Spray pumps, and complete the alignment for Charging Pump and Safety Injection pump for sump recirculation using ES-1.3 TRANSFER TO RHR CONTAINMENT. While aligning the ECCS pumps, the Containment Sump Valve Isolation FCV-74-3 fails to close. The examinee will use the alternate path to manually close the RHR Pump Suction from RWST FCV-63-1, while maintaining RHR pump flow.
d. Not examined.
e. With an AOP-C.03 RAPID SHUTDOWN OR LOAD REDUCTION in progress, the examinee will start to shutdown the B Main Feed Pump. When the shutdown the B Main Feed Pump commences a fault in the #2 SG Feed Regulating valve will occur. The examinee will use the alternate path and take manual control of the #2 SG Feed Regulating valve using the Immediate Operator Actions of AOP-S.01 MAIN FEEDWATER MALFUNCTIONS.
f. Following a plant accident, the examinee will initiate performance of EA-0-1, EQUIPMENT CHECKS FOLLOWING ESF ACTUATION and manually start at least one Emergency Gas Treatment System fan. Subsequently the examinee will use the alternate path and transition to EA-65-1, EGTS OPERATION to re-align dampers which failed to re-position due to a slave relay failure.
g. Not examined.
h. Not examined.
i. While the main control room is abandoned using AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, the examinee will initiate a cool down of all Steam Generators from the Auxiliary Control Room.
j. Not examined.
k. While recovering from a Containment Isolation, both trains of Essential Control Air isolation valves and the Non-essential Control Air isolation valves are opened supplying air to containment.