| issue date = 10/22/1998
| issue date = 10/22/1998
| title = LER 98-004-00:on 980923,inadvertent Actuation of Efs Occurred During Surveillance Testing.Caused by Personnel Error.Personnel Involved with Event Were Counseled & Procedure Changes Were Implemented.With 981022 Ltr
| title = LER 98-004-00:on 980923,inadvertent Actuation of Efs Occurred During Surveillance Testing.Caused by Personnel Error.Personnel Involved with Event Were Counseled & Procedure Changes Were Implemented.With 981022 Ltr
| author name = SCHEIDE R H, VANDERGRIFT J
| author name = Scheide R, Vandergrift J
| author affiliation = ENTERGY OPERATIONS, INC.
| author affiliation = ENTERGY OPERATIONS, INC.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORYlyREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9810280011 DOC.DATE:
{{#Wiki_filter:CATEGORY                ly REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
98/10/22NOTARIZED:
ACCESSION NBR:9810280011             DOC.DATE:     98/10/22    NOTARIZED: NO              DOCKET FACIL:50-313 Arkansas Nuclear One, Unit 1, Arkansas Power                    E  Light    05000313 AUTH"NAME, 'UTHOR AFFILIATION SCHEIDE,R.H.           Entergy Operations,       Inc.
NOFACIL:50-313 ArkansasNuclearOne,Unit1,ArkansasPowerELightAUTH"NAME,
VANDERGRIFT,J.       Entergy Operations,         Inc.
'UTHORAFFILIATION SCHEIDE,R.H.
RECIP.NAME             RECIPIENT AFFILIATION
EntergyOperations, Inc.VANDERGRIFT,J.
EntergyOperations, Inc.RECIP.NAME RECIPIENT AFFILIATION DOCKET05000313


==SUBJECT:==
==SUBJECT:==
LER98-004-00:on 980923,inadvertent actuation ofEFSoccurredduringsurveillance testing.Causedbypersonnel error.Personnel involvedwitheventwerecounseled
LER      98-004-00:on 980923,inadvertent actuation of EFS occurred during surveillance testing. Caused by personnel error. Personnel involved with event were counseled &                                   A procedure changes were implemented. With 981022 ltr.
&procedure changeswereimplemented.
DISTRIBUTION CODE: IE22T          COPIES RECEIVED:LTR               ENCL      SIZE:
With981022ltr.DISTRIBUTION CODE:IE22TCOPIESRECEIVED:LTR ENCLSIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),IncidentRpt,,etc.
TITLE: 50.73/50.9 Licensee Event Report (LER), Incident                    Rpt,,etc.
NOTES:A.RECIPIENT IDCODE/NAME PD4-1PD'NTERNAL:
NOTES:
ACRSAEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HOHB NRR/DRPM/PECB RES/DET/EIB EXTERNAL:
                . RECIPIENT           COPIES              RECIPIENT              COPIES ID CODE/NAME        LTTR ENCL          ID  CODE/NAME         LTTR ENCL PD4-1PD                   1      1      HILTON,N                    1    1
LSTLOBBYWARDNOACPOORE,W.NRCPDRCOPIESLTTRENCL1111111111111111111111RECIPIENT IDCODE/NAME HILTON,NAEODSPDRABNRR/DE/EELB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RGN4FILE01LITCOBRYCE,JHNOACQUEENER,DS NUDOCSFULLTXTCOPIESLTTRENCL1122111111111111111111NOTETOALL"BIDS"RECIPIENTS:
'NTERNAL:   ACRS                      1      1      AEOD SPD RAB                2    2 AEOD/SPD/RRAB             1      1                                  1    1 NRR/DE/ECGB               1      1      NRR/DE/EELB                1    1 NRR/DE/EMEB               1      1      NRR/DRCH/HICB              1    1 NRR/DRCH/HOHB             1      1      NRR/DRCH/HQMB              1    1 NRR/DRPM/PECB             1      1      NRR/DSSA/SPLB              1    1 RES/DET/EIB               1      1      RGN4      FILE    01      1    1 EXTERNAL: L ST LOBBY WARD              1      1      LITCO BRYCE,J H            1    1 NOAC POORE,W.             1      1      NOAC QUEENER,DS             1    1 NRC PDR                    1      1      NUDOCS FULL TXT            1    1 NOTE TO ALL "BIDS" RECIPIENTS:
PLEASE8LPUS0REDUCEWASTE,TC'VCURNAMORORGAIZAT'ONRMOVEDROMDIS'RIBUTION LISTCRREDUCETHENUMBERO."COP:ES.="CEIVED "OUR'.ORORGA.'JZACN,CONTACTTHEDOCUMENTCONROFULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:
PLEASE 8 LP US 0 REDUCE WASTE, TC   'V    CUR NAM OR ORGA I ZAT'ON R MOVED ROM DIS'RIBUTION LIST CR REDUCE THE NUMBER O." COP:ES .="CEIVED     OU R '.O R ORGA.'J ZA CN, CONTACT THE DOCUMENT CON RO FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR                23  ENCL      23
LTTR23ENCL23
 
=-EntergyEntergyOperations, Inc.1448SR333RussdhR,AR72801Te1501858.5000October22,19981CAN109801 U.S.NuclearRegulatory Commission DocumentControlDeskMailStationOP1-17Washington, DC20555
=- Entergy                                                                    Entergy Operations, Inc.
1448 SR 333 RussdhR, AR 72801 Te1 501 858.5000 October 22, 1998 1CAN109801 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station OP1-17 Washington, DC 20555


==Subject:==
==Subject:==
ArkansasNuclearOne-Unit-1DocketNo.50-313LicenseNo.DPR-51LicenseeEventReport50-313/98-004-00 Gentlemen:
Arkansas Nuclear One - Unit - 1 Docket No. 50-313 License No. DPR-51 Licensee Event Report 50-313/98-004-00 Gentlemen:
Inaccordance withlOCFR50.73(a)(2xiv),
In accordance with 10CFR50.73(a)(2xiv), enclosed is the subject report concerning an inadvertent actuation of the Emergency Peedwater System.
enclosedisthesubjectreportconcerning aninadvertent actuation oftheEmergency Peedwater System.Verytrulyyours,JiD.VanderD'ctor,NuclearSafetyJDV/rsenclosure 98102800ii 981022PDRADGCK05000SiSSPDR U.S.NRCOctober22,19981CAN109801 PAGE2cc:Mr.EllisW.MerschoFRegionalAdministrator U.S.NuclearRegulatory Commission RegionIV611RyanPlazaDrive,Suite400Arlington, TX76011-8064 NRCSeniorResidentInspector ArkansasNuclearOneP.O.Box310London,AR72847Institute ofNuclearPowerOperations 700GalleriaParkwayAtlanta,GA30339-5957 (5-92)LZCEMSEEEVENTREPORT(LER)APPROVEDSY(BIBNO.3150-0104 EXPIRES5/31/95ESTIHATED BURDENPERRESPONSETOCNIPLYllITHTHISINFORHATIOH COLLECTION REQUEST:50.0HRS.FORNARDCOHHENTSREGARDING BURDENESTIHATETOTHEINFORHATION AMDRECORDSHANAGEHENT BRANCH(IQIBB7714)~USTNUCLEARREGULATORY COHHISSIOMg MASHIMGTON, DC205550001,ANDTOTHEPAPERMORK REDUCTION PROJECT(31500104),OFFICEOFHANAGEHENT AMOSISGETMASHIMGTON DC20503.FACILITYNAHE(1)ArkansasNuclearOne-Unit1DOCKETNQIBER(2)05000313PAGE(3)1of3TITLE(4)Inadvertent Actuation OfTheEmergency Feeduater SystemDuringSurveillance TestingAsAResultOfPersanefErrorHONTHDAYYEAREVENTDATE5)LERNNSER(6SEQUENTIAL NQIBERREVISIONNQIBERREPORTDATE(7)OTHERFACILITIES INVOLVED(8)DOCKETNQIBERFACILITYMANEYEARHONTHDAY00102298OPERATING HOOE(9)POUERLEVEL(10)THISREPORTISSUSHITTED PURSUANT20.402(b) 20.405(a)(1)(f) 20.405(a)(1)(ll) 20.405(a)
Very truly yours, Ji    D. Vander D'ctor, Nuclear    Safety JDV/rs enclosure 98102800ii 981022 PDR S
(1)(Ifl)20.405(a)(1)(lv) 20.405(a)(1)(v) 20.405(c) 50.36(c)(1)50.36(c)(2) 50.73(a)(2)(l) 50.73(a)(2)(fI)50.73(a)(2)(l 1I)X50.73(a(2)(fv)50.73(a)(2)(v 50.73(a)(2)(vlf) 50.73(a)(2)(vill)(A) 50.73(a)(2)(vlf f)(B)50.73(a)(2)(x)
ADGCK    05000SiS PDR
TOTHEREQUIREMENTS OF10CFR:(Checkoneormore)(11)73.71b73.71(c)OTHERSpecffylnAbstractBefouandfnTextLICENSEECONTACTFORTHISLER(12)NAHERichardH.Scheide,NuclearSafetyandLlcensfng Specialist TELEPHONE NQIBER(IncludeAreaCode)501.858.4618 COHPLETEONELINEFOREACHC(SIPONENT FAILUREDESCRIBED INTHISREPORT(13)CAUSESYSTEHCNIPONENT HAMUFACTURER REPORTABLE TONPRDSCAUSESYSTEHCOHPONENT HAMUFACTURER REPORTABLE TONPRDSSUPPLEHENTAL REPORTEXPECTED(14)YES(Ifyes,coapfeteEXPECTEDSUBHISSION DATE)XEXPECTEDSUSHISSIONDATE(15)HONTHDAYABSTRACT(Lfmltto1400spaces,f.e.,approximately 15single-spaced typeMritten fines)(16)OnSeptember 23,1998,atapproximately 1033,aninadvertent actuation oftheEmergency Feedwater System(EFW)occurredduringtheperformance oftheEmergency Feedwater Initiation andControlSystem(EFZC)monthlysurveillance test.Whenthetechnicians reachedapointintheprocedure requiring ahalftripinthe"A"and"B"EFWtraintripmodulestobereset,theleadtechnician readthestepwhichstated,"ResettheEFWTripModulesinChannelsAandB."Thetechnician performing thesteprepeatedtheinstruction; however,insteadofdepressing theresettoggleswitch,hedepressed the"B"EFWtripmoduleTrip1button.Thisactionsatisfied theactuation logicforthe"B"trainofEFWandoneEEWpumpstarted.SincetheOTSGswereatnormallevelsandpressure, noEFWflowwasin)ected.
 
TheEFWpumpwasimmediately secured,"thetripmoduleswerereset,andEFICandEFWwerereturnedtotheirnormalconfiguration.
U. S. NRC October 22, 1998 1CAN109801 PAGE 2 cc:   Mr. Ellis W. MerschoF Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 Institute ofNuclear Power Operations 700 Galleria Parkway Atlanta, GA 30339-5957
Therootcauseofthiseventwaspersonnel error.Theindividuals involvedwerecounseled.
 
Also,thiseventandexpectations regarding self-checking werediscussed withappropriate pezsonnel.
APPROVED SY (BIB NO. 3150-0104 (5-92)                                                                                                             EXP IRES 5/31/95 ESTIHATED BURDEN PER RESPONSE              TO CNIPLY llITH LZCEMSEE EVENT REPORT                                                        THIS INFORHATIOH COLLECTION REQUEST: 50.0 HRS.
NRCFORH366A(592)  
(LER)                          FORNARD COHHENTS REGARDING BURDEN ESTIHATE TO THE INFORHATION AMD RECORDS HANAGEHENT BRANCH (IQIBB 7714) ~ U ST NUCLEAR REGULATORY COHHISSIOMg MASHIMGTON, DC 20555 0001, AND TO THE PAPERMORK REDUCTION       PROJECT     (3150 0104),       OFFICE OF HANAGEHENT AMO SISGET            MASHIMGTON DC 20503.
(5-92)LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDSYNNINO.31500104EXPIRES5/31/95ESTIHATED BURDENPERRESPONSETOCNIPLYHITHTHISINFORHATION COLLECTION REQUEST:50.0NRS.FORMARDCNNIENTSREGARDING BURDENESTIHATETOTHEINFORHATION ANDRECORDSHANAGEHENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY COBIISSIONg NASHINGTON, DC20555-0001, ANDTOTHEPAPERNDRK REDUCTION PROJECT(3150-0104),
FACILITY NAHE    (1)                                                                                   DOCKET NQIBER    (2)                 PAGE  (3)
OFFICEOFHANAGEHENT ANDBLNGETMASHINGTON DC20503.FACILITYNAHE(1)ArkanaaaNuclearOne-Unit1DOCKETIRBSER(2)0500031398LERNNBER(6)SEQUENTIAL NNBERREVISIONNNBERPAGE(3)2OF3TEXT(17)PlantStatusB.Atthetimethiseventoccurred, ArkansasNuclearOneUnit1(ANO-1)wasoperating insteady-state conditions at100percentpower.EventDescription OnSeptember 23,1998,atapproximately 1033,aninadvertent actuation oftheEmergency Feedwater System(EFW)[BAJ occurredduringperformance oftheEmergency Feedwater Initiation andControlSystem(EFIC)[JE]
Arkansas Nuclear One      - Unit  1                                                                        05000313                        1  of 3 TITLE  (4)   Inadvertent Actuation Of The Emergency Feeduater System During Surveillance Testing As                    A Result Of Persanef Error EVENT DATE    5)                 LER NNSER        (6              REPORT DATE      (7)                 OTHER  FACILITIES INVOLVED (8)
monthlysurveillance test.TheEFWsystemisatwotrainsystemconsisting ofasteamdrivenpump(P-7A)andamotordrivenpump(P-7B).EEWisactuatedtoprotectthereactorcorefromoverheating uponlossofmainfeedwater floworreactorcoolantpump(RCP)circulation.
SEQUENTIAL          REVISION                              FACILITY MANE                        DOCKET NQIBER HONTH      DAY    YEAR                                            HONTH    DAY        YEAR NQIBER            NQIBER 00        10      22        98 OPERATING                THIS REPORT IS SUSHITTED PURSUANT TO THE REQUIREMENTS            OF 10 CFR:    (Check one or    more )  (11)
EFICisafourchannelsystemthatmonitorsOnceThroughSteamGenerator (OTSG)levelsandpressures, mainfeedwater pumpstatus,RCPstatus/andEngineering Safeguazds Actuation System[JE)channels3and4inordertoinitiateEEWshouldanactuation setpointbereached.TheEFIClogicisa"oneoutoftwotakentwiceformat.ToactuateeithertrainofEEW,atleasttwoofthefourchannelsmustbeinitiated.
HOOE   (9)                   20.402(b)                           20.405(c)                      X 50.73(a (2)(fv)                   73.71 b POUER                      20.405(a)(1)(f)                     50.36(c) (1)                         50.73(a)(2)(v                  73.71(c)
IfonlytwoEFICchannelsareinitiated, itispossibletohaveoneorbothtrainsofEFWactuated, depending uponwhichchannelsareinitiated.
LEVEL  (10)                 20.405(a)(1)(ll)                     50.36(c)(2)                         50.73(a)(2)(vlf)                OTHER 20.405(a) (1) ( I f l )             50.73(a)(2)(l)                     50.73(a)(2)(vill)(A) Specffy ln 20.405(a)(1)(lv)                     50.73(a) (2) ( f I )                50.73(a)(2)(vlf   f)(B)     Abstract Befou 20.405(a)(1)(v)                       50.73(a)(2)(l    1 I)               50.73(a)(2)(x)               and fn Text LICENSEE CONTACT FOR THIS LER      (12)
ThemonthlyEFICChannel"B"surveillance testwascommenced atapproximately 0825onSeptember 23.Atapproximately 1030,thetechnicians performing thesurveillance verifiedthatasimulated lowlevelinthe"A"OTSGappropriately initiated the"Trip1"logicinthe"A"EEWTraintripmoduleandthe"Trip2"logicinthe"B"EFWTraintripmodule.Afterresetting thesimulated lowOTSGlevel,theprocedure requiredthattheEEWtripmodulesbereset.Theleadtechnician readtheprocedure stepwhichstated,"ResettheEFWTripModulesinChannelsAandB."Thetechnician performing thesteprepeatedtheinstruction; however,insteadofdepressing theresettoggleswitch,hedepressed the"B"EFWtripmoduletrip1button.Thisactionsatisfied theactuation logicforthe"B"trainofEFWandP-7Astarted.SincetheOTSGswereatnormaloperating levelsandpressure, noEFWflowwasinfected.
NAHE                                                                                                    TELEPHONE NQIBER    (Include Area    Code)
Thecontrolboardoperatorimmediately securedP-7A.TheEEWtripmoduleswereproperlyreset,EFICandEEWwerereturnedtotheirnormalconfiguration, andthesurveillance procedure wasexited.Thesurveillance testwasrecommenced at1247andsuccessfully completed at1422onSeptember 23.C.RootCauseTherootcauseofthiseventwasdetermined tobepersonnel error.Thetechnician performing theactionunderstood theprocedure stepreadbytheleadtechnician andrepeatedit;however,hefailedtoself-check beforeperforming theaction.NRCFORH366A(5-92)  
Richard H. Scheide, Nuclear Safety and Llcensfng Specialist                                               501.858.4618 COHPLETE ONE LINE FOR EACH C(SIPONENT FAILURE DESCRIBED IN THIS REPORT                (13)
;.5.92)LZCBMSBBBVENTREPORT(LER)TEXTCONTINUATION APPROVEDBT(NBNO.150.01EXPIRES5/31/95ESTINATEDBURDENPERRESPONSETOCNIPLYMITHTHISINFORHATIONCOLLECTION REQUEST:50.0HRS.FORMARDCQNENTSREGARDING BURDENESTIHATETOTHEINFORNATIONANDRECORDSHANAGENENT BRANCH(NNBB7714)~U.SoNUCLEARREGULATORY CONNISSION, MASHINGTON, DC20555-0001
REPORTABLE                                                                          REPORTABLE CAUSE      SYSTEH      CNIPONENT    HAMUFACTURER                                 CAUSE      SYSTEH      COHPONENT      HAMUFACTURER TO NPRDS                                                                            TO NPRDS SUPPLEHENTAL REPORT EXPECTED        (14)                                     EXPECTED              HONTH        DAY YES                                                                                             SUSHI SS I ON (If yes,   coapfete  EXPECTED SUBHISSION DATE)                     X                            DATE  (15)
~ANDTOTHEPAPERMQRK REDUCTION PROJECT(3150-0104)
ABSTRACT      (Lfmlt to  1400 spaces,   f.e., approximately     15 single-spaced typeMritten fines) (16)
~OFFICEOFNANAGEHENT ANOBISGETMASHINGTON DC20503FACILITYNANE(1)ArkansasNuciearOne-Unit1DOCKETNIMBER(2)05000313LERNMBER(6)SEQUENTIAL NSIBERREVISIONNWBERPAGE(3)30F3TEXT(17)Acontributing causetothiseventwasaprocedural ambiguity.
On    September 23, 1998, at approximately 1033, an inadvertent actuation of the Emergency Feedwater System (EFW) occurred during the performance of the Emergency Feedwater Initiation and Control System (EFZC) monthly surveillance test.       When    the technicians reached a point in the procedure requiring a half trip in      the "A" and "B" EFW train trip modules to be reset, the lead technician read the step which stated, "Reset the EFW Trip Modules in Channels A and B." The technician performing the step repeated the instruction; however, instead of depressing the reset toggle switch, he depressed the "B" EFW trip module Trip 1 button.                         This action satisfied the actuation logic for the "B" train of EFW and one EEW pump started. Since the OTSGs were at normal levels and pressure, no EFW flow was in)ected. The EFW pump was immediately secured, "the trip modules were reset, and EFIC and EFW were returned to their normal configuration. The root cause of this event was personnel error. The individuals involved were counseled. Also, this event and expectations regarding self-checking were discussed with appropriate pezsonnel.
Theprocedure step(8.3.6.K) thatresultedintheEFWactuation simplystated,"ResettheEEWTripModulesinChannelsAandB.Preceding stepsstipulating manipulation ofdevicesweremorespecificwithrespecttotheactionsrequired.
NRC FORH    366A  (5 92)
Forexample,step8.3.6.I.statesinpart,"PressandreleasetheResetbutton..~."Iftheprocedure hadstated,"PressandreleasetheResettoggleswitch....,"
 
theerrormightnothaveoccurred.
APPROVED SY  NNI NO. 3150 0104 (5-92)                                                                                     EXPIRES  5/31/95 ESTIHATED BURDEN PER RESPONSE        TO CNIPLY HITH THIS INFORHATION COLLECTION REQUEST: 50.0 NRS.
D.Corrective ActionsThetechnicians involvedwiththiseventwerecounseled bymanagement priortorecommencing thesurveillance test.Theimportance ofself-checking wasemphasized.
FORMARD CNNIENTS REGARDING BURDEN ESTIHATE TO LICENSEE EVENT REPORT (LER)                            THE INFORHATION AND RECORDS HANAGEHENT BRANCH (HNBB 7714), U.S. NUCLEAR REGULATORY COBIISSIONg TEXT CONTINUATION                              NASHINGTON, DC 20555-0001, AND TO THE PAPERNDRK REDUCTION     PROJECT     (3150-0104),   OFFICE OF HANAGEHENT  AND  BLNGET    MASHINGTON  DC  20503.
Thiseventandmanagement expectations regarding self-checking werediscussed withtheUnit-1Instrumentation andControlshoppersonnel duringtheirmorningmeetings.
FACILITY NAHE (1)               DOCKET IRBSER (2)             LER NNBER    (6)               PAGE  (3)
Procedure changeswefeimplemented toclearlyspecifydepressing theresettoggleswitchwhenresetting theEFWtripmodules.TheMaintenance HumanPerformance Committee willdevelopasummaryofthelessonslearnedfromthiseventtobepresented totheMaintenance Departments ofANO-1andANO-2.Thesummaryisexpectedtobecompleted byDecember21,1998.E.SafetySignificance TheEFZCandEFWsystemsperformed asdesignedaftertheinadvertent actuation signalwasinitiated.
SEQUENTIAL      REVISION NNBER          NNBER Arkanaaa Nuclear One  - Unit  1                    05000313                                                        2OF3 98 TEXT                                                                  (17)
However,sincetheOTSGswereatnormaloperating levelsandpressure, noEFWflowwasinitiated andnoplantperturbation resultedfromthisevent.,Therefore, thiscondition isconsidered tobeoflowsafetysignificance.
Plant Status At the time this event occurred, Arkansas Nuclear One Unit                    1  (ANO-1) was operating in steady-state conditions at 100 percent power.
F.BasisForReportability Thiscondition isreportable pursuantto10CFR50.73(a)
B.       Event Description On  September 23, 1998, at approximately 1033, an inadvertent actuation of the Emergency Feedwater System (EFW)[BAJ occurred during performance of the Emergency Feedwater Initiation and Control System (EFIC)[JE] monthly surveillance test.
(2)(iv)asanactuation ofanEngineered SafetyFeature(ESF).ItwasalsoreportedtotheNRCOperations Centerat1336onSeptember 23,1998,inaccordance with10CFR50.72(b)
The EFW system is a two train system consisting of a steam driven pump (P-7A) and a motor driven pump (P-7B). EEW is actuated to protect the reactor core from overheating upon loss of main feedwater flow or reactor coolant pump (RCP) circulation. EFIC is a four channel system that monitors Once Through Steam Generator (OTSG) levels and pressures, main feedwater pump status, RCP status/
(2)(ii).G.Additional Information TherehavebeennoprevioussimilarLERssubmitted byANOregarding theinadvertent actuation ofanESFasaresultofinadequate self-checking byMaintenance personnel.
and Engineering Safeguazds Actuation System [JE) channels 3 and 4 in order to initiate EEW should an actuation setpoint be reached. The EFIC logic is a "one out of two taken twice format. To actuate either train of EEW, at least two of the four channels must be initiated.
EnergyIndustryIdentification System(EIZS)codesareidentified inthetextas[XX].NRCFOHN366A(5-92)}}
initiated,     it                                If  only two EFIC channels are is possible to have one or both trains of EFW actuated, depending upon which channels are initiated.
The monthly EFIC Channel "B" surveillance test was commenced                    at approximately 0825 on September 23. At approximately 1030, the technicians                      performing the surveillance verified that a simulated low level in the "A" OTSG appropriately initiated the "Trip 1" logic in the "A" EEW Train trip module and the "Trip 2" logic in the "B" EFW Train trip module. After resetting the simulated low OTSG level, the procedure required that the EEW trip modules be reset. The lead technician read the procedure step which stated, "Reset the EFW Trip Modules in Channels A and B." The technician performing the step repeated the instruction; however, instead of depressing the reset toggle switch, he depressed the "B" EFW trip module trip 1 button. This action satisfied the actuation logic for the "B" train of EFW and P-7A started. Since the OTSGs were at normal operating levels and pressure, no EFW flow was infected. The control board operator immediately secured P-7A. The EEW trip modules were properly reset, EFIC and EEW were returned to their normal configuration, and the surveillance procedure was exited.
The surveillance test was recommenced at 1247 and successfully completed at 1422 on September        23.
C.       Root Cause The  root cause of this event was determined to be personnel error. The technician performing the action understood the procedure step read by the lead technician and repeated it; however, he failed to self-check before performing the action.
NRC FORH  366A  (5-92)
 
  ;.5.92)                                                                                   APPROVED BT  (NB NO. 150.01 EXPIRES  5/31/95 EST INATED BURDEN PER RESPONSE          TO CNIPLY MITH THI S INFORHATION COLLECTION REQUEST: 50.0 HRS.
FORMARD CQNENTS      REGARDING BURDEN EST IHATE TO LZCBMSBB BVENT REPORT            (LER)                      THE INFORNAT I ON AND RECORDS HANAGENENT BRANCH TEXT CONTINUATION                                  (NNBB 7714) ~ U.So NUCLEAR REGULATORY CONNISSION, MASHINGTON, DC 20555-0001 ~ AND TO THE PAPERMQRK REDUCTION     PROJECT   (3150-0104) ~     OF FICE OF NANAGEHENT ANO BISGET        MASHINGTON DC 20503 FACILITY NANE (1)                 DOCKET NIMBER (2)             LER NMBER (6)                   PAGE  (3)
SEQUENTIAL      REVISION NSIBER          NWBER Arkansas Nuciear One - Unit      1                        05000313                                                          30F3 TEXT                                                                        (17)
A  contributing cause to this event was a procedural ambiguity. The procedure step (8.3.6.K) that resulted        in the EFW actuation simply stated, "Reset the EEW Trip Modules in Channels A and B. Preceding steps stipulating manipulation of devices were more specific with respect to the actions required. For example ,
step 8.3.6.I. states in part, "Press and release the Reset button.. ." If the                ~
procedure had stated, "Press and release the Reset toggle switch....," the error might not have occurred.
D.         Corrective Actions The  technicians involved with this event were counseled by management prior to recommencing the        surveillance test. The importance of self-checking was emphasized.
This event and management expectations regarding self-checking were discussed with the Unit-1 Instrumentation and Control shop personnel during their morning meetings.
Procedure changes wefe implemented to            clearly specify depressing the reset toggle switch      when  resetting the  EFW  trip modules.
The Maintenance Human Performance          Committee will develop            a summary of the lessons learned from this event to be presented to the Maintenance Departments of ANO-1 and ANO-2. The summary is expected to be completed by December 21, 1998.
E.         Safety Significance The EFZC and EFW systems performed as designed after                    the inadvertent actuation signal was initiated. However, since the OTSGs were                    at normal operating levels and pressure, no EFW flow was initiated and no plant                    perturbation resulted from this event., Therefore, this condition is considered to be of low safety significance.
F.         Basis For Reportability This condition is reportable pursuant to 10CFR50.73(a) (2) (iv) as an actuation of an Engineered Safety Feature (ESF).
It was    also reported to the      NRC Operations Center at 1336 on September 23, 1998,   in  accordance with 10CFR50.72(b) (2)(ii) .
G.       Additional Information There have been no previous          similar  LERs    submitted by      ANO    regarding the inadvertent actuation of          an ESF as a  result of inadequate self-checking by Maintenance personnel.
Energy Industry        Identification  System (EIZS) codes are            identified in the text as    [XX] .
NRC FOHN    366A  (5-92)}}

Latest revision as of 23:28, 3 February 2020

LER 98-004-00:on 980923,inadvertent Actuation of Efs Occurred During Surveillance Testing.Caused by Personnel Error.Personnel Involved with Event Were Counseled & Procedure Changes Were Implemented.With 981022 Ltr
ML17335A764
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/22/1998
From: Scheide R, Vandergrift J
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1CAN109801, LER-98-004-04, LER-98-4-4, NUDOCS 9810280011
Download: ML17335A764 (6)


Text

CATEGORY ly REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9810280011 DOC.DATE: 98/10/22 NOTARIZED: NO DOCKET FACIL:50-313 Arkansas Nuclear One, Unit 1, Arkansas Power E Light 05000313 AUTH"NAME, 'UTHOR AFFILIATION SCHEIDE,R.H. Entergy Operations, Inc.

VANDERGRIFT,J. Entergy Operations, Inc.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 98-004-00:on 980923,inadvertent actuation of EFS occurred during surveillance testing. Caused by personnel error. Personnel involved with event were counseled & A procedure changes were implemented. With 981022 ltr.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt,,etc.

NOTES:

. RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-1PD 1 1 HILTON,N 1 1

'NTERNAL: ACRS 1 1 AEOD SPD RAB 2 2 AEOD/SPD/RRAB 1 1 1 1 NRR/DE/ECGB 1 1 NRR/DE/EELB 1 1 NRR/DE/EMEB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOHB 1 1 NRR/DRCH/HQMB 1 1 NRR/DRPM/PECB 1 1 NRR/DSSA/SPLB 1 1 RES/DET/EIB 1 1 RGN4 FILE 01 1 1 EXTERNAL: L ST LOBBY WARD 1 1 LITCO BRYCE,J H 1 1 NOAC POORE,W. 1 1 NOAC QUEENER,DS 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 1 NOTE TO ALL "BIDS" RECIPIENTS:

PLEASE 8 LP US 0 REDUCE WASTE, TC 'V CUR NAM OR ORGA I ZAT'ON R MOVED ROM DIS'RIBUTION LIST CR REDUCE THE NUMBER O." COP:ES .="CEIVED OU R '.O R ORGA.'J ZA CN, CONTACT THE DOCUMENT CON RO FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 23

=- Entergy Entergy Operations, Inc.

1448 SR 333 RussdhR, AR 72801 Te1 501 858.5000 October 22, 1998 1CAN109801 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station OP1-17 Washington, DC 20555

Subject:

Arkansas Nuclear One - Unit - 1 Docket No. 50-313 License No. DPR-51 Licensee Event Report 50-313/98-004-00 Gentlemen:

In accordance with 10CFR50.73(a)(2xiv), enclosed is the subject report concerning an inadvertent actuation of the Emergency Peedwater System.

Very truly yours, Ji D. Vander D'ctor, Nuclear Safety JDV/rs enclosure 98102800ii 981022 PDR S

ADGCK 05000SiS PDR

U. S. NRC October 22, 1998 1CAN109801 PAGE 2 cc: Mr. Ellis W. MerschoF Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 Institute ofNuclear Power Operations 700 Galleria Parkway Atlanta, GA 30339-5957

APPROVED SY (BIB NO. 3150-0104 (5-92) EXP IRES 5/31/95 ESTIHATED BURDEN PER RESPONSE TO CNIPLY llITH LZCEMSEE EVENT REPORT THIS INFORHATIOH COLLECTION REQUEST: 50.0 HRS.

(LER) FORNARD COHHENTS REGARDING BURDEN ESTIHATE TO THE INFORHATION AMD RECORDS HANAGEHENT BRANCH (IQIBB 7714) ~ U ST NUCLEAR REGULATORY COHHISSIOMg MASHIMGTON, DC 20555 0001, AND TO THE PAPERMORK REDUCTION PROJECT (3150 0104), OFFICE OF HANAGEHENT AMO SISGET MASHIMGTON DC 20503.

FACILITY NAHE (1) DOCKET NQIBER (2) PAGE (3)

Arkansas Nuclear One - Unit 1 05000313 1 of 3 TITLE (4) Inadvertent Actuation Of The Emergency Feeduater System During Surveillance Testing As A Result Of Persanef Error EVENT DATE 5) LER NNSER (6 REPORT DATE (7) OTHER FACILITIES INVOLVED (8)

SEQUENTIAL REVISION FACILITY MANE DOCKET NQIBER HONTH DAY YEAR HONTH DAY YEAR NQIBER NQIBER 00 10 22 98 OPERATING THIS REPORT IS SUSHITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR: (Check one or more ) (11)

HOOE (9) 20.402(b) 20.405(c) X 50.73(a (2)(fv) 73.71 b POUER 20.405(a)(1)(f) 50.36(c) (1) 50.73(a)(2)(v 73.71(c)

LEVEL (10) 20.405(a)(1)(ll) 50.36(c)(2) 50.73(a)(2)(vlf) OTHER 20.405(a) (1) ( I f l ) 50.73(a)(2)(l) 50.73(a)(2)(vill)(A) Specffy ln 20.405(a)(1)(lv) 50.73(a) (2) ( f I ) 50.73(a)(2)(vlf f)(B) Abstract Befou 20.405(a)(1)(v) 50.73(a)(2)(l 1 I) 50.73(a)(2)(x) and fn Text LICENSEE CONTACT FOR THIS LER (12)

NAHE TELEPHONE NQIBER (Include Area Code)

Richard H. Scheide, Nuclear Safety and Llcensfng Specialist 501.858.4618 COHPLETE ONE LINE FOR EACH C(SIPONENT FAILURE DESCRIBED IN THIS REPORT (13)

REPORTABLE REPORTABLE CAUSE SYSTEH CNIPONENT HAMUFACTURER CAUSE SYSTEH COHPONENT HAMUFACTURER TO NPRDS TO NPRDS SUPPLEHENTAL REPORT EXPECTED (14) EXPECTED HONTH DAY YES SUSHI SS I ON (If yes, coapfete EXPECTED SUBHISSION DATE) X DATE (15)

ABSTRACT (Lfmlt to 1400 spaces, f.e., approximately 15 single-spaced typeMritten fines) (16)

On September 23, 1998, at approximately 1033, an inadvertent actuation of the Emergency Feedwater System (EFW) occurred during the performance of the Emergency Feedwater Initiation and Control System (EFZC) monthly surveillance test. When the technicians reached a point in the procedure requiring a half trip in the "A" and "B" EFW train trip modules to be reset, the lead technician read the step which stated, "Reset the EFW Trip Modules in Channels A and B." The technician performing the step repeated the instruction; however, instead of depressing the reset toggle switch, he depressed the "B" EFW trip module Trip 1 button. This action satisfied the actuation logic for the "B" train of EFW and one EEW pump started. Since the OTSGs were at normal levels and pressure, no EFW flow was in)ected. The EFW pump was immediately secured, "the trip modules were reset, and EFIC and EFW were returned to their normal configuration. The root cause of this event was personnel error. The individuals involved were counseled. Also, this event and expectations regarding self-checking were discussed with appropriate pezsonnel.

NRC FORH 366A (5 92)

APPROVED SY NNI NO. 3150 0104 (5-92) EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPONSE TO CNIPLY HITH THIS INFORHATION COLLECTION REQUEST: 50.0 NRS.

FORMARD CNNIENTS REGARDING BURDEN ESTIHATE TO LICENSEE EVENT REPORT (LER) THE INFORHATION AND RECORDS HANAGEHENT BRANCH (HNBB 7714), U.S. NUCLEAR REGULATORY COBIISSIONg TEXT CONTINUATION NASHINGTON, DC 20555-0001, AND TO THE PAPERNDRK REDUCTION PROJECT (3150-0104), OFFICE OF HANAGEHENT AND BLNGET MASHINGTON DC 20503.

FACILITY NAHE (1) DOCKET IRBSER (2) LER NNBER (6) PAGE (3)

SEQUENTIAL REVISION NNBER NNBER Arkanaaa Nuclear One - Unit 1 05000313 2OF3 98 TEXT (17)

Plant Status At the time this event occurred, Arkansas Nuclear One Unit 1 (ANO-1) was operating in steady-state conditions at 100 percent power.

B. Event Description On September 23, 1998, at approximately 1033, an inadvertent actuation of the Emergency Feedwater System (EFW)[BAJ occurred during performance of the Emergency Feedwater Initiation and Control System (EFIC)[JE] monthly surveillance test.

The EFW system is a two train system consisting of a steam driven pump (P-7A) and a motor driven pump (P-7B). EEW is actuated to protect the reactor core from overheating upon loss of main feedwater flow or reactor coolant pump (RCP) circulation. EFIC is a four channel system that monitors Once Through Steam Generator (OTSG) levels and pressures, main feedwater pump status, RCP status/

and Engineering Safeguazds Actuation System [JE) channels 3 and 4 in order to initiate EEW should an actuation setpoint be reached. The EFIC logic is a "one out of two taken twice format. To actuate either train of EEW, at least two of the four channels must be initiated.

initiated, it If only two EFIC channels are is possible to have one or both trains of EFW actuated, depending upon which channels are initiated.

The monthly EFIC Channel "B" surveillance test was commenced at approximately 0825 on September 23. At approximately 1030, the technicians performing the surveillance verified that a simulated low level in the "A" OTSG appropriately initiated the "Trip 1" logic in the "A" EEW Train trip module and the "Trip 2" logic in the "B" EFW Train trip module. After resetting the simulated low OTSG level, the procedure required that the EEW trip modules be reset. The lead technician read the procedure step which stated, "Reset the EFW Trip Modules in Channels A and B." The technician performing the step repeated the instruction; however, instead of depressing the reset toggle switch, he depressed the "B" EFW trip module trip 1 button. This action satisfied the actuation logic for the "B" train of EFW and P-7A started. Since the OTSGs were at normal operating levels and pressure, no EFW flow was infected. The control board operator immediately secured P-7A. The EEW trip modules were properly reset, EFIC and EEW were returned to their normal configuration, and the surveillance procedure was exited.

The surveillance test was recommenced at 1247 and successfully completed at 1422 on September 23.

C. Root Cause The root cause of this event was determined to be personnel error. The technician performing the action understood the procedure step read by the lead technician and repeated it; however, he failed to self-check before performing the action.

NRC FORH 366A (5-92)

.5.92) APPROVED BT (NB NO. 150.01 EXPIRES 5/31/95 EST INATED BURDEN PER RESPONSE TO CNIPLY MITH THI S INFORHATION COLLECTION REQUEST
50.0 HRS.

FORMARD CQNENTS REGARDING BURDEN EST IHATE TO LZCBMSBB BVENT REPORT (LER) THE INFORNAT I ON AND RECORDS HANAGENENT BRANCH TEXT CONTINUATION (NNBB 7714) ~ U.So NUCLEAR REGULATORY CONNISSION, MASHINGTON, DC 20555-0001 ~ AND TO THE PAPERMQRK REDUCTION PROJECT (3150-0104) ~ OF FICE OF NANAGEHENT ANO BISGET MASHINGTON DC 20503 FACILITY NANE (1) DOCKET NIMBER (2) LER NMBER (6) PAGE (3)

SEQUENTIAL REVISION NSIBER NWBER Arkansas Nuciear One - Unit 1 05000313 30F3 TEXT (17)

A contributing cause to this event was a procedural ambiguity. The procedure step (8.3.6.K) that resulted in the EFW actuation simply stated, "Reset the EEW Trip Modules in Channels A and B. Preceding steps stipulating manipulation of devices were more specific with respect to the actions required. For example ,

step 8.3.6.I. states in part, "Press and release the Reset button.. ." If the ~

procedure had stated, "Press and release the Reset toggle switch....," the error might not have occurred.

D. Corrective Actions The technicians involved with this event were counseled by management prior to recommencing the surveillance test. The importance of self-checking was emphasized.

This event and management expectations regarding self-checking were discussed with the Unit-1 Instrumentation and Control shop personnel during their morning meetings.

Procedure changes wefe implemented to clearly specify depressing the reset toggle switch when resetting the EFW trip modules.

The Maintenance Human Performance Committee will develop a summary of the lessons learned from this event to be presented to the Maintenance Departments of ANO-1 and ANO-2. The summary is expected to be completed by December 21, 1998.

E. Safety Significance The EFZC and EFW systems performed as designed after the inadvertent actuation signal was initiated. However, since the OTSGs were at normal operating levels and pressure, no EFW flow was initiated and no plant perturbation resulted from this event., Therefore, this condition is considered to be of low safety significance.

F. Basis For Reportability This condition is reportable pursuant to 10CFR50.73(a) (2) (iv) as an actuation of an Engineered Safety Feature (ESF).

It was also reported to the NRC Operations Center at 1336 on September 23, 1998, in accordance with 10CFR50.72(b) (2)(ii) .

G. Additional Information There have been no previous similar LERs submitted by ANO regarding the inadvertent actuation of an ESF as a result of inadequate self-checking by Maintenance personnel.

Energy Industry Identification System (EIZS) codes are identified in the text as [XX] .