|
|
(4 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 05/24/2016 | | | issue date = 05/24/2016 |
| | title = Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 - Annual Radioactive Effluent Release Report 58, January 1, 2015 Through December 31, 2015 | | | title = Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 - Annual Radioactive Effluent Release Report 58, January 1, 2015 Through December 31, 2015 |
| | author name = Navin P D | | | author name = Navin P |
| | author affiliation = Exelon Generation Co, LLC | | | author affiliation = Exelon Generation Co, LLC |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:Exelon Generation 10CFR 50.4 May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) |
| | Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 |
| | |
| | ==Subject:== |
| | Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'. |
| | Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. The PCP should not have included the |
| | 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. This oversight has been entered into the Exelon Corrective Action Program. |
| | Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator - Region I NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves) |
| | |
| | Exelon Generation 10CFR 50.4 May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) |
| | Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 |
| | |
| | ==Subject:== |
| | Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'. |
| | Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. The PCP should not have included the |
| | 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. This oversight has been entered into the Exelon Corrective Action Program. |
| | Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator - Region I NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)}} |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 05000277/LER-2024-003, (Pbaps), Unit 2, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 (Pbaps), Unit 2, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval ML24099A0012024-04-0808 April 2024 (PBAPS) Units 2 and 3, Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. 05000277/LER-2024-001, Submittal of LER 2024-001-00 for Peach Bottom Atomic Power Station (PBAPS) Unit 2, Automatic Reactor Scram Due to an Invalid Generator Lockout2024-03-21021 March 2024 Submittal of LER 2024-001-00 for Peach Bottom Atomic Power Station (PBAPS) Unit 2, Automatic Reactor Scram Due to an Invalid Generator Lockout IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection IR 05000277/20230062024-02-28028 February 2024 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2023006 and 05000278/2023006) IR 05000171/20230012024-02-20020 February 2024 Constellation Energy Generation, LLC - Peach Bottom Atomic Power Station, Unit 1 - NRC Inspection Report No. 05000171/2023001 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] |
Text
Exelon Generation 10CFR 50.4 May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI)
Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29
Subject:
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. The PCP should not have included the
'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. This oversight has been entered into the Exelon Corrective Action Program.
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator - Region I NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)
Exelon Generation 10CFR 50.4 May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI)
Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29
Subject:
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential. The PCP should not have included the
'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document. This oversight has been entered into the Exelon Corrective Action Program.
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator - Region I NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)