|
|
(7 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 08/26/1988 | | | issue date = 08/26/1988 |
| | title = Revised Emergency Plan Implementing Procedures,Including Rev 1 to SC-321, Mgt of Emergency Off-Site Radiation Survey Teams & Rev 27 to SC-410, Insp of Emergency Equipment. | | | title = Revised Emergency Plan Implementing Procedures,Including Rev 1 to SC-321, Mgt of Emergency Off-Site Radiation Survey Teams & Rev 27 to SC-410, Insp of Emergency Equipment. |
| | author name = MEYER T A | | | author name = Meyer T |
| | author affiliation = ROCHESTER GAS & ELECTRIC CORP. | | | author affiliation = ROCHESTER GAS & ELECTRIC CORP. |
| | addressee name = | | | addressee name = |
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:ROCHESTERGASANDELECPICCORPORATIONGINNASTATIONCONTROLLEDCOPYNUMBERoU6INNASTATIONUNIT¹'ICOMP(HIEDDATE:-TIME:-PROCEDURENO.SC-321REV.NO.1MANAGEMENTOFEMERGENCYOFF-SITERADIATIONSURVEYTEAMSTECHNICALREVIEWPORCREVIEWDATELANTSUPERINTEEFFECTIVEDATEQAXNON-QACATEGORY1.0REVIEWEDBY:THISPROCEDURECONTAINS2PAGES880'P080410880886PDRADOCK.05000244IFPDRg | | {{#Wiki_filter:6INNA STATION UNIT ¹'I ROCHESTER GAS AND ELEC PIC CORPORATION COMP( HIED GINNA STATION DATE:- |
| 'e SC-3?1:1SC-321MANAGI%ENTOFEMERGENCYOFF-SITERADIATIONSURVEYTEAMS1.0PURPOSE:Theob)ectiveoftheoff-siteradiationsurveyteamdirectoristoobtainmeaningfulplumeinformationinatimelymanner.Thisprocedureprovidesguidanceforthesurveyteamdirectortoefficientlymanagethesurveyteamsinthecollectionofplumeinformation.2' | | CONTROLLED COPY NUMBER oU TIME:- |
| | PROCEDURE NO. SC-321 REV. NO. 1 MANAGEMENT OF EMERGENCY OFF-SITE RADIATION SURVEY TEAMS TECHNICAL REVIEW PORC REVIEW DATE LANT SUPERINTE EFFECTIVE DATE QA X NON-QA CATEGORY 1.0 REVIEWED BY: |
| | THIS PROCEDURE CONTAINS 2 PAGES 880'P080410 880886 PDR ADOCK. 05000244 I F PDR g |
| | |
| | 'e SC-3? 1: 1 SC-321 MANAGI%ENT OF EMERGENCY OFF-SITE RADIATION SURVEY TEAMS |
| | |
| | ==1.0 PURPOSE== |
| | The ob)ective of the off-site radiation survey team director is to obtain meaningful plume information in a timely manner. This procedure provides guidance for the survey team director to efficiently manage the survey teams in the collection of plume information. |
| | 2 ' |
|
| |
|
| ==REFERENCES:== | | ==REFERENCES:== |
| F12'2'SC-323,EmergencyOff-SiteRadiationSurveyTeamsSC-420,EstimatingOff-SiteDosesSC-442,MonitoringSiteRadiationLevelbyTLDINSTRUCTIONS:3.1.1Directingteamspriortorelease.Directteamstocompleteprimarysurveyroutes.Thiswillallowtheteamstocheckoutequipmentandput,outadditionalTLDsatlocationsasdescribedinprocedureSC-442,TableZZZ,orotherlocationsasdesired.3~1.2Positionteamsdownwindatthreedifferentdistancesfromtheplant.Thismight,beatone,threeandfivemiles.Haveteamssurveybackandforthacrosstheareawheretheplumewouldbeexpectedifareleaseoccurred.3.1.33.1.43.23.2'Informteamsofthepro)ectedlocationofthecenter-lineoftheplumeandthewindspeedanddirection.Obtainnamesofteammembersandobtainexposurehistoryforthecurrentcalendarquarter.Directingteamsduringarelease.Informteamswhenreleasebeginsandtheirlocationinrelationoftheplumecenterline.Tellwhatthepro)ecteddoseratesareattheplumecenterline.
| |
| ~l SC-321:2XnfanduseofKZ.nformteamsastoneedforrespiratorytt'roecsonPositionteamsdownwindatthreedifferentdistancesfromtheplant.Thismightbeatone,twoandfiveDirectteamstodoaprofileoftheplumeafteritarrives.Theyshouldbedirectedtodriveacrosstheplumetodeterminethewidthandthemaximumreading(centerline),recordingdoseratesevery1/10miles.Moreprofilesoftheplumearemadeasnecessarytoputtheplumelocationonthemap.Direcrectteamstotakeanairsample(approximately10minutes)attheplumecenterline.Maintainrecordofdosetosurveyteammembers.Zfteamsneedreliefformeals,etc.,relieveoneteamatatimeonarotatingbasis.Teamsonstandbyshouldbelocatedinlowbackgroundareas.
| |
| T1 GIN!SASTATIONUNIT0lCOMPLETEDDAVE:-TlME:-ROCHESTERGASANDELECTRICCORPORATIONGINNASTATIONCONTROLLEDCOPYNUMBERPROCEDURENO.SC-322REV.NO.MANNINGTHEEMERGENCYSURVEYCENTERTECHNICALREVIEWPORCREVIEWDATESEP223988PLANTUPERINTENDENTSEP271988EFFECTIVEDATEQA~NON-QACATEGORY1.0REVIEWEDBY:TNZSPROCEDURECONTAINS4PAGES
| |
|
| |
|
| SC-322:1SC-322MANNINGTHEEMERGENCYSURVEYCENTER1.0PURPOSEThepurposeofthisprocedureistodesignateindivid-ualswhoshouldreporttotheEmergencySurveyCenterforanAlertlevelorgreaterevent.ThesepersonnelwillassisttheTSCandOSCwithemergencyfunctions.2.02. | | F 1 SC-323, Emergency Off-Site Radiation Survey Teams 2 ' SC-420, Estimating Off-Site Doses 2 ' SC-442, Monitoring Site Radiation Level by TLD INSTRUCTIONS: |
| | Directing teams prior to release. |
| | 3.1.1 Direct teams to complete primary survey routes. This will allow the teams to check out equipment and put, out additional TLDs at locations as described in procedure SC-442, Table ZZZ, or other locations as desired. |
| | 3 1.2 Position teams downwind at three different distances from the plant. This might, be at one, three and five |
| | ~ |
| | miles. Have teams survey back and forth across the area where the plume would be expected occurred. |
| | if a release |
| | : 3. 1.3 Inform teams of the pro)ected location of the center-line of the plume and the wind speed and direction. |
| | : 3. 1.4 Obtain names of team members and obtain exposure history for the current calendar quarter. |
| | 3.2 Directing teams during a release. |
| | 3.2 ' Inform teams when release begins and their location in relation of the plume centerline. Tell what the pro)ected dose rates are at the plume centerline. |
| | |
| | ~l SC-321:2 nform teams as Xnf and use of KZ. |
| | to need for respiratory tec t'ro son Position teams downwind at three different distances from the plant. This might be at one, two and five Direct teams to do a profile of the plume after it arrives. They should be directed to drive across the plume to determine the width and the maximum reading (centerline), recording dose rates every 1/10 miles. |
| | More profiles of the plume are made as necessary to put the plume location on the map. |
| | rect teams to take an air sample (approximately 10 Direc minutes) at the plume centerline. |
| | Maintain record of dose to survey team members. |
| | Zf teams need relief for meals, etc., relieve one team at a time on a rotating basis. |
| | Teams on standby should be located in low background areas. |
|
| |
|
| ==12.2REFERENCES==
| | T1 GIN!SA STATION ROCHESTER GAS AND ELECTRIC CORPORATION UNIT 0 l COMPLETED GINNA STATION DAVE:- CONTROLLED COPY NUMBER TlME:- |
| :SC-323,EmergencyOffSiteRadiationSurveyTeamsSC-324,EmergencyOnSiteRadiationSurveyTeams3'INSTRUCTIONS:3~13.23~2~13.2'Duringnormalworkinghours(orifonsite)thefollowingpersonsreportdirectlytotheEmergencySurveyCertteruponannouncementofanAlertlevelorgreater.1.QualityControlPersonnel2.DesignatedSurveyTeamMembersperSC-600UponArrivalattheEmergencySurveyCenterAssureEmergencySurveyCenterisopenObtainappropriatetagfromSurveyCenterTagBoardandLognameundertag.TaginstructionfoundinAttachmentI~3''3''3'SignoutaTLD.Signoutaselfreadingpocketdosimeter.Duringoffdutyhours,individualswillbecalledtoreporttoGinnaStation.YoumayreportdirectlytotheEmergencySurveyCenterandproceedwithStep3.2above.3.4SURVEYCENTERMANAGERORASSISTANT3~4~1Checkouthighrangesurveyinstrument.
| | PROCEDURE NO. SC-322 REV. NO. |
| | MANNING THE EMERGENCY SURVEY CENTER TECHNICAL REVIEW PORC REVIEW DATE SEP 2 2 3988 PLANT UPERINTENDENT SEP 2 7 1988 EFFECTIVE DATE QA ~ NON-QA CATEGORY 1.0 REVIEWED BY: |
| | TNZS PROCEDURE CONTAINS 4 PAGES |
|
| |
|
| 3.4.2SC-322:2InsurebothradiosintheSurveyCenterManager'sOfficeareON.3'.33'.43.4.53.4.63.53~5~13.5'3''3'3.6'Conductradi'ologicalsurveyofbasement,auditoriumandareasexteriortothebuilding.Ifdoserateisgreaterthan50mRem/hradviseemergencycoordinatorandmakearrangementstorelocateaftersurveyteamsaredispatched.Takeanairsampleanddetermineactivit~.Ifunidenti-fiedactivityisgreaterthan1x10"uci/cc,adviseemergencycoordinator.Startconstantairmonitorinoperation.PAssistsurveyteamstoorganizeandpreparefordispatch.ObtainweatherdatafromControlRoomandadvisesurveyteamsofprojectedlocationoftheplume.MaintainalogofeventsasregardsSurveyCenteropera-tions.~~Maintainarecordofallsurveyteamsamplesandinsuresamplesareproperlymarkedandstored.NotifySecurityatSASofTSCmembers(byname)whowillneedaccesstothesite.AdvisethosegoingtotheTSCofdoseratesinthearea.
| | SC-322:1 SC-322 MANNING THE EMERGENCY SURVEY CENTER 1.0 PURPOSE The purpose of this procedure is to designate individ-uals who should report to the Emergency Survey Center for an Alert level or greater event. These personnel will assist the TSC and OSC with emergency functions. |
|
| |
|
| ATTACHMENTITOSC-322SC-322:3TAGBOARDASSIGNMENTSEmergencySurveyCenterManagerLogNameonTagBoardFollowprocedureSC-322REVERSESIDEBLANKEmergencySurveyCenterCommunicatorReporttoSurveyCenterManagerOn-SiteSurveyTeamBlueObtainBlueFootlockerFollowprocedureSC-324foundinsidefootlockerOn-SiteSurveyTeamYellowObtainYellowFootlockerFollowprocedureSC-324foundinsidefootlockerSpareSurveyTeamWhiteReporttoSurveyCenterMangerObtainadosimeterREVERSESIDEBLANKREVERSESIDEBLANKREVERSESIDEBLANKREVERSESIDEBLANKFollowprocedureSC-323and324foundinsidefootlockerStandbyinSurveyCenterOff-SiteSurveyTeamGreenObtainGreenfootlockerFollowprocedureSC-323FoundinsidefootlockerREVERSESIDEBLANK
| | ==2.0 REFERENCES== |
| | 2.1 SC-323, Emergency Off Site Radiation Survey Teams 2.2 SC-324, Emergency On Site Radiation Survey Teams 3 ' INSTRUCTIONS: |
| | 3 ~ 1 During normal working hours (or if on site) the following persons report directly to the Emergency Survey Certter upon announcement of an Alert level or greater. |
| | : 1. Quality Control Personnel |
| | : 2. Designated Survey Team Members per SC-600 3.2 Upon Arrival at the Emergency Survey Center 3~2~1 Assure Emergency Survey Center is open 3.2 ' Obtain appropriate tag from Survey Center Tag Board and Log name under tag. Tag instruction found in Attachment I ~ |
| | 3 ' ' Sign out a TLD. |
| | 3 ' ' Sign out a self reading pocket dosimeter. |
| | 3 ' During off duty hours, individuals will be called to report to Ginna Station. You may report directly to the Emergency Survey Center and proceed with Step 3.2 above. |
| | 3.4 SURVEY CENTER MANAGER OR ASSISTANT 3 ~ 4~1 Check out high range survey instrument. |
|
| |
|
| Off-SiteSurveyTeamRedObtainRedfootlockerFollowprocedureSC-323foundirsidefootlockerOff-SiteSurveyTeamOrangeObtainOrangeFootlockerFollowprocedureSC-323foundinsidefootlockerSC-322:4REVERSESIDEBLANKREVERSESIDEBLANK 0'
| | SC-322:2 3.4.2 Insure both radios in the Survey Center Manager's Office are ON. |
| }} | | 3 '.3 Conduct radi'ological survey of basement, areas exterior to the building. |
| | auditorium and 3 '.4 If dose rate is greater than 50 mRem/hr advise emergency coordinator and make arrangements to relocate after survey teams are dispatched. |
| | 3.4.5 Take an air sample and determine fied activity is greater than 1 activit~. |
| | x 10 " |
| | If unidenti-uci/cc, advise emergency coordinator. |
| | 3.4.6 Start constant air monitor in operation. |
| | P 3.5 Assist survey teams to organize and prepare for dispatch. |
| | 3 ~ 5~1 Obtain weather data from Control Room and advise survey teams of projected location of the plume. |
| | 3.5 ' Maintain a log of events as regards Survey Center opera-tions. |
| | ~ ~ |
| | 3 ' ' Maintain a record of all survey team samples and insure samples are properly marked and stored. |
| | 3 ' Notify Security at SAS of TSC members (by name) who will need access to the site. |
| | 3.6 ' Advise those going to the TSC of dose rates in the area. |
| | |
| | SC-322:3 ATTACHMENT I TO SC-322 TAG BOARD ASSIGNMENTS Emergency Survey Center Manager Log Name on Tag Board REVERSE SIDE Follow procedure SC-322 BLANK Emergency Survey Center Communicator Report to Survey Center Manager REVERSE SIDE BLANK On-Site Survey Team Blue Obtain Blue Foot locker REVERSE SIDE Follow procedure SC-324 BLANK found inside foot locker On-Site Survey Team Yellow Obtain Yellow Foot locker REVERSE SIDE Follow procedure SC-324 BLANK found inside foot locker Spare Survey Team White Report to Survey Center REVERSE SIDE Manger BLANK Obtain a dosimeter Follow procedure SC-323 and 324 found inside foot locker Standby in Survey Center Off-Site Survey Team Green Obtain Green foot locker REVERSE SIDE Follow procedure SC-323 BLANK Found inside foot locker |
| | |
| | SC-322:4 Off-Site Survey Team Red Obtain Red foot locker REVERSE SIDE Follow procedure SC-323 BLANK found irside foot locker Off-Site Survey Team Orange Obtain Orange Foot locker REVERSE SIDE Follow procedure SC-323 BLANK found inside foot locker |
| | |
| | 0'}} |
Similar Documents at Ginna |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements 1999-06-28
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML20140B8291997-03-24024 March 1997 Rev 3 to EOP ATT-12.0, Attachment N2 Porvs ML17264A8221997-02-0606 February 1997 Rev 15 to FR-P.1, Response to Imminent Pressurized Thermal Shock Condition. ML17264A8201997-02-0606 February 1997 Rev 7 to AP-RCC.2, Rcc/Rpi Malfunction. ML17264A8081997-01-23023 January 1997 Revised Emergency Operating Procedures,Including Rev 14 to E-1,Rev 19 to E-3,Rev 14 to ECA-2.1,Rev ECA-3.3,Rev 20 to ES-1.3,Rev 13 to FR-C.1,Rev 12 to FR-C.2 & Rev 14 to FR-P.1 ML20133N3351997-01-10010 January 1997 Rev 7 to FR-C.3, Response to Saturated Core Cooling ML17264A8881996-10-10010 October 1996 Rev 9 to ODCM for Ginna Station. ML20128N0681996-10-0303 October 1996 Revised Emergency Operating Procedures,Including Rev 5 to Att-10.0, Attachment Faulted S/G & Rev 6 to Att-16.0, Attachment Ruptured S/G ML17264A5311996-05-31031 May 1996 Revised Emergency Operating Procedures,Including Rev 10 to AP-RCP.1,Rev 12 to ECA-0.1,Rev 12 to ECA-2.1,Rev 3 to FR-H.2,Rev 3 to FR-H.4,Rev 7 to FR-I.1,Rev 12 to FR-P.1,Rev 10 to FR-S-1 & Rev 6 to FR-S.2 ML17264A5161996-05-22022 May 1996 Rev 2 to Technical Requirements Manual (TRM) ML17264A4581996-04-0808 April 1996 Rev 7 to ODCM for Ginna Station. ML17264A4371996-04-0101 April 1996 Rev 1 to Technical Requirements Manual (TRM) ML17264A4391996-04-0101 April 1996 Rev 1 to Updated Technical Requirements Manual (TRM) ML17264A4191996-02-24024 February 1996 Rev 0 to Technical Requirements Manual (Trm). ML17264A6901996-02-23023 February 1996 Rev 0 to Inservice Testing Program. 1999-05-12
[Table view] |
Text
6INNA STATION UNIT ¹'I ROCHESTER GAS AND ELEC PIC CORPORATION COMP( HIED GINNA STATION DATE:-
CONTROLLED COPY NUMBER oU TIME:-
PROCEDURE NO. SC-321 REV. NO. 1 MANAGEMENT OF EMERGENCY OFF-SITE RADIATION SURVEY TEAMS TECHNICAL REVIEW PORC REVIEW DATE LANT SUPERINTE EFFECTIVE DATE QA X NON-QA CATEGORY 1.0 REVIEWED BY:
THIS PROCEDURE CONTAINS 2 PAGES 880'P080410 880886 PDR ADOCK. 05000244 I F PDR g
'e SC-3? 1: 1 SC-321 MANAGI%ENT OF EMERGENCY OFF-SITE RADIATION SURVEY TEAMS
1.0 PURPOSE
The ob)ective of the off-site radiation survey team director is to obtain meaningful plume information in a timely manner. This procedure provides guidance for the survey team director to efficiently manage the survey teams in the collection of plume information.
2 '
REFERENCES:
F 1 SC-323, Emergency Off-Site Radiation Survey Teams 2 ' SC-420, Estimating Off-Site Doses 2 ' SC-442, Monitoring Site Radiation Level by TLD INSTRUCTIONS:
Directing teams prior to release.
3.1.1 Direct teams to complete primary survey routes. This will allow the teams to check out equipment and put, out additional TLDs at locations as described in procedure SC-442, Table ZZZ, or other locations as desired.
3 1.2 Position teams downwind at three different distances from the plant. This might, be at one, three and five
~
miles. Have teams survey back and forth across the area where the plume would be expected occurred.
if a release
- 3. 1.3 Inform teams of the pro)ected location of the center-line of the plume and the wind speed and direction.
- 3. 1.4 Obtain names of team members and obtain exposure history for the current calendar quarter.
3.2 Directing teams during a release.
3.2 ' Inform teams when release begins and their location in relation of the plume centerline. Tell what the pro)ected dose rates are at the plume centerline.
~l SC-321:2 nform teams as Xnf and use of KZ.
to need for respiratory tec t'ro son Position teams downwind at three different distances from the plant. This might be at one, two and five Direct teams to do a profile of the plume after it arrives. They should be directed to drive across the plume to determine the width and the maximum reading (centerline), recording dose rates every 1/10 miles.
More profiles of the plume are made as necessary to put the plume location on the map.
rect teams to take an air sample (approximately 10 Direc minutes) at the plume centerline.
Maintain record of dose to survey team members.
Zf teams need relief for meals, etc., relieve one team at a time on a rotating basis.
Teams on standby should be located in low background areas.
T1 GIN!SA STATION ROCHESTER GAS AND ELECTRIC CORPORATION UNIT 0 l COMPLETED GINNA STATION DAVE:- CONTROLLED COPY NUMBER TlME:-
PROCEDURE NO. SC-322 REV. NO.
MANNING THE EMERGENCY SURVEY CENTER TECHNICAL REVIEW PORC REVIEW DATE SEP 2 2 3988 PLANT UPERINTENDENT SEP 2 7 1988 EFFECTIVE DATE QA ~ NON-QA CATEGORY 1.0 REVIEWED BY:
TNZS PROCEDURE CONTAINS 4 PAGES
SC-322:1 SC-322 MANNING THE EMERGENCY SURVEY CENTER 1.0 PURPOSE The purpose of this procedure is to designate individ-uals who should report to the Emergency Survey Center for an Alert level or greater event. These personnel will assist the TSC and OSC with emergency functions.
2.0 REFERENCES
2.1 SC-323, Emergency Off Site Radiation Survey Teams 2.2 SC-324, Emergency On Site Radiation Survey Teams 3 ' INSTRUCTIONS:
3 ~ 1 During normal working hours (or if on site) the following persons report directly to the Emergency Survey Certter upon announcement of an Alert level or greater.
- 1. Quality Control Personnel
- 2. Designated Survey Team Members per SC-600 3.2 Upon Arrival at the Emergency Survey Center 3~2~1 Assure Emergency Survey Center is open 3.2 ' Obtain appropriate tag from Survey Center Tag Board and Log name under tag. Tag instruction found in Attachment I ~
3 ' ' Sign out a TLD.
3 ' ' Sign out a self reading pocket dosimeter.
3 ' During off duty hours, individuals will be called to report to Ginna Station. You may report directly to the Emergency Survey Center and proceed with Step 3.2 above.
3.4 SURVEY CENTER MANAGER OR ASSISTANT 3 ~ 4~1 Check out high range survey instrument.
SC-322:2 3.4.2 Insure both radios in the Survey Center Manager's Office are ON.
3 '.3 Conduct radi'ological survey of basement, areas exterior to the building.
auditorium and 3 '.4 If dose rate is greater than 50 mRem/hr advise emergency coordinator and make arrangements to relocate after survey teams are dispatched.
3.4.5 Take an air sample and determine fied activity is greater than 1 activit~.
x 10 "
If unidenti-uci/cc, advise emergency coordinator.
3.4.6 Start constant air monitor in operation.
P 3.5 Assist survey teams to organize and prepare for dispatch.
3 ~ 5~1 Obtain weather data from Control Room and advise survey teams of projected location of the plume.
3.5 ' Maintain a log of events as regards Survey Center opera-tions.
~ ~
3 ' ' Maintain a record of all survey team samples and insure samples are properly marked and stored.
3 ' Notify Security at SAS of TSC members (by name) who will need access to the site.
3.6 ' Advise those going to the TSC of dose rates in the area.
SC-322:3 ATTACHMENT I TO SC-322 TAG BOARD ASSIGNMENTS Emergency Survey Center Manager Log Name on Tag Board REVERSE SIDE Follow procedure SC-322 BLANK Emergency Survey Center Communicator Report to Survey Center Manager REVERSE SIDE BLANK On-Site Survey Team Blue Obtain Blue Foot locker REVERSE SIDE Follow procedure SC-324 BLANK found inside foot locker On-Site Survey Team Yellow Obtain Yellow Foot locker REVERSE SIDE Follow procedure SC-324 BLANK found inside foot locker Spare Survey Team White Report to Survey Center REVERSE SIDE Manger BLANK Obtain a dosimeter Follow procedure SC-323 and 324 found inside foot locker Standby in Survey Center Off-Site Survey Team Green Obtain Green foot locker REVERSE SIDE Follow procedure SC-323 BLANK Found inside foot locker
SC-322:4 Off-Site Survey Team Red Obtain Red foot locker REVERSE SIDE Follow procedure SC-323 BLANK found irside foot locker Off-Site Survey Team Orange Obtain Orange Foot locker REVERSE SIDE Follow procedure SC-323 BLANK found inside foot locker
0'