(5 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML14219A751 | | | number = ML14219A751 |
| | issue date = 08/07/2014 | | | issue date = 08/07/2014 |
| | title = Columbia Generating Station, Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000397-14-005) and Request for Information | | | title = Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000397-14-005) and Request for Information |
| | author name = Farnholtz T R | | | author name = Farnholtz T |
| | author affiliation = NRC/RGN-IV/DRS/EB-1 | | | author affiliation = NRC/RGN-IV/DRS/EB-1 |
| | addressee name = Reddemann M E | | | addressee name = Reddemann M |
| | addressee affiliation = Energy Northwest | | | addressee affiliation = Energy Northwest |
| | docket = 05000397 | | | docket = 05000397 |
Line 14: |
Line 14: |
| | page count = 6 | | | page count = 6 |
| }} | | }} |
| See also: [[followed by::IR 05000397/2014005]] | | See also: [[see also::IR 05000397/2014005]] |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511 August 7, 2014 | | {{#Wiki_filter:UNITED STATES |
|
| | NUCLEAR REGULATORY COMMISSION |
| Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest | | REGION IV |
| P. O. Box 968 (Mail Drop 1023) | | 1600 E. LAMAR BLVD. |
| Richland, WA 99352-0968 | | ARLINGTON, TX 76011-4511 |
| SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT
| | August 7, 2014 |
| MODIFICATIONS INSPECTION (05000397/2014005) AND REQUEST FOR | | Mr. Mark E. Reddemann |
| INFORMATION Dear Mr. Reddemann: | | Chief Executive Officer |
| The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant | | Energy Northwest |
| modifications at your Columbia Generating Station from September 22-26, 2014, and October 5-10, 2014. The inspection will consist of three reactor inspectors from the NRC's Region IV office for two weeks. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments and | | P. O. Box 968 (Mail Drop 1023) |
| Permanent Plant Modifications." | | Richland, WA 99352-0968 |
|
| | SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF EVALUATIONS OF |
| Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for information. Please note that the | | CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT |
| information is requested to be provided by September 15, 2014. Upon review of this information, the inspectors will select additional information for review upon arrival onsite. It is | | MODIFICATIONS INSPECTION (05000397/2014005) AND REQUEST FOR |
| important that all of this information is up-to-date and complete in order to minimize the amount of additional information requested during the preparation and/or the onsite portions of the inspection. | | INFORMATION |
| We have discussed the schedule for these inspection activities with your staff and understand | | Dear Mr. Reddemann: |
| that our regulatory contact for this inspection will be Richard Garcia of your licensing | | The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff |
| organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194, or by e-mail at Jonathan.Braisted@nrc.gov. | | will conduct the baseline inspection of changes, tests, experiments, and permanent plant |
|
| | modifications at your Columbia Generating Station from September 22-26, 2014, and |
| This letter does not contain new or amended information collection requirements subject to the | | October 5-10, 2014. The inspection will consist of three reactor inspectors from the NRCs |
| Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | | Region IV office for two weeks. The inspection will be conducted in accordance with NRC |
| respond to, a request for information or an information collection requirement unless the | | Inspection Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and |
| requesting document displays a currently valid Office of Management and Budget control number. | | Permanent Plant Modifications. |
| M. Reddemann - 2 - In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at
| | Experience has shown that this inspection is resource intensive for both the NRC inspectors |
| http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,
| | and your staff. In order to minimize the impact to your onsite resources and to ensure a |
| /RA/
| | productive inspection, we have enclosed a request for information. Please note that the |
|
| | information is requested to be provided by September 15, 2014. Upon review of this |
| Thomas R. Farnholtz, Chief Engineering Branch 1
| | information, the inspectors will select additional information for review upon arrival onsite. It is |
| Division of Reactor Safety
| | important that all of this information is up-to-date and complete in order to minimize the amount |
| Docket No.: 50-397 License No.: NPF-21
| | of additional information requested during the preparation and/or the onsite portions of the |
| Enclosure:
| | inspection. |
| Evaluations of Changes, Tests,
| | We have discussed the schedule for these inspection activities with your staff and understand |
| and Experiments and Permanent Plant
| | that our regulatory contact for this inspection will be Richard Garcia of your licensing |
| Modifications Inspection Request for Information Electronic Distribution to Columbia Generating Station
| | organization. If there are any questions about this inspection or the material requested, please |
|
| | contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194, or by e-mail at |
|
| | Jonathan.Braisted@nrc.gov. |
|
| | This letter does not contain new or amended information collection requirements subject to the |
| Enclosure Request for Information Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Columbia Generating Station
| | Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection |
| Inspection Report: 05000397/20140045
| | requirements were approved by the Office of Management and Budget, control |
| Inspection Dates: September 22-26, 2014, and October 5-10, 2014
| | number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to |
| Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications" Lead Inspector: Jonathan Braisted, Reactor Inspector
| | respond to, a request for information or an information collection requirement unless the |
| Information Requested for the In-Office Preparation Week
| | requesting document displays a currently valid Office of Management and Budget control |
| The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by September 15, 2014, to the attention of Jonathan Braisted. We request
| | number. |
| that you categorize the documents in your response with the numbered list below. The
| |
| inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific
| |
| items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as possible.
| |
| 1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations. 2. A list with descriptions of all 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation.
| |
| 3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial modification inspection that did not result in an application for license amendment. 4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection. 5. Procedure(s) for implementing permanent plant modifications. 6. A list with descriptions of all permanent plant modifications since the last triennial modification inspection. 7. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection. 8. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates. 9. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
| |
| - 2 - 10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report. Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
| |
| determine the safety and/or risk significance of the screenings, evaluations, and modifications.
| |
|
| |
| Note: For this inspection, permanent plant modifications include permanent plant changes,
| |
| design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications
| |
|
| |
|
| |
| Inspector Contact Information: Jonathan Braisted Mahdi Hayes Nnaerika Okonkwo
| |
| Reactor Inspector Operations Engineer Reactor Inspector
| |
| 817-200-1194 817-200-1508 817-200-1114
| |
| Jonathan.Braisted@nrc.gov Mahdi.Hayes@nrc.gov Nnaerika.Okonkwo@nrc.gov
| |
| Mailing Address:
| |
|
| |
| U.S. NRC, Region IV
| |
| Attn: Jonathan Braisted 1600 East Lamar Blvd. Arlington, TX 76011-4125
| |
|
| |
|
| |
| M. Reddemann -2- In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at
| |
| http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/
| |
| Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety
| |
| Docket No.: 50-397
| |
| License No.: NPF-21 Enclosure:
| |
| Evaluations of Changes, Tests,
| |
| and Experiments and Permanent Plant
| |
| Modifications Inspection Request for Information
| |
| Electronic Distribution to Columbia Generating Station
| |
|
| |
|
| |
| DISTRIBUTION: See next page
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
| R:\REACTORS\CGS\2014\CGS 2014004 RFI-JDB ADAMS ACCESSION NUMBER: ML14219A751 SUNSI Review By: JDB ADAMS: Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword NRC-002 OFFICE RI:DRS/EB1 C:/DRP/PBD C:DRS/EB1 NAME JBraisted/tek BHagar TFarnholtz SIGNATURE /RA/ /RA/ /RA/ DATE 8/6/14 8/6/14 8/7/14 OFFICIAL RECORD COPY
| |
| Letter to Mark Reddemann from Thomas Farnholtz, dated August 7, 2014 SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS
| |
| INSPECTION (05000397/2014005) AND REQUEST FOR INFORMATION
| |
|
| |
| DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) Acting DRP Director (Troy.Pruett@nrc.gov)
| |
| Acting DRP Deputy Director (Michael.Hay@nrc.gov)
| |
| DRS Director (Anton.Vegel@nrc.gov)
| |
| DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Jeremy.Groom@nrc.gov) Resident Inspector (Dan.Bradley@nrc.gov)
| |
| Administrative Assistant (Douglas.Bodine@nrc.gov)
| |
| Acting Branch Chief, DRP/D (Nick.Taylor@nrc.gov)
| |
| Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
| |
| Public Affairs Officer (Lara.Uselding@nrc.gov)
| |
| Project Manager (Andrea.George@nrc.gov)
| |
| Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
| |
| RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
| |
| Technical Support Assistant (Loretta.Williams@nrc.gov)
| |
| Congressional Affairs Officer (Jenny.Weil@nrc.gov)
| |
| RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
| |
|
| |
|
| | M. Reddemann -2- |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its |
| | enclosure will be available electronically for public inspection in the NRC Public Document |
| | Room or from the Publicly Available Records (PARS) component of NRC's document system |
| | (ADAMS). ADAMS is accessible from the NRC Web site at |
| | http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | Sincerely, |
| | /RA/ |
| | Thomas R. Farnholtz, Chief |
| | Engineering Branch 1 |
| | Division of Reactor Safety |
| | Docket No.: 50-397 |
| | License No.: NPF-21 |
| | Enclosure: |
| | Evaluations of Changes, Tests, |
| | and Experiments and Permanent Plant |
| | Modifications Inspection Request for Information |
| | Electronic Distribution to Columbia Generating Station |
| | |
| | Request for Information |
| | Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications |
| | Inspection |
| | Columbia Generating Station |
| | Inspection Report: 05000397/20140045 |
| | Inspection Dates: September 22-26, 2014, and October 5-10, 2014 |
| | Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments |
| | and Permanent Plant Modifications |
| | Lead Inspector: Jonathan Braisted, Reactor Inspector |
| | Information Requested for the In-Office Preparation Week |
| | The following information should be sent to the Region IV office in hard copy or electronic |
| | format (preferred) by September 15, 2014, to the attention of Jonathan Braisted. We request |
| | that you categorize the documents in your response with the numbered list below. The |
| | inspectors will select specific items from the information requested below and request from your |
| | staff additional documents needed during the onsite inspection weeks. We ask that the specific |
| | items requested be available and ready for review on the first day of inspection. If you have any |
| | questions regarding this information request, please contact the lead inspector as soon as |
| | possible. |
| | 1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations. |
| | 2. A list with descriptions of all 50.59 screenings (or equivalent) performed since the last |
| | triennial modification inspection that did not result in an evaluation. |
| | 3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial |
| | modification inspection that did not result in an application for license amendment. |
| | 4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 |
| | screenings and evaluations since the last triennial modification inspection. |
| | 5. Procedure(s) for implementing permanent plant modifications. |
| | 6. A list with descriptions of all permanent plant modifications since the last triennial |
| | modification inspection. |
| | 7. A list with descriptions of all corrective action documents related to permanent plant |
| | modifications since the last triennial modification inspection. |
| | 8. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, |
| | including qualification dates. |
| | 9. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or |
| | evaluations, including qualification dates. |
| | Enclosure |
| | |
| | 10. Current revisions of the Technical Specifications and Bases and the Updated Final |
| | Safety Analysis Report. |
| | Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can |
| | determine the safety and/or risk significance of the screenings, evaluations, and modifications. |
| | Note: For this inspection, permanent plant modifications include permanent plant changes, |
| | design changes, set point changes, procedure changes, equivalency evaluations, suitability |
| | analyses, calculations, and commercial grade dedications |
| | Inspector Contact Information: |
| | Jonathan Braisted Mahdi Hayes Nnaerika Okonkwo |
| | Reactor Inspector Operations Engineer Reactor Inspector |
| | 817-200-1194 817-200-1508 817-200-1114 |
| | Jonathan.Braisted@nrc.gov Mahdi.Hayes@nrc.gov Nnaerika.Okonkwo@nrc.gov |
| | Mailing Address: |
| | U.S. NRC, Region IV |
| | Attn: Jonathan Braisted |
| | 1600 East Lamar Blvd. |
| | Arlington, TX 76011-4125 |
| | -2- |
| | |
| | |
| | ML14219A751 |
| | SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword |
| | By: JDB Yes No Non-Sensitive Publicly Available NRC-002 |
| | OFFICE RI:DRS/EB1 C:/DRP/PBD C:DRS/EB1 |
| | NAME JBraisted/tek BHagar TFarnholtz |
| | SIGNATURE /RA/ /RA/ /RA/ |
| | DATE 8/6/14 8/6/14 8/7/14 |
| | |
| | Letter to Mark Reddemann from Thomas Farnholtz, dated August 7, 2014 |
| | SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF EVALUATIONS OF |
| | CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS |
| | INSPECTION (05000397/2014005) AND REQUEST FOR INFORMATION |
| | DISTRIBUTION: |
| | Regional Administrator (Marc.Dapas@nrc.gov) |
| | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) |
| | Acting DRP Director (Troy.Pruett@nrc.gov) |
| | Acting DRP Deputy Director (Michael.Hay@nrc.gov) |
| | DRS Director (Anton.Vegel@nrc.gov) |
| | DRS Deputy Director (Jeff.Clark@nrc.gov) |
| | Senior Resident Inspector (Jeremy.Groom@nrc.gov) |
| | Resident Inspector (Dan.Bradley@nrc.gov) |
| | Administrative Assistant (Douglas.Bodine@nrc.gov) |
| | Acting Branch Chief, DRP/D (Nick.Taylor@nrc.gov) |
| | Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) |
| | Project Engineer, DRP/D (Brian.Parks@nrc.gov) |
| | Public Affairs Officer (Victor.Dricks@nrc.gov) |
| | Public Affairs Officer (Lara.Uselding@nrc.gov) |
| | Project Manager (Andrea.George@nrc.gov) |
| | Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) |
| | RITS Coordinator (Marisa.Herrera@nrc.gov) |
| | ACES (R4Enforcement.Resource@nrc.gov) |
| | Regional Counsel (Karla.Fuller@nrc.gov) |
| | Technical Support Assistant (Loretta.Williams@nrc.gov) |
| | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| | RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARIR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20220062023-03-0101 March 2023 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2022006) ML23019A2482023-01-19019 January 2023 Inservice Inspection Request for Information ML22242A1082022-08-30030 August 2022 Information Request, Information Request, Security IR 2022404 ML22230C7392022-08-23023 August 2022 2022 Mid-Cycle Planning Letter IR 05000397/20210062022-03-0202 March 2022 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2021006) ML21277A3572021-10-12012 October 2021 CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information ML21230A3892021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21111A0282021-04-21021 April 2021 _ Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2021011) and Request for Information ML21104A3032021-04-0808 April 2021 Inspection Report 05000397/2021010, Information Request Biennial Problem Identification and Resolution Inspection ML21082A3042021-03-23023 March 2021 Request for Information: Columbia Generating Station, Dated March 11, 2021, Inspection Report 05000397/2021-002, Occupational Radiation Safety Inspection-1,2,3,PI IR 05000397/20200062021-03-0303 March 2021 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2020006) ML20353A1822020-12-18018 December 2020 Notification of NRC Triennial Heat Exchanger/Heat Sink Performance Inspection (05000397/2021001) and Request for Information IR 05000397/20200052020-09-0101 September 2020 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2020005) IR 05000397/20190062020-03-0303 March 2020 CGS2019006 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2019006) ML20049H2622020-02-18018 February 2020 Notification of Cyber Security Inspection (NRC Inspection Report 05000397/2020401) and Request for Information ML19266A5922019-09-23023 September 2019 Notification of Inspection (NRC Inspection Report 05000397/2019004) and Request for Information IR 05000397/20190052019-08-30030 August 2019 Updated Inspection Plan for Columbia Generating Station, Report 05000397/2019005 ML19100A4242019-04-10010 April 2019 Columba - Notification of NRC Design Bases Assurance Inspection Report (Teams) (05000397/2019011) and Initial Request for Information IR 05000397/20180062019-03-0404 March 2019 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2018006 ML18313A0942018-11-0808 November 2018 Notification of NRC Triennial Heat Sink Performance Inspection Report 05000397/2018004) and Request for Information IR 05000397/20180052018-08-31031 August 2018 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2018005) IR 05000397/20170062018-03-0101 March 2018 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2017006) IR 05000397/20170052017-08-28028 August 2017 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2017005) IR 05000397/20160062017-03-0101 March 2017 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2016006) ML16256A2682016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000483/2016005) ML16251A1342016-09-0707 September 2016 Notification of Inspection (NRC Integrated Inspection Report 05000397/2016004) and Request for Information ML16239A2412016-08-31031 August 2016 Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000483/2016005) IR 05000397/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Columbia Generating Station (NRC Physical Security Inspection Report Number 05000397/2016401) IR 05000397/20150062016-03-0202 March 2016 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2015006) ML16061A5662016-03-0101 March 2016 Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information ML16061A5542016-03-0101 March 2016 Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information IR 05000397/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Columbia Generating Station (NRC Physical Security Inspection Report Number 05000397/2015401) IR 05000397/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000397/2015005) IR 05000397/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Columbia Generating Station (NRC Physical Security Inspection Report Number 05000397/2014402) IR 05000397/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000397/2014006) ML14219A7512014-08-0707 August 2014 Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000397-14-005) and Request for Information IR 05000397/20130012014-03-0404 March 2014 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2013001) IR 05000397/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter Columbia Generating Station (Report 05000397-13-006) IR 05000397/20128012013-03-0404 March 2013 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2012801) IR 05000397/20120062012-09-0404 September 2012 Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000397/2012006) IR 05000397/20120012012-03-0505 March 2012 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2012001) ML1124306472011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Columbia Generating Station ML1112907052011-05-0606 May 2011 Notification of Inspection (IR 05000397-11-004) and Request for Information ML1024403712010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Columbia Generating Station IR 05000397/20100012010-03-0303 March 2010 Annual Assessment Letter - Columbia Generating Station (Report 05000397-10-001) ML0924000972009-09-0101 September 2009 9/1/2009 Columbia 2009 Midcycle Performance Review and Inspection Plan 2024-08-22
[Table view] Category:Letter
MONTHYEARML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 IR 05000397/20244032024-10-0101 October 2024 Cybersecurity Inspection Report 05000397/2024403 Public GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation 2024-09-24
[Table view] |
See also: IR 05000397/2014005
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511
August 7, 2014
Mr. Mark E. Reddemann
Chief Executive Officer
Energy Northwest
P. O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF EVALUATIONS OF
CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT
MODIFICATIONS INSPECTION (05000397/2014005) AND REQUEST FOR
INFORMATION
Dear Mr. Reddemann:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the baseline inspection of changes, tests, experiments, and permanent plant
modifications at your Columbia Generating Station from September 22-26, 2014, and
October 5-10, 2014. The inspection will consist of three reactor inspectors from the NRCs
Region IV office for two weeks. The inspection will be conducted in accordance with NRC
Inspection Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and
Permanent Plant Modifications.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for information. Please note that the
information is requested to be provided by September 15, 2014. Upon review of this
information, the inspectors will select additional information for review upon arrival onsite. It is
important that all of this information is up-to-date and complete in order to minimize the amount
of additional information requested during the preparation and/or the onsite portions of the
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Richard Garcia of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194, or by e-mail at
Jonathan.Braisted@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
M. Reddemann -2-
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket No.: 50-397
License No.: NPF-21
Enclosure:
Evaluations of Changes, Tests,
and Experiments and Permanent Plant
Modifications Inspection Request for Information
Electronic Distribution to Columbia Generating Station
Request for Information
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
Inspection
Columbia Generating Station
Inspection Report: 05000397/20140045
Inspection Dates: September 22-26, 2014, and October 5-10, 2014
Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments
and Permanent Plant Modifications
Lead Inspector: Jonathan Braisted, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by September 15, 2014, to the attention of Jonathan Braisted. We request
that you categorize the documents in your response with the numbered list below. The
inspectors will select specific items from the information requested below and request from your
staff additional documents needed during the onsite inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any
questions regarding this information request, please contact the lead inspector as soon as
possible.
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
2. A list with descriptions of all 50.59 screenings (or equivalent) performed since the last
triennial modification inspection that did not result in an evaluation.
3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial
modification inspection that did not result in an application for license amendment.
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59
screenings and evaluations since the last triennial modification inspection.
5. Procedure(s) for implementing permanent plant modifications.
6. A list with descriptions of all permanent plant modifications since the last triennial
modification inspection.
7. A list with descriptions of all corrective action documents related to permanent plant
modifications since the last triennial modification inspection.
8. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
including qualification dates.
9. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
evaluations, including qualification dates.
Enclosure
10. Current revisions of the Technical Specifications and Bases and the Updated Final
Safety Analysis Report.
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Note: For this inspection, permanent plant modifications include permanent plant changes,
design changes, set point changes, procedure changes, equivalency evaluations, suitability
analyses, calculations, and commercial grade dedications
Inspector Contact Information:
Jonathan Braisted Mahdi Hayes Nnaerika Okonkwo
Reactor Inspector Operations Engineer Reactor Inspector
817-200-1194 817-200-1508 817-200-1114
Jonathan.Braisted@nrc.gov Mahdi.Hayes@nrc.gov Nnaerika.Okonkwo@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Jonathan Braisted
1600 East Lamar Blvd.
Arlington, TX 76011-4125
-2-
ML14219A751
SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword
By: JDB Yes No Non-Sensitive Publicly Available NRC-002
OFFICE RI:DRS/EB1 C:/DRP/PBD C:DRS/EB1
NAME JBraisted/tek BHagar TFarnholtz
SIGNATURE /RA/ /RA/ /RA/
DATE 8/6/14 8/6/14 8/7/14
Letter to Mark Reddemann from Thomas Farnholtz, dated August 7, 2014
SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF EVALUATIONS OF
CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS
INSPECTION (05000397/2014005) AND REQUEST FOR INFORMATION
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Jeremy.Groom@nrc.gov)
Resident Inspector (Dan.Bradley@nrc.gov)
Administrative Assistant (Douglas.Bodine@nrc.gov)
Acting Branch Chief, DRP/D (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Andrea.George@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)