ML11129A030: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11129A030
| number = ML11129A030
| issue date = 04/26/2011
| issue date = 04/26/2011
| title = Palo Verde Nuclear Generating Station, 2010 Annual Environmental Operating Report
| title = 2010 Annual Environmental Operating Report
| author name = Weber T N
| author name = Weber T
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
=Text=
{{#Wiki_filter:m Palo Verde Nuclear Generating Station A subsidiaryof Pinnacle West CapitalCorporation Thomas N. Weber Department Leader Regulatory Affairs Tel. 623-393-5764 Fax 623-393-5442 Mail Station 7636 PO Box 52034 Phoenix, Arizona 85072-2034 102-06352-TNW/RKR April 26, 2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
==Dear Sirs:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-5281529/530 2010 Annual Environmental Operating Report Enclosed please find the 2010 Annual Environmental Operating Report for PVNGS Units 1, 2, and 3. Arizona Public Service Company is submitting this report pursuant to Section 5.4.1 of Appendix B to the PVNGS Units 1, 2, and 3 Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74, respectively.
No commitments are being made to the NRC in this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.
Sincerely, wi4-1'i              -(
TNW/RAS/RKR/gat Enclosure cc:      E. E. Collins Jr.        NRC Region IV Regional Administrator L. K. Gibson            NRC NRR Project Manager for PVNGS J. R. Hall              NRC NRR Senior Project Manager M. A. Brown              NRC Senior Resident Inspector for PVNGS A. V. Godwin            Arizona Radiation Regulatory Agency (ARRA)
T. Morales              Arizona Radiation Regulatory Agency (ARRA)
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
* Comanche Peak
* Diablo Canyon
* Palo Verde
* San Onofre
* South Texas
* Wolf Creek
ENCLOSURE Palo Verde Nuclear Generating Station Units 1, 2, and 3 2010 Annual Environmental Operating Report
Enclosure - PVNGS Units 1, 2, and 3 2010 Annual Environmental Operating Report I. INTRODUCTION The Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona, approximately 50 miles west of the Phoenix metropolitan area.
The PVNGS site comprises approximately 4280 acres. Site elevations range from 890 feet above mean sea level at the southern boundary to 1030 feet above mean sea level at the northern boundary. The station consists of three pressurized water reactor electrical generating units. Units 1, 2 and 3 each have a rated thermal power of 3990 MW.
The Units 1, 2, and 3 Renewed Operating Licenses NPF-41, NPF-51, and NPF-74, respectively, were issued on April 21, 2011. Appendix B to these operating licenses is entitled the "Environmental Protection Plan (Non Radiological)." The Environmental Protection Plans (EPP) for each of the current operating licenses are identical and are unchanged by the renewed license.
The EPP purpose is to provide for protection of environmental values during construction and operation of the nuclear facility. The principal objectives of the EPP are as follows:
(1)    Verify that the station is operated in an environmentally acceptable manner, as established by the FES (Final Environmental Statement) and other Nuclear Regulatory Commission (NRC) environmental impact assessments.
(2)  Coordinate NRC requirements and maintain consistency with other Federal, State and Local requirements for environmental protection.
(3)    Keep NRC informed of the environmental effects of facility construction and operation and actions taken to control those effects.
This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This report describes the activities during calendar year 2010 related to the PVNGS EPP. For purposes of this report, references to the EPP are considered to be the EPP (Appendix B) of Renewed Operating Licenses NPF-41, NPF-51, and NPF-74.
1
Enclosure - PVNGS Units 1, 2, and 3 2010 Annual Environmental Operating Report II. ENVIRONMENTAL MONITORING SUMMARIES AND ANALYSIS A. Cultural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when final alignment of the PVNGS-to-Saguaro transmission line is completed. As of the date of this report, plans for this transmission line have been indefinitely suspended. Therefore, there has been no activity with regard to this requirement of the EPP.
B. Terrestrial Ecology Monitoring As communicated in a letter from William F. Conway, APS, to NRC, dated December 30, 1991, the salt deposition monitoring program was discontinued at the end of 1991.
III. PLANT DESIGN AND OPERATION CHANGES Section 3.1 of the EPP allows changes in station design or operation or the performance of tests or experiments affecting the environment provided that such changes, tests, or experiments do not involve an unreviewed environmental question and do not involve a change to the EPP. Changes, tests, or experiments in which all measurable non-radiological effects are confined to the on-site areas previously disturbed during site preparation and plant construction or in which the environment is not affected are exempt from the evaluation and reporting requirements of Section 3.1.
Section 3.2 of the EPP also exempts changes, tests, or experiments, which are required to comply with other Federal, State, or local environmental regulations.
No design and operational changes were initiated in 2010 that required an evaluation to determine if they involved either an unreviewed environmental question or constituted a change in the EPP.
IV. EPP NON-COMPLIANCES There were no instances of non-compliance with the EPP identified during 2010.
V. NON-ROUTINE REPORTS There were no non-routine reports required by Section 5.4.2 of the EPP submitted during 2010.
2}}

Latest revision as of 00:56, 13 November 2019

2010 Annual Environmental Operating Report
ML11129A030
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/26/2011
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06352-TNW/RKR
Download: ML11129A030 (4)


Text

m Palo Verde Nuclear Generating Station A subsidiaryof Pinnacle West CapitalCorporation Thomas N. Weber Department Leader Regulatory Affairs Tel. 623-393-5764 Fax 623-393-5442 Mail Station 7636 PO Box 52034 Phoenix, Arizona 85072-2034 102-06352-TNW/RKR April 26, 2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-5281529/530 2010 Annual Environmental Operating Report Enclosed please find the 2010 Annual Environmental Operating Report for PVNGS Units 1, 2, and 3. Arizona Public Service Company is submitting this report pursuant to Section 5.4.1 of Appendix B to the PVNGS Units 1, 2, and 3 Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74, respectively.

No commitments are being made to the NRC in this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.

Sincerely, wi4-1'i -(

TNW/RAS/RKR/gat Enclosure cc: E. E. Collins Jr. NRC Region IV Regional Administrator L. K. Gibson NRC NRR Project Manager for PVNGS J. R. Hall NRC NRR Senior Project Manager M. A. Brown NRC Senior Resident Inspector for PVNGS A. V. Godwin Arizona Radiation Regulatory Agency (ARRA)

T. Morales Arizona Radiation Regulatory Agency (ARRA)

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre
  • Wolf Creek

ENCLOSURE Palo Verde Nuclear Generating Station Units 1, 2, and 3 2010 Annual Environmental Operating Report

Enclosure - PVNGS Units 1, 2, and 3 2010 Annual Environmental Operating Report I. INTRODUCTION The Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona, approximately 50 miles west of the Phoenix metropolitan area.

The PVNGS site comprises approximately 4280 acres. Site elevations range from 890 feet above mean sea level at the southern boundary to 1030 feet above mean sea level at the northern boundary. The station consists of three pressurized water reactor electrical generating units. Units 1, 2 and 3 each have a rated thermal power of 3990 MW.

The Units 1, 2, and 3 Renewed Operating Licenses NPF-41, NPF-51, and NPF-74, respectively, were issued on April 21, 2011. Appendix B to these operating licenses is entitled the "Environmental Protection Plan (Non Radiological)." The Environmental Protection Plans (EPP) for each of the current operating licenses are identical and are unchanged by the renewed license.

The EPP purpose is to provide for protection of environmental values during construction and operation of the nuclear facility. The principal objectives of the EPP are as follows:

(1) Verify that the station is operated in an environmentally acceptable manner, as established by the FES (Final Environmental Statement) and other Nuclear Regulatory Commission (NRC) environmental impact assessments.

(2) Coordinate NRC requirements and maintain consistency with other Federal, State and Local requirements for environmental protection.

(3) Keep NRC informed of the environmental effects of facility construction and operation and actions taken to control those effects.

This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This report describes the activities during calendar year 2010 related to the PVNGS EPP. For purposes of this report, references to the EPP are considered to be the EPP (Appendix B) of Renewed Operating Licenses NPF-41, NPF-51, and NPF-74.

1

Enclosure - PVNGS Units 1, 2, and 3 2010 Annual Environmental Operating Report II. ENVIRONMENTAL MONITORING SUMMARIES AND ANALYSIS A. Cultural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when final alignment of the PVNGS-to-Saguaro transmission line is completed. As of the date of this report, plans for this transmission line have been indefinitely suspended. Therefore, there has been no activity with regard to this requirement of the EPP.

B. Terrestrial Ecology Monitoring As communicated in a letter from William F. Conway, APS, to NRC, dated December 30, 1991, the salt deposition monitoring program was discontinued at the end of 1991.

III. PLANT DESIGN AND OPERATION CHANGES Section 3.1 of the EPP allows changes in station design or operation or the performance of tests or experiments affecting the environment provided that such changes, tests, or experiments do not involve an unreviewed environmental question and do not involve a change to the EPP. Changes, tests, or experiments in which all measurable non-radiological effects are confined to the on-site areas previously disturbed during site preparation and plant construction or in which the environment is not affected are exempt from the evaluation and reporting requirements of Section 3.1.

Section 3.2 of the EPP also exempts changes, tests, or experiments, which are required to comply with other Federal, State, or local environmental regulations.

No design and operational changes were initiated in 2010 that required an evaluation to determine if they involved either an unreviewed environmental question or constituted a change in the EPP.

IV. EPP NON-COMPLIANCES There were no instances of non-compliance with the EPP identified during 2010.

V. NON-ROUTINE REPORTS There were no non-routine reports required by Section 5.4.2 of the EPP submitted during 2010.

2