(5 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 04/05/2012 | | | issue date = 04/05/2012 |
| | title = 2012 Dresden Nuclear Power Station Initial License Examination ES-301-2 - RO | | | title = 2012 Dresden Nuclear Power Station Initial License Examination ES-301-2 - RO |
| | author name = Reeser D W | | | author name = Reeser D |
| | author affiliation = NRC/RGN-III/DRS/OB | | | author affiliation = NRC/RGN-III/DRS/OB |
| | addressee name = Nelson J | | | addressee name = Nelson J |
Line 14: |
Line 14: |
| | page count = 1 | | | page count = 1 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Dresden Date of Examination: 08/06/2012 Exam Level: RO SRO-I SRO-U Operating Test Number: 11-1 (2012-301) |
| | Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) |
| | Safety System / JPM Title Type Code* |
| | Function |
| | : a. SBLC - INJECTION WITH PUMP AND RWCU ISOLATION FAILURES A, P, S 1 (211000.A4.08) |
| | : b. FW - ALTERNATE WATER INJECTION USING STANDBY COOLANT D, L, S 2 (295031.A1.08) |
| | : c. MAIN STEAM - UNISOLATE ONE LINE USING ALTERNATE METHOD D, S 3 (239001.A4.01) |
| | : d. ISO COND - SHUTDOWN (207000.A4.05) D, S 4 |
| | : e. TORUS COOLING - LOWER WATER LEVEL (219000.A4.02) D, L, S 5 |
| | : f. EDG - PERFORM SURVEILLANCE TESTING, WITH SCRAM A, L, P, S 6 (264000.A4.05) |
| | : g. NI - IRM DETECTOR TEST, WITH FAILURE TO MEET ACCEPTANCE A, N, S 7 CRITERIA (215003.A4.06) |
| | : h. SBGT - START SBGT WITH A FAILURE OF REACTOR BLDG TO A, D, S 9 ISOLATE (261000.A2.13) |
| | In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) |
| | : i. CRD - CROSSTIE FOR ALTERNATE INJECTION (295031.A1.08) D, E, R 2 |
| | : j. ISO COND - MAKEUP PUMP LOCAL OPERATION WITH COOLING A, N 4 WATER FAILURE (207000.A2.05) |
| | : k. IA - CROSS CONNECT 3C IAC TO UNIT 2 ONLY (300000.G.2.1.30) N, R 8 |
| | @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. |
| | * Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system) |
| | (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3 / <3 / < 2 (randomly selected) |
| | (R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27}} |
|
---|
Category:License-Operator
MONTHYEARML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24179A1752024-06-27027 June 2024 Form 5.1-1 Post Examination Check Sheet ML24179A1742024-06-11011 June 2024 Form 2.1-1 Examination Preparation Checklist ML24179A1732024-06-11011 June 2024 Form 1.3-1 - Exam Security Agreement ML24179A1722024-06-0707 June 2024 2024-301 Post Exam SVP Letter ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 ML24179A2152024-04-25025 April 2024 Form 3.4-1 Events and Evolutions Checklist ML24179A2142024-04-25025 April 2024 Form 2.3-1 Examination Outline Quality Checklist ML24179A2242024-04-23023 April 2024 Form 2.3-2 - Operating Test Quality Checklist ML24179A2252024-04-22022 April 2024 Form 2.3-4 - Written Examination Quality Checklist ML24179A2232024-02-12012 February 2024 ILT 23-1 (2024-301) SVP Letter - 24-007 ILT Exam Submittal ML24179A2122023-11-0808 November 2023 ILT 23-1 (2024-301) Exam Outline Submittal SVP Letter 23-0036 ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22215A2492021-05-14014 May 2021 April 2021 Form ES-401-6 ML22216A1902021-05-14014 May 2021 April 2021 Proposed Written Exam ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22235A7572021-05-14014 May 2021 April 2021 Form ES-201-2 Written Outline Only ML22235A7562021-05-14014 May 2021 April 2021 Form ES-301-5 2024-09-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24179A1752024-06-27027 June 2024 Form 5.1-1 Post Examination Check Sheet ML24179A1742024-06-11011 June 2024 Form 2.1-1 Examination Preparation Checklist ML24179A1732024-06-11011 June 2024 Form 1.3-1 - Exam Security Agreement ML24179A1722024-06-0707 June 2024 2024-301 Post Exam SVP Letter ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 ML24179A2152024-04-25025 April 2024 Form 3.4-1 Events and Evolutions Checklist ML24179A2142024-04-25025 April 2024 Form 2.3-1 Examination Outline Quality Checklist ML24179A2242024-04-23023 April 2024 Form 2.3-2 - Operating Test Quality Checklist ML24179A2252024-04-22022 April 2024 Form 2.3-4 - Written Examination Quality Checklist ML24179A2232024-02-12012 February 2024 ILT 23-1 (2024-301) SVP Letter - 24-007 ILT Exam Submittal ML24179A2122023-11-0808 November 2023 ILT 23-1 (2024-301) Exam Outline Submittal SVP Letter 23-0036 ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A0162021-05-14014 May 2021 Initial License Exam Forms ES-301-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22215A1862021-05-14014 May 2021 April 2021 Administered Written Exam ML22216A1902021-05-14014 May 2021 April 2021 Proposed Written Exam ML22216A1892021-05-14014 May 2021 April 2021 Proposed Scenarios 2024-09-16
[Table view] |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Dresden Date of Examination: 08/06/2012 Exam Level: RO SRO-I SRO-U Operating Test Number: 11-1 (2012-301)
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. SBLC - INJECTION WITH PUMP AND RWCU ISOLATION FAILURES A, P, S 1 (211000.A4.08)
- b. FW - ALTERNATE WATER INJECTION USING STANDBY COOLANT D, L, S 2 (295031.A1.08)
- c. MAIN STEAM - UNISOLATE ONE LINE USING ALTERNATE METHOD D, S 3 (239001.A4.01)
- d. ISO COND - SHUTDOWN (207000.A4.05) D, S 4
- e. TORUS COOLING - LOWER WATER LEVEL (219000.A4.02) D, L, S 5
- f. EDG - PERFORM SURVEILLANCE TESTING, WITH SCRAM A, L, P, S 6 (264000.A4.05)
- g. NI - IRM DETECTOR TEST, WITH FAILURE TO MEET ACCEPTANCE A, N, S 7 CRITERIA (215003.A4.06)
- h. SBGT - START SBGT WITH A FAILURE OF REACTOR BLDG TO A, D, S 9 ISOLATE (261000.A2.13)
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. CRD - CROSSTIE FOR ALTERNATE INJECTION (295031.A1.08) D, E, R 2
- j. ISO COND - MAKEUP PUMP LOCAL OPERATION WITH COOLING A, N 4 WATER FAILURE (207000.A2.05)
- k. IA - CROSS CONNECT 3C IAC TO UNIT 2 ONLY (300000.G.2.1.30) N, R 8
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system)
(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3 / <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27