| issue date = 02/25/2013 | | issue date = 02/25/2013 | ||
| title = 2013 Perry Nuclear Power Plant Initial License Examination Miscellaneous Correspondence | | title = 2013 Perry Nuclear Power Plant Initial License Examination Miscellaneous Correspondence | ||
| author name = Bielby M | | author name = Bielby M | ||
| author affiliation = NRC/RGN-III/DRS/OLB | | author affiliation = NRC/RGN-III/DRS/OLB | ||
| addressee name = | | addressee name = | ||
Line 15: | Line 15: | ||
| page count = 17 | | page count = 17 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:2013 PERRY NUCLEAR POWER PLANT INITAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE | |||
Mr. Mark Bezilla Site Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 November 16, 2011 FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. 0. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097 | |||
==SUBJECT:== | |||
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS: | |||
PERRY NUCLEAR POWER PLANT | |||
==Dear Mr. Bezilla:== | |||
We have received your corporate letter L-11-204, dated July 8, 2010. In that letter, you did not request any changes to the existing initial operator licensing examinations scheduled at the Perry Nuclear Power Plant. | |||
However, we note that you were previously scheduled for an initial operator licensing exam the weeks of February 18 and 25, 2013. This exam has been moved to the weeks of February 25 and March 4, 2013, with an on-site validation scheduled for the week of February 4, 2013. | |||
Similarly, the February 2015 exam date was moved to the weeks of February 9 and 16, 2015, with an on-site validation date scheduled for the week of January 19, 2015. These exams were moved to accommodate resource scheduling. | |||
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examinations at a mutually acceptable date. | |||
We understand that your staff will develop the examinations. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date. | |||
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to review and conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program. | |||
In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System {PARS) component of NRC's Agencywide Document | |||
Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Docket No. 50-440 License No. NPF-58 cc: | |||
Distribution via ListServ' Hironori Peterson, Chief Operations Branch Division of Reactor Safety | |||
Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Docket No. 50-440 License No. NPF-58 cc: | |||
Distribution via ListServ' DISTRIBUTION: | |||
Amy Snyder RidsNrrPMPerry Resource RidsNrrDorllpl3-2 Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak ROPreports Resource Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: G:\\DRSIII\\DRS\\Work in Progress\\Ltr 110411 Perry Exam 2011.docx 0 Publicly Available 0 Non-Publicly AvailableO Sensitive 0 Non-Sensitive To receive a copy of this document indicate in the concurrence box ""C'' =Copy without attach/encl ""E"" =Copy with attach/encl ""N"" =No copy OFFICE Rill k Rill J | |||
I NAME RKWalton:ls ~ | |||
HPeterson J/ | |||
DATE 10/31/11 11/[f, /11 (If OFFICIAL RECORD COPY I | |||
FENOC | |||
~ | |||
FirstEnergy Nuclear Operating Company Mark B. Bezilla Vice President June 15,2011 L-11-204 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 | |||
==SUBJECT:== | |||
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Response to NRC Regulatory Issue Summary 2011-04 Preparation and Scheduling of Operator Licensing Examinations Perry Nuclear Power Plant 10 Center Road Perry, Ohio 44081 440-280-5382 Fax: 44G-280-8029 This letter provides the Perry Nuclear Power Plant (PNPP) response to NRC Regulatory Issue Summary (RIS) 2011-04, Preparation and Scheduling of Operator Licensing Examinations. The RIS requested licensees to voluntarily submit a response using NRC Form 536 to provide information for scheduling and preparation of operator licensing examinations. | |||
The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for calendar years 2013 through 2016. | |||
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Anthony E. Mueller Jr., | |||
Manager, Perry Training Section at (440) 280-5535. | |||
Sincerely, | |||
/)1 4 f 1/ | |||
4 t-1 /li~j '?~ 1/ | |||
==Enclosure:== | |||
I OPERATOR LICENS1NG EXAMINATION DATA, NRC Form 536 cc: | |||
Regional Administrator, NRC Region Ill NRC Resident Inspector Office NRC Project Manager Hironori Peterson, NRC Region Ill | |||
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) | |||
Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour. | |||
his information conection is used to plan budgets and resources for operator examinations. Send comments re~arding burden OPERA TOR LICENSING estimate to the Records and FOIA/Privacy Services Branch ( -5 F53), U.S. | |||
Nuclear Re~ulatory Commission, Washington, DC 20555-Q001, or bfc internet EXAMINATION DATA e-mail to in ocollects@nrc.0 ov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150..0131), Office of Management and Budget, Washington, DC 20503. | |||
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | |||
FACILITY NRC REGION PERRY NUCLEAR POWER PLANT m | |||
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 | |||
0 1 | |||
0 EXAMINATIONS ESTIMATED NUMBER OF 0 | |||
0 0 | |||
NRC-PREPARED 0 | |||
EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cv2o14 CY2015 cv2o16 NUMBER OF REACTOR 4 | |||
0 6 | |||
0 OPERATORS NUMBER OF SENIOR REACTOR 7 | |||
0 4 | |||
0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2 | |||
0 2 | |||
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 | |||
0 0 | |||
0 OPERA TORS* LIMITED PROPOSED DATES PRIMARY DATE 02/18/2013 02/09/2015 ALTERNATE DATE 02/25/2013 02/16/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 CANDIDATES NRC FORM 536 (10-2008) | |||
PRINTED ON RECYCLED PAPER | |||
Mr. Mark Bezilla Site Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 I 0 LISLE, IlliNOIS 60532-4352 July 30, 2010 FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. 0. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097 | |||
==SUBJECT:== | |||
CONFIRMATION OF INITIAL OPERA TOR LICENSE EXAMINATIONS: | |||
PERRY NUCLEAR POWER PLANT | |||
==Dear Mr. Bezilla:== | |||
In response to your letters dated July 8, 2010 (L-10-210}, and July 22, 2010 (L-10-218) you requested dates for initial operator licensing examinations in 2013 and 2015. You also requested we cancel the initial operator license exam scheduled for January 9, 2012. | |||
In response, we have scheduled an examination for the weeks of February 11 and 18, 2013, with an onsite validation date of January 7, 2013. Additionally, we have scheduled an examination for the weeks of February 9 and 16, 2015, with an onsite validation date of January 12, 2015. We have also canceled the initial operator license examination scheduled for January 9, 2012. | |||
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. | |||
We understand that your staff will develop the examinations. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date. | |||
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to review and conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program. | |||
In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Docket No. 50-440 License No. NPF-58 cc: | |||
Distribution via ListServ Hironori Peterson, Chief Operations Branch Division of Reactor Safety | |||
In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Docket No. 50-440 License No. NPF-58 cc: | |||
Distribution via ListServ DISTRIBUTION: | |||
Susan Bagley RidsNrrPMPerry RidsNrrDorllpl3-2 RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak Sincerely, | |||
!fUr( | |||
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Document Name: G:\\DRS\\Work in Progress\\PER 07 _1 0 DRS OL Re Confirmation of License Exam.docx o Publicly Available o Non-Publicly Available o Sensitive o Non-Sensitive To receive a copy of this document, indicate in the box: "C" =Copy without attachmenVenclosure "E" =Copy with attachmenVenclosure "N" =No copy OFFICE Rill IC Rill IN l | |||
NAME RKWalton:co Q'ivJ HPeterson, /J DATE 07/~0/10 071 1!)/10 <q r OFFICIAL RECORD COPY I | |||
FENOC Firs/Energy Nuclear Operating Company Mark B. Bezilla Vice President July 8, 2010 L-10-210 ATTN: Mr. Hironori Peterson U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 | |||
==SUBJECT:== | |||
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Scheduling of NRC Operator License Examinations Perry Nuclear Power Station 10 Center Road Perry, Ohio 44081 440-280-5382 Fax: 440-280-8029 The purpose of this letter is to request an initial operator license examination be administered the weeks of February 11 and 18, 2013, at the Perry Nuclear Power Plant. | |||
If you are unable to support an examination at that time, it is requested an examination be scheduled at the next, earliest opportunity. A second initial operator license examination is requested for NRC administration in February 2015. The license class for these examinations is expected to contain both Senior Reactor Operator and Reactor Operator (SRO/RO) candidates. Please contact us at your earliest convenience regarding whether the NRC can support this schedule request. | |||
The examination scheduled to begin January 9, 2012, is no longer needed and may be deleted from the NRC's examination schedule for licensees. | |||
If there are any questions, or if additional information is required, please contact Mr. Anthony Mueller Jr., Manager, Perry Training Section, at (440) 280-5535. | |||
Sincerely, | |||
~~~/ | |||
~.4au~:C Mark B. Bezilla cc: | |||
Ms. Janet Kweiser, Operator Licensing Section, NRC Region Ill Mr. Dell McNeil, Operator Licensing Section, NRC Region Ill NRC Project Manager NRC Resident Inspector NRC Document Control Desk JUL I 5 2010 | |||
FENOC Perry "-iuc!ear Po11ver S.'~Jtr()n 10 CerttH Pca(_""i PerrJ. Oh~c,JJCE i | |||
.,....,1~ | |||
FirstEr:ergy Nuclear Operat;r:g Corrpary Mark B. Bezilla Vice President July 22, 2010 L-10-218 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 | |||
==SUBJECT:== | |||
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Voluntary Response to NRC Regulatory Issue Summary 2010-08 Preparation and Scheduling of Operator Licensing Examinations | |||
-1J0-28C-5j82 Fax. 4d0-2cD-8C29 10 CFR 55 As requested in NRC Regulatory Issue Summary, 2010-08, Preparation and Scheduling of Operator Licensing Examinations, enclosed is the voluntary response concerning the estimated number of candidates to be examined during scheduled examination visits. | |||
The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for fiscal years 2012 through 2015. | |||
There are no regulatory commitments contained in this letter or its enclosure. If there are any questions concerning this matter, please contact Mr. Anthony E. Mueller Jr., | |||
Manager, Perry Training Section at (440) 280-5535. | |||
Sincerely, | |||
/ / | |||
'\\, | |||
/ | |||
/ | |||
/ | |||
I | |||
-''t_ | |||
==Enclosure:== | |||
OPERATOR LICENSING EXAMINATION DATA, NRC Form 536 cc: | |||
Regional Administrator, NRC Region Ill NRC Resident Inspector Office NRC Project Manager Hironori Peterson, NRC Region Ill JUL 2 8 20t0 | |||
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION | |||
.'\\PPROVED BY OMS NO 3150-0 131 EXPIRES 10/3112011 1 :o-2DOS) | |||
Estimated burden per response to comply w1th th1s *;cluntary Information collectron request* 1 hour. ThiS rnformatron collection rs used to plan budgets OPERA TOR LICENSING and resources for operator examinatrons. Send comments regarding burden estimate to the Records and FOIAIPrrvacy Servrces Branch (T-5 F53), U S Nuclear Regulatory CommiSSIOn. Washmgton. DC 20555-0001. or by internet EXAMINATION DATA e-mail to infoccllects@nrc.gov, and to the Desk Officer, Office of lnformatron and Regulatory Affalfs. NEOB-1 0202, (3150-0131), Office of Management and Budget, Wash1ngton. DC 20503 If a means used to 1mpose an mformation collection does not display a currently val1d OMB control number, the NRC may not conduct or sponsor, and a person IS not required to respond to. the information collection FACILITY NRC REGION PERRY NUCLEAR POWER PLANT III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 | |||
1 0 | |||
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 | |||
0 0 | |||
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 NUMBER OF REACTOR OPERATORS 0 | |||
6 0 | |||
6 NUMBER OF SENIOR REACTOR 0 | |||
OPERATORS -INSTANT 4 | |||
0 4 | |||
NUMBER OF SENIOR REACTOR 0 | |||
2 0 | |||
2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 | |||
0 0 | |||
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 02/11/2013 02/09/2015 ALTERNATE DATE 02/18/2013 02/16/2015 | |||
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 CANOIDP..TES NRC FORM 536 (10-2CC8) | |||
PRINTED ON RECYCLED PAPER | |||
Mr. Mark Bezilla Site Vice President October 7, 2008 FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. 0. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097 | |||
==SUBJECT:== | |||
CONFIRMATION OF INITIAL/REQUALIFICATION OPERATOR LICENSE EXAMINATIONS: PERRY NUCLEAR POWER PLANT | |||
==Dear Mr. Bezilla:== | |||
In a {{letter dated|date=June 16, 2008|text=letter dated June 16, 2008}} (L-08-182), and a {{letter dated|date=July 28, 2008|text=letter dated July 28, 2008}} (L-08-238), your staff requested we schedule initial license operator examinations in January 2009, May 2010, January 2011, and January 2012. We have tentatively scheduled the requested examinations to occur during the following weeks: January 12, 2009, May 10, 2010, January 10, 2011, and January 9, 2012. The last three examinations were scheduled on the proposed alternate examination dates rather than the proposed primary dates. On-site validation of the examinations will occur approximately three weeks prior to the start of the examinations. In the unlikely event that we are unable to support an examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. | |||
We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination. Your letters indicated that each examination will have more than nine applicants. Each examination has been scheduled for two weeks to accommodate this number of applicants. Please inform us if the number of applicants declines below ten as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations. | |||
A supplementary letter will be sent to the Perry Nuclear Power Plant Training Department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. | |||
We have scheduled a Licensed Operator Requalification Training Program Inspection (IP 71111.11) for the week of December 1, 2008. Please inform us at your earliest opportunity if you discover this week is outside of your normally scheduled requalification training program's annual examinations. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and | |||
*, agement System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
Docket No. 50-440 License No. NPF-58 Sincerely, IRA/ | |||
Hironori Peterson, Chief Operations Branch Division of Reactor Safety cc: | |||
J. Hagan, President and Chief Nuclear Officer-FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight-FENOC P. Harden, Vice President, Nuclear Support Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp. | |||
Public Utilities Commission of Ohio C. O'Ciaire, State Liaison Officer, Ohio Emergency Management Agency R. Owen, Ohio Department of Health | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
Sincerely, IRA/ | |||
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: | |||
J. Hagan, President and Chief Nuclear Officer-FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer-FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC P. Harden, Vice President, Nuclear Support Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp. | |||
Public Utilities Commission of Ohio C. O'Ciaire, State Liaison Officer, Ohio Emergency Management Agency R. Owen, Ohio Department of Health DISTRIBUTION: | |||
Russell Gibbs Tamara Bloomer Cameron Goodwin RidsNrrDirslrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Aria no Linda Linn DR Pill DR Sill Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\\DRS\\WORK IN PROGRESS\\PER 100708 DRS OL.DOC X Publicly Available D Non-Publicly Available D Sensitive D Non-Sensitive To receive a cop: of this document, indicate in the box "C" =Copy w/o attachlencl "E" =Copy with attachlencl "N" =No copy OFFICE RIII:DRS I | |||
RIII:DRS I | |||
RIII:DRS I | |||
NAME JKweiser:cco DMcNeil HPeterson DATE 10/02/08 10/02/08 10/07/08 OFFICIAL RECORD COPY I | |||
FENOC FirstEnergv Nuclear Operating Company l'erry Nurlcar Power Stat:on 10 Cr;nter Rnali Perry; Onio -1 dt)tJ 1 | |||
---------------~--------------------- | |||
Mark B. Bezilla Vtce f>resicfent July 28, 2008 L-08-238 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 | |||
==SUBJECT:== | |||
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 10CFR55 Voluntary Response to NRC Regulatory Issue Summary 2008-16: | |||
Preparation and Scheduling of Operator Licensing Examinations 4 '1!7-2{!()- SJ8::* | |||
rax.* 410-2A080?9 As requested in NRC Regulatory Issue Summary, 2008-16, Preparation and Scheduling of Operator Licensing Examinations, enclosed is the voluntary response concerning the estimated number of candidates to be examined during scheduled examination visits. | |||
The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for fiscal years 2009 through 2012. | |||
There are no regulatory commitments contained in this letter or its attachments. If there are any questions concerning this matter, please contact Mr. Jeffrey Lausberg - | |||
Manager, Regulatory Compliance at (440) 280-5940. | |||
==Enclosure:== | |||
OPERATOR LICENSING EXAMINATION DATA, NRC Form 536 cc: NRC Region Ill NRC Resident Inspector Office NRC Project Manager Nancy L. Salgado, NRR Hironori Peterson, Rill JlJl 2 9 2008 | |||
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) | |||
Estimated burden per res~onse to comply with this voluntary information collection request 1 hour. | |||
his information collection is used to plan budgets OPERATOR LICENSING and resources for operator examinations. Send comments regarding burden estimate to the Records ~nd FOIA!Priyacy Ser;lces Branch ~T-5 F53), U.S. | |||
Nuclear ReTculatory Commtsslon, Washmgton, DC 20555-000, or by internet EXAMINATION DATA e-mail to In ocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. | |||
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a p*Hson is not required to respond to the information collection. | |||
FACILITY NRC REGION Perry Nuclear Power Plant Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY 2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 | |||
1 1 | |||
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 | |||
0 0 | |||
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR 1 | |||
OPERATORS 2 | |||
4 12 NUMBER OF SENIOR REACTOR 9 | |||
14 9 | |||
2 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2 | |||
2 2 | |||
1 OPERA TORS ** UPGRADE NUMBER OF SENIOR REACTOR 0 | |||
0 0 | |||
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 01/12/2009 05/03/2010 01/03/2011 01/02/2012 ALTERNATE DATE 01/19/2009 05/10/2010 01/10/2011 01/09/2012 | |||
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH | |||
.JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 13 14 CANDIDATES NRC FORM 536 (8-2005) | |||
PRINTED ON FlECYCLED PAPEF{}} |
Latest revision as of 07:51, 11 January 2025
ML13158A127 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 02/25/2013 |
From: | Bielby M NRC/RGN-III/DRS/OLB |
To: | FirstEnergy Nuclear Operating Co |
Shared Package | |
ML12236a337 | List: |
References | |
L-11-204 | |
Download: ML13158A127 (17) | |
Text
2013 PERRY NUCLEAR POWER PLANT INITAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE
Mr. Mark Bezilla Site Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 November 16, 2011 FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. 0. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:
PERRY NUCLEAR POWER PLANT
Dear Mr. Bezilla:
We have received your corporate letter L-11-204, dated July 8, 2010. In that letter, you did not request any changes to the existing initial operator licensing examinations scheduled at the Perry Nuclear Power Plant.
However, we note that you were previously scheduled for an initial operator licensing exam the weeks of February 18 and 25, 2013. This exam has been moved to the weeks of February 25 and March 4, 2013, with an on-site validation scheduled for the week of February 4, 2013.
Similarly, the February 2015 exam date was moved to the weeks of February 9 and 16, 2015, with an on-site validation date scheduled for the week of January 19, 2015. These exams were moved to accommodate resource scheduling.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examinations at a mutually acceptable date.
We understand that your staff will develop the examinations. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to review and conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.
In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System {PARS) component of NRC's Agencywide Document
Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Docket No. 50-440 License No. NPF-58 cc:
Distribution via ListServ' Hironori Peterson, Chief Operations Branch Division of Reactor Safety
Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Docket No. 50-440 License No. NPF-58 cc:
Distribution via ListServ' DISTRIBUTION:
Amy Snyder RidsNrrPMPerry Resource RidsNrrDorllpl3-2 Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak ROPreports Resource Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: G:\\DRSIII\\DRS\\Work in Progress\\Ltr 110411 Perry Exam 2011.docx 0 Publicly Available 0 Non-Publicly AvailableO Sensitive 0 Non-Sensitive To receive a copy of this document indicate in the concurrence box ""C =Copy without attach/encl ""E"" =Copy with attach/encl ""N"" =No copy OFFICE Rill k Rill J
I NAME RKWalton:ls ~
HPeterson J/
DATE 10/31/11 11/[f, /11 (If OFFICIAL RECORD COPY I
~
FirstEnergy Nuclear Operating Company Mark B. Bezilla Vice President June 15,2011 L-11-204 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Response to NRC Regulatory Issue Summary 2011-04 Preparation and Scheduling of Operator Licensing Examinations Perry Nuclear Power Plant 10 Center Road Perry, Ohio 44081 440-280-5382 Fax: 44G-280-8029 This letter provides the Perry Nuclear Power Plant (PNPP) response to NRC Regulatory Issue Summary (RIS) 2011-04, Preparation and Scheduling of Operator Licensing Examinations. The RIS requested licensees to voluntarily submit a response using NRC Form 536 to provide information for scheduling and preparation of operator licensing examinations.
The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for calendar years 2013 through 2016.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Anthony E. Mueller Jr.,
Manager, Perry Training Section at (440) 280-5535.
Sincerely,
/)1 4 f 1/
4 t-1 /li~j '?~ 1/
Enclosure:
I OPERATOR LICENS1NG EXAMINATION DATA, NRC Form 536 cc:
Regional Administrator, NRC Region Ill NRC Resident Inspector Office NRC Project Manager Hironori Peterson, NRC Region Ill
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
his information conection is used to plan budgets and resources for operator examinations. Send comments re~arding burden OPERA TOR LICENSING estimate to the Records and FOIA/Privacy Services Branch ( -5 F53), U.S.
Nuclear Re~ulatory Commission, Washington, DC 20555-Q001, or bfc internet EXAMINATION DATA e-mail to in ocollects@nrc.0 ov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150..0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION PERRY NUCLEAR POWER PLANT m
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF 0
0 0
NRC-PREPARED 0
EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cv2o14 CY2015 cv2o16 NUMBER OF REACTOR 4
0 6
0 OPERATORS NUMBER OF SENIOR REACTOR 7
0 4
0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2
0 2
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERA TORS* LIMITED PROPOSED DATES PRIMARY DATE 02/18/2013 02/09/2015 ALTERNATE DATE 02/25/2013 02/16/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 CANDIDATES NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER
Mr. Mark Bezilla Site Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 I 0 LISLE, IlliNOIS 60532-4352 July 30, 2010 FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. 0. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
SUBJECT:
CONFIRMATION OF INITIAL OPERA TOR LICENSE EXAMINATIONS:
PERRY NUCLEAR POWER PLANT
Dear Mr. Bezilla:
In response to your letters dated July 8, 2010 (L-10-210}, and July 22, 2010 (L-10-218) you requested dates for initial operator licensing examinations in 2013 and 2015. You also requested we cancel the initial operator license exam scheduled for January 9, 2012.
In response, we have scheduled an examination for the weeks of February 11 and 18, 2013, with an onsite validation date of January 7, 2013. Additionally, we have scheduled an examination for the weeks of February 9 and 16, 2015, with an onsite validation date of January 12, 2015. We have also canceled the initial operator license examination scheduled for January 9, 2012.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the examinations. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to review and conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.
In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Docket No. 50-440 License No. NPF-58 cc:
Distribution via ListServ Hironori Peterson, Chief Operations Branch Division of Reactor Safety
In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Docket No. 50-440 License No. NPF-58 cc:
Distribution via ListServ DISTRIBUTION:
Susan Bagley RidsNrrPMPerry RidsNrrDorllpl3-2 RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak Sincerely,
!fUr(
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Document Name: G:\\DRS\\Work in Progress\\PER 07 _1 0 DRS OL Re Confirmation of License Exam.docx o Publicly Available o Non-Publicly Available o Sensitive o Non-Sensitive To receive a copy of this document, indicate in the box: "C" =Copy without attachmenVenclosure "E" =Copy with attachmenVenclosure "N" =No copy OFFICE Rill IC Rill IN l
NAME RKWalton:co Q'ivJ HPeterson, /J DATE 07/~0/10 071 1!)/10 resicfent July 28, 2008 L-08-238 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 10CFR55 Voluntary Response to NRC Regulatory Issue Summary 2008-16:
Preparation and Scheduling of Operator Licensing Examinations 4 '1!7-2{!()- SJ8::*
rax.* 410-2A080?9 As requested in NRC Regulatory Issue Summary, 2008-16, Preparation and Scheduling of Operator Licensing Examinations, enclosed is the voluntary response concerning the estimated number of candidates to be examined during scheduled examination visits.
The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for fiscal years 2009 through 2012.
There are no regulatory commitments contained in this letter or its attachments. If there are any questions concerning this matter, please contact Mr. Jeffrey Lausberg -
Manager, Regulatory Compliance at (440) 280-5940.
Enclosure:
OPERATOR LICENSING EXAMINATION DATA, NRC Form 536 cc: NRC Region Ill NRC Resident Inspector Office NRC Project Manager Nancy L. Salgado, NRR Hironori Peterson, Rill JlJl 2 9 2008
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)
Estimated burden per res~onse to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
his information collection is used to plan budgets OPERATOR LICENSING and resources for operator examinations. Send comments regarding burden estimate to the Records ~nd FOIA!Priyacy Ser;lces Branch ~T-5 F53), U.S.
Nuclear ReTculatory Commtsslon, Washmgton, DC 20555-000, or by internet EXAMINATION DATA e-mail to In ocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a p*Hson is not required to respond to the information collection.
FACILITY NRC REGION Perry Nuclear Power Plant Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY 2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR 1
OPERATORS 2
4 12 NUMBER OF SENIOR REACTOR 9
14 9
2 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2
2 2
1 OPERA TORS ** UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 01/12/2009 05/03/2010 01/03/2011 01/02/2012 ALTERNATE DATE 01/19/2009 05/10/2010 01/10/2011 01/09/2012
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH
.JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 13 14 CANDIDATES NRC FORM 536 (8-2005)
PRINTED ON FlECYCLED PAPEF{