ML21168A357: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = Graphics incl Charts and Tables, Technical Specification, Amendment
| document type = Graphics incl Charts and Tables, Technical Specification, Amendment
| page count = 35
| page count = 35
| project = CAC:00120, EPID:L-2018-RNW-0030
| project = CAC:001208, EPID:L-2018-RNW-0030
| stage = Other
| stage = Other
}}
}}
Line 21: Line 21:
{{#Wiki_filter:RENEWED CERTIFICATE OF COMPLIANCE NO. 1008 APPENDIX A TECHNICAL SPECIFICATIONS FOR THE HI-STAR 100 CASK SYSTEM AMENDMENT 1
{{#Wiki_filter:RENEWED CERTIFICATE OF COMPLIANCE NO. 1008 APPENDIX A TECHNICAL SPECIFICATIONS FOR THE HI-STAR 100 CASK SYSTEM AMENDMENT 1


TABLE OF CONTENTS REVISION HISTORY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .           iii 1.0USE AND APPLICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.1       Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.2       Logical Connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4 1.3       Completion Times . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7 1.4       Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-11 2.0LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY . . . . . . . . . . . . . . . . 2-1 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY . . . . . . . . . . . . . . . . . . . . . . . . 2-2 2.1   SFSC Integrity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 2.1.1         Multipurpose Canister (MPC) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 2.1.2         OVERPACK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7 2.1.3         SFSC Lifting Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9 2.1.4         Fuel Cool-Down . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11 2.2   SFSC Radiation Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12 2.2.1         OVERPACK Average Surface Dose Rates . . . . . . . . . . . . . . . . . . . 2-12 2.2.2         SFSC Surface Contamination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15 3.0ADMINISTRATIVE CONTROLS AND PROGRAMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 3.1       Training Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .       3-1 3.2       Pre-Operational Testing and Training Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . .                       3-1 3.3       Special Requirements for First Systems in Place . . . . . . . . . . . . . . . . . . . . . . . . . .                         3-2 3.4       Radioactive Effluent Control Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                 3-2 3.5     Aging Management Program (AMP) Procedures ..................................................... 3-3 Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                                        i
Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 i
TABLE OF CONTENTS REVISION HISTORY....................................................... iii 1.0USE AND APPLICATION................................................ 1-1 1.1 Definitions........................................................ 1-1 1.2 Logical Connectors................................................. 1-4 1.3 Completion Times.................................................. 1-7 1.4 Frequency....................................................... 1-11 2.0LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY
................ 2-1 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY........................ 2-2 2.1 SFSC Integrity..................................................... 2-4 2.1.1 Multipurpose Canister (MPC)............................... 2-4 2.1.2 OVERPACK............................................ 2-7 2.1.3 SFSC Lifting Requirements................................ 2-9 2.1.4 Fuel Cool-Down........................................ 2-11 2.2 SFSC Radiation Protection.......................................... 2-12 2.2.1 OVERPACK Average Surface Dose Rates
................... 2-12 2.2.2 SFSC Surface Contamination.............................. 2-15 3.0ADMINISTRATIVE CONTROLS AND PROGRAMS............................ 3-1 3.1 Training Program.................................................. 3-1 3.2 Pre-Operational Testing and Training Exercise............................ 3-1 3.3 Special Requirements for First Systems in Place.......................... 3-2 3.4 Radioactive Effluent Control Program................................... 3-2 3.5 Aging Management Program (AMP) Procedures..................................................... 3-3


This page is intentionally left blank.
Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 iiii This page is intentionally left blank.
Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1                           ii


REVISION HISTORY Amendment             Section                             Change Description 1             Throughout       Editorial changes and typographical corrections.
Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 iiiiii REVISION HISTORY Amendment Section Change Description 1
1.1          Revised definitions of DAMAGED FUEL ASSEMBLY and DAMAGED FUEL CONTAINER.
Throughout 1.1 2.1.1 Editorial changes and typographical corrections.
2.1.1        Replaced the MPC helium backfill density limit with a helium backfill pressure limit.
Revised definitions of DAMAGED FUEL ASSEMBLY and DAMAGED FUEL CONTAINER.
Replaced the MPC helium backfill density limit with a helium backfill pressure limit.
Revised the leak rate units in Table 2-1 from std cc/sec to atm-cc/sec.
Revised the leak rate units in Table 2-1 from std cc/sec to atm-cc/sec.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                            iii


Definition 1.1 1.0 USE AND APPLICATION 1.1 Definitions
Definition 1.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-1 1.0 USE AND APPLICATION 1.1 Definitions
-----------------------------------------------------------Note -----------------------------------------------------------
-----------------------------------------------------------Note -----------------------------------------------------------
The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications.
The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications.
Term                                           Definition ACTIONS                                         ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.
Term Definition ACTIONS DAMAGED FUEL ASSEMBLY DAMAGED FUEL CONTAINER (DFC)
DAMAGED FUEL ASSEMBLY                          DAMAGED FUEL ASSEMBLIES are fuel assemblies with known or suspected cladding defects, as determined by a review of records, greater than pinhole leaks or hairline cracks, missing fuel rods that are not replaced with dummy fuel rods, or those that cannot be handled by normal means. Fuel assemblies which cannot be handled by normal means due to fuel cladding damage are considered FUEL DEBRIS.
FUEL BUILDING FUEL DEBRIS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.
DAMAGED FUEL CONTAINER                          DFCs are specially designed enclosures for (DFC)                                          DAMAGED FUEL ASSEMBLIES or FUEL DEBRIS which permit gaseous and liquid media to escape while minimizing dispersal of gross particulates. DFCs authorized for use in the HI-STAR 100 design are shown in Figures 2.1.1 and 2.1.2 of the Final Safety Analysis Report (SAR) for the HI-STAR 100 Cask System.
DAMAGED FUEL ASSEMBLIES are fuel assemblies with known or suspected cladding defects, as determined by a review of records, greater than pinhole leaks or hairline cracks, missing fuel rods that are not replaced with dummy fuel rods, or those that cannot be handled by normal means. Fuel assemblies which cannot be handled by normal means due to fuel cladding damage are considered FUEL DEBRIS.
FUEL BUILDING                                  The FUEL BUILDING is the site-specific power plant facility, licensed pursuant to 10 CFR Part 50 or 10 CFR Part 52, where the loaded OVERPACK is transferred to or from the transporter.
DFCs are specially designed enclosures for DAMAGED FUEL ASSEMBLIES or FUEL DEBRIS which permit gaseous and liquid media to escape while minimizing dispersal of gross particulates. DFCs authorized for use in the HI-STAR 100 design are shown in Figures 2.1.1 and 2.1.2 of the Final Safety Analysis Report (SAR) for the HI-STAR 100 Cask System.
FUEL DEBRIS                                    FUEL DEBRIS is ruptured fuel rods, severed rods, loose fuel pellets or fuel assemblies with known or suspected defects which cannot be handled by normal means due to fuel cladding damage.
The FUEL BUILDING is the site-specific power plant facility, licensed pursuant to 10 CFR Part 50 or 10 CFR Part 52, where the loaded OVERPACK is transferred to or from the transporter.
FUEL DEBRIS is ruptured fuel rods, severed rods, loose fuel pellets or fuel assemblies with known or suspected defects which cannot be handled by normal means due to fuel cladding damage.
(continued)
(continued)
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                                    1-1


Definition 1.1 1.1 Definitions (continued)
Definition 1.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-2 1.1 Definitions (continued)
INDEPENDENT SPENT FUEL                   The facility within the perimeter fence licensed STORAGE INSTALLATION                     for storage of spent fuel within SFSCs. (See also (ISFSI)                                   10 CFR 72.3)
INDEPENDENT SPENT FUEL The facility within the perimeter fence licensed STORAGE INSTALLATION for storage of spent fuel within SFSCs. (See also (ISFSI) 10 CFR 72.3)
INTACT FUEL ASSEMBLY                     INTACT FUEL ASSEMBLIES are fuel assemblies without known or suspected cladding defects greater than pinhole leaks or hairline cracks and which can be handled by normal means. Partial fuel assemblies, that is fuel assemblies from which fuel rods are missing, shall not be classified as INTACT FUEL ASSEMBLIES unless dummy fuel rods are used to displace an amount of water greater than or equal to that displaced by the original fuel rod(s).
INTACT FUEL ASSEMBLY INTACT FUEL ASSEMBLIES are fuel assemblies without known or suspected cladding defects greater than pinhole leaks or hairline cracks and which can be handled by normal means. Partial fuel assemblies, that is fuel assemblies from which fuel rods are missing, shall not be classified as INTACT FUEL ASSEMBLIES unless dummy fuel rods are used to displace an amount of water greater than or equal to that displaced by the original fuel rod(s).
LOADING OPERATIONS                       LOADING OPERATIONS include all licensed activities on an SFSC while it is being loaded with fuel assemblies.
LOADING OPERATIONS LOADING OPERATIONS include all licensed activities on an SFSC while it is being loaded with fuel assemblies.
LOADING OPERATIONS begin when the first fuel assembly is placed in the SFSC and end when the SFSC is suspended from or secured on the transporter.
LOADING OPERATIONS begin when the first fuel assembly is placed in the SFSC and end when the SFSC is suspended from or secured on the transporter.
MULTI-PURPOSE CANISTER                   MPCs are the sealed spent nuclear fuel canisters which (MPC)                                     consist of a honeycombed fuel basket contained in a cylindrical canister shell which is welded to a baseplate, lid with welded port cover plates, and closure ring. The MPC provides the confinement boundary for the contained radioactive materials.
MULTI-PURPOSE CANISTER MPCs are the sealed spent nuclear fuel canisters which (MPC) consist of a honeycombed fuel basket contained in a cylindrical canister shell which is welded to a baseplate, lid with welded port cover plates, and closure ring. The MPC provides the confinement boundary for the contained radioactive materials.
OVERPACK                                 OVERPACKs are the casks which receive and contain the sealed MPCs. They provide the helium retention boundary, gamma and neutron shielding, and a set each of lifting and pocket trunnions for handling.
OVERPACK OVERPACKs are the casks which receive and contain the sealed MPCs. They provide the helium retention boundary, gamma and neutron shielding, and a set each of lifting and pocket trunnions for handling.
PLANAR-AVERAGE                           PLANAR-AVERAGE INITIAL ENRICHMENT is INITIAL ENRICHMENT                       the average of the distributed fuel rod initial enrichments within a given axial plane of the assembly lattice.
PLANAR-AVERAGE PLANAR-AVERAGE INITIAL ENRICHMENT is INITIAL ENRICHMENT the average of the distributed fuel rod initial enrichments within a given axial plane of the assembly lattice.
(continued)
(continued)
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                              1-2


Definition 1.1 1.1 Definitions (continued)
Definition 1.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-3 1.1 Definitions (continued)
SPENT FUEL STORAGE                       SFSCs are storage containers approved for CASKS (SFSCs)                             casks of spent fuel assemblies at the ISFSI. The HI-STAR 100 SFSC System consists of the OVERPACK and its integral MPC.
SPENT FUEL STORAGE SFSCs are storage containers approved for CASKS (SFSCs) casks of spent fuel assemblies at the ISFSI. The HI-STAR 100 SFSC System consists of the OVERPACK and its integral MPC.
STORAGE OPERATIONS                       STORAGE OPERATIONS include all licensed activities that are performed at the ISFSI while an SFSC containing spent fuel is sitting on a storage pad within the ISFSI perimeter.
STORAGE OPERATIONS STORAGE OPERATIONS include all licensed activities that are performed at the ISFSI while an SFSC containing spent fuel is sitting on a storage pad within the ISFSI perimeter.
TRANSPORT OPERATIONS                     TRANSPORT OPERATIONS include all licensed activities performed on an SFSC loaded with one or more fuel assemblies when it is being moved to and from the ISFSI.
TRANSPORT OPERATIONS TRANSPORT OPERATIONS include all licensed activities performed on an SFSC loaded with one or more fuel assemblies when it is being moved to and from the ISFSI.
TRANSPORT OPERATIONS begin when the SFSC is first suspended from or secured on the transporter and end when the SFSC is at its destination and no longer secured on or suspended from the transporter.
TRANSPORT OPERATIONS begin when the SFSC is first suspended from or secured on the transporter and end when the SFSC is at its destination and no longer secured on or suspended from the transporter.
UNLOADING OPERATIONS                     UNLOADING OPERATIONS include all licensed activities on an SFSC to be unloaded of the contained fuel assemblies. UNLOADING OPERATIONS begin when the OVERPACK or TRANSFER CASK is no longer suspended from or secured on the transporter and end when the last fuel assembly is removed from the SFSC. UNLOADING OPERATIONS does not include MPC transfer between the TRANSFER CASK and the OVERPACK.
UNLOADING OPERATIONS UNLOADING OPERATIONS include all licensed activities on an SFSC to be unloaded of the contained fuel assemblies. UNLOADING OPERATIONS begin when the OVERPACK or TRANSFER CASK is no longer suspended from or secured on the transporter and end when the last fuel assembly is removed from the SFSC. UNLOADING OPERATIONS does not include MPC transfer between the TRANSFER CASK and the OVERPACK.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                            1-3


Logical Connectors 1.2 1.0 USE AND APPLICATION 1.2 Logical Connectors PURPOSE                 The purpose of this section is to explain the meaning of logical connectors.
Logical Connectors 1.2 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-4 1.0 USE AND APPLICATION 1.2 Logical Connectors PURPOSE The purpose of this section is to explain the meaning of logical connectors.
Logical connectors are used in Technical Specifications (TS) to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies. The only logical connectors that appear in TS are AND and OR. The physical arrangement of these connectors constitutes logical conventions with specific meanings.
Logical connectors are used in Technical Specifications (TS) to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies. The only logical connectors that appear in TS are AND and OR. The physical arrangement of these connectors constitutes logical conventions with specific meanings.
BACKGROUND               Several levels of logic may be used to state Required Actions. These levels are identified by the placement (or nesting) of the logical connectors and by the number assigned to each Required Action. The first level of logic is identified by the first digit of the number assigned to a Required Action and the placement of the logical connector in the first level of nesting (i.e., left justified with the number of the Required Action).
BACKGROUND Several levels of logic may be used to state Required Actions. These levels are identified by the placement (or nesting) of the logical connectors and by the number assigned to each Required Action. The first level of logic is identified by the first digit of the number assigned to a Required Action and the placement of the logical connector in the first level of nesting (i.e., left justified with the number of the Required Action).
The successive levels of logic are identified by additional digits of the Required Action number and by successive indentions of the logical connectors.
The successive levels of logic are identified by additional digits of the Required Action number and by successive indentions of the logical connectors.
When logical connectors are used to state a Condition, Completion Time, Surveillance, or Frequency, only the first level of logic is used, and the logical connector is left justified with the statement of the Condition, Completion Time, Surveillance, or Frequency.
When logical connectors are used to state a Condition, Completion Time, Surveillance, or Frequency, only the first level of logic is used, and the logical connector is left justified with the statement of the Condition, Completion Time, Surveillance, or Frequency.
(continued)
(continued)
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                              1-4


Logical Connectors 1.2 1.2 Logical Connectors (continued)
Logical Connectors 1.2 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-5 1.2 Logical Connectors (continued)
EXAMPLES                 The following examples illustrate the use of logical connectors.
EXAMPLES The following examples illustrate the use of logical connectors.
EXAMPLE 1.2-1 ACTIONS CONDITION             REQUIRED ACTION             COMPLETION TIME A.     LCO not met.     A.1   Verify . . .
EXAMPLE 1.2-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
AND A.2   Restore . . .
LCO not met.
A.1 Verify...
AND A.2 Restore...
In this example the logical connector AND is used to indicate that when in Condition A, both Required Actions A.1 and A.2 must be completed.
In this example the logical connector AND is used to indicate that when in Condition A, both Required Actions A.1 and A.2 must be completed.
(continued)
(continued)
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                          1-5


Logical Connectors 1.2 1.2 Logical Connectors (continued)
Logical Connectors 1.2 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-6 1.2 Logical Connectors (continued)
EXAMPLES                 EXAMPLE 1.2-2 (continued)
EXAMPLES EXAMPLE 1.2-2 (continued)
ACTIONS CONDITION               REQUIRED ACTION           COMPLETION TIME A.         LCO not       1.       Stop . . .
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
met.
LCO not met.
OR A.2.1   Verify . . .
1.
AND A.2.2.1 Reduce . . .
Stop...
OR A.2.2.2 Perform . . .
OR A.2.1 Verify...
OR A.3     Remove. . .
AND A.2.2.1 Reduce...
OR A.2.2.2 Perform...
OR A.3 Remove...
This example represents a more complicated use of logical connectors.
This example represents a more complicated use of logical connectors.
Required Actions A.1, A.2, and A.3 are alternative choices, only one of which must be performed as indicated by the use of the logical connector OR and the left justified placement. Any one of these three ACTIONS may be chosen. If A.2 is chosen, then both A.2.1 and A.2.2 must be performed as indicated by the logical connector AND. Required Action A.2.2 is met by performing A.2.2.1 or A.2.2.2. The indented position of the logical connector OR indicates that A.2.2.1 and A.2.2.2 are alternative choices, only one of which must be performed.
Required Actions A.1, A.2, and A.3 are alternative choices, only one of which must be performed as indicated by the use of the logical connector OR and the left justified placement. Any one of these three ACTIONS may be chosen. If A.2 is chosen, then both A.2.1 and A.2.2 must be performed as indicated by the logical connector AND. Required Action A.2.2 is met by performing A.2.2.1 or A.2.2.2. The indented position of the logical connector OR indicates that A.2.2.1 and A.2.2.2 are alternative choices, only one of which must be performed.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                          1-6


Completion Times 1.3 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE                     The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.
Completion Times 1.3 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-7 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.
BACKGROUND                   Limiting Conditions for Operation (LCOs) specify the lowest functional capability or performance levels of equipment required for safe operation of the facility. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Times(s).
BACKGROUND Limiting Conditions for Operation (LCOs) specify the lowest functional capability or performance levels of equipment required for safe operation of the facility. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Times(s).
DESCRIPTION                 The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, provided that the SFSC is in a specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the SFSC is not within the LCO Applicability.
DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, provided that the SFSC is in a specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the SFSC is not within the LCO Applicability.
Once a Condition has been entered, subsequent subsystems, components, or variables expressed in the Condition, discovered to be not within limits, will not result in separate entry into the Condition unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition.
Once a Condition has been entered, subsequent subsystems, components, or variables expressed in the Condition, discovered to be not within limits, will not result in separate entry into the Condition unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition.
-----------------------------------------------------------Note -----------------------------------------------------------
-----------------------------------------------------------Note -----------------------------------------------------------
When Immediately is used as a Completion Time, the Required Action should be pursued without delay and in a controlled manner.
When Immediately is used as a Completion Time, the Required Action should be pursued without delay and in a controlled manner.
(continued)
(continued)
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                                    1-7


Completion Times 1.3 1.3 Completion Times (continued)
Completion Times 1.3 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-8 1.3 Completion Times (continued)
EXAMPLES                 The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.
EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.
EXAMPLE 1.3-1 ACTIONS CONDITION             REQUIRED ACTION             COMPLETION TIME B. Required           B.1 Perform Action B.1       12 hours Action and associated        AND Completion Time not met.      B.2 Perform Action B.2       36 hours Condition B has two Required Actions. Each Required Action has its own separate Completion Time. Each Completion Time is referenced to the time that Condition B is entered.
EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.
Required Action and associated Completion Time not met.
B.1 Perform Action B.1 AND B.2 Perform Action B.2 12 hours 36 hours Condition B has two Required Actions. Each Required Action has its own separate Completion Time. Each Completion Time is referenced to the time that Condition B is entered.
The Required Actions of Condition B are to complete action B.1 within 12 hours AND complete action B.2 within 36 hours. A total of 12 hours is allowed for completing action B.1 and a total of 36 hours (not 48 hours) is allowed for completing action B.2 from the time that Condition B was entered. If action B.1 is completed within 6 hours, the time allowed for completing action B.2 is the next 30 hours because the total time allowed for completing action B.2 is 36 hours.
The Required Actions of Condition B are to complete action B.1 within 12 hours AND complete action B.2 within 36 hours. A total of 12 hours is allowed for completing action B.1 and a total of 36 hours (not 48 hours) is allowed for completing action B.2 from the time that Condition B was entered. If action B.1 is completed within 6 hours, the time allowed for completing action B.2 is the next 30 hours because the total time allowed for completing action B.2 is 36 hours.
(continued)
(continued)
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                          1-8


Completion Times 1.3 1.3 Completion Times (continued)
Completion Times 1.3 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-9 1.3 Completion Times (continued)
EXAMPLES                 EXAMPLE 1.3-2 (continued)
EXAMPLES EXAMPLE 1.3-2 (continued)
ACTIONS CONDITION             REQUIRED ACTION             COMPLETION TIME A. One system           A.1 Restore system to         7 days not within limit.      within limit.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
B. Required             B.1 Complete action B.1.     12 hours Action and associated        AND Completion Time not met.      B.2 Complete action B.2.     36 hours When a system is determined not to meet the LCO, Condition A is entered. If the system is not restored within 7 days, Condition B is also entered and the Completion Time clocks for Required Actions B.1 and B.2 start. If the system is restored after Condition B is entered, Conditions A and B are exited, and therefore, the Required Actions of Condition B may be terminated.
One system not within limit.
A.1 Restore system to within limit.
7 days B.
Required Action and associated Completion Time not met.
B.1 Complete action B.1.
AND B.2 Complete action B.2.
12 hours 36 hours When a system is determined not to meet the LCO, Condition A is entered. If the system is not restored within 7 days, Condition B is also entered and the Completion Time clocks for Required Actions B.1 and B.2 start. If the system is restored after Condition B is entered, Conditions A and B are exited, and therefore, the Required Actions of Condition B may be terminated.
(continued)
(continued)
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                          1-9


Completion Times 1.3 1.3 Completion Times (continued)
Completion Times 1.3 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-10 1.3 Completion Times (continued)
EXAMPLES                 EXAMPLE 1.3-3 (continued)
EXAMPLES EXAMPLE 1.3-3 (continued)
ACTIONS
ACTIONS
                        ---------------------------------------NOTE-------------------------------------------
---------------------------------------NOTE-------------------------------------------
Separate Condition entry is allowed for each component.
Separate Condition entry is allowed for each component.
CONDITION                   REQUIRED ACTION                       COMPLETION TIME A. LCO not met.             A.1 Restore compliance                 4 hours with LCO.
CONDITION REQUIRED ACTION COMPLETION TIME A.
B. Required                 B.1 Complete action B.1               6 hours Action and associated              AND Completion Time not met.          B.2 Complete action B.2               12 hours The Note above the ACTIONS table is a method of modifying how the Completion Time is tracked. If this method of modifying how the Completion Time is tracked was applicable only to a specific Condition, the Note would appear in that Condition rather than at the top of the ACTIONS Table.
LCO not met.
A.1 Restore compliance with LCO.
4 hours B.
Required Action and associated Completion Time not met.
B.1 Complete action B.1 AND B.2 Complete action B.2 6 hours 12 hours The Note above the ACTIONS table is a method of modifying how the Completion Time is tracked. If this method of modifying how the Completion Time is tracked was applicable only to a specific Condition, the Note would appear in that Condition rather than at the top of the ACTIONS Table.
The Note allows Condition A to be entered separately for each component, and Completion Times tracked on a per component basis.
The Note allows Condition A to be entered separately for each component, and Completion Times tracked on a per component basis.
When a component is determined to not meet the LCO, Condition A is entered and its Completion Time starts. If subsequent components are determined to not meet the LCO, Condition A is entered for each component and separate Completion Times start and are tracked for each component.
When a component is determined to not meet the LCO, Condition A is entered and its Completion Time starts. If subsequent components are determined to not meet the LCO, Condition A is entered for each component and separate Completion Times start and are tracked for each component.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                                1-10


Frequency 1.4 1.0 USE AND APPLICATION 1.4 Frequency PURPOSE                 The purpose of this section is to define the proper use and application of Frequency requirements.
Frequency 1.4 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-11 1.0 USE AND APPLICATION 1.4 Frequency PURPOSE The purpose of this section is to define the proper use and application of Frequency requirements.
DESCRIPTION             Each Surveillance Requirement (SR) has a specified Frequency in which the Surveillance must be met in order to meet the associated Limiting Condition for Operation (LCO). An understanding of the correct application of the specified Frequency is necessary for compliance with the SR.
DESCRIPTION Each Surveillance Requirement (SR) has a specified Frequency in which the Surveillance must be met in order to meet the associated Limiting Condition for Operation (LCO). An understanding of the correct application of the specified Frequency is necessary for compliance with the SR.
The "specified Frequency" is referred to throughout this section and each of the Specifications of Section 2.0, Surveillance Requirement (SR)
The "specified Frequency" is referred to throughout this section and each of the Specifications of Section 2.0, Surveillance Requirement (SR)
Applicability. The "specified Frequency" consists of the requirements of the Frequency column of each SR.
Applicability. The "specified Frequency" consists of the requirements of the Frequency column of each SR.
Situations where a Surveillance could be required (i.e., its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 2.0.4 conflicts. To avoid these conflicts, the SR (i.e., the Surveillance or the Frequency) is stated such that it is only "required" when it can be and should be performed. With an SR satisfied, SR 2.0.4 imposes no restriction.
Situations where a Surveillance could be required (i.e., its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 2.0.4 conflicts. To avoid these conflicts, the SR (i.e., the Surveillance or the Frequency) is stated such that it is only "required" when it can be and should be performed. With an SR satisfied, SR 2.0.4 imposes no restriction.
(continued)
(continued)
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                            1-11


Frequency 1.4 1.4 Frequency (continued)
Frequency 1.4 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-12 1.4 Frequency (continued)
EXAMPLES                 The following examples illustrate the various ways that Frequencies are specified.
EXAMPLES The following examples illustrate the various ways that Frequencies are specified.
EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                             FREQUENCY Verify pressure within limit                             12 hours Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications (TS). The Frequency specifies an interval (12 hours) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 2.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 2.0.1 (such as when the equipment or variables are outside specified limits, or the facility is outside the Applicability of the LCO). If the interval specified by SR 2.0.2 is exceeded while the facility is in a condition specified in the Applicability of the LCO, the LCO is not met in accordance with SR 2.0.1.
EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify pressure within limit 12 hours Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications (TS). The Frequency specifies an interval (12 hours) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 2.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 2.0.1 (such as when the equipment or variables are outside specified limits, or the facility is outside the Applicability of the LCO). If the interval specified by SR 2.0.2 is exceeded while the facility is in a condition specified in the Applicability of the LCO, the LCO is not met in accordance with SR 2.0.1.
If the interval as specified by SR 2.0.2 is exceeded while the facility is not in a condition specified in the Applicability of the LCO for which performance of the SR is required, the Surveillance must be performed within the Frequency requirements of SR 2.0.2 prior to entry into the specified condition. Failure to do so would result in a violation of SR 2.0.4 (continued)
If the interval as specified by SR 2.0.2 is exceeded while the facility is not in a condition specified in the Applicability of the LCO for which performance of the SR is required, the Surveillance must be performed within the Frequency requirements of SR 2.0.2 prior to entry into the specified condition. Failure to do so would result in a violation of SR 2.0.4 (continued)
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                          1-12


Frequency 1.4 1.4 Frequency (continued)
Frequency 1.4 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-13 1.4 Frequency (continued)
EXAMPLES (continued)             EXAMPLE 1.4-2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                             FREQUENCY Verify vacuum drying pressure is within limits.       Once within 12 hours prior to starting activity AND 24 hours thereafter Example 1.4-2 has two Frequencies. The first is a one time performance Frequency, and the second is of the type shown in Example 1.4-1. The logical connector "AND" indicates that both Frequency requirements must be met. Each time the example activity is to be performed, the Surveillance must be performed within 12 hours prior to starting the activity.
EXAMPLES (continued)
EXAMPLE 1.4-2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify vacuum drying pressure is within limits.
Once within 12 hours prior to starting activity AND 24 hours thereafter Example 1.4-2 has two Frequencies. The first is a one time performance Frequency, and the second is of the type shown in Example 1.4-1. The logical connector "AND" indicates that both Frequency requirements must be met. Each time the example activity is to be performed, the Surveillance must be performed within 12 hours prior to starting the activity.
The use of "once" indicates a single performance will satisfy the specified Frequency (assuming no other Frequencies are connected by "AND").
The use of "once" indicates a single performance will satisfy the specified Frequency (assuming no other Frequencies are connected by "AND").
This type of Frequency does not qualify for the 25% extension allowed by SR 2.0.2.
This type of Frequency does not qualify for the 25% extension allowed by SR 2.0.2.
                        "Thereafter" indicates future performances must be established per SR 2.0.2, but only after a specified condition is first met (i.e., the "once" performance in this example). If the specified activity is canceled or not performed, the measurement of both intervals stops. New intervals start upon preparing to restart the specified activity.
"Thereafter" indicates future performances must be established per SR 2.0.2, but only after a specified condition is first met (i.e., the "once" performance in this example). If the specified activity is canceled or not performed, the measurement of both intervals stops. New intervals start upon preparing to restart the specified activity.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                          1-13


LCO Applicability 2.0 2.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 2.0.1       LCOs shall be met during specified conditions in the Applicability, except as provided in LCO 2.0.2.
LCO Applicability 2.0 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-1 2.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 2.0.1 LCOs shall be met during specified conditions in the Applicability, except as provided in LCO 2.0.2.
LCO 2.0.2       Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 2.0.5.
LCO 2.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 2.0.5.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
LCO 2.0.3       Not applicable.
LCO 2.0.3 Not applicable.
LCO 2.0.4       When an LCO is not met, entry into a specified condition in the Applicability shall not be made except when the associated ACTIONS to be entered permit continued operation in the specified condition in the Applicability for an unlimited period of time. This Specification shall not prevent changes in specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of an SFSC.
LCO 2.0.4 When an LCO is not met, entry into a specified condition in the Applicability shall not be made except when the associated ACTIONS to be entered permit continued operation in the specified condition in the Applicability for an unlimited period of time. This Specification shall not prevent changes in specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of an SFSC.
LCO 2.0.5       Equipment removed from service or not in service in compliance with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate it meets the LCO or that other equipment meets the LCO. This is an exception to LCO 2.0.2 for the system returned to service under administrative control to perform the testing.
LCO 2.0.5 Equipment removed from service or not in service in compliance with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate it meets the LCO or that other equipment meets the LCO. This is an exception to LCO 2.0.2 for the system returned to service under administrative control to perform the testing.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                          2-1


SR Applicability 2.0 2.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 2.0.1         SRs shall be met during the specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO.
SR Applicability 2.0 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-2 2.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 2.0.1 SRs shall be met during the specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO.
Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 2.0.3. Surveillances do not have to be performed on equipment or variables outside specified limits.
Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 2.0.3. Surveillances do not have to be performed on equipment or variables outside specified limits.
SR 2.0.2         The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.
SR 2.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.
For Frequencies specified as once, the above interval extension does not apply. If a Completion Time requires periodic performance on a once per...
For Frequencies specified as once, the above interval extension does not apply. If a Completion Time requires periodic performance on a once per...
basis, the above Frequency extension applies to each performance after the initial performance.
basis, the above Frequency extension applies to each performance after the initial performance.
Exceptions to this Specification are stated in the individual Specifications.
Exceptions to this Specification are stated in the individual Specifications.
SR 2.0.3         If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.
SR 2.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.
If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
(continued)
(continued)
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                            2-2


SR Applicability 2.0 2.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY (continued)
SR Applicability 2.0 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-3 2.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY (continued)
SR 2.0.4         Entry into a specified condition in the Applicability of an LCO shall not be made unless the LCO's Surveillances have been met within their specified Frequency.
SR 2.0.4 Entry into a specified condition in the Applicability of an LCO shall not be made unless the LCO's Surveillances have been met within their specified Frequency.
This provision shall not prevent entry into specified conditions in the Applicability that are required to comply with Actions or that are related to the unloading of an SFSC.
This provision shall not prevent entry into specified conditions in the Applicability that are required to comply with Actions or that are related to the unloading of an SFSC.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                          2-3


MULTIPURPOSE CANISTER 2.1.1 2.1 SFSC INTEGRITY 2.1.1 Multipurpose Canister (MPC)
MULTIPURPOSE CANISTER 2.1.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-4 2.1 SFSC INTEGRITY 2.1.1 Multipurpose Canister (MPC)
LCO 2.1.1                   The MPC shall be dry and helium filled.
LCO 2.1.1 The MPC shall be dry and helium filled.
APPLICABILITY:               During TRANSPORT OPERATIONS and STORAGE OPERATIONS.
APPLICABILITY:
During TRANSPORT OPERATIONS and STORAGE OPERATIONS.
ACTIONS
ACTIONS
--------------------------------------------------------- NOTE ----------------------------------------------------------
--------------------------------------------------------- NOTE ----------------------------------------------------------
Separate Condition entry is allowed for each SFSC.
Separate Condition entry is allowed for each SFSC.
COMPLETION CONDITION                                 REQUIRED ACTION TIME A. MPC cavity vacuum drying               A.1 Perform an engineering                         7 days pressure limit not met.                      evaluation to determine the quantity of moisture left in the MPC.
CONDITION REQUIRED ACTION COMPLETION TIME A.
AND A.2 Determine and complete                         30 days corrective actions necessary to return the MPC to an analyzed condition.
MPC cavity vacuum drying pressure limit not met.
B. MPC helium backfill                   B.1 Perform an engineering                         72 hours pressure limit not met.                      evaluation to determine the impact of helium differential.
A.1 Perform an engineering evaluation to determine the quantity of moisture left in the MPC.
AND B.2 Determine and complete                         14 days corrective actions necessary to return the MPC to an analyzed condition.
AND A.2 Determine and complete corrective actions necessary to return the MPC to an analyzed condition.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                                    2-4
7 days 30 days B.
MPC helium backfill pressure limit not met.
B.1 Perform an engineering evaluation to determine the impact of helium differential.
AND B.2 Determine and complete corrective actions necessary to return the MPC to an analyzed condition.
72 hours 14 days


MULTIPURPOSE CANISTER 2.1.1 COMPLETION CONDITION                             REQUIRED ACTION TIME C. MPC helium leak rate limit         C.1 Perform an engineering           24 hours not met.                                evaluation to determine impact of increased helium leak rate on heat removal capability and offsite dose release effects.
MULTIPURPOSE CANISTER 2.1.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-5 CONDITION REQUIRED ACTION COMPLETION TIME C.
AND C.2 Determine and complete           7 days corrective actions necessary to return MPC to an analyzed condition.
MPC helium leak rate limit not met.
D. Required Actions and               D.1 Remove all fuel assemblies       30 days associated Completion                    from the SFSC.
C.1 Perform an engineering evaluation to determine impact of increased helium leak rate on heat removal capability and offsite dose release effects.
Times not met.
AND C.2 Determine and complete corrective actions necessary to return MPC to an analyzed condition.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY SR 2.1.1.1           Verify MPC cavity vacuum drying pressure is within       During LOADING the limit specified in Table 2-1 for the applicable MPC OPERATIONS model.
24 hours 7 days D.
SR 2.1.1.2           Verify MPC helium backfill pressure is within the limit During LOADING specified in Table 2-1 for the applicable MPC model. OPERATIONS SR 2.1.1.3           Verify that the total helium leak rate through the MPC   During LOADING lid confinement weld and the drain and vent port         OPERATIONS confinement welds is within the limit specified in Table 2-1 for the applicable MPC model.
Required Actions and associated Completion Times not met.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                            2-5
D.1 Remove all fuel assemblies from the SFSC.
30 days SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 2.1.1.1 Verify MPC cavity vacuum drying pressure is within the limit specified in Table 2-1 for the applicable MPC model.
During LOADING OPERATIONS SR 2.1.1.2 Verify MPC helium backfill pressure is within the limit specified in Table 2-1 for the applicable MPC model.
During LOADING OPERATIONS SR 2.1.1.3 Verify that the total helium leak rate through the MPC lid confinement weld and the drain and vent port confinement welds is within the limit specified in Table 2-1 for the applicable MPC model.
During LOADING OPERATIONS


MULTIPURPOSE CANISTER 2.1.1 Table 2-1 MPC Model-Dependent Limits MPC MODEL                                 LIMITS
MULTIPURPOSE CANISTER 2.1.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-6 Table 2-1 MPC Model-Dependent Limits MPC MODEL LIMITS
< 3 torr for > 30 min
< 3 torr for > 30 min
< 22.2 psig
> 10 psig and < 14 psig
< 5.0E-6 atm cc/sec (He)
< 4.3E-6 atm cc/sec (He)
< 3 torr for > 30 min
< 3 torr for > 30 min
< 28.5 psig
> 10 psig and < 14 psig
< 5.0E-6 atm cc/sec (He)
< 4.3E-6 atm cc/sec (He)
< 3 torr for > 30 min
< 3 torr for > 30 min
< 28.5 psig
: 1. MPC-24
: 1. MPC-24
: a. MPC Cavity Vacuum Drying Pressure                   < 3 torr for > 30 min
: a. MPC Cavity Vacuum Drying Pressure
: b. OVERPACK Annulus Vacuum Drying Pressure             < 3 torr for > 30 min
: b. OVERPACK Annulus Vacuum Drying Pressure c.
: c. MPC Helium Backfill Pressure1                       < 22.2 psig
MPC Helium Backfill Pressure1
: d. OVERPACK Annulus Helium Backfill Pressure           > 10 psig and < 14 psig
: d. OVERPACK Annulus Helium Backfill Pressure
: e. MPC Helium Leak Rate                               < 5.0E-6 atm cc/sec (He)
: e. MPC Helium Leak Rate f.
: f. OVERPACK Helium Leak Rate                           < 4.3E-6 atm cc/sec (He)
OVERPACK Helium Leak Rate
: 2. MPC-68
: 2. MPC-68
: a. MPC Cavity Vacuum Drying Pressure                   < 3 torr for > 30 min
: a. MPC Cavity Vacuum Drying Pressure
: b. OVERPACK Annulus Vacuum Drying Pressure             < 3 torr for > 30 min
: b. OVERPACK Annulus Vacuum Drying Pressure c.
: c. MPC Helium Backfill Pressure1                       < 28.5 psig
MPC Helium Backfill Pressure1
: d. OVERPACK Annulus Helium Backfill Pressure           > 10 psig and < 14 psig
: d. OVERPACK Annulus Helium Backfill Pressure
: e. MPC Helium Leak Rate                               < 5.0E-6 atm cc/sec (He)
: e. MPC Helium Leak Rate f.
: f. OVERPACK Helium Leak Rate                           < 4.3E-6 atm cc/sec (He)
OVERPACK Helium Leak Rate
: 3. MPC-68F
: 3. MPC-68F
: a. MPC Cavity Vacuum Drying Pressure                   < 3 torr for > 30 min
: a. MPC Cavity Vacuum Drying Pressure
: b. OVERPACK Annulus Vacuum Drying Pressure             < 3 torr for > 30 min
: b. OVERPACK Annulus Vacuum Drying Pressure c.
: c. MPC Helium Backfill Pressure1                       < 28.5 psig
MPC Helium Backfill Pressure1
: d. OVERPACK Annulus Helium Backfill Pressure           > 10 psig and < 14 psig
: d. OVERPACK Annulus Helium Backfill Pressure
: e. MPC Helium Leak Rate                                < 5.0E-6 atm cc/sec (He)
: e. MPC Helium Leak Rate f.
: f. OVERPACK Helium Leak Rate                          < 4.3E-6 atm cc/sec (He) 1 Helium used for backfill of MPC shall have a purity of >99.995%
OVERPACK Helium Leak Rate
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                        2-6
> 10 psig and < 14 psig  
< 5.0E-6 atm cc/sec (He)  
< 4.3E-6 atm cc/sec (He) 1 Helium used for backfill of MPC shall have a purity of >99.995%


OVERPACK 2.1.2 2.1 SFSC INTEGRITY 2.1.2 OVERPACK LCO 2.1.2                   The OVERPACK shall be dry and helium filled.
OVERPACK 2.1.2 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-7 2.1 SFSC INTEGRITY 2.1.2 OVERPACK LCO 2.1.2 The OVERPACK shall be dry and helium filled.
APPLICABILITY:               TRANSPORT OPERATIONS and STORAGE OPERATIONS ACTIONS
APPLICABILITY:
TRANSPORT OPERATIONS and STORAGE OPERATIONS ACTIONS
--------------------------------------------------------- NOTE ---------------------------------------------------------
--------------------------------------------------------- NOTE ---------------------------------------------------------
Separate Condition entry is allowed for each SFSC.
Separate Condition entry is allowed for each SFSC.
COMPLETION CONDITION                                 REQUIRED ACTION TIME A. OVERPACK annulus                       A.1 Perform an engineering                         7 days vacuum drying pressure                        evaluation to determine limit not met.                                quantity of moisture left in OVERPACK.
CONDITION REQUIRED ACTION COMPLETION TIME A.
AND A.2 Determine and complete                         30 days corrective actions necessary to return OVERPACK to analyzed condition.
OVERPACK annulus vacuum drying pressure limit not met.
B. OVERPACK annulus                       B.1 Perform an engineering                         72 hours helium backfill pressure                      evaluation to determine impact limit not met                                of helium pressure differential.
A.1 Perform an engineering evaluation to determine quantity of moisture left in OVERPACK.
AND B.2 Determine and complete                         30 days corrective actions necessary to return the OVERPACK to analyzed condition.
AND A.2 Determine and complete corrective actions necessary to return OVERPACK to analyzed condition.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                                    2-7
7 days 30 days B.
OVERPACK annulus helium backfill pressure limit not met B.1 Perform an engineering evaluation to determine impact of helium pressure differential.
AND B.2 Determine and complete corrective actions necessary to return the OVERPACK to analyzed condition.
72 hours 30 days


OVERPACK 2.1.2 COMPLETION CONDITION                           REQUIRED ACTION TIME C. OVERPACK helium leak               C.1 Perform an engineering           7 days rate limit not met.                    evaluation to determine impact of increased helium leak rate on heat removal capability and off-site dose release effects.
OVERPACK 2.1.2 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-8 CONDITION REQUIRED ACTION COMPLETION TIME C.
AND C.2 Determine and complete           30 days corrective actions necessary to return OVERPACK to analyzed condition.
OVERPACK helium leak rate limit not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                     FREQUENCY SR 2.1.2.1       Verify OVERPACK annulus vacuum drying pressure is             During LOADING within limit specified in Table 2-1 for the applicable MPC   OPERATIONS model.
C.1 Perform an engineering evaluation to determine impact of increased helium leak rate on heat removal capability and off-site dose release effects.
SR 2.1.2.2       Verify OVERPACK annulus helium backfill pressure is           During LOADING within the limit specified in Table 2-1 for the applicable   OPERATIONS MPC model.
AND C.2 Determine and complete corrective actions necessary to return OVERPACK to analyzed condition.
SR 2.1.2.3       Verify that the total helium leak rate through the           During LOADING OVERPACK closure plate inner mechanical seal, the             OPERATIONS OVERPACK vent port plug seal, and the OVERPACK drain port plug seal is within the limits specified in Table 2-1 for the applicable MPC model.
7 days 30 days SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 2.1.2.1 Verify OVERPACK annulus vacuum drying pressure is within limit specified in Table 2-1 for the applicable MPC model.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                            2-8
During LOADING OPERATIONS SR 2.1.2.2 Verify OVERPACK annulus helium backfill pressure is within the limit specified in Table 2-1 for the applicable MPC model.
During LOADING OPERATIONS SR 2.1.2.3 Verify that the total helium leak rate through the OVERPACK closure plate inner mechanical seal, the OVERPACK vent port plug seal, and the OVERPACK drain port plug seal is within the limits specified in Table 2-1 for the applicable MPC model.
During LOADING OPERATIONS


SFSC Lifting Requirements 2.1.3 2.1 SFSC INTEGRITY 2.1.3 SFSC Lifting Requirements LCO 2.1.3         An OVERPACK loaded with spent fuel shall be lifted in accordance with either of the following requirements
SFSC Lifting Requirements 2.1.3 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-9 2.1 SFSC INTEGRITY 2.1.3 SFSC Lifting Requirements LCO 2.1.3 An OVERPACK loaded with spent fuel shall be lifted in accordance with either of the following requirements a.
: a.       i.       A lift height < 21 inches when oriented vertically.
i.
AND ii.       A lift height < 72 inches when oriented horizontally.
A lift height < 21 inches when oriented vertically.
OR
AND ii.
: b.       The OVERPACK is lifted with lifting devices designed in accordance with ANSI N14.6 and having redundant drop prevention design features.
A lift height < 72 inches when oriented horizontally.
OR
OR b.
: c.       Site-specific analysis to evaluate site-specific conditions to ensure that the drop accidents impact loads remain within HI-STAR 100 SAR limits of 60g.
The OVERPACK is lifted with lifting devices designed in accordance with ANSI N14.6 and having redundant drop prevention design features.
APPLICABILITY:              During TRANSPORT OPERATIONS.
OR c.
Site-specific analysis to evaluate site-specific conditions to ensure that APPLICABILITY:
the drop accidents impact loads remain within HI-STAR 100 SAR limits of 60g.
During TRANSPORT OPERATIONS.
---------------------------------------------------------- NOTE ---------------------------------------------------------
---------------------------------------------------------- NOTE ---------------------------------------------------------
This LCO is not applicable when the SFSC is in the FUEL BUILDING or is being handled by a device providing support from underneath (i.e., on a rail car, heavy haul trailer, air pads, etc.)
This LCO is not applicable when the SFSC is in the FUEL BUILDING or is being handled by a device providing support from underneath (i.e., on a rail car, heavy haul trailer, air pads, etc.)
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                                    2-9


SFSC Lifting Requirements 2.1.3 ACTIONS
SFSC Lifting Requirements 2.1.3 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-10 ACTIONS
---------------------------------------------------------- NOTE ---------------------------------------------------------
---------------------------------------------------------- NOTE ---------------------------------------------------------
Separate Condition entry is allowed for each SFSC.
Separate Condition entry is allowed for each SFSC.
COMPLETION CONDITION                                   REQUIRED ACTION TIME A. SFSC lifting requirements             A.1 Initiate actions to meet SFSC                 Immediately not met.                                      lifting requirements.
CONDITION REQUIRED ACTION COMPLETION TIME A.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                     FREQUENCY SR 2.1.3.1         Verify SFSC lifting requirements are met.                     After the SFSC is suspended from, or secured in the transporter and prior to the transporter beginning to move the SFSC within ISFSI Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                                    2-10
SFSC lifting requirements not met.
A.1 Initiate actions to meet SFSC lifting requirements.
Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 2.1.3.1 Verify SFSC lifting requirements are met.
After the SFSC is suspended from, or secured in the transporter and prior to the transporter beginning to move the SFSC within ISFSI


Fuel Cool-Down 2.1.4 2.1 SFSC INTEGRITY 2.1.4 Fuel Cool-Down LCO 2.1.4                   The MPC exit gas temperature shall be < 200o F.
Fuel Cool-Down 2.1.4 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-11 2.1 SFSC INTEGRITY 2.1.4 Fuel Cool-Down LCO 2.1.4 The MPC exit gas temperature shall be < 200o F.
---------------------------------------------------------- NOTE ---------------------------------------------------------
---------------------------------------------------------- NOTE ---------------------------------------------------------
The LCO is only applicable to wet UNLOADING OPERATIONS.
The LCO is only applicable to wet UNLOADING OPERATIONS.
APPLICABILITY:               UNLOADING OPERATIONS prior to flooding.
APPLICABILITY:
UNLOADING OPERATIONS prior to flooding.
ACTIONS
ACTIONS
---------------------------------------------------------- NOTE ---------------------------------------------------------
---------------------------------------------------------- NOTE ---------------------------------------------------------
Separate Condition entry is allowed for each SFSC.
Separate Condition entry is allowed for each SFSC.
COMPLETION CONDITION                                 REQUIRED ACTION TIME A. MPC exit temperature not               A.1 Establish MPC helium gas exit                 Prior to initiating within limit.                                temperature within limit.                   MPC re-flooding operations AND A.2 Ensure adequate heat transfer                 24 hours from MPC to the environment.
CONDITION REQUIRED ACTION COMPLETION TIME A.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                     FREQUENCY SR 2.1.4.1         Verify MPC helium gas exit temperature within limit.                     Prior to initiation of MPC re-flooding operations.
MPC exit temperature not within limit.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                                    2-11
A.1 Establish MPC helium gas exit temperature within limit.
AND A.2 Ensure adequate heat transfer from MPC to the environment.
Prior to initiating MPC re-flooding operations 24 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 2.1.4.1 Verify MPC helium gas exit temperature within limit.
Prior to initiation of MPC re-flooding operations.


OVERPACK Average Surface Dose Rates 2.2.1 2.2 SFSC RADIATION PROTECTION 2.2.1 OVERPACK Average Surface Dose Rates LCO 2.2.1                   The average surface dose rates of each OVERPACK shall not exceed:
OVERPACK Average Surface Dose Rates 2.2.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-12 2.2 SFSC RADIATION PROTECTION 2.2.1 OVERPACK Average Surface Dose Rates LCO 2.2.1 The average surface dose rates of each OVERPACK shall not exceed:
: a. 125 mrem/hour (neutron + gamma) on the side;
: a. 125 mrem/hour (neutron + gamma) on the side;
: b. 80 mrem/hour (neutron + gamma) on the top; APPLICABILITY:               TRANSPORT OPERATIONS and STORAGE OPERATIONS ACTIONS
: b. 80 mrem/hour (neutron + gamma) on the top; APPLICABILITY:
TRANSPORT OPERATIONS and STORAGE OPERATIONS ACTIONS
---------------------------------------------------------- NOTE ---------------------------------------------------------
---------------------------------------------------------- NOTE ---------------------------------------------------------
Separate Condition entry is allowed for each SFSC.
Separate Condition entry is allowed for each SFSC.
COMPLETION CONDITION                                 REQUIRED ACTION TIME A. OVERPACK average                       A.1 Administratively verify correct               24 hours surface dose rate limits not                  fuel loading.
CONDITION REQUIRED ACTION COMPLETION TIME A.
met.
OVERPACK average surface dose rate limits not met.
AND A.2 Perform written evaluations to                 48 hours verify compliance with the ISFSI offsite radiation protection requirements of 10 CFR Part 20 and 10 CFR Part 72.
A.1 Administratively verify correct fuel loading.
B. Required Action and                   B.1 Remove all fuel assemblies                     30 days Associated Completion                        from SFSC.
AND A.2 Perform written evaluations to verify compliance with the ISFSI offsite radiation protection requirements of 10 CFR Part 20 and 10 CFR Part 72.
Time not met.
24 hours 48 hours B.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                                    2-12
Required Action and Associated Completion Time not met.
B.1 Remove all fuel assemblies from SFSC.
30 days


OVERPACK Average Surface Dose Rates 2.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY SR 2.2.1.1       Verify average surface dose rates of OVERPACK               During LOADING containing fuel assemblies are within limits. OVERPACK     OPERATIONS dose rates shall be measured at locations shown in Figure 2.2.1-1.
OVERPACK Average Surface Dose Rates 2.2.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-13 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 2.2.1.1 Verify average surface dose rates of OVERPACK containing fuel assemblies are within limits. OVERPACK dose rates shall be measured at locations shown in Figure 2.2.1-1.
NOTE:           SR 2.2.1.1 shall be performed after the MPC has been vacuum dried.
NOTE:
NOTE:           If a loaded OVERPACK is placed into storage after transport from an on off-site location, SR 2.2.1.1 shall be performed after receipt of the OVERPACK and prior to STORAGE OPERATIONS.
SR 2.2.1.1 shall be performed after the MPC has been vacuum dried.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                        2-13
NOTE:
If a loaded OVERPACK is placed into storage after transport from an on off-site location, SR 2.2.1.1 shall be performed after receipt of the OVERPACK and prior to STORAGE OPERATIONS.
During LOADING OPERATIONS


OVERPACK Average Surface Dose Rates 2.2.1 Figure 2.2.1-1 OVERPACK Surface Rate Measurement Locations Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1                       2-14
OVERPACK Average Surface Dose Rates 2.2.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-14 Figure 2.2.1-1 OVERPACK Surface Rate Measurement Locations


SFSC Surface Contamination 2.2.2 2.2 SFSC RADIATION PROTECTION 2.2.2 SFSC Surface Contamination LCO 2.2.2                   Removable contamination on the exterior surfaces of the OVERPACK and accessible portions of the MPC shall each not exceed:
SFSC Surface Contamination 2.2.2 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-15 2.2 SFSC RADIATION PROTECTION 2.2.2 SFSC Surface Contamination LCO 2.2.2 Removable contamination on the exterior surfaces of the OVERPACK and accessible portions of the MPC shall each not exceed:
: a.       1000 dpm/100 cm2 from beta and gamma sources; and
a.
: b.       20 dpm/100 cm2 from alpha sources.
1000 dpm/100 cm2 from beta and gamma sources; and b.
APPLICABILITY:               TRANSPORT OPERATIONS and STORAGE OPERATIONS ACTIONS
20 dpm/100 cm2 from alpha sources.
APPLICABILITY:
TRANSPORT OPERATIONS and STORAGE OPERATIONS ACTIONS
---------------------------------------------------------- NOTE ---------------------------------------------------------
---------------------------------------------------------- NOTE ---------------------------------------------------------
Separate Condition entry is allowed for each SSSC.
Separate Condition entry is allowed for each SSSC.
COMPLETION CONDITION                                 REQUIRED ACTION TIME A. SFSC removable surface                 A.1 Restore SFSC removable                         7 days contamination limits not                      surface contamination to within met.                                          limits.
CONDITION REQUIRED ACTION COMPLETION TIME A.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                     FREQUENCY SR 2.2.2.1         Verify that the removable contamination on the exterior                       During LOADING surfaces of OVERPACKs and accessible portions of the                           OPERATIONS MPC containing fuel is within limits.
SFSC removable surface contamination limits not met.
NOTE:             If a loaded OVERPACK is placed into storage after transport from an off-site location, SR 2.2.2.1 shall be performed after receipt of the OVERPACK and prior to STORAGE OPERATIONS.
A.1 Restore SFSC removable surface contamination to within limits.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                                    2-15
7 days SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 2.2.2.1 Verify that the removable contamination on the exterior surfaces of OVERPACKs and accessible portions of the MPC containing fuel is within limits.
NOTE:
If a loaded OVERPACK is placed into storage after transport from an off-site location, SR 2.2.2.1 shall be performed after receipt of the OVERPACK and prior to STORAGE OPERATIONS.
During LOADING OPERATIONS


Administrative Controls and Programs 3.0 3.0 ADMINISTRATIVE CONTROLS AND PROGRAMS The following programs shall be established, implemented, and maintained.
Administrative Controls and Programs 3.0 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 3-1 3.0 ADMINISTRATIVE CONTROLS AND PROGRAMS The following programs shall be established, implemented, and maintained.
3.1     Training Program A training program for the HI-STAR 100 cask system shall be developed under the general licensee's systematic approach to training (SAT). Training modules shall include comprehensive instructions for the operation and maintenance of the HI-STAR 100 spent fuel storage cask system and the independent spent fuel storage installation (ISFSI).
3.1 Training Program A training program for the HI-STAR 100 cask system shall be developed under the general licensee's systematic approach to training (SAT). Training modules shall include comprehensive instructions for the operation and maintenance of the HI-STAR 100 spent fuel storage cask system and the independent spent fuel storage installation (ISFSI).
3.2     Pre-Operational Testing and Training Exercise A dry run training exercise of the loading, closure, handling, unloading, and transfer of the HI-STAR 100 system shall be conducted by the licensee prior to the first use of the system to load spent fuel assemblies. The training exercise shall not be conducted with spent fuel in the MPC/OVERPACK. The dry run may be performed in an alternate step sequence from the actual procedures, but all steps must be performed. The dry run shall include, but is not limited to the following:
3.2 Pre-Operational Testing and Training Exercise A dry run training exercise of the loading, closure, handling, unloading, and transfer of the HI-STAR 100 system shall be conducted by the licensee prior to the first use of the system to load spent fuel assemblies. The training exercise shall not be conducted with spent fuel in the MPC/OVERPACK. The dry run may be performed in an alternate step sequence from the actual procedures, but all steps must be performed. The dry run shall include, but is not limited to the following:
: a.       Moving the HI-STAR 100 MPC/OVERPACK into the spent fuel pool.
a.
: b.       Preparation of the HI-STAR 100 Cask System for fuel loading.
Moving the HI-STAR 100 MPC/OVERPACK into the spent fuel pool.
: c.       Selection and verification of specific fuel assemblies to ensure type conformance.
b.
Preparation of the HI-STAR 100 Cask System for fuel loading.
c.
Selection and verification of specific fuel assemblies to ensure type conformance.
Locating specific assemblies and placing assemblies into the MPC (using a dummy fuel assembly), including appropriate independent verification.
Locating specific assemblies and placing assemblies into the MPC (using a dummy fuel assembly), including appropriate independent verification.
: e.       Remote installation of the MPC lid and removal of HI-STAR 100 MPC/OVERPACK from the spent fuel pool.
e.
: f.       MPC welding, NDE inspections, hydrostatic testing, draining, vacuum drying, helium backfilling, and leakage testing.
Remote installation of the MPC lid and removal of HI-STAR 100 MPC/OVERPACK from the spent fuel pool.
: g.       HI-STAR 100 OVERPACK closure, draining, vacuum drying, helium backfilling and leakage testing.
f.
: h.       HI-STAR 100 OVERPACK upending/downending on the horizontal transfer trailer or other transfer device, as applicable to the sites cask handling arrangement.
MPC welding, NDE inspections, hydrostatic testing, draining, vacuum drying, helium backfilling, and leakage testing.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                            3-1
g.
HI-STAR 100 OVERPACK closure, draining, vacuum drying, helium backfilling and leakage testing.
h.
HI-STAR 100 OVERPACK upending/downending on the horizontal transfer trailer or other transfer device, as applicable to the sites cask handling arrangement.


Administrative Controls and Programs 3.0
Administrative Controls and Programs 3.0 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 3-2 i.
: i.       Placement of the HI-STAR 100 Cask System at the ISFSI.
Placement of the HI-STAR 100 Cask System at the ISFSI.
: j.       HI-STAR 100 Cask System unloading, including cooling fuel assemblies, flooding MPC cavity, removing MPC lid welds.
j.
3.3     Special Requirements For First Systems In Place The heat transfer characteristics of the cask system will be recorded by temperature measurements for the first HI-STAR 100 SFSC systems (MPC-24 and MPC-68) placed into service with a heat load equal to or greater than 10 kW. An analysis shall be performed that demonstrates the temperature measurements validate the analytic methods and predicted thermal behavior described in Chapter 4 of the SAR.
HI-STAR 100 Cask System unloading, including cooling fuel assemblies, flooding MPC cavity, removing MPC lid welds.
3.3 Special Requirements For First Systems In Place The heat transfer characteristics of the cask system will be recorded by temperature measurements for the first HI-STAR 100 SFSC systems (MPC-24 and MPC-68) placed into service with a heat load equal to or greater than 10 kW. An analysis shall be performed that demonstrates the temperature measurements validate the analytic methods and predicted thermal behavior described in Chapter 4 of the SAR.
Validation tests shall be performed for each subsequent cask system that has a heat load that exceeds a previously validated heat load by more than 2 kW. (e.g., if the initial test was conducted at 10 kW, then no additional testing is needed until the heat load exceeds 12 kW). No additional testing is required for a system after it has been tested at a heat load equal to or greater than 16 kW.
Validation tests shall be performed for each subsequent cask system that has a heat load that exceeds a previously validated heat load by more than 2 kW. (e.g., if the initial test was conducted at 10 kW, then no additional testing is needed until the heat load exceeds 12 kW). No additional testing is required for a system after it has been tested at a heat load equal to or greater than 16 kW.
Letter reports summarizing the results of each validation test shall be submitted to the NRC in accordance with 10 CFR 72.4. Cask users may satisfy these requirements by referencing validation test reports submitted to the NRC by other cask users.
Letter reports summarizing the results of each validation test shall be submitted to the NRC in accordance with 10 CFR 72.4. Cask users may satisfy these requirements by referencing validation test reports submitted to the NRC by other cask users.
3.4. Radioactive Effluent Control Program This program implements the requirements of 10 CFR 72.44(d).
3.4.
: a.       The HI-STAR 100 Cask System does not create any radioactive materials or have any radioactive waste treatment systems. Therefore, specific operating procedures for the control of radioactive effluents are not required. Specification 2.1.1, Multi-Purpose Canister (MPC), provides assurance that there are no radioactive effluents from the SFSC.
Radioactive Effluent Control Program This program implements the requirements of 10 CFR 72.44(d).
: b.       This program includes an environmental monitoring program. Each general license user may incorporate SFSC operations into their environmental monitoring program for 10 CFR Part 50 or 10 CFR Part 52 operations.
a.
: c.       An annual report shall be submitted pursuant to 10 CFR 72.44(d)(3).
The HI-STAR 100 Cask System does not create any radioactive materials or have any radioactive waste treatment systems. Therefore, specific operating procedures for the control of radioactive effluents are not required. Specification 2.1.1, Multi-Purpose Canister (MPC), provides assurance that there are no radioactive effluents from the SFSC.
Renewed Certificate of Compliance No. 1008 Appendix A  Amendment 1                          3-2
b.
This program includes an environmental monitoring program. Each general license user may incorporate SFSC operations into their environmental monitoring program for 10 CFR Part 50 or 10 CFR Part 52 operations.
c.
An annual report shall be submitted pursuant to 10 CFR 72.44(d)(3).


Administrative Controls and Programs 3.0 3.5   Aging Management Program (AMP) Procedures Each general licensee shall have a program to establish, implement, and maintain written procedures for each AMP described in the FSAR. The program shall include provisions for changing AMP elements, as necessary, and within the limitations of the approved design bases to address new information on aging effects based on inspection findings and/or industry operating experience. Each procedure shall contain a reference to the specific aspect of the AMP element implemented by that procedure, and that reference shall be maintained even if the procedure is modified.
Administrative Controls and Programs 3.0 Renewed Certificate of Compliance No. 1008 3-3 Appendix A - Amendment 1 3.5 Aging Management Program (AMP) Procedures Each general licensee shall have a program to establish, implement, and maintain written procedures for each AMP described in the FSAR. The program shall include provisions for changing AMP elements, as necessary, and within the limitations of the approved design bases to address new information on aging effects based on inspection findings and/or industry operating experience. Each procedure shall contain a reference to the specific aspect of the AMP element implemented by that procedure, and that reference shall be maintained even if the procedure is modified.
The general licensee shall establish and implement these written procedures prior to entering the period of extended operation or no later than one year after the effective date of the CoC renewal, whichever is later. The general licensee shall maintain these written procedures for as long as the general licensee continues to operate HI-STAR 100 Cask Systems in service for longer than 20 years.
The general licensee shall establish and implement these written procedures prior to entering the period of extended operation or no later than one year after the effective date of the CoC renewal, whichever is later. The general licensee shall maintain these written procedures for as long as the general licensee continues to operate HI-STAR 100 Cask Systems in service for longer than 20 years.
Each general licensee shall perform tollgate assessments as described in Chapter 9 of the FSAR.
Each general licensee shall perform tollgate assessments as described in Chapter 9 of the FSAR.}}
Renewed Certificate of Compliance No. 1008    3-3 Appendix A - Amendment 1}}

Latest revision as of 08:26, 29 November 2024

Proposed Technical Specifications (Appendix a) for CoC No. 1008, Renewed Amendment No. 1
ML21168A357
Person / Time
Site: 07201008
Issue date: 09/09/2021
From:
Office of Nuclear Material Safety and Safeguards
To:
Holtec
KLBanovac NMSS/DFM/STL 301.415.7116
Shared Package
ML21168A351 List:
References
CAC 001208, EPID L-2018-RNW-0030
Download: ML21168A357 (35)


Text

RENEWED CERTIFICATE OF COMPLIANCE NO. 1008 APPENDIX A TECHNICAL SPECIFICATIONS FOR THE HI-STAR 100 CASK SYSTEM AMENDMENT 1

Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 i

TABLE OF CONTENTS REVISION HISTORY....................................................... iii 1.0USE AND APPLICATION................................................ 1-1 1.1 Definitions........................................................ 1-1 1.2 Logical Connectors................................................. 1-4 1.3 Completion Times.................................................. 1-7 1.4 Frequency....................................................... 1-11 2.0LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY

................ 2-1 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY........................ 2-2 2.1 SFSC Integrity..................................................... 2-4 2.1.1 Multipurpose Canister (MPC)............................... 2-4 2.1.2 OVERPACK............................................ 2-7 2.1.3 SFSC Lifting Requirements................................ 2-9 2.1.4 Fuel Cool-Down........................................ 2-11 2.2 SFSC Radiation Protection.......................................... 2-12 2.2.1 OVERPACK Average Surface Dose Rates

................... 2-12 2.2.2 SFSC Surface Contamination.............................. 2-15 3.0ADMINISTRATIVE CONTROLS AND PROGRAMS............................ 3-1 3.1 Training Program.................................................. 3-1 3.2 Pre-Operational Testing and Training Exercise............................ 3-1 3.3 Special Requirements for First Systems in Place.......................... 3-2 3.4 Radioactive Effluent Control Program................................... 3-2 3.5 Aging Management Program (AMP) Procedures..................................................... 3-3

Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 iiii This page is intentionally left blank.

Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 iiiiii REVISION HISTORY Amendment Section Change Description 1

Throughout 1.1 2.1.1 Editorial changes and typographical corrections.

Revised definitions of DAMAGED FUEL ASSEMBLY and DAMAGED FUEL CONTAINER.

Replaced the MPC helium backfill density limit with a helium backfill pressure limit.

Revised the leak rate units in Table 2-1 from std cc/sec to atm-cc/sec.

Definition 1.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-1 1.0 USE AND APPLICATION 1.1 Definitions


Note -----------------------------------------------------------

The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications.

Term Definition ACTIONS DAMAGED FUEL ASSEMBLY DAMAGED FUEL CONTAINER (DFC)

FUEL BUILDING FUEL DEBRIS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.

DAMAGED FUEL ASSEMBLIES are fuel assemblies with known or suspected cladding defects, as determined by a review of records, greater than pinhole leaks or hairline cracks, missing fuel rods that are not replaced with dummy fuel rods, or those that cannot be handled by normal means. Fuel assemblies which cannot be handled by normal means due to fuel cladding damage are considered FUEL DEBRIS.

DFCs are specially designed enclosures for DAMAGED FUEL ASSEMBLIES or FUEL DEBRIS which permit gaseous and liquid media to escape while minimizing dispersal of gross particulates. DFCs authorized for use in the HI-STAR 100 design are shown in Figures 2.1.1 and 2.1.2 of the Final Safety Analysis Report (SAR) for the HI-STAR 100 Cask System.

The FUEL BUILDING is the site-specific power plant facility, licensed pursuant to 10 CFR Part 50 or 10 CFR Part 52, where the loaded OVERPACK is transferred to or from the transporter.

FUEL DEBRIS is ruptured fuel rods, severed rods, loose fuel pellets or fuel assemblies with known or suspected defects which cannot be handled by normal means due to fuel cladding damage.

(continued)

Definition 1.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-2 1.1 Definitions (continued)

INDEPENDENT SPENT FUEL The facility within the perimeter fence licensed STORAGE INSTALLATION for storage of spent fuel within SFSCs. (See also (ISFSI) 10 CFR 72.3)

INTACT FUEL ASSEMBLY INTACT FUEL ASSEMBLIES are fuel assemblies without known or suspected cladding defects greater than pinhole leaks or hairline cracks and which can be handled by normal means. Partial fuel assemblies, that is fuel assemblies from which fuel rods are missing, shall not be classified as INTACT FUEL ASSEMBLIES unless dummy fuel rods are used to displace an amount of water greater than or equal to that displaced by the original fuel rod(s).

LOADING OPERATIONS LOADING OPERATIONS include all licensed activities on an SFSC while it is being loaded with fuel assemblies.

LOADING OPERATIONS begin when the first fuel assembly is placed in the SFSC and end when the SFSC is suspended from or secured on the transporter.

MULTI-PURPOSE CANISTER MPCs are the sealed spent nuclear fuel canisters which (MPC) consist of a honeycombed fuel basket contained in a cylindrical canister shell which is welded to a baseplate, lid with welded port cover plates, and closure ring. The MPC provides the confinement boundary for the contained radioactive materials.

OVERPACK OVERPACKs are the casks which receive and contain the sealed MPCs. They provide the helium retention boundary, gamma and neutron shielding, and a set each of lifting and pocket trunnions for handling.

PLANAR-AVERAGE PLANAR-AVERAGE INITIAL ENRICHMENT is INITIAL ENRICHMENT the average of the distributed fuel rod initial enrichments within a given axial plane of the assembly lattice.

(continued)

Definition 1.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-3 1.1 Definitions (continued)

SPENT FUEL STORAGE SFSCs are storage containers approved for CASKS (SFSCs) casks of spent fuel assemblies at the ISFSI. The HI-STAR 100 SFSC System consists of the OVERPACK and its integral MPC.

STORAGE OPERATIONS STORAGE OPERATIONS include all licensed activities that are performed at the ISFSI while an SFSC containing spent fuel is sitting on a storage pad within the ISFSI perimeter.

TRANSPORT OPERATIONS TRANSPORT OPERATIONS include all licensed activities performed on an SFSC loaded with one or more fuel assemblies when it is being moved to and from the ISFSI.

TRANSPORT OPERATIONS begin when the SFSC is first suspended from or secured on the transporter and end when the SFSC is at its destination and no longer secured on or suspended from the transporter.

UNLOADING OPERATIONS UNLOADING OPERATIONS include all licensed activities on an SFSC to be unloaded of the contained fuel assemblies. UNLOADING OPERATIONS begin when the OVERPACK or TRANSFER CASK is no longer suspended from or secured on the transporter and end when the last fuel assembly is removed from the SFSC. UNLOADING OPERATIONS does not include MPC transfer between the TRANSFER CASK and the OVERPACK.

Logical Connectors 1.2 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-4 1.0 USE AND APPLICATION 1.2 Logical Connectors PURPOSE The purpose of this section is to explain the meaning of logical connectors.

Logical connectors are used in Technical Specifications (TS) to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies. The only logical connectors that appear in TS are AND and OR. The physical arrangement of these connectors constitutes logical conventions with specific meanings.

BACKGROUND Several levels of logic may be used to state Required Actions. These levels are identified by the placement (or nesting) of the logical connectors and by the number assigned to each Required Action. The first level of logic is identified by the first digit of the number assigned to a Required Action and the placement of the logical connector in the first level of nesting (i.e., left justified with the number of the Required Action).

The successive levels of logic are identified by additional digits of the Required Action number and by successive indentions of the logical connectors.

When logical connectors are used to state a Condition, Completion Time, Surveillance, or Frequency, only the first level of logic is used, and the logical connector is left justified with the statement of the Condition, Completion Time, Surveillance, or Frequency.

(continued)

Logical Connectors 1.2 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-5 1.2 Logical Connectors (continued)

EXAMPLES The following examples illustrate the use of logical connectors.

EXAMPLE 1.2-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

LCO not met.

A.1 Verify...

AND A.2 Restore...

In this example the logical connector AND is used to indicate that when in Condition A, both Required Actions A.1 and A.2 must be completed.

(continued)

Logical Connectors 1.2 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-6 1.2 Logical Connectors (continued)

EXAMPLES EXAMPLE 1.2-2 (continued)

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

LCO not met.

1.

Stop...

OR A.2.1 Verify...

AND A.2.2.1 Reduce...

OR A.2.2.2 Perform...

OR A.3 Remove...

This example represents a more complicated use of logical connectors.

Required Actions A.1, A.2, and A.3 are alternative choices, only one of which must be performed as indicated by the use of the logical connector OR and the left justified placement. Any one of these three ACTIONS may be chosen. If A.2 is chosen, then both A.2.1 and A.2.2 must be performed as indicated by the logical connector AND. Required Action A.2.2 is met by performing A.2.2.1 or A.2.2.2. The indented position of the logical connector OR indicates that A.2.2.1 and A.2.2.2 are alternative choices, only one of which must be performed.

Completion Times 1.3 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-7 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify the lowest functional capability or performance levels of equipment required for safe operation of the facility. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Times(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, provided that the SFSC is in a specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the SFSC is not within the LCO Applicability.

Once a Condition has been entered, subsequent subsystems, components, or variables expressed in the Condition, discovered to be not within limits, will not result in separate entry into the Condition unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition.


Note -----------------------------------------------------------

When Immediately is used as a Completion Time, the Required Action should be pursued without delay and in a controlled manner.

(continued)

Completion Times 1.3 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-8 1.3 Completion Times (continued)

EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.

EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.

Required Action and associated Completion Time not met.

B.1 Perform Action B.1 AND B.2 Perform Action B.2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours Condition B has two Required Actions. Each Required Action has its own separate Completion Time. Each Completion Time is referenced to the time that Condition B is entered.

The Required Actions of Condition B are to complete action B.1 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND complete action B.2 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. A total of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is allowed for completing action B.1 and a total of 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (not 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />) is allowed for completing action B.2 from the time that Condition B was entered. If action B.1 is completed within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, the time allowed for completing action B.2 is the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> because the total time allowed for completing action B.2 is 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

(continued)

Completion Times 1.3 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-9 1.3 Completion Times (continued)

EXAMPLES EXAMPLE 1.3-2 (continued)

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One system not within limit.

A.1 Restore system to within limit.

7 days B.

Required Action and associated Completion Time not met.

B.1 Complete action B.1.

AND B.2 Complete action B.2.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours When a system is determined not to meet the LCO, Condition A is entered. If the system is not restored within 7 days, Condition B is also entered and the Completion Time clocks for Required Actions B.1 and B.2 start. If the system is restored after Condition B is entered, Conditions A and B are exited, and therefore, the Required Actions of Condition B may be terminated.

(continued)

Completion Times 1.3 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-10 1.3 Completion Times (continued)

EXAMPLES EXAMPLE 1.3-3 (continued)

ACTIONS


NOTE-------------------------------------------

Separate Condition entry is allowed for each component.

CONDITION REQUIRED ACTION COMPLETION TIME A.

LCO not met.

A.1 Restore compliance with LCO.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

Required Action and associated Completion Time not met.

B.1 Complete action B.1 AND B.2 Complete action B.2 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours The Note above the ACTIONS table is a method of modifying how the Completion Time is tracked. If this method of modifying how the Completion Time is tracked was applicable only to a specific Condition, the Note would appear in that Condition rather than at the top of the ACTIONS Table.

The Note allows Condition A to be entered separately for each component, and Completion Times tracked on a per component basis.

When a component is determined to not meet the LCO, Condition A is entered and its Completion Time starts. If subsequent components are determined to not meet the LCO, Condition A is entered for each component and separate Completion Times start and are tracked for each component.

Frequency 1.4 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-11 1.0 USE AND APPLICATION 1.4 Frequency PURPOSE The purpose of this section is to define the proper use and application of Frequency requirements.

DESCRIPTION Each Surveillance Requirement (SR) has a specified Frequency in which the Surveillance must be met in order to meet the associated Limiting Condition for Operation (LCO). An understanding of the correct application of the specified Frequency is necessary for compliance with the SR.

The "specified Frequency" is referred to throughout this section and each of the Specifications of Section 2.0, Surveillance Requirement (SR)

Applicability. The "specified Frequency" consists of the requirements of the Frequency column of each SR.

Situations where a Surveillance could be required (i.e., its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 2.0.4 conflicts. To avoid these conflicts, the SR (i.e., the Surveillance or the Frequency) is stated such that it is only "required" when it can be and should be performed. With an SR satisfied, SR 2.0.4 imposes no restriction.

(continued)

Frequency 1.4 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-12 1.4 Frequency (continued)

EXAMPLES The following examples illustrate the various ways that Frequencies are specified.

EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify pressure within limit 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications (TS). The Frequency specifies an interval (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 2.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 2.0.1 (such as when the equipment or variables are outside specified limits, or the facility is outside the Applicability of the LCO). If the interval specified by SR 2.0.2 is exceeded while the facility is in a condition specified in the Applicability of the LCO, the LCO is not met in accordance with SR 2.0.1.

If the interval as specified by SR 2.0.2 is exceeded while the facility is not in a condition specified in the Applicability of the LCO for which performance of the SR is required, the Surveillance must be performed within the Frequency requirements of SR 2.0.2 prior to entry into the specified condition. Failure to do so would result in a violation of SR 2.0.4 (continued)

Frequency 1.4 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 1-13 1.4 Frequency (continued)

EXAMPLES (continued)

EXAMPLE 1.4-2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify vacuum drying pressure is within limits.

Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to starting activity AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter Example 1.4-2 has two Frequencies. The first is a one time performance Frequency, and the second is of the type shown in Example 1.4-1. The logical connector "AND" indicates that both Frequency requirements must be met. Each time the example activity is to be performed, the Surveillance must be performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to starting the activity.

The use of "once" indicates a single performance will satisfy the specified Frequency (assuming no other Frequencies are connected by "AND").

This type of Frequency does not qualify for the 25% extension allowed by SR 2.0.2.

"Thereafter" indicates future performances must be established per SR 2.0.2, but only after a specified condition is first met (i.e., the "once" performance in this example). If the specified activity is canceled or not performed, the measurement of both intervals stops. New intervals start upon preparing to restart the specified activity.

LCO Applicability 2.0 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-1 2.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 2.0.1 LCOs shall be met during specified conditions in the Applicability, except as provided in LCO 2.0.2.

LCO 2.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 2.0.5.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.

LCO 2.0.3 Not applicable.

LCO 2.0.4 When an LCO is not met, entry into a specified condition in the Applicability shall not be made except when the associated ACTIONS to be entered permit continued operation in the specified condition in the Applicability for an unlimited period of time. This Specification shall not prevent changes in specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of an SFSC.

LCO 2.0.5 Equipment removed from service or not in service in compliance with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate it meets the LCO or that other equipment meets the LCO. This is an exception to LCO 2.0.2 for the system returned to service under administrative control to perform the testing.

SR Applicability 2.0 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-2 2.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 2.0.1 SRs shall be met during the specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO.

Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 2.0.3. Surveillances do not have to be performed on equipment or variables outside specified limits.

SR 2.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as once, the above interval extension does not apply. If a Completion Time requires periodic performance on a once per...

basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 2.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

(continued)

SR Applicability 2.0 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-3 2.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY (continued)

SR 2.0.4 Entry into a specified condition in the Applicability of an LCO shall not be made unless the LCO's Surveillances have been met within their specified Frequency.

This provision shall not prevent entry into specified conditions in the Applicability that are required to comply with Actions or that are related to the unloading of an SFSC.

MULTIPURPOSE CANISTER 2.1.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-4 2.1 SFSC INTEGRITY 2.1.1 Multipurpose Canister (MPC)

LCO 2.1.1 The MPC shall be dry and helium filled.

APPLICABILITY:

During TRANSPORT OPERATIONS and STORAGE OPERATIONS.

ACTIONS


NOTE ----------------------------------------------------------

Separate Condition entry is allowed for each SFSC.

CONDITION REQUIRED ACTION COMPLETION TIME A.

MPC cavity vacuum drying pressure limit not met.

A.1 Perform an engineering evaluation to determine the quantity of moisture left in the MPC.

AND A.2 Determine and complete corrective actions necessary to return the MPC to an analyzed condition.

7 days 30 days B.

MPC helium backfill pressure limit not met.

B.1 Perform an engineering evaluation to determine the impact of helium differential.

AND B.2 Determine and complete corrective actions necessary to return the MPC to an analyzed condition.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 14 days

MULTIPURPOSE CANISTER 2.1.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-5 CONDITION REQUIRED ACTION COMPLETION TIME C.

MPC helium leak rate limit not met.

C.1 Perform an engineering evaluation to determine impact of increased helium leak rate on heat removal capability and offsite dose release effects.

AND C.2 Determine and complete corrective actions necessary to return MPC to an analyzed condition.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 7 days D.

Required Actions and associated Completion Times not met.

D.1 Remove all fuel assemblies from the SFSC.

30 days SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 2.1.1.1 Verify MPC cavity vacuum drying pressure is within the limit specified in Table 2-1 for the applicable MPC model.

During LOADING OPERATIONS SR 2.1.1.2 Verify MPC helium backfill pressure is within the limit specified in Table 2-1 for the applicable MPC model.

During LOADING OPERATIONS SR 2.1.1.3 Verify that the total helium leak rate through the MPC lid confinement weld and the drain and vent port confinement welds is within the limit specified in Table 2-1 for the applicable MPC model.

During LOADING OPERATIONS

MULTIPURPOSE CANISTER 2.1.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-6 Table 2-1 MPC Model-Dependent Limits MPC MODEL LIMITS

< 3 torr for > 30 min

< 3 torr for > 30 min

< 22.2 psig

> 10 psig and < 14 psig

< 5.0E-6 atm cc/sec (He)

< 4.3E-6 atm cc/sec (He)

< 3 torr for > 30 min

< 3 torr for > 30 min

< 28.5 psig

> 10 psig and < 14 psig

< 5.0E-6 atm cc/sec (He)

< 4.3E-6 atm cc/sec (He)

< 3 torr for > 30 min

< 3 torr for > 30 min

< 28.5 psig

1. MPC-24
a. MPC Cavity Vacuum Drying Pressure
b. OVERPACK Annulus Vacuum Drying Pressure c.

MPC Helium Backfill Pressure1

d. OVERPACK Annulus Helium Backfill Pressure
e. MPC Helium Leak Rate f.

OVERPACK Helium Leak Rate

2. MPC-68
a. MPC Cavity Vacuum Drying Pressure
b. OVERPACK Annulus Vacuum Drying Pressure c.

MPC Helium Backfill Pressure1

d. OVERPACK Annulus Helium Backfill Pressure
e. MPC Helium Leak Rate f.

OVERPACK Helium Leak Rate

3. MPC-68F
a. MPC Cavity Vacuum Drying Pressure
b. OVERPACK Annulus Vacuum Drying Pressure c.

MPC Helium Backfill Pressure1

d. OVERPACK Annulus Helium Backfill Pressure
e. MPC Helium Leak Rate f.

OVERPACK Helium Leak Rate

> 10 psig and < 14 psig

< 5.0E-6 atm cc/sec (He)

< 4.3E-6 atm cc/sec (He) 1 Helium used for backfill of MPC shall have a purity of >99.995%

OVERPACK 2.1.2 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-7 2.1 SFSC INTEGRITY 2.1.2 OVERPACK LCO 2.1.2 The OVERPACK shall be dry and helium filled.

APPLICABILITY:

TRANSPORT OPERATIONS and STORAGE OPERATIONS ACTIONS


NOTE ---------------------------------------------------------

Separate Condition entry is allowed for each SFSC.

CONDITION REQUIRED ACTION COMPLETION TIME A.

OVERPACK annulus vacuum drying pressure limit not met.

A.1 Perform an engineering evaluation to determine quantity of moisture left in OVERPACK.

AND A.2 Determine and complete corrective actions necessary to return OVERPACK to analyzed condition.

7 days 30 days B.

OVERPACK annulus helium backfill pressure limit not met B.1 Perform an engineering evaluation to determine impact of helium pressure differential.

AND B.2 Determine and complete corrective actions necessary to return the OVERPACK to analyzed condition.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 30 days

OVERPACK 2.1.2 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-8 CONDITION REQUIRED ACTION COMPLETION TIME C.

OVERPACK helium leak rate limit not met.

C.1 Perform an engineering evaluation to determine impact of increased helium leak rate on heat removal capability and off-site dose release effects.

AND C.2 Determine and complete corrective actions necessary to return OVERPACK to analyzed condition.

7 days 30 days SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 2.1.2.1 Verify OVERPACK annulus vacuum drying pressure is within limit specified in Table 2-1 for the applicable MPC model.

During LOADING OPERATIONS SR 2.1.2.2 Verify OVERPACK annulus helium backfill pressure is within the limit specified in Table 2-1 for the applicable MPC model.

During LOADING OPERATIONS SR 2.1.2.3 Verify that the total helium leak rate through the OVERPACK closure plate inner mechanical seal, the OVERPACK vent port plug seal, and the OVERPACK drain port plug seal is within the limits specified in Table 2-1 for the applicable MPC model.

During LOADING OPERATIONS

SFSC Lifting Requirements 2.1.3 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-9 2.1 SFSC INTEGRITY 2.1.3 SFSC Lifting Requirements LCO 2.1.3 An OVERPACK loaded with spent fuel shall be lifted in accordance with either of the following requirements a.

i.

A lift height < 21 inches when oriented vertically.

AND ii.

A lift height < 72 inches when oriented horizontally.

OR b.

The OVERPACK is lifted with lifting devices designed in accordance with ANSI N14.6 and having redundant drop prevention design features.

OR c.

Site-specific analysis to evaluate site-specific conditions to ensure that APPLICABILITY:

the drop accidents impact loads remain within HI-STAR 100 SAR limits of 60g.

During TRANSPORT OPERATIONS.


NOTE ---------------------------------------------------------

This LCO is not applicable when the SFSC is in the FUEL BUILDING or is being handled by a device providing support from underneath (i.e., on a rail car, heavy haul trailer, air pads, etc.)

SFSC Lifting Requirements 2.1.3 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-10 ACTIONS


NOTE ---------------------------------------------------------

Separate Condition entry is allowed for each SFSC.

CONDITION REQUIRED ACTION COMPLETION TIME A.

SFSC lifting requirements not met.

A.1 Initiate actions to meet SFSC lifting requirements.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 2.1.3.1 Verify SFSC lifting requirements are met.

After the SFSC is suspended from, or secured in the transporter and prior to the transporter beginning to move the SFSC within ISFSI

Fuel Cool-Down 2.1.4 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-11 2.1 SFSC INTEGRITY 2.1.4 Fuel Cool-Down LCO 2.1.4 The MPC exit gas temperature shall be < 200o F.


NOTE ---------------------------------------------------------

The LCO is only applicable to wet UNLOADING OPERATIONS.

APPLICABILITY:

UNLOADING OPERATIONS prior to flooding.

ACTIONS


NOTE ---------------------------------------------------------

Separate Condition entry is allowed for each SFSC.

CONDITION REQUIRED ACTION COMPLETION TIME A.

MPC exit temperature not within limit.

A.1 Establish MPC helium gas exit temperature within limit.

AND A.2 Ensure adequate heat transfer from MPC to the environment.

Prior to initiating MPC re-flooding operations 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 2.1.4.1 Verify MPC helium gas exit temperature within limit.

Prior to initiation of MPC re-flooding operations.

OVERPACK Average Surface Dose Rates 2.2.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-12 2.2 SFSC RADIATION PROTECTION 2.2.1 OVERPACK Average Surface Dose Rates LCO 2.2.1 The average surface dose rates of each OVERPACK shall not exceed:

a. 125 mrem/hour (neutron + gamma) on the side;
b. 80 mrem/hour (neutron + gamma) on the top; APPLICABILITY:

TRANSPORT OPERATIONS and STORAGE OPERATIONS ACTIONS


NOTE ---------------------------------------------------------

Separate Condition entry is allowed for each SFSC.

CONDITION REQUIRED ACTION COMPLETION TIME A.

OVERPACK average surface dose rate limits not met.

A.1 Administratively verify correct fuel loading.

AND A.2 Perform written evaluations to verify compliance with the ISFSI offsite radiation protection requirements of 10 CFR Part 20 and 10 CFR Part 72.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 48 hours B.

Required Action and Associated Completion Time not met.

B.1 Remove all fuel assemblies from SFSC.

30 days

OVERPACK Average Surface Dose Rates 2.2.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-13 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 2.2.1.1 Verify average surface dose rates of OVERPACK containing fuel assemblies are within limits. OVERPACK dose rates shall be measured at locations shown in Figure 2.2.1-1.

NOTE:

SR 2.2.1.1 shall be performed after the MPC has been vacuum dried.

NOTE:

If a loaded OVERPACK is placed into storage after transport from an on off-site location, SR 2.2.1.1 shall be performed after receipt of the OVERPACK and prior to STORAGE OPERATIONS.

During LOADING OPERATIONS

OVERPACK Average Surface Dose Rates 2.2.1 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-14 Figure 2.2.1-1 OVERPACK Surface Rate Measurement Locations

SFSC Surface Contamination 2.2.2 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 2-15 2.2 SFSC RADIATION PROTECTION 2.2.2 SFSC Surface Contamination LCO 2.2.2 Removable contamination on the exterior surfaces of the OVERPACK and accessible portions of the MPC shall each not exceed:

a.

1000 dpm/100 cm2 from beta and gamma sources; and b.

20 dpm/100 cm2 from alpha sources.

APPLICABILITY:

TRANSPORT OPERATIONS and STORAGE OPERATIONS ACTIONS


NOTE ---------------------------------------------------------

Separate Condition entry is allowed for each SSSC.

CONDITION REQUIRED ACTION COMPLETION TIME A.

SFSC removable surface contamination limits not met.

A.1 Restore SFSC removable surface contamination to within limits.

7 days SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 2.2.2.1 Verify that the removable contamination on the exterior surfaces of OVERPACKs and accessible portions of the MPC containing fuel is within limits.

NOTE:

If a loaded OVERPACK is placed into storage after transport from an off-site location, SR 2.2.2.1 shall be performed after receipt of the OVERPACK and prior to STORAGE OPERATIONS.

During LOADING OPERATIONS

Administrative Controls and Programs 3.0 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 3-1 3.0 ADMINISTRATIVE CONTROLS AND PROGRAMS The following programs shall be established, implemented, and maintained.

3.1 Training Program A training program for the HI-STAR 100 cask system shall be developed under the general licensee's systematic approach to training (SAT). Training modules shall include comprehensive instructions for the operation and maintenance of the HI-STAR 100 spent fuel storage cask system and the independent spent fuel storage installation (ISFSI).

3.2 Pre-Operational Testing and Training Exercise A dry run training exercise of the loading, closure, handling, unloading, and transfer of the HI-STAR 100 system shall be conducted by the licensee prior to the first use of the system to load spent fuel assemblies. The training exercise shall not be conducted with spent fuel in the MPC/OVERPACK. The dry run may be performed in an alternate step sequence from the actual procedures, but all steps must be performed. The dry run shall include, but is not limited to the following:

a.

Moving the HI-STAR 100 MPC/OVERPACK into the spent fuel pool.

b.

Preparation of the HI-STAR 100 Cask System for fuel loading.

c.

Selection and verification of specific fuel assemblies to ensure type conformance.

Locating specific assemblies and placing assemblies into the MPC (using a dummy fuel assembly), including appropriate independent verification.

e.

Remote installation of the MPC lid and removal of HI-STAR 100 MPC/OVERPACK from the spent fuel pool.

f.

MPC welding, NDE inspections, hydrostatic testing, draining, vacuum drying, helium backfilling, and leakage testing.

g.

HI-STAR 100 OVERPACK closure, draining, vacuum drying, helium backfilling and leakage testing.

h.

HI-STAR 100 OVERPACK upending/downending on the horizontal transfer trailer or other transfer device, as applicable to the sites cask handling arrangement.

Administrative Controls and Programs 3.0 Renewed Certificate of Compliance No. 1008 Appendix A Amendment 1 3-2 i.

Placement of the HI-STAR 100 Cask System at the ISFSI.

j.

HI-STAR 100 Cask System unloading, including cooling fuel assemblies, flooding MPC cavity, removing MPC lid welds.

3.3 Special Requirements For First Systems In Place The heat transfer characteristics of the cask system will be recorded by temperature measurements for the first HI-STAR 100 SFSC systems (MPC-24 and MPC-68) placed into service with a heat load equal to or greater than 10 kW. An analysis shall be performed that demonstrates the temperature measurements validate the analytic methods and predicted thermal behavior described in Chapter 4 of the SAR.

Validation tests shall be performed for each subsequent cask system that has a heat load that exceeds a previously validated heat load by more than 2 kW. (e.g., if the initial test was conducted at 10 kW, then no additional testing is needed until the heat load exceeds 12 kW). No additional testing is required for a system after it has been tested at a heat load equal to or greater than 16 kW.

Letter reports summarizing the results of each validation test shall be submitted to the NRC in accordance with 10 CFR 72.4. Cask users may satisfy these requirements by referencing validation test reports submitted to the NRC by other cask users.

3.4.

Radioactive Effluent Control Program This program implements the requirements of 10 CFR 72.44(d).

a.

The HI-STAR 100 Cask System does not create any radioactive materials or have any radioactive waste treatment systems. Therefore, specific operating procedures for the control of radioactive effluents are not required. Specification 2.1.1, Multi-Purpose Canister (MPC), provides assurance that there are no radioactive effluents from the SFSC.

b.

This program includes an environmental monitoring program. Each general license user may incorporate SFSC operations into their environmental monitoring program for 10 CFR Part 50 or 10 CFR Part 52 operations.

c.

An annual report shall be submitted pursuant to 10 CFR 72.44(d)(3).

Administrative Controls and Programs 3.0 Renewed Certificate of Compliance No. 1008 3-3 Appendix A - Amendment 1 3.5 Aging Management Program (AMP) Procedures Each general licensee shall have a program to establish, implement, and maintain written procedures for each AMP described in the FSAR. The program shall include provisions for changing AMP elements, as necessary, and within the limitations of the approved design bases to address new information on aging effects based on inspection findings and/or industry operating experience. Each procedure shall contain a reference to the specific aspect of the AMP element implemented by that procedure, and that reference shall be maintained even if the procedure is modified.

The general licensee shall establish and implement these written procedures prior to entering the period of extended operation or no later than one year after the effective date of the CoC renewal, whichever is later. The general licensee shall maintain these written procedures for as long as the general licensee continues to operate HI-STAR 100 Cask Systems in service for longer than 20 years.

Each general licensee shall perform tollgate assessments as described in Chapter 9 of the FSAR.