ML21201A158: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:THIS IS A CONTROLLED COPY OF THE UNIT 2 TECHNICAL REQUIREMENTS MANUAL INCLUDING CHANGE NO. 182 UPDATED BY TECHNICAL PUBLISHING
 
CROSS INDEX - OLD TRM LCOS/SRS TO NEW TRM LCOS/SRS Old TRM                                                    Corresponding        General TRM Sec LCO/SR          Title                                New TRM section No. Section No.
1.0                  Fire Protection System 1.0.A.3.1            Fire detection Instruments LCO        3.3.3.7              3/4.3.3 1.0.A.4.1            Fire detection Instr SR              4.3.3.7.1 1.0.A.4.2                                                4.3.3.7.2 1.0.A.4.3                                                4.3.3.7.3 1.0.B.3.1            Fire Supp. Water system LCO          3.7.9.1              3/4.7.9 1.0.B.4.1.a          Fire Supp Water Syste SR              4.7.9.1.a 1.0.B.4.1.b                                              4.7.9.1.b 1.0.B.4.1.c                                              4.7.9.1.c 1.0.B.4.1.d                                              4.7.9.1.d 1.0.B.4.1.e.1                                            4.7.9.1.e.1 1.0.B.4.1.e.2                                            4.7.9.1.e.2 1.0.B.4.1.e.3                                            4.7.9.1.e.3 1.0.B.4.1.f                                              4.7.9.1.f 1.0.C.3.1            Spray/Sprinkler System LCO            3.7.9.2              3/4.7.9 1.0.C.4.1.a          Spray/Sprinkler Sys SR                4.7.9.2.a 1.0.C.4.1.b.1.a                                          4.7.9.2.b.1.a 1.0.C.4.1.b.1.b                                          4.7.9.2.b.1.b 1.0.C.4.1.b.2                                            4.7.9.2.b.2 1.0.C.4.1.b.3                                            4.7.9.2.b.3 1.0.C.4.1.c                                              4.7.9.2.c 1.0.D.3.1            Fire Hose Stations LCO                3.7.9.3              3/4.7.9 1.0.D.4.1.a          Fire Hose Stations SR                4.7.9.3.a 1.0.D.4.1.b.1                                            4.7.9.3.b.1 1.0.D.4.1.b.2                                            4.7.9.3.b.2 1.0.D.4.1.c.1                                            4.7.9.3.c.1 1.0.D.4.1.c.2                                            4.7.9.3.c.2 1.0.E.3.1            Halon Fire Supp. System LCO          3.7.9.4              3/4.7.9 1.0.E.4.1.a.1.a      Halon Fire Supp System SR            4.7.9.4.a.1.a 1.0.E.4.1.a.1.b                                          4.7.9.4.a.1.b 1.0.E.4.1.a.1.c                                          4.7.9.4.a.1.c 1.0.E.4.1.b.1                                            4.7.9.4.b.1 1.0.E.4.1.b.2                                            4.7.9.4.b.2 1.0.F.3.1            Penetration Fire Barriers LCO        3.7.10              3/4.7.10 1.0.F.4.1.a          Penetration Fire Barriers SR          4.7.10.a 1.0.F.4.1.b                                              4.7.10.b 1.0.F.4.1.c                                              4.7.10.c 2.0                  COLR                                  Appendix 8.1 3.0                  Appendix R Safe SD Reqs              Addl Reqt -7.1      26 LCO tbls Refer to Add'l Reqt's section following after section 11.0 sub-section .1 - .26 26 SR tbls Page 1
 
CROSS INDEX - OLD TRM LCOS/SRS TO NEW TRM LCOS/SRS Old TRM                                          Corresponding      General TRM Sec LCO/SR        Title                          New TRM section No. Section No.
4.0 Instrumentation LCO 3.3.1.1 4.0Table 3.3-2    RPS Instr Response Time        SR 4.3.1.1.3        3/4.3.1 LCO 3.3.2.1 4.0 Table 3.3-5  ESF Response Times            SR 4.3.2.1.3        3/4.3.2 RPS Pressurizer High Press 4.2.1            Channels LCO                  3.3.1.1.1          3/4.3.1 4.2.3            RPS Pzr High Press SR          4.3.1.1.3 4.3.3            In Core Detectors LCO          3.3.3.2            3/4.3.3 4.3.5.a.1        In Core Detectors SR          4.3.3.2.a.1 4.3.5.a.2                                      4.3.3.2.a.2 4.3.5.a.3                                      4.3.3.2.a.3 4.3.5.b                                        4.3.3.2.b 4.4.3            Seismic Instruments LCO        3.3.3.3            3/4.3.3 4.4.5            Seismic Instruments SR        4.3.3.3 4.5.3            Meteorological Instruments LCO 3.3.3.4            3/4.3.3 4.5.5            Meteorological Instruments SR  4.3.3.4 5.0.1            Ctmt Isolation valves Info LCO 3.6.3.1 3            / 4.6.3 5.0.3            Ctmt Iso Valves SR            4.6.3.1 6.0.1            EDG Fuel Oil Supply Sys. LCO  3.8.1.1.c          3/4.8.1 6.0.3            EDG Fuel Oil Supply Sys. SR    4.8.1.1.3 7.0              PCS Leakage Outside Ctmt      Admin Control 6.13 8.0.1            SDC Overpressure Protect LCO  3.4.9.4            3/4.4.9 8.0.3            SDC Overpressure Protect SR    4.4.9.4 9.0              Refueling Operations                              3/4.9 9.1.3            SFP Temperature LCO            3.9.3.2            3/4.9.3 9.1.5            SFP Temperature SR            4.9.3.2 9.2.3            Spent Fuel Pool Decay Time LCO 3.9.3.3            3/4.9.3 9.2.5.a          SFP Decay Time SR              4.9.3.3.a 9.2.5.b          SFP Decay Time SR              4.9.3.3.b 9.3.3            Communications LCO            3.9.5              3/4.9.5 9.3.5            Communications SR              4.9.5 Page 2
 
CROSS INDEX - OLD TRM LCOS/SRS TO NEW TRM LCOS/SRS Old TRM                                                  Corresponding      General TRM Sec LCO/SR          Title                                New TRM section No. Section No.
9.4.3              Crane (refuel mach) Oper. LCO        3.9.6              3/4.9.6 9.4.5              Crane (refuel mach) Oper. SR        4.9.6 9.5.1              Cask (SFP) Crane LCO                3.9.7 3/4.9.7 9.5.3              Cask (SFP) Crane SR                  4.9.7 10.0.1              SFP Doors LCO                        3.9.15 3/4.9.15 10.0.4              SFP Doors SR                        4.9.15 11.0.1              Switchgear Ventilation LCO          3.8.2.1B 3/4.8.2 11.0.4              Switchgear Ventilation SR            4.8.2.1B 3.0.1              Table 1 Appendix R SSR LCO's        7.1.1 - 7.1.26(*)  26 LCO tbls 3.0.3              Table 1 Appendix R SSR SR's SR      7.1.1- SR7.1.26(*)  26 SR tbls
*Refer to separate Appendix R sections (26 total) for LCO & SR breakdowns Table Nos: LCO's are Table 7.1.1-1 thru 7.1.26-1.
Table Nos: SR's are Table 7.1.1-2 thru 7.1.26-2.
Page 3
 
CROSS INDEX: OLD APPX R TABLE COMPONENTS TO NEW APPX R LCO AND SRS SECTIONS Old      SR  Tbl 1 Component ID        System Description                  New TRM New TRM TRM          Item                                                          LCO    SR LCO -
3.0.1 - 3.0.3 27    P18A, 18B. 18C      Charging Pumps                      7.1.1  SR 7.1 .l 3.0.1 - 3.0.3 28    CH-089              Regen HX Outlet Is0                7.1.1  SR 7.1.1 3.0.1 - 3.0.3 29    CH-518,519          Charging to RCS loops              7.1 .I  SR 7.1.1 3.0.1 - 3.0.3 30    CH-517              Aux Spray to PZR (RCS)              7.1.1  SR 7.1.1 3.0.1 - 3.0.3 31    CH-429              Charging Pump Header Is0 MOV        7.1 .I  SR 7.1 .I 3.0.1 - 3.0.3 32    CH-501              VCT outlet MOV                      7.1.1  SR 7.1.1 3.0.1 - 3.0.3 33    CH-504              Chrg Pps suct fm RWST MOV          7.1.1  SR 7.1.1 3.0.1 - 3.0.3 34    CH-192              Chrg Pps suct fm RWST AOV          7.1.1  SR 7.1.1 3.0.1 - 3.0.3 57A  LI-206A, 208A        Instr, Monitor local BAST level    7.1.2  SR 7.1.2 3.0.1 - 3.0.3 8A    MS-265B              MS Low Pt Drain -ESF-MSI            7.1.3  SR 7.1.3 3.0.1 - 3.0.3 88    MS-266B              MS Low Pt Drain -ESF-MSI            7.1.3  SR 7.1.3 3.0.1 - 3.0.3 50    PT- 1 02B- 1        Instrument, Monitoring Pzr Press    7.1.4  SR 7.1.4 3.0.1 - 3.0.3 54    PT-10238            Instr, Monitor SG Press            7.1.4  SR 7.1.4 3.0.1 - 3.0.3 56    QEXC2PDA. 4PDA      Instr, Monitor NI, wide rang        7.1.4  SR 7.1.4 3.0.1 - 3.0.3 56A  QEXCl PDA, 3PDA      Instr, Monitor NI, wide range      7.1.4  SR 7.1.4 3.0.1 - 3.0.3 58A  PT-103,103-1        Instr, Monitor Pzr Press low rng    7.1.4  SR 7.1.4 3.0.1 - 3.0.3 58F  LT-103. 1 lox, 110Y  Instr, monitor Pzr level, cold, nor 7.1.4  SR 7.1.4 3.0.1 - 3.0.3 58C  LT-1114A. 11 148    Instr, monitor SG 1 level,wide mg  7.1.4  SR 7.1.4 3.0.1 - 3.0.3 58B  LT-11238            Instr, Monitor SG 2 level, nar mg  7.1.4  SR 7.1.4 3.0.1 - 3.0.3 588  LT-1124A. 1 124B    Instr, Monitor SG 2 level,wide rng  7.1.4  SR 7.1.4 3.0.1 - 3.0.3 51    TE-121X              Instr, Monitoring hot leg temp      7.1.5  SR 7.1.5 3.0.1 - 3.0.3 52    TE-125              Instr. Monitoring cold leg temp    7.1.5  SR 7.1.5 3.0.1 - 3.0.3 51A  TE-111X              Instr, Monitoring hot leg temp      7.1.5  SR 7.1.5 3.0.1 - 3.0.3 52A  TE-115              Instr, Monitoring cold leg temp    7.1.5  SR 7.1.5 3.0.1 - 3.0.3 58 B  FT-5278A. 5278B      Instr, Monitor AFW flow to SG 2    7.1.5  SR 7.1.5 3.0.1 - 3.0.3 58C  FT-5277A. 52778      Instr, Monitor AFW flow to SG 1    7.1.5  SR 7.1.5 3.0.1 - 3.0.3 69A  Bus 25A (Hi)        6900 V breakers for RCPs            7.1.6  SR 7.1.6 3.0.1 - 3.0.3 69B  Bus 25B (H2)        6900 V breakers for RCPs            7.1.6  SR 7.1.6 3.0.1 - 3.0.3 21    SI-306              SDC HX bypass                      7.1.7  SR 7.1.7 3.0.1 - 3.0.3 22    SI-651,652          SDC suct MOVs                      7.1.7  SR 7.1.7 3.0.1 - 3.0.3 580  TE-351 X, 351 Y      SDC sup, ret temp monitors          7.1.7  SR 7.1.7 3.0.1 - 3.0.3 58G  TE-303X, 303Y        SDC HXs outlet temps indication    7.1.7  SR 7.1.7 3.0.1 - 3.0.3 19    RC-402/ 404          RCS- PORVS                          7.1.8  SR 7.1.8 3.0.1 - 3.0.3 26D  SI-614,624,634,644  SIT Outlet MOVs                    7.1.9  SR 7.1.9 3.0.1 - 3.0.3 26E  SI-613,623,633,643  SIT Nitrogen vent valves            7.1.9  SR 7.1.9 3.0.1 - 3.0.3 20    SI-615,625,635,645  LPSl flow MOVs                      7.1.10  SR 7.1.10 3.0.1 - 3.0.3 24    Sl-657              SDC HX outlet                      7.1.10  SR 7.1.10 3.0.1 - 3.0.3 23A  Sl-449.450          SDC min flow alt                    7.1.10  SR 7.1.10 3.0.1 - 3.0.3 26A1  SI-432.444          LPSl suct fm RWST                  7.1.10  SR 7.1.10 3.0.1 - 3.0.3 26A2  SI440,441            LPSl suct fm RCS                    7.1.10  SR 7.1 .I0 3.0.1 - 3.0.3 26B  S1452,453            LPSl disch to SDC HX                7.1.10  SR 7.1.10 3.0.1 - 3.0.3 26C  Sl-456,457          SDC HX outlet                      7.1.10  SR 7.1.10 3.0.1 - 3.0.3 36    CS-13.1B            RSWT outlet MOV                    7.1.11  SR7.1.11 3.0.1 - 3.0.3 35    CH-508,509          Boric Acid Grav feed MOVs          7.1.12  SR 7.1.12 3.0.1 - 3.0.3 58E  TE-8108              Ctmt Ambient Temp monitoring        7.1.13  SR 7.1.13 3.0.1 - 3.0.3 25A  CS-4A, 4B            Ctmt Spray Stop Valves              7.1.14  SR 7.1.14 Page 1
 
CROSS INDEX: OLD APPX R TABLE COMPONENTS TO NEW APPX R LCO AND SRS SECTIONS Old      SR  Tbl 1 Component ID              System Description        New TRM New TRM TRM          Item                                                      LCO    SR LCO -
3.0.1 - 3.0.3 1    SV-4188                  AFW Turbine                7.1.15  SR 7.1.15 3.0.1 - 3.0.3 2    P4 & H-21                AFW Turbine                7.1.15  SR 7.1.15 3.0.1 - 3.0.3 7    MS-202                    AFW Turbine steam stop MOV 7.1.15  SR 7.1.15 3.0.1 - 3.0.3 8    P9A, P9B                  AFW pumps, motor driven    7.1.15  SR 7.1.15 3.0.1 - 3.0.3 10    FW-44                    AFW P4 Discharge Is0 MOV  7.1.15  SR 7.1.15 3.0.1 - 3.0.3 12    FW-43N43B                AFW flow control valves    7.1.15  SR 7.1.15 3.0.1 - 3.0.3 55    LT-5282                  Instr, Monitor CST level  7.1.16  SR 7.1.16 3.0.1 - 3.0.3 55A  LIS-5489                  Instr, Local CST level Ind 7.1.16  SR 7.1.16 3.0.1 - 3.0.3 3    MS-64N64 B                MSlVs                      7.1.17  SR 7.1.1 7
3.0.1 - 3.0.3 4    MS-65N65B                MSlV Bypass                7.1.17  SR 7.1.17 3.0.1 - 3.0.3 5    MS-1 SON1 90B            AOVs                      7.1.18  SR7.1 .I8 3.0.1 - 3.0.3 6    MS-220N220B              SG Blowdown Valves        7.1.19  SR 7.1.19 3.0.1 - 3.0.3 39    RB-13.1A, 13.18          RBCCW out of SDC HXs      7.1.20  SR 7.1.20 3.0.1 - 3.0.3 40    RB-21 lA, 21 1B          RBCCW Pp A Inlet AOVs      7.1.20  SR 7.1 20 3.0.1 - 3.0.3 41    RB-21 lC, 21 1D          RBCCW Pp 6 Inlet AOV's    7.1 20  SR 7.1.20 3.0.1 - 3.0.3 42    RB-211E,211F              RBCCW Pp C Inlet AOVs      7.1 -20 SR 7.1.20 3.0.1 - 3.0.3 43    RB-4.1A. 4.18            RBCCW Hx A outlet AOVs    7.1 -20 SR 7.1.20 3.0.1 - 3.0.3 44    RB4.1C. 4.10              RBCCW Hx B outlet AOVs    7.1.20  SR 7.1.20 3.0.1 - 3.0.3 45    RB-4.1 E, 4.1 F          RBCCW Hx C outlet AOVs    7.1.20  SR 7.1.20 3.0.1 - 3.0.3 46    PllA, P l l B , P l l C  RBCCW pumps                7.1.20  SR 7.1.20 3.0.1 - 3.0.3 47    P5A, P5C, LlA, L1C        RBCCW pp disch x-tie AOVs  7.1.20  SR 7.1.20 3.0.1 - 3.0.3 13    RB-251A. 251B            SW pumps 8 Strainers      7.1.21  SR 7.1.21 3.0.1 - 3.0.3 14    SW-97AI 978              SW Disch hdr x-tie valves  7.1.21  SR 7.1.21 3.0.1 - 3.0.3 15    SW-3.1N 3.16              SW inlet to RBCCW HXs      7.1.21  SR 7.1.21 3.0.1 - 3.0.3 14A  SW-2A. 2B, 2C            SW pump disch valves      7.1.21  SR 7.1.21 3.0.1 - 3.0.3 16A  SW-9N 9B/ 9C              SW outlet fm RBCCW HXs    7.1.21  SR 7.1.21 3.0.1 - 3.0.3 18A  SW-5N 5BI 5C              SW inlet to TBCCW HXs      7.1.21  SR 7.1.21 3.0.1 - 3.0.3 188  SW-12BI 12C              SW is0 to EDG A & B        7.1.21  SR 7.1.21 3.0.1 - 3.0.3 18C  SW-296                    Drain on SW to EDG B      7.1.21  SR 7.1.21 3.0.1 - 3.0.3 62    SBO DG                    Alternate AC diesel gen    7.1.22  SR 7.1.22 3.0.1 - 3.0.3 59    Bus 24C (A3)              4160 volt switchgear      7.1.23  SR 7.1.23 3.0.1 - 3.0.3 60    Bus 240 (A4)              4160 volt switchgear      7.1.23  SR 7.1.23 3.0.1 - 3.0.3 61    Bus 24E (A5)              4160 volt switchgear      7.1.23  SR 7.1.23 3.0.1 - 3.0.3 63    Bus 22E (805)            480 volt switchgear        7.1.23  SR 7.1.23 3.0.1 - 3.0.3 64    Bus 22F (B06)            480 volt switchgear        7.1.23  SR 7.1.23 3.0.1 - 3.0.3 65    851 (mcc-22-1 E)          MCC B51                    7.1 2 3 SR 7.1.23 3.0.1 - 3.0.3 66    852 (mcc-22-2E)          MCC B52                    7.1.23  SR 7.1.23 3.0.1 - 3.0.3 67    B61 (mcc-22-1 F)          MCC B61                    7.1.23  SR 7.1.23 3.0.1 - 3.0.3 68    862 (mcc-22-2F)          MCC B62                    7.1.23  SR 7.1.23 3.0.1 - 3.0.3 70    ELUs                      Em. Light Units            7.1.23  SR 7.1.23 3.0.1 - 3.0.3 62A  Bus 24A (Al)              4160 volt switchgear      7.1.23  SR 7.1.23 3.0.1 - 3.0.3 62B  Bus 248 (A2)              4160 volt switchgear      7.1 :23 SR 7.1.23 3.0.1 - 3.0.3 62C  Bus 22A (BOl)            480 volt load center      7.1.23  SR 7.1.23 3.0.1 - 3.0.3 62D  Bus 228 (802)            480 volt load center      7.1.23  SR 7.1.23 3.0.1 - 3.0.3 69K  VA 20                    120 VAC panel VIAC-2      7.1.23  SR 7.1.23 3.0.1 - 3.0.3 69    DC3                      201 C swing batt charger  7.1 24  SR 7.1.24 3.0.1 - 3.0.3 69C  Bus DO1                  125 VDC Bus 201A          7.1 24  SR 7.1.24 Page 2
 
CROSS INDEX: OLD APPX R TABLE COMPONENTS TO NEW APPX R LCO AND SRS SECTIONS Old      SR  Tbl 1 Component ID        System Description              New TRM New TRM TRM          Item                                                      LCO    SR LCO -
3.0.1 - 3.0.3 69D  Bus DO2            125 VDC Bus 201 B              7.1.24  SR 7.1 24 3.0.1 - 3.0.3 69E  DV 10              125 VDC panel 201A-1V          7.1.24  SR 7.1 2 4
3.0.1 - 3.0.3 69F  DV 20              125 VDC panel 201B-1V          7.1 24  SR 7.1.24 3.0.1 - 3.0.3 69G  D11                125 VDC panel 201A-1            7.1.24  SR 7.1 24 3.0.1 - 3.0.3 69H  Dl2                125 VDC panel 201A-2            7.1.24  SR 7.1.24 3.0.1 - 3.0.3 69 I  D2 1                125 VDC panel 201 B-1          7.1.24  SR 7.1.24 3.0.1 - 3.0.3 69J  D22                125 VDC panel 201 B-2          7.1.24  SR 7.1.24 3.0.1 - 3.0.3 71    FIRE-258, 259, 559, Fire Supp system                7.1.25  SR 7.1.25 560 3.0.1 - 3.0.3 18D  Fire Suppression    Alt(Fire Pro) cooling to EDGs  7.1.25  SR 7.1.25 sys 3.0.1 - 3.0.3 72    Radio Comm Sys      Radio Communication system      7.1 2 6 SR 7.1.26 3.0.1 - 3.0.3 74    HSD Storage Box    Box Inventory items available  7.1 2 6 SR 7.1.26 3.0.1 - 3.0.3 75    FSD Storage Box    Box Inventory items available  7.1.26  SR 7.1.26 3.0.1 - 3.0.3 76    CSD Repair Material Materials available for repairs 7.1.26  SR 7.1.26 3.0.1 - 3.0.3 81    F156A, B, C, D      fans-East &West DC rooms        7.1.26  SR 7.1.26 3.0.1 - 3.0.3 82    F157A. B, C, D      fans-East & West 480 V rooms    7.1 2 6 SR 7.1.26 3.0.1 - 3.0.3 83    Bottle 3A, 3B,3C    bottles and valves              7.1 2 6 SR 7.1 26 Page 3
 
Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section-                                                                        Approval TR - Title Page No.                                                                          Date 3 Pages      Cross Index - Old TRM LCOs/SRs to New TRM TRs/TSRs                -
3 Pages      Cross Index - Old Appendix R Table Components to New Appendix R  -
TR and TSR Sections 11 Pages      List of Effective Pages                                          Per Distribution Memo 1 page      Memo; C Schwartz to Copy Holders, re: Reissue of Unit 2 TRM      -
1.0 - 1      Definitions                                                      10/05/2009 1.0 - 2                                                                        10/05/2009 2.0/ -        Safety Limits (No Content)                                      -
3/4 0-1      TECHNICAL REQUIREMENT/TECHNICAL SURVEILLANCE                    10/05/2009 REQUIREMENT Sections 3/4 0-2                                                                        10/05/2009 3/4 0-3                                                                        10/05/2009 3/4 0-4                                                                        10/05/2009 3/4 0-5                                                                        10/05/2009 3/4 0-6                                                                        10/05/2009 3/4 0-7                                                                        10/05/2009 3/4 0-8                                                                        10/05/2009 10/05/2009 3/4.1 - Reactivity Control System                                -
3/4 1-1      3/4.1.2.1 - Boration Systems - Flow Paths - Shutdown              10/05/2009 3/4 1-2                                                                        10/05/2009 3/4 1-3      3/4.1.2.2 - Flow Paths - Operating                                10/05/2009 3/4 1-4                                                                        03/29/2017 3/4 1-5                                                                        03/29/2017 3/4 1-6      3/4.1.2.3 - Charging Pump - Shutdown                              10/05/2009 3/4 1-7                                                                        10/05/2009 3/4 1-8      3/4.1.2.4 - Charging Pump - Operating                            03/29/2017 3/4 1-9                                                                        03/29/2017 3/4 1-10    3/4.1.2.5 - Boric Acid Pumps - Shutdown                          10/05/2009 Millstone Unit 2                        TRM EP- 1                        LBDCR 16-MP2-014 March 29, 2017
 
Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section-                                                                      Approval TR - Title Page No.                                                                        Date 3/4 1-11                                                                    10/05/2009 3/4 1-12    3/4.1.2.6 - Boric Acid Pumps - Operating                        03/29/2017 3/4 1-13                                                                    03/29/2017 3/4 1-14    3/4.1.2.7 - Borated Water Sources - Shutdown                    10/05/2009 3/4 1-15                                                                    10/05/2009 3/4 1-16                                                                    10/05/2009 3/4 1-17    3/4.1.2.8 - Borated Water Sources - Operating                  10/05/2009 3/4 1-18                                                                    09/24/2014 3/4 1-19                                                                    10/05/2009 3/4 1-20      Figure 3.1 Minimum Volume vs Stored BAST Concentration    05/15/2009 Figure 3/4.3- Instrumentation                                          -
3/4 3-1      3/4.3.1.1 - Reactor Protective Instrumentation                  10/05/2009 3/4 3-2      Table 3.3-2                                                    10/05/2009 3/4 3-3      3/4.3.1.1.1 - RPS Pressurizer High Pressure Channels            10/05/2009 3/4 3-4                                                                      10/05/2009 3/4 3-5      3/4.3.2.1 - ESFAS Equipment Response Times                      10/05/2009 3/4 3-6      Table 3.3-5                                                    12/06/2001 3/4 3-7                                                                      09/19/2002 3/4 3-8                                                                      12/06/2001 3/4 3-9      Table 3.3-5A                                                    10/05/2009 3/4 3-10    Table 3.3-5B                                                    10/05/2009 3/4 3-11    Table 3.3-5C                                                    10/05/2009 3/4 3-12                                                                    10/05/2009 3/4 3-13    Table 3.3-5D                                                    10/05/2009 3/4 3-14                                                                    10/05/2009 3/4 3-15    Table 3.3-5E                                                    10/05/2009 3/4 3-16                                                                    12/06/2001 3/4 3-17    Table 3.3-5F                                                    10/05/2009 3/4 3-18    Table 3.3-5G                                                    10/05/2009 3/4 3-19    Table 3.3-5H                                                    06/03/2011 3/4 3-20    Table 3.3-5I                                                    10/05/2009 3/4 3-21    Table 3.3-5J - Deleted                                          09/19/2002 3/4 3-22    Table 3.3-5K                                                    10/05/2009 3/4 3-23    Table 3.3-5L                                                    10/05/2009 Millstone Unit 2                      TRM EP- 2                        LBDCR 16-MP2-014 March 29, 2017
 
Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section-                                                                        Approval TR - Title Page No.                                                                            Date 3/4 3-24    Table 3.3-5M                                                        05/24/2001 3/4 3-25                                                                        12/06/2001 3/4 3-26                                                                        12/06/2001 3/4 3-27                                                                        12/06/2001 3/4 3-28                                                                        12/06/2001 3/4 3-29                                                                        10/05/2009 3/4 3-30                                                                        12/06/2001 3/4 3-31                                                                        10/05/2009 3/4 3-32                                                                        12/06/2001 3/4 3-33                                                                        12/06/2001 3/4 3-34                                                                        12/06/2001 3/4 3-35                                                                        10/05/2009 3/4 3-36                                                                        12/06/2001 3/4 3-37                                                                        12/06/2001 3/4 3-38                                                                        10/05/2009 3/4 3-39                                                                        10/05/2009 3/4 3-40                                                                        10/05/2009 3/4 3-41    3/4.3.3.2 - Incore Detector Instrumentation                        11/29/2018 3/4 3-42                                                                        11/29/2018 3/4 3-42a                                                                        11/29/2018 3/4 3-43    3/4.3.3.3 - Seismic Instrumentation                                01/12/2010 3/4 3-44                                                                        10/05/2009 3/4 3-45    Table 3.3-7                                                        10/05/2009 3/4 3-46      Table 4.3-4                                                        10/05/2009 3/4 3-47    3/4.3.3.4 Meteorological Instrumentation                            01/12/2010 3/4 3-48                                                                        10/05/2009 3/4 3-49    Table 3.3-8                                                        10/05/2009 3/4 3-50    Table 4.3-5                                                        10/05/2009 3/4 3-51    3/4.3.3.7 - Fire Detection Instrumentation                          10/05/2009 3/4 3-52                                                                        10/05/2009 3/4 3-53                                                                        10/05/2009 3/4 3-54      Table 3.3-10                                                      10/05/2009 3/4 3-55                                                                        10/05/2009 3/4 3-56                                                                        10/05/2009 3/4 3-57                                                                        10/05/2009 Millstone Unit 2                        TRM EP- 3          LBDCR 18-MP2-007, November 29, 2018
 
Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section-                                                                        Approval TR - Title Page No.                                                                          Date 3/4 3-58    3/4.3.3.8 - Accident Radiation Monitoring Instrumentation        10/05/2009 3/4 3-59                                                                      10/05/2009 3/4.4 - Reactor Coolant System                                    -
3/4 4-1      3/4.4.7 - Chemistry                                              10/05/2009 3/4 4-2                                                                        10/05/2009 3/4 4-3      Table 3.4-1                                                      06/17/2002 3/4 4-4      Table 4.4-1                                                      10/05/2009 3/4 4-5      3/4.4.9 - Pressure/Temperature Limits                            10/05/2009 3/4 4-6      Table 4.4-3                                                      08/04/2005 3/4 4-7                                                                        08/04/2005 3/4 4-8      3/4.4.9.2 - Pressurizer                                          10/05/2009 3/4 4-9                                                                        10/05/2009 3/4 4-10    3/4.4.9.4 - Shutdown Cooling Overpressure Protection System      10/05/2009 3/4 4-11                                                                      10/05/2009 3/4 4-12    3/4.4.10 - Structural Integrity - ASME Code Class 1, 2, 3        10/05/2009 Components 3/4 4-13                                                                      10/05/2009 3/4 4-14                                                                      10/05/2009 3/4 4-15    3/4.4.11 - Reactor Coolant System Vents                          01/12/2010 3/4 4-16                                                                      10/05/2009 3/4.5 - Emergency Core Cooling Systems                            -
3/4 5-1      3/4.5.2 - ECCS Subsystems - Tavg  300°F                          10/05/2009 3/4 5-2                                                                        10/05/2009 3/4.6 - Containment Systems                                      -
3/4 6-1      3/4.6.3 - Containment Isolation Valves                            10/05/2009 3/4 6-2                                                                        09/11/2003 3/4 6-3      Table 3.6-1                                                      09/11/2003 3/4 6-4                                                                        10/16/2013 3/4 6-5                                                                        09/11/2003 3/4 6-6                                                                        09/11/2003 3/4 6-7                                                                        09/11/2003 3/4 6-8                                                                        10/05/2009 3/4 6-9                                                                        10/05/2009 Millstone Unit 2                        TRM EP- 4                        LBDCR 13-MP2-015 October 16, 2013
 
Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section-                                                                      Approval TR - Title Page No.                                                                        Date 3/4 6-10                                                                    10/05/2009 3/4 6-11                                                                    09/11/2003 3/4 6-12    3/4.6.4 - Combustible Gas Control                              10/05/2009 3/4 6-13                                                                    10/05/2009 3/4 6-14                                                                    08/04/2005 3/4.7 - Plant Systems                                          -
3/4 7-1      3/4.7.2 - Steam Generator Pressure/Temperature Limitation      10/05/2009 3/4 7-2                                                                      02/27/2003 3/4 7-3      3/4.7.5 - Flood Level                                          10/05/2009 3/4 7-4                                                                      10/05/2009 3/4 7-5      Figure 3.7 Critical Area                                    02/27/2003 3/4 7-6                                                                      10/05/2009 3/4 7-7      3/4.7.7 - Sealed Source Contamination                          10/05/2009 3/4 7-8                                                                      10/05/2009 3/4 7-9                                                                      10/05/2009 3/4 7-10    3/4.7.9 - Fire Protection Systems                              02/02/2010 3/4.7.9.1 - Fire Suppression Water System 3/4 7-11                                                                    02/02/2010 3/4 7-12                                                                    02/02/2010 3/4 7-12a                                                                    02/02/2010 3/4 7-13    3/4.7.9.2 - Fire Protection Spray/Sprinkler Systems            10/05/2009 3/4 7-14                                                                    10/05/2009 3/4 7-15                                                                    10/05/2009 3/4 7-16    3/4.7.9.3 - Fire Protection Hose Stations                      10/05/2009 3/4 7-17                                                                    10/05/2009 3/4 7-18    Table 4.7-5                                                    12/06/2001 3/4 7-19    3/4.7.9.4 - Fire Protection Halon Fire Suppression System      10/05/2009 3/4 7-20                                                                    10/05/2009 3/4 7-21                                                                    10/05/2009 3/4 7-22    3/4.7.10 - Penetration Fire Barriers                            10/05/2009 3/4 7-23                                                                    10/05/2009 3/4 7-24    Table 7-1                                                      09/24/2014 3/4 7-25                                                                    08/08/2002 3/4 7-26                                                                    08/08/2002 Millstone Unit 2                        TRM EP- 5                      LBDCR 14-MP2-015 September 24, 2014
 
Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section-                                                                            Approval TR - Title Page No.                                                                              Date 3/4 7-27                                                                            11/2/2010 3/4 7-28                                                                            10/05/2009 3/4.8 - Electrical Power Systems                                      -
3/4 8-1      3/4.8.1.1.c -Emergency Diesel Generator Fuel Oil Supply System        02/27/2020 3/4 8-2                                                                            04/02/2020 3/4 8-3                                                                            02/27/2020 3/4 8-4      Tables 3.8.1.1.c-1 and 3.8.1.1.c-2                                    04/02/2020 3/4 8-5                                                                            02/27/2020 3/4 8-6                                                                            02/27/2020 3/4 8-7      3.8.1.2 - Offsite Line Power Sources                                  03/23/2017 3/4 8-8                                                                            03/23/2017 3/4 8-9                                                                            03/23/2017 3/4 8-10    3/4.8.2.1 - Electrical Switchgear Room Ventilation Systems            06/02/2016 3/4 8-11                                                                            06/02/2016 3/4 8-12                                                                            06/02/2016 3/4 8-13                                                                            06/02/0216 3/4 8-14                                                                            08/24/2010 3/4 8-15                                                                            06/02/2016 3/4.9 - REFUELING Operations                                          -
3/4 9-1      3/4.9.3.2 SPENT FUEL POOL TEMPERATURE                                  10/05/2009 3/4 9-2      3/4.9.3.3 SPENT FUEL POOL DECAY TIME                                  03/16/2017 3/4 9-3                                                                            03/16/2017 3/4 9-4      3/4.9.5 - Communications                                              10/05/2009 3/4 9-5      3/4.9.6 - Containment Building REFUELING Machine                      10/03/2012 3/4 9-6                                                                            10/03/2012 3/4 9-7      3/4.9.7 - Spent Fuel Pool Cask Crane Travel Limits                    02/01/2011 3/4 9-8                                                                            10/05/2009 5.0 -        Design Features; 5.0 (No Content)                                      -
6.0 - Administrative Controls                                          -
6.0 - 1      6.2.2 - Fire Protection Administrative Requirements                    10/05/2009 6.0 - 2      6.13 - System Integrity Requirements                                  10/05/2009 Millstone Unit 2                        TRM EP- 6            LBDCR 20-MP2-002, February 27, 2020 LBDCR 20-MP2-005, April 02, 2020
 
Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section-                                                                    Approval TR - Title Page No.                                                                      Date 6.0 - 3                                                                    10/05/2009 6.0 - 4                                                                    12/06/2001 7.1 - Appendix R Safe Shutdown Requirements                  -
7.1 - 1      7.1 Appendix R Safe Shutdown Requirement Components: TR, TSR, 05/23/2017 Admin Requirements, Bases, Index 7.1-1a                                                                    03/18/2014 7.1 - 2                                                                    05/10/2011 7.1 - 3                                                                    05/23/2017 7.1-3a                                                                    05/23/2017 7.1 - 4                                                                    02/02/2010 7.1 - 5                                                                    11/26/2013 7.1 - 5a                                                                  11/26/2013 7.1 - 5b                                                                  11/26/2013 7.1 - 6      INDEX - Appendix R Safe Shutdown Technical Requirements      02/29/2016 7.1 - 7                                                                    02/29/2016 7.1 - 8                                                                    02/29/2016 7.1 - 9      7.1.1 - Charging Pumps                                      09/24/2014 7.1 - 10    Table 7.1.1-1                                                11/26/2013 7.1 - 11                                                                  11/26/2013 7.1 - 12                                                                  11/26/2013 7.1 - 13    Table 7.1.1-2                                                11/26/2013 7.1 - 14                                                                  11/26/2013 7.1 - 15      7.1.2 - Boric Acid Storage Tanks                            09/24/2014 7.1 - 16    Table 7.1.2-1                                                10/05/2009 7.1 - 17    Table 7.1.2-2                                                10/05/2009 7.1 - 18      7.1.3 - ESFAS Instrumentation                                09/24/2014 7.1 - 19    Table 7.1.3-1                                                10/05/2009 7.1 - 20    Table 7.1.3-2                                                10/05/2009 7.1 - 21    7.1.4 - Remote Shutdown Instruments                          10/05/2009 7.1 - 22    Table 7.1.4-1                                                04/19/2011 7.1 - 23                                                                  04/19/2011 7.1 - 24                                                                  04/19/2011 7.1 - 25    Table 7.1.4-2                                                04/19/2011 7.1 - 26    7.1.5 - Accident Monitoring Instruments                      10/05/2009 7.1 - 27    Table 7.1.5-1                                                10/05/2009 Millstone Unit 2                        TRM EP- 7                      LBDCR 17-MP2-007 May 23, 2017
 
Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section-                                                                      Approval TR - Title Page No.                                                                          Date 7.1 - 28                                                                      10/05/2009 7.1 - 29    Table 7.1.5-2                                                    10/05/2009 7.1 - 30    7.1.6 - Reactor Coolant Pump Circuit Breakers - 6.9 kV Bus        02/29/2016 7.1 - 31    Table 7.1.6-1                                                    10/05/2009 7.1 - 32    Table 7.1.6-2                                                    03/30/2010 7.1 - 33    7.1.7 - Shutdown Cooling Components, HOT SHUTDOWN                02/29/2016 7.1 - 34    Table 7.1.7-1                                                    10/05/2009 7.1 - 35                                                                      04/19/2011 7.1 - 36    Table 7.1.7-2                                                    10/05/2009 7.1 - 37    7.1.8 - Reactor Coolant System Relief Valves - PORVs              10/05/2009 7.1 - 38    Table 7.1.8-1                                                    10/05/2009 7.1 - 39    Table 7.1.8-2                                                    10/05/2009 7.1 - 40    7.1.9 - Safety Injection Tank Isolation Valves                    02/29/2016 7.1 - 41    Table 7.1.9-1                                                    10/05/2009 7.1 - 42    Table 7.1.9-2                                                    10/05/2009 7.1 - 43    7.1.10 - ECCS Low Pressure Safety Injection Valves                02/29/2016 7.1 - 44    Table 7.1.10-1                                                    10/05/2009 7.1 - 45                                                                      10/05/2009 7.1 - 46    Table 7.1.10-2                                                    10/05/2009 7.1 - 47    7.1.11 - ECCS - Refueling Water Storage Tank Outlet Valve        09/24/2014 7.1 - 48    Table 7.1.11-1                                                    11/26/2013 7.1 - 49    Table 7.1.11-2                                                    10/05/2009 7.1 - 50      7.1.12 - Reactivity Control System Flow Paths - Operating        09/24/2014 7.1 - 51    Table 7.1.12-1                                                    10/05/2009 7.1 - 52    Table 7.1.12-2                                                    10/05/2009 7.1 - 53    7.1.13 - Containment Air Temperature Indication                  10/05/2009 7.1 - 54    Table 7.1.13-1                                                    10/05/2009 7.1 - 55    Table 7.1.13-2                                                    10/05/2009 7.1 - 56    7.1.14 - Containment Spray and Cooling Systems                    09/24/2014 7.1 - 57    Table 7.1.14-1                                                    09/24/2014 7.1 - 58    Table 7.1.14-2                                                    09/24/2014 7.1 - 59    7.1.15 - Auxiliary Feedwater Pumps Components                    10/05/2009 7.1 - 60    Table 7.1.15-1                                                    11/26/2013 7.1 - 61                                                                      11/26/2013 Millstone Unit 2                        TRM EP- 8                        LBDCR 16-MP2-003 February 29, 2016
 
Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section-                                                                        Approval TR - Title Page No.                                                                            Date 7.1 - 62    Table 7.1.15-2                                                      10/05/2009 7.1 - 63    7.1.16 - Condensate Storage Tank Level Indication Components        10/05/2009 7.1 - 64    Table 7.1.16-1                                                      10/05/2009 7.1 - 65    Table 7.1.16-2                                                      09/24/2014 7.1 - 66    7.1.17 - Main Steam Isolation & Bypass Valves                      10/05/2009 7.1 - 67    Table 7.1.17-1                                                      10/05/2009 7.1 - 68    Table 7.1.17-2                                                      10/05/2009 7.1 - 69    7.1.18 - Atmospheric Dump (Steam) Valves                            10/05/2009 7.1 - 70    Table 7.1.18-1                                                      10/05/2009 7.1 - 71    Table 7.1.18-2                                                      10/05/2009 7.1 - 72    7.1.19 - Steam Generator Blowdown Isolation Valves                  02/29/2016 7.1 - 73    Table 7.1.19-1                                                      10/05/2009 7.1 - 74    Table 7.1.19-2                                                      10/05/2009 7.1 - 75    7.1.20 - Reactor Building Closed Cooling Water (RBCCW) System      10/05/2009 Components 7.1 - 76    Table 7.1.20-1                                                      11/26/2013 7.1 - 77                                                                        11/26/2013 7.1 - 78                                                                        11/26/2013 7.1 - 79                                                                        11/26/2013 7.1 - 79a                                                                        11/26/2013 7.1 - 80    Table 7.1.20-2                                                      10/05/2009 7.1 - 81    7.1.21 - Service Water System Components                            10/05/2009 7.1 - 82    Table 7.1.21-1                                                      07/29/2014 7.1 - 83                                                                        11/26/2013 7.1 - 84                                                                        11/26/2013 7.1 - 84a                                                                        11/26/2013 7.1 - 85    Table 7.1.21-2                                                      10/05/2009 7.1 - 86    7.1.22 - Electrical Power AC Sources                                09/24/2014 7.1 - 87    Table 7.1.22-1                                                      10/05/2009 7.1 - 88    Table 7.1.22-2                                                      03/30/2010 7.1 - 89    7.1.23- Onsite Electrical Power AC Distribution System Components  10/05/2009 7.1 - 90    Table 7.1.23-1                                                      10/05/2009 7.1 - 91                                                                        10/05/2009 7.1 - 92                                                                        10/05/2009 7.1 - 93                                                                        05/31/2012 7.1 - 94                                                                        03/30/2010 Millstone Unit 2                        TRM EP- 9                          LBDCR 16-MP2-003 February 29, 2016
 
Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section-                                                                      Approval TR - Title Page No.                                                                        Date 7.1 - 95                                                                      01/07/2010 7.1 - 96    Table 7.1.23-2                                                  05/31/2012 7.1 - 97                                                                      05/31/2012 7.1 - 98    7.1.24 - Electrical Power DC Distribution System Components      10/05/2009 7.1 - 99    Table 7.1.24-1                                                  10/05/2009 7.1 - 100                                                                    10/05/2009 7.1 - 101                                                                    10/05/2009 7.1 - 102                                                                    05/27/2010 7.1 - 103    Table 7.1.24-2                                                  03/30/2010 7.1 - 104    7.1.25 - Fire Protection Miscellaneous System Components        10/05/2009 7.1 - 105    Table 7.1.25-1                                                  11/26/2013 7.1 - 106    Table 7.1.25-2                                                  11/26/2013 7.1 - 107    7.1.26 - Support Equipment, Appendix R Components                10/05/2009 7.1 - 108    Table 7.1.26-1                                                  09/13/2019 7.1 - 109                                                                    03/18/2014 7.1 - 110                                                                    03/18/2014 7.1 - 111                                                                    03/18/2014 7.1 - 112    Table 7.1.26-2                                                  03/18/2014 7.1 - 113    7.1.27 - A. C. Sources Operating                                03/18/2014 7.1 - 114    Table 7.1.27-1                                                  03/18/2014 Appendix 8.1 Core Operating Limits Report, Cycle 27              -
8.1 - 1      8.1 - COLR                                                      03/19/2020 8.1 - 2                                                                      03/19/2020 8.1 - 3                                                                      03/19/2020 8.1 - 4                                                                      03/19/2020 8.1 - 5                                                                      03/19/2020 8.1 - 6                                                                      03/19/2020 8.1 - 7                                                                      03/19/2020 8.1 - 8      Figure 2.4 CEA Insertion Limit vs. THERMAL POWER With Four  03/19/2020 Reactor Coolant Pumps Operating 8.1 - 9      Figure 2.5 AXIAL SHAPE INDEX vs. PERCENT OF                  03/19/2020 ALLOWABLE POWER LEVEL 8.1 - 10    Figure 2.6 TOTAL UNRODDED INTEGRATED RADIAL                  03/19/2020 PEAKING FACTOR vs. Allowable RATED THERMAL POWER For Reactor Coolant Flow Rates  360,000 gpm Millstone Unit 2                      TRM EP- 10                        LBDCR 20-MP2-003 March 19, 2020
 
Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section-                                                                    Approval TR - Title Page No.                                                                      Date 8.1 - 11    Figure 2.6 TOTAL UNRODDED INTEGRATED RADIAL                03/19/2020 PEAKING FACTOR vs. Allowable RATED THERMAL POWER For Reactor Coolant Flow Rates < 360,000 gpm and  354,600 gpm 8.1 - 12    Figure 2.6 TOTAL UNRODDED INTEGRATED RADIAL                03/19/2020 PEAKING FACTOR vs. Allowable RATED THERMAL POWER For Reactor Coolant Flow Rates < 354,600 gpm and  349,200 gpm 8.1 - 13    Figure 2.7 AXIAL SHAPE INDEX Operating Limits With Four    03/19/2020 Reactor Coolant Pumps Operating Millstone Unit 2                    TRM EP- 11                        LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS 1.0    DEFINITIONS The DEFINED TERMS appear in capitalized type throughout these TECHNICAL REQUIREMENTS. These capitalized terms are defined in Section 1.0 of the Technical Specifications.
In addition to the terms defined in the Technical Specifications, the following defined terms and acronyms appear in the TECHNICAL REQUIREMENTS. These defined terms and acronyms also appear in capitalized type throughout the TECHNICAL REQUIREMENTS.
CURRENT LICENSING BASIS 1.1    The CURRENT LICENSING BASIS (CLB) is the set of NRC requirements applicable to a specific plant, plus a licensee's docketed and currently effective written commitments for ensuring compliance with, and operation within, applicable NRC requirements and the plant-specific DESIGN BASIS, including all modifications and additions to such commitments over the life of the facility operating license.
The set of NRC requirements applicable to a specific plant CLB include:
: a. NRC regulations in 10 CFR Parts 2, 19, 20, 21, 26, 30, 40, 50, 51, 54, 55, 70, 72, 73, and 100 and appendices thereto
: b. Commission orders
: c. license conditions
: d. exemptions
: e. technical specifications (TSs)
: f. plant-specific DESIGN BASIS information defined in 10 CFR 50.2 and documented in the most recent Updated Final Safety Analysis Report (UFSAR) (as required by 10 CFR 50.71)
: g. licensee commitments remaining in effect that were made in docketed licensing correspondence (such as licensee responses to NRC bulletins, Licensee Event Reports, generic letters, and enforcement actions)
: h. licensee commitments documented in NRC safety evaluations DESIGN BASIS 1.2    Design bases information, defined by 10 CFR 50.2, is documented in the UFSAR as required by 10 CFR 50.71. The DESIGN BASIS of safety-related structures, systems, and components (SSCs) is established initially during the original plant licensing and relates primarily to the accident prevention or mitigation functions of safety-related SSCs. The DESIGN BASIS of a safety-related SSC is a subset of the CLB.
MILLSTONE - UNIT 2                TRM 1.0 - 1                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS FUNCTIONAL - FUNCTIONALITY 1.3  FUNCTIONALITY is an attribute of SSCs that is not controlled by TSs. An SSC is FUNCTIONAL or has FUNCTIONALITY when it is capable of performing its SPECIFIED FUNCTION, as set forth in the CLB. FUNCTIONALITY does not apply to SPECIFIED SAFETY FUNCTIONS, but does apply to the ability of non-TS SSCs to perform other SPECIFIED FUNCTIONS that have a necessary support function.
SPECIFIED FUNCTION/SPECIFIED SAFETY FUNCTION 1.4  The SPECIFIED FUNCTION(S) of the system, subsystem, train, component or device (hereafter referred to as system) is that SPECIFIED SAFETY FUNCTION(S) in the CLB for the facility. In addition to providing the SPECIFIED SAFETY FUNCTION, a system is expected to perform as designed, tested and maintained. When system capability is degraded to a point where it cannot perform with reasonable expectation or reliability, the system should be judged inoperable/nonfunctional, even if at this instantaneous point in time the system could provide the SPECIFIED SAFETY FUNCTION.
TECHNICAL REQUIREMENT 1.5  A TECHNICAL REQUIREMENT represents the lowest functional capability or performance level allowed for the specified equipment or parameter.
TECHNICAL SURVEILLANCE REQUIREMENT 1.6  TECHNICAL SURVEILLANCE REQUIREMENTS are requirements related to test, calibration, or inspection to verify that the associated TECHNICAL REQUIREMENTS are met.
MILLSTONE - UNIT 2              TRM 1.0 - 2                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY For the purpose of the TRs, the Technical Requirements Manual (TRM) terms specified below are considered similar to the listed Technical Specification terms:
Technical Specification Term            Technical Requirements Manual Term Technical Specifications (TS)                  Technical Requirements Manual (TRM)
Limiting Condition for Operation (LCO)        TECHNICAL REQUIREMENT (TR)
Surveillance Requirement (SR)                  TECHNICAL SURVEILLANCE REQUIREMENT (TSR)
Specification                                  Requirement TECHNICAL REQUIRMENT TR 3.0.1 Compliance with the TRs contained in the succeeding requirements is required during the OPERATIONAL MODES or other conditions specified therein; except that upon failure to meet the TR, the associated ACTION requirements shall be met.
TR 3.0.2 Noncompliance with a requirement shall exist when the requirements of the TR and associated ACTION requirements are not met within the specified time intervals, except as provided in TR 3.0.6. If the TR is restored prior to expiration of the specified time intervals, completion of the ACTION requirements is not required.
TR 3.0.3 When a TR is not met, except as provided in the associated ACTION requirements, the unit shall be placed in a safe condition as determined by the Operational Decision Making process. Corrective action shall be initiated in accordance with the corrective action program.
TR 3.0.4 Entry into an OPERATIONAL MODE or specified condition may be made in accordance with ACTION requirements when conformance to them permits continued operation of the facility for an unlimited period of time. This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements or that is part of a shutdown of the unit.
MILLSTONE - UNIT 2                TRM 3/4 0-1                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL REQUIRMENT TR 3.0.5 When a system, subsystem, train, component or device is determined to be nonfunctional solely because its emergency power source is nonfunctional, or solely because its normal power source is nonfunctional, it may be considered FUNCTIONAL for the purpose of satisfying the requirements of its applicable TR, provided: (1) its corresponding normal or emergency power source is FUNCTIONAL; and (2) all of its redundant system(s), subsystem(s), train(s),
component(s) and device(s) are FUNCTIONAL, or likewise satisfy the requirements of this requirement. Unless both conditions (1) and (2) are satisfied, the unit shall be placed in a safe condition as determined by the Operational Decision Making process. Corrective action shall be initiated in accordance with the corrective action program.
This TR is not applicable in MODES 5 or 6.
TR 3.0.6 Equipment removed from service or declared nonfunctional to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its FUNCTIONALITY or the FUNCTIONALITY of other equipment. This is an exception to TR 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate FUNCTIONALITY.
TECHNICAL SURVEILLANCE REQUIREMENTS TSR 4.0.1 TSRs shall be met during the OPERATIONAL MODES or other conditions specified for individual TRs unless otherwise stated in an individual TSR.
Failure to meet a TSR, whether such failure is experienced during the performance of the TSR or between performances of the TSR, shall be failure to meet the TR. Failure to perform a TSR within the specified TSR interval shall be failure to meet the TR except as provided in TSR 4.0.3. TSRs do not have to be performed on nonfunctional equipment or variables outside specified limits.
TSR 4.0.2 Each TSR shall be performed within the specified time interval with a maximum allowable extension not to exceed 25% of the surveillance time interval.
TSR 4.0.3 If it is discovered that a TSR was not performed within its specified surveillance interval, then compliance with the requirement to declare the TR not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified surveillance interval, whichever is greater. This delay period is permitted to allow performance of the TSR. A risk evaluation shall be performed for any TSR delayed greater than 24 hours and the risk impact shall be managed.
MILLSTONE - UNIT 2                TRM 3/4 0-2                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL SURVEILLANCE REQUIREMENTS If the TSR is not performed within the delay period, the TR must immediately be declared not met, and the applicable ACTION(s) must be entered.
When the TSR is performed within the delay period and the TSR is not met, the TR must immediately be declared not met, and the applicable ACTION(s) must be entered.
TSR 4.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made unless the TSR(s) associated with the TR have been performed within the stated TSR interval or as otherwise specified. This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements or that is part of a shutdown of the unit.
BASES:
TR 3.0.1 through 3.0.4 establish the general requirements applicable to TRs.
TR 3.0.1 establishes the Applicability statement within each individual TR as the requirement for when (i.e., in which OPERATIONAL MODES or other specified conditions) conformance to the TR is required for safe operation of the facility. The ACTION requirements establish those remedial measures that must be taken within specified time limits when the requirements of a TR are not met.
There are two basic types of ACTION requirements. The first specifies the remedial measures that permit continued operation of the facility that is not further restricted by the time limits of the ACTION requirements. In this case, conformance to the ACTION requirements provides an acceptable level of safety for unlimited continued operation as long as the ACTION requirements continue to be met. The second type of ACTION requirement specifies a time limit in which conformance to the conditions of the TR must be met. This time limit is the allowable outage time to restore a nonfunctional system or component to FUNCTIONAL status or for restoring parameters within specified limits. If these actions are not completed within the allowable outage time limits, the unit shall be placed in a safe condition as determined by the Operational Decision Making process and corrective action shall be initiated in accordance with the corrective action program. It is not intended that the ACTION requirements be used as an operational convenience that permits (routine) voluntary removal of a system(s) or component(s) from service in lieu of other alternatives that would not result in redundant systems or components being nonfunctional.
MILLSTONE - UNIT 2                TRM 3/4 0-3                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL SURVEILLANCE REQUIREMENTS The specific time limits of the ACTION requirements are applicable from the point in time it is identified that a TR is not met. The time limits of the ACTION requirements are also applicable when a system or component is removed from service for surveillance testing or investigation of operational problems. Individual TRs may include a specified time limit for the completion of a TSR when equipment is removed from service. In this case, the allowable outage time limits of ACTION requirements are applicable when this limit expires if the TSR has not been completed.
TR 3.0.2 establishes that noncompliance with a TR exists when the requirements of the TR are not met and the associated ACTION requirements have not been implemented within the specified time interval. The purpose of this TR is to clarify that (1) implementation of the ACTION requirements within the specified time interval constitutes compliance with a TR and (2) completion of the remedial measures of the ACTION requirements is not required when compliance with a TR is restored within the time interval specified in the associated ACTION requirements.
TR 3.0.3 establishes the ACTION requirements that must be implemented when a TR is not met and the condition is not specifically addressed by the associated ACTION requirements. The purpose of this TR is to delineate the ACTIONS when plant operation cannot be maintained within the limits of safe operation defined by the TR and its ACTION requirements. It is not intended to be used as an operational convenience that permits (routine) voluntary removal of redundant systems or components from service in lieu of other alternatives that would not result in redundant systems or components being nonfunctional.
TR 3.0.4 establishes limitations on MODE changes when a TR is not met. It precludes placing the facility in a higher MODE of operation when the requirements for a TR are not met and continued noncompliance to these conditions would result in a shutdown to comply with the ACTION requirements if a change in MODES were permitted. The purpose of this specification is to ensure that facility operation is not initiated or that higher MODES of operation are not entered when corrective action is being taken to obtain compliance with a requirement by restoring equipment to FUNCTIONAL status or parameters to specified limits. Compliance with ACTION requirements that permit continued operation of the facility for an unlimited period of time provides an acceptable level of safety for continued operation without regard to the status of the plant before or after a MODE change. Therefore, in this case, entry into an OPERATIONAL MODE or other specified condition may be made in accordance with the provision of the ACTION requirements. The provisions of this specification should not, however, be interpreted as endorsing the failure to exercise good practice in restoring systems or components to FUNCTIONAL status before plant STARTUP.
When a shutdown is required as determined by the Operational Decision Making process, the provisions of TR 3.0.4 do not apply because they would delay placing the facility in a lower MODE of operation.
MILLSTONE - UNIT 2                TRM 3/4 0-4                            LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL SURVEILLANCE REQUIREMENTS TR 3.0.5 delineates what additional conditions must be satisfied to permit operation to continue, consistent with the ACTION statements for power sources, when a normal or emergency power source is nonfunctional. It specifically prohibits operation when one division is nonfunctional because its normal or emergency power source is nonfunctional and a system, subsystem, train, component or device in another division is nonfunctional for another reason.
The provisions of this TR permit the ACTION statements associated with individual systems, subsystems, trains, components, or devices to be consistent with the ACTION statements of the associated electrical power source. It allows operation to be governed by the time limits of the ACTION statement associated with the TR for the normal or emergency power source, not the individual ACTION statements for each system, subsystem, train, component or device that is determined to be nonfunctional solely because of the nonfunctionality of its normal emergency power source.
In MODES 5 and 6 TR 3.0.5 is not applicable, and thus the individual ACTION statements for each applicable TR in these MODES must be adhered to.
TR 3.0.6 establishes the allowance for restoring equipment to service under administrative controls when it has been removed from service or declared nonfunctional to comply with ACTIONS. The sole purpose of this TR is to provide an exception to TR 3.0.2 (e.g., to not comply with the applicable required ACTION(s)) to allow the performance of TSRs to demonstrate:
: a. The FUNCTIONALITY of the equipment being returned to service; or
: b. The FUNCTIONALITY of other equipment.
The administrative controls ensure the time the equipment is returned to service in conflict with the requirements of the ACTIONS is limited to the time absolutely necessary to perform the allowed TSRs. The TR does not provide time to perform any other preventive or corrective maintenance.
TSR 4.0.1 through 4.0.4 establish the general requirements applicable to TSRs.
TSR 4.0.1 establishes the requirement that TSRs must be met during the OPERATIONAL MODES or other conditions for which the requirements of the TR apply unless otherwise stated in an individual TSR. The purpose of this requirement is to ensure that TSRs are performed to verify the FUNCTIONALITY of systems and components and that parameters are within specified limits to ensure safe operation of the facility when the plant is in a MODE or other specified condition for which the associated TR are applicable.
Failure to meet a TSR within the specified TSR interval, in accordance with TSR 4.0.2 constitutes a failure to meet a TR.
MILLSTONE - UNIT 2              TRM 3/4 0-5                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL SURVEILLANCE REQUIREMENTS Systems and components are assumed to be FUNCTIONAL when the associated TSRs have been met. Nothing in this requirement, however, is to be construed as implying that systems or components are FUNCTIONAL when either:
: a. The system or components are known to be nonfunctional, although still meeting the TSRs or
: b. The requirements of the TSR(s) are known to be not met between required TSR performances.
TSRs do not have to be performed when the facility is in an OPERATIONAL MODE or other specified conditions for which the requirements of the associated TR do not apply unless otherwise specified. The TSRs associated with a Special Test Exception are only applicable when the Special Test Exception is used as an allowable exception to the requirements of a TR.
Unplanned events may satisfy the requirements (including applicable acceptance criteria) for a given TSR. In this case, the unplanned event may be credited as fulfilling the performance of the TSR. This allowance includes those TSRs whose performance is normally precluded in a given MODE or other specified condition.
TSRs, including TSRs invoked by ACTION requirements, do not have to be performed on nonfunctional equipment because the ACTIONS define the remedial measures that apply.
TSRs have to be met and performed in accordance with TSR 4.0.2, prior to returning equipment to FUNCTIONAL status.
Upon completion of maintenance, appropriate post maintenance testing is required to declare equipment FUNCTIONAL. This includes ensuring applicable TSRs are not failed and their most recent performance is in accordance with TSR 4.0.2. Post maintenance testing may not be possible in the current MODE or other specified conditions in the Applicability due to the necessary unit parameters not having been established. In these situations, the equipment may be considered FUNCTIONAL provided testing has been satisfactorily completed to the extent possible and the equipment is not otherwise believed to be incapable of performing its function. This will allow operation to proceed to a MODE or other specified condition where other necessary post maintenance tests can be completed.
TSR 4.0.2 establishes the limit for which the specified time interval for TSRs may be extended. It permits an allowable extension of the normal TSR interval to facilitate TSR scheduling and consideration of plant operating conditions that may not be suitable for conducting the TSR, e.g., transient conditions or other ongoing TSR or maintenance activities. It also provides flexibility to accommodate the length of a fuel cycle for TSRs that are performed at each REFUELING outage and are specified with an 18-month TSR interval. It is not intended that this provision be used repeatedly as a convenience to extend TSR intervals beyond that specified for TSRs that are not performed during MILLSTONE - UNIT 2                  TRM 3/4 0-6                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL SURVEILLANCE REQUIREMENTS REFUELING outages. The limitation of TSR 4.0.2 is based on engineering judgment and the recognition that the most probable result of any particular TSR being performed is the verification of conformance with the TSR. This provision is sufficient to ensure that the reliability ensured through TSR activities is not significantly degraded beyond that obtained from the specified TSR interval.
TSR 4.0.3 establishes the flexibility to defer declaring affected equipment nonfunctional or an affected variable outside the specified limits when a TSR has not been completed within the specified TSR interval. A delay period of up to 24 hours or up to the limit of the specified TSR interval, whichever is greater, applies from the point in time that it is discovered that the TSR has not been performed in accordance with TSR 4.0.2,and not at the time that the specified TSR interval was not met.
This delay period provides adequate time to complete TSRs that have been missed. This delay period permits the completion of a TSR before complying with ACTION requirements or other remedial measures that might preclude completion of the TSR. The basis for this delay period includes consideration of unit conditions, adequate planning, availability of personnel, the time required to perform the TSR, the safety significance of the delay in completing the required TSR, and the recognition that the most probable result of any particular TSR being performed is the verification of conformance with the requirements.
When a TSR, with a TSR interval based not on time intervals, but upon specified unit conditions, operating situations, or requirements of regulations, (e.g., prior to entering MODE 1 after each fuel loading, or in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, etc.) is discovered to not have been performed when specified, TSR 4.0.3 allows for the full delay period of up to the specified TSR interval to perform the TSR. However, since there is not a time interval specified, the missed TSR should be performed at the first reasonable opportunity.
TSR 4.0.3 provides a time limit for, and allowances for the performance of, TSRs that become applicable as a consequence of MODE changes imposed by ACTION requirements.
Failure to comply with specified TSR intervals for the TSRs is expected to be an infrequent occurrence. Use of the delay period established by TSR 4.0.3 is a flexibility that is not intended to be used as an operational convenience to extend TSR intervals. While up to 24 hours or the limit of the specified TSR interval is provided to perform the missed TSR, it is expected that the missed TSR will be performed at the first reasonable opportunity.
The determination of the first reasonable opportunity should include consideration of the impact on plant risk (from delaying the TSR as well as any plant configuration changes required) and impact on any analysis assumptions, in addition to unit conditions, planning, availability of personnel, and the time required to perform the TSR. This risk impact should MILLSTONE - UNIT 2                TRM 3/4 0-7                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL SURVEILLANCE REQUIREMENTS be managed through the program in place to implement 10 CFR 50.65(a)(4) and its implementation guidance, NRC Regulatory Guide 1.182, Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants. This Regulatory Guide addresses consideration of temporary and aggregate risk impacts, determination of risk management action thresholds, and risk management action up to and including plant shutdown. The missed TSR should be treated as an emergent condition as discussed in the Regulatory Guide. The risk evaluation may use quantitative, qualitative, or blended methods. The degree of depth and rigor of the evaluation should be commensurate with the importance of the component. If the results of the risk evaluation determine the risk increase is significant, this evaluation should be used to determine the safest course of action. All missed TSRs will be placed in the licensees Corrective Action Program.
If a TSR is not completed within the allowed delay period, then the equipment is considered nonfunctional or the variable is considered outside the specified limits and the entry into the ACTION requirements for the applicable TR begins immediately upon expiration of the delay period. If a TSR is failed within the delay period, then the equipment is nonfunctional, or the variable is outside the specified limits and entry into the ACTION requirements for the applicable TR begins immediately upon the failure of the TSR.
Completion of the TSR within the delay period allowed by this TSR, or within the Allowed Outage Time of the applicable ACTIONS, restores compliance with TSR 4.0.1.
TSR 4.0.4 establishes the requirement that all applicable TSRs must be met before entry into an OPERATIONAL MODE or other condition of operation specified in the Applicability statement. The purpose of this specification is to ensure that system and component FUNCTIONALITY requirements or parameter limits are met before entry into a MODE or condition for which these systems and components ensure safe operation of the facility.
This provision applies to changes in OPERATIONAL MODES or other specified conditions associated with plant shutdown as well as STARTUP.
Under the provisions of this specification, the applicable TSRs must be performed within the specified TSR interval to ensure that the TRs are met during initial plant STARTUP following a plant outage.
When a shutdown is required as determined by the Operational Decision Making process, the provisions of TSR 4.0.4 do not apply because this would delay placing the facility in a lower MODE of operation.
MILLSTONE - UNIT 2                  TRM 3/4 0-8                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM 3/4.1.2 BORATION SYSTEMS FLOW PATHS - SHUTDOWN TECHNICAL REQUIRMENT 3.1.2.1    As a minimum, one of the following boron injection flow paths shall be FUNCTIONAL:
: a.      A flow path with a piping temperature of greater than 55&deg;F from the boric acid storage tank via either a boric acid pump or a gravity feed connection and a charging pump to the Reactor Coolant System if only the boric acid storage tank in TECHNICAL REQUIREMENT 3.1.2.7.a is FUNCTIONAL, or
: b.      The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if only the refueling water storage tank in TECHNICAL REQUIREMENT 3.1.2.7.b is FUNCTIONAL.
APPLICABILITY:        MODES 5 and 6.
ACTION:
With none of the above flow paths FUNCTIONAL, suspend all operations involving CORE ALTERATIONS and positive reactivity additions that could cause introduction of coolant into the RCS with boron concentration less than required to meet Technical Specification 3.1.1.1 in MODE 5 or Technical Specification 3.9.1 in MODE 6 until at least one injection path is restored to FUNCTIONAL status.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.1    At least one of the above required flow paths shall be demonstrated FUNCTIONAL:
: a.      At least once per 31 days by verifying each manual, power operated, and automatic valve in the boron injection flow path that is not locked, sealed or otherwise secured in position, is in the correct position.
: b.      At least once per 24 hours by verifying that the boric acid piping temperature is greater than 55&deg;F.
MILLSTONE - UNIT 2                TRM 3/4 1-1                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM 3/4.1.2 BORATION SYSTEMS FLOW PATHS - SHUTDOWN BASES:
The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.
With the RCS temperature below 200&deg;F, one injection system is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor and the additional restrictions prohibiting CORE ALTERATIONS and operations that would dilute the RCS boron concentration by introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration as described in the Technical Specifications in the event the single injection system becomes nonfunctional. The MODES 5 and 6 ACTION requirement to suspend positive reactivity additions does not preclude completion of actions to establish a safe conservative plant condition, or to maintain or increase reactor vessel inventory provided the boron concentration of the makeup water source is greater than or equal to the boron concentration for the required SHUTDOWN MARGIN (SDM).
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.1.a verifies the correct alignment for manual, power operated, and automatic valves in the boration flow paths to provide assurance that the proper flow paths will exist to establish boric acid flow to the Reactor Coolant System (RCS). This surveillance does not apply to valves that are locked, sealed, or otherwise secured in position, since these valves were verified to be in the correct position prior to locking, sealing, or securing. A valve that receives an actuation signal is allowed to be in a non-accident position provided the valve automatically repositions within the proper stroke time. This surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position. The 31 day frequency has been shown to be acceptable through operating experience.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.1.b verifies the temperature of the boric acid piping to ensure FUNCTIONALITY of the boration flow path. Ambient air temperature in the vicinity of the boric acid piping on elevations (-)5 -0 and (-)25 -6 is a valid indication of piping temperature. The 24 hour frequency is sufficient to identify temperature changes that approach the limit.
 
==REFERENCE:==
: 1. License Amendment 283
: 2. License Amendment 293 MILLSTONE - UNIT 2                TRM 3/4 1-2                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM FLOW PATHS - OPERATING TECHNICAL REQUIREMENT 3.1.2.2  The following boron injection flowpaths to the RCS via the charging pump(s) shall be FUNCTIONAL:
: a. At least one of the following combinations:
: 1. One boric acid storage tank, with the tank contents in accordance with Figure 3.1-1 and a piping temperature greater than 55&deg;F, its associated gravity feed valve, and boric acid pump.
: 2. Two boric acid storage tanks, with the weighted average of the combined contents of the tanks in accordance with Figure 3.1-1 and a piping temperature greater than 55&deg;F, their associated gravity feed valves, and boric acid pumps.
: 3. Two boric acid storage tanks, each with contents in accordance with Figure 3.1-1 and a piping temperature greater than 55&deg;F, at least one gravity feed valve, and at least one boric acid pump.
: b. The flow path from a FUNCTIONAL refueling water storage tank, as per TECHNICAL REQUIREMENT 3.1.2.8.b.
APPLICABILITY:      MODES 1, 2, 3, and 4.
ACTION:
With fewer than the above required boron injection flow paths to the Reactor Coolant System FUNCTIONAL, manage the risk impact in accordance with the requirements of 10 CFR 50.65(a)(4).
TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.2  The above required flow paths shall be demonstrated FUNCTIONAL:
: a. At least once per 31 days by verifying each manual, power operated, and automatic valve in the boron injection flow path that is not locked, sealed or otherwise secured in position, is in the correct position.
: b. At least once per 24 hours by verifying that the boric acid piping temperature is greater than 55&deg;F.
MILLSTONE - UNIT 2              TRM 3/4 1-3                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM FLOW PATHS - OPERATING TECHNICAL SURVEILLANCE REQUIREMENTS
: c.      At least once per 36 months, by verifying each valve in the required boron injection flowpaths that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
BASES:
The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.
With the RCS average temperature above 200&deg;F, a minimum of two separate and redundant boron injection flowpaths are provided to ensure single FUNCTIONAL capability in the event an assumed failure of a pump or valve renders one of the flowpaths nonfunctional. Redundant flow paths from the boric acid storage tanks are achieved through boric acid pumps, gravity feed lines and charging pumps. Redundant flow paths from the refueling water storage tank are achieved through charging pump flow path guaranteed by TECHNICAL REQUIREMENT 3.1.2.2 and the HPSI flow path guaranteed by Technical Specification 3.5.2 and 3.5.3.
Paragraph (a)(4) of 10CFR50.65 Maintenance Rule requires that licensees assess and manage the increase in risk that may result from proposed maintenance activities, including out of service Structures, Systems, and Components (SSCs).
Management of risk involves consideration of incremental and aggregate impacts. The incremental risk increase is predominantly assessed using quantitative PRA methods, which measure the effect on core damage frequency and large early release frequency associated with the plant configuration. The risk increase is then managed in accordance with action thresholds defined by NUMARC 93-01. The aggregate impact is controlled by meeting Maintenance Rule requirements for establishing and meeting SSC performance criteria. These requirements include consideration of the risk significance of SSCs in establishing performance goals. Significant risk impacts are documented in the corrective action program and assessed as appropriate.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.2.a verifies the correct alignment for manual, power operated, and automatic valves in the boration flow paths and provides assurance that the proper flow paths will exist to establish boric acid flow to the Reactor Coolant System (RCS). This surveillance does not apply to valves that are locked, sealed, or otherwise secured in position, since these valves were verified to be in the correct position prior to locking, sealing, or securing. A valve that receives an actuation signal is allowed to be in a non-accident position provided the valve MILLSTONE - UNIT 2                  TRM 3/4 1-4                          LBDCR 16-MP2-014 March 29, 2017
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM FLOW PATHS - OPERATING TECHNICAL SURVEILLANCE REQUIREMENTS automatically repositions within the proper stroke time. This surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position. The 31-day frequency has been shown to be acceptable through operating experience.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.2.b verifies the temperature of the boric acid piping to ensure FUNCTIONALITY of the boration flow path. Ambient air temperature in the vicinity of the boric acid piping on elevations (-)5 -0 and (-)25 -6 is a valid indication of piping temperature. The 24 hour frequency is sufficient to identify temperature changes that approach the limit.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.2.c verifies the ability of the valves in the boration injection flowpath to actuate to the correct position on an actual or simulated actuation signal. The 36 month frequency is consistent with other Millstone Power Station Unit 2 actuation testing requirements and with standard industry practices and guidelines.
 
==REFERENCE:==
: 1. License Amendment 283 MILLSTONE - UNIT 2                  TRM 3/4 1-5                        LBDCR 16-MP2-014 March 29, 2017
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM CHARGING PUMP - SHUTDOWN TECHNICAL REQUIREMENT 3.1.2.3    At least one charging pump in the boron injection flow path required FUNCTIONAL pursuant to TECHNICAL REQUIREMENT 3.1.2.1 shall be FUNCTIONAL.
APPLICABILITY:        MODES 5 and 6.
ACTION:
With no charging pump FUNCTIONAL, suspend all operations involving CORE ALTERATIONS and positive reactivity additions that could cause introduction of coolant into the RCS with boron concentration less than required to meet Technical Specification 3.1.1.1 in MODE 5 or Technical Specification 3.9.1 in MODE 6 until one charging pump is restored to FUNCTIONAL status.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.3    The above required charging pump shall be demonstrated FUNCTIONAL by verifying the delivered flow of the charging pump at the required discharge pressure is greater than or equal to the required flow when tested in accordance with the Inservice Testing (IST) program.
BASES:
The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.
With the RCS temperature below 200&deg;F, one injection system is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor and the additional restrictions prohibiting CORE ALTERATIONS and operations that would dilute the RCS boron concentration by introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration as described in the technical specifications in the event the single injection system becomes nonfunctional. The MODES 5 and 6 ACTION requirement to suspend positive reactivity additions does not preclude completion of actions to establish a safe conservative plant condition, or to maintain or increase reactor vessel inventory provided the boron concentration of the makeup water source is greater than or equal to the boron concentration for the required SHUTDOWN MARGIN (SDM).
MILLSTONE - UNIT 2                TRM 3/4 1-6                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM CHARGING PUMP - SHUTDOWN TECHNICAL SURVEILLANCE REQUIREMENTS TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.3, which verifies charging pump flow and discharge pressure, is a normal test of charging pump performance required by the ASME OM Code. The frequency for this surveillance is a Code requirement governed by the IST program. Such inservice testing detects component degradation and incipient failures.
 
==REFERENCE:==
: 1. License Amendment 283
: 2. License Amendment 293 MILLSTONE - UNIT 2              TRM 3/4 1-7                      LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM CHARGING PUMPS - OPERATING TECHNICAL REQUIREMENT 3.1.2.4    At least two charging pumps shall be FUNCTIONAL.
APPLICABILITY:        MODES 1, 2, 3 and 4*.
ACTION:
With only one charging pump FUNCTIONAL, manage the risk impact in accordance with the requirement of 10 CFR 50.65(a)(4).
TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.4.1 Two charging pumps shall be demonstrated FUNCTIONAL by verifying the delivered flow of the charging pump at the required discharge pressure is greater than or equal to the required flow when tested in accordance with the Inservice Testing (IST) program.
4.1.2.4.2 Two charging pumps shall be demonstrated FUNCTIONAL at least once per 36 months by verifying that each charging pump NOT in Pull-To-Lock starts automatically on an actual or simulated actuation signal.
BASES:
The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.
With the RCS average temperature above 200 &deg;F, a minimum of two separate and redundant boron injection flowpaths are provided to ensure single FUNCTIONAL capability in the event an assumed failure of a pump or valve renders one of the flowpaths nonfunctional. Redundant flow paths from the boric acid storage tanks are
* The provisions of TECHNICAL REQUIREMENT 3.0.4 and 4.0.4 are not applicable for entry into MODE 4 for the charging pump that is nonfunctional pursuant to Technical Specification 3.4.9.3 provided the charging pump is restored to FUNCTIONAL status within at least 4 hours or prior to entering MODE 3, whichever comes first.
MILLSTONE - UNIT 2                TRM 3/4 1-8                        LBDCR 16-MP2-014 March 29, 2017
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM CHARGING PUMPS - OPERATING TECHNICAL SURVEILLANCE REQUIREMENTS achieved through Boric Acid Pumps, gravity feed lines and Charging Pumps. Redundant flow paths from the Refueling Water Storage Tank are achieved through Charging Pump flow path guaranteed by TECHNICAL REQUIREMENT 3.1.2.2 and the HPSI flow path guaranteed by Technical Specification 3.5.2 and 3.5.3.
Paragraph (a)(4) of 10CFR50.65 Maintenance Rule requires that licensees assess and manage the increase in risk that may result from proposed maintenance activities, including out of service Structures, Systems, and Components (SSCs).
Management of risk involves consideration of incremental and aggregate impacts. The incremental risk increase is predominantly assessed using quantitative PRA methods, which measure the effect on core damage frequency and large early release frequency associated with the plant configuration. The risk increase is then managed in accordance with action thresholds defined by NUMARC 93-01. The aggregate impact is controlled by meeting Maintenance Rule requirements for establishing and meeting SSC performance criteria. These requirements include consideration of the risk significance of SSCs in establishing performance goals. Significant risk impacts are documented in the corrective action program and assessed as appropriate.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.4.1, which verifies charging pump flow at the design discharge pressure, is a normal test of charging pump performance required by the ASME OM Code. The frequency for this surveillance is a Code requirement governed by the IST program. Such inservice testing detects component degradation and incipient failures.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.4.2 verifies the ability of the charging pumps which are NOT in Pull-To-Lock to automatically start on an actual or simulated actuation signal. The 36 month frequency is consistent with other Millstone Power Station Unit 2 actuation testing requirements and with standard industry practices and guidelines.
 
==REFERENCE:==
: 1. License Amendment 283
: 2. DCR M2-07-002, Replacement of the Unit 2 Charging Pumps Discharge Pulsation Dampeners MILLSTONE - UNIT 2                TRM 3/4 1-9                        LBDCR 16-MP2-014 March 29, 2017
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORIC ACID PUMPS - SHUTDOWN TECHNICAL REQUIREMENT 3.1.2.5    At least one boric acid pump shall be FUNCTIONAL if only the flow path through the boric acid pump in TECHNICAL REQUIREMENT 3.1.2.1.a is FUNCTIONAL.
APPLICABILITY:        MODES 5 and 6.
ACTION:
With no boric acid pump FUNCTIONAL as required to complete the flow path of TECHNICAL REQUIREMENT 3.1.2.1.a, suspend all operations involving CORE ALTERATIONS and positive reactivity additions that could cause introduction of coolant into the RCS with boron concentration less than required to meet Technical Specification 3.1.1.1 in MODE 5 or Technical Specification 3.9.1 in MODE 6 until at least one boric acid pump is restored to FUNCTIONAL status.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.5    One boric acid pump shall be demonstrated FUNCTIONAL by verifying the developed head of the boric acid pump at the flow test point is greater than or equal to the required developed head when tested in accordance with the Inservice Testing (IST) program.
BASES:
The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.
With the RCS temperature below 200&deg;F, one injection system is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor and the additional restrictions prohibiting CORE ALTERATIONS and operations that would dilute the RCS boron concentration by introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration as described in the Technical Specifications in the event the single injection system becomes nonfunctional. The MODES 5 and 6 ACTION requirement to suspend positive reactivity additions does not preclude completion of actions to establish a safe conservative plant condition, or to maintain or increase reactor vessel inventory provided the boron concentration of the makeup water source is greater than or equal to the boron concentration for the required SHUTDOWN MARGIN (SDM).
MILLSTONE - UNIT 2                TRM 3/4 1-10                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORIC ACID PUMPS - SHUTDOWN TECHNICAL SURVEILLANCE REQUIREMENTS TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.5, which verifies boric acid pump design flow, is a normal test of boric acid pump performance required by the ASME OM Code. A quarterly frequency for such tests is a Code requirement. Such inservice testing detects component degradation and incipient failures.
 
==REFERENCE:==
: 1. License Amendment 283
: 2. License Amendment 293 MILLSTONE - UNIT 2              TRM 3/4 1-11                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORIC ACID PUMPS - OPERATING TECHNICAL REQUIREMENT 3.1.2.6    The boric acid pump(s) in the boron injection flow path(s) required FUNCTIONAL pursuant to TECHNICAL REQUIREMENT 3.1.2.2.a shall be FUNCTIONAL if the flow path through the boric acid pump in TECHNICAL REQUIREMENT 3.1.2.2.a is FUNCTIONAL.
APPLICABILITY:        MODES 1, 2, 3 and 4.
ACTION:
With the boric acid pump(s) required for the boron injection flow path(s) pursuant to TECHNICAL REQUIREMENT 3.1.2.2.a nonfunctional, manage the risk impact in accordance with the requirements of 10CFR50.65(a)(4).
TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.6.1 The boric acid pump(s) shall be demonstrated FUNCTIONAL by verifying the developed head of each boric acid pump at the flow test point is greater than or equal to the required developed head when tested in accordance with the Inservice Testing (IST) program.
4.1.2.6.2 Two boric acid pumps shall be demonstrated FUNCTIONAL at least once per 36 months by verifying that each boric acid pump starts automatically on an actual or simulated actuation signal.
BASES:
The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.
With the RCS average temperature above 200&deg;F, a minimum of two separate and redundant boron injection flowpaths are provided to ensure single FUNCTIONAL capability in the event an assumed failure of a pump or valve renders one of the flowpaths nonfunctional. Redundant flow paths from the boric acid storage tanks are achieved through boric acid pumps, gravity feed lines and charging pumps. Redundant flow paths from the refueling water storage tank are achieved through charging pump flow path guaranteed by TECHNICAL REQUIREMENT 3.1.2.2 and the HPSI flow path guaranteed by Technical Specification 3.5.2 and 3.5.3.
MILLSTONE - UNIT 2                TRM 3/4 1-12                      LBDCR 16-MP2-014 March 29, 2017
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORIC ACID PUMPS - OPERATING TECHNICAL SURVEILLANCE REQUIREMENTS Paragraph (a)(4) of 10CFR50.65 Maintenance Rule requires that licensees assess and manage the increase in risk that may result from proposed maintenance activities, including out of service Structures, Systems, and Components (SSCs).
Management of risk involves consideration of incremental and aggregate impacts. The incremental risk increase is predominantly assessed using quantitative PRA methods, which measure the effect on core damage frequency and large early release frequency associated with the plant configuration. The risk increase is then managed in accordance with action thresholds defined by NUMARC 93-01. The aggregate impact is controlled by meeting Maintenance Rule requirements for establishing and meeting SSC performance criteria. These requirements include consideration of the risk significance of SSCs in establishing performance goals. Significant risk impacts are documented in the corrective action program and assessed as appropriate.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.6.1, which verifies boric acid pump developed head at the flow test point, is a normal test of boric acid pump performance required by the ASME OM Code. The frequency for this surveillance is a Code requirement governed by the IST Program. Such inservice testing detects component degradation and incipient failures.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.6.2 verifies the ability of the boric acid pumps to automatically start on an actual or simulated actuation signal. The 36 month frequency is consistent with other Millstone Power Station Unit 2 actuation testing requirements and with standard industry practices and guidelines.
 
==REFERENCE:==
: 1. License Amendment 283 MILLSTONE - UNIT 2                TRM 3/4 1-13                        LBDCR 16-MP2-014 March 29, 2017
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORATED WATER SOURCES - SHUTDOWN TECHNICAL REQUIREMENT 3.1.2.7    As a minimum, one of the following borated water sources shall be FUNCTIONAL:
: a. One boric acid storage tank with:
: 1. A concentration between 2.5 and 3.5 weight percent boric acid.
: 2. A minimum volume of 3750 gallons, and
: 3. A minimum boric acid storage tank temperature of 55&deg;F.
or      b. The refueling water storage tank with:
: 1. A minimum contained volume of 57,300 gallons,
: 2. A minimum boron concentration of 1720 ppm when in MODE 5,
: 3. A minimum boron concentration as defined in Technical Specification 3.9.1 when in MODE 6.
: 4. A minimum solution temperature of 35&deg;F.
APPLICABILITY:      MODES 5 and 6.
ACTION:
With no borated water sources FUNCTIONAL, suspend all operations involving CORE ALTERATIONS and positive reactivity additions that could cause introduction of coolant into the RCS with boron concentration less than required to meet Technical Specification 3.1.1.1 in MODE 5 or Technical Specification 3.9.1 in MODE 6 until at least one borated water source is restored to FUNCTIONAL status.
MILLSTONE - UNIT 2              TRM 3/4 1-14                      LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORATED WATER SOURCES - SHUTDOWN TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.7    The above required borated water source shall be demonstrated FUNCTIONAL:
: a. By performing the following as appropriate for the tank(s) being credited to satisfy this TRM requirement:
: 1.      Verify boron concentration of the BASTs at least once per 31 days and within 12 hours after each solution volume increase of > 1% of indicated tank volume.
: 2.      Verify boron concentration of the RWST at least once per 7 days.
: 3.      Verify water level of both BASTs and the RWST at least once per 7 days.
: b. At least once per 24 hours by verifying the RWST temperature when it is the source of borated water and the RWST ambient air temperature is
              <35&deg;F.
: c. At least once per 24 hours by verifying that the Boric Acid Storage Tank temperature is greater than 55&deg;F when it is the source of borated water.
BASES:
The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.
A minimum boron concentration of 1720 ppm is required in the RWST at all times in order to satisfy safety analysis assumptions for boron dilution incidents and other transients using the RWST as a borated water source as well as the analysis assumption to determine the boration requirement to ensure adequate SHUTDOWN MARGIN.
The boron capability required below 200&deg;F is based upon providing a SHUTDOWN MARGIN (SDM) within the limit specified in the CORE OPERATING LIMITS REPORT at 140&deg;F after xenon decay. This condition requires either 3750 gallons of 2.5% boric acid solution from the boric acid storage tanks or 57,300 gallons of 1720 ppm borated water from the refueling water storage tank.
The maximum boron concentration requirement (3.5%) and the minimum temperature requirement (55&deg;F) for the Boric Acid Storage Tank ensure that boron does not precipitate in the Boric Acid System. The daily surveillance requirement provides sufficient assurance that the temperature of the tank will be maintained higher than 55&deg;F at all times.
MILLSTONE - UNIT 2                TRM 3/4 1-15                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORATED WATER SOURCES - SHUTDOWN BASES:
A minimum boron concentration of 1720 ppm is required in the RWST at all times in order to satisfy safety analysis assumptions for boron dilution incidents and other transients using the RWST as a borated water source as well as the analysis assumption to determine the boration requirement to ensure adequate SHUTDOWN MARGIN.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.7.a verifies the boron concentration of the water and the water level of the tank. This assures the availability of the borated water source for boron dilution incidents and other transients using the RWST as a borated water source.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.7.b verifies the RWST temperature is greater than 35&deg;F when it is the source of borated water and the RWST ambient air temperature is less than 35&deg;F.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.7.c verifies the Boric Acid Storage Tank temperature is greater than 55&deg;F when it is the source of borated water.
This may be accomplished by verifying that the ambient air temperature in the vicinity of the BAST is greater than 55&deg;F.
 
==REFERENCE:==
: 1. License Amendment 283
: 2. License Amendment 293 MILLSTONE - UNIT 2                TRM 3/4 1-16                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES - OPERATING TECHNICAL REQUIREMENT 3.1.2.8    Both of the following borated water sources shall be FUNCTIONAL:
: a. At least one of the following Boric Acid Storage Tank(s) (BASTs) combinations:
: 1.      One boric acid storage tank, with the tank contents in accordance with Figure 3.1-1 and a minimum temperature of 55&deg;F, its associated gravity feed valve, and boric acid pump, or
: 2.      Two boric acid storage tanks, with the weighted average of the combined contents of the tanks in accordance with Figure 3.1-1 and a minimum temperature of 55&deg;F, their associated gravity feed valves, and boric acid pumps, or
: 3.      Two boric acid storage tanks, each with contents in accordance with Figure 3.1-1 and a minimum temperature of 55&deg;F, at least one gravity feed valve, and at least one boric acid pump.
and    b. The refueling water storage tank with:
: 1.      A minimum contained volume of 370,000 gallons of water,
: 2.      A minimum boron concentration of 1720 ppm,
: 3.      A minimum solution temperature of 50&deg;F when in MODES 1 and 2, and
: 4.      A minimum solution temperature of 35&deg;F when in MODES 3 and 4.
APPLICABILITY:        MODES 1, 2, 3 and 4.
ACTION:
With only one borated water source FUNCTIONAL, manage the risk impact in accordance with the requirements of 10CFR50.65(a)(4).
TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.8    Each borated water source shall be demonstrated FUNCTIONAL:
: a. By performing the following as appropriate for the tank(s) being credited to satisfy this TRM requirement:
MILLSTONE - UNIT 2                TRM 3/4 1-17                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES - OPERATING TECHNICAL SURVEILLANCE REQUIREMENTS
: 1. Verify boron concentration of the BASTs at least once per 31 days and within 12 hours after each solution volume increase of > 1% of indicated tank volume.
: 2. Verify boron concentration of the RWST at least once per 7 days.
: 3. Verify water level of both BASTs and the RWST at least once per 7 days.
: b. When in MODES 3 and 4, at least once per 24 hours by verifying the RWST temperature is 35&deg;F when the RWST ambient air temperature is
              <35&deg;F.
: c. When in MODES 1 and 2, at least once per 24 hours by verifying the RWST temperature is 50&deg;F when the RWST ambient air temperature is
              <50&deg;F.
: d. At least once per 24 hours by verifying that the boric acid storage tank temperatures are greater than 55&deg;F.
BASES:
The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.
The minimum boration capability is sufficient to provide a SHUTDOWN MARGIN within the limits specified in the CORE OPERATING LIMITS REPORT at all temperatures above 200&deg;F. The maximum boration capability requirement occurs at EOL from full power equilibrium xenon conditions and requires an equivalent of 4900 gallons of 3.5% boric acid solution from the boric acid storage tanks plus 15,000 gallons of 1720 ppm borated water from the refueling water storage tank. The refueling water storage tank can also be used alone by feed-and-bleed using well under the 370,000 gallons of 1720 ppm borated water required.
The requirement for a minimum contained volume of 370,000 gallons of borated water in the refueling water storage tank ensures the capability for borating the RCS to the desired level. The specified quantity of borated water is consistent with the ECCS requirements of Technical Specification 3.5.4. Therefore, the larger volume of borated water is specified here too.
MILLSTONE - UNIT 2                TRM 3/4 1-18                        LBDCR 14-MP2-015 September 24, 2014
 
TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES - OPERATING TECHNICAL SURVEILLANCE REQUIREMENTS The analysis to determine the boration requirements assumed that the Reactor Coolant System is borated concurrently with cooldown. In the limiting situation when letdown is not available, the cooldown is assumed to be initiated within 26 hours and cooldown to 220&deg;F, is completed in the next 28 hours.
A minimum boron concentration of 1720 ppm is required in the RWST at all times in order to satisfy safety analysis assumptions for boron dilution incidents and other transients using the RWST as a borated water source as well as the analysis assumption to determine the boration requirement to ensure adequate SHUTDOWN MARGIN.
Paragraph (a)(4) of 10CFR50.65 Maintenance Rule requires that licensees assess and manage the increase in risk that may result from proposed maintenance activities, including out of service Structures, Systems, and Components (SSCs).
Management of risk involves consideration of incremental and aggregate impacts. The incremental risk increase is predominantly assessed using quantitative PRA methods, which measure the effect on core damage frequency and large early release frequency associated with the plant configuration. The risk increase is then managed in accordance with action thresholds defined by NUMARC 93-01. The aggregate impact is controlled by meeting Maintenance Rule requirements for establishing and meeting SSC performance criteria. These requirements include consideration of the risk significance of SSCs in establishing performance goals. Significant risk impacts are documented in the corrective action program and assessed as appropriate.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.8.a verifies the boron concentration in each water source and the water level in each water source. This assures the availability of the borated water source for boron dilution incidents and other transients using the BAST and RWST as a borated water sources.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.8.b verifies the RWST temperature is greater than 35&deg;F when in MODES 3 and 4 and the RWST ambient air temperature is less than 35&deg;F.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.8.c verifies the RWST temperature is greater than 50&deg;F when in MODES 1 and 2 and the RWST ambient air temperature is less than 50&deg;F.
TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.8.d verifies the BAST temperature is greater than 55&deg;F. This may be accomplished by verifying that the ambient air temperature in the vicinity of the BAST is greater than 55&deg;F.
 
==REFERENCE:==
: 1. License Amendment 283 MILLSTONE - UNIT 2                TRM 3/4 1-19                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS FIGURE 3.1-1 MINIMUM VOLUME VS STORED BAST CONCENTRATION (WT% BORIC ACID) 8000 7900 7661 7450 Region of Acceptable Operation      PMM (BORON) in RWST 7000  6950 6850 6750 6455 6350 6200 1720 ppm 6000    5950          6000            6000 Minimum BAST Volume (Gallons) 5663 5600                                                1800 ppm 5450        5450 5200            5150                                1900 ppm 5000 4900                        4878        4900 4650        4600        4593      2000 ppm 4350        4350 4200 2100 ppm 4050        4050 4000 3750        3750        3750 2200 ppm Region of                                3450        3400 Unacceptable Operation                              3200      2300 ppm 3000 Stored BAST Concentration (wt% Boric Acid)
MILLSTONE - UNIT 2              TRM 3/4 1-20                  LBDCR 09-MP2-003 May 15, 2009
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTIVE INSTRUMENTATION TECHNICAL REQUIREMENT 3.3.1.1  In accordance with Technical Specification LCO 3.3.1.1, Reactor Protective Instrumentation.
APPLICABILITY:
In accordance with Technical Specification LCO 3.3.1.1.
ACTION:
In accordance with Technical Specification LCO 3.3.1.1.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.1.1.3 The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be demonstrated to be within its limit as listed in TRM Table 3.3-2, in accordance with the test frequency specified in TS SR 4.3.1.1.3.
BASES:
In accordance with Technical Specification Bases section 3/4.3.1.
 
==REFERENCE:==
: 1. CR M3-00-02659.
: 2. Technical Specification section 3/4.3.1 MILLSTONE - UNIT 2              TRM 3/4 3-1                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-2 Reactor Protective Instrumentation Response Times FUNCTIONAL              FUNCTIONAL Unit Description                      Response Time Unit No.
1                      Manual Reactor Trip                          2.0 seconds 2                      Power Level - High 2.a Neutron Flux power                    0.4 seconds 2.b Delta T Power              8.4 seconds# and 8.0 seconds##
3                  Reactor Coolant Flow - Low                      0.65 seconds 4                  Pressurizer Pressure - High                    0.90 seconds 5                Containment Pressure - High                      0.90 seconds 6              Steam Generator Pressure - Low                    0.90 seconds 7            Steam Generator Water Level - Low                    0.90 seconds 8                  Local power Density - High 8.a Neutron Flux Power                        0.40 seconds*
8.b Delta T Power                  8.4 seconds# and  8.0 seconds##
9        Thermal Margin/Low Pressure 9.a Pressurizer Pressure/Neutron Flux Power              0.90 seconds 9.b Delta T Power                              0.89 seconds# and  8.0 seconds##
10          Loss of Turbine - Hydraulic Fluid Pressure              Not Applicable
* Neutron detectors are exempt from response time testing. Response time of the neutron flux signal portion of the signal shall be measured from the detector output or input of first electronic component in channel.
# Response time includes contribution of RTDs
## RTD response time only. This value is equivalent to the time interval required for the RTD's output to achieve 63.2% of its total change when subjected to a step change in RTD temperature.
MILLSTONE - UNIT 2                TRM 3/4 3-2                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR TRIP SYSTEM INSTRUMENTATION PRESSURIZER HIGH PRESSURE CHANNELS TECHNICAL REQUIREMENT 3.3.1.1.1 All pressurizer high pressure reactor protection channels shall be FUNCTIONAL.
APPLICABILITY:
In accordance with Technical Specification LCO 3.3.1.1 Applicability.
ACTION:
Restore any nonfunctional pressurizer high pressure reactor protection channel to FUNCTIONAL status within 30 days of placing the channel in the tripped condition, or be in MODE 3 within the next 6 hours with the failed channel in the bypassed condition.
MILLSTONE - UNIT 2              TRM 3/4 3-3                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR TRIP SYSTEM INSTRUMENTATION PRESSURIZER HIGH PRESSURE CHANNELS TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.1.1.4 In accordance with Technical Specification LCO 3.3.1.1 Surveillance Requirements.
BASES:
Technical Specification 3.3.1.1, Instrumentation - Reactor Protective Instrumentation ACTION 2, requires an inoperable reactor protection channel to be placed in the tripped condition if not restored to the OPERABLE status within 48 hours. With a pressurizer high pressure channel in the tripped condition, the high failure of a second pressurizer pressure channel would initiate a reactor trip and open both pressurizer power operated relief valves (PORVs). Opening the pressurizer PORVs would result in an undesired loss of primary coolant. To minimize the risk of a loss of primary coolant associated with a second failure, a 30 day restriction on plant operation with a failed high pressurizer pressure channel in the tripped condition is necessary. If the channel is not restored to OPERABLE status the plant shall be shutdown to MODE 3, where this function is not required by Technical Specifications. After entering MODE 3, the failed channel shall be placed in the bypassed condition.
 
==REFERENCE:==
: 1. Condition Report M3-00-02659 MILLSTONE - UNIT 2                TRM 3/4 3-4                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.2 ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TECHNICAL REQUIREMENT 3.3.2.1    In accordance with Technical Specification LCO 3.3.2.1, Engineered Safety Feature Actuation System Instrumentation.
APPLICABILITY:
In accordance with Technical Specification LCO 3.3.2.1.
ACTION:
In accordance with Technical Specification LCO 3.3.2.1.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.2.1.3 The ENGINEERED SAFETY FEATURES RESPONSE TIME of each ESF function shall be demonstrated to be within the limit as listed in TRM Table 3.3-5, in accordance with the test frequency specified in TS SR 4.3.2.1.3.
BASES:
In accordance with Technical Specification Bases section 3/4.3.2.
 
==REFERENCE:==
: 1. CR M3-00-2659
: 2. Technical Specification section 3/4.3.2
: 3. NRC Generic Letter 96-01, Testing of Safety Related Logic Circuits MILLSTONE - UNIT 2              TRM 3/4 3-5                            LBDCR 07-MP2-010 October 5, 2009
 
Table 3.3-5 Engineered Safety Features Response Times Initiating Signal and Function          Response Time in Seconds    Equipment Tested
: 1. Manual
: a. SIAS Safety Injection (ECCS)                Not Applicable  Not Applicable Containment Isolation                  Not Applicable  Not Applicable Enclosure Building Filtration System    Not Applicable  Not Applicable
: b. CSAS Containment Spray                      Not Applicable  Not Applicable
: c. CIAS Containment Isolation          Not Applicable  Not Applicable
: d. SRAS Containment Sump Recirculation          Not Applicable  Not Applicable
: e. EBFAS Enclosure Building Filtration System Not Applicable    Not Applicable
: f. Auxiliary Feedwater Initiation          Not Applicable  Not Applicable
: g. Main Steam Isolation                    Not Applicable  Not Applicable
: 2. Pressurizer Pressure - Low
: a. Safety Injection (ECCS)
: 1) High Pressure Safety Injection        25.0*/10.0** See Table 3.3-5A
: 2) Low Pressure Safety Injection        45.0*/30.0** See Table 3.3-5B
: 3) Charging Pump                        35.0*/35.0** See Table 3.3-5C
: 4) Containment Air Recirculation System                              26.0*/15.0** See Table 3.3-5D
: b. Containment Isolation                    7.5          See Table 3.3-5E
: c. Enclosure Building Filtration System    45.0*/45.0** See Table 3.3-5F MILLSTONE - UNIT 2                TRM 3/4 3-6                          TRMCR 01-2-11 December 6, 2001
 
Table 3.3-5 Engineered Safety Features Response Times Initiating Signal and Function          Response Time in Seconds          Equipment Tested
: 3. Containment Pressure - High
: a. Safety Injection (ECCS)
: 1) High Pressure Safety Injection        25.0*/10.0**        See Table 3.3-5A
: 2) Low Pressure Safety Injection        45.0*/30.0**        See Table 3.3-5B
: 3) Charging Pumps                        35.0*/35.0**        See Table 3.3-5C
: 4) Containment Air Recirculation        26.0*/15.0**        See Table 3.3-5D System
: b. Containment Isolation                    7.5                See Table 3.3-5E
: c. Enclosure Building Filtration System    45.0*/45.00**      See Table 3.3-5F
: d. Main Steam Isolation                    6.9                See Table 3.3-5G
: e. Feedwater Isolation                      14                  See Table 3.3-5H
: 4. Containment Pressure -- High-High
: a. Containment Spray                      35.6*(1)/16.0**(1)  See Table 3.3-5I
: 5. DELETED
: 6. Steam Generator Pressure - Low
: a. Main Steam Isolation                    6.9                See Table 3.3-5G
: b. Feedwater Isolation                      14                  See Table 3.3-5H
: 7. Refueling Water Storage Tank - Low
: a. Containment Sump                        120                See Table 3.3-5K Recirculation
: 8. Steam Generator Level - Low
: a. Auxiliary Feedwater System              240/ > 180          See Table 3.3-5L
: b. Steam Generator Blooding                  10 Isolation MILLSTONE - UNIT 2                TRM 3/4 3-7                              LBDCR 02-2-12 September 19, 2002
 
Table 3.3-5 Engineered Safety Features Response Times Table Notation
* Diesel generator starting and sequence loading delays included.
**    Diesel generator starting and sequence loading delays not included.
(1)  Header fill time not included.
MILLSTONE - UNIT 2              TRM 3/4 3-8                          TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5A High Pressure Safety Injection TECHNICAL            ESF Actuation                  Tested                Equipment REQUIREMENT                Signal                  Equipment                  Action 2a1, 3a1                SIAS            P41A                                Start 2a1, 3a1                SIAS            P41B                                Start 2a1, 3a1                SIAS            P41C                                Start 2a1, 3a1                SIAS            2-SI-616                            Open 2a1, 3a1                SIAS            2-SI-617                            Open 2a1, 3a1                SIAS            2-SI-626                            Open 2a1, 3a1                SIAS            2-SI-627                            Open 2a1, 3a1                SIAS            2-SI-636                            Open 2a1, 3a1                SIAS            2-SI-637                            Open 2a1, 3a1                SIAS            2-SI-646                            Open 2a1, 3a1                SIAS            2-SI-647                            Open 2a1, 3a1                SIAS            2-SI-618                            Close 2a1, 3a1                SIAS            2-SI-628                            Close 2a1, 3a1                SIAS            2-SI-638                            Close 2a1, 3a1                SIAS            2-SI-648                            Close Notes for Table 3.3-5A:
: 1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
: 2. HPSI Pumps - The pump under test is aligned with its recirculation valves open and its facility stop valve closed. Timing for the component actuation portion of the response time begins with the pump start signal and ends when the required Technical Specification pump PSID is developed.
: 3. HPSI Valves - Timing for the component actuation portion of the response time begins with the valve open (or close) signal and ends when the control board valve position lamps indicate full travel.
MILLSTONE - UNIT 2                TRM 3/4 3-9                                LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5B Low Pressure Safety Injection TECHNICAL            ESF Actuation            Equipment Tested              Equipment REQUIREMENT                Signal                                                Action 2a2, 3a2                SIAS            P42A                                  Start 2a2, 3a2                SIAS            P42B                                  Start 2a2, 3a2                SIAS            2-SI-615                            Open 2a2, 3a2                SIAS            2-SI-625                            Open 2a2, 3a2                SIAS            2-SI-635                            Open 2a2, 3a2                SIAS            2-SI-645                            Open Notes for Table 3.3-5B:
: 1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
: 2. LPSI Pumps - The pump under test is aligned with its recirculation valves open and its facility stop valve closed. Timing for the component actuation portion of the response time begins with the pump start signal and ends when the required Technical Specification pump PSID is developed.
: 3. LPSI Valves - Timing for the component actuation portion of the response time begins with the valve open (or close) signal and ends when the control board valve position lamps indicate full travel.
MILLSTONE - UNIT 2                TRM 3/4 3-10                              LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5C Charging Pump TECHNICAL          ESF Actuation Signal            Equipment Tested                  Equipment REQUIREMENT                                                                              Action 2a3, 3a3 note 6              SIAS              P18A                                      Start 2a3, 3a3 note 6              SIAS              P18B                                      Start 2a3, 3a3 note 6              SIAS              P18C                                      Start 2a3, 3a3 note 3, 4          SIAS P19A            Start 2a3, 3a3 note 3, 4          SIAS P19B            Start 2a3, 3a3 note 3, 5            SIAS              2-CH-501                                  Close 2a3, 3a3 note 3, 5            SIAS              2-CH-510                                  Close 2a3, 3a3 note 3, 5            SIAS              2-CH-511                                  Close 2a3, 3a3 note 3, 5            SIAS              2-CH-512                                  Close 2a3, 3a3 note 3, 5            SIAS              2-CH-508                                  Open 2a3, 3a3 note 3, 5            SIAS              2-CH-509                                  Open 2a3, 3a3 note 3, 5            SIAS              2-CH-514                                  Open Notes for Table 3.3-5C:
: 1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
: 2. Charging Pumps - Initially, one charging pump is running. The pump under test is initially off.
Timing for the component actuation portion of the response time begins with the pump start signal and ends when charging header flow has increased by the required GPM.
MILLSTONE - UNIT 2                TRM 3/4 3-11                              LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5C Charging Pump
: 3. Response time testing of this component is outside the scope of Technical Specification Surveillance 4.3.2.1.3. However, verification of the response time of this component is necessary to ensure that the equipment is capable of supporting the safety function within the response times assumed in the accident analyses. If the overall response time of this component does not meet the required response time, FUNCTIONALITY and Reportability Determinations should be performed to ensure the accident analyses assumptions are met.
: 4. Boric acid pumps - Timing for the component actuation portion of the response time begins with the pump start signal and ends when the required Technical Specification pump PSID is developed.
: 5. The component actuation time of this component is tested under the IST program. The acceptance criteria for the component actuation time is established conservatively, such that the overall response time criteria will be met if the component actuation time is met.
: 6. Any charging pump with its control switch positioned to Pull-To-Lock (PTL) will be precluded from automatic operation under both normal and abnormal (e.g., SIAS) signal.
MILLSTONE - UNIT 2                TRM 3/4 3-12                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5D Containment Air Recirculation System TECHNICAL            ESF Actuation              Equipment Tested            Equipment Action REQUIREMENT                Signal 2a4, 3a4                SIAS            CAR F14A                          Start Slow Speed 2a4, 3a4                SIAS            CAR F14B                          Start Slow Speed 2a4, 3a4                SIAS            CAR F14C                          Start Slow Speed 2a4, 3a4                SIAS            CAR F14D                          Start Slow Speed 2a4, 3a4 note 3, 4            SIAS            2-RB-210 (HV-6739)                      Close 2a4, 3a4 note 3, 4            SIAS            2-RB-28.3A (HV-6080)                    Open 2a4, 3a4 note 3, 4            SIAS            2-RB-28.3B (HV-6084)                    Open 2a4, 3a4 note 3, 4            SIAS            2-RB-28.3C (HV-6088)                    Open 2a4, 3a4 note 3, 4            SIAS            2-RB-28.3D (HV-6092)                    Open 2a4, 3a4 note 3, 4            SIAS            2-RB-8.1A (HV-6315)                    Close 2a4, 3a4 note 3, 4            SIAS            2-RB-8.1B (HV-6316)                    Close 2a4, 3a4 note 3, 4            SIAS            2-RB-68.1A (HV-6731)                    Open 2a4, 3a4 note 3, 4            SIAS            2-RB-68.1B (HV-6735)                    Open 2a4, 3a4 note 3, 4            CIAS            2-RB-402                                Close 2a4, 3a4 note 3, 4            SIAS            2-SW-8.1A (HV-6308)                    Open 2a4, 3a4 note 3, 4            SIAS            2-SW-8.1B (HV-6307)                    Open 2a4, 3a4 note 3, 4            SIAS            2-SW-8.1C (HV-6706)                    Open 2a4, 3a4 note 3, 4            SIAS            2-SW-3.2A (HV-6438)                    Close 2a4, 3a4 note 3, 4            SIAS            2-SW-3.2B (HV-6439)                    Close Notes for Table 3.3-5D:
: 1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
: 2. The CAR fans are individually started and stopped in slow speed. Timing for the component actuation portion of the response time begins with the fan start signal and ends when the CAR fan motor current decays to the normal steady state, slow speed motor current (Amperes) following the initial motor in-rush current.
MILLSTONE - UNIT 2                TRM 3/4 3-13                              LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5D CONTAINMENT AIR RECIRCULATION SYSTEM
: 3. Response time testing of this component is outside the scope of Technical Specification Surveillance 4.3.2.1.3. However, verification of the response time of this component is necessary to ensure that the equipment is capable of supporting the safety function within the response times assumed in the accident analyses. If the overall response time of this component does not meet the required response time, FUNCTIONALITY and Reportability Determinations should be performed to ensure the accident analyses assumptions are met.
: 4. The component actuation time of this component is tested under the IST program. The acceptance criteria for the component actuation time is established conservatively, such that the overall response time criteria will be met if the component actuation time is met.
MILLSTONE - UNIT 2                TRM 3/4 3-14                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5E Containment Isolation TECHNICAL      ESF Actuation        Equipment Tested  Equipment REQUIREMENT        Signal                                Action 2b, 3b          CIAS        2-AC-12 (HV-8122)        Close 2b, 3b          CIAS        2-AC-15 (HV-8124)        Close 2b, 3b          CIAS        2-AC-20 (HV-8656)        Close 2b, 3b          CIAS        2-AC-47 (HV-8121)        Close 2b, 3b          CIAS        2-CH-089 (HV-2525)      Close 2b, 3b          CIAS        2-CH-198                Close 2b, 3b          CIAS        2-CH-505                Close 2b, 3b          CIAS        2-CH-506                Close 2b, 3b          CIAS        2-CH-516                Close 2b, 3b          CIAS        2-EB-100 (HV-8378)      Close 2b, 3b          CIAS        2-EB-88 (HV-8150)        Close 2b, 3b          CIAS        2-EB-89 (HV-8151)        Close 2b, 3b          CIAS        2-EB-91 (HV-8380)        Close 2b, 3b          CIAS        2-EB-92 (HV-8379)        Close 2b, 3b          CIAS        2-EB-99 (HV-8377)        Close 2b, 3b          CIAS        2-GR-11.1 (HV-9125)      Close 2b, 3b          CIAS        2-GR-11.2 (HV-9126)      Close 2b, 3b          CIAS        2-LRR-43.1 (HV-9015)    Close 2b, 3b          CIAS        2-LRR-43.2 (HV-9016)    Close 2b, 3b          CIAS        2-LRR-61.1 (HV-9230)    Close 2b, 3b          CIAS        2-MS-191A (HV-4250)      Close 2b, 3b          CIAS        2-MS-191B (HV-4251)      Close 2b, 3b          CIAS        2-MS-220A (HV-4246)      Close 2b, 3b          CIAS        2-MS-220B (HV-4248)      Close 2b, 3b          CIAS        2-PMW-43 (HV-7311)      Close 2b, 3b          CIAS        2-RC-001 (HV-1064)      Close 2b, 3b          CIAS        2-RC-002 (HV-1062)      Close 2b, 3b          CIAS        2-RC-003 (HV-1060)      Close 2b, 3b          CIAS        2-RC-45 (HV-7690)        Close 2b, 3b          CIAS        2-SI-312 (HV-7312)      Close 2b, 3b          CIAS        2-SSP-16.1 (HV-9151)    Close 2b, 3b          CIAS        2-SSP-16.2 (HV-9150)    Close MILLSTONE - UNIT 2        TRM 3/4 3-15                LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5E CONTAINMENT ISOLATION Notes for Table 3.3-5E:
: 1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
: 2. Containment Isolation Valves - Timing for the component actuation portion of the response time begins with the valve close signal and ends when the control board valve position lamps indicate full travel.
MILLSTONE - UNIT 2                TRM 3/4 3-16                                    TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5F Enclosure Building Filtration The EBFAS fan being tested is aligned with its suction damper and header isolation damper open.
Timing begins with a fan start signal and ends when EBFAS train D/P is stable.
TECHNICAL          ESF Actuation            Equipment Tested              Equipment REQUIREMENT              Signal                                                Action 2c, 3c              EBFAS            F25A                                  Start 2c, 3c              EBFAS            F25B                                  Start Notes for Table 3.3-5F:
: 1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/
differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
: 2. The EBFAS fan under tested is aligned with its suction damper and header isolation damper open. Timing for the component actuation portion of the response time begins with the fan start signal and ends when EBFAS train D/P is stable.
MILLSTONE - UNIT 2                TRM 3/4 3-17                              LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5G Main Steam Isolation TECHNICAL          ESF Actuation              Equipment Tested              Equipment REQUIREMENT              Signal                                                Action 3d, 6a                MSI            MSIV HV-4217A                        Close (MS-64A) 3d, 6a                MSI            MSIV HV-4217B                        Close (MS-64A) 3d, 6a                MSI            MSIV HV-4221A                        Close (MS-64B) 3d, 6a                MSI            MSIV HV-4221B                        Close (MS-64B)
Notes for Table 3.3-5G:
: 1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
: 2. The MSIV being tested is aligned open with its bypass valve open. Timing for the component actuation portion of the response time begins with the valve close signal and ends when the MSIV indicates closed.
MILLSTONE - UNIT 2                TRM 3/4 3-18                              LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5H Feedwater Isolation TECHNICAL          ESF Actuation              Equipment Tested              Equipment REQUIREMENT              Signal                                                Action 3e, 6b                MSI            2-FW-38A (HV-5245)                    Close 3e, 6b                MSI            2-FW-38B (HV-5247)                    Close 3e, 6b                MSI            2-FW-41A (HV-5215)                    Close 3e, 6b                MSI            2-FW-41B (HV-5216)                    Close 3e, 6b                MSI            2-FW-42A (HV-5263)                    Close 3e, 6b                MSI            2-FW-42B (HV-5264 )                  Close 3e, 6b                MSI            2-FW-51A (HV-5268)                    Close 3e, 6b                MSI            2-FW-51B (HV-5269)                    Close 3e, 6b                MSI            2-MS-265B (HV-4193)                  Close 3e, 6b                MSI            2-MS-266B (HV-4209)                  Close 3e, 6b                MSI            SGFP Turb H5A                        Stop 3e, 6b                MSI            SGFP Turb H5B                        Stop Notes for Table 3.3-5H:
: 1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
MILLSTONE - UNIT 2                TRM 3/4 3-19                              LBDCR 11-MP2-008 June 3, 2011
 
TECHNICAL REQUIREMENTS Table 3.3-5I Containment Spray TECHNICAL          ESF Actuation              Equipment Tested              Equipment REQUIREMENT              Signal                                                Action 4a                CSAS            CS P43A                              Start 4a                CSAS            CS P43B                              Start 4a                CSAS            2-CS-4.1A (HV-3021)                  Open 4a                CSAS            2-CS-4.1B (HV-3022)                  Open Notes for Table 3.3-5I:
: 1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
: 2. CS Pumps - The pump being tested is aligned with its minimum flow recirculation valves open. If Shutdown Cooling (SDC) is in operation, the CS header isolation valve is closed. If SDC is not in operation, the CS pump discharge valve is closed. Timing for the component actuation portion of the response time begins with the pump start signal and ends when the required pump differential pressure (psid) is established and stable.
: 3. CS Valves - Timing for the component actuation portion of the response time begins with the valve open signal and ends when the control board valve position lamps indicate full travel.
MILLSTONE - UNIT 2                TRM 3/4 3-20                              LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5J Deleted MILLSTONE - UNIT 2    TRM 3/4 3-21          TRMCR 02-2-12 September 19, 2002
 
TECHNICAL REQUIREMENTS Table 3.3-5K Containment Sump Recirculation TECHNICAL          ESF Actuation              Equipment Tested              Equipment REQUIREMENT              Signal                                                Action 7a                SRAS            2-CS-16.1A (HV-3008)                  Open 7a                SRAS            2-CS-16.1B (HV-3009)                  Open Notes for Table 3.3-5K:
: 1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
: 2. Containment Sump Outlet Isolation Valves - Timing for the component actuation portion of the response time begins with the valve open signal and ends when the control board valve position lamps indicate full travel.
MILLSTONE - UNIT 2                TRM 3/4 3-22                              LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5L Auxiliary Feedwater System TECHNICAL          ESF Actuation              Equipment Tested              Equipment REQUIREMENT              Signal                                                Action 8a                AFAIS            2-FW-43A (HV-5276)                    Open 8a                AFAIS            2-FW-43B (HV-5279)                    Open 8a                AFAIS            AFW P9A                              Start 8a                AFAIS            AFW P9B                              Start Notes for Table 3.3-5L:
: 1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
: 2. The AFW pump being tested is aligned for recirculation. Timing for the component actuation portion of the response time test begins with the start logic satisfied and ends when the aux feedwater pump develops the required differential pressure and valves HV-5276/FW-43A (HV-5279/FW-43B) are open.
MILLSTONE - UNIT 2                TRM 3/4 3-23                              LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested The following components receive ESF Actuation Signals, but do not affect the response time of the ESF functions listed in Table 3.3-5. Therefore, the components listed below are not periodically time response tested SF Actuation        Equipment        Equipment                                              Basis Signal            Not Tested          Action SIAS        2-CH-196                  Close    The timing for primary make-up water isolation does not affect the charging volumetric flow function.
SIAS        2-CH-515                  Close    Timing for let down isolation does not affect the charging function.
SIAS        2-CHW-11 (HV-8847)        Close    The timing for closure of this chilled water valve is not critical to establishing the safety function assumed in the accident analysis.
SIAS        2-CHW-12 (HV-8854)        Close    The timing for closure of this chilled water valve is not critical to establishing the safety function assumed in the accident analysis.
SIAS        2-CHW-13 (HV-8850)        Close    The timing for closure of this chilled water valve is not critical to establishing the safety function assumed in the accident analysis.
SIAS        2-CHW-14 (HV-8855)        Close    The timing for closure of this chilled water valve is not critical to establishing the safety function assumed in the accident analysis.
SIAS        2-CHW-3 (HV-8846)          Open    The timing for closure of this chilled water valve is not critical to establishing the safety function assumed in the accident analysis.
SIAS        2-CHW-33 (HV-8853)        Open    The timing for closure of this chilled water valve is not critical to establishing the safety function assumed in the accident analysis.
SIAS        2-SI- 634                  Open    The SIT Valves are disabled in the open position during heat up.
SIAS        2-SI-614                  Open    The SIT Valves are disabled in the open position during heat up.
SIAS        2-SI-624                  Open    The SIT Valves are disabled in the open position during heat up.
SIAS        2-SI-644                  Open    The SIT Valves are disabled in the open position during heat up.
SIAS        F112A                    Inhibit  The timing of the inhibit of Battery Room Vent Fan A does not impact the initiation of the safety injection function.
MILLSTONE - UNIT 2                                    TRM 3/4 3-24                                                  TRMCR 01-2-6 May 24, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested SIAS    F112B        Inhibit  The timing of the inhibit of Battery Room Vent Fan B does not impact the initiation of the safety injection function.
SIAS    F13A          Inhibit  CEDM cooling fans do not support completion of the safety injection function.
SIAS    F13B          Inhibit  CEDM cooling fans do not support completion of the safety injection function.
SIAS    F13C          Inhibit  CEDM cooling fans do not support completion of the safety injection function.
SIAS    F15A          Start    The response time for the start of the ESF room recirculation fans is not critical to the safety injection function.
SIAS    F15B          Start    The response time for start of the ESF room recirculation fans is not critical to the safety injection function.
SIAS    F54A          Start    The response time for start of the DC vital switchgear room cooling fans is not critical to the safety injection function.
SIAS    F54B          Start    The response time for start of the DC vital switchgear room cooling fans is not critical to the safety injection function.
SIAS    H7A            Start    The diesel generators are tested per the Tech Specs. The diesel starting and load sequencing time is included in the ESF Response Time when required.
SIAS    H7B            Start    The diesel generators are tested per the Tech Specs. The diesel starting and load sequencing time is included in the ESF Response Time when required.
MILLSTONE - UNIT 2                      TRM 3/4 3-25                                            TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested SIAS            P5A    Start  The SW pumps are not ESF equipment. It is impractical to response time test the component actuation time for these pumps. This is considered acceptable because the component actuation time (i.e., motor and pump acceleration time) is small compared with the time for signal processing, ESAS actuation, and diesel starting and load sequencing. The time for signal processing, ESAS actuation, and diesel starting and load sequencing are response time tested and the acceptance criteria are set consistent with the response time assumed in the accident analysis, including an allowance for motor and pump acceleration time.
Periodic surveillance testing and the IST will detect any changes in the performance characteristics of the pump.
SIAS            P5B    Start  The SW pumps are not ESF equipment. It is impractical to response time test the component actuation time for these pumps. This is considered acceptable because the component actuation time (i.e., motor and pump acceleration time) is small compared with the time for signal processing, ESAS actuation, and diesel starting and load sequencing. The time for signal processing, ESAS actuation, and diesel starting and load sequencing are response time tested and the acceptance criteria are set consistent with the response time assumed in the accident analysis, including an allowance for motor and pump acceleration time.
Periodic surveillance testing and the IST will detect any changes in the performance characteristics of the pump.
MILLSTONE - UNIT 2                  TRM 3/4 3-26                                                TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested SIAS    P5C          Start  The SW pumps are not ESF equipment. It is impractical to response time test the component actuation time for these pumps. This is considered acceptable because the component actuation time (i.e., motor and pump acceleration time) is small compared with the time for signal processing, ESAS actuation, and diesel starting and load sequencing. The time for signal processing, ESAS actuation, and diesel starting and load sequencing are response time tested and the acceptance criteria are set consistent with the response time assumed in the accident analysis, including an allowance for motor and pump acceleration time.
Periodic surveillance testing and the IST will detect any changes in the performance characteristics of the pump.
SIAS    P11A          Start  The RBCCW pumps are not ESF equipment. It is impractical to response time test the component actuation time for these pumps. This is considered acceptable because the component actuation time (i.e., motor and pump acceleration time) is small compared with the time for signal processing, ESAS actuation, and diesel starting and load sequencing. The time for signal processing, ESAS actuation, and diesel starting and load sequencing are response time tested and the acceptance criteria are set consistent with the response time assumed in the accident analysis, including an allowance for motor and pump acceleration time. Periodic surveillance testing and the IST will detect any changes in the performance characteristics of the pump.
MILLSTONE - UNIT 2                  TRM 3/4 3-27                                              TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested SIAS    P11B          Start  The RBCCW pumps are not ESF equipment. It is impractical to response time test the component actuation time for these pumps. This is considered acceptable because the component actuation time (i.e., motor and pump acceleration time) is small compared with the time for signal processing, ESAS actuation, and diesel starting and load sequencing. The time for signal processing, ESAS actuation, and diesel starting and load sequencing are response time tested and the acceptance criteria are set consistent with the response time assumed in the accident analysis, including an allowance for motor and pump acceleration time. Periodic surveillance testing and the IST will detect any changes in the performance characteristics of the pump.
SIAS    P11C          Start  The RBCCW pumps are not ESF equipment. It is impractical to response time test the component actuation time for these pumps. This is considered acceptable because the component actuation time (i.e., motor and pump acceleration time) is small compared with the time for signal processing, ESAS actuation, and diesel starting and load sequencing. The time for signal processing, ESAS actuation, and diesel starting and load sequencing are response time tested and the acceptance criteria are set consistent with the response time assumed in the accident analysis, including an allowance for motor and pump acceleration time. Periodic surveillance testing and the IST will detect any changes in the performance characteristics of the pump.
SIAS    P122A        Start  The timing for start of the vital switchgear chilled water pumps is not critical to establishing the safety function assumed in the accident analysis.
SIAS    P122B        Start  The timing for start of the vital switchgear chilled water pumps is not critical to establishing the safety function assumed in the accident analysis.
SIAS    X169A        Start  The timing for start of the DC Swgr Room Chillers is not critical to establishing the safety function assumed in the accident analysis.
SIAS    X169B        Start  The timing for start of the DC Swgr Room Chillers is not critical to establishing the safety function assumed in the accident analysis.
MILLSTONE - UNIT 2                  TRM 3/4 3-28                                                TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested CIAS    2-AC-1 (HV-8050)    Close  Enclosure building damper, not a containment isolation valve. FUNCTIONAL testing verifies that the damper goes to the required position. The component actuation time is not critical to the accident analysis assumption. Therefore response time testing is not required.
CIAS    2-AC-3 (HV-8081)    Open    Enclosure building damper, not a containment isolation valve. FUNCTIONAL testing verifies that the damper goes to the required position. The component actuation time is not critical to the accident analysis assumption. Therefore response time testing is not required.
CIAS    2-AC-8 (HV-8127)    Open    Enclosure building damper, not a containment isolation valve. FUNCTIONAL testing verifies that the damper goes to the required position. The component actuation time is not critical to the accident analysis assumption. Therefore response time testing is not required.
CIAS    2-AC-11 (HV-8128)    Close  Enclosure building damper, not a containment isolation valve. FUNCTIONAL testing verifies that the damper goes to the required position. The component actuation time is not critical to the accident analysis assumption. Therefore response time testing is not required.
CIAS    2-AC-527 (HV-        Close  This valve isolates Radiation Monitor RM-8262 to prevent leakage from the 8262AB1)                    radiation monitors when the containment isolation valves in the sample lines are re-opened manually to align the hydrogen analyzers and PASS after an accident. This valve is subject to the leak requirements of Appendix J and ISI/
IST requirements. The timing for closure for this valve is not critical to the accident analysis assumptions regarding containment isolation. The function of this valve is to protect the radiation monitor after the containment isolation valves have performed their functions and are opened manually to provide flow to the H2 analyzer and for PASS MILLSTONE - UNIT 2                          TRM 3/4 3-29                                            LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested CIAS    2-AC-528 (HV-    Close  This valve isolates Radiation Monitor RM-8262 to prevent leakage from the 8262AB2)                radiation monitors when the containment isolation valves in the sample lines are re-opened manually to align the hydrogen analyzers and PASS after an accident. This valve is subject to the leak requirements of Appendix J and ISI/
IST requirements. The timing for closure for this valve is not critical to the accident analysis assumptions regarding containment isolation. The function of this valve is to protect the radiation monitor after the containment isolation valves have performed their functions and are opened manually to provide flow to the H2 analyzer and for PASS CIAS    2-AC-529 (HV-    Close  This valve isolates Radiation Monitor RM-8123 to prevent leakage from the 8123AB1)                radiation monitors when the containment isolation valves in the sample lines are re-opened manually to align the hydrogen analyzers and PASS after an accident. This valve is subject to the leak requirements of Appendix J and ISI/
IST requirements. The timing for closure for this valve is not critical to the accident analysis assumptions regarding containment isolation. The function of this valve is to protect the radiation monitor after the containment isolation valves have performed their functions and are opened manually to provide flow to the H2 analyzer and for PASS CIAS    2-AC-530 (HV-    Close  This valve isolates Radiation Monitor RM-8123 to prevent leakage from the 8123AB2)                radiation monitors when the containment isolation valves in the sample lines are re-opened manually to align the hydrogen analyzers and PASS after an accident. This valve is subject to the leak requirements of Appendix J and ISI/
IST requirements. The timing for closure for this valve is not critical to the accident analysis assumptions regarding containment isolation. The function of this valve is to protect the radiation monitor after the containment isolation valves have performed their functions and are opened manually to provide flow to the H2 analyzer and for PASS MILLSTONE - UNIT 2                      TRM 3/4 3-30                                                TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested CIAS    F23                  Stop    The containment PURGE supply fan does not perform a containment isolation function. The response time for stopping the fan on a CIAS is not critical to the safety function assumed in the accident analysis.
CIAS    F39A                Stop    The containment radiation monitor fan does not perform a containment isolation function. The response time for stopping the fan on a CIAS is not critical to the safety function assumed in the accident analysis.
CIAS    F39B                Stop    The containment radiation monitor fan does not perform a containment isolation function. The response time for stopping the fan on a CIAS is not critical to the safety function assumed in the accident analysis.
CIAS    P33A                Stop    Containment sump pumps are stopped on a CIAS for equipment protection. The time it takes to stop the pumps does not effect the completion of the containment isolation function.
CIAS    P33B                Stop    Containment sump pumps are stopped on a CIAS for equipment protection. The time it takes to stop the pumps does not effect the completion of the containment isolation function.
EBFAS    2-EB-40 (HV-8063)    Open    The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-EB-41 (HV-8070)    Open    The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-EB-42 (HV-8073)    Open    The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-EB-50 (HV-8153)    Open    The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-EB-51 (HV-8074)    Open    The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
MILLSTONE - UNIT 2                          TRM 3/4 3-31                                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested EBFAS    2-EB-52 (HV-8079)    Open    The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-EB-55 (HV-8654)    Close  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-EB-56 (HV-8695)    Close  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-EB-60 (HV-8143)    Close  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-EB-61 (HV-8062)    Close  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-EB-72 (HV-8650)    Close  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-EB-73 (HV-8651)    Close  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-HV-106 (HV-8133)    Close    The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-HV-107 (HV-8247)    Close    The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-HV-116 (HV-8249)    Close  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
MILLSTONE - UNIT 2                          TRM 3/4 3-32                                          TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested EBFAS    2-HV-117 (HV-8248)    Close  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-HV-202 (HV-8361)    Close  Control room isolation damper. The current TRM requirements do not include a response time for this function. Condition Report, CR M2-99-0282 was issued to investigate the need for response time testing of this component in accordance with the assumptions in the radiological accident analysis.
EBFAS    2-HV-207 (HV-8002)    Close  Control room isolation damper. The current TRM requirements do not include a response time for this function. Condition Report, CR M2-99-0282 was issued to investigate the need for response time testing of this component in accordance with the assumptions in the radiological accident analysis.
EBFAS    2-HV-208 (HV-8003B)    Close  Control room isolation damper. The current TRM requirements do not include a response time for this function. Condition Report, CR M2-99-0282 was issued to investigate the need for response time testing of this component in accordance with the assumptions in the radiological accident analysis.
EBFAS    2-HV-210 (HV-8005)    Open    The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. This damper is disable in the open position Therefore, individual component time response testing is not required.
EBFAS    2-HV-211 (HV-8004)    Close  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-HV-212A (HV-8006)    Open    The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    2-HV-212B (HV-8007)    Open    The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
MILLSTONE - UNIT 2                            TRM 3/4 3-33                                            TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested EBFAS    2-HV-495              Close  Control room isolation damper. The current TRM requirements do not include a response time for this function. Condition Report, CR M2-99-0282 was issued to investigate the need for response time testing of this component in accordance with the assumptions in the radiological accident analysis.
EBFAS    2-HV-496              Close  Control room isolation damper. The current TRM requirements do not include a response time for this function. Condition Report, CR M2-99-0282 was issued to investigate the need for response time testing of this component in accordance with the assumptions in the radiological accident analysis.
EBFAS    2-HV-497              Close  Control room isolation damper. The current TRM requirements do not include a response time for this function. Condition Report, CR M2-99-0282 was issued to investigate the need for response time testing of this component in accordance with the assumptions in the radiological accident analysis.
EBFAS    F32A                  Start  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    F32B                  Start  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    X61A                  Start  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
EBFAS    X61B                  Start  The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.
MSIAS    2-MS-65A (HV-4218)    Close  The MSIV bypass valve is normally closed. It is only opened for a short time to equalize the pressure across the MSIV during plant start-up. Therefore response time testing is not required.
MILLSTONE - UNIT 2                          TRM 3/4 3-34                                            TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested MSIAS    2-MS-65B (HV-4222)    Close  The MSIV bypass valve is normally closed. It is only opened for a short time to equalize the pressure across the MSIV during plant start-up. Therefore response time testing is not required.
SRAS    2-RB-13.1A (HV-      Open    This RBCCW valve opens on an SRAS to direct RBCCW flow to the shutdown 6050)                        cooling heat exchanger. FUNCTIONAL testing of this valve is adequate to demonstrate that the safety function of this valve is met. Therefore, response time testing is not required.
SRAS    2-RB-13.1B (HV-      Open    This RBCCW valve opens on an SRAS to direct RBCCW flow to the shutdown 6055)                        cooling heat exchanger. FUNCTIONAL testing of this valve is adequate to demonstrate that the safety function of this valve is met. Therefore, response time testing is not required.
SRAS    2-SI-659              Close  Closure of the RWST minflow valves prevents highly radioactive water from being sent to the RWST following an SRAS. FUNCTIONAL testing of this valve is adequate to demonstrate that the safety function of this valve is met.
Therefore, response time testing is not required.
SRAS    2-SI-660              Close  Closure of the RWST minflow valves prevents highly radioactive water from being sent to the RWST following an SRAS. FUNCTIONAL testing of this valve is adequate to demonstrate that the safety function of this valve is met.
Therefore, response time testing is not required.
SRAS    P42A                  Stop  LPSI pumps, P42A and P42B are not time response tested because a failure of the pump to trip within the required SRAS response time would be considered a equipment failure issue as opposed to a time response issue.
SRAS    P42B                  Stop  LPSI pumps, P42A and P42B are not time response tested because a failure of the pump to trip within the required SRAS response time would be considered a equipment failure issue as opposed to a time response issue.
LOAD SHED  52-A302            Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
MILLSTONE - UNIT 2                          TRM 3/4 3-35                                            LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested LOAD SHED  52-A304    Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  52-A312    Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  52-A401    Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  52-A410    Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  52-A411    Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  52-A505    Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  L105        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  L106        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  LO46A      Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  LO46B L    Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
MILLSTONE - UNIT 2                  TRM 3/4 3-36                                              TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested LOAD SHED  P11A        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P11B        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P11C        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P41A        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P41B        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P41C        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P42A        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P42B        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P43A        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P43B        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
MILLSTONE - UNIT 2                  TRM 3/4 3-37                                              TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested LOAD SHED  P5A        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P5B        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P5C        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P98        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
LOAD SHED  P9A        Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.
AEAS    2-EB-40      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-EB-41      Open    The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-EB-42      Open    The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-EB-50      Close    The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-EB-51      Open    The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-EB-52      Open    The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-EB-55      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-EB-56      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation MILLSTONE - UNIT 2                  TRM 3/4 3-38                                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested AEAS    2-EB-60      Open    The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-EB-61      Open    The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-EB-72      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-EB-73      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-HV-165      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-HV-170      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-HV-171      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-HV-202      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-HV-207      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-HV-208      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-HV-210      Open    The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-HV-211      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-HV-212A    Open    The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation MILLSTONE - UNIT 2                  TRM 3/4 3-39                                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested AEAS    2-HV-212B    Open    The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-HV-495      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-HV-496      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    2-HV-497      Close  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    F20          Stop    The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    F25A          Start  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    F25B          Start  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    F32A          Start  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    F32B          Start  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    X61A          Start  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS    X61B          Start  The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation MILLSTONE - UNIT 2                  TRM 3/4 3-40                                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.2 INCORE DETECTOR INSTRUMENTATION TECHNICAL REQUIREMENT 3.3.3.2    The incore detection system shall be FUNCTIONAL with:
: a. At least 34 (75% of 45) incore detector locations, and
: b. A minimum of two quadrant symmetric incore detector locations per core quadrant, and
: c. A minimum of 9 FUNCTIONAL incore detector segments at each detector segment level.
Where; A FUNCTIONAL incore detector segment shall consist of a FUNCTIONAL rhodium detector constituting one of the segments in a fixed detector string.
A FUNCTIONAL incore detection location shall consist of a string in which at least three of the four incore detector segments are FUNCTIONAL.
APPLICABILITY:
When the incore detection system is used for:
: a. Monitoring the AZIMUTHAL POWER TILT,
: b. Recalibration of the excore neutron flux detection system, or
: c. Monitoring the TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR or the linear heat rate.
MILLSTONE - UNIT 2                TRM 3/4 3-41                        LBDCR 18-MP2-007 November 29, 2018
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.2 INCORE DETECTOR INSTRUMENTATION TECHNICAL REQUIREMENT ACTION:
Either Action a AND b (if applicable) OR Action c must be satisfied.
: a. With less than 34 (75% of 45) incore detector locations FUNCTIONAL and with Technical Requirement 3.3.3.2.b and 3.3.3.2.c satisfied, the system can be used for the above applicable monitoring or calibration functions provided that the number of FUNCTIONAL incore detector locations remain at least 27 (60% of 45 incore detection locations) and initiate corrective action to restore at least 34 (75% of 45 incore detector locations) FUNCTIONAL, AND
: b. If less than 34 (75% of 45) incore detector locations are FUNCTIONAL during the first 30% power flux map following a core alteration, then limit power to 30% or less until a cycle specific fuel misload analysis has been performed and implemented, OR
: c. Declare the incore detection system nonfunctional. With the incore detection system nonfunctional, do not use the system for the above applicable monitoring or calibration functions.
MILLSTONE - UNIT 2                TRM 3/4 3-42                          LBDCR 18-MP2-007 November 29, 2018
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.2 INCORE DETECTOR INSTRUMENTATION TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.3.2 The incore detection system shall be demonstrated FUNCTIONAL:
: a. By performance of a CHANNEL CHECK within 24 hours prior to its use and at least once per 7 days thereafter when required for:
: 1. Monitoring the AZIMUTHAL POWER TILT.
: 2. Recalibration of the excore neutron flux detection system, or
: 3. Monitoring the TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR or the linear heat rate.
: b. At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but includes all electronic components. The neutron detectors shall be calibrated prior to installation in the reactor core.
BASES:
The FUNCTIONALITY of the incore detectors with the specified minimum compliment of equipment ensures that the measurements from use of this system accurately represent the spatial neutron flux distribution of the reactor core.
Analyses performed by Framatome and summarized in Reference 2, performed in accordance with the NRC approved methodology (Reference 1), conclude that the uncertainty limits on Linear Heat Rate and FTr, 7% and 6% respectively, are met with at least 27 (60% of 45) incore detector locations FUNCTIONAL. Reference 2 also demonstrates that the ASI uncertainty with 60% FUNCTIONAL detector locations is accommodated in the FSAR Chapter 14 Safety Analyses. In addition, when Action b is applicable, a cycle-specific analysis as was done in support of Cycle 26 (Reference 2),
must be performed to demonstrate the ability of the incore detection system to detect a fuel misload that could result in exceedance of a specified acceptable fuel design limit.
 
==REFERENCE:==
: 1. Siemens Report No. EMF-96-029(P)(A), dated January 1997, volumes 1 and 2, Reactor Analysis System for PWRs, Volume 1-Methodology Description, Volume 2 -
Benchmarking Results.
: 2. LBDCR 18-MP2-007, Functionality Definition Change for the Incore Detector Instrumentation.
MILLSTONE - UNIT 2                TRM 3/4 3-42a                    LBDCR 18-MP2-007 November 29, 2018
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.3 SEISMIC INSTRUMENTATION TECHNICAL REQUIREMENT 3.3.3.3. The seismic monitoring instrumentation channels shown in TRM Table 3.3-7 shall be FUNCTIONAL.
APPLICABILITY:
All MODES.
ACTION:
: a. With the number of FUNCTIONAL seismic monitoring channels less than required by TRM Table 3.3-7, restore the nonfunctional channel(s) to FUNCTIONAL status within 30 days or otherwise enter the condition into the corrective action program.
MILLSTONE - UNIT 2              TRM 3/4 3-43                        LBDCR 09-MP2-026 January 12, 2010
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.3 SEISMIC INSTRUMENTATION TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.3.3    Each of the above seismic monitoring instrumentation channels shall be Demonstrated FUNCTIONAL by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations at the frequencies shown in TRM Table 4.3-4.
BASES:
The FUNCTIONALITY of the seismic instrumentation ensures that sufficient capability is available to promptly determine the magnitude of a seismic event and evaluate the response of those features important to safety. This capability is required to permit comparison of the measured response to that used in the design of the facility.
 
==REFERENCE:==
: 1. Condition Report M3-00-02659 MILLSTONE - UNIT 2              TRM 3/4 3-44                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-7 Seismic Monitoring Instrumentation Response Times MINIMUM MEASUREMENT      CHANNELS INSTRUMENT CHANNEL        SENSOR LOCATION        RANGE            FUNCTIONAL
: 1. TIME HISTORY ACCELEROGRAPHS
: a. Containment Base      El. -240 @ 215&deg;          .001 to 1 g          1 Slab                    outside of containment
: b. Containment          El. 750 @ 215&deg;          .001 to 1 g          1 Structure                outside of containment
: c. Auxiliary Building    El. 146 in              .001 to 1 g          1 maintenance work area
: d. Intake Structure      El. 180 on South wall    .001 to 1 g          1
: e. Free Field            El. 146 ground level    .001 to 1 g          1 on pad 139 South-East of Condensate Storage Tank
: 2. PEAK ACCELEROGRAPHS
: a. Containment Base      El. -240 outside of        0 to 1 g            1 Slab                    containment
: b. Steam Generator      El. -07 S/G #1            0 to 1 g            1 Support
: c. Pressurizer Support  El. 146                    0 to 1 g            1
: d. Safety Injection Tank El. 386                    0 to 1 g            1 Support
: 3. SEISMIC TRIGGER
: a. Containment Base      El. -240 @ 215&deg;        .005 to .02 g          1 Slab                    outside of containment
: 4. RESPONSE SPECTRUM RECORDER
: a. Containment Base      El. -240 outside of            -              1 Slab                    containment MILLSTONE - UNIT 2            TRM 3/4.3-45                    LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 4.3-4 Seismic Monitoring Instrumentation Technical Surveillance Requirements CHANNEL CHANNEL      CHANNEL      FUNCTIONAL INSTRUMENT CHANNEL                                                  CHECK        CALIBRATION TEST
: 1. TIME HISTORY ACCELEROGRAPHS
: a. Containment Base Slab                                              M            R            SA
: b. Containment Structure                                              M            R            SA
: c. Auxiliary Building                                                  M            R            SA
: d. Intake Structure                                                    M            R            SA
: e. Free Field                                                          M            R            SA
: 2. PEAK ACCELEROGRAPHS
: a. Containment Base Slab                                              N.A.          R            N.A.
: b. Steam Generator Support                                            N.A.          R            N.A.
: c. Pressurizer Support                                                N.A.          R            N.A.
: d. Safety Injection Tank Support                                      N.A.          R            N.A.
: 3. SEISMIC TRIGGER
: a. Containment Base Slab                                              N.A.          R            SA
: 4. RESPONSE SPECTRUM RECORDER
: a. Containment Base Slab                                              N.A.          R            N.A.
MILLSTONE - UNIT 2                                TRM 3/4 3-46                                    LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.4 METEOROLOGICAL INSTRUMENTATION TECHNICAL REQUIREMENT 3.3.3.4    The meteorological monitoring instrumentation channels shown in TRM Table 3.3-8 shall be FUNCTIONAL.
APPLICABILITY:
All MODES.
ACTION:
: a. With the number of FUNCTIONAL meteorological monitoring channels less than required by TRM Table 3.3-8, suspend all releases of gaseous radioactive material from the radwaste gas decay tanks until the nonfunctional channel(s) is restored to FUNCTIONAL status.
: b. With one or more required meteorological monitoring channels nonfunctional for more than 7 days, enter condition into the corrective action program.
MILLSTONE - UNIT 2              TRM 3/4 3-47                        LBDCR 09-MP2-026 January 12, 2010
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.4 METEREOLOGICAL INSTRUMENTATION TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.3.4    Each meteorological monitoring instrumentation channel shall be demonstrated FUNCTIONAL by the performance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in TRM Table 4.3-5.
BASES:
The FUNCTIONALITY of the meteorological instrumentation ensures that sufficient meteorological data is available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere. This capability is required to evaluate the need for initiating protective measures to protect the health and safety of the public. This instrumentation is consistent with the recommendations of Regulatory Guide 1.23, Onsite Meteorological Programs.
If the ACTIONS of the TECHNICAL REQUIREMENT cannot be met, the condition is documented in the corrective action program and assessed, as appropriate.
 
==REFERENCE:==
: 1. Condition Report M3-00-02659 MILLSTONE - UNIT 2                TRM 3/4 3-48                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.3-8 Meteorological Monitoring InstrumentatioN INSTRUMENT MINIMUM MINIMUM        CHANNELS INSTRUMENT                    LOCATION            ACCURACY      FUNCTIONAL
: 1. WIND SPEED
: a. Nominal                  142 ft.              +/- 0.22 m/sec*      1 Elev.
: b. Nominal                  374 ft.              +/- 0.22 m/sec*      1 Elev.
: 2. WIND DIRECTION
: a. Nominal                  142 ft.                  +/- 5&deg;          1 Elev.
: b. Nominal                  374 ft.                  +/- 5&deg;          1 Elev.
: 3. AIR TEMPERATURE - DELTA T
: a. Nominal                  142 ft.                +/- 0.18&deg;F        1 Elev.
: b. Nominal                  374 ft.                +/- 0.18&deg;F        1 Elev.
* Starting speed of anemometer shall be < 0.45 m/sec.
MILLSTONE - UNIT 2            TRM 3/4 3-49                      LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 4.3-5 Meteorological Monitoring Instrumentation Technical Surveillance Requirements CHANNEL            CHANNEL INSTRUMENT CHANNEL                                                                CHECK            CALIBRATION
: 1. WIND SPEED
: a. Nominal Elev. 142                                                                D                SA
: b. Nominal Elev. 374                                                                D                SA
: 2. WIND DIRECTION
: a. Nominal Elev. 142                                                                D                SA
: b. Nominal Elev. 374                                                                D                SA
: 3. AIR TEMPERATURE - DELTA T
: a. Nominal Elev. 142                                                                D                SA
: b. Nominal Elev. 374                                                                D                SA MILLSTONE - UNIT 2                                TRM 3/4 3-50                                    LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.7 FIRE DETECTION INSTRUMENTATION TECHNICAL REQUIREMENT 3.3 3.7    As a minimum, the fire detection instrumentation for each fire detection zone in TRM Table 3.3-10 shall be FUNCTIONAL.
APPLICABILITY:
Whenever equipment in that fire detection zone is required to be FUNCTIONAL.
ACTION:
With the number of FUNCTIONAL fire detection instrument(s) less than the minimum number of FUNCTIONAL requirements of TRM Table 3.3-10:
: a. Within 1 hour, establish a fire watch patrol to inspect the zone(s) with the nonfunctional instrument(s) at least once per hour unless the instrument(s) is located inside the containment. Roving fire watches must monitor the area of the device in question, as a minimum, within the specified time frame, plus or minus 25% of the time interval specified in the ACTION statement for periodic roving fire watches. The 25% extension of the time interval specified does not degrade the reliability that results from performing the rove at the specified interval, based on plant experience, and Fire Protection Engineering analysis as documented in Technical Evaluation M3-EV-02-2005.
If the instrument(s) are located inside the containment, then inspect the associated containment area at least once per 8 hours or monitor and record the average containment air temperatures manually once an hour or rely on the plant process computer to continuously monitor associated area containment temperatures with an alarm setpoint of 150&deg;F using the following temperature elements:
* TE8098 (located 30 elev. C and D RCPs)
* TE9770 (located 18 elev. West Penetration)
* TE9771 (located 18 elev. East Penetration)
* TE8097 (located 30 elev. A and B RCPS)
: b. Restore the nonfunctional equipment to FUNCTIONAL status within 14 days, or develop a plan and schedule for restoring the equipment to FUNCTIONAL status.
MILLSTONE - UNIT 2                TRM 3/4 3-51                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.7 FIRE DETECTION INSTRUMENTATION TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.3.7.1 Each of the above required fire detection instruments, which are accessible during plant operation, shall be demonstrated FUNCTIONAL at least once per 6 months by performance of a CHANNEL FUNCTIONAL TEST. Fire detectors which are not accessible during plant operation shall be demonstrated FUNCTIONAL by the performance of a CHANNEL FUNCTIONAL TEST during each COLD SHUTDOWN exceeding 24 hours unless performed in the previous 6 months.
4.3.3.7.2 The circuitry associated with the supervision of the above fire detection instruments and circuits, per NFPA 72-D, shall be demonstrated FUNCTIONAL at least once per 6 months.
BASES:
FUNCTIONALITY of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This capability is required in order to detect and locate fires in their early stages. Prompt detection of fires will reduce the potential for damage to safety related equipment and is an integral element in the overall facility Fire Protection program.
In the event that a portion of the fire detection instrumentation is nonfunctional, the establishment of frequent fire patrols in the affected areas is required to provide detection capability until the nonfunctional instrumentation is restored to FUNCTIONALITY.
Roving fire watches must monitor the area of the device in question, as a minimum, within the specified time frame, plus or minus 25% of the time interval specified in the ACTION statement for periodic roving fire watches. The 25% extension of the time interval specified does not degrade the reliability that results from performing the rove at the specified interval, based on plant experience, and Fire Protection Engineering analysis as documented in Technical Evaluation M3-EV-02-2005.
Fire detection in containment is limited to the areas above the reactor coolant pumps and above the electrical penetration areas. The plant process computer (PPC) continuously monitors air temperatures throughout containment to compute technical specification containment average air temperature. However monitoring the average temperature is not ideal for detecting incipient stage fires in the reactor coolant pump and the cable penetration areas.
MILLSTONE - UNIT 2                TRM 3/4 3-52                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.3  INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.7 FIRE DETECTION INSTRUMENTATION BASES: (Continued)
Individual temperature monitoring elements located in containment are set to alarm at 150&deg;F. When the PPC alarms it will display any appropriate AOPs associated with the alarm. The PPC must display the procedure for fire response A0P2559, Fire to credit these points as an appropriate compensatory measure for a nonfunctional fire detection system in containment.
The temperature monitoring elements indicated were chosen based on their proximity to the existing fire detection systems. In the event the temperature element associated with the nonfunctional fire detector or the PPC fails, it is acceptable to monitor and record average containment air temperatures manually once an hour.
Based on the ability of the PPC to produce historic records of temperatures for the locations specified, this compensatory measure would provide an acceptable means of monitoring for fire conditions and would document regulatory adherence.
 
==REFERENCE:==
: 1. Condition Report M3-00-2659 MILLSTONE - UNIT 2                TRM 3/4 3-53                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)
Table 3.3-10 Fire Detection Instruments Heat                              Smoke Minimum                          Minimum Total No.        Channels          Total No.      Channels Instrument Location (Zone)                                    of Channels    FUNCTIONAL          of Channels  FUNCTIONAL
: 1. Containment East Penetration (37) -- FLP 3-3                                    --              --                7              5 West Penetration (37) -- FLP 3-7                                    --              --                7              5
: 2. Control Room Vent Duct (42) Z-2                                    --              --                1              1 Control Room Vent Duct (2) Z-1                                      --              --                1              1
: 3. Cable Vaults & Areas Aux. Bldg Cable Vault (256) (10)                                  5                4                16            12 Turbine Bldg. Cable Vault & Vertical Shaft (256) (30)            --              --              17            17 Turbine Bldg Cable Vault & Vertical Shaft (256) (32)              --              --              17            17 Turbine Bldg Cable Vault Area (45) (21)                            --              --                8              6 Lunch Room Cable Chase Area (366) (24)                            --              --                4              3
: 4. 4.16 & 6.9 kV Switchgear Room (566) (40)                          --              --                4              3 4.16 & 6.9 kV Switchgear Room (316) (18)                          --              --                4              3 480 V West Switchgear Room (366) (18)                            --              --                2              1 480 V East Switchgear Room (366) (28)                            --              --                2              1 MILLSTONE - UNIT 2                                    TRM 3/4 3-54                                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)
Table 3.3-10 (Continued)
Fire Detection Instruments Heat                              Smoke Minimum                          Minimum Total No.          Channels          Total No.      Channels Instrument Location (Zone)                                  of Channels      FUNCTIONAL          of Channels  FUNCTIONAL East DC Equipment Room (43 Alarm) (FLP 5)                        --                --                6              6 West DC Equipment Room (45 Alarm) (FLP 6)                        --                --                6              6 East Cable Vault Ventilation Opening (44) (FLP 7)                --                --                1              1 West Cable Vault Ventilation Opening (44) (FLP 7)                --                --                1              1
: 5. Battery Rooms West Battery Room (146) (39)                                  --                --                1            1 East Battery Room (146) (39)                                  --                --                2              1
: 6. Electrical Penetration Rooms East (146) (20)                                                --                --                3              2 West (146) (17)                                                --                --                2              1
: 7. Diesel Generators Diesel 1221 (12)                                                8                  8                --            --
Diesel 1321 (13)                                                8                  8                --            --
: 8. Main Exhaust Equipment Room and B52 Enclosure Room (EL 386) (5)                                              --                --                3              3 MILLSTONE - UNIT 2                                  TRM 3/4 3-55                                            LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)
Table 3.3-10 (Continued)
Fire Detection Instruments Heat                              Smoke Minimum                          Minimum Total No.          Channels          Total No.      Channels Instrument Location (Zone)                                    of Channels      FUNCTIONAL          of Channels  FUNCTIONAL
: 9. Auxiliary Building (-456) (FLP - 1)
General Area (48)                                                  --                --                3              2 A. Safe Guards Room (48)                                              --                --                2              1 B. Safe Guards Room (48)                                              --                --                2              1 C. Safe Guards Room (48)                                              --                --                1              1
: 10. Auxiliary Building (-256) (FLP-2)
General Area (-256) (52)                                          --                --                9              7 Charging Pump Rooms (-256) (52)                                  --                --                5              3
: 11. Containment Building FLP-3 (37)
RCP A - (FLP 3-1)                                                5                  3                --            --
RCP B - (FLP 3-2)                                                5                  3                --            --
RCP C - (FLP 3-6)                                                5                  3                --            --
RCP D - (FLP 3-5)                                                5                  3                --            --
: 12. Auxiliary Building (-5/146) (FLP-4)
Auxiliary Building General Area 146 (41)                          --                --                9              7 MILLSTONE - UNIT 2                                    TRM 3/4 3-56                                            LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)
Table 3.3-10 (Continued)
Fire Detection Instruments Heat                              Smoke Minimum                          Minimum Total No.          Channels          Total No.      Channels Instrument Location (Zone)                                  of Channels      FUNCTIONAL          of Channels    FUNCTIONAL Auxiliary Building West Piping Penetration Room -5 (41)          --                --                3              2 Auxiliary Building -5 (41)                                      --                --              13              10
: 13. Hydrogen Seal Oil (31)                                            7                  7                --            --
: 14. Intake Structure (6)                                              --                --              10              10
: 15. Motor Driven Aux. Feed Pump Rm (22)                              --                --                2              2
: 16. Turbine Driven Aux. Feed Pump Rm (22)                            --                --                2              1
: 17. Turbine Battery Area (27)                                        --        --                        2      1
: 18. Filtration System Equip. Rm. (13)                                --        --                        12      12 MILLSTONE - UNIT 2                                  TRM 3/4 3-57                                              LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3.8 ACCIDENT RADIATION MONITORING INSTRUMENTATION TECHNICAL REQUIREMENT 3.3.3.8    The mid and high range channels of the Wide Range Gas Monitor (WRGM) shall be FUNCTIONAL with an alarm setpoint set less than the EAL Alert Classification level.
APPLICABILITY:
MODES 1, 2, 3, 4, 5, and 6.
ACTION:
: a. With an alarm setpoint of the mid or high range channel(s) of the WRGM exceeding the EAL Alert Classification level, adjust the setpoint to within the required value within twenty-four hours or declare the channel(s) nonfunctional.
: b. With mid or high range channel(s) of WRGM nonfunctional, within 72 hours, initiate an alternate method of monitoring the appropriate parameters (not required if the nonfunctionality is only due to alarm setpoint)
AND Restore required channel(s) to FUNCTIONAL status within 30 days, or otherwise initiate corrective actions.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.3.8    The mid and high range channels of the WRGM shall be demonstrated FUNCTIONAL by the performance of the following surveillances at the frequencies shown:
: a. CHANNEL CHECK once per 12 hours.
: b. CHANNEL FUNCTIONAL TEST once per 31 days.
: c. CHANNEL CALIBRATION once per 18 months.
MILLSTONE - UNIT 2                TRM 3/4 3-58                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3.8 ACCIDENT RADIATION MONITORING INSTRUMENTATION BASES:
When the Unit 1 stack high range radiation monitor was deactivated and removed, Unit 2 had to install a new high range radiation monitor (the Wide Range Gas Monitor, or WRGM, RM-8169) to monitor its release to the Millstone stack during an accident.
FUNCTIONALITY and TECHNICAL SURVEILLANCE REQUIREMENT for RM-8169 are needed to replace the equivalent requirements applicable to the Unit 1 high range monitor. FUNCTIONALITY and TECHNICAL SURVEILLANCE REQUIREMENT for the WRGM are consistent with technical specifications which have similar requirements for the Unit 2 vent high range radiation monitor (RM-8168). These requirements will assure that radiation monitoring is available during an accident with releases to the environment for assessment purposes.
The alternate method of monitoring specified in TR ACTION b. is contained in procedures. It includes use of the lower range (channel 1) of the WRGM, if FUNCTIONAL and on scale.
 
==REFERENCE:==
: 1. CR-01-01975, New Wide Range Gas Monitor Does Not Appear to Meet NUREG-0737 Requirement MILLSTONE - UNIT 2                TRM 3/4 3-59                      LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.7 CHEMISTRY TECHNICAL REQUIREMENT 3.4.7      The reactor coolant system chemistry shall be maintained within the limits specified in TRM Table 3.4-1.
APPLICABILITY:
All MODES.
ACTION:
MODES 1, 2, 3 and 4.
: a. With any one or more chemistry parameter in excess of its Steady State Limit but within its Transient Limit, implement established plant chemistry guidelines.
: b. With any one or more chemistry parameter in excess of its Transient Limit, implement established plant chemistry guidelines.
MODES 5 and 6.
With the concentration of either chloride or fluoride in the reactor coolant system in excess of its Steady State Limit for more than 24 hours or in excess of its Transient Limit, reduce the pressurizer pressure to 500 psia, if applicable, and perform an analysis to determine the effects of the out-of-limit condition on the structural integrity of the reactor coolant system; determine that the reactor coolant system remains acceptable for continued operations prior to increasing the pressurizer pressure above 500 psia or prior to proceeding to MODE 4.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.4.7      The reactor coolant system chemistry shall be determined to be within the limits by analysis of those parameters at the frequencies specified in TRM Table 4.4-1.
MILLSTONE - UNIT 2                  TRM 3/4 4-1                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.7 CHEMISTRY BASES:
The limitations on reactor coolant system contaminants ensure that corrosion of the reactor coolant system is minimized and reduce the potential for reactor coolant system leakage or failure due to stress corrosion. Maintaining the concentrations of the contaminants within the Steady State Limits shown on TRM Table 3.4-1 provides adequate corrosion protection to ensure the structural integrity of the reactor coolant system over the life of the plant. The associated effects of exceeding the oxygen, chloride and fluoride limits are time and temperature dependent.
Established plant chemistry guidelines are contained in MP-PROC-CH-CP 2802A, Primary Chemistry Control.
The TECHNICAL SURVEILLANCE REQUIREMENTS provide adequate assurance that concentrations in excess of the limits will be detected in sufficient time to take corrective action.
 
==REFERENCE:==
: 1. License Amendment No. 266 MILLSTONE - UNIT 2                TRM 3/4 4-2                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 3.4-1 Reactor Coolant System Chemistry Limits STEADY STATE    TRANSIENT PARAMETER                                      LIMIT        LIMIT DISSOLVED OXYGEN                            0.10 ppm*    1.00 ppm*
CHLORIDE                                      0.15 ppm    1.50 ppm FLUORIDE                                      0.10 ppm    1.00 ppm
*Limit not applicable with Tavg 250&deg;F.
MILLSTONE - UNIT 2              TRM 3/4 4-3            LBDCR No. 02-2-7 June 17, 2002
 
TECHNICAL REQUIREMENTS Table 4.4-1 Reactor Coolant System Chemistry Limits Technical Surveillance Requirements MINIMUM            MAXIMUM TIME PARAMETER                        SAMPLING FREQUENCIES BETWEEN SAMPLES DISSOLVED OXYGEN                    3 times per 7 days*        72 hours CHLORIDE                            3 times per 7 days        72 hours FLUORIDE                            3 times per 7 days        72 hours
*Not required with Tavg  250&deg;F.
MILLSTONE - UNIT 2              TRM 3/4 4-4                LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.9 PRESSURE/TEMPERATURE LIMITS TECHNICAL REQUIREMENT 3.4.9.1    In accordance with Technical Specification LCO 3.4.9.1, Pressure/
Temperature Limits.
APPLICABILITY:
In accordance with Technical Specification 3.4.9.1.
ACTION:
In accordance with Technical Specification 3.4.9.1.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.4.9.1
: a. In accordance with Technical Specifications Surveillance Requirement 4.4.9.1a.
: b. The reactor vessel material irradiation surveillance specimens shall be removed and examined, to determine changes in material properties, at the intervals shown in Table 4.4-3.
: c. The results of the examinations in TECHNICAL SURVEILLANCE REQUIREMENT 4.4.9.1b shall be used to update Technical Specifications Table 3.4-2 and Technical Specifications Figures 3.4-2a and 3.4-2b.
MILLSTONE - UNIT 2              TRM 3/4 4-5                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS Table 4.4-3 Reactor Vessel Material Irradiation Surveillance Schedule CAPSULE                    WITHDRAWAL SCHEDULE (EFPY)
W-97                            3.0 W-97                          10.0 (Flux Monitor)
W-104                          10.0 W-83                          15.3 W-277                          EOL W-263                        Spare W-284                        Spare MILLSTONE - UNIT 2          TRM 3/4 4-6                  LBDCR 05-MP2-011 August 4, 2005
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.9 PRESSURE/TEMPERATURE LIMITS BASES:
The number of reactor vessel irradiation surveillance specimens and the frequencies for removing and testing these specimens are provided in Table 4.4-3 to assure compliance with the requirements of Appendix H to 10 CFR Part 50. Removal of reactor vessel irradiation surveillance specimens does not constitute a CORE ALTERATION per Technical Specification 1.12.
 
==REFERENCE:==
: 1. License Amendment No. 272
: 2. NRC safety evaluation for approval of changes to Table 4.4-3, Millstone Power Station, Unit No. 2 - Changes to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule (TAC No. MB9149), dated October 1, 2003 MILLSTONE - UNIT 2              TRM 3/4 4-7                      LBDCR 05-MP2-011 August 4, 2005
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.9.2 PRESSURIZER TECHNICAL REQUIREMENT 3.4.9.2  The pressurizer temperature shall be limited to:
: a. A maximum heatup of 100&deg;F in any one hour period,
: b. A maximum cooldown of 200&deg;F in any one hour period, and
: c. A maximum spray water temperature differential of 350&deg;F.
APPLICABILITY:
MODES 1, 2, 3, 4 and 5.
ACTION:
With any of the above limits exceeded, perform the following:
: a. Restore the temperature to within limit within 30 minutes.
AND
: b. Perform an engineering evaluation to determine the effects of the out of limit condition on the structural integrity of the pressurizer and determine that the pressurizer remains acceptable for continued operation within 72 hours. Otherwise, be in at least MODE 3 within the next 6 hours and reduce pressurizer pressure to less than 500 psia within the following 30 hours.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.4.9.2  The pressurizer temperature and spray water temperature differential shall be determined to be within the limits at least once per 30 minutes during system heatup or cooldown.
MILLSTONE - UNIT 2                TRM 3/4 4-8                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.9.2 PRESSURIZER BASES:
The limitations imposed on the pressurizer heatup and cooldown rates and spray water temperature differential are provided to assure that the pressurizer is operated within the design criteria assumed for the fatigue analysis performed in accordance with the ASME Code requirements. Verification that pressurizer temperature conditions are within the limits of TECHNICAL REQUIREMENT 3.4.9.2, at least once per 30 minutes, is required when undergoing planned changes of 10&deg;F. The 30 minute time interval permits assessment and correction for temperature deviations within a reasonable time.
 
==REFERENCE:==
: 1. License Amendment No. 266 MILLSTONE - UNIT 2              TRM 3/4 4-9                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.9.4 SHUTDOWN COOLING OVERPRESSURE PROTECTION TECHNICAL REQUIREMENT 3.4.9.4    Shutdown Cooling System overpressure protection shall be provided as follows: (1)
: a. All HPSI pumps shall be prevented from automatically injecting into the RCS when the RCS is not vented through a vent of  2.2 in2.
: b. A maximum of one HPSI pump may be capable of automatically injecting into the RCS when the RCS is vented through a vent of  2.2 in2.
APPLICABILITY:
When the Shutdown Cooling System is connected to the RCS and the head is on the reactor vessel.
ACTION:
With more than the maximum allowed number of HPSI pumps capable of automatically injecting into the RCS, take immediate ACTION to comply with the TECHNICAL REQUIREMENT 3.4.9.4 above.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.4.9.4    Verify all required HPSI pumps are prevented from automatically injecting into the RCS at least once per 12 hours by:(2)
: a. Racking down the motor circuit breaker from the power supply circuit; or
: b. Shutting and tagging the discharge valve with the key lock on the control panel (2-51-654 or 2-SI-656); or
: c. Placing the pump control switch in the pull-to-lock position.
(1) Refer to Technical Specification 3.4.9.3 for additional restrictions concerning HPSI pump operation.
(2) In MODE 4, Technical Specification 3.5.3 requires at least one HPSI pump to be OPERABLE. The only acceptable method to provide Shutdown Cooling System overpressure protection, without affecting the OPERABILITY of this HPSI pump, is to place the pump control switch in the pull-to-lock position.
MILLSTONE - UNIT 2                TRM 3/4 4-10                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.9.4 SHUTDOWN COOLING OVERPRESSURE PROTECTION BASES:
An inadvertent start of a HPSI pump could result in the overpressurization of the SDC System. To prevent this, it is necessary to disable HPSI pump automatic injection capability into the RCS whenever the SDC System is connected to the RCS. If the RCS is not vented, the automatic injection capability of all HPSI pumps must be prevented.
This restriction may be relaxed if the RCS is adequately vented. If a vent of  2.2 in2 has been established, a maximum of one HPSI may be capable of automatically injecting into the RCS. If the reactor vessel head has been removed, there is no restriction on HPSI pump automatic injection capability.
If a loss of RCS inventory or reduction in SHUTDOWN MARGIN event occurs, the appropriate response will be to correct the situation by starting RCS makeup pumps. If the loss of inventory or SHUTDOWN MARGIN is significant, this may necessitate the use of HPSI pumps that are being maintained not capable of automatically injecting into the RCS in accordance with this requirement. The use of the HPSI pump(s) to restore RCS inventory or SHUTDOWN MARGIN will require entry into the associated ACTION statement. The ACTION statement requires immediate ACTION to comply with the requirements. The restoration of RCS inventory or SHUTDOWN MARGIN can be considered to be part of the immediate ACTION to restore the HPSI pump(s) to a not capable of automatically injecting status. While recovering RCS inventory or SHUTDOWN MARGIN, RCS pressure will be maintained below SDC design pressure.
After RCS inventory or SHUTDOWN MARGIN has been restored, the HPSI pump(s) should be immediately made not capable of automatically injecting and the ACTION statement exited.
 
==REFERENCE:==
: 1. Technical Specification LCO 3.4.9.3
: 2. Technical Specification LCO 3.5.3
: 3. Condition Report M3-00-02659 MILLSTONE - UNIT 2                TRM 3/4 4-11                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.10    STRUCTURAL INTEGRITY - ASME CODE CLASS 1, 2, 3 COMPONENTS TECHNICAL REQUIREMENT 3.4.10    The structural integrity of ASME Code Class 1, 2 and 3 components shall be maintained in accordance with TECHNICAL SURVEILLANCE REQUIREMENT 4.4.10.
APPLICABILITY:
MODES 1, 2, 3, 4, 5, and 6, except when a ASME Code Class 1, 2, or 3 component is not required to be FUNCTIONAL.
ACTION:
: a. With one or more ASME Code Class 1, 2 and 3 component(s) in a degraded or nonconforming condition(s), perform the following ACTIONS within 72 hours:*
: 1. Determine that structural integrity is still maintained in the degraded or nonconforming condition; or
: 2. Isolate the affected component(s) from service.
: b. If the above ACTION is not completed within 72 hours, immediately declare the affected component(s) nonfunctional.
* - For ASME Code Class 1 and 2 components which have PRESSURE BOUNDARY LEAKAGE, the affected component(s) must be immediately isolated from service or declared nonfunctional.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.4.10    The structural integrity of ASME Code Classes 1, 2 and 3 components shall be inspected in accordance with the Inservice Inspection Program.
MILLSTONE - UNIT 2                TRM 3/4 4-12                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.10 STRUCTURAL INTEGRITY - ASME CODE CLASS 1, 2, 3 COMPONENTS BASES:
The inservice inspection and testing programs for ASME Code Class 1, 2 and 3 components ensure that the structural integrity and operational readiness of these components will be maintained at an acceptable level throughout the life of the plant.
These programs are in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR Part 50.55a.
This TR requires that the structural integrity of ASME Code Class 1, 2 and 3 components be maintained. Structural integrity is the ability to withstand specified loading, with an acceptable margin, without collapse, rupture, brittle fracture, or unstable flaw growth.
Components that may experience unanalyzed loads, have a deficient original design analysis, or have pressure boundary wall loss, but nevertheless can be shown to meet the minimum requirements of the original construction Code or ASME Section III Appendix F, are considered to retain their structural integrity. For components with degraded material properties or relevant conditions as defined in ASME Section XI, the criteria for structural integrity are contained or referenced in Section XI.
Alternative evaluation criteria may be used to determine structural integrity when approved by the NRC. In addition to the initial discovery, supplemental NDE may be required to fully characterize the degraded condition. Preliminary judgments regarding structural integrity may be expressed considering the available information and the expectation that a final determination of structural integrity will result once all characterization, evaluation and documentation are complete.
For ASME Code Class 1 or 2 components which have PRESSURE-BOUNDARY LEAKAGE, the structural integrity of the component is considered not to be maintained and the affected component(s) must be immediately isolated from service. If the affected component(s) cannot be isolated from service, the affected component(s) is immediately declared nonfunctional and the required ACTIONS of the applicable TS and TRs apply.
For all other structural integrity (i.e. non pressure boundary leakage) degraded or nonconforming conditions of Class 1 and Class 2 components, the structural integrity of the affected component will be evaluated consistent with the requirements of this TR.
If the required determination of structural integrity cannot be accomplished within 72 hours or the results are indeterminate or structural integrity is not maintained, or the affected component is not isolated, or cannot be isolated, ACTION must proceed to declare the affected component(s) nonfunctional, as specified in ACTION statement 'b.'
The appropriate TS or TR shall be considered not met, as appropriate.
MILLSTONE - UNIT 2                  TRM 3/4 4-13                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.10 STRUCTURAL INTEGRITY - ASME CODE CLASS 1, 2, 3 COMPONENTS BASES: (Continued)
Surveillance Requirement 4.4.10 requires performing inservice inspections of ASME Section XI Code Class 1, 2 and 3 components in accordance with TS 4.0.5.
Inservice inspection of ASME Code Class 1, 2 and 3 components are performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda, as required by 10 CFR 50.55a(g), to ensure that the structural integrity of these components will be maintained at an acceptable level throughout the life of the plant. Exception to these requirements apply where relief has been granted by the Commission pursuant to 10 CFR 50.55a(a)(3) and (g)(6)(i). The surveillance intervals specified in Section XI of the ASME Code apply.
 
==REFERENCE:==
: 1. Generic Letter 91-18, "Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability," November 7, 1991, and Revision 1, October 8, 1997.
: 2. 10 CFR 50.55a(b)(2)(xiii), "Flaws in Class 3 Piping," Federal Register (Vol. 64, No. 183), September 22,1999.
: 3. Generic Letter 90-05, "Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 and 3 Piping," June 15,1990; and August 16,1990.
: 4. Code Case N-513, "Evaluation Criteria for Temporary Acceptance of Flaws in Class 3 Piping."
: 5. Code Case N-523-1, "Mechanical Clamping Devices for Class 2 and 3 Piping."
: 6. Elinor G. Adensam, U.S. NRC to Martin L. Bowling, "Millstone Nuclear Power Station, Unit Nos. 2 and 3 - Request for an Alternative to the Requirements of the ASME Code," TAC Nos. MA3889 and MA3884, dated February 23,1999.
: 7. License Amendment No. 264. LBDCR 02-2-11 September 13, 2002.
MILLSTONE - UNIT 2                TRM 3/4 4-14                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.11 REACTOR COOLANT SYSTEM VENTS TECHNICAL REQUIREMENT 3.4.11    At least one reactor coolant system vent path consisting of at least two valves in series capable of being powered from emergency buses shall be FUNCTIONAL at each of the following locations:
: a. Reactor vessel head
: b. Pressurizer steam space APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
: a. With any one of the PORVs or PORV block valves of the pressurizer steam space vent path nonfunctional in MODES 1, 2 or 3, follow the ACTION requirements of Technical Specification 3.4.3.
: b. With any one of the PORVs or PORV block valves of the pressurizer steam space vent path nonfunctional in MODE 4, follow the ACTION requirements of Technical Specification 3.4.9.3.
: c. With the reactor vessel head vent path nonfunctional, STARTUP and/or POWER OPERATION may continue provided that the nonfunctional vent path is maintained closed with power removed from the valve actuator of all the valves in the nonfunctional vent path. Restore the reactor vessel head vent path to FUNCTIONAL status within 30 days or otherwise enter the condition into the corrective action program.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.4.11    Each reactor coolant system vent path shall be demonstrated FUNCTIONAL at least once per 18 months by:
: 1. Verifying all manual isolation valves in each vent path are locked in the open position.
: 2. Cycling each valve in the vent path through at least one complete cycle of full travel from the control room during COLD SHUTDOWN or REFUELING.
: 3. Verifying flow through the reactor coolant vent system vent paths during COLD SHUTDOWN or REFUELING.
MILLSTONE - UNIT 2                TRM 3/4 4-15                      LBDCR 09-MP2-026 January 12, 2010
 
TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.11 REACTOR COOLANT SYSTEM VENTS BASES:
Reactor Coolant System Vents are provided to exhaust noncondensible gases and/or steam from the primary system that could inhibit natural circulation core cooling. The FUNCTIONALITY of at least one reactor coolant system vent path from the reactor vessel head and the pressurizer steam space ensures that the capability exists to perform this function.
The valve redundancy of the reactor coolant system vent paths serves to minimize the probability of inadvertent or irreversible actuation while ensuring that a single failure of a vent valve, power supply or control system does not prevent isolation of the vent path.
The flow test verifies that each flowpath for the reactor vessel head vent and the pressurizer steam space vent is FUNCTIONAL. This verification can be performed by using a series of overlapping tests to ensure flow is verified through all parts of the system.
 
==REFERENCE:==
: 1. License Amendment No. 266
: 2. DCR M2-02006
: 3. DCR M2-05002 MILLSTONE - UNIT 2                TRM 3/4 4-16                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.5 EMERGENCY CORE COOLING SYSTEMS 3/4.5.2 ECCS SUBSYSTEMS - TAVG  300&deg;F TECHNICAL REQUIREMENT 3.5.2    In accordance with Technical Specification LCO 3.5.2, ECCS Subsystems -
Tavg >300&deg;F APPLICABILITY:      In accordance with Technical Specification LCO 3.5.2.
ACTION:
In accordance with Technical Specification LCO 3.5.2.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.5.2    Each ECCS subsystem shall be demonstrated FUNCTIONAL:
: a. By a visual inspection which verifies that no loose debris (rags, trash, clothing, etc.) is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during LOCA conditions. This visual inspection shall be performed:
: 1. For all accessible areas of the containment prior to establishing CONTAINMENT INTEGRITY, and
: 2. Of the areas affected within containment at the completion of containment entry when CONTAINMENT INTEGRITY is established.
: b. By conducting a flow balance verification immediately prior to returning to service any portion of a subsystem after the completion of a modification that could alter system flow characteristics. The injection leg flow rate shall be as follows:
: 1. HPSI Headers - the sum of the three lowest injection flows must be 471 gpm. The sum of the four injection flows must be  675 gpm.
: 2. LPSI Header - the sum of the three lowest injection flows must be 2850 gpm. The sum of the four injection flows must be RWST level (%) - 10(%)
4500 + ------------------------------------------------------------------ x 200 90%
MILLSTONE - UNIT 2                TRM 3/4 5-1                                                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS SUBSYSTEMS - TAVG  300&deg;F TECHNICAL SURVEILLANCE REQUIREMENTS BASES:
TECHNICAL SURVEILLANCE REQUIREMENT 4.5.2.a verifies by a visual inspection that no loose debris (rags, trash, clothing, etc.) is present in the containment that could be transported to the containment sumps and cause restriction of the pump suction during LOCA conditions. This is a good housekeeping item, which is an integral part of any maintenance or surveillance activity. It does not verify FUNCTIONALITY of the ECCS or any ECCS functions assumed in the safety analysis. This approach is consistent with NUREG-1432, which does not contain a requirement to inspect the containment sump prior to establishing CONTAINMENT INTEGRITY. In addition, the containment sump will continue to be inspected every 18 months as required by Technical Specification SR 4.5.2.j.
TECHNICAL SURVEILLANCE REQUIREMENT 4.5.2.b verifies proper flow distribution following any modifications that could alter system flow characteristics. The purpose of the ECCS throttle valve surveillance requirements is to provide assurance that proper ECCS flows will be maintained in the event of a LOCA. Maintenance of proper flow resistance and pressure drop in the piping system to each injection point is necessary to:
(1) prevent total pump flow from exceeding runout conditions when the system is in its minimum resistance configuration, (2) provide the proper flow split between injection points in accordance with the assumptions used in the ECCS-LOCA analyses, and (3) provide an acceptable level of total ECCS flow to all injection points equal to or above that assumed in the ECCS-LOCA analyses.
Verification of the correct position for the mechanical and/or electrical valve stops can be performed by either of the following methods:
: 1. Visually verify the valve opens to the designated throttled position; or
: 2. Manually position the valve to the designated throttled position and verify that the valve does not move when the applicable valve control switch is placed to OPEN.
Post maintenance testing associated with a system modification, which is controlled by plant procedures, will include verification of proper flow distribution if the associated modification could adversely affect the flow distribution. Without this verification, the respective system could not be declared FUNCTIONAL.
 
==REFERENCE:==
: 1. License Amendment 283 MILLSTONE - UNIT 2                TRM 3/4 5-2                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS 3/4.6.3 CONTAINMENT ISOLATION VALVES TECHNICAL REQUIREMENT 3.6.3.1    The Containment Isolation Valves listed in TRM Table 3.6-1 Containment Isolation Valve List, shall be FUNCTIONAL.
APPLICABILITY:
In accordance with Technical Specification 3.6.3.1.
ACTION:
In accordance with Technical Specification 3.6.3.1.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.6.3.1    In accordance with Technical Specification 3.6.3.1 Surveillance Requirements.
BASES:
In accordance with the Technical Specifications Bases section 3/4.6.3 (Containment Isolation Valves).
In addition, the attached TRM Table 3.6-1 provides a list of containment isolation valves which are a subset of those valves identified by the FSAR, Table 5.2-11, Containment Structure Isolation Valve Information. The containment isolation valves identified are main process isolation valves that are within the containment penetration boundary and conform to the requirements of 10 CFR 50 Appendix A (GDC 55, 56, or 57). Manual test, vent or drain valves within the containment penetration boundary are also identified. An explanation of the several notes included on TRM Table 3.6-1 follows:
Column 1 provides the containment penetration number and containment isolation valve description.
Column 2 provides the component local identification.
Column 3 provides the stroke time closure requirements.
Note a provides the extended allowed outage time of 72 hours for those isolation valves that are located on penetrations for closed systems as defined by the Standard Review Plan (SRP) 6.2.4. The 72 hour allowed outage time also applies to the RBCCW containment isolation valves, which are located on a closed system as defined by Millstone Unit 2 original design basis.
MILLSTONE - UNIT 2                TRM 3/4 6-1                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS 3/4.6.3 CONTAINMENT ISOLATION VALVES Note b indicates the small (1 inch or less) valves used as Test, Drain or Vent valves, which are normally closed.
 
==REFERENCE:==
 
The attached TRM Table has been compiled from a review of the P&ID drawings, the FSAR Chapter 5 and has been supplemented by plant inspections of the listed penetrations.
: 1. MP2 Final Safety Analysis Report (FSAR) Sections 5.2.8.1.2, 5.2.8.2.1 and Table 5.2-11.b.
: 2. Condition Report M3-00-02659
: 3. Amendment 278 to Millstone Unit 2 Technical Specifications MILLSTONE - UNIT 2                TRM 3/4 6-2                              LBDCR 03-2-7 September 11, 2003
 
Table 3.6-1 Containment Isolation Valve List Pen. No. and Function Description                            Valve No. Maximum IsolationTime (seconds)
No. 1 - Demin Water to Ctmt Iso - Inner - check                          2-PMW-3                    NA No. 1 - Demin Water to Ctmt Iso - Outer - AOV, CIAS                      2-PMW-43                    5 No. 1 - Demin Water to Ctmt Iso - Outer - manual                          2-PMW-165                  NA No. 2 - RCS Letdown Iso - Inner - AOV, SIAS                              2-CH-515                    5 No. 2 - RCS Letdown Iso - Inner - AOV, CIAS                              2-CH-516                    5 No. 2 - RCS Letdown Iso - Outer- AOV, CIAS                                2-CH-089                    5 No. 2 - RCS Letdown Isolation - Inner - manual - b                        2-CH-763                    NA No. 2 - RCS Letdown Isolation - Inner - manual - b                        2-CH-658                    NA No. 2 - RCS Letdown Isolation - Inner - manual - b                        2-CH-260                    NA No. 2 - RCS Letdown Isolation - Inner - manual - b                        2-CH-082                    NA No. 2 - RCS Letdown Isolation - Inner - manual - b                        2-CH-083                    NA No. 2 - RCS Letdown Isolation - Outer - manual - b                        2-CH-067                    NA No. 2 - RCS Letdown Isolation - Inner - manual - b                        2-CH-991                    NA No. 3 - RCS Charging Isolation - Inner - AOV                              2-CH-517                  NSR No. 3 - RCS Charging Isolation - Inner - AOV                              2-CH-518                  NSR No. 3 - RCS Charging Isolation - Inner - AOV                              2-CH-519                  NSR No. 3 - RCS Charging Isolation - Outer - MOV                              2-CH-429                  NSR No. 3 - RCS Charging Isolation - Inner - manual                          2-CH-434                    NA No. 3 - RCS Charging Isolation - Inner - manual - b                      2-CH-001                    NA No. 3 - RCS Charging Isolation - Inner - manual - b                      2-CH-002                    NA No. 3 - RCS Charging Iso - Inner - manual - b                            2-CH-003                    NA No. 3 - RCS Charging Iso - Inner - manual - b                            2-CH-004                    NA No. 3 - RCS Charging Iso - Inner - manual - b                            2-CH-443                    NA No. 3 - RCS Charging Iso - Outer - manual - b                            2-CH-710                    NA No. 3 - RCS Charging Iso - Inner - manual - b                            2-CH-714                    NA No. 3 - RCS Charging Iso - Inner - manual - b                            2-CH-661                    NA No. 3 - RCS Charging Iso - Outer - Relief                                2-CH-986                    NA No. 3 - RCS Charging Iso - Inner - manual                                2-RC-071                    NA No. 4 - Containment Spray Iso - Outer - MOV-CSAS                          2-CS-4.1A                  NSR No. 4 - Containment Spray Iso - Inner - check                            2-CS-5A                    NA No. 4 - Containment Spray Iso - Outer - manual - b                        2-CS-049A                  NA No. 4 - Containment Spray Iso - Outer - manual - b                        2-CS-049C                  NA MILLSTONE - UNIT 2                                        TRM 3/4 6-3                                    LBDCR 03-2-7 September 11, 2003
 
Table 3.6-1 Containment Isolation Valve List Pen. No. and Function Description                            Valve No. Maximum IsolationTime (seconds)
No. 5 - Containment Spray Iso - Outer - MOV-CSAS                          2-CS-4.1B                  NSR No. 5 - Containment Spray Iso - Inner - check                            2-CS-5B                      NA No. 5 - Containment Spray Iso - Outer - manual - b                        2-CS-101                    NA No. 6 - Safety Inj. Isolation - Inner - check                            2-SI-706D                    NA No. 6 - Safety Inj. Isolation - Outer - manual - b                        2-SI-095                    NA No. 6 - Safety Inj. Isolation - Outer - manual - b                        2-SI-041F                    NA No. 6 - Safety Inj. Isolation - Outer - manual - b                        2-SI-742D                    NA No. 6 - Safety Inj. Isolation - Outer - MOV - SIAS                        2-SI-645                    NSR No. 6 - Safety Inj. Isolation - Outer - MOV - SIAS                        2-SI-646                    NSR No. 6 - Safety Inj. Isolation - Outer - MOV - SIAS                        2-SI-647                    NSR No. 6 - Safety Inj. Isolation - Outer - manual - b                        2-SI-734                    NA No. 6 - Safety Inj. Isolation - Outer - manual - b                        2-SI-735                    NA No. 6 - Safety Inj. Isolation - Outer - manual - b                        2-SI-848                    NA No. 6 - Safety Inj. Isolation - Outer - manual                            2-SI-160                    NA No. 6 - Safety Inj. Isolation - Outer - manual                            2-SI-161                    NA No. 6 - Safety Inj. Isolation - Outer - manual - b                        2-SI-163                    NA No. 7 - Safety Inj. Isolation - Inner - check                            2-SI-706A                  NA No. 7 - Safety Inj. Isolation - Outer - manual - b                        2-SI-742A                    NA No. 7 - Safety Inj. Isolation - Outer - manual - b                        2-SI-107                    NA No. 7 - Safety Inj. Isolation - Outer - manual - b                        2-SI-715                    NA No. 7 - Safety Inj. Isolation - Outer - manual - b                        2-SI-717                    NA No. 7 - Safety Inj. Isolation - Outer -MOV SIAS                          2-SI-615                  NSR No. 7 - Safety Inj. Isolation - Outer -MOV SIAS                          2-SI-616                  NSR No. 7 - Safety Inj. Isolation - Outer -MOV SIAS                          2-SI-617                  NSR No. 7 - Safety Inj. Isolation - Outer -manual - b                        2-SI-041A                    NA No. 7 - Safety Inj. Isolation - Outer -manual - b                        2-SI-716                    NA No. 7 - Safety Inj. Isolation - Outer -manual - b                        2-SI-718                    NA No. 8 - Safety Inj. Isolation - Inner -check                              2-SI-706C                    NA No. 8 - Safety Inj. Isolation - Outer - manual - b                        2-SI-733                    NA No. 8 - Safety Inj. Isolation - Outer - manual - b                        2-SI-041D                    NA No. 8 - Safety Inj. Isolation - Outer - manual - b                        2-SI-742C                    NA No. 8 - Safety Inj. Isolation - Outer - MOV - SIAS                        2-SI-635                    NSR No. 8 - Safety Inj. Isolation - Outer - MOV - SIAS                        2-SI-636                    NSR No. 8 - Safety Inj. Isolation - Outer - MOV - SIAS                        2-SI-637                    NSR No. 8 - Safety Inj. Isolation - Outer - manual - b                        2-SI-041E                    NA No. 8 - Safety Inj. Isolation - Outer - manual - b                        2-SI-110                    NA No. 8 - Safety Inj. Isolation - Outer - manual - b                        2-SI-846                    NA MILLSTONE - UNIT 2                                        TRM 3/4 6-4                                LBDCR 13-MP2-015 October 16, 2013
 
Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description                                      Valve No. Maximum IsolationTime (seconds)
No. 9 - Safety Inj. Isolation - Inner - check                                      2-SI-706B                    NA No. 9 - Safety Inj. Isolation - Outer - manual - b                                  2-SI-722                    NA No. 9 - Safety Inj. Isolation - Outer - manual - b                                  2-SI-721                    NA No. 9 - Safety Inj. Isolation - Outer - manual - b                                  2-SI-742B                    NA No. 9 - Safety Inj. Isolation - Outer - MOV - SIAS                                  2-SI-625                    NSR No. 9 - Safety Inj. Isolation - Outer - MOV - SIAS                                  2-SI-626                    NSR No. 9 - Safety Inj. Isolation - Outer - MOV - SIAS                                  2-SI-627                    NSR No. 9 - Safety Inj. Isolation - Outer - manual - b                                  2-SI-723                    NA No. 9 - Safety Inj. Isolation - Outer - manual - b                                  2-SI-720                    NA No. 10 - RCS-SDC Suction Isolation - Inner - MOV                                    2-SI-651                    NSR No. 10 - RCS-SDC Suction Isolation - Inner - manual - b                            2-SI-043A                  NA No. 10 - RCS-SDC Suction Isolation - Outer - manual - b                            2-SI-102A                  NA No. 10 - RCS-SDC Suction Isolation - Outer - manual - b                            2-SI-101A                  NA No. 10 - RCS-SDC Suction Isolation - Outer - manual                                2-SI-709                    NA No. 11 - SIT Recirc & Test Line Isolation - Outer - manual - a                      2-SI-463                    NA No. 12 - Ctmt Sump SI Recirc Line Iso - Outer - MOV-SRAS                            2-CS-16.1A                  NSR No. 12 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b                          2-CS-130                    NA No. 12 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b                          2-CS-132                    NA No. 12 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b                          2-CS-133                    NA No. 12 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b                          2-CS-134                    NA No. 13 - Ctmt Sump SI Recirc Line Iso - Outer - MOV-SRAS                            2-CS-16.1B                  NSR No. 13 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b                          2-CS-135                    NA No. 13 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b                          2-CS-137                    NA No. 13 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b                          2-CS-138                    NA No. 13 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b                          2-CS-139                    NA No. 14 - Ctmt Sump Drain Line Iso - Inner - AOV-CIAS                                2-SSP-16.1                    5 No. 14 - Ctmt Sump Drain Line Iso - Outer - AOV-CIAS                                2-SSP-16.2                    5 No. 14 - Ctmt Sump Drain Line Iso - Outer - manual - b                              2-SSP-51                    NA No. 14 - Ctmt Sump Drain Line Iso - Outer - manual - b                              2-SSP-73                    NA MILLSTONE - UNIT 2                                                  TRM 3/4 6-5                                      LBDCR 03-2-7 September 11, 2003
 
Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description                                    Valve No.      Maximum IsolationTime (seconds)
No. 15 - Main Fd Iso - Outer - Check; Air Assist Open - AOV-MSI - a              2-FW-5A                          NA No. 15 - Aux Fd Iso - Outer - Check; Air Assist Open - AOV - a                    2-FW-12A                        NA No. 15 - Main Fd Iso - Outer - manual - b, a                                      2-FW-86                          NA No. 15 - Main Fd Iso - Outer - manual - b, a                                      2-FW-261A                        NA No. 15 - Main Fd Iso - Outer - manual - Hydrazine supply - a                      2-FW-15A                        NA No. 16 - Main Fd Iso - Outer - Check; Air Assist Open - AOV-MSI - a              2-FW-5B                          NA No. 16 - Main Fd Iso - Outer - Check; Air Assist Open - AOV - a                  2-FW-12B                        NA No. 16 - Main Fd Iso - Outer - manual - Hydrazine supply - a                      2-FW-15B                        NA No. 16 - Main Fd Iso - Outer - manual - b, a                                      2-FW-182                        NA No. 17 - Personnel Airlock LLRT Iso - b                                          2-AC-520                        NA No. 17 - Personnel Airlock LLRT Iso - b                                          2-AC-521                        NA No. 17 - Personnel Airlock LLRT Iso - b                                          2-AC-522                        NA No. 17 - Personnel Airlock Equalizing - Outer - Ball                              2-AC-523                        NA No. 17 - Personnel Airlock Equalizing - Inner - Ball                              2-AC-524                        NA No. 19 - Main Stm Iso - Outer -AOV - Steam dump valve - a                        2-MS-190A                      NSR No. 19 - Main Stm Iso - Outer - manual - b, a                                    2-MS-371                        NA No. 19 - Main Stm Iso - Outer - MOV-Stm to AFW pump - a                          2-MS-201                        NSR No. 19 - Main Stm Iso - Outer - manual bypass, a                                  2-MS-459                        NA No. 19 - Main Stm Iso - Outer -manual - b, a                                      2-MS-297                        NA No. 19 - Main Stm Iso - Outer - AOV - MSI closes valve - a                        2-MS-265B                        6 No. 19 - Main Stm Iso - Outer - Relief valves(8) - a                              2-MS-247 thru 254                NA No. 19 - Main Stm Iso - Outer - MSI - air open - check - a                        2-MS-64A                          6 No. 19 - Main Stm Iso - Outer - MOV - MSI closes - a                              2-MS-65A                        NSR No. 19 - Main Stm Iso - Outer - manual - b, a                                    2-MS-255                        NA No. 20 - Main Stm Iso - Outer - AOV - Steam dump valve, - a                      2-MS-190B                      NSR No. 20 - Main Stm Iso - Outer - manual - b, a                                    2-MS-369                        NA No. 20 - Main Stm Iso - Outer - MOV - Stm to AFW pump - a                        2-MS-202                        NSR No. 20 - Main Stm Iso - Outer - manual bypass - a                                2-MS-458                        NA No. 20 - Main Stm Iso - Outer - manual - b, a                                    2-MS-296                        NA No. 20 - Main Stm Iso - Outer - AOV - MSI closes valve - a                        2-MS-266B                        6 No. 20 - Main Stm Iso - Outer - Relief valves (8), a                              2-MS-239 thru 246                NA No. 20 - Main Stm Iso - Outer - MSI - air open - check - a                        2-MS-64B                          6 MILLSTONE - UNIT 2                                                TRM 3/4 6-6                                        LBDCR 03-2-7 September 11, 2003
 
Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description                                    Valve No. Maximum IsolationTime (seconds)
No. 20 - Main Stm Iso - Outer - MOV - MSI closes - a                              2-MS-65B                  NSR No. 20 - Main Stm Iso - Outer - manual - b, a                                    2-MS-258                  NA No. 21 - RCS Loop 1 smpl Iso. - Inner - AOV-CIAS                                  2-RC-001                    5 No. 21 - RCS Pzr Surge Line smpl Iso - Inner - AOV-CIAS                          2-RC-002                    5 No. 21 - RCS Pzr Stm Space smpl Iso - Inner - AOV-CIAS                            2-RC-003                    5 No. 21 - RCS - PDT&QT smpl Iso - Inner - AOV-CIAS                                2-LRR-61.1                  5 No. 21 - RCS Sample Line Iso - Inner - sample valve - manual - b                  2-RC-434                  NA No. 21 - RCS Sample Line Iso - Outer - AOV-CIAS                                  2-RC-045                    5 No. 21 - RCS Sample Line Iso - Inner - sample valve - manual - b                  2-RC-435                  NA No. 22 - SG No. 1 Blwdwn Iso - Outer - AOV-CIAS, AFAIS, Hi Rad - a                2-MS-220A                    5 No. 23 - SG No. 2 Blwdwn Iso - Outer - AOV-CIAS, AFAIS, Hi Rad - a                2-MS-220B                    5 No. 24 - RBCCW Sply to RCPs Iso - Outer - MOV - a                                2-RB-30.1A                NSR No. 24 - RBCCW Sply to RCPs - Outer - manual - b, a                              2-RB-289                    NA No. 25 - RBCCW Sply to CAR coolers - Outer - AOV - a                              2-RB-28.1D                NSR No. 25 - RBCCW Sply to CAR coolers - Outer - manual - b, a                        2-RB-282                  NA No. 26 - RBCCW Sply to CAR coolers - Outer - AOV - a                              2-RB-28.1B                NSR No. 26 - RBCCW Sply to CAR coolers - Outer - manual - b, a                        2-RB-283                  NA No. 26 - RBCCW Sply to CAR coolers - Outer - manual - b, a                        2-RB-345                  NA No. 27 - RBCCW Sply to CAR coolers - Outer - AOV - a                              2-RB-28.1A                NSR No. 27 - RBCCW Sply to CAR coolers - Outer - manual - b, a                        2-RB-236                  NA No. 28 - RBCCW Sply to CAR coolers - Outer - AOV - a                              2-RB-28.1C                NSR No. 28 - RBCCW Sply to CAR coolers - Outer - manual - b, a                        2-RB-237                  NA No. 29 - RBCCW Return fm RCPs - Outer - MOV - a                                  2-RB-37.2A                NSR No. 29 - RBCCW Return fm RCPs - Outer - manual - b, a                            2-RB-298                    NA No. 29 - RBCCW Return fm RCPs - Outer - manual - b, a                            2-RB-297A                  NA No. 30 - RBCCW Ret fm CAR cooler - Outer - AOV - a                                2-RB-28.2D                NSR MILLSTONE - UNIT 2                                                TRM 3/4 6-7                                    LBDCR 03-2-7 September 11, 2003
 
Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description                                  Valve No. Maximum IsolationTime (seconds)
No. 30 - RBCCW Ret fm CAR cooler - Outer - SIAS AOV - a                        2-RB-28.3D                  NSR No. 31 - RBCCW Ret fm CAR cooler - Outer - AOV - a                            2-RB-28.2B                NSR No. 31 - RBCCW Ret fm CAR cooler - Outer - SIAS AOV - a                        2-RB-28.3B                  NSR No. 32 - RBCCW Ret fm CAR cooler - Outer - AOV - a                            2-RB-28.2A                NSR No. 32 - RBCCW Ret fm CAR cooler - Outer - SIAS AOV - a                        2-RB-28.3A                NSR No. 33 - RBCCW Ret fm CAR cooler - Outer - AOV - a                            2-RB-28.2C                  NSR No. 33 - RBCCW Ret fm CAR cooler - Outer - SIAS AOV - a                        2-RB-28.3C                  NSR No. 34 - Nitrogen Sply to Ctmt Iso - Outer - AOV-CIAS                          2-SI-312                      5 No. 34 - Nitrogen Sply to Ctmt - Outer - manual - b                            2-SI-045                    NA No. 35 - Prim Drain Tank Disch - Inner Iso - AOV-CIAS                          2-LRR-43.1                    5 No. 35 - Prim Drain Tank Disch - Outer Iso - AOV-CIAS                          2-LRR-43.2                    5 No. 35 - Prim Drain Tank Disch - Outer Iso - manual - b                        2-LRR-291                    NA No. 35 - Prim Drain Tank Disch - Outer Iso - manual - b                        2-LRR-293                    NA No. 35 - Prim Drain Tank Disch - Outer Iso - manual - b                        2-LRR-295                    NA No. 36 - Instr Air BU to Ctmt - Inner Iso check                                2-IA-569                    NA No. 36 - Instr Air BU to Ctmt - Inner - manual - b                            2-IA-572                    NA No. 36 - Instr Air BU to Ctmt - Outer Iso - manual                            2-IA-566                    NA No. 37 - Instr Air Sply to Ctmt - Inner - Iso - check                          2-IA-43                      NA No. 37 - Instr Air Sply to Ctmt - Outer Iso - AOV                              2-IA-27.1                  NSR No. 37 - Instr Air Sply to Ctmt - Outer - Manual - b                          2-IA-40                      NA No. 38 - Station Air Sply to Ctmt - Inner - manual - b                        2-SA-28                      NA No. 38 - Station Air Sply to Ctmt - Outer Iso - manual                        2-SA-19                      NA No. 38 - Station Air Sply to Ctmt - Inner Iso - check                          2-SA-22                      NA No. 39 - Ctmt Air PURGE Sply - Outer Iso - AOV-HiRad                          2-AC-4                      NSR No. 39 - Ctmt Air PURGE Sply - Inner Iso - AOV-HiRad                          2-AC-5                      NSR No. 39 - Ctmt Air PURGE Sply - Outer Iso - manual - b                          2-AC-21                      NA MILLSTONE - UNIT 2                                            TRM 3/4 6-8                                  LBDCR 07-MP2-010 October 5, 2009
 
Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description                                      Valve No. Maximum IsolationTime (seconds)
No. 40 - Ctmt Air PURGE Sply - Outer Iso - AOV-HiRad                              2-AC-7                    NSR No. 40 - Ctmt Air PURGE Sply - Inner Iso - AOV-HiRad                              2-AC-6                    NSR No. 40 - Ctmt Air PURGE Sply - Inner - manual - b                                2-AC-31                    NA No. 42 - Fuel Transfer Tube - Inner - manual                                      Blank Flange                NA No. 42 - Fuel Transfer Tube Flange Test - Inner - manual - b                      2-RW-31                    NA No. 42 - Fuel Transfer Tube - Inner - manual - b                                  2-RW-291                    NA No. 42 - Sleeve Drain Valve - Inner - manual - b                                  2-RW-292                    NA No. 43 - RCP seals bleedoff Inner AOV-CIAS                                        2-CH-506                    5 No. 43 - RCP seals bleedoff Outer AOV-CIAS                                        2-CH-505                    5 No. 43 - RCP seals bleedoff Outer AOV-CIAS                                        2-CH-198                    5 No. 43 - RCP seals bleedoff Line Outer - manual - b                              2-CH-744                    NA No. 43 - RCP seals bleedoff Line Outer - manual - b                              2-CH-768                    NA No. 43 - RCP seals bleedoff Line Outer - manual - b                              2-CH-758                    NA No. 43 - RCP seals bleedoff Line Outer - manual - b                              2-CH-701                    NA No. 49 - Fire Header Ctmt Sply - Outer Iso - manual                              2-FIRE-108                  NA No. 49 - Fire Header Ctmt Sply - Outer - manual - b                              2-FIRE-125                  NA No. 49 - Fire Header Ctmt Sply - Inner Iso - check                                2-FIRE-109                  NA No. 51 - Waste Gas fm Ctmt - Inner Iso - AOV-CIAS                                2-GR-11.1                    5 No. 51 - Waste Gas fm Ctmt - Outer - manual - b                                  2-GR-63                    NA No. 51 - Waste Gas fm Ctmt - Outer Iso - AOV-CIAS                                2-GR-11.2                    5 No. 53 - RBCCW Sply to RCPs - Outer - MOV -a                                      2-RB-30.1B                NSR No. 53 - RBCCW Sply to RCPs - Outer - manual - b, a                              2-RB-291                    NA No. 54 - RBCCW Return fm RCPs - Outer - MOV - a                                  2-RB-37.2B                NSR No. 54 - RBCCW Return fm RCPs - Outer - manual - b, a                            2-RB-300                    NA No. 54 - RBCCW Return fm RCPs - Outer - manual - b, a                            2-RB-299A                  NA No. 61 - Ctmt Air Monitor Sply - Inner Iso - AOV, CIAS                            2-EB-88                      5 No. 61 - Ctmt Air Monitor Sply - Outer - manual - b                              2-AC-101                    NA No. 61 - Ctmt Air Monitor Sply - Outer Iso - AOV, CIAS                            2-AC-12                      5 MILLSTONE - UNIT 2                                                TRM 3/4 6-9                                LBDCR 07-MP2-010 October 5, 2009
 
Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description                                    Valve No. Maximum IsolationTime (seconds)
No. 62 - Ctmt Air Monitor Rtrn - Inner Iso - check                              2-AC-54                        5 No. 62 - Ctmt Air Monitor Rtrn - Outer Iso - manual - b                          2-AC-103                      NA No. 62 - Ctmt Air Monitor Rtrn - Outer Iso - AOV, CIAS                          2-AC-15                        5 No. 63 - Ctmt ILRT Instrument Test - Inner Iso - manual                          2-AC-117                      NA No. 63 - Ctmt ILRT Instrument Test - Outer Iso - manual                          2-AC-114                      NA No. 63 - Ctmt ILRT Instr. - Outer Test Flange                                    Blank Flange                  NA No. 64 - Ctmt ILRT Instrument Test - Inner Iso - manual                          2-AC-116                      NA No. 64 - Ctmt ILRT Instrument Test - Outer Iso - manual                          2-AC-112                      NA No. 64 - Ctmt ILRT Instr. - Outer Test Flange                                    Blank Flange                  NA No. 65 - SG #1 Bldn Sample - Outer Iso - AOV, CIAS a                            2-MS-191A                      5 No. 67 - Refueling Water Purif. Rtrn - Inner Iso - manual                        2-RW-232                      NA No. 67 - Refueling Water Purif. Rtrn - Outer Iso - manual                        2-RW-21                      NA No. 67 - Refueling Water Purif. Rtrn - Outer - manual - b                        2-RW-158                      NA No. 68 - Refueling Water Purif. Sply - Inner Iso - manual                        2-RW-154                      NA No. 68 - Refueling Water Purif. Sply - Outer Iso - manual                        2-RW-63                      NA No. 68 - Refueling Water Purif. Sply - Outer - manual - b                        2-RW-159                      NA No. 72 - SG #2 Bldn Sample - Outer Iso - AOV, CIAS a                            2-MS-191B                      5 No. 82 - Hyd. PURGE - Inner Iso - AOV - CIAS, HiRad                              2-EB-91                        5 No. 82 - Hyd. PURGE - Outer Iso - AOV - CIAS, HiRad                              2-EB-92                        5 No. 82 - Hyd. PURGE -Outer - manual - b                                          2-EB-120                      NA No. 82 - Hyd. PURGE - Inner - manual                                            2-EB-86                      NA No. 83 - Hyd. PURGE - Inner Iso - AOV - CIAS, HiRad                              2-EB-100                      5 No. 83 - Hyd. PURGE - Outer Iso - AOV - CIAS, HiRad                              2-EB-99                        5 No. 83 - Hyd. PURGE -Outer - manual - b                                          2-EB-121                      NA No. 85 - Ctmt ILRT Pressurization - Outer Iso. - manual                          SF-01 Sp. Flnge              NA No. 85 - Ctmt ILRT Pressurization - Outer - manual - b                          2-AC-107                      NA No. 85 - Ctmt ILRT Pressurization - Inner Iso Flange                            Blank Flange                  NA MILLSTONE - UNIT 2                                              TRM 3/4 6-10                                LBDCR 07-MP2-010 October 5, 2009
 
Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description                                      Valve No.              Maximum IsolationTime (seconds)
No. 86 - Ctmt Air Monitor Sply - Inner Iso - AOV, CIAS                            2-EB-89                                          5 No. 86 - Ctmt Air Monitor Sply - Outer - manual - b                              2-AC-102                                        NA No. 86 - Ctmt Air Monitor Sply - Outer Iso - AOV, CIAS                            2-AC-47                                          5 No. 87 - Ctmt Air Monitor Rtrn - Inner Iso - check                                2-AC-55                                          NA No. 87 - Ctmt Air Monitor Rtrn - Outer - manual - b                              2-AC-104                                        NA No. 87 - Ctmt Air Monitor Rtrn - Outer Iso - AOV, CIAS                            2-AC-20                                          5 a = The Allowed Outage Time = 72 hours b = Vent, Drain, or Test Connection NA = Closure Time is Not Applicable to Manual Valves, Relief Valves, Blind Flanges and Check Valves NSR = No Stroke time Required. This is applicable for valves that are open, go open, open during an accident or valves that are normally shut and stay shut during an accident.
MILLSTONE - UNIT 2                                              TRM 3/4 6-11                                                          LBDCR 03-2-7 September 11, 2003
 
TECHNICAL REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS TECHNICAL REQUIREMENT 3.6.4.1    Two independent containment hydrogen monitors shall be FUNCTIONAL.
APPLICABILITY:        MODES 1 and 2.
ACTION:
: a. With one hydrogen monitor nonfunctional, restore the nonfunctional monitor to FUNCTIONAL status within 30 days or otherwise initiate corrective actions.
: b. With both hydrogen monitors nonfunctional, restore at least one monitor to FUNCTIONAL status within 72 hours or otherwise initiate corrective actions.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.6.4.1    Each hydrogen monitor shall be demonstrated FUNCTIONAL:
: a. By the performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days, and
: b. By the performance of a CHANNEL CALIBRATION at least once per 92 days on a STAGGERED TEST BASIS.
BASES:
The containment hydrogen monitors are used to assess the degree of core damage during beyond-design-basis accidents and to confirm that random or deliberate ignition of hydrogen in the containment atmosphere has taken place. Each containment hydrogen monitor is required to be FUNCTIONAL within 90 minutes after initiation of safety injection. The requirement that monitors be FUNCTIONAL within 90 minutes is based on the NRCs expectation outlined in Regulatory Guide 1.7, Revision 3, Control of Combustible Gas Concentration in Containment Following a LOCA. If an explosive gas mixture threatens CONTAINMENT INTEGRITY during beyond-design-basis events, then severe accident management guidelines use the hydrogen monitors to implement strategies that protect the integrity of the containment boundary.
MILLSTONE - UNIT 2                TRM 3/4 6-12                    LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS BASES: (Continued)
The equipment for monitoring containment hydrogen levels must be FUNCTIONAL, reliable and capable of continuously measuring the concentration of hydrogen in the containment atmosphere following beyond-design-basis accidents to facilitate accident management, including emergency planning. Since these monitors are not required to mitigate the effects of design basis events, entry into other operational MODES is permitted while taking ACTIONS to restore these monitors to service.
The hydrogen monitors are connected directly to the containment boundary and are an extension of the containment boundary during post accident conditions. When placed into service, any leakage from these monitors would bypass the enclosure building filtration region and discharge to atmosphere. Therefore, pressure boundary integrity is subject to Technical Specification 6.13 "Systems Integrity," which establishes a program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels.
The TECHNICAL SURVEILLANCE REQUIREMENT To perform a CHANNEL CALIBRATION at least every 92 days is based upon vendor recommendations to maintain sensor calibration. This calibration consists of a two-point calibration, utilizing the following sample gases:
: a. One volume percent hydrogen, balance nitrogen
: b. Four volume percent hydrogen, balance nitrogen The ACTION requirement to initiate corrective actions means that the problem is entered into the Millstone Corrective Action Program and addresses why the hydrogen monitor(s) was (were) not restored to FUNCTIONAL status within the specified time. Use of the corrective action process in this situation will ensure management attention and oversight to minimize the additional time the containment hydrogen monitor(s) is (are) nonfunctional. ACTIONS shall be taken in a timely manner to establish alternate methods for determining hydrogen concentration levels as needed and determined by management.
MILLSTONE - UNIT 2                TRM 3/4 6-13                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS
 
==REFERENCE:==
: 1. Amendment No. 287, dated June 29, 2005
: 2. DCR M2-04009, Implementation of Revised Combustible Gas (Hydrogen) Control Requirements in Containment
: 3. Regulatory Commitment RCR-42915 as described in Letter Serial No. 04-386, dated September 8, 2004
: 4. Consolidated Line Item Improvement Process Notice of Availability, published September 25, 2003 (68 FR 55416) in support of TSTF-447 MILLSTONE - UNIT 2            TRM 3/4 6-14                      LBDCR 05-MP2-007 August 4, 2005
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION TECHNICAL REQUIREMENT 3.7.2.1  The temperatures of both the primary and secondary coolants in the steam generators shall be > 70&deg;F when the pressure of either coolant in the steam generator is > 200 psig.
APPLICABILITY:
All MODES.
ACTION:
With the requirements of the above specification not satisfied:
: a. Immediately reduce the steam generator pressure to  200 psig, and
: b. Perform an analysis to determine the effect of the overpressurization on the structural integrity of the steam generator. Determine that the steam generator remains acceptable for continued operation prior to increasing its temperatures above 200&deg;F.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.2.1  The temperatures of both the primary and secondary coolants in the steam generators shall be determined to be > 70&deg;F at least once per hour when pressures in the steam generators are > 200 psig and Tavg is < 200&deg;F.
MILLSTONE - UNIT 2                  TRM 3/4 7-1                      LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION BASES:
The limitation on steam generator pressure and temperature ensures that the pressure-induced stresses in the steam generators do not exceed the maximum allowable fracture toughness stress limits. The limitations of 70&deg;F and 200 psig are based on a steam generator RTNDT of 50&deg;F and are sufficient to prevent brittle fracture.
 
==REFERENCE:==
: 1. License Amendment No. 272 MILLSTONE - UNIT 2              TRM 3/4 7-2                              LBDCR 03-2-1 February 27, 2003
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.5 FLOOD LEVEL TECHNICAL REQUIREMENT 3.7.5.1  At least one FUNCTIONAL service water pump motor shall be protected against flooding to a minimum elevation of 28 feet Mean Sea Level USGS datum if either:
: a. The water level, including wave crest height, is exceeding plant grade level (14.0 feet Mean Sea level USGS datum), or
: b. Three or more of the following conditions are occurring simultaneously:
: 1. The center of circulation of a storm with sustained winds greater than 60 miles per hour, as determined by radar, or reconnaissance, is presently located within the critical area as defined on Figure 3.7-1.
: 2. The projected track of a storm, with sustained winds greater than 60 miles per hour, which is expected to strike the facility within 12 hours as determined by radar, reconnaissance, or forecasted track projection, is from between 130&deg; clockwise to 350&deg;.
: 3. The central pressure of the storm expected to strike the facility within 12 hours is or is forecasted to be  28.0 in. Hg; or the measured 15 minute average wind speed at nominal elevation 33 feet from on site meteorological instrumentation exceeds 60 miles per hour.
: 4. A storm with sustained winds greater than 60 miles per hour is: expected to strike the facility within 12 hours; and the 15 minute average wind direction at nominal elevation 33 feet from on site meteorological instrumentation is from the sector 150&deg; clockwise to 300&deg;.
APPLICABILITY:
ALL MODES.
ACTION:
With the water level, including wave crest height, exceeding either plant grade or with three or more of the above specified meteorological conditions being exceeded simultaneously, immediately initiate ACTION to protect at least one service water pump motor against flooding to a minimum elevation of 28 feet; complete this protective ACTION within 2 hours.
MILLSTONE - UNIT 2                  TRM 3/4 7-3                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.5 FLOOD LEVEL TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.5.1.1 The water level, including wave crest height, shall be determined to be below plant grade at least once per hour when the center of circulation of a storm with sustained winds greater than 60 miles per hour is expected to strike the facility within 12 hours.
4.7.5.1.2 The following conditions shall be determined at least once per 2 hours when the center of circulation of a storm with sustained winds greater than 60 miles per hour is expected to strike the facility within 12 hours. The meteorological conditions shall be determined from weather service forecasts and/or from the site meteorological instrumentation:
* location of center of storm
* forecasted time storm is expected to strike
* storm track (actual and forecasted)
* storm approach angle
* central pressure of storm
* 33 feet 15 minute average wind speed
* 33 feet 15 minute average wind direction MILLSTONE - UNIT 2                TRM 3/4 7-4                          LBDCR 07-MP2-010 October 5, 2009
 
FIGURE 3.7-1 CRITICAL AREA MILLSTONE - UNIT 2  TRM 3/4 7-5    LBDCR 03-2-1 February 27, 2003
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.5 FLOOD LEVEL BASES:
Water level must rise above 22 feet above mean sea level before reaching the base of the service water pump motors. Therefore service water pump motors are normally protected against water damage to an elevation of 22 feet. If the water level is exceeding plant grade level or if a severe storm is approaching the plant site, one service water pump motor will be protected against flooding to a minimum elevation of 28 feet. This will ensure that this pump will continue to be capable of removing decay heat from the reactor. In order to ensure accessibility to the intake structure, ACTION to provide pump motor protection will be initiated when the water level including wave crest height reaches plant grade level. Entry into the ACTION to protect one service water pump from the flooding precludes any need to perform surveillance requirements.
 
==REFERENCE:==
: 1. License Amendment No. 272 MILLSTONE - UNIT 2                TRM 3/4 7-6                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.7 SEALED SOURCE CONTAMINATION TECHNICAL REQUIREMENT 3.7.7.1    Each sealed source containing radioactive material either in excess of 100 microcuries of beta and/or gamma emitting material or 5 microcuries of alpha emitting material shall be free of  0.005 microcuries of removable contamination.
APPLICABILITY:
AT ALL TIMES.
ACTION:
: a. Each sealed source having removable contamination in excess of the above limit shall be immediately withdraw from use and:
: 1.      Either decontaminated and repaired, or
: 2.      Disposed of in accordance with Commission Regulations.
: b. The provisions of TECHNICAL REQUIREMENT 3.0.3 are not applicable.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.7.1.1 Test Requirements - Each sealed source shall be tested for leakage and/or contamination by:
: a.      The licensee, or
: b.      Other persons specifically authorized by the Commission or an Agreement State.
The test method shall have a detection sensitivity of at least 0.005 microcuries per test sample.
4.7.7.1.2 Test Frequencies - Each category of sealed sources shall be tested at the frequencies described below.
: a.      Sources in use (excluding STARTUP sources previously subjected to core flux) - At least once per six months for all sealed sources containing radioactive materials:
MILLSTONE - UNIT 2                  TRM 3/4 7-7                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.7 SEALED SOURCE CONTAMINATION TECHNICAL SURVEILLANCE REQUIREMENTS (Continued)
: 1)    With a half-life greater than 30 days (excluding Hydrogen 3), and
: 2)    In any form other than gas.
: b. Stored sources not in use - Each sealed source shall be tested prior to use or transfer to another licensee unless tested within the previous six months. Sealed sources transferred without a certificate indicating the last test date shall be tested prior to being placed into use.
: c. STARTUP sources - Each sealed STARTUP source shall be tested prior to being subjected to core flux and following repair or maintenance to the source.
MILLSTONE - UNIT 2            TRM 3/4 7-8                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.7 SEALED SOURCE CONTAMINATION BASES:
The limitations on sealed source removable contamination ensure that the total body or individual organ irradiation does not exceed allowable limits in the event of ingestion or inhalation of the source material. The limitations on removable contamination for sources requiring leak testing, including alpha emitters, is based on 10 CFR 70.39(a)(3) limits for plutonium. Leakage of sources excluded from the requirements of this specification represent less than one maximum permissible body burden for total body irradiation if the source material is inhaled or ingested.
Sealed sources are classified into three groups according to their use, with TECHNICAL SURVEILLANCE REQUIREMENTS commensurate with the probability of damage to a source in that group. Those sources, which are not frequently handled, are required to be tested more often than those which are not. Sealed sources, which are continuously enclosed within a shielded mechanism (i.e., sealed sources within radiation monitoring or boron measuring devices), are considered to be stored and need not be tested unless they are removed from the shield mechanism.
 
==REFERENCE:==
: 1. License Amendment No. 272 MILLSTONE - UNIT 2                TRM 3/4 7-9                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.1 FIRE SUPPRESSION WATER SYSTEM TECHNICAL REQUIREMENT 3.7.9.1 The fire suppression water system shall be FUNCTIONAL with:
: a. Three high pressure fire pumps, each with a capacity of at least 1,800 gpm, with pump discharge aligned to the fire suppression header,
: b. Two water supplies, each with a minimum contained volume of 200,000 gallons, and
: c. A FUNCTIONAL flow path capable of taking suction from the fire water tanks and transferring the water through distribution piping with FUNCTIONAL sectionalizing control or isolation valves to the yard hydrant curb valves and the first valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser required to be FUNCTIONAL per TECHNICAL REQUIREMENTS 3.7.9.2 (Spray/Sprinkler TECHNICAL REQUIREMENT) and 3.7.9.3 (Fire Hose Stations TECHNICAL REQUIREMENT).
APPLICABILITY:
At all times.
ACTION:
: a. With one pump and/or one water supply nonfunctional:
: 1. Restore the nonfunctional equipment to FUNCTIONAL status within 7 days OR
: 2. Provide an alternate backup pump or water supply within 24 hours AND develop a plan and schedule, within 14 days, for restoring the system to FUNCTIONAL status.
: b. With two pumps nonfunctional:
: 1. Establish a continuous fire watch in the Turbine Building with backup suppression within 1 hour AND
: 2. Provide an alternate backup pump within 24 hours AND MILLSTONE - UNIT 2                TRM 3/4 7-10                        LBDCR 07-MP2-015 February 2, 2010
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.1 FIRE SUPPRESSION WATER SYSTEM TECHNICAL SURVEILLANCE REQUIREMENTS
: 3. Restore the nonfunctional equipment to FUNCTIONAL status within 7 days OR develop a plan and schedule, within 14 days, for returning the equipment to FUNCTIONAL status.
: c. With the Fire Suppression Water System otherwise nonfunctional:
: 1. Establish a continuous fire watch in the Turbine Building with backup suppression within 1 hour AND
: 2. Restore the fire suppression water distribution system to FUNCTIONAL within 24 hours OR
: 3. Establish a backup Fire Suppression Water System within 24 hours AND develop a plan and schedule, within 14 days, for restoring the system to FUNCTIONAL status.
4.7.9.1 The fire suppression water system shall be demonstrated FUNCTIONAL:
: a. At least once per 7 days, by verifying the contained water supply volume.
: b. At least once per 31 days, on a STAGGERED TEST BASIS, by starting each electric motor driven pump and operating it for at least 15 minutes on recirculation flow.
: c. At least once per 31 days, by verifying that each valve (manual, power operated or automatic) in the flow path is in its correct position.
: d. At least once per 12 months, by cycling each testable valve in the flow path through at least one complete cycle of full travel.
: e. At least once per 18 months, by performing a system FUNCTIONAL test which includes simulated automatic actuation of the system throughout its operating sequence, and:
: 1. Verifying that each pump develops at least 1800 gpm at a pump differential pressure of 100 psid, and MILLSTONE - UNIT 2                TRM 3/4 7-11                        LBDCR 07-MP2-015 February 2, 2010
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.1 FIRE SUPPRESSION WATER SYSTEM TECHNICAL SURVEILLANCE REQUIREMENTS
: 2. Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel, and
: 3. Verifying that each pump starts (sequentially) to maintain the fire suppression water system pressure greater than or equal to 75 psig.
: f. At least once per 3 years, by performing a flow test of the system in accordance with Chapter 5, Section 11, of the Fire Protection Handbook, 14th Edition, published by the National Fire Protection Association.
: g. The fire pump diesel engine shall be demonstrated FUNCTIONAL:
: 1. At least once per 31 days, by verifying:
: a. The fuel storage tank contains at least 125 gallons of fuel; and
: b. The engine starts from ambient conditions and operates for at least 30 minutes, while loaded with the fire pump on recirculation flow.
: 2. By verifying:
: a. At least once per 92 days, a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTM D270-65, is within the acceptable limits specified in Table 1 of ASTM D975-74 when checked for viscosity, water, and sediment.
: b. At least once per 18 months, by subjecting the engine to an inspection in accordance with procedures prepared in conjunction with its manufacturers recommendations for the class of service.
: 3. The diesel engine starting 12-volt batteries and charger shall be demonstrated FUNCTIONAL:
: a. At least once per 7 days, by verifying:
: 1. The electrolyte level of each battery cell is above the plates.
: 2. The voltage of each battery is greater than or equal to 12 volts.
MILLSTONE - UNIT 2                TRM 3/4 7-12                        LBDCR 07-MP2-015 February 2, 2010
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.1 FIRE SUPPRESSION WATER SYSTEM
: b. At least once per 92 days, by verifying the specific gravity is appropriate for continued service of the batteries.
: c. At least once per 18 months, by verifying:
: 1. The batteries, cell plates, and battery racks show no visual indication of physical damage or abnormal deterioration; and
: 2. The battery-to-battery and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material.
BASES:
: 1. The FUNCTIONALITY of the fire suppression system ensures adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the high pressure fire pumps, water supply tanks, fire hydrants, fire hose stations, distribution piping and valves, spray and/
or sprinkler systems and Halon systems.
In the event that portions of the fire suppression systems are nonfunctional, alternate backup fire fighting equipment is required to be made available in the affected areas until the nonfunctional equipment is restored to service.
In the event the fire suppression water system becomes nonfunctional, immediate corrective measures must be taken since this system provides the major fire suppression capability of the plant.
: 2. It is the intent of monthly diesel engine fire pump testing to conduct this test during a different week than electric motor pump testing. Nominal monthly (once per 31 days) and 18 month surveillance requirements are consistent with the Unit 1 and 3 surveillance requirements. The surveillance procedures for each of the three fire pumps are common to Units 1, 2, and 3.
(See AR 97026324-03 for additional information).
 
==REFERENCE:==
: 1. Condition Report M3-00-2659 MILLSTONE - UNIT 2                  TRM 3/4 7-12a                        LBDCR 07-MP2-015 February 2, 2010
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.2 SPRAY AND/OR SPRINKLER SYSTEMS TECHNICAL REQUIREMENT 3.7.9.2  The following spray and/or sprinkler systems shall be FUNCTIONAL:
: a. Diesel Generator Rooms
: b. Diesel Generator Day Tank Rooms
: c. Cable Vault (Aux. Building)
: 1. Sprinkler (in tray)
: 2. Sprinkler (ceiling level)
: d. Cable Vault (Turbine Building)
: 1. Automatic Wet Pipe Sprinkler System (450)
: 2. Automatic Deluge System (vertical cable shaft and elevation 250 cable vault)
: e. Hydrogen Seal Oil Unit
: f. Turbine Building Northeast Corner
: g. Turbine Building 316/146 - North
: h. Turbine Building 316/146 - South
: i. Lube Oil Room
: j. Aux. Building (-456) General Area
: k. Aux. Building (146) Truck Access
: l. Turbine Bearing
: m. Steam Generator Feed Pumps
: n. Aux. Bldg. (146) at MCC B-61
: o. Aux. Bldg. (-256) at Charging Pump Cubicle
: p. Aux. Bldg. (146) General Area APPLICABILITY:
Whenever equipment in the spray/sprinkler protected areas is required to be FUNCTIONAL.
ACTION:
: a. With one or more of the above required spray and/or sprinkler systems nonfunctional, establish a continuous fire watch with backup fire suppression equipment for the unprotected area(s) within 1 hour. Restore the nonfunctional equipment to FUNCTIONAL status within 14 days, or develop a plan and schedule for restoring the equipment to FUNCTIONAL status.
MILLSTONE - UNIT 2              TRM 3/4 7-13                      LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.2 SPRAY AND/OR SPRINKLER SYSTEMS TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.9.2  Each of the above required spray and/or sprinkler systems shall be demonstrated FUNCTIONAL:
: a. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
: b. At least once per 18 months:
: 1. By performing a system FUNCTIONAL test which includes simulated automatic actuation of the system; and:
a)    Verifying that the automatic valves in the flow path actuate to their correct positions on a simulated test signal, and b)    Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel.
: 2. By inspection of the spray headers to verify their integrity, and
: 3. By inspection of each nozzle to verify no blockage.
: c. At least once per 3 years by performing an air or water flow test through each open head spray/sprinkler header and verifying each open head spray/sprinkler nozzle is unobstructed.
MILLSTONE - UNIT 2                TRM 3/4 7-14                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.2 SPRAY AND/OR SPRINKLER SYSTEMS BASES:
The FUNCTIONALITY of the fire suppression system ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.
In the event that portions of the fire suppression systems are nonfunctional, alternate backup fire fighting equipment is required to be made available in the affected areas until the nonfunctional equipment is restored to service.
In the event the fire suppression water system becomes nonfunctional, immediate corrective measures must be taken since this system provides the major fire suppression capability of the plant.
 
==REFERENCE:==
: 1. Condition Report M3-00-2659 MILLSTONE - UNIT 2                  TRM 3/4 7-15                      LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.3 FIRE HOSE STATIONS TECHNICAL REQUIREMENT 3.7.9.3    The fire hose stations shown in TRM Table 4.7-5 shall be FUNCTIONAL.
APPLICABILITY:
Whenever equipment in the areas protected by the fire hose stations is required to be FUNCTIONAL*.
ACTION:
With one or more of the fire hose stations shown in TRM Table 4.7-5 nonfunctional, route an additional equivalent capacity fire hose to the unprotected area(s) from an FUNCTIONAL hose station within 1 hour or establish a continuous fire watch with backup fire suppression equipment for the unprotected area(s). If the nonfunctional hose station(s) is not the primary means of fire suppression, then route the additional fire hose(s) or establish a continuous fire watch with fire suppression equipment within 24 hours.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.9.3    Each of the fire hose stations shown in TRM Table 4.7-5 shall be demonstrated FUNCTIONAL.
: a. At least once per 31 days by visual inspection of the station to assure all required equipment is at the station. The exception to the above will be the containment hose stations. The equipment will be located outside containment except when the unit is in COLD SHUTDOWN.
: b. At least once per 18 months by:
: 1. Removing the hose for inspection and re-racking, and
: 2. Replacement of all degraded gaskets in couplings.
: c. At least once per 3 years by:
: 1. Partially opening each hose station valve to verify valve FUNCTIONALITY and no flow blockage.
: 2. Conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at that hose station.
* Containment hose stations shall be FUNCTIONAL in MODE 5 when required to support maintenance activities and MODE 6.
MILLSTONE - UNIT 2                TRM 3/4 7-16                      LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.3 FIRE HOSE STATIONS BASES:
The FUNCTIONALITY of the fire suppression system ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.
In the event that portions of the fire suppression systems are nonfunctional, alternate backup fire fighting equipment is required to be made available in the affected areas until the nonfunctional equipment is restored to service.
In the event the fire suppression water system becomes nonfunctional, immediate corrective measures must be taken since this system provides the major fire suppression capability of the plant.
 
==REFERENCE:==
: 1. Condition Report M3-00-2659 MILLSTONE - UNIT 2                  TRM 3/4 7-17                      LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)
Table 4.7-5 Fire Hose Stations Hose Station        Bldg/Elevation                          Area Number 201-207            Turbine/146                    Turbine Building 208-214            Turbine/316                    Turbine Building 215-221            Turbine/546                    Turbine Building 222              Auxiliary/-456              Center of Open Area 223              Auxiliary/-256                    Near Elevator 224              Auxiliary/-50                    Near Elevator 225              Auxiliary/146                    Near Elevator 226              Auxiliary/386        Spent Fuel Pool - Northwest Corner 227              Auxiliary/146            Boric Acid Batch Tank Area 228              Auxiliary/146              Near MCC 22-1E (B51) 229              Auxiliary/146                    Railway Access 230              Auxiliary/386          Spent Fuel Pool - South Wall 231              Auxiliary/146                Outside Diesel Room 234              Auxiliary/386            Southeast Corner Stairway 240              Auxiliary/-50          Southeast Corner Stairway 241              Auxiliary/256        Cable Vault Southeast Entrance 242              Auxiliary/366          Control Room Ventilation Area 243              Turbine/450        North Entrance of Turbine Bldg. Cable Vaults 250-251          Containment/386              East & West Stairwells 248-249          Containment/146              East & West Stairwells 244-245          Containment/-226              East & West Stairwells MILLSTONE - UNIT 2          TRM 3/4 7-18                                TRMCR 01-2-11 December 6, 2001
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.4 HALON FIRE SUPPRESSION SYSTEM TECHNICAL REQUIREMENT 3.7.9.4    The following Halon 1301 fire suppression systems shall be FUNCTIONAL with an intact gas boundary, a FUNCTIONAL activation system, and a container having a net weight of not less than 95% of full charge weight at 325 psig minimum (corrected to 70&deg;F).
: a. West D.C. Switchgear Room.
: b. East D.C. Switchgear Room.
APPLICABILITY:
At all times.
ACTION:
With one or more of the above systems nonfunctional, establish a continuous fire watch with backup fire suppression equipment for the unprotected area(s) within 1 hour.
Restore the system to FUNCTIONAL status within 14 days, or develop a plan and schedule for restoring the system to FUNCTIONAL status.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.9.4    Each of the above halon fire suppression systems shall be demonstrated FUNCTIONAL.
: a. At least once per 6 months:
: 1. By performing a system FUNCTIONAL test which includes simulated automatic operation of the system; and,
: a. Simulated manual actuation of the system.
: b. Verifying that the storage containers have a net weight of not less than 95% of full charge weight at 325 psig (corrected to 70&deg;F).
: c. Verifying the associated dampers close.
: b. At least once per 18 months;
: 1. By performing a visual inspection of the discharge nozzles to assure no blockage.
: 2. By performing a visual inspection to assure the gas boundary is intact.
MILLSTONE - UNIT 2                TRM 3/4 7-19                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.4 HALON FIRE SUPPRESSION SYSTEM BASES:
The FUNCTIONALITY of the fire suppression system ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers, halon fire suppression system and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.
In the event that portions of the fire suppression systems are nonfunctional, alternate backup fire fighting equipment is required to be made available in the affected areas until the nonfunctional equipment is restored to service.
 
==REFERENCE:==
: 1. Condition Report M3-00-2659 MILLSTONE - UNIT 2                TRM 3/4 7-20                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.10 PENETRATION FIRE BARRIERS TECHNICAL REQUIREMENT 3.7.10    All fire rated assemblies (walls, floor/ceilings, cable tray enclosures, and other fire barriers) separating safety-related fire areas or separating portions of redundant systems important to safe shutdown within a fire area and all sealing devices in fire rated assembly penetrations (fire doors, fire windows, fire dampers, cable, piping, and ventilation duct penetration seals) shall be FUNCTIONAL.
APPLICABILITY:
At all times unless otherwise determined that the separation of safety-related fire areas or separating portions of redundant systems important to safe shutdown within a fire area is not required based on the MODE of operation.
ACTION:
With one or more of the above required fire rated assemblies and/or penetration sealing devices nonfunctional, within 1 hour:
: 1. Verify the fire areas/zones on at least one side of the affected fire rated assembly contains a FUNCTIONAL fire detection or automatic suppression system at the fire barrier and establish a fire watch patrol that inspects both areas at least once per hour. Roving fire watches must monitor the area of the device in question, as a minimum, within the specified time frame, plus or minus 25% of the time interval specified in the ACTION statement for periodic roving fire watches. The 25%
extension of the time interval specified does not degrade the reliability that results from performing the rove at the specified interval, based on plant experience, and Fire Protection Engineering analysis as documented in Technical Evaluation M3-EV-02-2005, or
: 2. Establish a continuous fire watch on at least one side of the affected fire rated assembly and/or penetration seal, or
: 3. Temporarily repair the nonfunctional fire rated assembly and/or sealing device and classify it as temporary.
All temporary repairs of nonfunctional fire rated assemblies and/or sealing devices shall be permanently repaired within 30 days, or implement ACTION 1 or 2 above.
MILLSTONE - UNIT 2                TRM 3/4 7-21                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.10 PENETRATION FIRE BARRIERS TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.10      The above required fire rated assemblies and penetration sealing devices shall be verified to be FUNCTIONAL by a visual inspection:
: a. At least once per 18 months for fire doors.
: b. At least once per 18 months for fire barrier penetration seals, on at least 10% of the total number of penetration seals. If any of the penetration seals in the inspection sample are found to be nonfunctional, then an additional 10% sample of the total number of penetration seals shall be visually inspected. Sampling and inspection shall continue until all of the seals in a sample are found FUNCTIONAL or 100% of the seals are inspected.
: c. At least once per 18 months for fire dampers, on at least 10% of the total number of fire dampers. If any of the fire dampers in the inspection sample are found to be nonfunctional, then an additional 10% sample of the total number of dampers shall be inspected. Sampling and inspection shall continue until all the fire dampers in a sample are found FUNCTIONAL or 100% of the fire dampers are inspected.
: d. Prior to returning a fire rated assembly and/or penetration sealing device to FUNCTIONAL
: e. status following repairs or maintenance.
BASES:
The FUNCTIONAL integrity of the penetration fire barriers ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility. This design feature minimizes the possibility of a single fire rapidly involving several areas of the facility prior to detection and extinguishment. The penetration fire barriers are a passive element in the facility fire protection program and are subject to periodic inspections.
During a period of time when a barrier is not FUNCTIONAL, alternate measures are taken to prevent the possible spread of fire. These measures include verifying the FUNCTIONALITY of fire detection or suppression systems on one side of the affected barrier and establishing a fire watch patrol, or posting a continuous, fire watch in the vicinity of the affected barrier, or installation of a temporary fire stop pending restoration of the permanent seal.
MILLSTONE - UNIT 2                  TRM 3/4 7-22                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.10 PENETRATION FIRE BARRIERS BASES: (Continued)
Roving fire watches must monitor the area of the device in question, as a minimum, within the specified time frame, plus or minus 25% of the time interval specified in the ACTION statement for periodic roving fire watches. The 25% extension of the time interval specified does not degrade the reliability that results from performing the rove at the specified interval, based on plant experience, and Fire Protection Engineering analysis as documented in Technical Evaluation M3-EV-02-2005.
 
==REFERENCE:==
: 1. Condition Report M3-00-2659
: 2. TRM Table 7-1: Barrier Fire Watch Matrix LBDCR 07-MP2-010 MILLSTONE - UNIT 2              TRM 3/4 7-23                              October 5, 2009
 
TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)
Table 7-1 Barrier Fire Watch Matrix Firewatch Determination - Index of Fire Areas/Zones FIRE    BUILDING                      DESCRIPTION                          ELEV.            APP R/ SUPPR OR *BARRIER AREA/ZONE                                                                                    SFTY REL  DETECTION FW REQD A-1 A      Auxiliary  Spent Resin Shipping Area                                -456            Y      S,D          Y A-1 B      Auxiliary  RBCCW Pump and Hx. Area                                  -256            Y      S1,D          Y A-1 C      Auxiliary  Waste Tank Pump Room                                    -456            Y        N            Y A-1 D      Auxiliary  Waste Tank Room                                          -456            N        N            N A-1 E      Auxiliary  Waste Gas Decay Tank Room                                -256            N        N            N A-1 F      Auxiliary  Waste Gas Comp. and Surge Tank                          -256            N        N            N A-1 G      Auxiliary  Boric Acid PP, SFP Hx.                                    -50            Y        D            Y A-1 H      Auxiliary  Volume Control Tank Room                                  -50            Y        N            Y A-1 I    Auxiliary  Auxiliary Evaporator and Tanks                            -50            Y        N            N A-1 J    Auxiliary  Evaporator and Tanks                                      -50            N        N            N A-3      Auxiliary  Safety Injection Pump Room                              -456            Y        D            Y A-4      Auxiliary  HPSI Pump Room                                          -456            Y        D            Y A-5      Auxiliary  Coolant Tanks Area                                      -256+            Y        N            Y A-6 A      Auxiliary  Charging Pump Room                                      -256            Y      S1,D          Y A-6 B      Auxiliary  Degasifier Area                                          -256            Y      S1,D          Y A-7      Auxiliary  Spent Resin Tank Area                                    -256            N        N            Y A-8 A      Auxiliary  Safety Injection Pump Room                              -456            Y        D            Y A-8 B      Auxiliary  Recirculation Valve Access                              -256            Y        N            Y A-8 C      Auxiliary  West Piping Penetration Room                              -50            Y        D            Y A-8 D      Auxiliary  West Ele Penetration Area                                -146            Y        D            Y A-8 E      Auxiliary  West Main Steam Safety Valve Room                        386            Y        N            Y A-9      Auxiliary  Maintenance Storage Crib                                  -50            N        D            Y A-10A      Auxiliary  East Piping Penetration Room                              -50            Y        D            Y A-10 B    Auxiliary  East Ele Penetration Area                                147            Y        D            Y MILLSTONE - UNIT 2                                TRM 3/4 7-24                                        LBDCR 14-MP2-015 September 24, 2014
 
TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)
Table 7-1 Barrier Fire Watch Matrix Firewatch Determination - Index of Fire Areas/Zones FIRE    BUILDING                      DESCRIPTION                            ELEV.            APP R/ SUPPR OR *BARRIER AREA/ZONE                                                                                      SFTY REL  DETECTION FW REQD A-10 C    Auxiliary  East Main Steam Safety Valve Room                        386            Y        N          Y A-11      Auxiliary  Ion Exchanger Room                                        -50            N        N          Y A-12 A    Auxiliary  Boric Acid and Chem Add. Tank                            146            Y      S,D          Y A-12 B    Auxiliary  Sample Area                                              146            N        N          Y A-12 C    Auxiliary  Borometer                                                146            N        N          Y A-13      Auxiliary  480 Volt MCC B61                                          146            Y      S1D          Y A-14A      Auxiliary  SFP and Cask Laydown Area                                -50            Y        N          Y A-14B      Auxiliary  Railroad Bay Area                                        146            Y        S          Y A-14C      Auxiliary  SFP and Fuel Handling Area                                386            Y        N          Y A-14D      Auxiliary  Filtration System Equip. Room                            146            Y      S1D          Y A-14E      Auxiliary  Cask Washdown Area                                        386            N        N          N A-15      Auxiliary  Diesel Generator Room A                                  146            Y      S,D          Y A-16      Auxiliary  Diesel Generator Room B                                  146            Y      S,D          Y A-17      Auxiliary  Solid Radwaste Drumming Storage Area                      146            Y        S          Y A-18      Auxiliary  Storage Area (Former Snubber Repair Shop)                146            N        S          Y A-19 A    Auxiliary  HP Access/Control Area (Former Maintenance                146            N        S          Y Shop)
A-19B      Auxiliary  RCP Seal Rebuild Area                                    386            Y      S1D1          Y A-20      Auxiliary  DC Equipment Room A (East)                                146            Y      S,D          Y A-21      Auxiliary  DC Equipment Room B (West)                                146            Y      S,D          Y A-22      Auxiliary  East Battery Room                                        146            Y        D          Y A-23      Auxiliary  West Battery Room                                        146            Y        D          Y A-24      Auxiliary  Cable Vault                                              256            Y      S,D          Y MILLSTONE - UNIT 2                                  TRM 3/4 7-25                                            LBDCR 02-2-10 August 8, 2002
 
TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)
Table 7-1 Barrier Fire Watch Matrix Firewatch Determination - Index of Fire Areas/Zones FIRE    BUILDING                      DESCRIPTION                          ELEV.            APP R/ SUPPR OR *BARRIER AREA/ZONE                                                                                    SFTY REL  DETECTION FW REQD A-25      Auxiliary  Main Control Room                                        386            Y      D1          Y A-26      Auxiliary  Operator Break Room (Former Computer Room)              386            N      S1D          Y A-27      Auxiliary  New Computer Room                                        386            N      S,D          Y A-28      Auxiliary  East 480V Load Center Room                              386            Y        D          Y A-29      Auxiliary  RCP Rebuild Shop Prep. Room                              386            N        S          Y A-30      Auxiliary  Diesel Oil Day Tank Room B                              386            Y        S          Y A-31      Auxiliary  Diesel Oil Day Tank Room A                              386            Y        S          Y A-32      Auxiliary  Air Handling Units                                      386            Y        D          Y A-33      Auxiliary  Ventilation Equipment Room                              386            Y        D          Y T-1 A      Turbine    General Area Elevation                                  146            Y        S          Y T-1 B      Turbine    Hydrogen Seal Oil Unit                                  146            N      S,D          Y T-1 C      Turbine    Mezzanine Equipment Area/Heater Bay                      316            Y        S          Y T-1 D      Turbine    DC Switchgear Area                                      316            N      S,D          Y T-1 E      Turbine    Auxiliary Battery Room                                  316            N        D          Y T-1 F      Turbine    Operating Floor/Turbine Deck                            546            Y      S1D1          Y T-2      Turbine    Turbine Lube Oil System                                  146            N        S          Y T-3      Turbine    Motor-Driven Aux. Feed Pump Pit                          16            Y        D          Y T-4      Turbine    Steam-Driven Aux. Feed Pump Pit                          16            Y        D          Y T-5      Turbine    I and C Equipment Storage Room                          256            N        S          Y T-6      Turbine    West 480V Load Center Room                              366            Y        D          Y T-7      Turbine    6.9 and 4.16 kV Switchgear Room                          316            Y        D          Y T-8      Turbine    West Cable Vault                                        450            Y      S,D          Y T-9      Turbine    East Cable Vault                                        450            Y      S,D          Y T-10      Turbine    6.9 and 4.16 kV Switchgear Room                          566            Y        D          Y MILLSTONE - UNIT 2                                TRM 3/4 7-26                                            LBDCR 02-2-10 August 8, 2002
 
TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)
Table 7-1 Barrier Fire Watch Matrix Firewatch Determination - Index of Fire Areas/Zones FIRE      BUILDING                        DESCRIPTION                          ELEV.          APP R/ SUPPR OR *BARRIER AREA/ZONE                                                                                        SFTY REL DETECTION FW REQD C-1    Containment Containment Building                                      -256+          Y      D1            Y I-1 A      Intake  Pump Room                                                  140            Y        D            N I-1 B      Intake  Sodium Hypochlorite Room                                    140            N        D            N I-1 C      Intake  MCC Room                                                    140            N        D            N FP-2        Yard    Unit 2 Fire Pumphouse                                      146            Y        N            Y PDC-1        Yard    Power Distribution Center #1 (VFD A & C)                    146            N        D            N PDC-2        Yard    Power Distribution Center #2 (VFD B & D)                    146            N        D            N Y-1        Yard    Ecolochem Building                                          146            N        D            N Y-2        Yard    Millstone Radwaste Reduction Facility - MRRF Building 146                  N        D            N Y-3        Yard    Flammable/Hazardous Waste Storage                          146            N      S,D          N Y-4        Yard    South Access Point Mod. Bldg.                              146            N        D            N Y-5        Yard    Unit 2 Maint. Bldg. Snubber Shop                            146            N        D            N Y-7        Yard    Unit 2 Maintenance Building                                146            N      S,D          N Y-8        Yard    Maintenance Air Compressor                                  146            N        S            N Y-9        Yard    Service Water Piping Tunnel (Under Turbine and Aux          30            Y        N            Y Bldgs)
Y-10        Yard    Bulk Hydrogen Storage Area                                  146            N        N            N Y-12        Yard    EDG Aboveground Fuel Storage Tank                          146            N        N            N Y-13        Yard    GSU Transformer Deluge Building                            146            N        D            N Y-14        Yard    Security Diesel Enclosure                                  146            N      S,D          N TS-1      Turbine General Electric Turbine Outage Office                        546            N        S            N (in Fire Zone T-1F)
XR-2        Yard    Normal Transformer                                          146            N      S,D          N XR-3        Yard    Reserve Transformer                                        146            N      S,D          N MILLSTONE - UNIT 2                                TRM 3/4 7-27                                          LBDCR 10-MP2-015 November 2, 2010
 
TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)
Table 7-1 Barrier Fire Watch Matrix Firewatch Determination - Index of Fire Areas/Zones FIRE      BUILDING                              DESCRIPTION                          ELEV.          APP R/ SUPPR OR *BARRIER AREA/ZONE                                                                                              SFTY REL DETECTION FW REQD XR-4          Yard      Main GSU Transformer 15G-2XA                                  146            N      S,D          N XR-5          Yard      Main GSU Transformer 15G-2XB                                  146            N      S,D          N XR-6          Yard      Main GSU Transformer 15G-2XC                                  146            N      S,D          N XR-7          Yard      Main GSU Transformer 15G-2XD                                  146            N      S,D          N Notes
*The Barrier FW Reqd column provides a conservative overview as to whether or not a fire watch could be required. To identify a specific boundary (i.e., wall, floor, ceiling), consult MP2 Barrier Boundary drawing series 25203 sheets 24093, 24095, 24097, 24099, 24101, 24103, 24105, 24107, and 24109. To determine type of firewatch (i.e., rove, continuous), evaluate TR against specific suppression/detection configuration.
: 1. Partial Coverage - consult Fire Hazard Analysis (FHA) for specific configuration
: 2. Curbing MILLSTONE - UNIT 2                                        TRM 3/4 7-28                                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY TECHNICAL REQUIREMENT 3.8.1.1.c The diesel oil storage tank (T-148) shall contain at least 18,620 total gallons of fuel.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
: a. With the diesel oil storage tank volume less than 18,620 total gallons, restore diesel oil storage tank level within 48 hours or declare one emergency diesel generator nonfunctional.
: b. With the diesel oil storage tank fuel oil volume less than 13,357 total gallons, declare one emergency diesel generator nonfunctional.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.8.1.1.3 Verify the diesel oil storage tank contains at least 18,620 total gallons of fuel at least once per 31 days.
BASES:
There are two emergency diesel generators (EDG) for Millstone Nuclear Power Station Unit No. 2. Each EDG is provided with a separate fuel oil supply system, which consists of a diesel oil supply tank and associated piping, valves, and instrumentation controls.
Technical Specifications require a minimum of 12,000 gallons of fuel oil to be stored in each diesel oil supply tank (T-48A and T-48B).
A cross-tie with two locked-closed valves for the diesel oil supply tanks is provided so that a total inventory of 24,000 gallons would be available to either one of the EDGs. In addition, a 25,000 gallon above ground fuel oil storage tank (T-148), which is common for both EDGs, is provided to receive fuel oil from delivery trucks prior to placing fuel oil in the diesel oil supply tanks.
MILLSTONE - UNIT 2                TRM 3/4 8-1                        LBDCR 20-MP2-002 February 27, 2020
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1    A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY BASES: (Continued):
ETE-MP-2020-1002,(1) determined that a total useable fuel oil volume of 42,106 gallons is necessary to support initial operation of both EDGs for 24 hours and then allow one of the EDGs to continue operation at its rated load for a total of 7 days. This 42,106 gallon requirement for total minimum fuel oil inventory is greater than the combined usable capacity of 24,000 gallons available from the two supply tanks.
The EDG supply tanks require an additional 18,106 gallons(2) to satisfy the 42,106 gallon total minimum inventory of useable fuel oil. The 18,106 gallons of additional volume of fuel oil is supplied from the common storage tank T-148. A minimum volume of 18,106 useable gallons equates to a fuel oil level of approximately 80 inches above the bottom of tank T-148. To ensure a usable volume of 18,106 gallons is maintained in tank T-148, a tank low-level alarm based on maintaining 18,620 total gallons is necessary to annunciate whenever the stored volume decreases below this value.
TR ACTION Statement b requires the operator to declare one of the EDGs nonfunctional if the total fuel oil inventory in tank T-148 decreases to 13,357 total gallons (i.e. six day supply) or less. A minimum volume of 13,357 total gallons (12,843 usable gallons) equates to a fuel oil level of approximately 63.3 inches above the bottom of the tank T-148. The Plant Process Computer (PPC) point L7004 will provide a low-low level alarm function based on the 13,357 gallon requirement whenever the stored volume decreases below this value.
Due to equipment uncertainties and oil density fluctuations plus an additional volume allowing operators time to respond to the alarm, the low-level alarm setpoint corresponding to the 7-day requirement must be set to approximately 88 inches above the bottom of tank T-148 to ensure the low-level alarm occurs prior to actual tank level falling below the minimum fuel oil requirement. In terms of volume indication, the nominal setpoint corresponds to 19,628 gallons. Additionally, due to the same uncertainties and oil density fluctuations plus an additional volume allowing operators time to respond to the alarm, the low-low-level alarm setpoint corresponding to the 6-day requirement must be set to approximately 66.9 inches above the bottom of tank t-148 to ensure the low-low level alarm occurs prior to the actual tank level falling below the (1) ETE-MP-2020-1002 Increasing the TRM required Diesel Fuel Oil Storage for T-148.
(2) The 18,620 gallon minimum fuel oil volume requirement determined in ETE-MP-2020-1002 assumed fuel is initially stored at 24&deg;F (delivered) and experiences a temperature elevation of 86&deg;F. This assumption was made in order to address the effects elevated temperature has on volume, and consequently, the heating value of the oil.
MILLSTONE - UNIT 2                  TRM 3/4 8-2    LBDCR 20-MP2-002, February 27, 2020 LBDCR 20-MP2-005, April 02, 2020
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1    A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY BASES: (Continued):
minimum fuel oil requirement. In terms of volume indication, the nominal setpoint corresponds to 14,300 gallons.
Alternate measures may be taken for verifying the minimum fuel oil volume requirement given failure of the level instrumentation or annunciator circuitry. Fuel oil volume may be verified by manual means by use of an oil dipstick or through the use of PPC point L7004.
A digital indicator, LI-7004A, is located on Control Room panel CO6F to provide the operator with a continuous indication of the fuel oil level in EDG storage tank T-148. This indicator is a dual bar graph style with the right side providing height of fuel in inches above the bottom of the tank and the left side providing net volume in gallons. The visible scale range of fuel height is 0-120 inches and the scale range for volume is 0-25 (x1000) gallons. Above each bar graph is a digital display of the scale reading. Also, the PPC has the capability of providing the operator with EDG storage tank T-148 fuel oil level and volume in terms of instrument range.
The above ground fuel oil storage tank T-148 contains a temperature element for monitoring the fuel oil bulk temperature. A low temperature alarm will annunciate when the fuel oil temperature falls below 40&deg;F indicating the possible failure of the tank heating system and the need for compensatory ACTIONS to maintain the fuel oil temperature above the established cloud point. Should the fuel oil temperature fall below the cloud point, the quality of the fuel within the storage tank T-148 becomes questionable due to wax formation and the operator is to declare one of the EDGs nonfunctional in accordance with ACTION Statement b since the storage tank design volume cannot be considered available. The fuel oil temperature is available on the PPC to provide the operator with continuous temperature monitoring.
ETE-MP-2020-1002 Increasing the TRM required Diesel Fuel Oil Storage for T-148 and calculation 97-ENG-1804E2, Rev 4,(3) provide the basis for establishing the following correlation between components of level monitoring lop L7004:
TRM Table 3.8.1.1.c-1 provides a correlation between tank level in inches from the bottom of tank to volume indication for both the process minimum limit and the instrumentation setpoint associated with the 18,620 gallons requirement.
TRM Table 3.8.1.1.c-2 provides a correlation between tank level in inches from bottom of tank to volume indication for both the process minimum limit and the instrumentation setpoint associated with the 13,357 total gallons requirement.
(3) Calculation 97-ENG-1804E2, Rev. 4, Diesel Oil Storage Tank (T-148) Level Loop Uncertainty and Alarm Setpoint, L-7004.
MILLSTONE - UNIT 2                  TRM 3/4 8-3                        LBDCR 20-MP2-002 February 27, 2020
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1  A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY BASES: (Continued):
TRM TABLE 3.8.1.1.C-1 18,620 Total Gallons Requirement Corresponding Level Values 18,620 Total Gallons              T-148 level          T-148 VOLUME Requirement            (inches above bottom of        GALLONS (18,106 Useable Gallons)                tank)
(7 day supply)
Low-level Alarm                  88 inches              19,628 Setpoint Fuel Volume @ minimum                83.8 inches              18,620 TRM limit of TRM TABLE 3.8.1.1.C-2 13,357 Total Gallons Requirement Corresponding Level Values 13,357 Total Gallons              T-148 Level          T-148 VOLUME Requirement              (inches above bottom          GALLONS (12,842 Useable Gallons)              of tank)
(6 day supply)
Low-Low Level                  66.9 inches              14,300 Alarm Setpoint Fuel Volume @ minimum                63.3 inches                13,357 TRM limit MILLSTONE - UNIT 2            TRM 3/4 8-4      LBDCR 20-MP2-002,February 27, 2020 LBDCR 20-MP2-005, April 02, 2020
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1    A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY TECHNICAL REQUIREMENT BASES:      (Continued):
Following a loss of coolant accident, both EDGs will operate initially at the continuous rated loads of 2750 kW for 24 hours at which time (assuming no fuel oil replenishment is provided) one of the EDGs may be secured and the other EDG may continue operation at its rated load for an additional six (6) days. The total volume of fuel oil required for two EDGs to initially operate for 24 hours, and then allow one of the EDGs to continue to operate at its rated load for six additional days, is 42,106 useable gallons out of which 24,000 gallons are stored in diesel oil supply tanks (T-48A and T-48B). Therefore, the extra requirement of fuel oil of approximately 18,106 useable gallons will be stored in the diesel oil storage tank T-148. The value of 13,357 total gallons (12,842 useable gallons) corresponds to a reduced level of stored fuel oil equivalent to 6 days.(1)
The TECHNICAL REQUIREMENT cannot be met if less than the seven (7) days diesel oil supply for the EDG is available. However, the ACTION statement allows for temporarily maintaining a reduced diesel oil supply level for a maximum time duration of 48 hours before declaring one EDG nonfunctional. This temporary reduction in diesel oil supply level may be caused by events, such as full load operation required after an inadvertent start while at minimum required level, or feed and bleed operations which may be necessitated by increasing particulate levels or any number of other oil quality degradations. A period of 48 hours is considered sufficient to complete restoration of the required level prior to declaring the DG nonfunctional. This period is acceptable based on the remaining capacity (>6 days), the fact that ACTIONS will be initiated to obtain replenishment, and the low probability of an event during this brief period.
The TECHNICAL SURVEILLANCE REQUIREMENT provides verification that there is an adequate inventory of diesel fuel oil in the storage tank to support the operation of EDGs at the continuous rated load of 2750 kW for 24 hours, at which time (assuming no fuel oil replenishment is provided) one of the EDGs may be secured and the other EDG may continue operation at its rated load for an additional six (6) days. The seven (7) day period is sufficient time to place the unit in a safe condition and to bring in replenishment fuel from an offsite location. The 31 day frequency is adequate to ensure that a sufficient supply of oil is available, since low-level alarms are provided and unit operators would be aware of any large uses of fuel oil during this period.
The above requirement is consistent with NUREG-1432, Standard Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air.
MILLSTONE - UNIT 2                  TRM 3/4 8-5                          LBDCR 20-MP2-002 February 27, 2020
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1  A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY
 
==REFERENCE:==
: 1. ETE-MP-2020-1002 Increasing the TRM required Diesel Fuel Oil Storage for T-148.
: 2. Calculation 97-ENG-1804E2, Rev. 4, Diesel Oil Storage Tank (T-47A) Level Loop Uncertainty and Alarm Setpoint, L-7004.
: 3. Condition Report M3-00-02659.
MILLSTONE - UNIT 2            TRM 3/4 8-6                      LBDCR 20-MP2-002 February 27, 2020
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1  A.C. SOURCES OFFSITE LINE POWER SOURCES TECHNICAL REQUIREMENT 3.8.1.2    The offsite lines to the Millstone Switchyard: 310, 348 (includes 3252 line), 371 (includes 364 line), and 383, shall be FUNCTIONAL.
APPLICABILITY:
When Millstone Power Station (MPS) electrical output exceeds 1650 MWe net.
ACTION:
: a. With one offsite line nonfunctional, perform the following or reduce total station output to < 1650 MWe net within the next 6 hours:
: 1. Restore FUNCTIONALITY of the affected offsite line within 72 hours, or
: 2. Establish the following ACTION requirements AND restore FUNCTIONALITY within 7 days for Lines 310, 348/3252, and 383, or within 14 days for Line 371364.
: a. Once per shift, verify the remaining offsite lines to the MPS switchyard are FUNCTIONAL.
: b. Perform an initial weather assessment for the scheduled line outage duration and then once per shift thereafter.
: 1. If the assessment predicts adverse or inclement weather will exist while the offsite line is nonfunctional (i.e., out of service), reduce total station output to < 1650 MWe net prior to arrival of the adverse or inclement weather.
: c. Within one hour prior to or after entering this condition and at least once per 24 hours thereafter, verify that both the Millstone Unit 2 EDGs and the Millstone Unit 3 EDGs are OPERABLE and the Millstone Unit 3 SBO diesel generator is available. Restore any inoperable Millstone Unit 2 EDG or Millstone Unit 3 EDG to OPERABLE status and/or the Millstone Unit 3 SBO to available status within 72 hours or reduce total station output to < 1650 MWe net within the next 6 hours.
: b. With two offsite lines nonfunctional, reduce total station output to < 1650 MWe net within the next 30 minutes.
MILLSTONE - UNIT 2                  TRM 3/4 8-7                            LBDCR 16-MP2-018 March 23, 2017
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1    A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY TECHNICAL SURVEILLANCE REQUIREMENTS 4.8.1.2      The four offsite lines to the Millstone Switchyard shall be determined to be FUNCTIONAL at least once per 7 days when station output exceeds 1650 MWe net.
BASES:
TR 3.8.1.2 requires that all four offsite 345 kV transmission lines are FUNCTIONAL when MPS electrical output exceeds 1650 MWe net. TR 3.8.1.2 contains ACTIONS that must be performed when one offsite 345 kV transmission line is nonfunctional.
TR 3.8.1.2 provides flexibility to preclude plant downpowers due to planned and unplanned offsite transmission line outages. The TRM requirements provide this flexibility while also maintaining adequate defense-in-depth to ensure grid reliability and stability are preserved and the ability of the plants to respond to design basis accidents is not adversely affected.
With one offsite line nonfunctional, ACTION a.1 allows 72 hours to restore FUNCTIONALITY. This 72-hour allowed outage time (AOT) is conservatively based on the loss of one offsite line being equal to the risk of losing one onsite connection to the offsite power system (i.e., TS 3.8.1.1).
With one offsite line nonfunctional, ACTION a.2 contains the provision to allow up to 7 days for Lines 310, 348/3252, and 383, or 14 days for Line 371/364 to restore FUNCTIONALITY if ACTIONS a.2.a, a.2.b, and a.2.c are met. The applicable AOT reduces the risk of a plant perturbation as a result of having to downpower the unit for short duration line outages and provides flexibility for conducting maintenance and improves operational safety margin by the following:
* Minimizes the number of plant downpowers for short duration 345 kV transmission line outages.
* Reduces the likelihood of a loss of offsite power event by establishing an AOT with additional defense-in-depth measures to minimize the potential for a double circuit failure scenario which can result in grid instability.
During the applicable AOT, ACTION a.2.a ensures there are no known issues that could threaten the reliability of the remaining 345 kV transmission lines. Verifying the remaining 345 kV offsite transmission lines to the MPS switchyard are FUNCTIONAL, increases confidence that the remaining 345 kV lines will remain FUNCTIONAL during the planned outage of the affected 345 kV line.
MILLSTONE - UNIT 2                  TRM 3/4 8-8                          LBDCR 16-MP2-018 March 23, 2017
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1    A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY BASES: (Continued):
During the applicable AOT, the action to perform weather assessments as required by ACTION a.2.b ensures appropriate actions are taken to minimize the potential for adverse or inclement weather event to impact grid reliability with one line nonfunctional.
If adverse or inclement weather is predicted, the nonfunctional 345 kV line would be restored to FUNCTIONAL status or station output would be reduced to < 1650 MWe net prior to the arrival of the adverse or inclement weather.
During the applicable AOT, ACTION a.2.c (i.e., both the Millstone Unit 2 and Millstone Unit 3 EDGs are operable and the Millstone Unit 3 SBO is available) provides assurance that AC power will be available to support required safety-related equipment in the unlikely event of a complete loss of offsite power during the time one of the 345 kV lines is nonfunctional. This ACTION ensures that electrical power will be available in a timely manner to perform the required functions to maintain cooling to the reactor core in the unlikely event a loss of offsite power was to occur during the AOT.
For the condition where the applicable AOT is in use for one nonfunctional transmission line and one or more of the following components is out-of-service:
* a Millstone Unit 2 EDG
* a Millstone Unit 3 EDG
* the Millstone Unit 3 SBO diesel generator 72 hours is allowed for restoration of the out-of-service component. If any one of these components is not restored within 72 hours, reduce total station output to < 1650 MWe net within the next 6 hours.
The allowed outage times for Lines 310, 348/3252, 371/364, and 383 are based on the configuration of the transmission lines at Hunts Brook Junction where Lines 383 and 310 cross over Line 371/364 and Line 348/3252 runs to the west of the crossover. With Line 348/3252, 310, or 383 nonfunctional, the possibility exists that either Line 383 or 310 could drop on Line 371/364 and result in three lines nonfunctional. This condition would impact grid stability and therefore, a 7-day AOT is allowed with the specified ACTION requirements in place. When Line 371/364 is nonfunctional, if either Line 310 or 383 drops, two transmission lines remain FUNCTIONAL. Therefore, a 14-day AOT is allowed with the specified ACTION requirements in place.
 
==REFERENCE:==
: 1. License Amendment 328 MILLSTONE - UNIT 2                TRM 3/4 8-9                        LBDCR 16-MP2-018 March 23, 2017
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER AC DISTRIBUTION SYSTEMS ELECTRICAL SWITCHGEAR ROOM VENTILATION TECHNICAL REQUIREMENT 3.8.2.1.b    The ventilation trains for the following switchgear rooms shall be FUNCTIONAL:
: a. Upper and Lower 4160 VAC Switchgear Rooms.
: b. East and West 480 VAC Switchgear Rooms.
: c. B51 and B61 MCC Cubicles.
: d. East and West DC Switchgear Rooms.
APPLICABILITY:
When associated switchgear is required to be OPERABLE.
ACTION:
Note: Separate ACTION entry is allowed for each switchgear/MCC cubicle ventilation train.
* Upper and Lower 4160 VAC Switchgear Rooms,
* East and West 480 VAC Switchgear Rooms, and
* East and West DC Switchgear Rooms.
: a. With a switchgear ventilation train nonfunctional, immediately implement the applicable switchgear ventilation system compensatory ACTIONS in accordance with the applicable operating procedure or enter the applicable Technical Specification ACTION Statement for the associated switchgear. If compensatory ACTIONS have been implemented, within 30 days, either restore the affected switchgear ventilation train to FUNCTIONAL status or prepare a FUNCTIONALITY assessment, including a Reasonable Assurance of Safety (RAS) determination. Applicable time constraints for continued operation with a switchgear ventilation train nonfunctional and the compensatory ACTIONS in place shall be identified and justified in the assessment.
MILLSTONE - UNIT 2                  TRM 3/4 8-10                      LBDCR 15-MP2-014 June 2, 2016
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER AC DISTRIBUTION SYSTEMS ELECTRICAL SWITCHGEAR ROOM VENTILATION TECHNICAL REQUIREMENT ACTION:        (Continued)
: b. With both trains of a switchgear ventilation system nonfunctional, immediately implement the applicable switchgear ventilation system compensatory ACTIONS in accordance with the applicable operating procedure or enter the applicable Technical Specification ACTION Statement for the associated switchgear. If compensatory actions have been implemented, within 7 days, either restore at least one train of the switchgear ventilation system to FUNCTIONAL status or prepare a FUNCTIONALITY assessment, including a Reasonable Assurance of Safety (RAS) determination.
Applicable time constraints for continued operation with both switchgear ventilation trains nonfunctional and the compensatory ACTIONS in place shall be identified and justified in the assessment.
* B51 and B61 MCC Cubicles.
Note: The compensatory ACTIONS contained in the applicable operating procedure for B51 and B61 MCC Cubicles switchgear ventilation trains may adversely affect enclosure building integrity. Evaluate and enter Technical Specification ACTION Statement 3.6.5.2, Containment Systems - Enclosure Building, as necessary.
: c. With either B51 or B61 MCC switchgear ventilation train nonfunctional, immediately implement the applicable switchgear ventilation system compensatory ACTIONS in accordance with the applicable operating procedure and enter Technical Specification ACTION Statement 3.6.5.2, if necessary. Otherwise, enter the applicable Technical Specification ACTION Statement for the associated switchgear. If entry into Technical Specification ACTION Statement 3.6.5.2 is required as a result of the use of compensatory ACTIONS, restore the affected switchgear ventilation train to FUNCTIONAL status within 24 hours, or terminate the use of compensatory measures per the applicable operating procedure and enter the applicable Technical Specification ACTION Statement for the associated switchgear. If entry into Technical Specification ACTION Statement 3.6.5.2 is NOT required and compensatory ACTIONS have been implemented, within 30 days, either restore the affected switchgear ventilation train to FUNCTIONAL status or prepare a FUNCTIONALITY assessment, including a Reasonable Assurance of Safety (RAS) determination.
Applicable time constraints for continued operation with a switchgear ventilation train nonfunctional and the compensatory ACTIONS in place shall be identified and justified in the assessment.
MILLSTONE - UNIT 2                TRM 3/4 8-11                      LBDCR 15-MP2-014 June 2, 2016
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER AC DISTRIBUTION SYSTEMS ELECTRICAL SWITCHGEAR ROOM VENTILATION TECHNICAL SURVEILLANCE REQUIREMENTS
: d. With both B51 and B61 MCC switchgear ventilation trains nonfunctional and entry into Technical Specification ACTION Statement 3.6.5.2 is required, restore both trains of the switchgear ventilation system to FUNCTIONAL status and operation within 24 hours, or terminate the use of compensatory measures per the applicable operating procedure and enter the applicable Technical Specification ACTION Statement for the associated switchgear. With both B51 and B61 MCC switchgear ventilation trains nonfunctional and entry into Technical Specification ACTION Statement 3.6.5.2 is NOT required, within 7 days, either restore at least one train of the switchgear ventilation system to FUNCTIONAL status or prepare a FUNCTIONALITY assessment, including a Reasonable Assurance of Safety (RAS) determination.
Applicable time constraints for continued operation with both switchgear ventilation trains nonfunctional and the compensatory ACTIONS in place shall be identified and justified in the assessment.
4.8.2.1b      Normal daily plant equipment operator rounds verify the switchgear ventilation systems are FUNCTIONAL.
BASES:
This TECHNICAL REQUIREMENT provides guidance to address switchgear ventilation systems that are nonfunctional. If any switchgear ventilation train is nonfunctional the compensatory measures contained in the applicable operating procedure must be implemented immediately (pursued without delay and in a controlled manner) or the associated switchgear shall be declared INOPERABLE and the appropriate Technical Specification ACTION Statement (TSAS) entered. Since the compensatory measures contained in the applicable operating procedure will ensure the associated switchgear will remain OPERABLE for all design basis events, it is acceptable to address each switchgear ventilation train separately.
The ACTION requirements are preceded by a note that states separate ACTION entry for each switchgear/MCC cubicle ventilation train is allowed. This is acceptable since the required ACTIONS for each condition provide appropriate compensatory ACTIONS for each nonfunctional ventilation train.
* Upper and Lower 4160 VAC Switchgear Rooms,
* East and West 480 VAC Switchgear Rooms, and
* East and West DC Switchgear Rooms.
MILLSTONE - UNIT 2                TRM 3/4 8-12                        LBDCR 15-MP2-014 June 2, 2016
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER AC DISTRIBUTION SYSTEMS ELECTRICAL SWITCHGEAR ROOM VENTILATION BASES:      (Continued)
: a. If one switchgear ventilation train for any switchgear is under compensatory measures a 30 day allowed outage time (AOT) is specified. The use of compensatory ACTIONS for the AOT or other applicable time constraint is acceptable since the compensatory measures ensure the associated switchgear will remain OPERABLE for all design basis events.
: b. If both switchgear ventilation trains for any switchgear are under compensatory measures, a 7 day AOT is specified to restore at least one of the switchgear ventilation trains to FUNCTIONAL status.
Within the specified AOT either restore the switchgear ventilation trains to FUNCTIONAL status or a FUNCTIONALITY assessment will be prepared, including a Reasonable Assurance of Safety (RAS) determination. Applicable time constraints for continued operation with both switchgear ventilation trains nonfunctional and the compensatory ACTIONS in place shall be identified and justified in the assessment.
* B51 and B61 MCC Cubicles:
The ACTION requirements are preceded by a note that states the compensatory ACTIONS contained in the applicable operating procedure for B51 and B61 MOC Cubicles switchgear ventilation trains may adversely affect enclosure building integrity. If enclosure building integrity is adversely affected, entry into Technical Specification ACTION Statement 3.6.5.2, Containment Systems - Enclosure Building, may be necessary. This ACTION statement requires restoration of enclosure building integrity within 24 hours or a plant shutdown to MODE 5 will be required.
: a. If one switchgear ventilation train for either B51 or B61 switchgear is under compensatory measures and the compensatory measures result in a loss of enclosure building integrity, the ventilation train shall be restored to FUNCTIONAL status and operation within 24 hours. The use of a 24 hour AOT is specified to be consistent with the AOT for Technical Specification 3.6.5.2. If the ventilation train is not restored to FUNCTIONAL status within 24 hours, the use of compensatory measures shall be terminated to restore enclosure building integrity and the appropriate TSAS shall be entered for the affected switchgear. If the use of compensatory ACTIONS does not result in a loss of enclosure building integrity, a 30 day AOT is specified. The use of compensatory ACTIONS for the AOT or other applicable time constraint is acceptable since the compensatory measures ensure the associated switchgear will remain OPERABLE for all design basis events.
MILLSTONE - UNIT 2                TRM 3/4 8-13                          LBDCR 15-MP2-014 June 2, 2016
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER AC DISTRIBUTION SYSTEMS ELECTRICAL SWITCHGEAR ROOM VENTILATION BASES:    (Continued)
: b. If both B51 and B61 switchgear ventilation trains are under compensatory measures, and the compensatory measures result in a loss of enclosure building integrity, the ventilation trains shall be restored to FUNCTIONAL status within 24 hours. The use of a 24 hour AOT is specified to be consistent with the AOT for Technical Specification 3.6.5.2. If the ventilation trains are not restored to FUNCTIONAL status within 24 hours, the use of compensatory measures shall be terminated to restore enclosure building integrity and the appropriate TSAS shall be entered for the affected switchgear. If the use of compensatory ACTIONS does not result in a loss of enclosure building integrity, a 7 day AOT is specified to restore at least one of the switchgear ventilation trains to FUNCTIONAL status.
Within the specified AOT either restore the switchgear ventilation trains to FUNCTIONAL status or a FUNCTIONALITY assessment will be prepared, including a Reasonable Assurance of Safety (RAS) determination. Applicable time constraints for continued operation with both switchgear ventilation trains nonfunctional and the compensatory ACTIONS in place shall be identified and justified in the assessment.
* Upper and Lower 4160 VAC Switchgear Rooms
* East and West 480 VAC Switchgear Rooms
* B51 and B61 MCC Cubicles
* East and West DC Switchgear Rooms.
: a. Periodic testing of system valves and fans may interrupt cooling flow to one of these rooms for a short period of time (< 5 minutes). The ventilation for the affected room remains FUNCTIONAL during this testing. However, if the component being tested cannot be restored, i.e. ventilation/ventilation cooling cannot be restored, then the applicable ACTION statement for the affected ventilation train/system will be entered.
 
==REFERENCE:==
: 1. Technical Specification Section 3/4.8.2, Onsite Power Distribution Systems.
: 2. Technical Evaluation M2-EV-99-0093, Rev. 04.
MILLSTONE - UNIT 2                TRM 3/4 8-14                          LBDCR 10-MP2-013 August 24, 2010
 
TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER AC DISTRIBUTION SYSTEMS ELECTRICAL SWITCHGEAR ROOM VENTILATION
 
==REFERENCE:==
(Continued)
: 3. Regulatory Issue Summary - RIS-05-020, Revision to Guidance Formerly Contained in NRC Generic Letter 91-18, information to Licensees regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability.
: 4. NRR Staff Analysis response to Clinton Power Station regarding Technical Specification Requirements which were based on NRC Inspection Manuel, Part 9900, STS10 OP STS.
: 5. CR M2-98-2661, was initiated against OP2315 SD to re-evaluate compensatory measures established to enhance identified weaknesses. This TRM addition is a corrective action for CR M2-98-2661.
: 6. 10 CFR Part 50.59 Safety Evaluation S2-EV-99-0090.
: 7. Condition Report M3-00-02659.
MILLSTONE - UNIT 2              TRM 3/4 8-15                      LBDCR 15-MP2-014 June 2, 2016
 
TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.3.2 SPENT FUEL POOL TEMPERATURE TECHNICAL REQUIREMENT 3.9.3.2    The spent fuel pool bulk temperature shall be maintained at less than or equal to 150&deg;F.
APPLICABILITY:
Whenever irradiated fuel is stored in the spent fuel pool.
ACTION:
With the above conditions not satisfied:
: a. Immediately initiate ACTIONS to restore the spent fuel pool temperature to less than or equal to 150&deg;F, and
: b. Within one hour, suspend all fuel movement in the spent fuel pool, and
: c. At least once per 4 hours, record the spent fuel pool bulk temperatures.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.9.3.2    The spent fuel pool bulk temperature shall be verified to be less than or equal to 150&deg;F at least once per 12 hours.
BASES:
The requirement that the spent fuel pool bulk temperature be maintained at or below 150&deg;F ensures that the bulk water temperature will not exceed 200&deg;F with the loss of spent fuel pool cooling assumed following a design basis LOCA. This ensures the post-LOCA function of the spent fuel pool cooling system.
The requirements that the spent fuel pool bulk temperature be maintained at or below 150&deg;F ensures that the temperature and humidity above the pool are compatible with personnel comfort and safety requirements. The maximum temperature limit of 150&deg;F in the spent fuel pool ensures that the design temperature of the spent fuel pool cooling system, liner/building structures, and racks are not exceeded. The heat removal capacity of the spent fuel pool cooling system, and/or shutdown cooling system (in MODES 5 or 6, or with core defueled) is sufficient to maintain the spent fuel pool bulk water temperature to less than or equal to 150&deg;F.
 
==REFERENCE:==
: 1. Condition Report M3-00-02659
: 2. DCR M2-01001, TRMCR 01-2-5 MILLSTONE - UNIT 2                TRM 3/4 9-1                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.3.3 SPENT FUEL POOL DECAY TIME TECHNICAL REQUIREMENT 3.9.3.3    The reactor shall be maintained in MODE 5 or 6, or core defueled until either:
: a. 616 hours has passed since sub-criticality for the fuel bundles remaining in the spent fuel pool which were discharged from the previous REFUELING*, of less than or equal to 81 fuel bundles, or
: b. The heat load in the spent fuel pool is less than 10.16x106 BTU/hr.
APPLICABILITY**:
MODES 5 and 6, and core defueled.
ACTION:
With the above conditions not satisfied, immediately initiate ACTIONS to restore the reactor to MODE 5 or 6, or core defueled.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.9.3.3    Prior to entry into MODE 4 from MODE 5, verify that either:
: a. 616 hours has passed since sub-criticality for the fuel discharged from the previous REFUELING,* of less than or equal to 81 fuel bundles, or
: b. The heat load in the spent fuel pool is less than 10.16x106 BTU/hr.
* For the purpose of this requirement, the fuel bundles remaining in the spent fuel pool which were discharged from the previous REFUELING, is defined as the fuel bundles discharged at the end of the most recent REFUELING, that will not be reloaded into the next fuel cycle.
** When either TECHNICAL REQUIREMENT, Item (a) or (b) has been satisfied following a REFUELING, the TECHNICAL REQUIREMENT is satisfied for the remainder of the fuel cycle, until the next REFUELING.
MILLSTONE - UNIT 2                TRM 3/4 9-2                        LBDCR 17-MP2-002 March 16, 2017
 
TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.3.3 SPENT FUEL POOL DECAY TIME BASES:
The requirement for the reactor to remain in MODE 5 or 6, or core defueled until either:
: a. 616 hours has passed since sub-criticality for the fuel bundles remaining in the SFP which were discharged from the previous REFUELING of less than or equal to 81 fuel bundles, or
: b. The heat load in the SFP is less than 10.16x106 BTU/hr. At a SFP heat load of 10.16x106 BTU/hr, adequate cooling is available to maintain the SFP bulk temperature less than or equal to 150&deg;F should a single failure occur in the SFP cooling system.
This ensures that adequate cooling is available to maintain the SFP bulk temperature less than or equal to 150&deg;F should a single failure occur in the SFP cooling system.
If either TECHNICAL REQUIREMENT Item (a) or (b) are met, then the SFP heat load will be less than 10.16x106 BTU/hr. Once the SFP heat load is below this value, the SFP cooling system can accommodate a single failure and maintain the SFP bulk water temperature to less than 150&deg;F. The decay time of 616 hours for recently discharge fuel is the bounding decay time for a discharge of less than or equal to 81 fuel bundles to assure a SFP decay heat load of less than or equal to 10.16x106 BTU/hr.
If the spent fuel pool decay heat load is greater than 10.16x106 BTU/hr, then entry into MODE 4 from MODE 5 is not allowed. The reason for this restriction on entering MODE 4 with this heat load, is that one train of shutdown cooling must be available to either supplement or replace SFP cooling, and thus could not also be aligned to support MODE 4 ECCS requirements. One train of the shutdown cooling system is capable of cooling both the core and the SFP, should a failure occur in the SFP cooling system, and maintain the SFP water temperature to less than 150&deg;F.
 
==REFERENCE:==
: 1. Condition Report M3-00-02659
: 2. DCR M2-01001, TRMCR 01-2-5 MILLSTONE - UNIT 2                TRM 3/4 9-3                        LBDCR 17-MP2-002 March 16, 2017
 
TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.5 COMMUNICATIONS TECHNICAL REQUIREMENT 3.9.5      Direct communications shall be maintained between the control room and personnel at the REFUELING station during fuel or CEA movement within the reactor pressure vessel.
APPLICABILITY:
MODE 6.
ACTION:
When direct communications between the control room and personnel at the REFUELING station cannot be maintained, suspend all operations involving fuel or CEA movement within the reactor pressure vessel.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.9.5      Direct communications between the control room and personnel at the REFUELING station shall be demonstrated within one hour prior to the start of and at least once per 12 hours during fuel or CEA movement within the reactor pressure vessel.
BASES:
The requirement for communications capability ensures that REFUELING station personnel can be promptly informed of significant changes in the facility status or core reactivity condition during fuel or CEA movement within the reactor pressure vessel.
 
==REFERENCE:==
: 1. Condition Report M3-00-02659 MILLSTONE - UNIT 2                TRM 3/4 9-4                      LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.6 CONTAINMENT BUILDING REFUELING MACHINE TECHNICAL REQUIREMENT 3.9.6    The containment building REFUELING machine used for movement of fuel assemblies shall be FUNCTIONAL with:
: a. A minimum capacity of 1600 pounds in the fuel only region,
: b. An overload cutoff limit of less than or equal to 1700 pounds in the fuel only region.
: c. A minimum capacity of 2900 pounds in the fuel plus hoist region, and
: d. An overload cutoff limit of less than or equal to 3590 pounds in the fuel plus hoist region.
APPLICABILITY:
During movement of fuel assemblies.
ACTION:
With the requirements of TECHNICAL REQUIREMENT 3.9.6 listed above not satisfied, suspend all REFUELING machine operations involving movement of fuel assemblies.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.9.6    The containment building REFUELING machine used for movement of fuel assemblies shall be demonstrated FUNCTIONAL within 72 hours prior to the start of moving fuel assemblies by performing applicable load tests of at least 1600 and 2900 pounds and demonstrating applicable automatic load cutoffs of less than or equal to 1700 and 3590 pounds.
MILLSTONE - UNIT 2                TRM 3/4 9-5                        LBDCR 12-MP2-006 October 3, 2012
 
TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.6 CONTAINMENT BUILDING REFUELING MACHINE BASES:
The fuel hoist assembly is located on the REFUELING platform and is positioned over a specific core location using the joysticks located on the console shelf panel. The hoist and grapple assembly is lowered to a position over the fuel assembly (Upper Grapple Operate Zone - UGOZ). The operator turns the grapple selector switch to open the grapple at the bottom of the hoist assembly. The grapple is lowered over the fuel assembly to the Lower Grapple Operating Zone (LGOZ) and the operator turns the grapple selector switch to close the grapple, engaging the top fitting of the fuel assembly.
The grapple and fuel assembly are raised using the joystick on the console shelf panel, as the fuel assembly is hoisted out of the core it is protected by an overload cutoff provided in the Programmable Logic Controller (PLC) software until it is safely inside the hoist box (fuel only region). This overload limit protects the fuel assembly, core internals and pressure vessel from excessive lifting force in the event they are inadvertently engaged during lifting operations.
After the fuel is inside the hoist box, the fuel and hoist box are lifted into the trolley mast with the loads carried by the hoist assembly (fuel plus hoist region). Overload cutoff settings are provided by the PLC software and an external hard wire setting in the load weighing system to prevent the forces from exceeding the maximum design lifting capacity of the refuel machine.
The basis for TECHNICAL REQUIREMENT 3/4.9.6 is to ensure that: 1) the REFUELING machine has sufficient load capacity to lift a fuel element, 2) the core internals and pressure vessel are protected from excessive lifting force in the event they are inadvertently engaged during lifting operations, and 3) the REFUELING machine is protected from excessive lifting forces that may exceed its design rated maximum load capacity.
 
==REFERENCE:==
: 1. Condition Report M3-00-2659.
: 2. TRMCR 00-2-19.
: 3. PaR Nuclear, Software Requirements Specification (SRS) Refueling Machine Millstone Power Station - Unit 2, Procedure No. 70587896.
: 4. DNC drawing 25203-39277 SH 354, Drive Assembly Hoist, Refuel Machine.
MILLSTONE - UNIT 2                  TRM 3/4 9-6                          LBDCR 12-MP2-006 October 3, 2012
 
TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.7 SPENT FUEL POOL CASK CRANE TRAVEL LIMITS TECHNICAL REQUIREMENT 3.9.7      Loads in excess of 1800 pounds shall be prohibited from travel over irradiated fuel assemblies in the storage pool spent fuel racks, with the following exceptions:
: a. Heavy Dummy Fuel Assembly,
: b. Consolidated Fuel Storage Box,
: c. Single-failure-proof lifts in accordance with the guidelines of NUREG-0612.
APPLICABILITY:
With irradiated fuel assemblies in the storage pool spent fuel racks.
ACTION:
With the requirements of the above specification not satisfied, place cask crane load in a safe condition.
TECHNICAL SURVEILLANCE REQUIREMENTS 4.9.7      Crane interlocks and/or physical stops which prevent cask crane travel with loads in excess of 1800 pounds over irradiated fuel assemblies shall be demonstrated FUNCTIONAL at least once per calendar quarter.
BASES:
The restriction on movement of loads in excess of the combined nominal weight of a fuel assembly, CEA and associated handling tool over irradiated fuel assemblies in the storage pool spent fuel racks using the spent fuel pool cask crane ensures that no more than the contents of one fuel assembly will be ruptured in the event of a fuel handling accident. This assumption is consistent with the activity release assumed in the accident analysis. Specific analysis has been performed for the drop of a consolidated fuel storage box on an intact fuel assembly. The results of this analysis determined that the impacted assembly would not fail. The drop of the heavy dummy fuel assembly is bounded by the consolidated fuel storage box drop analysis.
MILLSTONE - UNIT 2              TRM 3/4 9-7                          LBDCR 11-MP2-001 February 1, 2011
 
TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.7 SPENT FUEL POOL CASK CRANE TRAVEL LIMITS TECHNICAL REQUIREMENT BASES: continued With the cask crane design and application of single-failure-proof lifting devices that satisfy the increased design margins of NUREG-0612, a load drop onto irradiated fuel assemblies is not credible and need not be postulated. For other cranes capable of travel with loads in excess of 1800 pounds over irradiated fuel assemblies, administrative controls are in place to ensure compliance with the heavy loads guidelines of NUREG-0612.
 
==REFERENCE:==
: 1. Condition Report M3-00-02659.
MILLSTONE - UNIT 2              TRM 3/4 9-8                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 6.0      ADMINISTRATIVE CONTROLS 6.2.2      FIRE PROTECTION ADMINISTRATIVE REQUIREMENTS The following administrative requirements for staffing and training are applicable to support the Fire Protection System TECHNICAL REQUIREMENTS in the below listed TRM sections:
3/4.3.3.7      Fire Detection Instrumentation 3/4.7.9.1      Fire Suppression Water System 3/4.7.9.2      Spray and/or Sprinkler Systems 3/4.7.9.3      Fire Hose Stations 3/4.7.9.4      Halon Fire Suppression System 3/4.7.10        Penetration Fire Barriers ADMINISTRATIVE REQUIREMENTS
: a. A site Fire Brigade of at least five members* shall be maintained on site at all times.
The Fire Brigade shall not include two members of the minimum shift crew necessary for safe shutdown of the unit and any personnel required for other essential functions during a fire emergency.
: b. A training program for the Fire Brigade shall be maintained and shall meet or exceed the requirements of NFPA 27 - 1975, except for Fire Brigade training sessions which shall be held at least quarterly.
* The Fire Brigade composition may be less than the minimum requirements for a period of time not to exceed 2 hours, in order to accommodate unexpected absence, provided immediate ACTION is taken to fill the required positions.
MILLSTONE - UNIT 2                  TRM 6.0-1                        LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 6.0    ADMINISTRATIVE CONTROLS 6.13      SYSTEM INTEGRITY REQUIREMENTS The licensee shall implement a program to reduce leakage from systems outside containment that would, or could, contain highly radioactive fluids during a serious transient, or accident, to as low as practical levels. This program shall include the following:
: a. Provisions establishing preventive maintenance and periodic visual inspection requirements, and
: b. Integrated leak test requirements for each system at a frequency not to exceed REFUELING cycle intervals.
PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT LEAKAGE REDUCTION PROGRAM
: 1. PURPOSE:
This program provides controls to minimize LEAKAGE from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to levels as low as practicable. The program shall include the following:
: a. Preventive maintenance and periodic visual inspection requirements; and
: b. Integrated leak test requirements for each system at REFUELING cycle intervals or less.
: 2. SCOPE:
The systems, or portions of the systems, included in this program are limited to those which penetrate containment and may contain highly radioactive fluids after a serious transient or accident. The applicable systems are:
: a. Containment Spray System;
: b. Low Pressure Safety Injection;
: c. Shutdown Cooling System;
: d. Chemical and Volume Control System (boron precipitation control only);
: e. High Pressure Safety Injection System;
: f. Reactor Coolant System Post Accident Sample System;
: g. Containment Air Post Accident Sample System; and
: h. Hydrogen Sampling System.
MILLSTONE - UNIT 2                TRM 6.0-2                          LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 6.0    ADMINISTRATIVE CONTROLS 6.13      SYSTEMS INTEGRITY PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT LEAKAGE REDUCTION PROGRAM
: 3. PREVENTIVE MAINTENANCE:
Each applicable system, or portion of the system is included in the plant Preventive Maintenance Program. Since LEAKAGE from these systems would have to penetrate welded or passive barriers (i.e. gaskets, packing, pump seals, etc.), and is subject to the visual inspections described below, the normal plant Preventive Maintenance Program satisfies the intent of this program.
: 4. PERIODIC VISUAL INSPECTIONS:
Each applicable system, or portion of the system is subject to periodic visual inspections.
Periodic visual inspection are performed during such activities as ASME Section XI pressure tests, operator rounds, health physics surveillances, and for systems not routinely in service during FUNCTIONALITY surveillance testing. Any LEAKAGE or residual boric acid buildup is identified using a trouble report and corrected in accordance with the Corrective Action Program.
: 5. INTEGRATED LEAK TEST REQUIREMENTS:
Integrated leak test requirements for each system are performed at REFUELING cycle intervals, or less. This testing will verify the external leak tightness of the applicable systems, or portions of the systems, by inspecting the system or subsystem boundary, measuring visible LEAKAGE from mechanical joints, summing the total LEAKAGE, and comparing the individual and total LEAKAGE results with the acceptance criteria. In addition, testing is performed to verify system-to-system LEAKAGE is within the acceptance criteria. This testing is performed by the following procedures.
Procedure                                  Title                              Frequency SP 21157      HPSI System and ECCS Suction Piping Leakage Test              REFUELING SP 21162      Volume Control Portion of the CVCS Leakage Test                REFUELING SP 21198      Containment Spray System Leakage Test                          REFUELING SP 21199      LPSI System and Shutdown Cooling Heat Exchangers              REFUELING Leakage Test SP 2849      Surveillance Test for Reactor Coolant PASS                    REFUELING SP 2608G      Leak Test of the Containment Air Post-Accident Sample          REFUELING System SP 2608H      Leak Check of the Hydrogen Sampling System                    REFUELING MILLSTONE - UNIT 2                  TRM 6.0-3                            LBDCR 07-MP2-010 October 5, 2009
 
TECHNICAL REQUIREMENTS 6.0    ADMINISTRATIVE CONTROLS 6.13    SYSTEMS INTEGRITY PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT LEAKAGE REDUCTION PROGRAM
: 6.
 
==REFERENCES:==
: 1. NUREG 0737, Clarification of TMI Action Plan Requirements, Section Ill.D.1.1, Integrity of Systems Outside Containment Likely to Contain Radioactive Material for Pressurized Water Reactors.
: 2. NRC Information Notice 91-56, Potential Radioactive Leakage to Tank Vented to Atmosphere, dated September 19, 1991
: 3. Millstone Unit No. 2 Technical Specification 6.13, Systems Integrity.
: 4. Condition Report M3-00-02659.
MILLSTONE - UNIT 2              TRM 6.0-4                              TRMCR 01-2-11 December 6, 2001
 
ADDITIONAL REQUIREMENTS 7.1      APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: As Identified In Each TECHNICAL REQUIREMENT TECHNICAL REQUIREMENT IS AS SPECIFIED IN THE FOLLOWING COMPONENT SECTIONS.
APPLICABILITY:
Is as specified in the following component sections.
ACTION:
With an Appendix R Safe Shutdown Related (ARSR) component listed in the following component tables nonfunctional (unable to meet its intended Appendix R shutdown function), perform the following:
: a. Restore FUNCTIONALITY of the affected component(s) within 14 days*, or
: b. Establish the following compensatory measures to satisfy the FUNCTIONALITY requirements of ARSR components listed in the following component tables unless other compensatory measures are stated:
: 1. Establish a one-hour roving fire watch for all affected areas identified in the following component tables (except the control room, containment, waste gas decay tanks room, spent resin tank area, ion exchange room, spent fuel pool and cask laydown area and service water cable tunnels). Refer to the Appendix R Compliance Report for fire watch patrol areas. Roving fire watches must monitor the area of the device in question, as a minimum, within the specified time frame, plus or minus 25% of the time interval specified in the ACTION statement for periodic roving fire watches. The 25%
extension of the time interval specified does not degrade the reliability that results from performing the rove at the specified interval, based on plant experience, and Fire Protection Engineering analysis as documented in Technical Evaluation M3-EV-02-2005.
: 2. Verify the FUNCTIONALITY of all fire suppression and detection systems, note required transient combustibles, and verify the lack of substantial new transient combustibles, in the affected areas (except containment) on a Daily Basis. Bring any changes to the attention of the Shift Manager.
Establishment of the above compensatory measures will allow continued operation for up to sixty (60) days pending restoration of the component(s)
FUNCTIONALITY, or
* Compensatory measures will be established prior to the end of the 14 day window when it is apparent that the 14 day restoration period cannot be met.
MILLSTONE - UNIT 2                      TRM 7.1-1                              LBDCR 17-MP2-007 May 23, 2017
 
ADDITIONAL REQUIREMENTS 7.1  APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: As Identified In Each TECHNICAL REQUIREMENT TECHNICAL REQUIREMENT IS AS SPECIFIED IN THE FOLLOWING COMPONENT SECTIONS. (Continued)
ACTION:    (continued)
: c. Prepare a FUNCTIONALITY assessment, including a Reasonable Assurance of Safety (RAS) determination, if warranted, for the function described in the Appendix R Compliance Report, if component FUNCTIONALITY cannot be established within 60 days per ACTION Statement b. Applicable time constraints for continued operation with ARSR component(s) nonfunctional will be identified and justified in the assessment.
: d. Restore FUNCTIONALITY of the affected Risk Significant component within 72 hours, or
: e. Establish the following risk management action (RMA) Defense-In-Depth compensatory measures for the next 30 days to limit transient combustible material and ignition sources identified in the following component tables:
: 1. Review existing transient combustible material permits for the affected areas.
: 2. Review existing ignition source permits for the affected areas.
: 3. Perform an area walkdown of the affected areas.
: 4. Evaluate all work requiring transient combustibles, hot work, or racking of breakers in the affected areas.
: 5. On a daily basis, brief the shift operators and the fire brigade lead on the significance of a fire in the affected areas.
: 6. Restore FUNCTIONALITY of the affected Risk Significant component within the 30 days or prepare a RAS determination for the Risk Significant component out of service.
: f. For ARSR components requiring prompt action, establish compensatory measures within the time specified in the component table.
MILLSTONE - UNIT 2              TRM 7.1-1a                          LBDCR 14-MP2-005 March 18, 2014
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: As Identified In Each TECHNICAL REQUIREMENT ADMINISTRATIVE REQUIREMENT:
During Modes 1, 2, 3, or 4, each on duty operating shift shall have one licensed or nonlicensed operator in addition to the minimum shift crew composition required by Section 6.2.2 of the Millstone Unit 2 Safety Technical Specifications. The shift manager shall call in personnel to meet this requirement, if needed. If this requirement cannot be met within eight hours, TECHNICAL REQUIREMENT ACTION Statement b shall be implemented for Appendix R Fire Areas R-1, R-2, R-3, R-14, and R-16 within the next four hours.
BASES:
: 1. ARSR equipment are those components used in plant systems to achieve and maintain HOT STANDBY and COLD SHUTDOWN when a fire disables any area or system(s) at Millstone Unit 2. This Appendix R Safe Shutdown TECHNICAL REQUIREMENTS section addresses the FUNCTIONALITY of ARSR equipment not addressed in Millstone Unit 2 Technical Specifications. Specifically, this document:
: a. Identifies ARSR equipment not addressed in Technical Specifications required to support plant safe shutdown following a fire.
: b. Identifies the FUNCTIONALITY requirements for the ARSR equipment.
: c. Identifies the conditions (such as local or remote) and plant location (fire areas) in which ARSR equipment FUNCTIONALITY is required.
: d. Provides compensatory measures in the event ARSR equipment becomes nonfunctional.
: e. Provides TECHNICAL SURVEILLANCE REQUIREMENTS for ARSR equipment.
: f. Provides a basis for establishing administrative controls over ARSR equipment.
MILLSTONE - UNIT 2                TRM 7.1-2                            LBDCR 11-MP2-005 May 10, 2011
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS BASES (Continued)
: 2. The consequences of a fire at a nuclear plant are considered to be less severe than those for Design Basis Accidents. The 14-day window for restoration of ARSR component FUNCTIONALITY, the establishment of compensatory measures, and the once per cycle TECHNICAL SURVEILLANCE REQUIREMENT reflect this decreased level of risk. Compensatory measures will be established prior to the 14-day window when it is apparent that the 14-day restoration period cannot be met.
: 3. ARSR equipment which are addressed in more restrictive technical specifications are not addressed in this document. Exceptions include shutdown process instrumentation which are allowed to be out of service by technical specifications based upon the availability of redundant channels. If the redundant channel(s) are not ARSR equipment, the redundant channel cannot be credited as ARSR redundant and the instrumentation is included in this document for further administrative control.
: 4. The compensatory measures are intended to ensure that either an alternative component is available to fulfill the shutdown function after a fire, or to minimize the possibility that a fire will occur in an area of the plant which relies on the particular component for safe shutdown. Roving fire watches must monitor the area of the device in question, as a minimum, within the specified time frame, plus or minus 25%
of the time interval specified in the ACTION statement for periodic roving fire watches. The 25% extension of the time interval specified does not degrade the reliability that results from performing the rove at the specified interval, based on plant experience, and Fire Protection Engineering analysis as documented in Technical Evaluation M3-EV-02-2005.
: 5. The lack of fire watch requirements for the control room is based upon continuous staffing by trained operators. The lack of fire watch requirements for containment is based upon the administrative control of transient combustibles and the low potential of introducing transient combustibles or ignition sources, since containment is not normally accessible during POWER OPERATION. The lack of fire watch requirements for the waste gas decay tanks room, spent resin tank area and ion exchange area is based upon the fact that the areas contain negligible combustible loading and are normally inaccessible, limiting the potential of introducing combustibles or ignition sources. The lack of fire watch requirements for the spent fuel pool and cask laydown area is based upon the fact that the area is underwater.
Further, these areas contain no ARSR components or cables. The lack of fire watch requirements for the service water cable tunnels is based upon the low potential of introducing transient combustibles or ignition sources, since these tunnels are normally inaccessible. While this area contains ARSR cables, alternate shutdown methods are available were a fire to affect both cable tunnels.
MILLSTONE - UNIT 2                  TRM 7.1-3                            LBDCR 17-MP2-007 May 23, 2017
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS BASES (Continued)
: 6. The FUNCTIONALITY Assessment, including a Reasonable Assurance of Safety (RAS) determination, if warranted, for continued plant operation is intended to ensure the nonfunctionality of the ARSR equipment has been thoroughly evaluated in accordance with existing engineering guidelines and that the appropriate level of plant management is cognizant of the status of the equipment.
MILLSTONE - UNIT 2              TRM 7.1-3a                          LBDCR 17-MP2-007 May 23, 2017
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS BASES (Continued)
: 7. Entry into MODE 4 or higher is permitted with ARSR components nonfunctional. The ACTIONS identified in the Compensatory Measures column of the component FUNCTIONALITY Requirements and Compensatory Measures tables shall be implemented at the time of entry into MODE 4 for components found to be nonfunctional during MODES 5 or 6. Compensatory ACTIONS shall be implemented when the component is declared nonfunctional for components found to be nonfunctional during MODES 1, 2, 3, or 4.
: 8. TECHNICAL SURVEILLANCE REQUIREMENT of the Turbine Driven Auxiliary Feedwater Pump (P4) cannot be implemented before entering MODE 3. If the previous TECHNICAL SURVEILLANCE REQUIREMENT was satisfactory, and P4 has not been declared nonfunctional for other reasons, MODES 3 and 4 can be entered without restriction. This approach is consistent with Technical Specification 4.7.1.2.a.2.b which allows entry into MODE 3, even though the Technical Specification surveillance for the Turbine Driven Auxiliary Feedwater Pump is not performed prior to MODE 3 entry.
: 9. Electrical Breaker TECHNICAL SURVEILLANCE REQUIREMENT Testing
: a. TECHNICAL SURVEILLANCE REQUIREMENT Frequency TECHNICAL SURVEILLANCE REQUIREMENT frequency are as specified in the Preventive Maintenance Program. Changes in the frequency for breaker PMs, as allowed by the Preventive Maintenance Program, continue to fulfill the Appendix R TECHNICAL SURVEILLANCE REQUIREMENT and prove FUNCTIONALITY of these breakers. The electrical breaker TECHNICAL SURVEILLANCE REQUIREMENTS may be performed in any MODE when preventive maintenance on the breakers is allowed by either the Preventive Maintenance Program or by breaker availability, such as during a train outage.
: b. Breaker Manual Cycling Manual cycling of a breaker is defined as cycling the breaker via the mechanical trip and close buttons.
: c. ARSR Equipment Isolation When ARSR equipment (not a breaker) is removed from service for maintenance, repairs, testing, etc. and its associated power supply breaker(s) and/or control power breaker(s) are intentionally opened, no additional Appendix R compensatory ACTIONS specifically for the opened breakers are required since removal of the ARSR equipment from service already has adequate compensatory ACTIONS.
MILLSTONE - UNIT 2                  TRM 7.1-4                        LBDCR 07-MP2-015 February 2, 2010
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS BASES (Continued)
: d. NON-ARSR Equipment Isolation When equipment not listed as ARSR equipment is removed from service but its associated power supply breaker(s) and/or control power breaker(s) is listed as ARSR equipment, no Appendix R compensatory ACTION is required for the open breaker(s) since the component is not credited for operation in any Appendix R shutdown scenario.
: e. When D0105 is out for maintenance, D0111 will be used to jumper out D0105 to supply panel DV10.
When D0108 is out for maintenance, D0111 will be used to jumper out D0108 to supply panel DV30.
When D0205 is out for maintenance, D0211 will be used to jumper out D0205 to supply panel DV40.
When D0208 is out for maintenance, D0211 will be used to jumper out D0208 to supply panel DV20.
: 10. Existing compensatory ACTION(s) for a nonfunctional fire suppression and/or detection system may be utilized in lieu of FUNCTIONALITY for that suppression and/or detection system when equal compensatory ACTIONS are required for additional ARSR equipment TECHNICAL REQUIREMENT for the same fire area.
: 11. ACTION c requires that the impact be managed by performance of a FUNCTIONALITY Assessment, including a Reasonable Assurance of Safety (RAS) determination, if warranted, if ARSR component FUNCTIONALITY cannot be established within 60 days. The use of a FUNCTIONALITY Assessment, including a RAS determination, if warranted, assures the FUNCTIONALITY of ARSR components through evaluation or the use of compensatory measures if needed.
: 12. The intent of limiting transient combustibles as a compensatory measure is to create a heightened awareness of potential fire hazards (combustibles), limit to the extent possible the introduction of new hazards, and limit existing hazards through removal as work is completed. This would be accomplished by the fire watch, and the administrate controls of the permitting process. It is not the intent to prevent the introduction of materials required for repair of the system(s) in question, or fire protection systems used as compensatory measures.
(See AR 06000479-02 for additional information)
MILLSTONE - UNIT 2                TRM 7.1-5                            LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS BASES (Continued)
: 13. Risk Significant Components According to Regulatory Guide 1.160, Revision 3 Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, the NRC determined additional guidance was necessary to adequately assess and manage the risk from internal fires in the conduct of activities required by MRule (a)(4). Revision 4A of NUMARC 93-01, Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, addresses this concern by providing methods licensees can use to identify equipment important to mitigation of risk of core damage from fire initiators.
The revision also describes approaches to developing and implementing fire Risk Management Actions (RMAs) and the tools for effective implementation of the guidance.
The risk associated with the performance of maintenance activities having the potential to cause a fire (e.g., welding, use of cutting and grinding tools, transient combustibles, etc.), removal of fire detection or suppression equipment from service, and removal or impairment of fire barriers (e.g., opening of fire doors to facilitate maintenance, removal of protective barriers on cable trays or conduit, etc.) are all addressed by the existing Appendix R program. No additional action is warranted under MRule (a)(4) for these items. However, under the new guidance, removal of equipment from service important to core damage mitigation requires additional action to ensure adequate risk assessment for the impact of fire risk.
According to NUMARC 93-01, Revision 4A, the identification of equipment important for mitigating core damage resulting from fire initiating events can come from either:
10 CFR 50.58/Appendix R, a screening analysis (e.g. Fire Induced Vulnerability Evaluation), or a fire Probability Risk Assessment (PRA). MPS3 does not have fire PRAs, so Appendix R was used as the basis to identify the equipment within the existing MRule (a)(4) scope that is found to have appreciable impact on core damage mitigation for fire initiators.
The Fire Related Safe Shutdown Component list was compared with the PRA Internal Events model list of components which are risk significant for core damage frequency. Those components that were common to both lists, comprised the population of components considered for inclusion in the MRule (a)(4) program for fire risk impact. This component list was further refined down to a risk-informed list through site-specific working groups and a fleet expert panel. Once the appropriate scope of components was determined, RMAs to compensate for the reduction of the fire Safe Shutdown Capability when the component is removed from service, were developed based on guidance provided in NUMARC 93-01, Section 11.3.7.5.
The RMAs will be implemented using the method detailed in NUMARC 93-01, Section 11.3.7.3, Item 2. If a component important for mitigating core damage MILLSTONE - UNIT 2                TRM 7.1-5a                            LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS BASES (Continued)
: 13. (continued) resulting from fire initiating events is out of service for 72 hours, RMAs must be implemented. Within 30 days, the component is to be returned to service. If the component is not returned to service within 30 days, additional risk evaluations to determine additional actions must be performed.
It is important to note, the RMAs developed under the new guidance only address incremental risk from fire events. It is not appropriate to utilize the fire risk RMA implementation methods to address aggregate risk from fire and internal events.
Risk from internal events will continue to be evaluated under the current MRule (a)(4) program.
 
==REFERENCE:==
: 1. Condition Report M3-00-02659.
: 2. RP-5, Operability Determinations.
MILLSTONE - UNIT 2                  TRM 7.1-5b                          LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Appendix R Safe Shutdown TECHNICAL REQUIREMENTS Index TR No.      System Description                      Component ID      ADDITIONAL          TRM 7.1 REQUIREMENTS        Page No.
7.1.1      Charging Pumps                          P18A, 18B, 18C    TR 3.1.2.4              10 7.1.1      Regen HX outlet iso                      CH-089            TR 3.1.2.4              10 7.1.1      Charging to RCS loops                    CH-518, 519        TR 3.1.2.4              11 7.1.1      Aux Spray to PZR (RCS)                  CH-517            TR 3.1.2.4              11 7.1.1      Charging pump header iso MOV            CH-429            TR 3.1.2.4              11 7.1.1      VCT outlet MOV                          CH-501            TR 3.1.2.4              11 7.1.1      Chrg Pps suct fm RWST MOV                CH-504            TR 3.1.2.4              12 7.1.1      Chrg Pps suct fm RWST AOV                CH-192            TR 3.1.2.4              12 7.1.2      Instr, Monitor local BAST level          LI-206A, 208A      TR 3.1.2.8.a            16 7.1.3      MS Low Pt Drain -ESF-MSI                MS-265B            TS 3.3.2.1              19 7.1.3      MS Low Pt Drain -ESF-MSI                MS-266B            TS 3.3.2.1              19 7.1.4      Instr, Monitor SG Press                  PT-1023B          TS 3.3.3.5              22 7.1.4      Instrument, Monitoring Pzr Press        PT-102B-1          TS 3.3.3.5              22 7.1.4      Instr, Monitor NI, wide rang            QEXC2PDA, 4PDA    TS 3.3.3.5              22 7.1.4      Instr, Monitor NI, wide range            QEXC1PDA, 3PDA    TS 3.3.3.5              22 7.1.4      Instr, Monitor Pzr Press low rng        PT-103, 103-1      TS 3.3.3.5              22 7.1.4      Instr, monitor Pzr level, cold, nor      LT-103, 110X, 110Y TS 3.3.3.5              23 7.1.4      Instr, Monitor SG 2 level, nar rng      LT-1123B          TS 3.3.3.5              23 7.1.4      Instr, Monitor SG 2 level,wide rng      LT-1124A, 1124B    TS 3.3.3.5              23 7.1.4      Instr, monitor SG 1 level,wide rng      LT-1114A, 1114B    TS 3.3.3.5              24 7.1.5      Instr, Monitoring hot leg temp          TE-121X            TS 3.3.3.8              27 7.1.5      Instr, Monitoring hot leg temp          TE-111X            TS 3.3.3.8              27 7.1.5      Instr, Monitoring cold leg temp          TE-125            TS 3.3.3.8              27 7.1.5      Instr, Monitoring cold leg temp          TE-115            TS 3.3.3.8              27 7.1.5      Instr, Monitor AFW flow to SG 2          FT-5278A. 5278B    TS 3.3.3.8              28 7.1.5      Instr, Monitor AFW flow to SG 1          FT-5277A, 5277B    TS 3.3.3.8              28 7.1.6      6900 V breakers for RCPs Bus 25A        (H1)              TS 3.4.1.2              31 7.1.6      6900 V breakers for RCPs Bus 25B          (H2)              TS 3.4.1.2              31 7.1.7      SDC HX bypass                            SI-306            TS 3.4.1.3              34 7.1.7      SDC suct MOVs                            SI-651, 652        TS 3.4.1.3              34 7.1.7      SDC sup, ret temp monitors              TE-351X, 351Y      TS 3.4.1.3              34 7.1.7      SDC HXs outlet temps indication          TE-303X, 303Y      TS 3.4.1.3              35 7.1.8      RCS- PORVs                              RC-402/ 404        TS 3.4.3                38 7.1.9      SIT Nitrogen vent valves                SI-613,623,633,643 TS 3.5.1.a              41 7.1.9      SIT Outlet MOVs                          SI-614,624,634,644 TS 3.5.1.a              41 7.1.10      LPSI flow MOVs                          SI-615,625,635,645 TS 3.4.1.3              44 7.1.10      SDC min flow alt                        SI-449, 450        TS 3.4.1.3              44 7.1.10      SDC HX outlet                            SI-657            TS 3.4.1.3              44 7.1.10      LPSI suct fm RWST                        SI-432, 444        TS 3.4.1.3              44 7.1.10      LPSI suct fm RCS                        SI-440, 441        TS 3.4.1.3              44 7.1.10      LPSI disch to SDC HX                    SI-452, 453        TS 3.4.1.3              45 7.1.10      SDC HX outlet                            SI-456, 457        TS 3.4.1.3              45 7.1.11      RWST outlet MOV                          CS-13.1B          n/a                      48 MILLSTONE - UNIT 2                      TRM 7.1-6                            LBDCR 16-MP2-003 February 29, 2016
 
ADDITIONAL REQUIREMENTS Appendix R Safe Shutdown TECHNICAL REQUIREMENTS Index (Continued)
TR No.      System Description                Component ID      ADDITIONAL          TRM 7.1 REQUIREMENTS        Page No.
7.1.12      Boric Acid Grav feed MOVs          CH-508, 509        TR 3.1.2.2.a            51 7.1.13      Ctmt Ambient Temp monitoring      TE-8108            TS 3.6.1.5              54 7.1.14      Ctmt Spray Stop Valves            CS-4A, 4B          TS 3.6.2.1              57 7.1.15      AFW Turbine                        SV-4188            TS 3.7.1.2              60 7.1.15      AFW Turbine                        P4 & H-21          TS 3.7.1.2              60 7.1.15      AFW Turbine steam stop            MOV MS-202        TS 3.7.1.2              60 7.1.15      AFW pumps, motor driven            P9A, P9B          TS 3.7.1.2              60 7.1.15      AFW P4 Discharge Iso              MOV FW-44          TS 3.7.1.2              61 7.1.15      AFW flow control valves            FW-43A/43B        TS 3.7.1.2              61 7.1.16      Instr, Monitor CST level          LT-5282            TS 3.7.1.3                64 7.1.16      Instr, Local CST level Ind        LIS-5489          TS 3.7.1.3                64 7.1.17      MSIVs                              MS-64A/64B        TS 3.7.1.5              67 7.1.17      MSIV Bypass M                      S-65A/65B          TS 3.7.1.5              67 7.1.18      ADVs                              MS-190A/190B      TS 3.7.1.7              70 7.1.19      SG Blowdown Valves                MS-220A/220B      TS 3.7.1.8              73 7.1.20      RBCCW out of SDC HXs              RB-13.1A, 13.1B    TS 3.7.3.1                76 7.1.20      RBCCW Pp A Inlet AOVs              RB-211A, 211B      TS 3.7.3.1              76 7.1.20      RBCCW Pp B Inlet AOV's            RB-211C, 211D      TS 3.7.3.1              77 7.1.20      RBCCW Pp C Inlet AOVs              RB-211E, 211F      TS 3.7.3.1                77 7.1.20      RBCCW Hx A outlet AOVs            RB-4.1A, 4.1B      TS 3.7.3.1              78 7.1.20      RBCCW Hx B outlet AOVs            RB-4.1C, 4.1D      TS 3.7.3.1              78 7.1.20      RBCCW Hx C outlet AOVs            RB-4.1E, 4.1F      TS 3.7.3.1              79 7.1.20      RBCCW pumps                        P11A, P11B, P11C  TS 3.7.3.1              79 7.1.20      RBCCW pp disch x-tie AOVs          RB-251A, 251B      TS 3.7.3.1              79a 7.1.21      SW pumps & Strainers              P5A, P5C, L1A, L1C TS 3.7.4.1              82 7.1.21      SW Disch hdr x-tie valves          SW-97A/ 97B        TS 3.7.4.1              82 7.1.21      SW pump disch valves              SW-2A, 2B, 2C      TS 3.7.4.1              83 7.1.21      SW inlet to RBCCW HXs              SW-3.1A/ 3.1B      TS 3.7.4.1              83 7.1.21      SW outlet fm RBCCW HXs            SW-9A/ 9B/ 9C      TS 3.7.4.1              84 7.1.21      SW inlet to TBCCW HXs              SW-5A/ 5B/ 5C      TS 3.7.4.1              84 7.1.21      SW iso to EDG A & B                SW-12B/ 12C        TS 3.7.4.1              84 7.1.21      Drain on SW to EDG B              SW-296            TS 3.7.4.1              84a 7.1.22      Alternate AC diesel gen            SBO DG            TS 3.8.1.1.a            87 7.1.23      4160 volt switchgear              Bus 24C (A3)      TS 3.8.2.1              90 7.1.23      4160 volt switchgear              Bus 24D (A4)      TS 3.8.2.1              91 7.1.23      4160 volt switchgear              Bus 24E (A5)      TS 3.8.2.1              91 7.1.23      4160 volt switchgear              Bus 24A (A1)      TS 3.8.2.1              92 7.1.23      4160 volt switchgear              Bus 24B (A2)      TS 3.8.2.1              92 7.1.23      480 volt load center              Bus 22A (B01)      TS 3.8.2.1              92 7.1.23      480 volt load center              Bus 22B (B02)      TS 3.8.2.1              92 7.1.23      480 volt switchgear                Bus 22E (B05)      TS 3.8.2.1              93 7.1.23      480 volt switchgear                Bus 22F (B06)      TS 3.8.2.1              93 7.1.23      MCC B51                            B51 (MCC-22-1E)    TS 3.8.2.1              93 MILLSTONE - UNIT 2                TRM 7.1-7                            LBDCR 16-MP2-003 February 29, 2016
 
ADDITIONAL REQUIREMENTS Appendix R Safe Shutdown TECHNICAL REQUIREMENTS Index (Continued)
TR No.      System Description                      Component ID        ADDITIONAL        TRM 7.1 REQUIREMENTS      Page No.
7.1.23      MCC B52                                B52 (MCC-22-2E)      TS 3.8.2.1              93 7.1.23      MCC B61                                B61 (MCC-22-1F)      TS 3.8.2.1              94 7.1.23      MCC B62                                B62 (MCC-22-2F)      TS 3.8.2.1              94 7.1.23      120 VAC panel VIAC-2                    VA 20                TS 3.8.2.1              94 7.1.23      Em. Light Units                        ELUs                TS 3.8.2.1              95 7.1.24      125 VDC Bus 201A                        Bus D01              TS 3.8.2.3              99 7.1.24      125 VDC Bus 201B                        Bus D02              TS 3.8.2.3              99 7.1.24      125 VDC panel 201A-1V                  DV 10                TS 3.8.2.3            100 7.1.24      125 VDC panel 201B-1V                  DV 20                TS 3.8.2.3            101 7.1.24      125 VDC panel 201A-1                    D11                  TS 3.8.2.3            101 7.1.24      125 VDC panel 201A-2                    D12                  TS 3.8.2.3            101 7.1.24      125 VDC panel 201B-1                    D21                  TS 3.8.2.3            102 7.1.24      125 VDC panel 201B-2                    D22                  TS 3.8.2.3            102 7.1.25      Alt (Fire Pro) cooling to EDGs          FIRE-258,259,559,560 n/a                    105 7.1.25      Fire Supp System                        Fire Suppression sys n/a                    105 7.1.25      Cross-tie to AFW suction                2-FIRE-34            n/a                    105 7.1.26      Radio Communication System              Hand-held Radios    n/a                    108 7.1.26      Box Inventory items available          HSD Storage Box      n/a                    108 7.1.26      Box Inventory items available          FSD Storage Box      n/a                    108 7.1.26      Materials available for repairs        CSD Repair Material  n/a                    109 7.1.26      Fans-East & West DC rooms              F156A, B, C, D      n/a                    109 7.1.26      Fans-East & West 480 V rooms            F157A, B, C, D      n/a                    109 7.1.26      Bottles & Valves                        Bottle 3A, 3B, 3C    n/a                    110 7.1.27      Emergency Diesel Generators            H7A, H7B            TS 3.8.1.1            113 MILLSTONE - UNIT 2                    TRM 7.1-8                              LBDCR 16-MP2-003 February 29, 2016
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL REQUIREMENT: 3.1.2.4 - Charging Pumps TECHNICAL REQUIREMENT 7.1.1    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.1-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.1    The capability of equipment listed in TRM Table 7.1.1-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.1-2.
MILLSTONE - UNIT 2              TRM 7.1-9                          LBDCR 14-MP2-015 September 24, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.1-1 CVCS Components FUNCTIONALITY Requirements and Compensatory Measures TR        Comp ID            FUNCTIONALITY Description            Compensatory Measures if Component Risk Significant Component Item                                                                        Not Restored in 14 Days                Not Restored in 72 Hours (see ACTION a)                        (see Action d)
A  P18A Charging Pump    Pump must be FUNCTIONAL from          With P18A nonfunctional perform ACTIONS        With P18A pump nonfunctional, control room                          b.1, b.2 for Fire Area R-2.                    Risk Mitigation Areas are: R-2 (FHA A-8B, A-8D, A-13 and T-10),
R-3 (FHA T-1A, T-1C and T-1F), R-5 (FHA A-8A), R-8 (FHA A-16), R-10 (FHA A-21 and A-23) and R-11 (FHA A-28)
B  P18B Charging Pump    Pump must be controllable from panel 1. With P18B nonfunctional from C10 ensure      N/A C10                                      P18C is FUNCTIONAL from C10 or perform ACTIONS b.1, b.2 for Fire Areas R-1 & R-13.
: 2. With P18B nonfunctional from panel C10 perform ACTIONS b.1, b.2 for fire area R-4.
C  P18C Charging Pump    1. Pump must be controllable from      1. With P18C nonfunctional from C10 ensure    N/A panel C10.                            P18B is FUNCTIONAL from C10 or perform
: 2. Pump must be FUNCTIONAL from          ACTIONS b.1, b.2 for Fire Areas R-1 & R-13.
control room                      2. With P18C nonfunctional from CR perform ACTIONS b.1, b.2 for Fire Area R-4.
D  Z2 Powered Charging    At least one pump must be powered      N/A                                            With Z2 pump nonfunctional, Risk Pump                  from facility Z2.                                                                    Mitigation Areas are: R-1 (FHA A-1B, A-24 and A-25), R-4 (FHA A-6A), R-7 (FHA A-15), R-9 (FHA A-20 and A-22), R-13 (FHA T-6, R-14 (FHA T-7 and T-9) and R-17 (FHA A-10B)
E  CH-089 Regen HX Outlet Valve must be controllable from panel  Perform ACTIONS b.1, b.2 for Fire Area R-1    N/A Iso                    C10 MILLSTONE - UNIT 2                                        TRM 7.1-10                                                  LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.1-1 CVCS Components FUNCTIONALITY Requirements and Compensatory Measures TR        Comp ID          FUNCTIONALITY Description            Compensatory Measures if Component Risk Significant Component Item                                                                        Not Restored in 14 Days                  Not Restored in 72 Hours (see ACTION a)                        (see Action d)
F  CH-518 Charging to RCS Valve must be capable of being        Verify that valve CH-518 & 519 can be cycled    N/A cycled by local manual hand-wheel    from the CR and BU air bottles are available or perform ACTIONS b.1, b.2 for all fire areas except R-1.
G  CH-519 Charging to RCS 1. Valve must be capable of being    1. Verify that valve CH-518 & 519 can be        N/A cycled by local manual hand-          cycled from the CR and BU air bottles are wheel.                                available or perform ACTIONS b.1, b.2 for all
: 2. Valve must be controllable from      fire areas except R-1.
panel C10.                        2. Perform ACTIONS b.1, b.2 for fire area R-1.
H  CH-517 Auxiliary Spray 1. Valve must be capable of being    1. With hand-wheel nonfunctional perform        N/A to Pressurizer AOV        cycled by local manual hand-          ACTIONS b.1, b.2 for fire areas R-2, R-10 &
wheel.                                R-15.
: 2. Valve must be capable of being    2. Verify valve can be cycled by local manual cycled using BU air bottles by        hand-wheel or perform ACTIONS b.1, b.2 for remote CR operation.                  ALL fire areas except R-1.
: 3. Valve must be controllable from    3. With valve nonfunctional perform ACTIONS panel C10 using BU air bottles.      b.1, b.2 for Fire area R-1.
: 4. Valve must fail closed when        4. With valve nonfunctional perform ACTIONS solenoid is de-energized.            b.1, b.2 for Fire areas R-2 & R-15 I CH-429 Charging Pp Hdr 1. Valve must be capable of being    1. With valve nonfunctional perform ACTIONS      N/A Iso MOV                  cycled by local manual hand-          b.1, b.2 for fire areas R-1 & R-2.
wheel.                            2. With valve nonfunctional, ensure manual
: 2. Valve must be controllable from      capability is available.
panel C10 MILLSTONE - UNIT 2                                      TRM 7.1-11                                                  LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.1-1 CVCS Components FUNCTIONALITY Requirements and Compensatory Measures TR        Comp ID        FUNCTIONALITY Description          Compensatory Measures if Component Risk Significant Component Item                                                                      Not Restored in 14 Days                  Not Restored in 72 Hours (see ACTION a)                        (see Action d)
J  CH-501 VCT Outlet MOV Valve must be capable of being      With valve nonfunctional perform ACTIONS b.1, N/A cycled by local manual hand-wheel. b.2 for fire areas R-1,R-4, R-7, R-9, R-13, R-14, R-16 & R-17.
K  CH-504 Chrg Pps Suct  Valve must be capable of being      With valve nonfunctional perform ACTIONS b.1, N/A fm RWST              cycled by local manual hand-wheel. b.2 for fire areas R-1.
L  CH-192 Charging Pps  Valve must be capable of being      1. With the hand-wheel nonfunctional perform      N/A Suct fm RWST AOV      cycled by local manual hand-wheel. ACTIONS b.1, b.2 for fire areas R-1, R-4, R-7, R-9, R-13, R-14, R-16 & R-17; and
: 2. Verify valve can be operated using BU air or perform ACTIONS b.1, b.2 for fire areas R-2, R-3,R-5, R-6, R-8, R-10, R-11, R-12 & R-15.
MILLSTONE - UNIT 2                                    TRM 7.1-12                                                  LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.1-2 CVCS Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR No. Comp ID      TECHNICAL SURVEILLANCE REQUIREMENT                        Frequency A  P18A        Verify P18A can be operated from the control room. Once per REFUELING Charging                                                          cycle Pump B  P18B        Verify control of P18B can be isolated from the        Once per REFUELING Charging    control room and that it can be operated from C10. cycle Pump C  P18C        1. Verify control of P18C can be isolated from the    Once per REFUELING Charging      control room and that it can be operated from      cycle Pump          C10.
: 2. Verify P18C can be operated from the control room.
D  Z2          N/A                                                    N/A Powered Charging Pump E  CH-089      Verify control can be isolated from the control room  Once per REFUELING Regen HX    and operated room C10.                                cycle Outlet Iso F  CH-518      Verify valve can be manually cycled using its hand-    Once every 48 months.
Charging to wheel.
RCS G  CH-519      1. Verify valve can be manually cycled using its      1. Once every 48 Charging to    hand- wheel.                                          months.
RCS
: 2. Verify control of 2-CH-519 can be isolated from    2. Once per the control room and operated from panel C10.          REFUELING cycle.
H  CH-517      1. Verify valve can be manually cycled using its      1. Once every 48 Auxiliary      hand-wheel.                                            months.
Spray to Pressurizer 2. Verify valve can be operated from control room      2. Once per using backup air bottles.                              REFUELING cycle
: 3. Verify valve control can be isolated from control  3. Once per room and operated from C10, using backup air          REFUELING cycle bottles.                                            4. Once per
: 4. Verify valve fails closed on loss of control power. REFUELING cycle MILLSTONE - UNIT 2              TRM 7.1-13                        LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.1-2 CVCS Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR No. Comp ID    TECHNICAL SURVEILLANCE REQUIREMENT                        Frequency I  CH-429    1. Verify valve can be manually cycled using its    1. In accordance with Charging      hand-wheel.                                          the MOV surveillance Pp Hdr Iso                                                          frequency established MOV        2. Verify valve control can be isolated from control room and operated from Panel C10.                    by the PM Program.
: 2. Once per REFUELING cycle J  CH-501    Verify valve can be manually cycled using its hand-  In accordance with the VCT Outlet wheel.                                              MOV surveillance MOV                                                            frequency established by the PM Program.
K  CH-504    Verify valve can be manually cycled using its hand-  In accordance with the Chrg Pps  wheel                                                MOV surveillance Suct fm                                                        frequency established by RWST                                                            the PM Program L  CH-192    Verify valve can be manually cycled using its hand-  Once every 48 months.
Chrg Pps  wheel Suct fm RWST AOV MILLSTONE - UNIT 2            TRM 7.1-14                        LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL REQUIREMENT: 3.1.2.8.a - Boric Acid Storage Tanks TECHNICAL REQUIREMENT 7.1.2      The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.2-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.2      The capability of equipment listed in TRM Table 7.1.2-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.2-2.
MILLSTONE - UNIT 2                TRM 7.1-15                          LBDCR 14-MP2-015 September 24, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.2-1 BAST Local Level Instruments FUNCTIONALITY Requirements and Compensatory Measures TR Item  Comp ID  FUNCTIONALITY                  Compensatory Measures if Description            Component Not Restored in 14 Days (see ACTION a)
A    LI-206A    Local level indicator  With local level indication nonfunctional, perform Local BAST must be                ACTIONS b.1, b.2 listed for Fire Areas R-2 and R-10.
Level Ind  FUNCTIONAL.
B    LI-208A    Local level indicator  With local level indication nonfunctional, perform Local BAST must be                ACTIONS b.1, b.2 listed for Fire Areas R-2 and R-10.
Level Ind  FUNCTIONAL.
MILLSTONE - UNIT 2            TRM 7.1-16                                LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.2-2 BAST Local Level Indicators TECHNICAL SURVEILLANCE REQUIREMENTS TSR    Comp ID            TECHNICAL                          Frequency Item                    SURVEILLANCE REQUIREMENT A  LI-206A Local Verify the instrument is    Once per REFUELING cycle BAST Level    calibrated.
Ind B  LI-208A Local Verify the instrument is    Once per REFUELING cycle BAST Level    calibrated.
Ind MILLSTONE - UNIT 2              TRM 7.1-17                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.3.2.1 Engineered Safety Feature Actuation System Instrumentation TECHNICAL REQUIREMENT 7.1.3      The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.3-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.3      The capability of equipment listed in TRM Table 7.1.3-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.3-2.
MILLSTONE - UNIT 2                TRM 7.1-18                          LBDCR 14-MP2-015 September 24, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.3-1 MSI Components Functionality Requirements And Compensatory Measures TR  Comp ID          FUNCTIONALITY              Compensatory Measures if Item                      Description            Component Not Restored in 14 Days (see ACTION a)
A  2-MS-      Valve must be capable of    With valve nonfunctional, perform 265B Mn    failing closed when the      ACTIONS b.1, b.2 for Fire Areas R-1 Steam      solenoid is de-energized. and R-17.
Low Point Drain B  2-MS-      Valve must be capable of    With valve nonfunctional, perform 266B Mn    failing closed when the      ACTIONS b.1, b.2 for Fire Areas R-1 Steam      solenoid is de-energized. and R-2.
Low Point Drain MILLSTONE - UNIT 2            TRM 7.1-19                      LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.3-2 MSIV Components Technical Surveillance Requirements TECHNICAL TSR          Comp ID              SURVEILLANCE                    Frequency No.                                  REQUIREMENT A  2-MS-265B Mn Steam Low    Verify valve will fail closed Once per REFUELING cycle Point Drain                on loss of control power B  2-MS-266B Mn Steam Low    Verify valve will fail closed Once per REFUELING cycle Point Drain                on loss of control power MILLSTONE - UNIT 2        TRM 7.1-20                              LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.3.3.5 REMOTE SHUTDOWN INSTRS TECHNICAL REQUIREMENT 7.1.4      The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.4-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.4      The capability of equipment listed in TRM Table 7.1.4-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.4-2.
MILLSTONE - UNIT 2                TRM 7.1-21                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.4-1 Remote Shutdown Instruments, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures TR                      FUNCTIONALITY                              Compensatory Measures if Component Not Item      Comp ID            Description                              Restored in 14 Days (see ACTION a)
A  PT-102B-1        Instrument loop and    With loop nonfunctional from Panel C10, perform ACTIONS b.1, b.2 for fire area R-1.
Pressurizer      pressure indicator Pressure          must be FUNCTIONAL at Panel C10.
B  PT-1023B          Instrument loop must  With loop nonfunctional from Panel C10, perform ACTIONS b.1, b.2 for fire area R-1.
Stm Gen # 2      be FUNCTIONAL at Pressure          Panel C10.
C  QEXC2PDA          Instrument loops must 1. With both B and D loops nonfunctional from the Control Room, perform ACTIONS (WR-DET-B),      be FUNCTIONAL from        b.1, b.2 for fire areas R-7, R-9, R-14, R-16, and R-17.
the Control Room.
QEXC4PDA                                2. With loop D nonfunctional from the Control Room, perform ACTIONS b.1, b.2 for (WR-DET-D),                                fire area R-13 QEXC1PDA                                3. With both A and C loops nonfunctional from the Control Room, perform ACTIONS (WR-DET-A),                                b.1, b.2 for fire areas R-2 and R-10 QEXC3PDA                                4. With all loops (A,B,C,D) nonfunctional from the Control Room, perform ACTIONS (WR-DET-C)                                  b.1, b.2 for fire areas R-2, R-3, R-4, R-5, R-6, R-7, R-8, R-9, R-10, R-11, R-12, R-13, R-14, R-15, R-16 and R-17.
D  PT-103,          Instrument loops must 1. With 103 loop nonfunctional from Control Room, perform ACTIONS b.1, b.2 for fire PT-103-1          be FUNCTIONAL from        areas R-7, R-9, R-13, R-14, R-16 and R-17.
Pressurizer      the Control Room.      2. With 103-1 loop nonfunctional from Control Room, perform ACTIONS b.1, b.2 for Pressure                                    fire areas R-2, R-3, and R-10.
Low Range
: 3. With loops 103 and 103-1 nonfunctional from Control Room, perform ACTIONS b.1, b.2 for fire areas R-4, R-5, R-6, R-8, R-11, and R-12.
MILLSTONE - UNIT 2                                TRM 7.1-22                                              LBDCR 11-MP2-002 April 19, 2011
 
ADDITIONAL REQUIREMENTS Table 7.1.4-1 Remote Shutdown Instruments, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures TR                      FUNCTIONALITY                              Compensatory Measures if Component Not Comp ID Item                        Description                              Restored in 14 Days (see ACTION a)
E  LT-103            1. Loop LT-103 must 1. With loop LT-103 nonfunctional from Panel C10, perform ACTIONS b.1, b.2 for fire (Cold)              be FUNCTIONAL          area R-1.
LT-110X              from Panel C10. 2. With loop LT-110X nonfunctional from Control Room, perform ACTIONS b.1, b.2 LT-110Y          2. Loop LT-110X must      for fire area R-2, R-10, and R-15.
Pressurizer          be FUNCTIONAL Level                from Control Room. 3. for With loop LT-110Y nonfunctional from Control Room, perform ACTIONS b.1, b.2 fire area R-7, R-9, R-14, R-15, R-16, and R-17.
: 3. Loop LT-110Y must be FUNCTIONAL from Control Room.
F  LT-1123B          1. Loops L-1123B and  1. With either loop F-5278B or L-1123B nonfunctional from Panel C10, perform SG 2 Water          F-5278B must be        ACTIONS b.1, b.2 for fire area R-1.
Level Narrow        FUNCTIONAL from    2. With loop L-1124A nonfunctional from Control Room, perform ACTIONS b.1, b.2 Range                Panel C10.            for fire area R-2.
LT-1124A          2. SG WR Level, or LT-1124B                                3. With loops L-1124A and F-5278A nonfunctional from Control room perform AFW Flow and NR SG2 Water                                  ACTIONS b.1, b.2 for fire area R-10.
Level for same SG Level Wide          must be            4. With Loop L-1124B nonfunctional from Control Room, perform ACTIONS b.1, b.2 Range                FUNCTIONAL from        for Fire Area R-13.
Control Room.      5. With loops L-1124B & F-5278B nonfunctional from Control Room, perform ACTIONS b.1, b.2 for fire areas R-7, 9, 14, 16 and R-17.
MILLSTONE - UNIT 2                                  TRM 7.1-23                                      LBDCR 11-MP2-002 April 19, 2011
 
ADDITIONAL REQUIREMENTS Table 7.1.4-1 Remote Shutdown Instruments, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures TR                      FUNCTIONALITY                          Compensatory Measures if Component Not Comp ID Item                        Description                            Restored in 14 Days (see ACTION a)
G  LT-1114A          SG Wide Range      1. With loop L-1114A nonfunctional from Control Room, perform ACTIONS b.1, b.2 LT-1114B          Water Level or AFW    for fire area R-2.
SG 1 Water Level  Flow must be        2. With loops L-1114A and F-5277A nonfunctional from Control room perform Wide Range        FUNCTIONAL from        ACTIONS b.1, b.2 for fire area R-10.
Control Room
: 3. With loops L-1114B and F-5277B nonfunctional from Control room perform ACTIONS b.1, b.2 for fire area R-7, 9, 13, 14, 16 & R-17.
MILLSTONE - UNIT 2                              TRM 7.1-24                                        LBDCR 11-MP2-002 April 19, 2011
 
ADDITIONAL REQUIREMENTS Table 7.1.4-2 Remote Shutdown Instruments, Appendix R Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR                              TECHNICAL SURVEILLANCE Comp ID                                                        Frequency Item                                    REQUIREMENT PT-102B-1        Perform a CHANNEL CALIBRATION to          Once per REFUELING A    Pressurizer      verify that the instrument is calibrated. cycle.
Pressure PT-1023B          Perform a CHANNEL CALIBRATION to          Once per REFUELING B    Stm Gen # 2      verify that the instrument is calibrated. cycle.
Pressure QEXC2PDA          Perform a CHANNEL CALIBRATION to          Once per REFUELING (WR-DET-B),      verify that the instrument is calibrated. cycle.
QEXC4PDA (WR-DET-D),
C QEXC1PDA (WR-DET-A),
QEXC3PDA (WR-DET-C)
PT-103,          Perform a CHANNEL CALIBRATION to          Once per REFUELING PT-103-1          verify that the instrument is calibrated. cycle.
D    Pressurizer Pressure Low Range LT-103 (Cold)    Perform a CHANNEL CALIBRATION to          Once per REFUELING LT-110X          verify that the instrument is calibrated. cycle.
E    LT-110Y Pressurizer Level LT-1123B          Perform a CHANNEL CALIBRATION to          Once per REFUELING LT-1124A          verify that the instrument is calibrated. cycle.
F    SG 2 Water Level Wide Range LT-1124B LT-1114A          Perform a CHANNEL CALIBRATION to          Once per REFUELING LT-1114B          verify that the instrument is calibrated. cycle.
G    SG 1 Water Level Wide Range MILLSTONE - UNIT 2              TRM 7.1-25                        LBDCR 11-MP2-002 April 19, 2011
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.3.3.8 Accident Monitor Instrs TECHNICAL REQUIREMENT 7.1.5      The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.5-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.5      The capability of equipment listed in TRM Table 7.1.5-1 to meet its Appendix R shutdown related FUNCTIONALity requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.5-2.
MILLSTONE - UNIT 2                TRM 7.1-26                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.5-1 Accident Monitoring Instrumentation, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures TR                              FUNCTIONALITY                        Compensatory Measures if Component Not Comp ID Item                                Description                            Restored in 14 Days (see ACTION a)
A    TE-121X          1. Loop must be FUNCTIONAL at      1. With loop nonfunctional from Panel C10, perform ACTIONS RCS Hot              Panel C10.                          b.1, b.2 for fire area R-1.
Leg 2 Temperature 2. Loop must be FUNCTIONAL at      2. With loop nonfunctional from the Control Room, perform Control Room.                      ACTIONS b.1, b.2 for all fire areas EXCEPT R-1, R-2, and R-10.
B    TE-111X          Loop must be FUNCTIONAL at          With loop nonfunctional from Control Room, perform ACTIONS RCS Hot          Control Room.                      b.1, b.2 for fire areas R-2, R-3, R-4, R-5, R-6, R-8, R-10, R-11, R-Leg 1                                                12, and R-15.
Temperature C    TE-125 RCS        1. Loop must be FUNCTIONAL at      1. With loop nonfunctional from Panel C10, perform ACTIONS Cold Leg 2          Panel C10.                          b.1, b.2 for fire area R-1.
Temperature      2. Loop must be FUNCTIONAL at      2. With loop nonfunctional from Control Room, perform ACTIONS Control Room.                      b.1, b.2 for all fire areas EXCEPT R-1, R-2, and R-10.
D    TE-115 RCS Cold  Loop must be FUNCTIONAL at          With loop nonfunctional from Control Room, perform ACTIONS Leg 1            Control Room.                      b.1, b.2 for fire areas R-2, R-3, R-4, R-5, R-6, R-8, R-10, R-11, R-Temperature                                          12, and R-15.
MILLSTONE - UNIT 2                              TRM 7.1-27                                              LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.5-1 Accident Monitoring Instrumentation, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures TR                              FUNCTIONALITY                        Compensatory Measures if Component Not Comp ID Item                                Description                          Restored in 14 Days (see ACTION a)
E    FT-5278A,        1. Loops F-5278B and L-1123B must 1. With either loop F-5278B or L-1123B nonfunctional from Panel FT-5278B            be FUNCTIONAL from Panel C10.      C10, perform ACTIONS b.1, b.2 for fire area R-1.
AFW Flow to SG 2. 2. SG WR Level, or AFW Flow and    2. With loop L-1124A nonfunctional from Control Room, perform NR Level for same SG must be        ACTIONS b.1, b.2 for fire area R-2.
FUNCTIONAL from Control Room. 3. With loops L-1124A and F-5278A nonfunctional from Control room perform ACTIONS b.1, b.2 for fire area R-10.
: 4. With Loop L-1124B nonfunctional from Control Room, perform ACTIONS b.1, b.2 for Fire Area R-13.
: 5. With loops L-1124B & F-5278B nonfunctional from Control Room, perform ACTIONS b.1, b.2 for fire areas R-7, 9, 14, 16 &
R-17.
F    FT-5277A,        SG Wide Range Water Level or AFW 1. With loop L-1114A nonfunctional from Control Room, perform FT-5277B          Flow must be FUNCTIONAL from          ACTIONS b.1, b.2 for fire area R-2.
AFW Flow to SG 1 Control Room                        2. With loops L-1114A and F-5277A nonfunctional from Control room perform ACTIONS b.1, b.2 for fire area R-10.
: 3. With loops L-1114B and F-5277B nonfunctional from Control room perform ACTIONS b.1, b.2 for fire area R-7, 9, 13, 14, 16
                                                                & R-17.
MILLSTONE - UNIT 2                              TRM 7.1-28                                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.5-2 Accident Monitoring Instrumentation, Appendix R Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR                          TECHNICAL SURVEILLANCE Comp ID                                                        Frequency Item                                  REQUIREMENT A    TE-121X RCS      1. Perform CHANNEL CALIBRATION to          Once per REFUELING Hot Leg 2          verify the instrument is calibrated. cycle.
Temperature      2. Perform CHANNEL CALIBRATION as presently stated.
B    TE-111X RCS      Perform CHANNEL CALIBRATION to              Once per REFUELING Hot Leg 1        verify the instrument is calibrated.        cycle.
Temperature C    TE-125 RCS      1. Perform CHANNEL CALIBRATION to          Once per REFUELING Cold Leg 2          verify the instrument is calibrated. cycle.
Temperature      2. Perform CHANNEL CALIBRATION as presently stated.
D    TE-115 RCS      Perform CHANNEL CALIBRATION to              Once per REFUELING Cold Leg 1      verify the instrument is calibrated.        cycle.
Temperature E    FT-5278A,        Perform a CHANNEL CALIBRATION to            Once per REFUELING verify that the instruments are calibrated. cycle.
FT-5278B AFW Flow to SG 2.
F    FT-5277A,        Perform a CHANNEL CALIBRATION to            Once per REFUELING verify that the instruments are calibrated. cycle.
FT-5277B AFW Flow to SG 1
MILLSTONE - UNIT 2              TRM 7.1-29                            LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.4.1.2 Coolant Loops and Circulation TECHNICAL REQUIREMENT 7.1.6      The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.6-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.6      The capability of equipment listed in TRM Table 7.1.6-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.6-2.
MILLSTONE - UNIT 2                TRM 7.1-30                          LBDCR 16-MP2-003 February 29, 2016
 
ADDITIONAL REQUIREMENTS Table 7.1.6-1 6900 Volt Bus 25A (H1) and 25B (H2) Switchgear - RCP Breakers FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR                  FUNCTIONALITY                      Component Not Comp ID Item                    Description                    Restored in 14 Days (see ACTION a) 6900 Volt  RCP Breaker must be      With local breaker control RCP        capable of being cycled  nonfunctional, perform ACTIONS b.1, A  Breaker    (tripped) by local        b.2 for fire areas R-9 and R-17.
H104        manual operation.
6900 Volt  RCP Breaker must be      With local breaker control RCP        capable of being cycled  nonfunctional, perform ACTIONS b.1, B  Breaker    (tripped) by local        b.2 for fire areas R-9 and R-17.
H105        manual operation.
6900 Volt  RCP Breaker must be      With local breaker control RCP        capable of being cycled  nonfunctional, perform ACTIONS b.1, C  Breaker    (tripped) by local        b.2 for fire area R-10.
H201        manual operation.
6900 Volt  RCP Breaker must be      With local breaker control RCP        capable of being cycled  nonfunctional, perform ACTIONS b.1, D  Breaker    (tripped) by local        b.2 for fire area R-10.
H202        manual operation.
MILLSTONE - UNIT 2          TRM 7.1-31                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.6-2 6900 Volt Bus 25A (H1) and 25B (H2) Switchgear - RCP Breakers TECHNICAL SURVEILLANCE REQUIREMENTS TSR                        TECHNICAL SURVEILLANCE Comp ID                                                      Frequency Item                              REQUIREMENT 6900 Volt      Verify that the circuit breaker can be In accordance with the RCP            cycled (tripped) by local manual      surveillance frequency A    Breaker        operation.                            established by the Preventive H104                                                  Maintenance Program: See Bases item No. 9.
6900 Volt      Verify that the circuit breaker can be In accordance with the RCP            cycled (tripped) by local manual      surveillance frequency B    Breaker        operation.                            established by the Preventive H105                                                  Maintenance Program: See Bases item No. 9.
6900 Volt      Verify that the circuit breaker can be In accordance with the RCP            cycled (tripped) by local manual      surveillance frequency C    Breaker        operation.                            established by the Preventive H201                                                  Maintenance Program: See Bases item No. 9.
6900 Volt      Verify that the circuit breaker can be In accordance with the RCP            cycled (tripped) by local manual      surveillance frequency D    Breaker        operation.                            established by the Preventive H202                                                  Maintenance Program: See Bases item No. 9.
MILLSTONE - UNIT 2              TRM 7.1-32                          LBDCR 10-MP2-004 March 30, 2010
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.4.1.3 Coolant Loops and Circulation TECHNICAL REQUIREMENT 7.1.7      The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.7-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.7      The capability of equipment listed in TRM Table 7.1.7-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.7-2.
MILLSTONE - UNIT 2                TRM 7.1-33                          LBDCR 16-MP2-003 February 29, 2016
 
ADDITIONAL REQUIREMENTS Table 7.1.7-1 Shutdown Cooling Components, Hot Shutdown FUNCTIONALITY Requirements and Compensatory Measures TR                                                                            Compensatory Measures if Component Not Comp ID            FUNCTIONALITY Description Item                                                                              Restored in 14 Days (see ACTION a)
A  2-SI-306 SDC HX    Valve must be capable of being cycled by      With the valve nonfunctional, perform ACTIONS b.1, b.2 for Bypass AOV        local manual hand-wheel operation.            all fire areas.
B  2-SI-651,2-SI-652  1. Each valve must be closed and              1. N/A SDC Suction          electrically disconnected or made          NOTES: For plant operation in MODES 1 - 4, Technical Isolation MOVs        nonfunctional. Valve 2-SI-651 shall have  Specification LCO 3.6.3.1, Containment Isolation Valves, manual disconnect switch NSI651 locked    also applies. Thus for MODES 1 - 4, valves must be open. Valve 2-SI-652 shall have manual    OPERABLE to satisfy Technical Specifications and disconnect switch 89-SI-652 open.          FUNCTIONAL to satisfy Appendix R requirements.
: 2. Each valve must be capable of being        2. With one valve nonfunctional, perform ACTIONS b.1, b.2 electrically opened.                          fire area R-1.
: 3. Each valve must be capable of being        3. With one valve nonfunctional, perform ACTIONS b.1, b.2 opened by local manual hand-wheel              for fire area R-2, R-3, R- 7, R-8, R-9, R-10, R-11,R-13, R-operation.                                    14, R-15, R-16, R-17.
C  TE-351X, TE-351Y  Both instrument loops must be                With either instrument loop nonfunctional from the Control SDC combined      FUNCTIONAL from Control Room.                Room, perform ACTIONS b.1, b.2 for fire areas R-2, R-3, R-suction/ return                                                  5, R-6, R-8, R-10, R-11, R-12, and R-15.
header temperature MILLSTONE - UNIT 2                                  TRM 7.1-34                                              LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.7-1 Shutdown Cooling Components, Hot Shutdown FUNCTIONALITY Requirements and Compensatory Measures TR                                                                        Compensatory Measures if Component Not Item    Comp ID              FUNCTIONALITY Description                      Restored in 14 Days (see ACTION a)
D  TE-303X, TE-303Y  Both instrument loops must be              1. With instrument loop TE-303X nonfunctional from the SDC Heat          FUNCTIONAL from the Control Room.              Control Room, perform ACTIONS b.1, b.2 for fire areas Exchanger Outlets                                                R-2, R-3, R-4, R-6, R-8, R-10, and R-11.
Temperature                                                    2. With instrument loop TE-303Y nonfunctional from the Control Room, perform ACTIONS b.1, b.2 for fire areas R-5, R-7, R-9, R-13, R-14, R-16, and R-17.
MILLSTONE - UNIT 2                              TRM 7.1-35                                            LBDCR 11-MP2-002 April 19, 2011
 
ADDITIONAL REQUIREMENTS Table 7.1.7-2 Shutdown Cooling Components, Hot Shutdown TECHNICAL SURVEILLANCE REQUIREMENTS TSR                            TECHNICAL SURVEILLANCE Comp ID                                                            Frequency Item                                    REQUIREMENT A    2-SI-306 SDC      Verify that the valve can be manually cycled Once every 48 months.
HX Bypass AOV using its hand-wheel.
B    2-SI-651, 2-SI-  1. Administrative control over manual        8. N/A 652 SDC              disconnect switch NSI651 locked open, Suction Isolation    for 2-SI-651, and manual disconnect MOVs                switch 89-SI-652 operation for 2-SI-652 are provided in plant heat-up and cool-down procedures.
: 2. Verify that each valve can be remotely    9. Once per REFUELING cycled from the Control Room. Valves are    cycle.
electrically cycled when entering shutdown cooling and when securing from shutdown cooling, during plant heat-up. No additional surveillance testing needs to be performed.
: 3. Verify that each valve can be manually    10.In accordance with the cycled using its hand-wheel.                MOV surveillance frequency established by the PM Program.
C    TE-351X, TE-      Perform CHANNEL CALIBRATION to verify Once per REFUELING 351Y SDC          each instrument loop is calibrated.          cycle.
combined suction/return header temperature D    TE-303X, TE-      Perform CHANNEL CALIBRATION to verify Once per REFUELING 303Y SDC Heat    each instrument loop is calibrated.          cycle.
Exchanger Outlets Temperature MILLSTONE - UNIT 2              TRM 7.1-36                            LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.4.3 RCS Relief Valves TECHNICAL REQUIREMENT 7.1.8      The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.8-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.8      The capability of equipment listed in TRM Table 7.1.8-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.8-2.
MILLSTONE - UNIT 2                TRM 7.1-37                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.8-1 RCS Relief Valves - PORVs FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR                  FUNCTIONALITY                  Component Not Comp ID Item                  Description                Restored in 14 Days (see ACTION a) 2-RC-402,    Valve 2-RC-402 must    With 2-RC-402 nonfunctional perform Pressurizer  be capable of closure  ACTIONS b.1, b.2 for fire areas R-1, A  Relief Valve from Panel C70A.        R-9, and R-15.
(PORV) 2-RC-404,    Valve 2-RC-404 must    With 2-RC-404 nonfunctional perform Pressurizer  be capable of closure  ACTIONS b.1, b.2 for fire areas R-1, B  Relief Valve from Panel C70B.        R-10, and R-15.
(PORV)
MILLSTONE - UNIT 2        TRM 7.1-38                      LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.8-2 RCS Relief Valves - PORVs TECHNICAL SURVEILLANCE REQUIREMENTS TSR                              TECHNICAL SURVEILLANCE Comp ID                                                        Frequency Item                                      REQUIREMENT 2-RC-402,          Verify that valve 2-RC-402 can be closed at Once per A    Pressurizer Relief Panel C70A.                                REFUELING cycle.
Valve (PORV) 2-RC-404,          Verify that valve 2-RC-404 can be closed at Once per B    Pressurizer Relief Panel C70b.                                REFUELING cycle.
Valve (PORV)
MILLSTONE - UNIT 2            TRM 7.1-39                        LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.5.1.a SIT Isolation Valves TECHNICAL REQUIREMENT 7.1.9      The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.9-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.9      The capability of equipment listed in TRM Table 7.1.9-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.9-2.
MILLSTONE - UNIT 2                TRM 7.1-40                          LBDCR 16-MP2-003 February 29, 2016
 
ADDITIONAL REQUIREMENTS Table 7.1.9-1 Safety Injection Tank Isolation Valves FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component TR              FUNCTIONALITY Comp ID                                  Not Restored in 14 Days Item                Description                    (see ACTION a) 2-SI-614  Each valve must be      With one valve nonfunctional, perform 2-SI-624  capable of being        ACTIONS b.1, b.2 for all fire areas 2-SI-634  closed by local        EXCEPT R-1, R- 2, R-15, R-17.
A  2-SI-644  manual hand-wheel SIT Block operation.
Valve (MOVs) 2-SI-613  Each valve must be      With any valve nonfunctional, perform 2-SI-623  capable of being        ACTIONS b.1, b.2 for fire area R-1.
2-SI-633  electrically opened.
B  2-SI-643 SIT Vent Valve (AOVs)
MILLSTONE - UNIT 2            TRM 7.1-41                      LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.9-2 Safety Injection Tank Isolation Valves TECHNICAL SURVEILLANCE REQUIREMENTS TSR      Comp ID    TECHNICAL SURVEILLANCE REQUIREMENT                  Frequency Item 2-SI-614    Verify the MOV can be manually cycled.        In accordance with the 2-SI-624                                                  MOV surveillance 2-SI-634                                                  frequency established A    2-SI-644                                                  by the PM Program.
SIT Block Valve (MOVs) 2-SI-613    Verify that each valve can be remotely opened Once per REFUELING 2-SI-623    from the Control Room.                        cycle 2-SI-633 B    2-SI-643 SIT Vent Valve (AOVs)
MILLSTONE - UNIT 2            TRM 7.1-42                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.4.1.3 Coolant Loops and Circulation TECHNICAL REQUIREMENT 7.1.10    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.10-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.10    The capability of equipment listed in TRM Table 7.1.10-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.10-2.
MILLSTONE - UNIT 2                TRM 7.1-43                        LBDCR 16-MP2-003 February 29, 2016
 
ADDITIONAL REQUIREMENTS Table 7.1.10-1 ECCS - LPSI Valves FUNCTIONALITY Requirements and Compensatory Measures TR                          FUNCTIONALITY            Compensatory Measures if Component Not Restored in 14 Days Comp ID Item                            Description                                        (see ACTION a)
A    2-SI-615        Each valve must be capable of 1. With either 2-SI-615 or 2-SI-625 nonfunctional, perform ACTIONS 2-SI-625        being cycled by local manual      b.1, b.2 for fire areas R-1, R- 2,R-3, R-7, R-9, R-13, R-14,R-16,and 2-SI-635        hand-wheel operation.              R-17.
2-SI-645                                        2. With either 2-SI-635 or 2-SI-645 nonfunctional, perform ACTIONS LPSI Flow                                          b.1, b.2 for fire areas R-1, R- 2,R-8, R-10, and R-11.
MOV B    2-SI-449        Each valve must be capable of With one valve nonfunctional, perform ACTIONS b.1, b.2 for all fire 2-SI-450        being closed by local manual    areas.
LPSI (SDC)      hand-wheel operation.
Min Flow AOV C    2-SI-657        Valve must be capable of being With the valve nonfunctional, perform ACTIONS b.1, b.2 for all fire (LPSI) SDC    cycled by local manual hand-    areas.
HX Outlet      wheel operation.
AOV D    2-SI-432        Each valve must be capable of 1. With 2-SI-432 nonfunctional, perform ACTIONS b.1, b.2 for fire 2-SI-444        being closed by local manual      areas R-1, R-5, R-7, R-9, R-13, R- 14, R-16,and R-17.
LPSI Suction  hand-wheel operation.          2. With 2-SI-444 nonfunctional, perform ACTIONS b.1, b.2 for fire from RWST                                          areas R-2, R-3, R-6, R-8, R-10, and R-11.
AOV E    2-SI-440        Each valve must be capable of 1. With 2-SI-441 nonfunctional, perform ACTIONS b.1, b.2 for fire 2-SI-441        being opened by local manual      areas R-2, R-3, R-6, R-8, R-10, and R-11.
LPSI/SDC        hand-wheel operation.          2. With 2-SI-440 nonfunctional, perform ACTIONS b.1, b.2 for fire Suction                                            areas R-1, R-5, R-7, R-9, R-13, R-14,R-16, and R-17.
from RCS AOV MILLSTONE - UNIT 2                              TRM 7.1-44                                                  LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.10-1 ECCS - LPSI Valves FUNCTIONALITY Requirements and Compensatory Measures TR                          FUNCTIONALITY          Compensatory Measures if Component Not Restored in 14 Days Comp ID Item                            Description                                  (see ACTION a)
F    2-SI-452        Each valve must be capable of 1. With 2-SI-452 nonfunctional, perform ACTIONS b.1, b.2 for fire 2-SI-453        being opened by local manual    areas R-2, R-3, R-6, R-8, R-10, and R-11.
LPSI          hand-wheel operation.        2. With 2-SI-453 nonfunctional, perform ACTIONS b.1, b.2 for fire disch to                                        areas R-1, R-5, R-7, R-9, R-13, R-14,R-16, and R-17.
SDC HX AOV G    2-SI-456        Each valve must be capable of 1. With 2-SI-456 nonfunctional, perform ACTIONS b.1, b.2 for fire 2-SI-457        being opened by local manual    areas R-2, R-3, R-6, R-8, R-10, and R-11.
SDC HX          hand-wheel operation.        2. With 2-SI-457 nonfunctional, perform ACTIONS b.1, b.2 for fire outlet                                          areas R-1, R-5, R-7, R-9, R-13, R-14,R-16, and R-17.
AOV MILLSTONE - UNIT 2                              TRM 7.1-45                                            LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.10-2 ECCS - LPSI Valves TECHNICAL SURVEILLANCE REQUIREMENTS TSR      Comp ID    TECHNICAL SURVEILLANCE REQUIREMENT                    Frequency Item 2-SI-615      Verify that each valve can be manually cycled    In accordance with the 2-SI-625      using its hand-wheel.                            MOV surveillance 2-SI-635                                                      frequency established A    2-SI-645                                                      by the PM Program.
LPSI Flow MOV 2-SI-449      Verify that each valve can be manually cycled    Once every 48 2-SI-450      using its hand-wheel. Valves are manually cycled months.
LPSI (SDC)    when entering shutdown cooling, and securing B    Min Flow      from shutdown cooling during plant heat-up. No AOV          additional surveillance testing needs to be performed.
2-SI-657      Verify that the valve can be manually cycled    Once every 48 (LPSI) SDC    using its hand-wheel.                            months.
C    HX Outlet AOV 2-SI-432      Verify that each valve can be manually cycled    Once every 48 2-SI-444      using its hand-wheel. Valves are manually cycled months.
LPSI          when entering shutdown cooling. No additional D    Suction      surveillance testing needs to be performed.
from RWST AOV 2-SI-440      Verify that each valve can be manually cycled    Once every 48 2-SI-441      using its hand-wheel. Valves are manually cycled months.
LPSI/SDC      when entering shutdown cooling. No additional E    Suction      surveillance testing needs to be performed.
from RCS AOV 2-SI-452      Verify that each valve can be manually cycled    Once every 48 2-SI-453      using its hand-wheel. Valves are manually cycled months.
F    LPSI disch    when entering shutdown cooling. No additional to SDC HX    surveillance testing needs to be performed.
AOV 2-SI-456      Verify that each valve can be manually cycled    Once every 48 2-SI-457      using its hand-wheel. Valves are manually cycled months.
G    SDC HX        when entering shutdown cooling. No additional outlet AOV    surveillance testing needs to be performed.
MILLSTONE - UNIT 2            TRM 7.1-46                            LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: None TECHNICAL REQUIREMENT 7.1.11    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.11-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.11    The capability of equipment listed in TRM Table 7.1.11-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.11-2.
MILLSTONE - UNIT 2                TRM 7.1-47                        LBDCR 14-MP2-015 September 24, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.11-1 ECCS - RWST Outlet Valve FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR                    FUNCTIONALITY Comp ID                            Component Not Restored in 14 Days          Risk Significant Component Not Item                      Description (see ACTION a)            Restored in 72 Hours (see ACTION d) 2-CS-13.1B      Valve must be capable With the valve nonfunctional, perform    With valve nonfunctional, Risk Mitigation RWST Stop      of being opened by    ACTIONS b.1, b.2 for fire areas R-1, and Areas are: R-1 (FHA A-1G, A-12A and A  (outlet) MOV    local manual          R-2.                                    A-24) handwheel operation.
MILLSTONE - UNIT 2                              TRM 7.1-48                                          LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.11-2 ECCS - RWST Outlet Valve TECHNICAL SURVEILLANCE REQUIREMENTS TECHNICAL TSR      Comp ID          SURVEILLANCE                            Frequency Item                        REQUIREMENT 2-CS-13.1B    Verify that the valve can be  In accordance with the MOV surveillance A    RWST Stop    manually cycled using its      frequency established by the PM Program.
(outlet) MOV  hand-wheel.
MILLSTONE - UNIT 2            TRM 7.1-49                              LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL REQUIREMENT: 3.1.2.2.a Reactivity Control System Flow Paths - Operating TECHNICAL REQUIREMENT 7.1.12    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.12-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.12    The capability of equipment listed in TRM Table 7.1.12-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.12-1.
MILLSTONE - UNIT 2                TRM 7.1-50                        LBDCR 14-MP2-015 September 24, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.12-1 ECCS - Boric Acid Gravity Feed Valves FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR                FUNCTIONALITY Comp ID                          Component Not Restored in 14 Days Item                  Description                    (see ACTION a) 2-CH-508    Both valves must    With one valve nonfunctional, establish 2-CH-509,  be capable of being  minimum TECHNICAL REQUIREMENT Boric Acid  cycled by local      (3.1.2.7) inventory in the Boric Acid A  Gravity    manual hand-wheel    Storage Tank (BAST) associated with the Feed        operation.          FUNCTIONAL valve, or perform ACTIONS MOVs                            b.1, b.2 for fire areas R-1, R-7, R-9, R-13, R-14, R-16, and R-17.
MILLSTONE - UNIT 2          TRM 7.1-51                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.12-2 ECCS - Boric Acid Gravity Feed Valves TECHNICAL SURVEILLANCE REQUIREMENTS TSR      Comp ID    TECHNICAL SURVEILLANCE REQUIREMENT                    Frequency Item 2-CH-508    Verify that both valves can be manually cycled In accordance with the 2-CH-509,    using their hand-wheels.                      MOV surveillance A    Boric Acid                                                  frequency established Gravity Feed                                                by the PM Program.
MOVs MILLSTONE - UNIT 2            TRM 7.1-52                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.6.1.5 Containment Air Temperature TECHNICAL REQUIREMENT 7.1.13    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.13-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.13    The capability of equipment listed in TRM Table 7.1.13-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.13-2.
MILLSTONE - UNIT 2                TRM 7.1-53                        LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.13-1 Containment Systems - Air Temperature Indication FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR                  FUNCTIONALITY Comp ID                            Component Not Restored in 14 Days Item                    Description                    (see ACTION a)
TE-8108      Instrument loop      With instrument loop nonfunctional from Containment  must be              Control Room, perform ACTIONS b.1, b.2 A  Ambient      FUNCTIONAL from      for fire areas R-2, R-3, R-4, R-5, R-6, R-8, Temperature  the Control Room. R-10, R-11, and R-12.
Indication MILLSTONE - UNIT 2          TRM 7.1-54                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.13-2 Containment Systems - Air Temperature Indication TECHNICAL SURVEILLANCE REQUIREMENTS TSR      Comp ID      TECHNICAL SURVEILLANCE REQUIREMENT              Frequency Item TE-8108      Perform CHANNEL CALIBRATION to verify the      Once per Containment  instrument loop is calibrated.                REFUELING cycle A    Ambient Temperature Indication MILLSTONE - UNIT 2          TRM 7.1-55                    LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.6.2.1 Containment Spray and Cooling Systems TECHNICAL REQUIREMENT 7.1.14    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.14-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.14    The capability of equipment listed in TRM Table 7.1.14-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.14-2.
MILLSTONE - UNIT 2                TRM 7.1-56                        LBDCR 14-MP2-015 September 24, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.14-1 Containment Systems - Containment Spray and Cooling Systems FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR                FUNCTIONALITY Comp ID                          Component Not Restored in 14 Days Item                  Description                (see ACTION a) 2-CS-4A      Each valve must be  With valve 2-CS-4A nonfunctional, 2-CS-4B      capable of being    perform ACTIONS b.1, b.2 for fire area Containment  closed by local      R-2.
A  Spray Stop  manual hand-wheel    With valve 2-CS-4B nonfunctional, Valves      operation.          perform ACTIONS b.1, b.2 for fire areas R-1, and R-17.
MILLSTONE - UNIT 2          TRM 7.1-57                      LBDCR 14-MP2-015 September 24, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.14-2 Containment Systems - Containment Spray and Cooling Systems TECHNICAL SURVEILLANCE REQUIREMENTS TSR      Comp ID      TECHNICAL SURVEILLANCE REQUIREMENT                    Frequency Item 2-CS-4A      Verify that each valve can be manually cycled      Once every 48 2-CS-4B      using its hand-wheel. Valves are manually cycled    months.
A    Containment  when entering shutdown cooling, and securing Spray Stop  from shutdown cooling during plant heat-up. No Valves      additional surveillance testing needs to be done.
MILLSTONE - UNIT 2            TRM 7.1-58                        LBDCR 14-MP2-015 September 24, 2014
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.1.2 Auxiliary Feedwater Pumps TECHNICAL REQUIREMENT 7.1.15    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.15-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.15    The capability of equipment listed in TRM Table 7.1.15-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.15-2.
MILLSTONE - UNIT 2                TRM 7.1-59                        LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.15-1 Plant System - Auxiliary Feedwater Pumps FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR                    FUNCTIONALITY                                                          Risk Significant Component Not Comp ID                                  Component Not Restored in 14 Days Item                      Description                                                              Restored in 72 Hours (see ACTION a)                        (see ACTION d)
A  SV-4188 AFW  Valve must be capable of    With valve nonfunctional from Panel C10,    With valve nonfunctional, Risk Pump Turbine  being operated from Panel perform ACTIONS b.1, b.2 for fire areas R-1 Mitigation Areas are: R-1 (FHA A-24),
Stm Supply    C10.                        and R-13.                                    R-3 (FHA T-1A)
Valve B  P4 & H-21    1. Pump/Turbine must be    With Pump/Turbine nonfunctional, from        With Pump/Turbine nonfunctional, Risk AFW Pump        FUNCTIONAL from the      either location, perform ACTIONS b.1, b.2    Mitigation Areas are: R-1 (FHA A-24),
and Turbine      Control Room.            for fire areas R-3, R-11, R-16, and R-17. R-3 (FHA T-1A)
Governor      2. Pump/Turbine must be Control          FUNCTIONAL from Panel C10.
C  2-MS-202      Valve must be open,        With the valve closed and/or disconnect      N/A AFW Steam    incapable of remote        closed, perform ACTIONS b.1, b.2 for fire Supply from  operation with disconnect  areas R-1, R-2, and R-13.
SG 2, MOV    switch opened (off position).
D  P-9A          Pumps must be              1. With P-9A nonfunctional:                  1. With P-9A nonfunctional Risk P-9B          FUNCTIONAL from the                                                        Mitigation Areas are: R-2 (FHA A-a) Perform ACTIONS b.1, b.2 for fire Motor Driven  Control Room.                                                              8D, T-8, T-10) areas R-2 and R-10 AFW pumps                                                                              2. With P-9B nonfunctional Risk b) Verify P4 FUNCTIONAL, or Perform          Mitigation Areas are: R-14 (FHA T-7, ACTIONS b.1, b.2 for fire area R-8      T-9) c) Verify P9B FUNCTIONAL, or Perform ACTIONS b.1, b.2 for fire area R-12.
: 2. With P-9B nonfunctional, verify P4 FUNCTIONAL, or Perform ACTIONS b.1, b.2 for fire areas R-7 and R-14.
MILLSTONE - UNIT 2                                  TRM 7.1-60                                            LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.15-1 Plant System - Auxiliary Feedwater Pumps FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR                      FUNCTIONALITY                                                        Risk Significant Component Not Item    Comp ID            Description            Component Not Restored in 14 Days                Restored in 72 Hours (see ACTION a)                      (see ACTION d)
E  2-FW-44 AFW    Valve must be capable of    With valve nonfunctional, perform ACTIONS N/A Pump P4        being opened by local      b.1, b.2 for fire areas R-1 and R-13.
Discharge Iso  manual handwheel MOV            operation.
F  2-FW-43A      1. Each valve must be      1. Verify that the applicable AFW regulating N/A 2-FW-43B          capable of local manual    valve bypass valves 2-FW-56A and/or 2-AFW Flow          handwheel operation,        FW-56B, and isolation valves 2-FW-10A/
Control (AOVs)    and failing open when      10B and/or 2-FW-11A/B can be manually de-energized.              cycled.
: 2. Valve 2-FW-43B must      2. Verify that the AFW regulating valve be capable of remote        bypass valve 2-FW-56B, and isolation operation from Panel        valves 2-FW-10B or 2-FW-11B can be C10.                        manually cycled.
MILLSTONE - UNIT 2                                  TRM 7.1-61                                          LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.15-2 Plant System - Auxiliary Feedwater Pumps Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR                            TECHNICAL SURVEILLANCE Comp ID                                                          Frequency Item                                  REQUIREMENT A    SV-4188 AFW    Verify that control of the steam supply valve  Once per REFUELING Pump Turbine  SV-4188 can be isolated from the Control        cycle.
Stm Supply    Room and operated from Panel C10.
Valve B    P4 & H-21      1. In accordance with Technical Specification  1. In accordance with AFW Pump          4.7.1.2.a.1 and 4.7.1.2.a.2.b.                  Technical and Turbine                                                      Specification
: 2. In accordance with Technical Specification Governor                                                          4.7.1.2.a.
4.7.1.2.a.2.b.
Control                                                        2. In accordance with Technical Specification 4.7.1.2.a.
C    2-MS-202      Administrative control over the disconnect      N/A AFW Steam      switch key found in procedure SP-2610C, and Supply from    plant heatup procedure.
SG 2, MOV D    P-9A          In accordance with Technical Specification      In accordance with P-9B Motor    4.7.1.2.a.1 and 4.7.1.2.a.2.a for each motor    Technical Specification Driven AFW    driven pump.                                    4.7.1.2.a.
pumps E    2-FW-44        Verify that the valve can be manually cycled    In accordance with the AFW Pump      using its handwheel.                            MOV surveillance P4 Discharge                                                  frequency established Iso MOV.                                                      by the PM Program.
F    2-FW-43A      1.a. Verify that each valve can be manually    1. Once every 48 2-FW-43B            cycled using its handwheel, and              months.
AFW Flow      1.b. That each valve will fail open on loss of  2. Once per Control            control power.                                REFUELING cycle.
(AOVs)
: 2. Verify that 2-FW-43B can be isolated from the Control Room and operated from Panel C10.
MILLSTONE - UNIT 2            TRM 7.1-62                        LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.1.3 Condensate Storage Tank TECHNICAL REQUIREMENT 7.1.16    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.16-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.16    The capability of equipment listed in TRM Table 7.1.16-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.16-2.
MILLSTONE - UNIT 2                TRM 7.1-63                        LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.16-1 Condensate Storage Tank (CST) Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component TR              FUNCTIONALITY Comp ID                                    Not Restored in 14 Days Item                  Description                    (see ACTION a)
A  LT-5282    1. Instrument loop    1. With loop nonfunctional from Panel C10, CST          must be                perform ACTIONS b.1, b.2 for fire areas Level        FUNCTIONAL at          R-1 & R-13.
Indication    Panel C10.          2. With loop nonfunctional from Control
: 2. Instrument loop        Room, verify that the local CST level must be                indicator (LIS-5489) is FUNCTIONAL, or FUNCTIONAL            perform ACTIONS b.1, b.2 for all fire from the Control      areas.
Room.
B  LIS-5489 Local CST Level          With local indication nonfunctional, perform CST local Indication must be      ACTIONS b.1, b.2 for fire areas R-2, R-3, Level      available.            and R-10.
Indicator MILLSTONE - UNIT 2            TRM 7.1-64                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.16-2 Condensate Storage Tank Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR                          TECHNICAL SURVEILLANCE Comp ID                                                      Frequency Item                                REQUIREMENT LT-5282 CST    Perform CHANNEL CALIBRATION to verify Once per A    Level          the instrument loop is calibrated.          REFUELING cycle.
Indication LIS-5489 CST  Perform Instrument Calibration to verify the Once per B    local Level    instrument is calibrated.                    REFUELING cycle.
Indication MILLSTONE - UNIT 2            TRM 7.1-65                      LBDCR 14-MP2-015 September 24, 2014
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.1.5 Main Steam Isolation Valves TECHNICAL REQUIREMENT 7.1.17    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.17-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.17    The capability of equipment listed in TRM Table 7.1.17-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.17-2.
MILLSTONE - UNIT 2                TRM 7.1-66                        LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.17-1 Main Steam Isolation Valves FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR                FUNCTIONALITY Comp ID                            Component Not Restored in 14 Days Item                  Description                  (see ACTION a) 2-MS-64A  2-MS-64A must be        With one valve nonfunctional, perform 2-MS-64B  capable of closure from ACTIONS b.1, b.2 for fire areas R-1, R-2, Main Steam Bottle-up Panel C70A. and R-17.
A  Iso Valves 2-MS-64B must be (AOVs)    capable of closure from Bottle-up Panel C70B.
2-MS-65A  Valve must be closed    With 2-MS-65A open or disconnect SG MSIV    with its disconnect      closed, perform ACTIONS b.1, b.2 for B  Bypass    switch locked open.      fire areas R-1 and R-17.
Valve (MOV) 2-MS-65B  Valve must be closed    With 2-MS-65B open or disconnect SG MSIV    with its disconnect      closed, perform ACTIONS b.1, b.2 for C  Bypass    switch locked open.      fire areas R-1 and R-2.
Valve (MOV)
MILLSTONE - UNIT 2            TRM 7.1-67                      LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.17-2 Main Steam Isolation Valves TECHNICAL SURVEILLANCE REQUIREMENTS TSR      Comp ID      TECHNICAL SURVEILLANCE REQUIREMENT                        Frequency Item A    2-MS-64A      1. Verify that 2-MS-64A can be closed from Bottle-up Once per 2-MS-64B        Panel C70A.                                          REFUELING Main Steam    2. Verify that 2-MS-64B can be closed from Bottle-up cycle.
Iso Valves      Panel C70B.
(AOVs)
B    2-MS-65A      Administrative control for disconnect switch key        N/A SG MSIV      provided in plant start-up procedure.
Bypass Valve (MOV)
C    2-MS-65B      Administrative control for the opening coil provided in N/A SG MSIV      plant start-up procedure.
Bypass Valve (MOV)
MILLSTONE - UNIT 2            TRM 7.1-68                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.1.7 Atmospheric Dump Valves TECHNICAL REQUIREMENT 7.1.18    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.18-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.18    The capability of equipment listed in TRM Table 7.1.18-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.18-2.
MILLSTONE - UNIT 2                TRM 7.1-69                        LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.18-1 Atmospheric Dump Valves FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR                FUNCTIONALITY Comp ID                            Component Not Restored in 14 Days Item                  Description                      (see ACTION a)
A    2-MS-190A 1. Each valve must be      1. Failure to close with solenoid 2-MS-190B    capable of failing        deenergized requires isolation of Atmospheri    closed when the          instrument air to the affected valve, for c            valves solenoid is      fire area Steam        deenergized.              R-11.
Dump      2.a. Valve 2-MS-190A      2.a. With 2-MS-190A nonfunctional from Valves          must be capable of        C70A perform ACTIONS b.1, b.2 for (AOVs)          closure from Panel        fire areas R-1, R-13 and R-17.
C70A, and,          2.b. With 2-MS-190B nonfunctional from 2.b. Valve 2-MS-190B            C70B, perform ACTIONS b.1, b.2 must be capable of        for fire areas R-1, and R-2.
closure from Panel
: 3. With one valve nonfunctional, perform C70B.                  ACTIONS b.1, b.2 for all fire areas.
: 3. Each valve must be    4. With loss of remote operation from capable of local          Panel C10 for 2-MS-190B, ensure manual handwheel          local manual operation is available.
operation.
: 4. Valve 2-MS-190B must be capable of remote operation from panel C10.
MILLSTONE - UNIT 2          TRM 7.1-70                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.18-2 Atmospheric Dump Valves TECHNICAL SURVEILLANCE REQUIREMENTS TSR      Comp ID    TECHNICAL SURVEILLANCE REQUIREMENT                      Frequency Item A    2-MS-190A  1. From the Control room verify each valve will    Once per REFUELING 2-MS-190B      close when its quick open solenoid is de-        cycle.
Atmospheric    energized and its valve positioning instrument Steam Dump    loop is FUNCTIONAL and set to close.
Valves      2.a. Verify that valve 2-MS-190A can be closed at (AOVs)          Panel C70A.
2.b. Verify that valve 2-MS-190B can be closed at Panel C70B
: 3. Addressed under Tech. Spec. 4.7.1.7.
: 4. Verify that 2-MS-190B can be operated from Panel C10.
MILLSTONE - UNIT 2            TRM 7.1-71                        LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.1.8 Steam Generator Blowdown Isolation Valves TECHNICAL REQUIREMENT 7.1.19    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.19-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.19      The capability of equipment listed in TRM Table 7.1.19-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.19-2.
MILLSTONE - UNIT 2                TRM 7.1-72                        LBDCR 16-MP2-003 February 29, 2016
 
ADDITIONAL REQUIREMENTS Table 7.1.19-1 Steam Generator Blowdown Isolation Valves FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR              FUNCTIONALITY Comp ID                          Component Not Restored in 14 Days Item                  Description                (see ACTION a)
A    2-MS-220A 1.b. Valve 2-MS-220A 1. With one valve nonfunctional, perform 2-MS-220B      must be capable      ACTIONS b.1, b.2 for fire areas R-1, SG              of closure from      and R-17.
Blowdown        Panel C70A, and 2. With one valve nonfunctional, perform Isolation  1.c. Valve 2-MS-220B      ACTIONS b.1, b.2 for fire area R-11.
AOVs            must be capable of closure from Panel C70B.
: 2. Each valve must be capable of failing closed when the valves solenoid is deenergized.
MILLSTONE - UNIT 2            TRM 7.1-73                      LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.19-2 Steam Generator Blowdown Isolation Valves TECHNICAL SURVEILLANCE REQUIREMENTS TSR    Comp ID    TECHNICAL SURVEILLANCE REQUIREMENT                          Frequency Item A    2-MS-220A    1.b. Verify that valve 2-MS-220A can be closed        Once per REFUELING 2-MS-220B        at Panel C70A.                                  cycle.
(SG          1.c. Verify that valve 2-MS-220B can be closed Blowdown          at Panel C70B.
Isolation AOVs)        2. Verify that each valve will fail closed on loss of control power.
MILLSTONE - UNIT 2            TRM 7.1-74                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.3.1 RBCCW System TECHNICAL REQUIREMENT 7.1.20    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.20-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.20    The capability of equipment listed in TRM Table 7.1.20-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.20-2.
MILLSTONE - UNIT 2                TRM 7.1-75                        LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.20-1 Reactor Building Closed Cooling Water (RBCCW) System FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR                FUNCTIONALITY Comp ID                                                                                  Risk Significant Component Not Item                  Description              Component Not Restored in 14 Days                  Restored in 72 Hours (see ACTION a)                          (see ACTION d)
A    2-RB-13.1A  Each Valve must be      With valve 2-RB-13.1A nonfunctional, verify that 2- N/A 2-RB-13.1B  capable of being        RB-14A is FUNCTIONAL, or perform ACTIONS Shutdown    cycled by local manual  b.1, b.2 for fire areas R-2, R-3, R-6, R-8, R-10, HX Disch    handwheel operation. and R-11.
Header AOVs                                With valve 2-RB-13.1B nonfunctional, verify that 2-RB-14B is FUNCTIONAL, or perform ACTIONS listed for fire areas R-1, R-5, R-7, R-9, R-13, R-14, R-16, and R-17.
With valves 2-RB-13.1A and 2-RB-13.1B nonfunctional, verify that valves 2-RB-14A and 2-RB-14B are FUNCTIONAL, or perform ACTIONS listed for all fire areas.
B    2-RB-211A    Each Valve must be      Verify that RBCCW System can be manually              N/A 2-RB-211B    capable of being        aligned to provide cooling flow from P-11A to SDC RBCCW        cycled by local manual  HX A, or perform ACTIONS listed for Fire Areas Pump A inlet handwheel operation. R-2, and R-3.
AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.
Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.
MILLSTONE - UNIT 2                                  TRM 7.1-76                                          LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.20-1 Reactor Building Closed Cooling Water (RBCCW) System FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR                FUNCTIONALITY Comp ID                                                                              Risk Significant Component Not Item                  Description              Component Not Restored in 14 Days                Restored in 72 Hours (see ACTION a)                        (see ACTION d)
C    2-RB-211C    Each Valve must be      Verify that RBCCW System can be manually          N/A 2-RB-211D    capable of being        aligned to provide cooling flow from P-11A to SDC RBCCW        cycled by local manual  HX A, or perform ACTIONS listed for Fire Areas Pump B inlet handwheel operation. R-2, and R-3.
AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.
Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.
D    2-RB-211E    Each Valve must be      Verify that RBCCW System can be manually          N/A 2-RB-211F    capable of being        aligned to provide cooling flow from P-11A to SDC RBCCW        cycled by local manual  HX A, or perform ACTIONS listed for Fire Areas Pump C inlet handwheel operation. R-2, and R-3.
AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.
Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.
MILLSTONE - UNIT 2                                TRM 7.1-77                                        LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.20-1 Reactor Building Closed Cooling Water (RBCCW) System FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR                FUNCTIONALITY Comp ID                                                                              Risk Significant Component Not Item                  Description              Component Not Restored in 14 Days                Restored in 72 Hours (see ACTION a)                        (see ACTION d)
E    2-RB-4.1A    Each Valve must be      Verify that RBCCW System can be manually          N/A 2-RB-4.1B    capable of being        aligned to provide cooling flow from P-11A to SDC RBCCW HX    cycled by local manual  HX A, or perform ACTIONS listed for Fire Areas A Outlet    handwheel operation. R-2, and R-3.
AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.
Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.
F    2-RB-4.1C    Each Valve must be      Verify that RBCCW System can be manually          N/A 2-RB-4.1D    capable of being        aligned to provide cooling flow from P-11A to SDC RBCCW HX    cycled by local manual  HX A, or perform ACTIONS listed for Fire Areas B Outlet    handwheel operation. R-2, and R-3.
AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.
Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.
MILLSTONE - UNIT 2                                TRM 7.1-78                                        LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.20-1 Reactor Building Closed Cooling Water (RBCCW) System FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR                  FUNCTIONALITY Comp ID                                                                              Risk Significant Component Not Item                  Description              Component Not Restored in 14 Days                Restored in 72 Hours (see ACTION a)                          (see ACTION d)
G    2-RB-4.1E    Each Valve must be      Verify that RBCCW System can be manually          N/A 2-RB-4.1F    capable of being        aligned to provide cooling flow from P-11A to SDC RBCCW HX    cycled by local manual  HX A, or perform ACTIONS listed for Fire Areas C Outlet    handwheel operation. R-2, and R-3.
AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.
Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.
H    P11A        Each RBCCW Pump        With P11A nonfunctional, perform ACTIONS listed  With P11B supplying A train, Risk P11B        must be FUNCTIONAL      for fire areas R-2 and R-3.                      Mitigation Areas are: R-2 (FHA T-P11C        from the control room.                                                    8, T-10), R-3 (FHA T-1A, T-1C), R-RBCCW                                With P11B nonfunctional, perform ACTIONS listed  16 (FHA I-1A, I-1C).
Pumps                                for fire area R-11.
With P11B supplying B train, Risk With P11C nonfunctional, perform ACTIONS listed  Mitigation Areas are: R-11 (FHA A-for fire areas R-3 and R-14.                      28), R-14 (FHA T-7).
MILLSTONE - UNIT 2                                TRM 7.1-79                                          LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.20-1 Reactor Building Closed Cooling Water (RBCCW) System FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR                  FUNCTIONALITY Comp ID                                                                              Risk Significant Component Not Item                    Description              Component Not Restored in 14 Days                Restored in 72 Hours (see ACTION a)                        (see ACTION d)
I      2-RB-251A    Each Valve must be      Verify that RBCCW System can be manually          N/A 2-RB-251B    capable of being        aligned to provide cooling flow from P-11A to SDC RBCCW        cycled by local manual  HX A, or perform ACTIONS listed for Fire Areas Pump Disch. handwheel operation. R-2, and R-3.
Cross-connect AOVs                                  Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.
Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.
MILLSTONE - UNIT 2                                TRM 7.1-79a                                        LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.20-2 Reactor Building Closed Cooling Water (RBCCW) System Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR                              TECHNICAL SURVEILLANCE Comp ID                                                      Frequency Item                                    REQUIREMENT 2-RB-13.1A        Verify that each valve can be manually    Once every 48 months.
2-RB-13.1B        cycled using is handwheel.
A    Shutdown HX Disch Header AOVs 2-RB-211A        Verify that each valve can be manually    Once every 48 months.
2-RB-211B        cycled using is handwheel.
B    RBCCW Pump A inlet AOVs 2-RB-211C        Verify that each valve can be manually    Once every 48 months.
2-RB-211D        cycled using is handwheel.
C    RBCCW Pump B inlet AOVs 2-RB-211E        Verify that each valve can be manually    Once every 48 months.
2-RB-211F        cycled using is handwheel.
D    RBCCW Pump C inlet AOVs 2-RB-4.1A        Verify that each valve can be manually    Once every 48 months.
2-RB-4.1B        cycled using is handwheel.
E    RBCCW HX A Outlet AOVs 2-RB-4.1C        Verify that each valve can be manually    Once every 48 months.
2-RB-4.1D        cycled using is handwheel.
F    RBCCW HX B Outlet AOVs 2-RB-4.1E        Verify that each valve can be manually    Once every 48 months.
2-RB-4.1F        cycled using is handwheel.
G    RBCCW HX C Outlet AOVs P11A              In accordance with Technical Specification In accordance with P11B              Surveillance Requirement 4.0.5.            Technical Specification H    P11C RBCCW                                                  Surveillance Pumps                                                        Requirement 4.0.5 2-RB-251A        Verify that each valve can be manually    Once every 48 months.
2-RB-251B        cycled using is handwheel.
RBCCW Pump I    Disch. Cross-connect AOVs MILLSTONE - UNIT 2            TRM 7.1-80                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.4.1 Service Water System TECHNICAL REQUIREMENT 7.1.21    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.21-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.21    The capability of equipment listed in TRM Table 7.1.21-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.21-2.
MILLSTONE - UNIT 2                TRM 7.1-81                        LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.21-1 Service Water System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR                        FUNCTIONALITY Comp ID                                    Compensatory Measures if Component          Risk Significant Component Item                          Description Not Restored in 14 Days              Not Restored in 72 Hours (see ACTION a)                      (see ACTION d)
P5A & L1A      Each Service Water Pump      With P5A or its Strainer L1A nonfunctional,  With P5B supplying A train, P5C & L1C      and its associated Strainer  perform ACTIONS b.1, b.2 for fire areas R-2, Risk Mitigation Areas are: R-2 SW Pumps &      must be FUNCTIONAL from      R-3, R-8, R-10, and R-11.                    (FHA T-8,T-10), R-3 (FHA T-1A, A  Strainers      the Control Room.                                                          T-1C)
With P5C or its Strainer L1C nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-1, With P5B supplying B train, R-7, R-9, R-13, R-14, R-16 and R-17.        Risk Mitigation Areas are: R-11 (FHA A-28) R-14 (FHA T-7) 2-SW-97A        1. Each Valve must be        1. With one or both valve(s) nonfunctional,  N/A 2-SW-97B        capable of being cycled by    perform ACTIONS b.1, b.2 for fire areas R-1, SW Pump        local manual handwheel        R-3 and R-16.
B  Discharge Hdr  operation.                    2. When 2-SW-97A is open remove the Crossconn. AOVs 2. Valve 2-SW-97A must be    instrument air source from 2-SW-97B so it maintained in the closed      cannot spuriously open due to a fire or position.                    perform ACTIONS b.1, b.2 for fire area R-2.
MILLSTONE - UNIT 2                                TRM 7.1-82                                          LBDCR 14-MP2-012 July 29, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.21-1 Service Water System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR                      FUNCTIONALITY Comp ID                                    Compensatory Measures if Component          Risk Significant Component Item                        Description Not Restored in 14 Days              Not Restored in 72 Hours (see ACTION a)                    (see ACTION d) 2-SW-2A        Each Valve must be capable    With 2-SW-2A nonfunctional, align SW pump    N/A 2-SW-2B        of being cycled by local      P5B to cool Train A, or perform ACTIONS 2-SW-2C        manual handwheel              b.1, b.2 for fire areas R-3 and R-11.
SW Pump Disch  operation.                    With 2-SW-2B nonfunctional, align SW pump Valve                                        P5A to cool Train A and P5C to cool Train B, C
or perform ACTIONS b.1, b.2 for fire areas R-1, R-3, R-11, and R-16.
With 2-SW-2C nonfunctional, align SW pump P5B to cool Train B, or perform ACTIONS b.1, b.2 for fire areas R-1 and R-16.
2-SW-3.1A      Each Valve must be capable    With 2-SW-3.1A nonfunctional, perform        N/A 2-SW-3.1B      of being cycled by local      ACTIONS b.1, b.2 for fire area R-1 and R-14.
D  RBCCW HX Inlet  manual handwheel              With 2-SW-3.1B nonfunctional, perform AOVs            operation.                    ACTIONS b.1, b.2 for fire area R-1 and R-2.
MILLSTONE - UNIT 2                                TRM 7.1-83                                          LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.21-1 Service Water System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR                        FUNCTIONALITY Comp ID                                      Compensatory Measures if Component        Risk Significant Component Item                          Description Not Restored in 14 Days              Not Restored in 72 Hours (see ACTION a)                      (see ACTION d) 2-SW-9A          Each Valve must be capable    With valves 2-SW-9A and 2-SW-9B              N/A 2-SW-9B          of being closed by local      nonfunctional, perform ACTIONS b.1, b.2 for 2-SW-9C          manual handwheel              fire areas R-2, R-3, R-8, R-10, and R-11.
RBCW HX Outlet  operation.                    With valves 2-SW-9B and 2-SW-9C Valves E                                                nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-1, R-7, R-9, R-13, R-14, R-16, and R-17.
With all valves nonfunctional, perform ACTIONS b.1, b.2 for all fire areas.
2-SW-5A          Each Valve must be capable    With a valve nonfunctional, perform          N/A 2-SW-5B          of being closed by local      ACTIONS b.1, b.2 for all fire areas except R-F  2-SW-5C          manual handwheel              12.
TBCCW HX A, B    operation.
    & C Inlet Valves 2-SW-12B        Valve must be capable of      With 2-SW-12B nonfunctional, perform          N/A 2-SW-12C        being closed by local        ACTIONS b.1, b.2 for fire area R-3 and R-14.
G  SW Isolation to  manual handwheel              With 2-SW-12C nonfunctional, perform EDG A and EDG    operation.                    ACTIONS b.1, b.2 for fire area R-2.
B MILLSTONE - UNIT 2                                  TRM 7.1-84                                          LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.21-1 Service Water System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR                        FUNCTIONALITY Comp ID                                    Compensatory Measures if Component        Risk Significant Component Item                          Description Not Restored in 14 Days            Not Restored in 72 Hours (see ACTION a)                    (see ACTION d) 2-SW-296          Valve must be capable of      With 2-SW-296 nonfunctional, perform      N/A Fire Water Cross- being cycled by local        ACTIONS b.1, b.2 for fire area R-3.
H  Tie to A EDG    manual handwheel Service Water    operation.
Header MILLSTONE - UNIT 2                                  TRM 7.1-84a                                      LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.21-2 Service Water System Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR                            TECHNICAL SURVEILLANCE Comp ID                                                        Frequency Item                                  REQUIREMENT P5A & L1A      In accordance with Technical Specification    In accordance with P5C & L1C      Surveillance Requirement 4.0.5.              Technical Specification A    S.W. Pumps &                                                Surveillance Strainers                                                    Requirement 4.0.5.
2-SW-97A      Verify that each valve can be manually cycled Once every 48 months.
2-SW-97B      using its handwheel.
SW Pump B    Discharge Hdr Cross-conn.
AOVs 2-SW-2A        Verify that each valve can be manually cycled Once every 48 months.
2-SW-2B        using its handwheel.
C    2-SW-2C SW Pump Disch Valves.
2-SW-3.1A      Verify that each valve can be manually cycled Once every 48 months.
2-SW-3.1B      using its handwheel.
D    RBCCW HX Inlet AOVs 2-SW-9A        Verify that each valve can be manually cycled Once every 48 months.
2-SW-9B        using its handwheel.
E    2-SW-9C RBCW HX Outlet Valves 2-SW-5A        Verify that each valve can be manually cycled Once every 48 months.
2-SW-5B        using its handwheel.
2-SW-5C F    TBCCW HX A, B & C Inlet Valves 2-SW-12B      Verify that each valve can be manually cycled Once every 48 months.
2-SW-12C      using its handwheel.
G    SW Isolation to EDG A and EDG B 2-SW-296      Verify valve can be manually cycled using its Once every 48 months.
H    Drain on SW    handwheel.
to EDG B MILLSTONE - UNIT 2            TRM 7.1-85                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.8.1.1 Electrical Power Systems AC Sources TECHNICAL REQUIREMENT 7.1.22    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.22-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.22    The capability of equipment listed in TRM Table 7.1.22-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.22-2.
MILLSTONE - UNIT 2                TRM 7.1-86                        LBDCR 14-MP2-015 September 24, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.22-1 Electrical Power, AC Sources FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component TR              FUNCTIONALITY Comp ID                                  Not Restored in 14 Days Item                Description                      (see ACTION a)
A  Station    The Unit 3 Alternate With the Unit 3 Alternate AC (SBO) Diesel Blackout  AC (Station          Generator nonfunctional, perform ACTIONS (SBO)      Blackout) Diesel      b.1, b.2 for fire areas R-1, R-11, and R-16.
Alternate  Generator must be AC Diesel  capable of powering Gen.      Unit 2 Bus 24E.
MILLSTONE - UNIT 2          TRM 7.1-87                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.22-2 Electrical Power, AC Sources TECHNICAL SURVEILLANCE REQUIREMENTS TSR                  TECHNICAL SURVEILLANCE Comp ID                                                Frequency Item                        REQUIREMENT A  Station      1. Verify availability of Unit 3    1. Once per REFUELING Blackout        Alternate AC (SBO) Diesel          cycle.
(SBO)            Generator.
Alternate AC Diesel Gen. 2. Verify that breakers required to 2. In accordance with the align electric power from Unit 3    breaker surveillance SBO Diesel Generator to Unit 2      frequency established can be manually cycled.            by the Preventive Maintenance Program (Refer to TRM Appendix R Bases, item No. 9).
MILLSTONE - UNIT 2          TRM 7.1-88                          LBDCR 10-MP2-004 March 30, 2010
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.8.2.1 Onsite AC PWR Distribution TECHNICAL REQUIREMENT 7.1.23    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.23-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.23    The capability of equipment listed in TRM Table 7.1.23-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.23-2.
MILLSTONE - UNIT 2                TRM 7.1-89                        LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.23-1 Onsite Power - AC Distribution System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component Not TR      Comp ID                  FUNCTIONALITY Description                            Restored in 14 Days Item                                                                                      (see ACTION a)
A  Bus 24C (A3)    All 4160 V breakers must be capable of being cycled  1. With any local breaker control nonfunctional, 4160 V          using local manual controls.                            perform ACTIONS b.1, b.2 for fire area R-11; Switchgear                                                              and in addition if:
Facility Z1                                                          2. With breaker A302 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-1 and R-9;
: 3. With breaker A303 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-13;
: 4. With breaker A304 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-1;
: 5. With breaker A305 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-1, R-2, R-3, and R-16;
: 6. With breaker A307 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-13;
: 7. With breaker A310 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-7, 9, 10, 13, 16 and R-17;
: 8. With breaker A312 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-1.
MILLSTONE - UNIT 2                              TRM 7.1-90                                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.23-1 Onsite Power - AC Distribution System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component Not TR      Comp ID                  FUNCTIONALITY Description                            Restored in 14 Days Item                                                                                      (see ACTION a)
B  Bus 24D (A4)    All 4160 V breakers must be capable of being cycled  1. With any local breaker control nonfunctional, 4160 V          using local manual controls.                            perform ACTIONS b.1, b.2 for fire area R-1, Switchgear                                                              and R-16; and in addition if:
Facility Z2                                                          2. With breaker A401 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-14;
: 3. With breaker A408 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-14;
: 4. With breaker A410 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-14;
: 5. With breaker A405 nonfunctional, perform ACTIONS b.1, b. 2 for fire areas R-7, R-9, R-10, 13, 14, and R-17;
: 6. With breaker A406 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-13;
: 7. With breaker A409 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-11;
: 8. With breaker A411 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-10, and R-14.
C  Bus 24E (A5)    All 4160 V breakers must be capable of being cycled  With any local breaker control nonfunctional, 4160 V          using local manual controls.                        perform ACTIONS b.1, b.2 for fire areas R-1, R-Switchgear                                                          11, and R-16.
Facility Z5 MILLSTONE - UNIT 2                              TRM 7.1-91                                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.23-1 Onsite Power - AC Distribution System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component Not TR      Comp ID                    FUNCTIONALITY Description                            Restored in 14 Days Item                                                                                      (see ACTION a)
D  Bus 24A (A1)      4160 V feeder breakers A102, A103, and A104 must be  1. With breaker A102 local control nonfunctional, 4160 V            capable of being cycled using local manual controls. perform ACTIONS b.1, b.2 for fire area R-1.
Switchgear                                                            2. With breaker A103 local control nonfunctional, Facility 1                                                                perform ACTIONS b.1, b.2 for fire areas R-3 and R-13.
: 3. With breaker A104 local control nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-11 and R-13.
E  Bus 24B (A2)      4160 V feeder breakers A204, A205, and A206 must be  1. With breaker A204 local control nonfunctional, 4160 V            capable of being cycled using local manual controls. perform ACTIONS b.1, b.2 for fire area R-13.
Switchgear                                                            2. With breaker A205 local control nonfunctional, Facility 2                                                                perform ACTIONS b.1, b.2 for fire areas R-11 and R-13.
: 3. With breaker A206 local control nonfunctional, perform ACTIONS b.1, b.2 for fire area R-1.
F  Bus 22A (B01)    MCC feeder breaker B0105 must be capable of being    With breaker B0105 nonfunctional, perform 480 V load center tripped using local manual controls.                ACTIONS b.1, b.2 for fire areas R-2, R-3 and R-16.
G  Bus 22B (B02)    MCC feeder breaker B0205 must be capable of being    With breaker B0205 nonfunctional, perform 480 V load center tripped using local manual controls.                ACTIONS b.1, b.2 for fire areas R-2, R-3 and R-16.
MILLSTONE - UNIT 2                                  TRM 7.1-92                                      LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.23-1 Onsite Power - AC Distribution System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component Not TR      Comp ID                  FUNCTIONALITY Description                              Restored in 14 Days Item                                                                                      (see ACTION a)
H  Bus 22E (B05)    Breakers B0504 and B0505 must be capable of being    With any one of these breakers nonfunctional, 480 V Switchgear cycled using local manual controls.                  perform ACTIONS b.1, b.2 for fire area R-11.
Facility Z1 I  Bus 22F (B06)    Breakers B0603, B0605, B0606, B0608, B0609, and      With any one of these breakers nonfunctional, 480 V Switchgear B0611 must be capable of being cycled using local    perform ACTIONS b.1, b.2 for fire areas R-1 and Facility Z2      manual controls.                                      R-16.
J  MCC B51 (MCC-    Breakers B5105, B5110, B5111, B5112, B5118, B5119,    1. With breaker B5105 nonfunctional perform 22- 1E)          and B5145 must be capable of being cycled using local    ACTIONS b.1, b.2 fire areas R-2 and R-4.
manual controls.                                      2. With breaker B5110, B5111, or B5112 nonfunctional perform ACTIONS b.1, b.2 fire area R-15.
: 3. With breaker B5118, or B5119 nonfunctional perform ACTIONS b.1, b.2 fire area R-2.
: 4. With breaker B5145 nonfunctional perform ACTIONS b.1, b.2 fire area R-4.
K  MCC B52 (MCC-    Breaker B5222 must be capable of being cycled using  With breaker B5222 nonfunctional perform 22- 2E)          local manual controls.                                ACTIONS b.1, b.2 fire areas R-2,R-3, and R-16.
MILLSTONE - UNIT 2                                TRM 7.1-93                                        LBDCR 12-MP2-002 May 31, 2012
 
ADDITIONAL REQUIREMENTS Table 7.1.23-1 Onsite Power - AC Distribution System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component Not TR      Comp ID                  FUNCTIONALITY Description                            Restored in 14 Days Item                                                                                      (see ACTION a)
L  MCC B61 (MCC-    Breakers B6105, B6109, B6110, and B6119 must be      1. With breaker B6105 nonfunctional, perform 22- 1F)          capable of being cycled using local manual controls. ACTIONS b.1, b.2 for fire area R-4.
: 2. With breaker B6109, B6110 or B6119 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-15 and R-17.
M  MCC B62 (MCC-    Breakers B6203 and B6226 must be capable of being    1. With breaker B6203 nonfunctional, perform 22- 2F)          cycled using local manual controls.                    ACTIONS b.1, b.2 for fire area R-13.
: 2. With breaker B6226 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-2, R-3 and R-16.
N  VA 20 120VAC    All 120 VAC breakers must be capable of being cycled 1. With any local breaker control nonfunctional, Instrument Panel using local manual operation.                          perform ACTIONS b.1, b.2 for fire area R-1, VIAC-2                                                                  and if
: 2. Breaker VA2004 is nonfunctional, perform LCO 3.7.13.23 ACTION Statement for fire area R-2.
MILLSTONE - UNIT 2                                TRM 7.1-94                                        LBDCR 10-MP2-004 March 30, 2010
 
ADDITIONAL REQUIREMENTS Table 7.1.23-1 Onsite Power - AC Distribution System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component Not TR      Comp ID                    FUNCTIONALITY Description                          Restored in 14 Days Item                                                                                      (see ACTION a)
R  Emergency        All ELUs must be capable of at least 8 hours of      With any ELUs nonfunctional, replace defective Lighting Units  illumination.                                        ELUs with battery powered lanterns, and verify (ELUs)                                                                proper placement on a daily basis.
MILLSTONE - UNIT 2                                TRM 7.1-95                                      LBDCR 09-MP2-027 January 7, 2010
 
ADDITIONAL REQUIREMENTS Table 7.1.23-2 Onsite Power - AC Distribution System Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR                  TECHNICAL SURVEILLANCE Comp ID                                                      Frequency Item                          REQUIREMENT A    Bus 24C (A3) Verify that each breaker can be    In accordance with the breaker 4160 V        manually cycled.                  surveillance frequency established by Switchgear                                      the Preventive Maintenance Program Facility Z1                                    (Refer to TRM Appendix R Bases, item No. 9).
B    Bus 24D (A4) Verify that each breaker can be    In accordance with the breaker 4160 V        manually cycled.                  surveillance frequency established by Switchgear                                      the Preventive Maintenance Program Facility Z2                                    (Refer to TRM Appendix R Bases, item No. 9).
C    Bus 24E (A5) Verify that each breaker can be    In accordance with the breaker 4160 V        manually cycled.                  surveillance frequency established by Switchgear                                      the Preventive Maintenance Program Facility Z5                                    (Refer to TRM Appendix R Bases, item No. 9).
D    Bus 24A (A1) Verify that breakers A102, A103, In accordance with the breaker 4160 V        and A104 can be manually cycled. surveillance frequency established by Switchgear                                      the Preventive Maintenance Program Facility 1                                      (Refer to TRM Appendix R Bases, item No. 9).
E    Bus 24B (A2) Verify that breakers A204, A205, In accordance with the breaker 4160 V        and A206 can be manually cycled. surveillance frequency established by Switchgear                                      the Preventive Maintenance Program Facility 2                                      (Refer to TRM Appendix R Bases, item No. 9).
F    Bus 22A      Verify that breaker B0105 can be In accordance with the breaker (B01) 480 V manually cycled.                    surveillance frequency established by load center                                    the Preventive Maintenance Program (Refer to TRM Appendix R Bases, item No. 9).
G    Bus 22B      Verify that breaker B0205 can be In accordance with the breaker (B02) 480 V manually cycled.                    surveillance frequency established by load center                                    the Preventive Maintenance Program (Refer to TRM Appendix R Bases, item No. 9).
H    Bus 22E      Verify that breakers B0504 and    In accordance with the breaker (B05) 480 V B0505 can be manually cycled.      surveillance frequency established by Switchgear                                      the Preventive Maintenance Program Facility Z1                                    (Refer to TRM Appendix R Bases, item No. 9).
MILLSTONE - UNIT 2            TRM 7.1-96                            LBDCR 12-MP2-002 May 31, 2012
 
ADDITIONAL REQUIREMENTS Table 7.1.23-2 Onsite Power - AC Distribution System Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR                    TECHNICAL SURVEILLANCE Comp ID                                                        Frequency Item                          REQUIREMENT I    Bus 22F        Verify that breakers B0603,        In accordance with the breaker (B06) 480 V B0605, B0606, B0608, B0609,            surveillance frequency established by Switchgear    and B0611 can be manually          the Preventive Maintenance Program Facility Z2    cycled.                            (Refer to TRM Appendix R Bases, item No. 9).
J    MCC B51        Verify that Breakers B5105,        In accordance with the breaker (MCC-22-1E) B5110, B5111, B5112, B5118,            surveillance frequency established by B5119, and B5145 can be            the Preventive Maintenance Program manually cycled.                    (Refer to TRM Appendix R Bases, item No. 9).
K    MCC B52        Verify that breakers that supply    In accordance with the breaker (MCC-22-2E) Appendix R loads are capable of surveillance frequency established by being manually cycled.              the Preventive Maintenance Program (Refer to TRM Appendix R Bases, item No. 9).
L    MCC B61        Verify that breakers B6105,        In accordance with the breaker (MCC-22-1F) B6109, B6110, and B6119 can be surveillance frequency established by manually cycled.                    the Preventive Maintenance Program (Refer to TRM Appendix R Bases, item No. 9).
M    MCC B62        Verify that breakers that supply    In accordance with the breaker (MCC-22-2F) Appendix R loads are capable of surveillance frequency established by being manually cycled.              the Preventive Maintenance Program (Refer to TRM Appendix R Bases, item No. 9).
N    VA 20          Verify that breakers are capable of In accordance with the breaker 120VAC        being manually cycled.              surveillance frequency established by Instrument                                        the Preventive Maintenance Program Panel VIAC-2                                      (Refer to TRM Appendix R Bases, item No. 9).
R    Emergency      Verify capability of ELUs to        In accordance with the Emergency Lighting Units provide at least 8 hours of        Lighting Unit (ELU) surveillance (ELUs)        operation.                          frequency established by the Preventive Maintenance Program.
MILLSTONE - UNIT 2              TRM 7.1-97                            LBDCR 12-MP2-002 May 31, 2012
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.8.2.3 DC Power Distribution TECHNICAL REQUIREMENT 7.1.24    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.24-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.24    The capability of equipment listed in TRM Table 7.1.24-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.24-2.
MILLSTONE - UNIT 2                TRM 7.1-98                        LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.24-1 Electric Power - D.C. Distribution Components FUNCTIONALITY Requirements and Compensatory Measures TR                                                                        Compensatory Measures if Component Not Comp ID            FUNCTIONALITY Description Item                                                                          Restored in 14 Days (see ACTION a)
B  D01 BUS 201A 125    Breakers D0103, D0104, D0105,        1. With breaker D0103 nonfunctional, perform ACTIONS b.1, b.2 for VDC Switchgear      D0108, and D0111 must be capable        fire area R-1.
of being cycled using local manual
: 2. With breaker D0104 or D0111 nonfunctional, perform ACTIONS operation.                              b.1, b.2 for fire areas R- 3, R-8 and R-11.
: 3. With breaker D0105 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-3, R-13, R-14 and R-17.
: 4. With breaker D0108 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-15.
C  D02 BUS 201B 125    All breakers on this panel must be    1. With any breaker nonfunctional, perform ACTIONS b.1, b.2 for VDC Switchgear      capable of being cycled using local      fire area R-1.
manual operation.
: 2. With breaker D0204 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-3, R-8 and R-11.
: 3. With breaker D0205 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-15.
: 4. With breaker D0208 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-2 and R-8.
MILLSTONE - UNIT 2                                TRM 7.1-99                                          LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.24-1 Electric Power - D.C. Distribution Components FUNCTIONALITY Requirements and Compensatory Measures TR                                                                        Compensatory Measures if Component Not Comp ID          FUNCTIONALITY Description Item                                                                          Restored in 14 Days (see ACTION a)
D  DV10 Panel 201A-1V  All 125 VDC breakers on Panel DV10 1. With any breaker nonfunctional perform ACTIONS b.1, b.2 for fire 125 VDC Vital      must be capable of being cycled          area R-15, and in addition if:
Instrument Panel. using local manual operation.        2. Breakers DV1011, DV1015, DV1017, or DV1020 are nonfunctional perform ACTIONS b.1, b.2 for fire area R-17;
: 3. Breaker DV1008 is nonfunctional perform ACTIONS b.1, b.2 for fire area R-3;
: 4. Breaker DV1013 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-4 and R-17;
: 5. Breaker DV1014 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-2, 4, 5, 6, 8, 10, 11 and R-17;
: 6. Breaker DV1018 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-2, 3, 11, 13 and R-14;
: 7. Breaker DV1019 is nonfunctional perform ACTIONS b.1, b.2 for fire area R-13;
: 8. Breaker DV1008 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-3, 13 and R-14.
MILLSTONE - UNIT 2                                TRM 7.1-100                                            LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.24-1 Electric Power - D.C. Distribution Components FUNCTIONALITY Requirements and Compensatory Measures TR                                                                          Compensatory Measures if Component Not Comp ID            FUNCTIONALITY Description Item                                                                            Restored in 14 Days (see ACTION a)
E  DV20 Panel 201B-1V  All 125 VDC breakers on Panel DV20 1. With any breaker nonfunctional perform ACTIONS b.1, b.2 for fire 125 VDC Vital        must be capable of being cycled          areas R-1 and R-15, and in addition if:
Instrument Panel. using local manual operation.        2. Breaker DV2014 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-4, 5, 6, 7, 9, 13, 14, 16 and R-17;
: 3. Breaker DV2015 is nonfunctional perform ACTIONS b.1, b.2 for fire area R-8;
: 4. Breaker DV2018 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-3, 11 and R- 14;
: 5. Breaker DV2020 is nonfunctional perform ACTIONS b.1, b.2 for fire area R-8;
: 6. Breaker DV2021 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-13 and R- 14.
F  D11 Panel 201A-1    All 125 VDC breakers on Panel        1. With any breaker nonfunctional perform ACTIONS b.1, b.2 for fire 125 VDC Distribution D11must be capable of being cycled      area R-15, and in addition if:
using local manual operation.        2. Breaker D1104 is nonfunctional perform ACTIONS b.1, b.2 for fire area R-11.
G  D12 Panel 201A-2    All 125 VDC breakers on Panel D12    With any local breaker control nonfunctional perform ACTIONS b.1, 125 VDC Distribution must be capable of being cycled      b.2 for fire area R-15.
using local manual operation.
MILLSTONE - UNIT 2                                TRM 7.1-101                                              LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.24-1 Electric Power - D.C. Distribution Components FUNCTIONALITY Requirements and Compensatory Measures TR                                                                        Compensatory Measures if Component Not Comp ID            FUNCTIONALITY Description Item                                                                          Restored in 14 Days (see ACTION a)
H  D21 Panel 201B-1    All 125 VDC breakers on Panel D21    1. With any breaker nonfunctional perform ACTIONS b.1, b.2 for fire 125 VDC Distribution must be capable of being cycled          area R-15, and in addition if:
using local manual operation.        2. Breaker D2104 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-3 and R-11.
I  D22 Panel 201B-2    All 125 VDC breakers on Panel D22    1. With any breaker nonfunctional perform ACTIONS b.1, b.2 for fire 125 VDC Distribution must be capable of being cycled          area R-15, and in addition if:
using local manual operation.        2. Breaker D2216 is nonfunctional perform ACTIONS b.1, b.2 for fire area R-2.
MILLSTONE - UNIT 2                                TRM 7.1-102                                          LBDCR 10-MP2-009 May 27, 2010
 
ADDITIONAL REQUIREMENTS Table 7.1.24-2 Electric Power - D.C. Distribution Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR                  TECHNICAL SURVEILLANCE Comp ID                                                    Frequency Item                        REQUIREMENT B    D01 BUS      Verify that breakers D0103,      In accordance with the breaker 201A 125    D0104, D0105, D0108, and        surveillance frequency established by the VDC          D0111 can be manually cycled. Preventive Maintenance Program (Refer Switchgear                                    to TRM Appendix R Bases, item No. 9).
C    D02 BUS      Verify that breakers D0204,      In accordance with the breaker 201B 125    D0205, and D0208 and D0211      surveillance frequency established by the VDC          can be manually cycled.          Preventive Maintenance Program (Refer Switchgear                                    to TRM Appendix R Bases, item No. 9).
D    DV10 Panel Verify that all breakers on Panel  In accordance with the breaker 201A-1V      DV10 can be manually cycled. surveillance frequency established by the 125 VDC                                      Preventive Maintenance Program (Refer Vital                                        to TRM Appendix R Bases, item No. 9).
Instrument Panel.
E    DV20 Panel Verify that all breakers on Panel  In accordance with the breaker 201B-1V      DV20 can be manually cycled. surveillance frequency established by the 125 VDC                                      Preventive Maintenance Program (Refer Vital                                        to TRM Appendix R Bases, item No. 9).
Instrument Panel.
F    D11 Panel Verify that all breakers on Panel  In accordance with the breaker 201A-1 125 D11 can be manually cycled.        surveillance frequency established by the VDC                                          Preventive Maintenance Program (Refer Distribution                                  to TRM Appendix R Bases, item No. 9).
G    D12 Panel Verify that all breakers on Panel  In accordance with the breaker 201A-2 125 D12 can be manually cycled.        surveillance frequency established by the VDC                                          Preventive Maintenance Program (Refer Distribution                                  to TRM Appendix R Bases, item No. 9).
H    D21 Panel Verify that all breakers on Panel  In accordance with the breaker 201B-1 125 D21 can be manually cycled.        surveillance frequency established by the VDC                                          Preventive Maintenance Program (Refer Distribution                                  to TRM Appendix R Bases, item No. 9).
I    D22 Panel Verify that all breakers on Panel  In accordance with the breaker 201B-2 125 D22 can be manually cycled.        surveillance frequency established by the VDC                                          Preventive Maintenance Program (Refer Distribution                                  to TRM Appendix R Bases, item No. 9).
MILLSTONE - UNIT 2              TRM 7.1-103                          LBDCR 10-MP2-004 March 30, 2010
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: None TECHNICAL REQUIREMENT 7.1.25    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.25-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.25    The capability of equipment listed in TRM Table 7.1.25-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.25-2.
MILLSTONE - UNIT 2                TRM 7.1-104                      LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.25-1 Fire Protection Miscellaneous System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if        Risk Significant Component Not TR                                                      Component Not Restored in Item  Comp ID      FUNCTIONALITY Description                        14 Days                      Restored in 72 Hours (see Action d)
(see ACTION a)
A  2-FIRE-258  1. Valve 2-FIRE-258 must be        With any valve nonfunctional,      N/A 2-FIRE-259      capable of being opened, and;    perform ACTIONS b.1, b.2 for fire 2-FIRE-559                                      area R-3. Evaluation for continued
: 2. Valves 2-FIRE-259, 2-FIRE-2-FIRE-560                                      operation.
559, and 2-FIRE-560 must be Fire Prot.      capable of being closed, by Cross-tie to    local manual handwheel EDG SW          operation.
Cooling B  Fire        Refer to the following TRs: 3.7.9.1 As specified in the ACTION        N/A Suppression  Fire Suppression Water 3.7.9.2      Statements for the following:
Systems      Spray/Sprinkler Systems 3.7.9.3    TR 3.7.9.1 Fire Hose Stations 3.7.9.4 Halon    TR 3.7.9.2 System                              TR 3.7.9.3 TR 3.7.9.4 C  2-FIRE-34    Valve 2-FIRE-34 must be capable N/A                                    With 2-FIRE-34 nonfunctional, Risk Cross-tie to of being opened.                                                      Mitigation Areas are: R-1 (FHA A-1A, AFW suction                                                                        A-1B, A-1G, A-12A and A-24), R-3 (FHA T-1A), R-11 (FHA A-28 and R-16 (FHA I-1A and I-1B)
MILLSTONE - UNIT 2                                  TRM 7.1-105                                          LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS Table 7.1.25-2 Fire Protection Miscellaneous System Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR                      TECHNICAL SURVEILLANCE Comp ID                                                      Frequency Item                            REQUIREMENT A    2-FIRE-258      Verify that each valve can be    Once every 48 months.
2-FIRE-259      manually cycled by local manual 2-FIRE-559      handwheel operation.
2-FIRE-560 Fire Prot.
Crosstie to EDG SW Cooling B    Fire            Refer to the following TSRs:    As specified in the TSRs for the Suppression      4.7.9.1 Fire Suppression Water  following:
Systems          4.7.9.2 Spray/Sprinkler Systems  4.7.9.1 Fire Suppression Water 4.7.9.3 Fire Hose Stations      4.7.9.2 Spray/Sprinkler Systems 4.7.9.4 Halon System            4.7.9.3 Fire Hose Stations 4.7.9.4 Halon System C    2-FIRE-34        N/A                              N/A Cross-tie to AFW suction MILLSTONE - UNIT 2                TRM 7.1-106                          LBDCR 13-MP2-009 November 26, 2013
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: None TECHNICAL REQUIREMENT 7.1.26    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.26-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.26    The capability of equipment listed in TRM Table 7.1.26-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.26-2.
MILLSTONE - UNIT 2                TRM 7.1-107                      LBDCR 07-MP2-010 October 5, 2009
 
ADDITIONAL REQUIREMENTS Table 7.1.26-1 Support Equipment, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if            Compensatory Measures for TR                              FUNCTIONALITY Comp ID                                          Component Not Restored in 14 Days        Components Requiring Prompt Item                                Description                          (see ACTION a)                Action (see ACTION f)
A  Hand-held Radios    1. At least eight (8) hand-held  1. With less than 8 hand-held radios      N/A radios must be                    FUNCTIONAL, replace or restore FUNCTIONAL. Three (3) in          radios to FUNCTIONALITY within 7 the Control Room, and five        days or perform ACTIONS b.1, b.2 (5) in the Fire Shutdown          for all fire areas EXCEPT R-12.
Storage Box.                  2. With Remote Desktop Controller
: 2. Communications from              nonfunctional, perform ACTIONS manual action locations to        b.1, b.2 for all fire areas EXCEPT R-Control Room base station        3, R-11, R-12, and R-16.
(using Remote Desktop          3. With dedicated portable radio Controller and hand-held          nonfunctional, perform ACTIONS radios) must be                  b.1, b.2 for fire areas R-3, R-11, and FUNCTIONAL.                      R-16.
Note: If Main Radio Control Station located in MPS1        4. If the primary repeater is Control Room is                  nonfunctional, verify that the nonfunctional than Remote        Secondary Repeater is Desktop Controller in MPS2        FUNCTIONAL, or perform Control Room will also be        ACTIONS b.1, b.2 for all fire areas.
nonfunctional.                5. If the Secondary repeater is
: 3. Communications from              nonfunctional, verify that the Primary manual action locations to        Repeater is FUNCTIONAL, and dedicated Control Room            perform ACTIONS b.1, b.2 for fire portable radio unit (with        area R-3.
hardwired external            6. If neither repeater is FUNCTIONAL, antenna) must be                  immediately attempt to restore one FUNCTIONAL.                      repeater to operation, and perform
: 4. Primary or Secondary (800        ACTIONS b.1, b.2 for all fire areas.
MHz) Repeaters must be FUNCTIONAL.
MILLSTONE - UNIT 2                                  TRM 7.1-108                                            LBDCR 19-MP2-001 September 13, 2019
 
ADDITIONAL REQUIREMENTS Table 7.1.26-1 Support Equipment, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if              Compensatory Measures for TR                              FUNCTIONALITY Comp ID                                        Component Not Restored in 14 Days        Components Requiring Prompt Item                                Description                        (see ACTION a)                  Action (see ACTION f)
B  HOT SHUTDOWN          All items on inventory must be With any inventory item missing,          N/A (HSD) Storage Box    available to support COLD        perform ACTIONS b.1, b.2 for fire area Inventory            SHUTDOWN for fire area R-2. R- 2.
Refer to applicable station procedure for inventory.
C  Fire Shutdown (FSD)  All items on inventory must be With any inventory item missing,          N/A Storage Box Inventory available to support COLD        perform ACTIONS b.1, b.2 for fire SHUTDOWN for fire area(s)        area(s) where required.
where required. Refer to applicable station procedure for inventory.
D  COLD SHUTDOWN        All materials required to        With any inventory item missing or non-  Within 12 hours of any inventory Repair Material      support COLD SHUTDOWN            functional perform ACTION b.1 for fire  item identified as missing or non-repairs must be available in    areas where item is required. This      functional, perform ACTION b.2 the Unit 2 Appendix R storage    ACTION is in addition to the Prompt      for fire area where item is area. Repair Material shall not  ACTION b.2 taken.                        required. See applicable station be utilized as plant spare                                                procedure for fire area See applicable station procedure for material. Refer to applicable                                            identification. Note: Some items fire area identification. Note: Some station procedure for materials                                          are shared with Unit 3. Notify the items are shared with Unit 3. Notify the required.                                                                Shift Manager of any impacts.
Shift Manager of any impacts.
MILLSTONE - UNIT 2                                TRM 7.1-109                                            LBDCR 14-MP2-005 March 18, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.26-1 Support Equipment, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if          Compensatory Measures for TR                              FUNCTIONALITY Comp ID                                          Component Not Restored in 14 Days      Components Requiring Prompt Item                                Description                        (see ACTION a)              Action (see ACTION f)
E  F156A, F156B, F156C, 1. A minimum of two fans shall 1. With less than 2 fans FUNCTIONAL, N/A F156D Portable Fans    be FUNCTIONAL and                or the dedicated power supply stored in designated              (REC-1,2 and 3) in the East (Z1) DC cabinets in the corridor, el. Switchgear Room nonfunctional, 14-6 adjacent to the            perform ACTIONS b.1, b.2 for fire Turbine Bldg entrance.            area R-3.
: 2. Power shall be available at 2. With less than 2 fans FUNCTIONAL, the dedicated 480V outlets        or the dedicated power supply in both DC Switchgear            (REC-7, 8, and 9) in the West (Z2)
Rooms.                            DC Switchgear Room nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-1 and R-16.
F  F157A, F157B, F157C, 1. A minimum of two fans shall 1. With less than 2 fans FUNCTIONAL, N/A F157D Portable Fans    be FUNCTIONAL, and                or the dedicated power supply stored in designated              (REC-4, 5, and 6) in the West (Z1) cabinet on the platform          480V Switchgear Room (El.46-10) in the West          nonfunctional, perform ACTIONS 480V Switchgear Room.            b.1, b.2 for fire areas R-2 and R-3.
: 2. Power shall be available at 2. With less than 2 fans FUNCTIONAL, the dedicated 480V outlets        or the dedicated power supply in both 480V Switchgear          (REC-10, 11, and 12) in the East Rooms.                            (Z2) 480V Switchgear Room nonfunctional, perform ACTIONS b.1, b.2 for fire area R-1.
MILLSTONE - UNIT 2                                  TRM 7.1-110                                      LBDCR 14-MP2-005 March 18, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.26-1 Support Equipment, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if          Compensatory Measures for TR                                FUNCTIONALITY Comp ID                                          Component Not Restored in 14 Days      Components Requiring Prompt Item                                  Description                        (see ACTION a)              Action (see ACTION f)
G  Compressed air bottle  A minimum of one                With all three compressed air bottles  N/A 3A and valves 2-IA-601, compressed air bottle shall be  nonfunctional, 598, 600, 891, 910,    FUNCTIONAL (1000 psig          1. Perform ACTIONS b.1, b.2 for fire 566, and 2- IA-599      min.) and capable of alignment    area R-1, AND (regulator).            to 2-CH-517, 2-CH-518, and Compressed air bottle  2-CH-519 using indicated        2. Verify that 2-CH-517, 2-CH-518, and 3B and valves 2-IA-603, valving.                          2-CH-519 can be cycled by manual 590, 595, 566 and 2-IA-                                    operation or perform ACTIONS b.1, 591 (regulator).                                          b.2 for ALL remaining fire areas.
Compressed air bottle 3C and valves 2-IA-885, 887, 889, 910, 566, and 2-IA-886 (regulator).
MILLSTONE - UNIT 2                                  TRM 7.1-111                                          LBDCR 14-MP2-005 March 18, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.26-2 Support Equipment, Appendix R Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR                                  TECHNICAL SURVEILLANCE Comp ID                                                          Frequency Item                                          REQUIREMENT A  Hand-held Radios            1. Verify FUNCTIONALITY of the            Once per portable radios from all remote        REFUELING cycle shutdown areas.
: 2. Verify FUNCTIONALITY of both Control Room base stations and repeaters.
B  HOT SHUTDOWN (HSD)          Verify all items are available to support Once per Storage Box Inventory      COLD SHUTDOWN.                            REFUELING cycle C  Fire Shutdown (FSD)        Verify all items are available to support Once per Storage Box Inventory      COLD SHUTDOWN.                            REFUELING cycle D  COLD SHUTDOWN              Verify all materials available in the Unit Once per Repair Material            2 Appendix R Storage Area to support REFUELING cycle COLD SHUTDOWN.
E  F156A, F156B, F156C,        Verify each fan can be powered from        Once per F156D Portable Appendix    the outlets in both DC Switchgear          REFUELING cycle R fans                      Rooms, and fans are stored in their designated location.
F  F157A, F157B, F157C,        Verify each fan can be powered from        Once per F157D Portable Appendix    the outlets in both 480 V Switchgear      REFUELING cycle R fans                      Rooms, and fans are stored in their designated location.
G  Compressed air bottle 3A    1. Verify each required instrument air    Once per and valves 2-IA-601, 598,      valve and regulator can be manually REFUELING cycle 600, 891, 910, 566, and 2-    opened.
IA-599 (regulator).        2. Verify each compressed air bottle is Compressed air bottle 3B      FUNCTIONAL.
and valves 2-IA-603, 590, 595, 566, and 2-IA-591 (regulator).
Compressed air bottle 3C and valves 2-IA-885, 887, 889, 910, 566, and 2-IA-886 (regulator).
MILLSTONE - UNIT 2            TRM 7.1-112                              LBDCR 14-MP2-005 March 18, 2014
 
ADDITIONAL REQUIREMENTS 7.1    APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.8.1.1 - A. C. Sources Operating TECHNICAL REQUIREMENT 7.1.27    The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.27-1 shall be FUNCTIONAL.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.
TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.27    The capability of equipment listed in TRM Table 7.1.27-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements are verified per the SURVEILLANCE REQUIREMENTS of TS 4.8.1.1.2.a & b.
MILLSTONE - UNIT 2                TRM 7.1-113                      LBDCR 14-MP2-005 March 18, 2014
 
ADDITIONAL REQUIREMENTS Table 7.1.27-1 Plant System - Emergency Diesel Generators FUNCTIONALITY Requirements and Compensatory Measures Risk Significant Component TR                      FUNCTIONALITY            Component Not Restored in 14 Days Comp ID                                                                          Not Restored in 72 Hours Item                        Description                    (see ACTION a)                (see ACTION d)
H7A (includes  The A Emergency Diesel  (Tech Spec Limiting)                  With A EDG nonfunctional, F38A, A312, 2-  Generator must be capable                                        Risk Mitigation Areas are: R-1 SW-89A, 2-SW-  of powering Bus 24C                                              (FHA A-12A, A-14B, A-14D, A-A  231A)                                                                            17, A-24) R-2 (FHA A-13, T-8, T-10) R-3 (FHA T-1A, T-1C, T-1F) R-10 (FHA A-21) R16 (FHA I-1A)
H7B (includes  The B Emergency Diesel  (Tech Spec Limiting)                  With B EDG nonfunctional, F38B, A401, 2-  Generator must be capable                                        Risk Mitigation Areas are: R-1 SW-89B, 2-SW-  of powering Bus 24D                                              (FHA A-12A, A-14B, A-14D, A-B  231B)                                                                            24) R-3 (FHA T-1A) R-7 (FHA A-15, A-31) R-9 (FHA A-20) R-14 (FHA T-7, T-9) R16 (FHA I-1A) R-17 (FHA A-15)
MILLSTONE - UNIT 2                              TRM 7.1-114                                  LBDCR 14-MP2-005 March 18, 2014
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27
: 1. CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT for Millstone 2 has been prepared in accordance with the requirements of Technical Specification 6.9.1.8 a through 6.9.1.8 d.
The Technical Specifications affected by this report are listed below:
Section        Specification 2.1            3/4.1.1.1        SHUTDOWN MARGIN - (SDM) 2.2                            Deleted (Ref. License Amendment 280) 2.3            3/4.1.1.4        Moderator Temperature Coefficient (MTC) 2.4            3/4.1.3.6        Regulating CEA Insertion Limits 2.5            3/4.2.1          Linear Heat Rate 2.6            3/4.2.3          TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR -- FrT 2.7            3/4.2.6          DNB Margin Terms appearing in capitalized type are DEFINED TERMS as defined in Section 1.0 of the Technical Specifications.
: 2. OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Section 3.
2.1  SHUTDOWN MARGIN - (SDM) (Specification 3/4.1.1.1)
The SHUTDOWN MARGIN shall be  3.6% K/K 2.2  Deleted 2.3  Moderator Temperature Coefficient (Specification 3/4.1.1.4)
The moderator temperature coefficient shall be:
: a. Less positive than 0.7x10-4 K/K/&deg;F whenever THERMAL POWER is 70% of RATED THERMAL POWER,
: b. Less positive than 0.4x10-4 K/K/&deg;F whenever THERMAL POWER is > 70%
of RATED THERMAL POWER,
: c. Less negative than -3.0x10-4 K/K/&deg;F at RATED THERMAL POWER.
MILLSTONE - UNIT 2              TRM 8.1-1                              LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 2.4  Regulating CEA Insertion Limits (Technical Specification 3/4.1.3.6)
The regulating CEA groups shall be limited to the withdrawal sequence and to the insertion limits shown in Figure 2.4-1. CEA insertion between the Long Term Steady State Insertion Limits and the Transient Insertion Limits is restricted to:
: a. 4 hours per 24 hour interval,
: b. 5 Effective Full Power Days per 30 Effective Full Power Day interval, and
: c. 14 Effective Full Power Days per 365 Effective Full Power Day interval.
2.5  Linear Heat Rate (Technical Specification 3/4.2.1)
The linear heat rate, including heat generated in the fuel, clad and moderator, shall not exceed:
: a. 15.1 kw/ft whenever the reactor coolant flow rate (determined per Technical Specification 3/4.2.1) is  360,000 gpm.
: b. 15.0 kw/ft whenever the reactor coolant flow rate (determined per Technical Specification 3/4.2.1) is < 360,000 gpm and  354,600 gpm.
: c. 14.9 kw/ft whenever the reactor coolant flow rate (determined per Technical Specification 3/4.2.1) is < 354,600 gpm and  349,200 gpm.
During operation with the linear heat rate being monitored by the Excore Detector Monitoring System, the AXIAL SHAPE INDEX shall remain within the limits of Figure 2.5-1.
During operation with the linear heat rate being monitored by the Incore Detector Monitor System, the alarm setpoints shall be adjusted to less than or equal to the limit when the following factors are appropriately included in the setting of the alarms:
: 1. A measurement-calculational uncertainty factor of 1.07,
: 2. An engineering uncertainty factor of 1.03, and
: 3. A THERMAL POWER measurement uncertainty factor of 1.02.
MILLSTONE - UNIT 2              TRM 8.1-2                          LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 2.6    TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR -- FrT (Technical Specification 3/4.2.3)
The calculated value of FrT at RATED THERMAL POWER shall be:
1.690 whenever the reactor coolant flow rate is  360,000 gpm.
1.664 whenever the reactor coolant flow rate is < 360,000 gpm and  354,600 gpm.
1.639 whenever the reactor coolant flow rate is < 354,600 gpm and  349,200 gpm.
2.6.1        The Power Dependent FrT limits, whenever the reactor coolant flow rate is  360,000 gpm, are shown in Figure 2.6-1.
2.6.2        The Power Dependent FrT limits, whenever the reactor coolant flow rate is < 360,000 gpm and  354,600 gpm, are shown in Figure 2.6-2.
2.6.3        The Power Dependent FrT limits, whenever the reactor coolant flow rate is < 354,600 gpm and  349,200 gpm, are shown in Figure 2.6-3.
2.7    DNB Margin (Technical Specification 3/4.2.6)
The DNB margin shall be preserved by maintaining the cold leg temperature, pressurizer pressure, reactor coolant flow rate, and AXIAL SHAPE INDEX within the following limits:
Parameter                                Limits Four Reactor Coolant Pumps Operations
: a. Cold Leg Temperature                  549&deg;F
: b. Pressurizer Pressure                > 2225 psia*
: c. Reactor Coolant Flow Rate  360,000 gpm with Linear Heat Rate and F T limits as r
specified in Sections 2.5 and 2.6.
or 354,600 gpm with Linear Heat Rate and FrT limit reductions as specified in Sections 2.5 and 2.6.
or 349,200 gpm with Linear Heat Rate and FrT limit reductions as specified in Sections 2.5 and 2.6.
: d. AXIAL SHAPE INDEX                    Figure 2.7-1
* Limit not applicable during either the THERMAL POWER ramp increase in excess of 5% of RATED THERMAL POWER per minute or a THERMAL POWER step increase of greater than 10% of RATED THERMAL POWER.
MILLSTONE - UNIT 2                      TRM 8.1-3                          LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27
: 3. ANALYTICAL METHODS The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
3.1    EMF-96-029(P)(A) Volumes 1 and 2, Reactor Analysis System for PWRs Volume 1 - Methodology Description, Volume 2 - Benchmarking Results, Siemens Power Corporation, January 1997.
Methodology for:
TS 3.1.1.1 - Shutdown Margin - (SDM)
TS 3.1.1.4 - Moderator Temperature Coefficient (MTC)
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.2    ANF-84-73 Revision 5 Appendix B(P)(A), Advanced Nuclear Fuels Methodology for Pressurized Water Reactors: Analysis of Chapter 15 Events, Advanced Nuclear Fuels, July 1990.
Methodology for:
TS 3.1.1.1 - Shutdown Margin - (SDM)
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.3    XN-NF-82-21(P)(A) Revision 1, Application of Exxon Nuclear Company PWR Thermal Margin Methodology to Mixed Core Configurations, Exxon Nuclear Company, September 1983.
Methodology for:
TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.4    XN-75-32(P)(A) Supplements 1 through 4, Computational Procedure for Evaluating Fuel Rod Bowing, Exxon Nuclear Company, October 1983.
Methodology for:
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr MILLSTONE - UNIT 2              TRM 8.1-4                        LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 3.5  EMF-2328(P)(A), Revision 0 and Supplement 1(P)(A), PWR Small Break LOCA Evaluation Model S-RELAP5 Based, Framatome ANP, September 2015.
Methodology for:
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.6  EMF-2087(P)(A), SEM/PWR-98: ECCS Evaluation Model for PWR LBLOCA Applications, Siemens Power Corporation, June 1999.
Methodology for:
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.7  XN-NF-78-44(NP)(A), A Generic Analysis of the Control Rod Ejection Transient for Pressurized Water Reactors, Exxon Nuclear Company, October 1983.
Methodology for:
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.8  XN-NF-621(P)(A) Revision 1, Exxon Nuclear DNB Correlation for PWR Fuel Designs, Exxon Nuclear Company, September 1983.
Methodology for:
TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.9  XN-NF-82-06(P)(A) Revision 1 and Supplements 2, 4, and 5, Qualification of Exxon Nuclear Fuel for Extended Burnup, Exxon Nuclear Company, October 1986.
Methodology for:
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr MILLSTONE - UNIT 2            TRM 8.1-5                        LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 3.10 ANF-88-133(P)(A) and Supplement 1, Qualification of Advanced Nuclear Fuels PWR Design Methodology for Rod Burnups of 62 GWd/MTU, Advanced Nuclear Fuels Corporation, December 1991.
Methodology for:
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.11 XN-NF-85-92(P)(A) Exxon Nuclear Uranium Dioxide/Gadolinia Irradiation Examination and Thermal Conductivity Results, Exxon Nuclear Company, November 1986.
Methodology for:
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.12 ANF-89-151(P)(A), ANF-RELAP Methodology for Pressurized Water Reactors:
Analysis of Non-LOCA Chapter 15 Events, Advanced Nuclear Fuels Corporation, May 1992.
Methodology for:
TS 3.1.1.4 - Moderator Temperature Coefficient (MTC)
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.13 EMF-1961(P)(A) Revision 0, Statistical Setpoint/Transient Methodology for Combustion Engineering Type Reactors, Siemens Power Corporation, July 2000.
Methodology for:
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr TS 3.2.6 - DNB Margin MILLSTONE - UNIT 2            TRM 8.1-6                          LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 3.14 EMF-2310(P)(A), Revision 1, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors, Framatome ANP, May 2004.
Methodology for:
TS 3.1.1.4 - Moderator Temperature Coefficient (MTC)
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.15 EMF-92-153(P)(A), Revision 1, HTP: Departure from Nucleate Boiling Correlation for High Thermal Performance Fuel, Siemens Power Corporation, January 2005.
Methodology for:
TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.16 EMF-92-116(P)(A) Revision 0 and Supplement 1(P)(A), Generic Mechanical Design Criteria for PWR Fuel Designs, Siemens Power Corporation, February 2015.
Methodology for:
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.17 BAW-10240(P)(A), Revision 0, Incorporation of M5' Properties in Framatome ANP Approved Methods, Framatome ANP, Inc., May 2004.
Methodology for:
TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.18 EMF-2103(P)(A), Revision 3, Realistic Large Break LOCA Methodology for Pressurized Water Reactors, AREVA Inc., June 2016.
Methodology for:
TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr MILLSTONE - UNIT 2            TRM 8.1-7                        LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 Note:    Regulating CEAs that are > 176 steps withdrawn are considered fully withdrawn and are acceptable per this figure.
Figure 2.4-1 CEA Insertion Limit vs. THERMAL POWER With Four Reactor Coolant Pumps Operating MILLSTONE - UNIT 2              TRM 8.1-8                      LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 Figure 2.5-1 AXIAL SHAPE INDEX vs.
PERCENT OF ALLOWABLE POWER LEVEL MILLSTONE - UNIT 2      TRM 8.1-9                LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 Note: The FrT limit should be reduced for reactor coolant flow rates  349,200 gpm and < 360,000 gpm (see Section 2.6).
Figure 2.6-1 TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR vs. Allowable RATED THERMAL POWER For Reactor Coolant Flow Rates  360,000 gpm MILLSTONE - UNIT 2              TRM 8.1-10                    LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 Figure 2.6-2 TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR vs. Allowable RATED THERMAL POWER For Reactor Coolant Flow Rates < 360,000 gpm and  354,600 gpm MILLSTONE - UNIT 2          TRM 8.1-11                    LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 Figure 2.6-3 TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR vs. Allowable RATED THERMAL POWER For Reactor Coolant Flow Rates < 354,600 gpm and  349,200 gpm MILLSTONE - UNIT 2          TRM 8.1-12                    LBDCR 20-MP2-003 March 19, 2020
 
TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 Figure 2.7-1 AXIAL SHAPE INDEX Operating Limits With Four Reactor Coolant Pumps Operating MILLSTONE - UNIT 2        TRM 8.1-13                  LBDCR 20-MP2-003 March 19, 2020}}

Latest revision as of 20:40, 18 January 2022

9 to Updated Final Safety Analysis Report, Technical Requirements Manual
ML21201A158
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/24/2021
From:
Dominion Energy Nuclear Connecticut
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21201A164 List:
References
21-211
Download: ML21201A158 (330)


Text

THIS IS A CONTROLLED COPY OF THE UNIT 2 TECHNICAL REQUIREMENTS MANUAL INCLUDING CHANGE NO. 182 UPDATED BY TECHNICAL PUBLISHING

CROSS INDEX - OLD TRM LCOS/SRS TO NEW TRM LCOS/SRS Old TRM Corresponding General TRM Sec LCO/SR Title New TRM section No. Section No.

1.0 Fire Protection System 1.0.A.3.1 Fire detection Instruments LCO 3.3.3.7 3/4.3.3 1.0.A.4.1 Fire detection Instr SR 4.3.3.7.1 1.0.A.4.2 4.3.3.7.2 1.0.A.4.3 4.3.3.7.3 1.0.B.3.1 Fire Supp. Water system LCO 3.7.9.1 3/4.7.9 1.0.B.4.1.a Fire Supp Water Syste SR 4.7.9.1.a 1.0.B.4.1.b 4.7.9.1.b 1.0.B.4.1.c 4.7.9.1.c 1.0.B.4.1.d 4.7.9.1.d 1.0.B.4.1.e.1 4.7.9.1.e.1 1.0.B.4.1.e.2 4.7.9.1.e.2 1.0.B.4.1.e.3 4.7.9.1.e.3 1.0.B.4.1.f 4.7.9.1.f 1.0.C.3.1 Spray/Sprinkler System LCO 3.7.9.2 3/4.7.9 1.0.C.4.1.a Spray/Sprinkler Sys SR 4.7.9.2.a 1.0.C.4.1.b.1.a 4.7.9.2.b.1.a 1.0.C.4.1.b.1.b 4.7.9.2.b.1.b 1.0.C.4.1.b.2 4.7.9.2.b.2 1.0.C.4.1.b.3 4.7.9.2.b.3 1.0.C.4.1.c 4.7.9.2.c 1.0.D.3.1 Fire Hose Stations LCO 3.7.9.3 3/4.7.9 1.0.D.4.1.a Fire Hose Stations SR 4.7.9.3.a 1.0.D.4.1.b.1 4.7.9.3.b.1 1.0.D.4.1.b.2 4.7.9.3.b.2 1.0.D.4.1.c.1 4.7.9.3.c.1 1.0.D.4.1.c.2 4.7.9.3.c.2 1.0.E.3.1 Halon Fire Supp. System LCO 3.7.9.4 3/4.7.9 1.0.E.4.1.a.1.a Halon Fire Supp System SR 4.7.9.4.a.1.a 1.0.E.4.1.a.1.b 4.7.9.4.a.1.b 1.0.E.4.1.a.1.c 4.7.9.4.a.1.c 1.0.E.4.1.b.1 4.7.9.4.b.1 1.0.E.4.1.b.2 4.7.9.4.b.2 1.0.F.3.1 Penetration Fire Barriers LCO 3.7.10 3/4.7.10 1.0.F.4.1.a Penetration Fire Barriers SR 4.7.10.a 1.0.F.4.1.b 4.7.10.b 1.0.F.4.1.c 4.7.10.c 2.0 COLR Appendix 8.1 3.0 Appendix R Safe SD Reqs Addl Reqt -7.1 26 LCO tbls Refer to Add'l Reqt's section following after section 11.0 sub-section .1 - .26 26 SR tbls Page 1

CROSS INDEX - OLD TRM LCOS/SRS TO NEW TRM LCOS/SRS Old TRM Corresponding General TRM Sec LCO/SR Title New TRM section No. Section No.

4.0 Instrumentation LCO 3.3.1.1 4.0Table 3.3-2 RPS Instr Response Time SR 4.3.1.1.3 3/4.3.1 LCO 3.3.2.1 4.0 Table 3.3-5 ESF Response Times SR 4.3.2.1.3 3/4.3.2 RPS Pressurizer High Press 4.2.1 Channels LCO 3.3.1.1.1 3/4.3.1 4.2.3 RPS Pzr High Press SR 4.3.1.1.3 4.3.3 In Core Detectors LCO 3.3.3.2 3/4.3.3 4.3.5.a.1 In Core Detectors SR 4.3.3.2.a.1 4.3.5.a.2 4.3.3.2.a.2 4.3.5.a.3 4.3.3.2.a.3 4.3.5.b 4.3.3.2.b 4.4.3 Seismic Instruments LCO 3.3.3.3 3/4.3.3 4.4.5 Seismic Instruments SR 4.3.3.3 4.5.3 Meteorological Instruments LCO 3.3.3.4 3/4.3.3 4.5.5 Meteorological Instruments SR 4.3.3.4 5.0.1 Ctmt Isolation valves Info LCO 3.6.3.1 3 / 4.6.3 5.0.3 Ctmt Iso Valves SR 4.6.3.1 6.0.1 EDG Fuel Oil Supply Sys. LCO 3.8.1.1.c 3/4.8.1 6.0.3 EDG Fuel Oil Supply Sys. SR 4.8.1.1.3 7.0 PCS Leakage Outside Ctmt Admin Control 6.13 8.0.1 SDC Overpressure Protect LCO 3.4.9.4 3/4.4.9 8.0.3 SDC Overpressure Protect SR 4.4.9.4 9.0 Refueling Operations 3/4.9 9.1.3 SFP Temperature LCO 3.9.3.2 3/4.9.3 9.1.5 SFP Temperature SR 4.9.3.2 9.2.3 Spent Fuel Pool Decay Time LCO 3.9.3.3 3/4.9.3 9.2.5.a SFP Decay Time SR 4.9.3.3.a 9.2.5.b SFP Decay Time SR 4.9.3.3.b 9.3.3 Communications LCO 3.9.5 3/4.9.5 9.3.5 Communications SR 4.9.5 Page 2

CROSS INDEX - OLD TRM LCOS/SRS TO NEW TRM LCOS/SRS Old TRM Corresponding General TRM Sec LCO/SR Title New TRM section No. Section No.

9.4.3 Crane (refuel mach) Oper. LCO 3.9.6 3/4.9.6 9.4.5 Crane (refuel mach) Oper. SR 4.9.6 9.5.1 Cask (SFP) Crane LCO 3.9.7 3/4.9.7 9.5.3 Cask (SFP) Crane SR 4.9.7 10.0.1 SFP Doors LCO 3.9.15 3/4.9.15 10.0.4 SFP Doors SR 4.9.15 11.0.1 Switchgear Ventilation LCO 3.8.2.1B 3/4.8.2 11.0.4 Switchgear Ventilation SR 4.8.2.1B 3.0.1 Table 1 Appendix R SSR LCO's 7.1.1 - 7.1.26(*) 26 LCO tbls 3.0.3 Table 1 Appendix R SSR SR's SR 7.1.1- SR7.1.26(*) 26 SR tbls

  • Refer to separate Appendix R sections (26 total) for LCO & SR breakdowns Table Nos: LCO's are Table 7.1.1-1 thru 7.1.26-1.

Table Nos: SR's are Table 7.1.1-2 thru 7.1.26-2.

Page 3

CROSS INDEX: OLD APPX R TABLE COMPONENTS TO NEW APPX R LCO AND SRS SECTIONS Old SR Tbl 1 Component ID System Description New TRM New TRM TRM Item LCO SR LCO -

3.0.1 - 3.0.3 27 P18A, 18B. 18C Charging Pumps 7.1.1 SR 7.1 .l 3.0.1 - 3.0.3 28 CH-089 Regen HX Outlet Is0 7.1.1 SR 7.1.1 3.0.1 - 3.0.3 29 CH-518,519 Charging to RCS loops 7.1 .I SR 7.1.1 3.0.1 - 3.0.3 30 CH-517 Aux Spray to PZR (RCS) 7.1.1 SR 7.1.1 3.0.1 - 3.0.3 31 CH-429 Charging Pump Header Is0 MOV 7.1 .I SR 7.1 .I 3.0.1 - 3.0.3 32 CH-501 VCT outlet MOV 7.1.1 SR 7.1.1 3.0.1 - 3.0.3 33 CH-504 Chrg Pps suct fm RWST MOV 7.1.1 SR 7.1.1 3.0.1 - 3.0.3 34 CH-192 Chrg Pps suct fm RWST AOV 7.1.1 SR 7.1.1 3.0.1 - 3.0.3 57A LI-206A, 208A Instr, Monitor local BAST level 7.1.2 SR 7.1.2 3.0.1 - 3.0.3 8A MS-265B MS Low Pt Drain -ESF-MSI 7.1.3 SR 7.1.3 3.0.1 - 3.0.3 88 MS-266B MS Low Pt Drain -ESF-MSI 7.1.3 SR 7.1.3 3.0.1 - 3.0.3 50 PT- 1 02B- 1 Instrument, Monitoring Pzr Press 7.1.4 SR 7.1.4 3.0.1 - 3.0.3 54 PT-10238 Instr, Monitor SG Press 7.1.4 SR 7.1.4 3.0.1 - 3.0.3 56 QEXC2PDA. 4PDA Instr, Monitor NI, wide rang 7.1.4 SR 7.1.4 3.0.1 - 3.0.3 56A QEXCl PDA, 3PDA Instr, Monitor NI, wide range 7.1.4 SR 7.1.4 3.0.1 - 3.0.3 58A PT-103,103-1 Instr, Monitor Pzr Press low rng 7.1.4 SR 7.1.4 3.0.1 - 3.0.3 58F LT-103. 1 lox, 110Y Instr, monitor Pzr level, cold, nor 7.1.4 SR 7.1.4 3.0.1 - 3.0.3 58C LT-1114A. 11 148 Instr, monitor SG 1 level,wide mg 7.1.4 SR 7.1.4 3.0.1 - 3.0.3 58B LT-11238 Instr, Monitor SG 2 level, nar mg 7.1.4 SR 7.1.4 3.0.1 - 3.0.3 588 LT-1124A. 1 124B Instr, Monitor SG 2 level,wide rng 7.1.4 SR 7.1.4 3.0.1 - 3.0.3 51 TE-121X Instr, Monitoring hot leg temp 7.1.5 SR 7.1.5 3.0.1 - 3.0.3 52 TE-125 Instr. Monitoring cold leg temp 7.1.5 SR 7.1.5 3.0.1 - 3.0.3 51A TE-111X Instr, Monitoring hot leg temp 7.1.5 SR 7.1.5 3.0.1 - 3.0.3 52A TE-115 Instr, Monitoring cold leg temp 7.1.5 SR 7.1.5 3.0.1 - 3.0.3 58 B FT-5278A. 5278B Instr, Monitor AFW flow to SG 2 7.1.5 SR 7.1.5 3.0.1 - 3.0.3 58C FT-5277A. 52778 Instr, Monitor AFW flow to SG 1 7.1.5 SR 7.1.5 3.0.1 - 3.0.3 69A Bus 25A (Hi) 6900 V breakers for RCPs 7.1.6 SR 7.1.6 3.0.1 - 3.0.3 69B Bus 25B (H2) 6900 V breakers for RCPs 7.1.6 SR 7.1.6 3.0.1 - 3.0.3 21 SI-306 SDC HX bypass 7.1.7 SR 7.1.7 3.0.1 - 3.0.3 22 SI-651,652 SDC suct MOVs 7.1.7 SR 7.1.7 3.0.1 - 3.0.3 580 TE-351 X, 351 Y SDC sup, ret temp monitors 7.1.7 SR 7.1.7 3.0.1 - 3.0.3 58G TE-303X, 303Y SDC HXs outlet temps indication 7.1.7 SR 7.1.7 3.0.1 - 3.0.3 19 RC-402/ 404 RCS- PORVS 7.1.8 SR 7.1.8 3.0.1 - 3.0.3 26D SI-614,624,634,644 SIT Outlet MOVs 7.1.9 SR 7.1.9 3.0.1 - 3.0.3 26E SI-613,623,633,643 SIT Nitrogen vent valves 7.1.9 SR 7.1.9 3.0.1 - 3.0.3 20 SI-615,625,635,645 LPSl flow MOVs 7.1.10 SR 7.1.10 3.0.1 - 3.0.3 24 Sl-657 SDC HX outlet 7.1.10 SR 7.1.10 3.0.1 - 3.0.3 23A Sl-449.450 SDC min flow alt 7.1.10 SR 7.1.10 3.0.1 - 3.0.3 26A1 SI-432.444 LPSl suct fm RWST 7.1.10 SR 7.1.10 3.0.1 - 3.0.3 26A2 SI440,441 LPSl suct fm RCS 7.1.10 SR 7.1 .I0 3.0.1 - 3.0.3 26B S1452,453 LPSl disch to SDC HX 7.1.10 SR 7.1.10 3.0.1 - 3.0.3 26C Sl-456,457 SDC HX outlet 7.1.10 SR 7.1.10 3.0.1 - 3.0.3 36 CS-13.1B RSWT outlet MOV 7.1.11 SR7.1.11 3.0.1 - 3.0.3 35 CH-508,509 Boric Acid Grav feed MOVs 7.1.12 SR 7.1.12 3.0.1 - 3.0.3 58E TE-8108 Ctmt Ambient Temp monitoring 7.1.13 SR 7.1.13 3.0.1 - 3.0.3 25A CS-4A, 4B Ctmt Spray Stop Valves 7.1.14 SR 7.1.14 Page 1

CROSS INDEX: OLD APPX R TABLE COMPONENTS TO NEW APPX R LCO AND SRS SECTIONS Old SR Tbl 1 Component ID System Description New TRM New TRM TRM Item LCO SR LCO -

3.0.1 - 3.0.3 1 SV-4188 AFW Turbine 7.1.15 SR 7.1.15 3.0.1 - 3.0.3 2 P4 & H-21 AFW Turbine 7.1.15 SR 7.1.15 3.0.1 - 3.0.3 7 MS-202 AFW Turbine steam stop MOV 7.1.15 SR 7.1.15 3.0.1 - 3.0.3 8 P9A, P9B AFW pumps, motor driven 7.1.15 SR 7.1.15 3.0.1 - 3.0.3 10 FW-44 AFW P4 Discharge Is0 MOV 7.1.15 SR 7.1.15 3.0.1 - 3.0.3 12 FW-43N43B AFW flow control valves 7.1.15 SR 7.1.15 3.0.1 - 3.0.3 55 LT-5282 Instr, Monitor CST level 7.1.16 SR 7.1.16 3.0.1 - 3.0.3 55A LIS-5489 Instr, Local CST level Ind 7.1.16 SR 7.1.16 3.0.1 - 3.0.3 3 MS-64N64 B MSlVs 7.1.17 SR 7.1.1 7

3.0.1 - 3.0.3 4 MS-65N65B MSlV Bypass 7.1.17 SR 7.1.17 3.0.1 - 3.0.3 5 MS-1 SON1 90B AOVs 7.1.18 SR7.1 .I8 3.0.1 - 3.0.3 6 MS-220N220B SG Blowdown Valves 7.1.19 SR 7.1.19 3.0.1 - 3.0.3 39 RB-13.1A, 13.18 RBCCW out of SDC HXs 7.1.20 SR 7.1.20 3.0.1 - 3.0.3 40 RB-21 lA, 21 1B RBCCW Pp A Inlet AOVs 7.1.20 SR 7.1 20 3.0.1 - 3.0.3 41 RB-21 lC, 21 1D RBCCW Pp 6 Inlet AOV's 7.1 20 SR 7.1.20 3.0.1 - 3.0.3 42 RB-211E,211F RBCCW Pp C Inlet AOVs 7.1 -20 SR 7.1.20 3.0.1 - 3.0.3 43 RB-4.1A. 4.18 RBCCW Hx A outlet AOVs 7.1 -20 SR 7.1.20 3.0.1 - 3.0.3 44 RB4.1C. 4.10 RBCCW Hx B outlet AOVs 7.1.20 SR 7.1.20 3.0.1 - 3.0.3 45 RB-4.1 E, 4.1 F RBCCW Hx C outlet AOVs 7.1.20 SR 7.1.20 3.0.1 - 3.0.3 46 PllA, P l l B , P l l C RBCCW pumps 7.1.20 SR 7.1.20 3.0.1 - 3.0.3 47 P5A, P5C, LlA, L1C RBCCW pp disch x-tie AOVs 7.1.20 SR 7.1.20 3.0.1 - 3.0.3 13 RB-251A. 251B SW pumps 8 Strainers 7.1.21 SR 7.1.21 3.0.1 - 3.0.3 14 SW-97AI 978 SW Disch hdr x-tie valves 7.1.21 SR 7.1.21 3.0.1 - 3.0.3 15 SW-3.1N 3.16 SW inlet to RBCCW HXs 7.1.21 SR 7.1.21 3.0.1 - 3.0.3 14A SW-2A. 2B, 2C SW pump disch valves 7.1.21 SR 7.1.21 3.0.1 - 3.0.3 16A SW-9N 9B/ 9C SW outlet fm RBCCW HXs 7.1.21 SR 7.1.21 3.0.1 - 3.0.3 18A SW-5N 5BI 5C SW inlet to TBCCW HXs 7.1.21 SR 7.1.21 3.0.1 - 3.0.3 188 SW-12BI 12C SW is0 to EDG A & B 7.1.21 SR 7.1.21 3.0.1 - 3.0.3 18C SW-296 Drain on SW to EDG B 7.1.21 SR 7.1.21 3.0.1 - 3.0.3 62 SBO DG Alternate AC diesel gen 7.1.22 SR 7.1.22 3.0.1 - 3.0.3 59 Bus 24C (A3) 4160 volt switchgear 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 60 Bus 240 (A4) 4160 volt switchgear 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 61 Bus 24E (A5) 4160 volt switchgear 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 63 Bus 22E (805) 480 volt switchgear 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 64 Bus 22F (B06) 480 volt switchgear 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 65 851 (mcc-22-1 E) MCC B51 7.1 2 3 SR 7.1.23 3.0.1 - 3.0.3 66 852 (mcc-22-2E) MCC B52 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 67 B61 (mcc-22-1 F) MCC B61 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 68 862 (mcc-22-2F) MCC B62 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 70 ELUs Em. Light Units 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 62A Bus 24A (Al) 4160 volt switchgear 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 62B Bus 248 (A2) 4160 volt switchgear 7.1 :23 SR 7.1.23 3.0.1 - 3.0.3 62C Bus 22A (BOl) 480 volt load center 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 62D Bus 228 (802) 480 volt load center 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 69K VA 20 120 VAC panel VIAC-2 7.1.23 SR 7.1.23 3.0.1 - 3.0.3 69 DC3 201 C swing batt charger 7.1 24 SR 7.1.24 3.0.1 - 3.0.3 69C Bus DO1 125 VDC Bus 201A 7.1 24 SR 7.1.24 Page 2

CROSS INDEX: OLD APPX R TABLE COMPONENTS TO NEW APPX R LCO AND SRS SECTIONS Old SR Tbl 1 Component ID System Description New TRM New TRM TRM Item LCO SR LCO -

3.0.1 - 3.0.3 69D Bus DO2 125 VDC Bus 201 B 7.1.24 SR 7.1 24 3.0.1 - 3.0.3 69E DV 10 125 VDC panel 201A-1V 7.1.24 SR 7.1 2 4

3.0.1 - 3.0.3 69F DV 20 125 VDC panel 201B-1V 7.1 24 SR 7.1.24 3.0.1 - 3.0.3 69G D11 125 VDC panel 201A-1 7.1.24 SR 7.1 24 3.0.1 - 3.0.3 69H Dl2 125 VDC panel 201A-2 7.1.24 SR 7.1.24 3.0.1 - 3.0.3 69 I D2 1 125 VDC panel 201 B-1 7.1.24 SR 7.1.24 3.0.1 - 3.0.3 69J D22 125 VDC panel 201 B-2 7.1.24 SR 7.1.24 3.0.1 - 3.0.3 71 FIRE-258, 259, 559, Fire Supp system 7.1.25 SR 7.1.25 560 3.0.1 - 3.0.3 18D Fire Suppression Alt(Fire Pro) cooling to EDGs 7.1.25 SR 7.1.25 sys 3.0.1 - 3.0.3 72 Radio Comm Sys Radio Communication system 7.1 2 6 SR 7.1.26 3.0.1 - 3.0.3 74 HSD Storage Box Box Inventory items available 7.1 2 6 SR 7.1.26 3.0.1 - 3.0.3 75 FSD Storage Box Box Inventory items available 7.1.26 SR 7.1.26 3.0.1 - 3.0.3 76 CSD Repair Material Materials available for repairs 7.1.26 SR 7.1.26 3.0.1 - 3.0.3 81 F156A, B, C, D fans-East &West DC rooms 7.1.26 SR 7.1.26 3.0.1 - 3.0.3 82 F157A. B, C, D fans-East & West 480 V rooms 7.1 2 6 SR 7.1.26 3.0.1 - 3.0.3 83 Bottle 3A, 3B,3C bottles and valves 7.1 2 6 SR 7.1 26 Page 3

Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section- Approval TR - Title Page No. Date 3 Pages Cross Index - Old TRM LCOs/SRs to New TRM TRs/TSRs -

3 Pages Cross Index - Old Appendix R Table Components to New Appendix R -

TR and TSR Sections 11 Pages List of Effective Pages Per Distribution Memo 1 page Memo; C Schwartz to Copy Holders, re: Reissue of Unit 2 TRM -

1.0 - 1 Definitions 10/05/2009 1.0 - 2 10/05/2009 2.0/ - Safety Limits (No Content) -

3/4 0-1 TECHNICAL REQUIREMENT/TECHNICAL SURVEILLANCE 10/05/2009 REQUIREMENT Sections 3/4 0-2 10/05/2009 3/4 0-3 10/05/2009 3/4 0-4 10/05/2009 3/4 0-5 10/05/2009 3/4 0-6 10/05/2009 3/4 0-7 10/05/2009 3/4 0-8 10/05/2009 10/05/2009 3/4.1 - Reactivity Control System -

3/4 1-1 3/4.1.2.1 - Boration Systems - Flow Paths - Shutdown 10/05/2009 3/4 1-2 10/05/2009 3/4 1-3 3/4.1.2.2 - Flow Paths - Operating 10/05/2009 3/4 1-4 03/29/2017 3/4 1-5 03/29/2017 3/4 1-6 3/4.1.2.3 - Charging Pump - Shutdown 10/05/2009 3/4 1-7 10/05/2009 3/4 1-8 3/4.1.2.4 - Charging Pump - Operating 03/29/2017 3/4 1-9 03/29/2017 3/4 1-10 3/4.1.2.5 - Boric Acid Pumps - Shutdown 10/05/2009 Millstone Unit 2 TRM EP- 1 LBDCR 16-MP2-014 March 29, 2017

Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section- Approval TR - Title Page No. Date 3/4 1-11 10/05/2009 3/4 1-12 3/4.1.2.6 - Boric Acid Pumps - Operating 03/29/2017 3/4 1-13 03/29/2017 3/4 1-14 3/4.1.2.7 - Borated Water Sources - Shutdown 10/05/2009 3/4 1-15 10/05/2009 3/4 1-16 10/05/2009 3/4 1-17 3/4.1.2.8 - Borated Water Sources - Operating 10/05/2009 3/4 1-18 09/24/2014 3/4 1-19 10/05/2009 3/4 1-20 Figure 3.1 Minimum Volume vs Stored BAST Concentration 05/15/2009 Figure 3/4.3- Instrumentation -

3/4 3-1 3/4.3.1.1 - Reactor Protective Instrumentation 10/05/2009 3/4 3-2 Table 3.3-2 10/05/2009 3/4 3-3 3/4.3.1.1.1 - RPS Pressurizer High Pressure Channels 10/05/2009 3/4 3-4 10/05/2009 3/4 3-5 3/4.3.2.1 - ESFAS Equipment Response Times 10/05/2009 3/4 3-6 Table 3.3-5 12/06/2001 3/4 3-7 09/19/2002 3/4 3-8 12/06/2001 3/4 3-9 Table 3.3-5A 10/05/2009 3/4 3-10 Table 3.3-5B 10/05/2009 3/4 3-11 Table 3.3-5C 10/05/2009 3/4 3-12 10/05/2009 3/4 3-13 Table 3.3-5D 10/05/2009 3/4 3-14 10/05/2009 3/4 3-15 Table 3.3-5E 10/05/2009 3/4 3-16 12/06/2001 3/4 3-17 Table 3.3-5F 10/05/2009 3/4 3-18 Table 3.3-5G 10/05/2009 3/4 3-19 Table 3.3-5H 06/03/2011 3/4 3-20 Table 3.3-5I 10/05/2009 3/4 3-21 Table 3.3-5J - Deleted 09/19/2002 3/4 3-22 Table 3.3-5K 10/05/2009 3/4 3-23 Table 3.3-5L 10/05/2009 Millstone Unit 2 TRM EP- 2 LBDCR 16-MP2-014 March 29, 2017

Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section- Approval TR - Title Page No. Date 3/4 3-24 Table 3.3-5M 05/24/2001 3/4 3-25 12/06/2001 3/4 3-26 12/06/2001 3/4 3-27 12/06/2001 3/4 3-28 12/06/2001 3/4 3-29 10/05/2009 3/4 3-30 12/06/2001 3/4 3-31 10/05/2009 3/4 3-32 12/06/2001 3/4 3-33 12/06/2001 3/4 3-34 12/06/2001 3/4 3-35 10/05/2009 3/4 3-36 12/06/2001 3/4 3-37 12/06/2001 3/4 3-38 10/05/2009 3/4 3-39 10/05/2009 3/4 3-40 10/05/2009 3/4 3-41 3/4.3.3.2 - Incore Detector Instrumentation 11/29/2018 3/4 3-42 11/29/2018 3/4 3-42a 11/29/2018 3/4 3-43 3/4.3.3.3 - Seismic Instrumentation 01/12/2010 3/4 3-44 10/05/2009 3/4 3-45 Table 3.3-7 10/05/2009 3/4 3-46 Table 4.3-4 10/05/2009 3/4 3-47 3/4.3.3.4 Meteorological Instrumentation 01/12/2010 3/4 3-48 10/05/2009 3/4 3-49 Table 3.3-8 10/05/2009 3/4 3-50 Table 4.3-5 10/05/2009 3/4 3-51 3/4.3.3.7 - Fire Detection Instrumentation 10/05/2009 3/4 3-52 10/05/2009 3/4 3-53 10/05/2009 3/4 3-54 Table 3.3-10 10/05/2009 3/4 3-55 10/05/2009 3/4 3-56 10/05/2009 3/4 3-57 10/05/2009 Millstone Unit 2 TRM EP- 3 LBDCR 18-MP2-007, November 29, 2018

Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section- Approval TR - Title Page No. Date 3/4 3-58 3/4.3.3.8 - Accident Radiation Monitoring Instrumentation 10/05/2009 3/4 3-59 10/05/2009 3/4.4 - Reactor Coolant System -

3/4 4-1 3/4.4.7 - Chemistry 10/05/2009 3/4 4-2 10/05/2009 3/4 4-3 Table 3.4-1 06/17/2002 3/4 4-4 Table 4.4-1 10/05/2009 3/4 4-5 3/4.4.9 - Pressure/Temperature Limits 10/05/2009 3/4 4-6 Table 4.4-3 08/04/2005 3/4 4-7 08/04/2005 3/4 4-8 3/4.4.9.2 - Pressurizer 10/05/2009 3/4 4-9 10/05/2009 3/4 4-10 3/4.4.9.4 - Shutdown Cooling Overpressure Protection System 10/05/2009 3/4 4-11 10/05/2009 3/4 4-12 3/4.4.10 - Structural Integrity - ASME Code Class 1, 2, 3 10/05/2009 Components 3/4 4-13 10/05/2009 3/4 4-14 10/05/2009 3/4 4-15 3/4.4.11 - Reactor Coolant System Vents 01/12/2010 3/4 4-16 10/05/2009 3/4.5 - Emergency Core Cooling Systems -

3/4 5-1 3/4.5.2 - ECCS Subsystems - Tavg 300°F 10/05/2009 3/4 5-2 10/05/2009 3/4.6 - Containment Systems -

3/4 6-1 3/4.6.3 - Containment Isolation Valves 10/05/2009 3/4 6-2 09/11/2003 3/4 6-3 Table 3.6-1 09/11/2003 3/4 6-4 10/16/2013 3/4 6-5 09/11/2003 3/4 6-6 09/11/2003 3/4 6-7 09/11/2003 3/4 6-8 10/05/2009 3/4 6-9 10/05/2009 Millstone Unit 2 TRM EP- 4 LBDCR 13-MP2-015 October 16, 2013

Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section- Approval TR - Title Page No. Date 3/4 6-10 10/05/2009 3/4 6-11 09/11/2003 3/4 6-12 3/4.6.4 - Combustible Gas Control 10/05/2009 3/4 6-13 10/05/2009 3/4 6-14 08/04/2005 3/4.7 - Plant Systems -

3/4 7-1 3/4.7.2 - Steam Generator Pressure/Temperature Limitation 10/05/2009 3/4 7-2 02/27/2003 3/4 7-3 3/4.7.5 - Flood Level 10/05/2009 3/4 7-4 10/05/2009 3/4 7-5 Figure 3.7 Critical Area 02/27/2003 3/4 7-6 10/05/2009 3/4 7-7 3/4.7.7 - Sealed Source Contamination 10/05/2009 3/4 7-8 10/05/2009 3/4 7-9 10/05/2009 3/4 7-10 3/4.7.9 - Fire Protection Systems 02/02/2010 3/4.7.9.1 - Fire Suppression Water System 3/4 7-11 02/02/2010 3/4 7-12 02/02/2010 3/4 7-12a 02/02/2010 3/4 7-13 3/4.7.9.2 - Fire Protection Spray/Sprinkler Systems 10/05/2009 3/4 7-14 10/05/2009 3/4 7-15 10/05/2009 3/4 7-16 3/4.7.9.3 - Fire Protection Hose Stations 10/05/2009 3/4 7-17 10/05/2009 3/4 7-18 Table 4.7-5 12/06/2001 3/4 7-19 3/4.7.9.4 - Fire Protection Halon Fire Suppression System 10/05/2009 3/4 7-20 10/05/2009 3/4 7-21 10/05/2009 3/4 7-22 3/4.7.10 - Penetration Fire Barriers 10/05/2009 3/4 7-23 10/05/2009 3/4 7-24 Table 7-1 09/24/2014 3/4 7-25 08/08/2002 3/4 7-26 08/08/2002 Millstone Unit 2 TRM EP- 5 LBDCR 14-MP2-015 September 24, 2014

Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section- Approval TR - Title Page No. Date 3/4 7-27 11/2/2010 3/4 7-28 10/05/2009 3/4.8 - Electrical Power Systems -

3/4 8-1 3/4.8.1.1.c -Emergency Diesel Generator Fuel Oil Supply System 02/27/2020 3/4 8-2 04/02/2020 3/4 8-3 02/27/2020 3/4 8-4 Tables 3.8.1.1.c-1 and 3.8.1.1.c-2 04/02/2020 3/4 8-5 02/27/2020 3/4 8-6 02/27/2020 3/4 8-7 3.8.1.2 - Offsite Line Power Sources 03/23/2017 3/4 8-8 03/23/2017 3/4 8-9 03/23/2017 3/4 8-10 3/4.8.2.1 - Electrical Switchgear Room Ventilation Systems 06/02/2016 3/4 8-11 06/02/2016 3/4 8-12 06/02/2016 3/4 8-13 06/02/0216 3/4 8-14 08/24/2010 3/4 8-15 06/02/2016 3/4.9 - REFUELING Operations -

3/4 9-1 3/4.9.3.2 SPENT FUEL POOL TEMPERATURE 10/05/2009 3/4 9-2 3/4.9.3.3 SPENT FUEL POOL DECAY TIME 03/16/2017 3/4 9-3 03/16/2017 3/4 9-4 3/4.9.5 - Communications 10/05/2009 3/4 9-5 3/4.9.6 - Containment Building REFUELING Machine 10/03/2012 3/4 9-6 10/03/2012 3/4 9-7 3/4.9.7 - Spent Fuel Pool Cask Crane Travel Limits 02/01/2011 3/4 9-8 10/05/2009 5.0 - Design Features; 5.0 (No Content) -

6.0 - Administrative Controls -

6.0 - 1 6.2.2 - Fire Protection Administrative Requirements 10/05/2009 6.0 - 2 6.13 - System Integrity Requirements 10/05/2009 Millstone Unit 2 TRM EP- 6 LBDCR 20-MP2-002, February 27, 2020 LBDCR 20-MP2-005, April 02, 2020

Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section- Approval TR - Title Page No. Date 6.0 - 3 10/05/2009 6.0 - 4 12/06/2001 7.1 - Appendix R Safe Shutdown Requirements -

7.1 - 1 7.1 Appendix R Safe Shutdown Requirement Components: TR, TSR, 05/23/2017 Admin Requirements, Bases, Index 7.1-1a 03/18/2014 7.1 - 2 05/10/2011 7.1 - 3 05/23/2017 7.1-3a 05/23/2017 7.1 - 4 02/02/2010 7.1 - 5 11/26/2013 7.1 - 5a 11/26/2013 7.1 - 5b 11/26/2013 7.1 - 6 INDEX - Appendix R Safe Shutdown Technical Requirements 02/29/2016 7.1 - 7 02/29/2016 7.1 - 8 02/29/2016 7.1 - 9 7.1.1 - Charging Pumps 09/24/2014 7.1 - 10 Table 7.1.1-1 11/26/2013 7.1 - 11 11/26/2013 7.1 - 12 11/26/2013 7.1 - 13 Table 7.1.1-2 11/26/2013 7.1 - 14 11/26/2013 7.1 - 15 7.1.2 - Boric Acid Storage Tanks 09/24/2014 7.1 - 16 Table 7.1.2-1 10/05/2009 7.1 - 17 Table 7.1.2-2 10/05/2009 7.1 - 18 7.1.3 - ESFAS Instrumentation 09/24/2014 7.1 - 19 Table 7.1.3-1 10/05/2009 7.1 - 20 Table 7.1.3-2 10/05/2009 7.1 - 21 7.1.4 - Remote Shutdown Instruments 10/05/2009 7.1 - 22 Table 7.1.4-1 04/19/2011 7.1 - 23 04/19/2011 7.1 - 24 04/19/2011 7.1 - 25 Table 7.1.4-2 04/19/2011 7.1 - 26 7.1.5 - Accident Monitoring Instruments 10/05/2009 7.1 - 27 Table 7.1.5-1 10/05/2009 Millstone Unit 2 TRM EP- 7 LBDCR 17-MP2-007 May 23, 2017

Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section- Approval TR - Title Page No. Date 7.1 - 28 10/05/2009 7.1 - 29 Table 7.1.5-2 10/05/2009 7.1 - 30 7.1.6 - Reactor Coolant Pump Circuit Breakers - 6.9 kV Bus 02/29/2016 7.1 - 31 Table 7.1.6-1 10/05/2009 7.1 - 32 Table 7.1.6-2 03/30/2010 7.1 - 33 7.1.7 - Shutdown Cooling Components, HOT SHUTDOWN 02/29/2016 7.1 - 34 Table 7.1.7-1 10/05/2009 7.1 - 35 04/19/2011 7.1 - 36 Table 7.1.7-2 10/05/2009 7.1 - 37 7.1.8 - Reactor Coolant System Relief Valves - PORVs 10/05/2009 7.1 - 38 Table 7.1.8-1 10/05/2009 7.1 - 39 Table 7.1.8-2 10/05/2009 7.1 - 40 7.1.9 - Safety Injection Tank Isolation Valves 02/29/2016 7.1 - 41 Table 7.1.9-1 10/05/2009 7.1 - 42 Table 7.1.9-2 10/05/2009 7.1 - 43 7.1.10 - ECCS Low Pressure Safety Injection Valves 02/29/2016 7.1 - 44 Table 7.1.10-1 10/05/2009 7.1 - 45 10/05/2009 7.1 - 46 Table 7.1.10-2 10/05/2009 7.1 - 47 7.1.11 - ECCS - Refueling Water Storage Tank Outlet Valve 09/24/2014 7.1 - 48 Table 7.1.11-1 11/26/2013 7.1 - 49 Table 7.1.11-2 10/05/2009 7.1 - 50 7.1.12 - Reactivity Control System Flow Paths - Operating 09/24/2014 7.1 - 51 Table 7.1.12-1 10/05/2009 7.1 - 52 Table 7.1.12-2 10/05/2009 7.1 - 53 7.1.13 - Containment Air Temperature Indication 10/05/2009 7.1 - 54 Table 7.1.13-1 10/05/2009 7.1 - 55 Table 7.1.13-2 10/05/2009 7.1 - 56 7.1.14 - Containment Spray and Cooling Systems 09/24/2014 7.1 - 57 Table 7.1.14-1 09/24/2014 7.1 - 58 Table 7.1.14-2 09/24/2014 7.1 - 59 7.1.15 - Auxiliary Feedwater Pumps Components 10/05/2009 7.1 - 60 Table 7.1.15-1 11/26/2013 7.1 - 61 11/26/2013 Millstone Unit 2 TRM EP- 8 LBDCR 16-MP2-003 February 29, 2016

Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section- Approval TR - Title Page No. Date 7.1 - 62 Table 7.1.15-2 10/05/2009 7.1 - 63 7.1.16 - Condensate Storage Tank Level Indication Components 10/05/2009 7.1 - 64 Table 7.1.16-1 10/05/2009 7.1 - 65 Table 7.1.16-2 09/24/2014 7.1 - 66 7.1.17 - Main Steam Isolation & Bypass Valves 10/05/2009 7.1 - 67 Table 7.1.17-1 10/05/2009 7.1 - 68 Table 7.1.17-2 10/05/2009 7.1 - 69 7.1.18 - Atmospheric Dump (Steam) Valves 10/05/2009 7.1 - 70 Table 7.1.18-1 10/05/2009 7.1 - 71 Table 7.1.18-2 10/05/2009 7.1 - 72 7.1.19 - Steam Generator Blowdown Isolation Valves 02/29/2016 7.1 - 73 Table 7.1.19-1 10/05/2009 7.1 - 74 Table 7.1.19-2 10/05/2009 7.1 - 75 7.1.20 - Reactor Building Closed Cooling Water (RBCCW) System 10/05/2009 Components 7.1 - 76 Table 7.1.20-1 11/26/2013 7.1 - 77 11/26/2013 7.1 - 78 11/26/2013 7.1 - 79 11/26/2013 7.1 - 79a 11/26/2013 7.1 - 80 Table 7.1.20-2 10/05/2009 7.1 - 81 7.1.21 - Service Water System Components 10/05/2009 7.1 - 82 Table 7.1.21-1 07/29/2014 7.1 - 83 11/26/2013 7.1 - 84 11/26/2013 7.1 - 84a 11/26/2013 7.1 - 85 Table 7.1.21-2 10/05/2009 7.1 - 86 7.1.22 - Electrical Power AC Sources 09/24/2014 7.1 - 87 Table 7.1.22-1 10/05/2009 7.1 - 88 Table 7.1.22-2 03/30/2010 7.1 - 89 7.1.23- Onsite Electrical Power AC Distribution System Components 10/05/2009 7.1 - 90 Table 7.1.23-1 10/05/2009 7.1 - 91 10/05/2009 7.1 - 92 10/05/2009 7.1 - 93 05/31/2012 7.1 - 94 03/30/2010 Millstone Unit 2 TRM EP- 9 LBDCR 16-MP2-003 February 29, 2016

Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section- Approval TR - Title Page No. Date 7.1 - 95 01/07/2010 7.1 - 96 Table 7.1.23-2 05/31/2012 7.1 - 97 05/31/2012 7.1 - 98 7.1.24 - Electrical Power DC Distribution System Components 10/05/2009 7.1 - 99 Table 7.1.24-1 10/05/2009 7.1 - 100 10/05/2009 7.1 - 101 10/05/2009 7.1 - 102 05/27/2010 7.1 - 103 Table 7.1.24-2 03/30/2010 7.1 - 104 7.1.25 - Fire Protection Miscellaneous System Components 10/05/2009 7.1 - 105 Table 7.1.25-1 11/26/2013 7.1 - 106 Table 7.1.25-2 11/26/2013 7.1 - 107 7.1.26 - Support Equipment, Appendix R Components 10/05/2009 7.1 - 108 Table 7.1.26-1 09/13/2019 7.1 - 109 03/18/2014 7.1 - 110 03/18/2014 7.1 - 111 03/18/2014 7.1 - 112 Table 7.1.26-2 03/18/2014 7.1 - 113 7.1.27 - A. C. Sources Operating 03/18/2014 7.1 - 114 Table 7.1.27-1 03/18/2014 Appendix 8.1 Core Operating Limits Report, Cycle 27 -

8.1 - 1 8.1 - COLR 03/19/2020 8.1 - 2 03/19/2020 8.1 - 3 03/19/2020 8.1 - 4 03/19/2020 8.1 - 5 03/19/2020 8.1 - 6 03/19/2020 8.1 - 7 03/19/2020 8.1 - 8 Figure 2.4 CEA Insertion Limit vs. THERMAL POWER With Four 03/19/2020 Reactor Coolant Pumps Operating 8.1 - 9 Figure 2.5 AXIAL SHAPE INDEX vs. PERCENT OF 03/19/2020 ALLOWABLE POWER LEVEL 8.1 - 10 Figure 2.6 TOTAL UNRODDED INTEGRATED RADIAL 03/19/2020 PEAKING FACTOR vs. Allowable RATED THERMAL POWER For Reactor Coolant Flow Rates 360,000 gpm Millstone Unit 2 TRM EP- 10 LBDCR 20-MP2-003 March 19, 2020

Millstone Unit 2 Technical Requirements Manual List of Effective Pages Section- Approval TR - Title Page No. Date 8.1 - 11 Figure 2.6 TOTAL UNRODDED INTEGRATED RADIAL 03/19/2020 PEAKING FACTOR vs. Allowable RATED THERMAL POWER For Reactor Coolant Flow Rates < 360,000 gpm and 354,600 gpm 8.1 - 12 Figure 2.6 TOTAL UNRODDED INTEGRATED RADIAL 03/19/2020 PEAKING FACTOR vs. Allowable RATED THERMAL POWER For Reactor Coolant Flow Rates < 354,600 gpm and 349,200 gpm 8.1 - 13 Figure 2.7 AXIAL SHAPE INDEX Operating Limits With Four 03/19/2020 Reactor Coolant Pumps Operating Millstone Unit 2 TRM EP- 11 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS 1.0 DEFINITIONS The DEFINED TERMS appear in capitalized type throughout these TECHNICAL REQUIREMENTS. These capitalized terms are defined in Section 1.0 of the Technical Specifications.

In addition to the terms defined in the Technical Specifications, the following defined terms and acronyms appear in the TECHNICAL REQUIREMENTS. These defined terms and acronyms also appear in capitalized type throughout the TECHNICAL REQUIREMENTS.

CURRENT LICENSING BASIS 1.1 The CURRENT LICENSING BASIS (CLB) is the set of NRC requirements applicable to a specific plant, plus a licensee's docketed and currently effective written commitments for ensuring compliance with, and operation within, applicable NRC requirements and the plant-specific DESIGN BASIS, including all modifications and additions to such commitments over the life of the facility operating license.

The set of NRC requirements applicable to a specific plant CLB include:

a. NRC regulations in 10 CFR Parts 2, 19, 20, 21, 26, 30, 40, 50, 51, 54, 55, 70, 72, 73, and 100 and appendices thereto
b. Commission orders
c. license conditions
d. exemptions
e. technical specifications (TSs)
f. plant-specific DESIGN BASIS information defined in 10 CFR 50.2 and documented in the most recent Updated Final Safety Analysis Report (UFSAR) (as required by 10 CFR 50.71)
g. licensee commitments remaining in effect that were made in docketed licensing correspondence (such as licensee responses to NRC bulletins, Licensee Event Reports, generic letters, and enforcement actions)
h. licensee commitments documented in NRC safety evaluations DESIGN BASIS 1.2 Design bases information, defined by 10 CFR 50.2, is documented in the UFSAR as required by 10 CFR 50.71. The DESIGN BASIS of safety-related structures, systems, and components (SSCs) is established initially during the original plant licensing and relates primarily to the accident prevention or mitigation functions of safety-related SSCs. The DESIGN BASIS of a safety-related SSC is a subset of the CLB.

MILLSTONE - UNIT 2 TRM 1.0 - 1 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS FUNCTIONAL - FUNCTIONALITY 1.3 FUNCTIONALITY is an attribute of SSCs that is not controlled by TSs. An SSC is FUNCTIONAL or has FUNCTIONALITY when it is capable of performing its SPECIFIED FUNCTION, as set forth in the CLB. FUNCTIONALITY does not apply to SPECIFIED SAFETY FUNCTIONS, but does apply to the ability of non-TS SSCs to perform other SPECIFIED FUNCTIONS that have a necessary support function.

SPECIFIED FUNCTION/SPECIFIED SAFETY FUNCTION 1.4 The SPECIFIED FUNCTION(S) of the system, subsystem, train, component or device (hereafter referred to as system) is that SPECIFIED SAFETY FUNCTION(S) in the CLB for the facility. In addition to providing the SPECIFIED SAFETY FUNCTION, a system is expected to perform as designed, tested and maintained. When system capability is degraded to a point where it cannot perform with reasonable expectation or reliability, the system should be judged inoperable/nonfunctional, even if at this instantaneous point in time the system could provide the SPECIFIED SAFETY FUNCTION.

TECHNICAL REQUIREMENT 1.5 A TECHNICAL REQUIREMENT represents the lowest functional capability or performance level allowed for the specified equipment or parameter.

TECHNICAL SURVEILLANCE REQUIREMENT 1.6 TECHNICAL SURVEILLANCE REQUIREMENTS are requirements related to test, calibration, or inspection to verify that the associated TECHNICAL REQUIREMENTS are met.

MILLSTONE - UNIT 2 TRM 1.0 - 2 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY For the purpose of the TRs, the Technical Requirements Manual (TRM) terms specified below are considered similar to the listed Technical Specification terms:

Technical Specification Term Technical Requirements Manual Term Technical Specifications (TS) Technical Requirements Manual (TRM)

Limiting Condition for Operation (LCO) TECHNICAL REQUIREMENT (TR)

Surveillance Requirement (SR) TECHNICAL SURVEILLANCE REQUIREMENT (TSR)

Specification Requirement TECHNICAL REQUIRMENT TR 3.0.1 Compliance with the TRs contained in the succeeding requirements is required during the OPERATIONAL MODES or other conditions specified therein; except that upon failure to meet the TR, the associated ACTION requirements shall be met.

TR 3.0.2 Noncompliance with a requirement shall exist when the requirements of the TR and associated ACTION requirements are not met within the specified time intervals, except as provided in TR 3.0.6. If the TR is restored prior to expiration of the specified time intervals, completion of the ACTION requirements is not required.

TR 3.0.3 When a TR is not met, except as provided in the associated ACTION requirements, the unit shall be placed in a safe condition as determined by the Operational Decision Making process. Corrective action shall be initiated in accordance with the corrective action program.

TR 3.0.4 Entry into an OPERATIONAL MODE or specified condition may be made in accordance with ACTION requirements when conformance to them permits continued operation of the facility for an unlimited period of time. This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements or that is part of a shutdown of the unit.

MILLSTONE - UNIT 2 TRM 3/4 0-1 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL REQUIRMENT TR 3.0.5 When a system, subsystem, train, component or device is determined to be nonfunctional solely because its emergency power source is nonfunctional, or solely because its normal power source is nonfunctional, it may be considered FUNCTIONAL for the purpose of satisfying the requirements of its applicable TR, provided: (1) its corresponding normal or emergency power source is FUNCTIONAL; and (2) all of its redundant system(s), subsystem(s), train(s),

component(s) and device(s) are FUNCTIONAL, or likewise satisfy the requirements of this requirement. Unless both conditions (1) and (2) are satisfied, the unit shall be placed in a safe condition as determined by the Operational Decision Making process. Corrective action shall be initiated in accordance with the corrective action program.

This TR is not applicable in MODES 5 or 6.

TR 3.0.6 Equipment removed from service or declared nonfunctional to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its FUNCTIONALITY or the FUNCTIONALITY of other equipment. This is an exception to TR 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate FUNCTIONALITY.

TECHNICAL SURVEILLANCE REQUIREMENTS TSR 4.0.1 TSRs shall be met during the OPERATIONAL MODES or other conditions specified for individual TRs unless otherwise stated in an individual TSR.

Failure to meet a TSR, whether such failure is experienced during the performance of the TSR or between performances of the TSR, shall be failure to meet the TR. Failure to perform a TSR within the specified TSR interval shall be failure to meet the TR except as provided in TSR 4.0.3. TSRs do not have to be performed on nonfunctional equipment or variables outside specified limits.

TSR 4.0.2 Each TSR shall be performed within the specified time interval with a maximum allowable extension not to exceed 25% of the surveillance time interval.

TSR 4.0.3 If it is discovered that a TSR was not performed within its specified surveillance interval, then compliance with the requirement to declare the TR not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified surveillance interval, whichever is greater. This delay period is permitted to allow performance of the TSR. A risk evaluation shall be performed for any TSR delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

MILLSTONE - UNIT 2 TRM 3/4 0-2 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL SURVEILLANCE REQUIREMENTS If the TSR is not performed within the delay period, the TR must immediately be declared not met, and the applicable ACTION(s) must be entered.

When the TSR is performed within the delay period and the TSR is not met, the TR must immediately be declared not met, and the applicable ACTION(s) must be entered.

TSR 4.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made unless the TSR(s) associated with the TR have been performed within the stated TSR interval or as otherwise specified. This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements or that is part of a shutdown of the unit.

BASES:

TR 3.0.1 through 3.0.4 establish the general requirements applicable to TRs.

TR 3.0.1 establishes the Applicability statement within each individual TR as the requirement for when (i.e., in which OPERATIONAL MODES or other specified conditions) conformance to the TR is required for safe operation of the facility. The ACTION requirements establish those remedial measures that must be taken within specified time limits when the requirements of a TR are not met.

There are two basic types of ACTION requirements. The first specifies the remedial measures that permit continued operation of the facility that is not further restricted by the time limits of the ACTION requirements. In this case, conformance to the ACTION requirements provides an acceptable level of safety for unlimited continued operation as long as the ACTION requirements continue to be met. The second type of ACTION requirement specifies a time limit in which conformance to the conditions of the TR must be met. This time limit is the allowable outage time to restore a nonfunctional system or component to FUNCTIONAL status or for restoring parameters within specified limits. If these actions are not completed within the allowable outage time limits, the unit shall be placed in a safe condition as determined by the Operational Decision Making process and corrective action shall be initiated in accordance with the corrective action program. It is not intended that the ACTION requirements be used as an operational convenience that permits (routine) voluntary removal of a system(s) or component(s) from service in lieu of other alternatives that would not result in redundant systems or components being nonfunctional.

MILLSTONE - UNIT 2 TRM 3/4 0-3 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL SURVEILLANCE REQUIREMENTS The specific time limits of the ACTION requirements are applicable from the point in time it is identified that a TR is not met. The time limits of the ACTION requirements are also applicable when a system or component is removed from service for surveillance testing or investigation of operational problems. Individual TRs may include a specified time limit for the completion of a TSR when equipment is removed from service. In this case, the allowable outage time limits of ACTION requirements are applicable when this limit expires if the TSR has not been completed.

TR 3.0.2 establishes that noncompliance with a TR exists when the requirements of the TR are not met and the associated ACTION requirements have not been implemented within the specified time interval. The purpose of this TR is to clarify that (1) implementation of the ACTION requirements within the specified time interval constitutes compliance with a TR and (2) completion of the remedial measures of the ACTION requirements is not required when compliance with a TR is restored within the time interval specified in the associated ACTION requirements.

TR 3.0.3 establishes the ACTION requirements that must be implemented when a TR is not met and the condition is not specifically addressed by the associated ACTION requirements. The purpose of this TR is to delineate the ACTIONS when plant operation cannot be maintained within the limits of safe operation defined by the TR and its ACTION requirements. It is not intended to be used as an operational convenience that permits (routine) voluntary removal of redundant systems or components from service in lieu of other alternatives that would not result in redundant systems or components being nonfunctional.

TR 3.0.4 establishes limitations on MODE changes when a TR is not met. It precludes placing the facility in a higher MODE of operation when the requirements for a TR are not met and continued noncompliance to these conditions would result in a shutdown to comply with the ACTION requirements if a change in MODES were permitted. The purpose of this specification is to ensure that facility operation is not initiated or that higher MODES of operation are not entered when corrective action is being taken to obtain compliance with a requirement by restoring equipment to FUNCTIONAL status or parameters to specified limits. Compliance with ACTION requirements that permit continued operation of the facility for an unlimited period of time provides an acceptable level of safety for continued operation without regard to the status of the plant before or after a MODE change. Therefore, in this case, entry into an OPERATIONAL MODE or other specified condition may be made in accordance with the provision of the ACTION requirements. The provisions of this specification should not, however, be interpreted as endorsing the failure to exercise good practice in restoring systems or components to FUNCTIONAL status before plant STARTUP.

When a shutdown is required as determined by the Operational Decision Making process, the provisions of TR 3.0.4 do not apply because they would delay placing the facility in a lower MODE of operation.

MILLSTONE - UNIT 2 TRM 3/4 0-4 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL SURVEILLANCE REQUIREMENTS TR 3.0.5 delineates what additional conditions must be satisfied to permit operation to continue, consistent with the ACTION statements for power sources, when a normal or emergency power source is nonfunctional. It specifically prohibits operation when one division is nonfunctional because its normal or emergency power source is nonfunctional and a system, subsystem, train, component or device in another division is nonfunctional for another reason.

The provisions of this TR permit the ACTION statements associated with individual systems, subsystems, trains, components, or devices to be consistent with the ACTION statements of the associated electrical power source. It allows operation to be governed by the time limits of the ACTION statement associated with the TR for the normal or emergency power source, not the individual ACTION statements for each system, subsystem, train, component or device that is determined to be nonfunctional solely because of the nonfunctionality of its normal emergency power source.

In MODES 5 and 6 TR 3.0.5 is not applicable, and thus the individual ACTION statements for each applicable TR in these MODES must be adhered to.

TR 3.0.6 establishes the allowance for restoring equipment to service under administrative controls when it has been removed from service or declared nonfunctional to comply with ACTIONS. The sole purpose of this TR is to provide an exception to TR 3.0.2 (e.g., to not comply with the applicable required ACTION(s)) to allow the performance of TSRs to demonstrate:

a. The FUNCTIONALITY of the equipment being returned to service; or
b. The FUNCTIONALITY of other equipment.

The administrative controls ensure the time the equipment is returned to service in conflict with the requirements of the ACTIONS is limited to the time absolutely necessary to perform the allowed TSRs. The TR does not provide time to perform any other preventive or corrective maintenance.

TSR 4.0.1 through 4.0.4 establish the general requirements applicable to TSRs.

TSR 4.0.1 establishes the requirement that TSRs must be met during the OPERATIONAL MODES or other conditions for which the requirements of the TR apply unless otherwise stated in an individual TSR. The purpose of this requirement is to ensure that TSRs are performed to verify the FUNCTIONALITY of systems and components and that parameters are within specified limits to ensure safe operation of the facility when the plant is in a MODE or other specified condition for which the associated TR are applicable.

Failure to meet a TSR within the specified TSR interval, in accordance with TSR 4.0.2 constitutes a failure to meet a TR.

MILLSTONE - UNIT 2 TRM 3/4 0-5 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL SURVEILLANCE REQUIREMENTS Systems and components are assumed to be FUNCTIONAL when the associated TSRs have been met. Nothing in this requirement, however, is to be construed as implying that systems or components are FUNCTIONAL when either:

a. The system or components are known to be nonfunctional, although still meeting the TSRs or
b. The requirements of the TSR(s) are known to be not met between required TSR performances.

TSRs do not have to be performed when the facility is in an OPERATIONAL MODE or other specified conditions for which the requirements of the associated TR do not apply unless otherwise specified. The TSRs associated with a Special Test Exception are only applicable when the Special Test Exception is used as an allowable exception to the requirements of a TR.

Unplanned events may satisfy the requirements (including applicable acceptance criteria) for a given TSR. In this case, the unplanned event may be credited as fulfilling the performance of the TSR. This allowance includes those TSRs whose performance is normally precluded in a given MODE or other specified condition.

TSRs, including TSRs invoked by ACTION requirements, do not have to be performed on nonfunctional equipment because the ACTIONS define the remedial measures that apply.

TSRs have to be met and performed in accordance with TSR 4.0.2, prior to returning equipment to FUNCTIONAL status.

Upon completion of maintenance, appropriate post maintenance testing is required to declare equipment FUNCTIONAL. This includes ensuring applicable TSRs are not failed and their most recent performance is in accordance with TSR 4.0.2. Post maintenance testing may not be possible in the current MODE or other specified conditions in the Applicability due to the necessary unit parameters not having been established. In these situations, the equipment may be considered FUNCTIONAL provided testing has been satisfactorily completed to the extent possible and the equipment is not otherwise believed to be incapable of performing its function. This will allow operation to proceed to a MODE or other specified condition where other necessary post maintenance tests can be completed.

TSR 4.0.2 establishes the limit for which the specified time interval for TSRs may be extended. It permits an allowable extension of the normal TSR interval to facilitate TSR scheduling and consideration of plant operating conditions that may not be suitable for conducting the TSR, e.g., transient conditions or other ongoing TSR or maintenance activities. It also provides flexibility to accommodate the length of a fuel cycle for TSRs that are performed at each REFUELING outage and are specified with an 18-month TSR interval. It is not intended that this provision be used repeatedly as a convenience to extend TSR intervals beyond that specified for TSRs that are not performed during MILLSTONE - UNIT 2 TRM 3/4 0-6 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL SURVEILLANCE REQUIREMENTS REFUELING outages. The limitation of TSR 4.0.2 is based on engineering judgment and the recognition that the most probable result of any particular TSR being performed is the verification of conformance with the TSR. This provision is sufficient to ensure that the reliability ensured through TSR activities is not significantly degraded beyond that obtained from the specified TSR interval.

TSR 4.0.3 establishes the flexibility to defer declaring affected equipment nonfunctional or an affected variable outside the specified limits when a TSR has not been completed within the specified TSR interval. A delay period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified TSR interval, whichever is greater, applies from the point in time that it is discovered that the TSR has not been performed in accordance with TSR 4.0.2,and not at the time that the specified TSR interval was not met.

This delay period provides adequate time to complete TSRs that have been missed. This delay period permits the completion of a TSR before complying with ACTION requirements or other remedial measures that might preclude completion of the TSR. The basis for this delay period includes consideration of unit conditions, adequate planning, availability of personnel, the time required to perform the TSR, the safety significance of the delay in completing the required TSR, and the recognition that the most probable result of any particular TSR being performed is the verification of conformance with the requirements.

When a TSR, with a TSR interval based not on time intervals, but upon specified unit conditions, operating situations, or requirements of regulations, (e.g., prior to entering MODE 1 after each fuel loading, or in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, etc.) is discovered to not have been performed when specified, TSR 4.0.3 allows for the full delay period of up to the specified TSR interval to perform the TSR. However, since there is not a time interval specified, the missed TSR should be performed at the first reasonable opportunity.

TSR 4.0.3 provides a time limit for, and allowances for the performance of, TSRs that become applicable as a consequence of MODE changes imposed by ACTION requirements.

Failure to comply with specified TSR intervals for the TSRs is expected to be an infrequent occurrence. Use of the delay period established by TSR 4.0.3 is a flexibility that is not intended to be used as an operational convenience to extend TSR intervals. While up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or the limit of the specified TSR interval is provided to perform the missed TSR, it is expected that the missed TSR will be performed at the first reasonable opportunity.

The determination of the first reasonable opportunity should include consideration of the impact on plant risk (from delaying the TSR as well as any plant configuration changes required) and impact on any analysis assumptions, in addition to unit conditions, planning, availability of personnel, and the time required to perform the TSR. This risk impact should MILLSTONE - UNIT 2 TRM 3/4 0-7 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY TECHNICAL SURVEILLANCE REQUIREMENTS be managed through the program in place to implement 10 CFR 50.65(a)(4) and its implementation guidance, NRC Regulatory Guide 1.182, Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants. This Regulatory Guide addresses consideration of temporary and aggregate risk impacts, determination of risk management action thresholds, and risk management action up to and including plant shutdown. The missed TSR should be treated as an emergent condition as discussed in the Regulatory Guide. The risk evaluation may use quantitative, qualitative, or blended methods. The degree of depth and rigor of the evaluation should be commensurate with the importance of the component. If the results of the risk evaluation determine the risk increase is significant, this evaluation should be used to determine the safest course of action. All missed TSRs will be placed in the licensees Corrective Action Program.

If a TSR is not completed within the allowed delay period, then the equipment is considered nonfunctional or the variable is considered outside the specified limits and the entry into the ACTION requirements for the applicable TR begins immediately upon expiration of the delay period. If a TSR is failed within the delay period, then the equipment is nonfunctional, or the variable is outside the specified limits and entry into the ACTION requirements for the applicable TR begins immediately upon the failure of the TSR.

Completion of the TSR within the delay period allowed by this TSR, or within the Allowed Outage Time of the applicable ACTIONS, restores compliance with TSR 4.0.1.

TSR 4.0.4 establishes the requirement that all applicable TSRs must be met before entry into an OPERATIONAL MODE or other condition of operation specified in the Applicability statement. The purpose of this specification is to ensure that system and component FUNCTIONALITY requirements or parameter limits are met before entry into a MODE or condition for which these systems and components ensure safe operation of the facility.

This provision applies to changes in OPERATIONAL MODES or other specified conditions associated with plant shutdown as well as STARTUP.

Under the provisions of this specification, the applicable TSRs must be performed within the specified TSR interval to ensure that the TRs are met during initial plant STARTUP following a plant outage.

When a shutdown is required as determined by the Operational Decision Making process, the provisions of TSR 4.0.4 do not apply because this would delay placing the facility in a lower MODE of operation.

MILLSTONE - UNIT 2 TRM 3/4 0-8 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM 3/4.1.2 BORATION SYSTEMS FLOW PATHS - SHUTDOWN TECHNICAL REQUIRMENT 3.1.2.1 As a minimum, one of the following boron injection flow paths shall be FUNCTIONAL:

a. A flow path with a piping temperature of greater than 55°F from the boric acid storage tank via either a boric acid pump or a gravity feed connection and a charging pump to the Reactor Coolant System if only the boric acid storage tank in TECHNICAL REQUIREMENT 3.1.2.7.a is FUNCTIONAL, or
b. The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if only the refueling water storage tank in TECHNICAL REQUIREMENT 3.1.2.7.b is FUNCTIONAL.

APPLICABILITY: MODES 5 and 6.

ACTION:

With none of the above flow paths FUNCTIONAL, suspend all operations involving CORE ALTERATIONS and positive reactivity additions that could cause introduction of coolant into the RCS with boron concentration less than required to meet Technical Specification 3.1.1.1 in MODE 5 or Technical Specification 3.9.1 in MODE 6 until at least one injection path is restored to FUNCTIONAL status.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.1 At least one of the above required flow paths shall be demonstrated FUNCTIONAL:

a. At least once per 31 days by verifying each manual, power operated, and automatic valve in the boron injection flow path that is not locked, sealed or otherwise secured in position, is in the correct position.
b. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying that the boric acid piping temperature is greater than 55°F.

MILLSTONE - UNIT 2 TRM 3/4 1-1 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM 3/4.1.2 BORATION SYSTEMS FLOW PATHS - SHUTDOWN BASES:

The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.

With the RCS temperature below 200°F, one injection system is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor and the additional restrictions prohibiting CORE ALTERATIONS and operations that would dilute the RCS boron concentration by introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration as described in the Technical Specifications in the event the single injection system becomes nonfunctional. The MODES 5 and 6 ACTION requirement to suspend positive reactivity additions does not preclude completion of actions to establish a safe conservative plant condition, or to maintain or increase reactor vessel inventory provided the boron concentration of the makeup water source is greater than or equal to the boron concentration for the required SHUTDOWN MARGIN (SDM).

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.1.a verifies the correct alignment for manual, power operated, and automatic valves in the boration flow paths to provide assurance that the proper flow paths will exist to establish boric acid flow to the Reactor Coolant System (RCS). This surveillance does not apply to valves that are locked, sealed, or otherwise secured in position, since these valves were verified to be in the correct position prior to locking, sealing, or securing. A valve that receives an actuation signal is allowed to be in a non-accident position provided the valve automatically repositions within the proper stroke time. This surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position. The 31 day frequency has been shown to be acceptable through operating experience.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.1.b verifies the temperature of the boric acid piping to ensure FUNCTIONALITY of the boration flow path. Ambient air temperature in the vicinity of the boric acid piping on elevations (-)5 -0 and (-)25 -6 is a valid indication of piping temperature. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> frequency is sufficient to identify temperature changes that approach the limit.

REFERENCE:

1. License Amendment 283
2. License Amendment 293 MILLSTONE - UNIT 2 TRM 3/4 1-2 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM FLOW PATHS - OPERATING TECHNICAL REQUIREMENT 3.1.2.2 The following boron injection flowpaths to the RCS via the charging pump(s) shall be FUNCTIONAL:

a. At least one of the following combinations:
1. One boric acid storage tank, with the tank contents in accordance with Figure 3.1-1 and a piping temperature greater than 55°F, its associated gravity feed valve, and boric acid pump.
2. Two boric acid storage tanks, with the weighted average of the combined contents of the tanks in accordance with Figure 3.1-1 and a piping temperature greater than 55°F, their associated gravity feed valves, and boric acid pumps.
3. Two boric acid storage tanks, each with contents in accordance with Figure 3.1-1 and a piping temperature greater than 55°F, at least one gravity feed valve, and at least one boric acid pump.
b. The flow path from a FUNCTIONAL refueling water storage tank, as per TECHNICAL REQUIREMENT 3.1.2.8.b.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With fewer than the above required boron injection flow paths to the Reactor Coolant System FUNCTIONAL, manage the risk impact in accordance with the requirements of 10 CFR 50.65(a)(4).

TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.2 The above required flow paths shall be demonstrated FUNCTIONAL:

a. At least once per 31 days by verifying each manual, power operated, and automatic valve in the boron injection flow path that is not locked, sealed or otherwise secured in position, is in the correct position.
b. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying that the boric acid piping temperature is greater than 55°F.

MILLSTONE - UNIT 2 TRM 3/4 1-3 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM FLOW PATHS - OPERATING TECHNICAL SURVEILLANCE REQUIREMENTS

c. At least once per 36 months, by verifying each valve in the required boron injection flowpaths that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

BASES:

The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.

With the RCS average temperature above 200°F, a minimum of two separate and redundant boron injection flowpaths are provided to ensure single FUNCTIONAL capability in the event an assumed failure of a pump or valve renders one of the flowpaths nonfunctional. Redundant flow paths from the boric acid storage tanks are achieved through boric acid pumps, gravity feed lines and charging pumps. Redundant flow paths from the refueling water storage tank are achieved through charging pump flow path guaranteed by TECHNICAL REQUIREMENT 3.1.2.2 and the HPSI flow path guaranteed by Technical Specification 3.5.2 and 3.5.3.

Paragraph (a)(4) of 10CFR50.65 Maintenance Rule requires that licensees assess and manage the increase in risk that may result from proposed maintenance activities, including out of service Structures, Systems, and Components (SSCs).

Management of risk involves consideration of incremental and aggregate impacts. The incremental risk increase is predominantly assessed using quantitative PRA methods, which measure the effect on core damage frequency and large early release frequency associated with the plant configuration. The risk increase is then managed in accordance with action thresholds defined by NUMARC 93-01. The aggregate impact is controlled by meeting Maintenance Rule requirements for establishing and meeting SSC performance criteria. These requirements include consideration of the risk significance of SSCs in establishing performance goals. Significant risk impacts are documented in the corrective action program and assessed as appropriate.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.2.a verifies the correct alignment for manual, power operated, and automatic valves in the boration flow paths and provides assurance that the proper flow paths will exist to establish boric acid flow to the Reactor Coolant System (RCS). This surveillance does not apply to valves that are locked, sealed, or otherwise secured in position, since these valves were verified to be in the correct position prior to locking, sealing, or securing. A valve that receives an actuation signal is allowed to be in a non-accident position provided the valve MILLSTONE - UNIT 2 TRM 3/4 1-4 LBDCR 16-MP2-014 March 29, 2017

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM FLOW PATHS - OPERATING TECHNICAL SURVEILLANCE REQUIREMENTS automatically repositions within the proper stroke time. This surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position. The 31-day frequency has been shown to be acceptable through operating experience.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.2.b verifies the temperature of the boric acid piping to ensure FUNCTIONALITY of the boration flow path. Ambient air temperature in the vicinity of the boric acid piping on elevations (-)5 -0 and (-)25 -6 is a valid indication of piping temperature. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> frequency is sufficient to identify temperature changes that approach the limit.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.2.c verifies the ability of the valves in the boration injection flowpath to actuate to the correct position on an actual or simulated actuation signal. The 36 month frequency is consistent with other Millstone Power Station Unit 2 actuation testing requirements and with standard industry practices and guidelines.

REFERENCE:

1. License Amendment 283 MILLSTONE - UNIT 2 TRM 3/4 1-5 LBDCR 16-MP2-014 March 29, 2017

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM CHARGING PUMP - SHUTDOWN TECHNICAL REQUIREMENT 3.1.2.3 At least one charging pump in the boron injection flow path required FUNCTIONAL pursuant to TECHNICAL REQUIREMENT 3.1.2.1 shall be FUNCTIONAL.

APPLICABILITY: MODES 5 and 6.

ACTION:

With no charging pump FUNCTIONAL, suspend all operations involving CORE ALTERATIONS and positive reactivity additions that could cause introduction of coolant into the RCS with boron concentration less than required to meet Technical Specification 3.1.1.1 in MODE 5 or Technical Specification 3.9.1 in MODE 6 until one charging pump is restored to FUNCTIONAL status.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.3 The above required charging pump shall be demonstrated FUNCTIONAL by verifying the delivered flow of the charging pump at the required discharge pressure is greater than or equal to the required flow when tested in accordance with the Inservice Testing (IST) program.

BASES:

The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.

With the RCS temperature below 200°F, one injection system is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor and the additional restrictions prohibiting CORE ALTERATIONS and operations that would dilute the RCS boron concentration by introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration as described in the technical specifications in the event the single injection system becomes nonfunctional. The MODES 5 and 6 ACTION requirement to suspend positive reactivity additions does not preclude completion of actions to establish a safe conservative plant condition, or to maintain or increase reactor vessel inventory provided the boron concentration of the makeup water source is greater than or equal to the boron concentration for the required SHUTDOWN MARGIN (SDM).

MILLSTONE - UNIT 2 TRM 3/4 1-6 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM CHARGING PUMP - SHUTDOWN TECHNICAL SURVEILLANCE REQUIREMENTS TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.3, which verifies charging pump flow and discharge pressure, is a normal test of charging pump performance required by the ASME OM Code. The frequency for this surveillance is a Code requirement governed by the IST program. Such inservice testing detects component degradation and incipient failures.

REFERENCE:

1. License Amendment 283
2. License Amendment 293 MILLSTONE - UNIT 2 TRM 3/4 1-7 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM CHARGING PUMPS - OPERATING TECHNICAL REQUIREMENT 3.1.2.4 At least two charging pumps shall be FUNCTIONAL.

APPLICABILITY: MODES 1, 2, 3 and 4*.

ACTION:

With only one charging pump FUNCTIONAL, manage the risk impact in accordance with the requirement of 10 CFR 50.65(a)(4).

TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.4.1 Two charging pumps shall be demonstrated FUNCTIONAL by verifying the delivered flow of the charging pump at the required discharge pressure is greater than or equal to the required flow when tested in accordance with the Inservice Testing (IST) program.

4.1.2.4.2 Two charging pumps shall be demonstrated FUNCTIONAL at least once per 36 months by verifying that each charging pump NOT in Pull-To-Lock starts automatically on an actual or simulated actuation signal.

BASES:

The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.

With the RCS average temperature above 200 °F, a minimum of two separate and redundant boron injection flowpaths are provided to ensure single FUNCTIONAL capability in the event an assumed failure of a pump or valve renders one of the flowpaths nonfunctional. Redundant flow paths from the boric acid storage tanks are

  • The provisions of TECHNICAL REQUIREMENT 3.0.4 and 4.0.4 are not applicable for entry into MODE 4 for the charging pump that is nonfunctional pursuant to Technical Specification 3.4.9.3 provided the charging pump is restored to FUNCTIONAL status within at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or prior to entering MODE 3, whichever comes first.

MILLSTONE - UNIT 2 TRM 3/4 1-8 LBDCR 16-MP2-014 March 29, 2017

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM CHARGING PUMPS - OPERATING TECHNICAL SURVEILLANCE REQUIREMENTS achieved through Boric Acid Pumps, gravity feed lines and Charging Pumps. Redundant flow paths from the Refueling Water Storage Tank are achieved through Charging Pump flow path guaranteed by TECHNICAL REQUIREMENT 3.1.2.2 and the HPSI flow path guaranteed by Technical Specification 3.5.2 and 3.5.3.

Paragraph (a)(4) of 10CFR50.65 Maintenance Rule requires that licensees assess and manage the increase in risk that may result from proposed maintenance activities, including out of service Structures, Systems, and Components (SSCs).

Management of risk involves consideration of incremental and aggregate impacts. The incremental risk increase is predominantly assessed using quantitative PRA methods, which measure the effect on core damage frequency and large early release frequency associated with the plant configuration. The risk increase is then managed in accordance with action thresholds defined by NUMARC 93-01. The aggregate impact is controlled by meeting Maintenance Rule requirements for establishing and meeting SSC performance criteria. These requirements include consideration of the risk significance of SSCs in establishing performance goals. Significant risk impacts are documented in the corrective action program and assessed as appropriate.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.4.1, which verifies charging pump flow at the design discharge pressure, is a normal test of charging pump performance required by the ASME OM Code. The frequency for this surveillance is a Code requirement governed by the IST program. Such inservice testing detects component degradation and incipient failures.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.4.2 verifies the ability of the charging pumps which are NOT in Pull-To-Lock to automatically start on an actual or simulated actuation signal. The 36 month frequency is consistent with other Millstone Power Station Unit 2 actuation testing requirements and with standard industry practices and guidelines.

REFERENCE:

1. License Amendment 283
2. DCR M2-07-002, Replacement of the Unit 2 Charging Pumps Discharge Pulsation Dampeners MILLSTONE - UNIT 2 TRM 3/4 1-9 LBDCR 16-MP2-014 March 29, 2017

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORIC ACID PUMPS - SHUTDOWN TECHNICAL REQUIREMENT 3.1.2.5 At least one boric acid pump shall be FUNCTIONAL if only the flow path through the boric acid pump in TECHNICAL REQUIREMENT 3.1.2.1.a is FUNCTIONAL.

APPLICABILITY: MODES 5 and 6.

ACTION:

With no boric acid pump FUNCTIONAL as required to complete the flow path of TECHNICAL REQUIREMENT 3.1.2.1.a, suspend all operations involving CORE ALTERATIONS and positive reactivity additions that could cause introduction of coolant into the RCS with boron concentration less than required to meet Technical Specification 3.1.1.1 in MODE 5 or Technical Specification 3.9.1 in MODE 6 until at least one boric acid pump is restored to FUNCTIONAL status.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.5 One boric acid pump shall be demonstrated FUNCTIONAL by verifying the developed head of the boric acid pump at the flow test point is greater than or equal to the required developed head when tested in accordance with the Inservice Testing (IST) program.

BASES:

The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.

With the RCS temperature below 200°F, one injection system is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor and the additional restrictions prohibiting CORE ALTERATIONS and operations that would dilute the RCS boron concentration by introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration as described in the Technical Specifications in the event the single injection system becomes nonfunctional. The MODES 5 and 6 ACTION requirement to suspend positive reactivity additions does not preclude completion of actions to establish a safe conservative plant condition, or to maintain or increase reactor vessel inventory provided the boron concentration of the makeup water source is greater than or equal to the boron concentration for the required SHUTDOWN MARGIN (SDM).

MILLSTONE - UNIT 2 TRM 3/4 1-10 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORIC ACID PUMPS - SHUTDOWN TECHNICAL SURVEILLANCE REQUIREMENTS TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.5, which verifies boric acid pump design flow, is a normal test of boric acid pump performance required by the ASME OM Code. A quarterly frequency for such tests is a Code requirement. Such inservice testing detects component degradation and incipient failures.

REFERENCE:

1. License Amendment 283
2. License Amendment 293 MILLSTONE - UNIT 2 TRM 3/4 1-11 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORIC ACID PUMPS - OPERATING TECHNICAL REQUIREMENT 3.1.2.6 The boric acid pump(s) in the boron injection flow path(s) required FUNCTIONAL pursuant to TECHNICAL REQUIREMENT 3.1.2.2.a shall be FUNCTIONAL if the flow path through the boric acid pump in TECHNICAL REQUIREMENT 3.1.2.2.a is FUNCTIONAL.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With the boric acid pump(s) required for the boron injection flow path(s) pursuant to TECHNICAL REQUIREMENT 3.1.2.2.a nonfunctional, manage the risk impact in accordance with the requirements of 10CFR50.65(a)(4).

TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.6.1 The boric acid pump(s) shall be demonstrated FUNCTIONAL by verifying the developed head of each boric acid pump at the flow test point is greater than or equal to the required developed head when tested in accordance with the Inservice Testing (IST) program.

4.1.2.6.2 Two boric acid pumps shall be demonstrated FUNCTIONAL at least once per 36 months by verifying that each boric acid pump starts automatically on an actual or simulated actuation signal.

BASES:

The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.

With the RCS average temperature above 200°F, a minimum of two separate and redundant boron injection flowpaths are provided to ensure single FUNCTIONAL capability in the event an assumed failure of a pump or valve renders one of the flowpaths nonfunctional. Redundant flow paths from the boric acid storage tanks are achieved through boric acid pumps, gravity feed lines and charging pumps. Redundant flow paths from the refueling water storage tank are achieved through charging pump flow path guaranteed by TECHNICAL REQUIREMENT 3.1.2.2 and the HPSI flow path guaranteed by Technical Specification 3.5.2 and 3.5.3.

MILLSTONE - UNIT 2 TRM 3/4 1-12 LBDCR 16-MP2-014 March 29, 2017

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORIC ACID PUMPS - OPERATING TECHNICAL SURVEILLANCE REQUIREMENTS Paragraph (a)(4) of 10CFR50.65 Maintenance Rule requires that licensees assess and manage the increase in risk that may result from proposed maintenance activities, including out of service Structures, Systems, and Components (SSCs).

Management of risk involves consideration of incremental and aggregate impacts. The incremental risk increase is predominantly assessed using quantitative PRA methods, which measure the effect on core damage frequency and large early release frequency associated with the plant configuration. The risk increase is then managed in accordance with action thresholds defined by NUMARC 93-01. The aggregate impact is controlled by meeting Maintenance Rule requirements for establishing and meeting SSC performance criteria. These requirements include consideration of the risk significance of SSCs in establishing performance goals. Significant risk impacts are documented in the corrective action program and assessed as appropriate.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.6.1, which verifies boric acid pump developed head at the flow test point, is a normal test of boric acid pump performance required by the ASME OM Code. The frequency for this surveillance is a Code requirement governed by the IST Program. Such inservice testing detects component degradation and incipient failures.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.6.2 verifies the ability of the boric acid pumps to automatically start on an actual or simulated actuation signal. The 36 month frequency is consistent with other Millstone Power Station Unit 2 actuation testing requirements and with standard industry practices and guidelines.

REFERENCE:

1. License Amendment 283 MILLSTONE - UNIT 2 TRM 3/4 1-13 LBDCR 16-MP2-014 March 29, 2017

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORATED WATER SOURCES - SHUTDOWN TECHNICAL REQUIREMENT 3.1.2.7 As a minimum, one of the following borated water sources shall be FUNCTIONAL:

a. One boric acid storage tank with:
1. A concentration between 2.5 and 3.5 weight percent boric acid.
2. A minimum volume of 3750 gallons, and
3. A minimum boric acid storage tank temperature of 55°F.

or b. The refueling water storage tank with:

1. A minimum contained volume of 57,300 gallons,
2. A minimum boron concentration of 1720 ppm when in MODE 5,
3. A minimum boron concentration as defined in Technical Specification 3.9.1 when in MODE 6.
4. A minimum solution temperature of 35°F.

APPLICABILITY: MODES 5 and 6.

ACTION:

With no borated water sources FUNCTIONAL, suspend all operations involving CORE ALTERATIONS and positive reactivity additions that could cause introduction of coolant into the RCS with boron concentration less than required to meet Technical Specification 3.1.1.1 in MODE 5 or Technical Specification 3.9.1 in MODE 6 until at least one borated water source is restored to FUNCTIONAL status.

MILLSTONE - UNIT 2 TRM 3/4 1-14 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORATED WATER SOURCES - SHUTDOWN TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.7 The above required borated water source shall be demonstrated FUNCTIONAL:

a. By performing the following as appropriate for the tank(s) being credited to satisfy this TRM requirement:
1. Verify boron concentration of the BASTs at least once per 31 days and within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after each solution volume increase of > 1% of indicated tank volume.
2. Verify boron concentration of the RWST at least once per 7 days.
3. Verify water level of both BASTs and the RWST at least once per 7 days.
b. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature when it is the source of borated water and the RWST ambient air temperature is

<35°F.

c. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying that the Boric Acid Storage Tank temperature is greater than 55°F when it is the source of borated water.

BASES:

The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.

A minimum boron concentration of 1720 ppm is required in the RWST at all times in order to satisfy safety analysis assumptions for boron dilution incidents and other transients using the RWST as a borated water source as well as the analysis assumption to determine the boration requirement to ensure adequate SHUTDOWN MARGIN.

The boron capability required below 200°F is based upon providing a SHUTDOWN MARGIN (SDM) within the limit specified in the CORE OPERATING LIMITS REPORT at 140°F after xenon decay. This condition requires either 3750 gallons of 2.5% boric acid solution from the boric acid storage tanks or 57,300 gallons of 1720 ppm borated water from the refueling water storage tank.

The maximum boron concentration requirement (3.5%) and the minimum temperature requirement (55°F) for the Boric Acid Storage Tank ensure that boron does not precipitate in the Boric Acid System. The daily surveillance requirement provides sufficient assurance that the temperature of the tank will be maintained higher than 55°F at all times.

MILLSTONE - UNIT 2 TRM 3/4 1-15 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEM BORATED WATER SOURCES - SHUTDOWN BASES:

A minimum boron concentration of 1720 ppm is required in the RWST at all times in order to satisfy safety analysis assumptions for boron dilution incidents and other transients using the RWST as a borated water source as well as the analysis assumption to determine the boration requirement to ensure adequate SHUTDOWN MARGIN.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.7.a verifies the boron concentration of the water and the water level of the tank. This assures the availability of the borated water source for boron dilution incidents and other transients using the RWST as a borated water source.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.7.b verifies the RWST temperature is greater than 35°F when it is the source of borated water and the RWST ambient air temperature is less than 35°F.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.7.c verifies the Boric Acid Storage Tank temperature is greater than 55°F when it is the source of borated water.

This may be accomplished by verifying that the ambient air temperature in the vicinity of the BAST is greater than 55°F.

REFERENCE:

1. License Amendment 283
2. License Amendment 293 MILLSTONE - UNIT 2 TRM 3/4 1-16 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES - OPERATING TECHNICAL REQUIREMENT 3.1.2.8 Both of the following borated water sources shall be FUNCTIONAL:

a. At least one of the following Boric Acid Storage Tank(s) (BASTs) combinations:
1. One boric acid storage tank, with the tank contents in accordance with Figure 3.1-1 and a minimum temperature of 55°F, its associated gravity feed valve, and boric acid pump, or
2. Two boric acid storage tanks, with the weighted average of the combined contents of the tanks in accordance with Figure 3.1-1 and a minimum temperature of 55°F, their associated gravity feed valves, and boric acid pumps, or
3. Two boric acid storage tanks, each with contents in accordance with Figure 3.1-1 and a minimum temperature of 55°F, at least one gravity feed valve, and at least one boric acid pump.

and b. The refueling water storage tank with:

1. A minimum contained volume of 370,000 gallons of water,
2. A minimum boron concentration of 1720 ppm,
3. A minimum solution temperature of 50°F when in MODES 1 and 2, and
4. A minimum solution temperature of 35°F when in MODES 3 and 4.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With only one borated water source FUNCTIONAL, manage the risk impact in accordance with the requirements of 10CFR50.65(a)(4).

TECHNICAL SURVEILLANCE REQUIREMENTS 4.1.2.8 Each borated water source shall be demonstrated FUNCTIONAL:

a. By performing the following as appropriate for the tank(s) being credited to satisfy this TRM requirement:

MILLSTONE - UNIT 2 TRM 3/4 1-17 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES - OPERATING TECHNICAL SURVEILLANCE REQUIREMENTS

1. Verify boron concentration of the BASTs at least once per 31 days and within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after each solution volume increase of > 1% of indicated tank volume.
2. Verify boron concentration of the RWST at least once per 7 days.
3. Verify water level of both BASTs and the RWST at least once per 7 days.
b. When in MODES 3 and 4, at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature is 35°F when the RWST ambient air temperature is

<35°F.

c. When in MODES 1 and 2, at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature is 50°F when the RWST ambient air temperature is

<50°F.

d. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying that the boric acid storage tank temperatures are greater than 55°F.

BASES:

The boron injection system ensures that negative reactivity control is available during each MODE of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps, 3) separate flow paths, and 4) boric acid pumps.

The minimum boration capability is sufficient to provide a SHUTDOWN MARGIN within the limits specified in the CORE OPERATING LIMITS REPORT at all temperatures above 200°F. The maximum boration capability requirement occurs at EOL from full power equilibrium xenon conditions and requires an equivalent of 4900 gallons of 3.5% boric acid solution from the boric acid storage tanks plus 15,000 gallons of 1720 ppm borated water from the refueling water storage tank. The refueling water storage tank can also be used alone by feed-and-bleed using well under the 370,000 gallons of 1720 ppm borated water required.

The requirement for a minimum contained volume of 370,000 gallons of borated water in the refueling water storage tank ensures the capability for borating the RCS to the desired level. The specified quantity of borated water is consistent with the ECCS requirements of Technical Specification 3.5.4. Therefore, the larger volume of borated water is specified here too.

MILLSTONE - UNIT 2 TRM 3/4 1-18 LBDCR 14-MP2-015 September 24, 2014

TECHNICAL REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES - OPERATING TECHNICAL SURVEILLANCE REQUIREMENTS The analysis to determine the boration requirements assumed that the Reactor Coolant System is borated concurrently with cooldown. In the limiting situation when letdown is not available, the cooldown is assumed to be initiated within 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> and cooldown to 220°F, is completed in the next 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br />.

A minimum boron concentration of 1720 ppm is required in the RWST at all times in order to satisfy safety analysis assumptions for boron dilution incidents and other transients using the RWST as a borated water source as well as the analysis assumption to determine the boration requirement to ensure adequate SHUTDOWN MARGIN.

Paragraph (a)(4) of 10CFR50.65 Maintenance Rule requires that licensees assess and manage the increase in risk that may result from proposed maintenance activities, including out of service Structures, Systems, and Components (SSCs).

Management of risk involves consideration of incremental and aggregate impacts. The incremental risk increase is predominantly assessed using quantitative PRA methods, which measure the effect on core damage frequency and large early release frequency associated with the plant configuration. The risk increase is then managed in accordance with action thresholds defined by NUMARC 93-01. The aggregate impact is controlled by meeting Maintenance Rule requirements for establishing and meeting SSC performance criteria. These requirements include consideration of the risk significance of SSCs in establishing performance goals. Significant risk impacts are documented in the corrective action program and assessed as appropriate.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.8.a verifies the boron concentration in each water source and the water level in each water source. This assures the availability of the borated water source for boron dilution incidents and other transients using the BAST and RWST as a borated water sources.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.8.b verifies the RWST temperature is greater than 35°F when in MODES 3 and 4 and the RWST ambient air temperature is less than 35°F.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.8.c verifies the RWST temperature is greater than 50°F when in MODES 1 and 2 and the RWST ambient air temperature is less than 50°F.

TECHNICAL SURVEILLANCE REQUIREMENT 4.1.2.8.d verifies the BAST temperature is greater than 55°F. This may be accomplished by verifying that the ambient air temperature in the vicinity of the BAST is greater than 55°F.

REFERENCE:

1. License Amendment 283 MILLSTONE - UNIT 2 TRM 3/4 1-19 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS FIGURE 3.1-1 MINIMUM VOLUME VS STORED BAST CONCENTRATION (WT% BORIC ACID) 8000 7900 7661 7450 Region of Acceptable Operation PMM (BORON) in RWST 7000 6950 6850 6750 6455 6350 6200 1720 ppm 6000 5950 6000 6000 Minimum BAST Volume (Gallons) 5663 5600 1800 ppm 5450 5450 5200 5150 1900 ppm 5000 4900 4878 4900 4650 4600 4593 2000 ppm 4350 4350 4200 2100 ppm 4050 4050 4000 3750 3750 3750 2200 ppm Region of 3450 3400 Unacceptable Operation 3200 2300 ppm 3000 Stored BAST Concentration (wt% Boric Acid)

MILLSTONE - UNIT 2 TRM 3/4 1-20 LBDCR 09-MP2-003 May 15, 2009

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTIVE INSTRUMENTATION TECHNICAL REQUIREMENT 3.3.1.1 In accordance with Technical Specification LCO 3.3.1.1, Reactor Protective Instrumentation.

APPLICABILITY:

In accordance with Technical Specification LCO 3.3.1.1.

ACTION:

In accordance with Technical Specification LCO 3.3.1.1.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.1.1.3 The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be demonstrated to be within its limit as listed in TRM Table 3.3-2, in accordance with the test frequency specified in TS SR 4.3.1.1.3.

BASES:

In accordance with Technical Specification Bases section 3/4.3.1.

REFERENCE:

1. CR M3-00-02659.
2. Technical Specification section 3/4.3.1 MILLSTONE - UNIT 2 TRM 3/4 3-1 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-2 Reactor Protective Instrumentation Response Times FUNCTIONAL FUNCTIONAL Unit Description Response Time Unit No.

1 Manual Reactor Trip 2.0 seconds 2 Power Level - High 2.a Neutron Flux power 0.4 seconds 2.b Delta T Power 8.4 seconds# and 8.0 seconds##

3 Reactor Coolant Flow - Low 0.65 seconds 4 Pressurizer Pressure - High 0.90 seconds 5 Containment Pressure - High 0.90 seconds 6 Steam Generator Pressure - Low 0.90 seconds 7 Steam Generator Water Level - Low 0.90 seconds 8 Local power Density - High 8.a Neutron Flux Power 0.40 seconds*

8.b Delta T Power 8.4 seconds# and 8.0 seconds##

9 Thermal Margin/Low Pressure 9.a Pressurizer Pressure/Neutron Flux Power 0.90 seconds 9.b Delta T Power 0.89 seconds# and 8.0 seconds##

10 Loss of Turbine - Hydraulic Fluid Pressure Not Applicable

  • Neutron detectors are exempt from response time testing. Response time of the neutron flux signal portion of the signal shall be measured from the detector output or input of first electronic component in channel.
  1. Response time includes contribution of RTDs
    1. RTD response time only. This value is equivalent to the time interval required for the RTD's output to achieve 63.2% of its total change when subjected to a step change in RTD temperature.

MILLSTONE - UNIT 2 TRM 3/4 3-2 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR TRIP SYSTEM INSTRUMENTATION PRESSURIZER HIGH PRESSURE CHANNELS TECHNICAL REQUIREMENT 3.3.1.1.1 All pressurizer high pressure reactor protection channels shall be FUNCTIONAL.

APPLICABILITY:

In accordance with Technical Specification LCO 3.3.1.1 Applicability.

ACTION:

Restore any nonfunctional pressurizer high pressure reactor protection channel to FUNCTIONAL status within 30 days of placing the channel in the tripped condition, or be in MODE 3 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> with the failed channel in the bypassed condition.

MILLSTONE - UNIT 2 TRM 3/4 3-3 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR TRIP SYSTEM INSTRUMENTATION PRESSURIZER HIGH PRESSURE CHANNELS TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.1.1.4 In accordance with Technical Specification LCO 3.3.1.1 Surveillance Requirements.

BASES:

Technical Specification 3.3.1.1, Instrumentation - Reactor Protective Instrumentation ACTION 2, requires an inoperable reactor protection channel to be placed in the tripped condition if not restored to the OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />. With a pressurizer high pressure channel in the tripped condition, the high failure of a second pressurizer pressure channel would initiate a reactor trip and open both pressurizer power operated relief valves (PORVs). Opening the pressurizer PORVs would result in an undesired loss of primary coolant. To minimize the risk of a loss of primary coolant associated with a second failure, a 30 day restriction on plant operation with a failed high pressurizer pressure channel in the tripped condition is necessary. If the channel is not restored to OPERABLE status the plant shall be shutdown to MODE 3, where this function is not required by Technical Specifications. After entering MODE 3, the failed channel shall be placed in the bypassed condition.

REFERENCE:

1. Condition Report M3-00-02659 MILLSTONE - UNIT 2 TRM 3/4 3-4 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.2 ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TECHNICAL REQUIREMENT 3.3.2.1 In accordance with Technical Specification LCO 3.3.2.1, Engineered Safety Feature Actuation System Instrumentation.

APPLICABILITY:

In accordance with Technical Specification LCO 3.3.2.1.

ACTION:

In accordance with Technical Specification LCO 3.3.2.1.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.2.1.3 The ENGINEERED SAFETY FEATURES RESPONSE TIME of each ESF function shall be demonstrated to be within the limit as listed in TRM Table 3.3-5, in accordance with the test frequency specified in TS SR 4.3.2.1.3.

BASES:

In accordance with Technical Specification Bases section 3/4.3.2.

REFERENCE:

1. CR M3-00-2659
2. Technical Specification section 3/4.3.2
3. NRC Generic Letter 96-01, Testing of Safety Related Logic Circuits MILLSTONE - UNIT 2 TRM 3/4 3-5 LBDCR 07-MP2-010 October 5, 2009

Table 3.3-5 Engineered Safety Features Response Times Initiating Signal and Function Response Time in Seconds Equipment Tested

1. Manual
a. SIAS Safety Injection (ECCS) Not Applicable Not Applicable Containment Isolation Not Applicable Not Applicable Enclosure Building Filtration System Not Applicable Not Applicable
b. CSAS Containment Spray Not Applicable Not Applicable
c. CIAS Containment Isolation Not Applicable Not Applicable
d. SRAS Containment Sump Recirculation Not Applicable Not Applicable
e. EBFAS Enclosure Building Filtration System Not Applicable Not Applicable
f. Auxiliary Feedwater Initiation Not Applicable Not Applicable
g. Main Steam Isolation Not Applicable Not Applicable
2. Pressurizer Pressure - Low
a. Safety Injection (ECCS)
1) High Pressure Safety Injection 25.0*/10.0** See Table 3.3-5A
2) Low Pressure Safety Injection 45.0*/30.0** See Table 3.3-5B
3) Charging Pump 35.0*/35.0** See Table 3.3-5C
4) Containment Air Recirculation System 26.0*/15.0** See Table 3.3-5D
b. Containment Isolation 7.5 See Table 3.3-5E
c. Enclosure Building Filtration System 45.0*/45.0** See Table 3.3-5F MILLSTONE - UNIT 2 TRM 3/4 3-6 TRMCR 01-2-11 December 6, 2001

Table 3.3-5 Engineered Safety Features Response Times Initiating Signal and Function Response Time in Seconds Equipment Tested

3. Containment Pressure - High
a. Safety Injection (ECCS)
1) High Pressure Safety Injection 25.0*/10.0** See Table 3.3-5A
2) Low Pressure Safety Injection 45.0*/30.0** See Table 3.3-5B
3) Charging Pumps 35.0*/35.0** See Table 3.3-5C
4) Containment Air Recirculation 26.0*/15.0** See Table 3.3-5D System
b. Containment Isolation 7.5 See Table 3.3-5E
c. Enclosure Building Filtration System 45.0*/45.00** See Table 3.3-5F
d. Main Steam Isolation 6.9 See Table 3.3-5G
e. Feedwater Isolation 14 See Table 3.3-5H
4. Containment Pressure -- High-High
a. Containment Spray 35.6*(1)/16.0**(1) See Table 3.3-5I
5. DELETED
6. Steam Generator Pressure - Low
a. Main Steam Isolation 6.9 See Table 3.3-5G
b. Feedwater Isolation 14 See Table 3.3-5H
7. Refueling Water Storage Tank - Low
a. Containment Sump 120 See Table 3.3-5K Recirculation
8. Steam Generator Level - Low
a. Auxiliary Feedwater System 240/ > 180 See Table 3.3-5L
b. Steam Generator Blooding 10 Isolation MILLSTONE - UNIT 2 TRM 3/4 3-7 LBDCR 02-2-12 September 19, 2002

Table 3.3-5 Engineered Safety Features Response Times Table Notation

  • Diesel generator starting and sequence loading delays included.
    • Diesel generator starting and sequence loading delays not included.

(1) Header fill time not included.

MILLSTONE - UNIT 2 TRM 3/4 3-8 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS Table 3.3-5A High Pressure Safety Injection TECHNICAL ESF Actuation Tested Equipment REQUIREMENT Signal Equipment Action 2a1, 3a1 SIAS P41A Start 2a1, 3a1 SIAS P41B Start 2a1, 3a1 SIAS P41C Start 2a1, 3a1 SIAS 2-SI-616 Open 2a1, 3a1 SIAS 2-SI-617 Open 2a1, 3a1 SIAS 2-SI-626 Open 2a1, 3a1 SIAS 2-SI-627 Open 2a1, 3a1 SIAS 2-SI-636 Open 2a1, 3a1 SIAS 2-SI-637 Open 2a1, 3a1 SIAS 2-SI-646 Open 2a1, 3a1 SIAS 2-SI-647 Open 2a1, 3a1 SIAS 2-SI-618 Close 2a1, 3a1 SIAS 2-SI-628 Close 2a1, 3a1 SIAS 2-SI-638 Close 2a1, 3a1 SIAS 2-SI-648 Close Notes for Table 3.3-5A:

1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
2. HPSI Pumps - The pump under test is aligned with its recirculation valves open and its facility stop valve closed. Timing for the component actuation portion of the response time begins with the pump start signal and ends when the required Technical Specification pump PSID is developed.
3. HPSI Valves - Timing for the component actuation portion of the response time begins with the valve open (or close) signal and ends when the control board valve position lamps indicate full travel.

MILLSTONE - UNIT 2 TRM 3/4 3-9 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5B Low Pressure Safety Injection TECHNICAL ESF Actuation Equipment Tested Equipment REQUIREMENT Signal Action 2a2, 3a2 SIAS P42A Start 2a2, 3a2 SIAS P42B Start 2a2, 3a2 SIAS 2-SI-615 Open 2a2, 3a2 SIAS 2-SI-625 Open 2a2, 3a2 SIAS 2-SI-635 Open 2a2, 3a2 SIAS 2-SI-645 Open Notes for Table 3.3-5B:

1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
2. LPSI Pumps - The pump under test is aligned with its recirculation valves open and its facility stop valve closed. Timing for the component actuation portion of the response time begins with the pump start signal and ends when the required Technical Specification pump PSID is developed.
3. LPSI Valves - Timing for the component actuation portion of the response time begins with the valve open (or close) signal and ends when the control board valve position lamps indicate full travel.

MILLSTONE - UNIT 2 TRM 3/4 3-10 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5C Charging Pump TECHNICAL ESF Actuation Signal Equipment Tested Equipment REQUIREMENT Action 2a3, 3a3 note 6 SIAS P18A Start 2a3, 3a3 note 6 SIAS P18B Start 2a3, 3a3 note 6 SIAS P18C Start 2a3, 3a3 note 3, 4 SIAS P19A Start 2a3, 3a3 note 3, 4 SIAS P19B Start 2a3, 3a3 note 3, 5 SIAS 2-CH-501 Close 2a3, 3a3 note 3, 5 SIAS 2-CH-510 Close 2a3, 3a3 note 3, 5 SIAS 2-CH-511 Close 2a3, 3a3 note 3, 5 SIAS 2-CH-512 Close 2a3, 3a3 note 3, 5 SIAS 2-CH-508 Open 2a3, 3a3 note 3, 5 SIAS 2-CH-509 Open 2a3, 3a3 note 3, 5 SIAS 2-CH-514 Open Notes for Table 3.3-5C:

1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
2. Charging Pumps - Initially, one charging pump is running. The pump under test is initially off.

Timing for the component actuation portion of the response time begins with the pump start signal and ends when charging header flow has increased by the required GPM.

MILLSTONE - UNIT 2 TRM 3/4 3-11 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5C Charging Pump

3. Response time testing of this component is outside the scope of Technical Specification Surveillance 4.3.2.1.3. However, verification of the response time of this component is necessary to ensure that the equipment is capable of supporting the safety function within the response times assumed in the accident analyses. If the overall response time of this component does not meet the required response time, FUNCTIONALITY and Reportability Determinations should be performed to ensure the accident analyses assumptions are met.
4. Boric acid pumps - Timing for the component actuation portion of the response time begins with the pump start signal and ends when the required Technical Specification pump PSID is developed.
5. The component actuation time of this component is tested under the IST program. The acceptance criteria for the component actuation time is established conservatively, such that the overall response time criteria will be met if the component actuation time is met.
6. Any charging pump with its control switch positioned to Pull-To-Lock (PTL) will be precluded from automatic operation under both normal and abnormal (e.g., SIAS) signal.

MILLSTONE - UNIT 2 TRM 3/4 3-12 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5D Containment Air Recirculation System TECHNICAL ESF Actuation Equipment Tested Equipment Action REQUIREMENT Signal 2a4, 3a4 SIAS CAR F14A Start Slow Speed 2a4, 3a4 SIAS CAR F14B Start Slow Speed 2a4, 3a4 SIAS CAR F14C Start Slow Speed 2a4, 3a4 SIAS CAR F14D Start Slow Speed 2a4, 3a4 note 3, 4 SIAS 2-RB-210 (HV-6739) Close 2a4, 3a4 note 3, 4 SIAS 2-RB-28.3A (HV-6080) Open 2a4, 3a4 note 3, 4 SIAS 2-RB-28.3B (HV-6084) Open 2a4, 3a4 note 3, 4 SIAS 2-RB-28.3C (HV-6088) Open 2a4, 3a4 note 3, 4 SIAS 2-RB-28.3D (HV-6092) Open 2a4, 3a4 note 3, 4 SIAS 2-RB-8.1A (HV-6315) Close 2a4, 3a4 note 3, 4 SIAS 2-RB-8.1B (HV-6316) Close 2a4, 3a4 note 3, 4 SIAS 2-RB-68.1A (HV-6731) Open 2a4, 3a4 note 3, 4 SIAS 2-RB-68.1B (HV-6735) Open 2a4, 3a4 note 3, 4 CIAS 2-RB-402 Close 2a4, 3a4 note 3, 4 SIAS 2-SW-8.1A (HV-6308) Open 2a4, 3a4 note 3, 4 SIAS 2-SW-8.1B (HV-6307) Open 2a4, 3a4 note 3, 4 SIAS 2-SW-8.1C (HV-6706) Open 2a4, 3a4 note 3, 4 SIAS 2-SW-3.2A (HV-6438) Close 2a4, 3a4 note 3, 4 SIAS 2-SW-3.2B (HV-6439) Close Notes for Table 3.3-5D:

1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
2. The CAR fans are individually started and stopped in slow speed. Timing for the component actuation portion of the response time begins with the fan start signal and ends when the CAR fan motor current decays to the normal steady state, slow speed motor current (Amperes) following the initial motor in-rush current.

MILLSTONE - UNIT 2 TRM 3/4 3-13 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5D CONTAINMENT AIR RECIRCULATION SYSTEM

3. Response time testing of this component is outside the scope of Technical Specification Surveillance 4.3.2.1.3. However, verification of the response time of this component is necessary to ensure that the equipment is capable of supporting the safety function within the response times assumed in the accident analyses. If the overall response time of this component does not meet the required response time, FUNCTIONALITY and Reportability Determinations should be performed to ensure the accident analyses assumptions are met.
4. The component actuation time of this component is tested under the IST program. The acceptance criteria for the component actuation time is established conservatively, such that the overall response time criteria will be met if the component actuation time is met.

MILLSTONE - UNIT 2 TRM 3/4 3-14 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5E Containment Isolation TECHNICAL ESF Actuation Equipment Tested Equipment REQUIREMENT Signal Action 2b, 3b CIAS 2-AC-12 (HV-8122) Close 2b, 3b CIAS 2-AC-15 (HV-8124) Close 2b, 3b CIAS 2-AC-20 (HV-8656) Close 2b, 3b CIAS 2-AC-47 (HV-8121) Close 2b, 3b CIAS 2-CH-089 (HV-2525) Close 2b, 3b CIAS 2-CH-198 Close 2b, 3b CIAS 2-CH-505 Close 2b, 3b CIAS 2-CH-506 Close 2b, 3b CIAS 2-CH-516 Close 2b, 3b CIAS 2-EB-100 (HV-8378) Close 2b, 3b CIAS 2-EB-88 (HV-8150) Close 2b, 3b CIAS 2-EB-89 (HV-8151) Close 2b, 3b CIAS 2-EB-91 (HV-8380) Close 2b, 3b CIAS 2-EB-92 (HV-8379) Close 2b, 3b CIAS 2-EB-99 (HV-8377) Close 2b, 3b CIAS 2-GR-11.1 (HV-9125) Close 2b, 3b CIAS 2-GR-11.2 (HV-9126) Close 2b, 3b CIAS 2-LRR-43.1 (HV-9015) Close 2b, 3b CIAS 2-LRR-43.2 (HV-9016) Close 2b, 3b CIAS 2-LRR-61.1 (HV-9230) Close 2b, 3b CIAS 2-MS-191A (HV-4250) Close 2b, 3b CIAS 2-MS-191B (HV-4251) Close 2b, 3b CIAS 2-MS-220A (HV-4246) Close 2b, 3b CIAS 2-MS-220B (HV-4248) Close 2b, 3b CIAS 2-PMW-43 (HV-7311) Close 2b, 3b CIAS 2-RC-001 (HV-1064) Close 2b, 3b CIAS 2-RC-002 (HV-1062) Close 2b, 3b CIAS 2-RC-003 (HV-1060) Close 2b, 3b CIAS 2-RC-45 (HV-7690) Close 2b, 3b CIAS 2-SI-312 (HV-7312) Close 2b, 3b CIAS 2-SSP-16.1 (HV-9151) Close 2b, 3b CIAS 2-SSP-16.2 (HV-9150) Close MILLSTONE - UNIT 2 TRM 3/4 3-15 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5E CONTAINMENT ISOLATION Notes for Table 3.3-5E:

1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
2. Containment Isolation Valves - Timing for the component actuation portion of the response time begins with the valve close signal and ends when the control board valve position lamps indicate full travel.

MILLSTONE - UNIT 2 TRM 3/4 3-16 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS Table 3.3-5F Enclosure Building Filtration The EBFAS fan being tested is aligned with its suction damper and header isolation damper open.

Timing begins with a fan start signal and ends when EBFAS train D/P is stable.

TECHNICAL ESF Actuation Equipment Tested Equipment REQUIREMENT Signal Action 2c, 3c EBFAS F25A Start 2c, 3c EBFAS F25B Start Notes for Table 3.3-5F:

1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/

differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).

2. The EBFAS fan under tested is aligned with its suction damper and header isolation damper open. Timing for the component actuation portion of the response time begins with the fan start signal and ends when EBFAS train D/P is stable.

MILLSTONE - UNIT 2 TRM 3/4 3-17 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5G Main Steam Isolation TECHNICAL ESF Actuation Equipment Tested Equipment REQUIREMENT Signal Action 3d, 6a MSI MSIV HV-4217A Close (MS-64A) 3d, 6a MSI MSIV HV-4217B Close (MS-64A) 3d, 6a MSI MSIV HV-4221A Close (MS-64B) 3d, 6a MSI MSIV HV-4221B Close (MS-64B)

Notes for Table 3.3-5G:

1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
2. The MSIV being tested is aligned open with its bypass valve open. Timing for the component actuation portion of the response time begins with the valve close signal and ends when the MSIV indicates closed.

MILLSTONE - UNIT 2 TRM 3/4 3-18 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5H Feedwater Isolation TECHNICAL ESF Actuation Equipment Tested Equipment REQUIREMENT Signal Action 3e, 6b MSI 2-FW-38A (HV-5245) Close 3e, 6b MSI 2-FW-38B (HV-5247) Close 3e, 6b MSI 2-FW-41A (HV-5215) Close 3e, 6b MSI 2-FW-41B (HV-5216) Close 3e, 6b MSI 2-FW-42A (HV-5263) Close 3e, 6b MSI 2-FW-42B (HV-5264 ) Close 3e, 6b MSI 2-FW-51A (HV-5268) Close 3e, 6b MSI 2-FW-51B (HV-5269) Close 3e, 6b MSI 2-MS-265B (HV-4193) Close 3e, 6b MSI 2-MS-266B (HV-4209) Close 3e, 6b MSI SGFP Turb H5A Stop 3e, 6b MSI SGFP Turb H5B Stop Notes for Table 3.3-5H:

1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).

MILLSTONE - UNIT 2 TRM 3/4 3-19 LBDCR 11-MP2-008 June 3, 2011

TECHNICAL REQUIREMENTS Table 3.3-5I Containment Spray TECHNICAL ESF Actuation Equipment Tested Equipment REQUIREMENT Signal Action 4a CSAS CS P43A Start 4a CSAS CS P43B Start 4a CSAS 2-CS-4.1A (HV-3021) Open 4a CSAS 2-CS-4.1B (HV-3022) Open Notes for Table 3.3-5I:

1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
2. CS Pumps - The pump being tested is aligned with its minimum flow recirculation valves open. If Shutdown Cooling (SDC) is in operation, the CS header isolation valve is closed. If SDC is not in operation, the CS pump discharge valve is closed. Timing for the component actuation portion of the response time begins with the pump start signal and ends when the required pump differential pressure (psid) is established and stable.
3. CS Valves - Timing for the component actuation portion of the response time begins with the valve open signal and ends when the control board valve position lamps indicate full travel.

MILLSTONE - UNIT 2 TRM 3/4 3-20 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5J Deleted MILLSTONE - UNIT 2 TRM 3/4 3-21 TRMCR 02-2-12 September 19, 2002

TECHNICAL REQUIREMENTS Table 3.3-5K Containment Sump Recirculation TECHNICAL ESF Actuation Equipment Tested Equipment REQUIREMENT Signal Action 7a SRAS 2-CS-16.1A (HV-3008) Open 7a SRAS 2-CS-16.1B (HV-3009) Open Notes for Table 3.3-5K:

1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
2. Containment Sump Outlet Isolation Valves - Timing for the component actuation portion of the response time begins with the valve open signal and ends when the control board valve position lamps indicate full travel.

MILLSTONE - UNIT 2 TRM 3/4 3-22 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5L Auxiliary Feedwater System TECHNICAL ESF Actuation Equipment Tested Equipment REQUIREMENT Signal Action 8a AFAIS 2-FW-43A (HV-5276) Open 8a AFAIS 2-FW-43B (HV-5279) Open 8a AFAIS AFW P9A Start 8a AFAIS AFW P9B Start Notes for Table 3.3-5L:

1. Response time is defined as the time interval from when the monitored process parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge/differential pressures reach their required values, etc.). The response time includes the signal processing time, ESAS actuation time, diesel generator starting and sequencing time (when applicable), and component actuation time (e.g., valve opening or closing stroke time, motor and pump acceleration time).
2. The AFW pump being tested is aligned for recirculation. Timing for the component actuation portion of the response time test begins with the start logic satisfied and ends when the aux feedwater pump develops the required differential pressure and valves HV-5276/FW-43A (HV-5279/FW-43B) are open.

MILLSTONE - UNIT 2 TRM 3/4 3-23 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested The following components receive ESF Actuation Signals, but do not affect the response time of the ESF functions listed in Table 3.3-5. Therefore, the components listed below are not periodically time response tested SF Actuation Equipment Equipment Basis Signal Not Tested Action SIAS 2-CH-196 Close The timing for primary make-up water isolation does not affect the charging volumetric flow function.

SIAS 2-CH-515 Close Timing for let down isolation does not affect the charging function.

SIAS 2-CHW-11 (HV-8847) Close The timing for closure of this chilled water valve is not critical to establishing the safety function assumed in the accident analysis.

SIAS 2-CHW-12 (HV-8854) Close The timing for closure of this chilled water valve is not critical to establishing the safety function assumed in the accident analysis.

SIAS 2-CHW-13 (HV-8850) Close The timing for closure of this chilled water valve is not critical to establishing the safety function assumed in the accident analysis.

SIAS 2-CHW-14 (HV-8855) Close The timing for closure of this chilled water valve is not critical to establishing the safety function assumed in the accident analysis.

SIAS 2-CHW-3 (HV-8846) Open The timing for closure of this chilled water valve is not critical to establishing the safety function assumed in the accident analysis.

SIAS 2-CHW-33 (HV-8853) Open The timing for closure of this chilled water valve is not critical to establishing the safety function assumed in the accident analysis.

SIAS 2-SI- 634 Open The SIT Valves are disabled in the open position during heat up.

SIAS 2-SI-614 Open The SIT Valves are disabled in the open position during heat up.

SIAS 2-SI-624 Open The SIT Valves are disabled in the open position during heat up.

SIAS 2-SI-644 Open The SIT Valves are disabled in the open position during heat up.

SIAS F112A Inhibit The timing of the inhibit of Battery Room Vent Fan A does not impact the initiation of the safety injection function.

MILLSTONE - UNIT 2 TRM 3/4 3-24 TRMCR 01-2-6 May 24, 2001

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested SIAS F112B Inhibit The timing of the inhibit of Battery Room Vent Fan B does not impact the initiation of the safety injection function.

SIAS F13A Inhibit CEDM cooling fans do not support completion of the safety injection function.

SIAS F13B Inhibit CEDM cooling fans do not support completion of the safety injection function.

SIAS F13C Inhibit CEDM cooling fans do not support completion of the safety injection function.

SIAS F15A Start The response time for the start of the ESF room recirculation fans is not critical to the safety injection function.

SIAS F15B Start The response time for start of the ESF room recirculation fans is not critical to the safety injection function.

SIAS F54A Start The response time for start of the DC vital switchgear room cooling fans is not critical to the safety injection function.

SIAS F54B Start The response time for start of the DC vital switchgear room cooling fans is not critical to the safety injection function.

SIAS H7A Start The diesel generators are tested per the Tech Specs. The diesel starting and load sequencing time is included in the ESF Response Time when required.

SIAS H7B Start The diesel generators are tested per the Tech Specs. The diesel starting and load sequencing time is included in the ESF Response Time when required.

MILLSTONE - UNIT 2 TRM 3/4 3-25 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested SIAS P5A Start The SW pumps are not ESF equipment. It is impractical to response time test the component actuation time for these pumps. This is considered acceptable because the component actuation time (i.e., motor and pump acceleration time) is small compared with the time for signal processing, ESAS actuation, and diesel starting and load sequencing. The time for signal processing, ESAS actuation, and diesel starting and load sequencing are response time tested and the acceptance criteria are set consistent with the response time assumed in the accident analysis, including an allowance for motor and pump acceleration time.

Periodic surveillance testing and the IST will detect any changes in the performance characteristics of the pump.

SIAS P5B Start The SW pumps are not ESF equipment. It is impractical to response time test the component actuation time for these pumps. This is considered acceptable because the component actuation time (i.e., motor and pump acceleration time) is small compared with the time for signal processing, ESAS actuation, and diesel starting and load sequencing. The time for signal processing, ESAS actuation, and diesel starting and load sequencing are response time tested and the acceptance criteria are set consistent with the response time assumed in the accident analysis, including an allowance for motor and pump acceleration time.

Periodic surveillance testing and the IST will detect any changes in the performance characteristics of the pump.

MILLSTONE - UNIT 2 TRM 3/4 3-26 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested SIAS P5C Start The SW pumps are not ESF equipment. It is impractical to response time test the component actuation time for these pumps. This is considered acceptable because the component actuation time (i.e., motor and pump acceleration time) is small compared with the time for signal processing, ESAS actuation, and diesel starting and load sequencing. The time for signal processing, ESAS actuation, and diesel starting and load sequencing are response time tested and the acceptance criteria are set consistent with the response time assumed in the accident analysis, including an allowance for motor and pump acceleration time.

Periodic surveillance testing and the IST will detect any changes in the performance characteristics of the pump.

SIAS P11A Start The RBCCW pumps are not ESF equipment. It is impractical to response time test the component actuation time for these pumps. This is considered acceptable because the component actuation time (i.e., motor and pump acceleration time) is small compared with the time for signal processing, ESAS actuation, and diesel starting and load sequencing. The time for signal processing, ESAS actuation, and diesel starting and load sequencing are response time tested and the acceptance criteria are set consistent with the response time assumed in the accident analysis, including an allowance for motor and pump acceleration time. Periodic surveillance testing and the IST will detect any changes in the performance characteristics of the pump.

MILLSTONE - UNIT 2 TRM 3/4 3-27 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested SIAS P11B Start The RBCCW pumps are not ESF equipment. It is impractical to response time test the component actuation time for these pumps. This is considered acceptable because the component actuation time (i.e., motor and pump acceleration time) is small compared with the time for signal processing, ESAS actuation, and diesel starting and load sequencing. The time for signal processing, ESAS actuation, and diesel starting and load sequencing are response time tested and the acceptance criteria are set consistent with the response time assumed in the accident analysis, including an allowance for motor and pump acceleration time. Periodic surveillance testing and the IST will detect any changes in the performance characteristics of the pump.

SIAS P11C Start The RBCCW pumps are not ESF equipment. It is impractical to response time test the component actuation time for these pumps. This is considered acceptable because the component actuation time (i.e., motor and pump acceleration time) is small compared with the time for signal processing, ESAS actuation, and diesel starting and load sequencing. The time for signal processing, ESAS actuation, and diesel starting and load sequencing are response time tested and the acceptance criteria are set consistent with the response time assumed in the accident analysis, including an allowance for motor and pump acceleration time. Periodic surveillance testing and the IST will detect any changes in the performance characteristics of the pump.

SIAS P122A Start The timing for start of the vital switchgear chilled water pumps is not critical to establishing the safety function assumed in the accident analysis.

SIAS P122B Start The timing for start of the vital switchgear chilled water pumps is not critical to establishing the safety function assumed in the accident analysis.

SIAS X169A Start The timing for start of the DC Swgr Room Chillers is not critical to establishing the safety function assumed in the accident analysis.

SIAS X169B Start The timing for start of the DC Swgr Room Chillers is not critical to establishing the safety function assumed in the accident analysis.

MILLSTONE - UNIT 2 TRM 3/4 3-28 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested CIAS 2-AC-1 (HV-8050) Close Enclosure building damper, not a containment isolation valve. FUNCTIONAL testing verifies that the damper goes to the required position. The component actuation time is not critical to the accident analysis assumption. Therefore response time testing is not required.

CIAS 2-AC-3 (HV-8081) Open Enclosure building damper, not a containment isolation valve. FUNCTIONAL testing verifies that the damper goes to the required position. The component actuation time is not critical to the accident analysis assumption. Therefore response time testing is not required.

CIAS 2-AC-8 (HV-8127) Open Enclosure building damper, not a containment isolation valve. FUNCTIONAL testing verifies that the damper goes to the required position. The component actuation time is not critical to the accident analysis assumption. Therefore response time testing is not required.

CIAS 2-AC-11 (HV-8128) Close Enclosure building damper, not a containment isolation valve. FUNCTIONAL testing verifies that the damper goes to the required position. The component actuation time is not critical to the accident analysis assumption. Therefore response time testing is not required.

CIAS 2-AC-527 (HV- Close This valve isolates Radiation Monitor RM-8262 to prevent leakage from the 8262AB1) radiation monitors when the containment isolation valves in the sample lines are re-opened manually to align the hydrogen analyzers and PASS after an accident. This valve is subject to the leak requirements of Appendix J and ISI/

IST requirements. The timing for closure for this valve is not critical to the accident analysis assumptions regarding containment isolation. The function of this valve is to protect the radiation monitor after the containment isolation valves have performed their functions and are opened manually to provide flow to the H2 analyzer and for PASS MILLSTONE - UNIT 2 TRM 3/4 3-29 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested CIAS 2-AC-528 (HV- Close This valve isolates Radiation Monitor RM-8262 to prevent leakage from the 8262AB2) radiation monitors when the containment isolation valves in the sample lines are re-opened manually to align the hydrogen analyzers and PASS after an accident. This valve is subject to the leak requirements of Appendix J and ISI/

IST requirements. The timing for closure for this valve is not critical to the accident analysis assumptions regarding containment isolation. The function of this valve is to protect the radiation monitor after the containment isolation valves have performed their functions and are opened manually to provide flow to the H2 analyzer and for PASS CIAS 2-AC-529 (HV- Close This valve isolates Radiation Monitor RM-8123 to prevent leakage from the 8123AB1) radiation monitors when the containment isolation valves in the sample lines are re-opened manually to align the hydrogen analyzers and PASS after an accident. This valve is subject to the leak requirements of Appendix J and ISI/

IST requirements. The timing for closure for this valve is not critical to the accident analysis assumptions regarding containment isolation. The function of this valve is to protect the radiation monitor after the containment isolation valves have performed their functions and are opened manually to provide flow to the H2 analyzer and for PASS CIAS 2-AC-530 (HV- Close This valve isolates Radiation Monitor RM-8123 to prevent leakage from the 8123AB2) radiation monitors when the containment isolation valves in the sample lines are re-opened manually to align the hydrogen analyzers and PASS after an accident. This valve is subject to the leak requirements of Appendix J and ISI/

IST requirements. The timing for closure for this valve is not critical to the accident analysis assumptions regarding containment isolation. The function of this valve is to protect the radiation monitor after the containment isolation valves have performed their functions and are opened manually to provide flow to the H2 analyzer and for PASS MILLSTONE - UNIT 2 TRM 3/4 3-30 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested CIAS F23 Stop The containment PURGE supply fan does not perform a containment isolation function. The response time for stopping the fan on a CIAS is not critical to the safety function assumed in the accident analysis.

CIAS F39A Stop The containment radiation monitor fan does not perform a containment isolation function. The response time for stopping the fan on a CIAS is not critical to the safety function assumed in the accident analysis.

CIAS F39B Stop The containment radiation monitor fan does not perform a containment isolation function. The response time for stopping the fan on a CIAS is not critical to the safety function assumed in the accident analysis.

CIAS P33A Stop Containment sump pumps are stopped on a CIAS for equipment protection. The time it takes to stop the pumps does not effect the completion of the containment isolation function.

CIAS P33B Stop Containment sump pumps are stopped on a CIAS for equipment protection. The time it takes to stop the pumps does not effect the completion of the containment isolation function.

EBFAS 2-EB-40 (HV-8063) Open The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-EB-41 (HV-8070) Open The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-EB-42 (HV-8073) Open The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-EB-50 (HV-8153) Open The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-EB-51 (HV-8074) Open The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

MILLSTONE - UNIT 2 TRM 3/4 3-31 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested EBFAS 2-EB-52 (HV-8079) Open The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-EB-55 (HV-8654) Close The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-EB-56 (HV-8695) Close The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-EB-60 (HV-8143) Close The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-EB-61 (HV-8062) Close The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-EB-72 (HV-8650) Close The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-EB-73 (HV-8651) Close The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-HV-106 (HV-8133) Close The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-HV-107 (HV-8247) Close The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-HV-116 (HV-8249) Close The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

MILLSTONE - UNIT 2 TRM 3/4 3-32 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested EBFAS 2-HV-117 (HV-8248) Close The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-HV-202 (HV-8361) Close Control room isolation damper. The current TRM requirements do not include a response time for this function. Condition Report, CR M2-99-0282 was issued to investigate the need for response time testing of this component in accordance with the assumptions in the radiological accident analysis.

EBFAS 2-HV-207 (HV-8002) Close Control room isolation damper. The current TRM requirements do not include a response time for this function. Condition Report, CR M2-99-0282 was issued to investigate the need for response time testing of this component in accordance with the assumptions in the radiological accident analysis.

EBFAS 2-HV-208 (HV-8003B) Close Control room isolation damper. The current TRM requirements do not include a response time for this function. Condition Report, CR M2-99-0282 was issued to investigate the need for response time testing of this component in accordance with the assumptions in the radiological accident analysis.

EBFAS 2-HV-210 (HV-8005) Open The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. This damper is disable in the open position Therefore, individual component time response testing is not required.

EBFAS 2-HV-211 (HV-8004) Close The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-HV-212A (HV-8006) Open The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS 2-HV-212B (HV-8007) Open The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

MILLSTONE - UNIT 2 TRM 3/4 3-33 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested EBFAS 2-HV-495 Close Control room isolation damper. The current TRM requirements do not include a response time for this function. Condition Report, CR M2-99-0282 was issued to investigate the need for response time testing of this component in accordance with the assumptions in the radiological accident analysis.

EBFAS 2-HV-496 Close Control room isolation damper. The current TRM requirements do not include a response time for this function. Condition Report, CR M2-99-0282 was issued to investigate the need for response time testing of this component in accordance with the assumptions in the radiological accident analysis.

EBFAS 2-HV-497 Close Control room isolation damper. The current TRM requirements do not include a response time for this function. Condition Report, CR M2-99-0282 was issued to investigate the need for response time testing of this component in accordance with the assumptions in the radiological accident analysis.

EBFAS F32A Start The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS F32B Start The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS X61A Start The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

EBFAS X61B Start The EBFAS time response test is a system level test. Timing begins with a fan start signal and ends when EBFAS train D/P is stable. Therefore, individual component time response testing is not required.

MSIAS 2-MS-65A (HV-4218) Close The MSIV bypass valve is normally closed. It is only opened for a short time to equalize the pressure across the MSIV during plant start-up. Therefore response time testing is not required.

MILLSTONE - UNIT 2 TRM 3/4 3-34 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested MSIAS 2-MS-65B (HV-4222) Close The MSIV bypass valve is normally closed. It is only opened for a short time to equalize the pressure across the MSIV during plant start-up. Therefore response time testing is not required.

SRAS 2-RB-13.1A (HV- Open This RBCCW valve opens on an SRAS to direct RBCCW flow to the shutdown 6050) cooling heat exchanger. FUNCTIONAL testing of this valve is adequate to demonstrate that the safety function of this valve is met. Therefore, response time testing is not required.

SRAS 2-RB-13.1B (HV- Open This RBCCW valve opens on an SRAS to direct RBCCW flow to the shutdown 6055) cooling heat exchanger. FUNCTIONAL testing of this valve is adequate to demonstrate that the safety function of this valve is met. Therefore, response time testing is not required.

SRAS 2-SI-659 Close Closure of the RWST minflow valves prevents highly radioactive water from being sent to the RWST following an SRAS. FUNCTIONAL testing of this valve is adequate to demonstrate that the safety function of this valve is met.

Therefore, response time testing is not required.

SRAS 2-SI-660 Close Closure of the RWST minflow valves prevents highly radioactive water from being sent to the RWST following an SRAS. FUNCTIONAL testing of this valve is adequate to demonstrate that the safety function of this valve is met.

Therefore, response time testing is not required.

SRAS P42A Stop LPSI pumps, P42A and P42B are not time response tested because a failure of the pump to trip within the required SRAS response time would be considered a equipment failure issue as opposed to a time response issue.

SRAS P42B Stop LPSI pumps, P42A and P42B are not time response tested because a failure of the pump to trip within the required SRAS response time would be considered a equipment failure issue as opposed to a time response issue.

LOAD SHED 52-A302 Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

MILLSTONE - UNIT 2 TRM 3/4 3-35 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested LOAD SHED 52-A304 Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED 52-A312 Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED 52-A401 Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED 52-A410 Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED 52-A411 Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED 52-A505 Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED L105 Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED L106 Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED LO46A Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED LO46B L Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

MILLSTONE - UNIT 2 TRM 3/4 3-36 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested LOAD SHED P11A Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P11B Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P11C Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P41A Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P41B Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P41C Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P42A Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P42B Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P43A Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P43B Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

MILLSTONE - UNIT 2 TRM 3/4 3-37 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested LOAD SHED P5A Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P5B Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P5C Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P98 Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

LOAD SHED P9A Load Shed Response time testing of the load shed function is not required. The load shed function is tested implicitly during the Loss of Normal Power (LNP) test.

AEAS 2-EB-40 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-EB-41 Open The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-EB-42 Open The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-EB-50 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-EB-51 Open The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-EB-52 Open The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-EB-55 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-EB-56 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation MILLSTONE - UNIT 2 TRM 3/4 3-38 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested AEAS 2-EB-60 Open The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-EB-61 Open The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-EB-72 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-EB-73 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-HV-165 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-HV-170 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-HV-171 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-HV-202 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-HV-207 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-HV-208 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-HV-210 Open The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-HV-211 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-HV-212A Open The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation MILLSTONE - UNIT 2 TRM 3/4 3-39 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-5M Actuated Components Not Response Time Tested AEAS 2-HV-212B Open The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-HV-495 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-HV-496 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS 2-HV-497 Close The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS F20 Stop The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS F25A Start The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS F25B Start The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS F32A Start The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS F32B Start The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS X61A Start The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation AEAS X61B Start The fuel handling accident analysis does not credit any AEAS related ACTION for accident mitigation MILLSTONE - UNIT 2 TRM 3/4 3-40 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.2 INCORE DETECTOR INSTRUMENTATION TECHNICAL REQUIREMENT 3.3.3.2 The incore detection system shall be FUNCTIONAL with:

a. At least 34 (75% of 45) incore detector locations, and
b. A minimum of two quadrant symmetric incore detector locations per core quadrant, and
c. A minimum of 9 FUNCTIONAL incore detector segments at each detector segment level.

Where; A FUNCTIONAL incore detector segment shall consist of a FUNCTIONAL rhodium detector constituting one of the segments in a fixed detector string.

A FUNCTIONAL incore detection location shall consist of a string in which at least three of the four incore detector segments are FUNCTIONAL.

APPLICABILITY:

When the incore detection system is used for:

a. Monitoring the AZIMUTHAL POWER TILT,
b. Recalibration of the excore neutron flux detection system, or
c. Monitoring the TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR or the linear heat rate.

MILLSTONE - UNIT 2 TRM 3/4 3-41 LBDCR 18-MP2-007 November 29, 2018

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.2 INCORE DETECTOR INSTRUMENTATION TECHNICAL REQUIREMENT ACTION:

Either Action a AND b (if applicable) OR Action c must be satisfied.

a. With less than 34 (75% of 45) incore detector locations FUNCTIONAL and with Technical Requirement 3.3.3.2.b and 3.3.3.2.c satisfied, the system can be used for the above applicable monitoring or calibration functions provided that the number of FUNCTIONAL incore detector locations remain at least 27 (60% of 45 incore detection locations) and initiate corrective action to restore at least 34 (75% of 45 incore detector locations) FUNCTIONAL, AND
b. If less than 34 (75% of 45) incore detector locations are FUNCTIONAL during the first 30% power flux map following a core alteration, then limit power to 30% or less until a cycle specific fuel misload analysis has been performed and implemented, OR
c. Declare the incore detection system nonfunctional. With the incore detection system nonfunctional, do not use the system for the above applicable monitoring or calibration functions.

MILLSTONE - UNIT 2 TRM 3/4 3-42 LBDCR 18-MP2-007 November 29, 2018

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.2 INCORE DETECTOR INSTRUMENTATION TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.3.2 The incore detection system shall be demonstrated FUNCTIONAL:

a. By performance of a CHANNEL CHECK within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to its use and at least once per 7 days thereafter when required for:
1. Monitoring the AZIMUTHAL POWER TILT.
2. Recalibration of the excore neutron flux detection system, or
3. Monitoring the TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR or the linear heat rate.
b. At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but includes all electronic components. The neutron detectors shall be calibrated prior to installation in the reactor core.

BASES:

The FUNCTIONALITY of the incore detectors with the specified minimum compliment of equipment ensures that the measurements from use of this system accurately represent the spatial neutron flux distribution of the reactor core.

Analyses performed by Framatome and summarized in Reference 2, performed in accordance with the NRC approved methodology (Reference 1), conclude that the uncertainty limits on Linear Heat Rate and FTr, 7% and 6% respectively, are met with at least 27 (60% of 45) incore detector locations FUNCTIONAL. Reference 2 also demonstrates that the ASI uncertainty with 60% FUNCTIONAL detector locations is accommodated in the FSAR Chapter 14 Safety Analyses. In addition, when Action b is applicable, a cycle-specific analysis as was done in support of Cycle 26 (Reference 2),

must be performed to demonstrate the ability of the incore detection system to detect a fuel misload that could result in exceedance of a specified acceptable fuel design limit.

REFERENCE:

1. Siemens Report No. EMF-96-029(P)(A), dated January 1997, volumes 1 and 2, Reactor Analysis System for PWRs, Volume 1-Methodology Description, Volume 2 -

Benchmarking Results.

2. LBDCR 18-MP2-007, Functionality Definition Change for the Incore Detector Instrumentation.

MILLSTONE - UNIT 2 TRM 3/4 3-42a LBDCR 18-MP2-007 November 29, 2018

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.3 SEISMIC INSTRUMENTATION TECHNICAL REQUIREMENT 3.3.3.3. The seismic monitoring instrumentation channels shown in TRM Table 3.3-7 shall be FUNCTIONAL.

APPLICABILITY:

All MODES.

ACTION:

a. With the number of FUNCTIONAL seismic monitoring channels less than required by TRM Table 3.3-7, restore the nonfunctional channel(s) to FUNCTIONAL status within 30 days or otherwise enter the condition into the corrective action program.

MILLSTONE - UNIT 2 TRM 3/4 3-43 LBDCR 09-MP2-026 January 12, 2010

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.3 SEISMIC INSTRUMENTATION TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.3.3 Each of the above seismic monitoring instrumentation channels shall be Demonstrated FUNCTIONAL by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations at the frequencies shown in TRM Table 4.3-4.

BASES:

The FUNCTIONALITY of the seismic instrumentation ensures that sufficient capability is available to promptly determine the magnitude of a seismic event and evaluate the response of those features important to safety. This capability is required to permit comparison of the measured response to that used in the design of the facility.

REFERENCE:

1. Condition Report M3-00-02659 MILLSTONE - UNIT 2 TRM 3/4 3-44 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-7 Seismic Monitoring Instrumentation Response Times MINIMUM MEASUREMENT CHANNELS INSTRUMENT CHANNEL SENSOR LOCATION RANGE FUNCTIONAL

1. TIME HISTORY ACCELEROGRAPHS
a. Containment Base El. -240 @ 215° .001 to 1 g 1 Slab outside of containment
b. Containment El. 750 @ 215° .001 to 1 g 1 Structure outside of containment
c. Auxiliary Building El. 146 in .001 to 1 g 1 maintenance work area
d. Intake Structure El. 180 on South wall .001 to 1 g 1
e. Free Field El. 146 ground level .001 to 1 g 1 on pad 139 South-East of Condensate Storage Tank
2. PEAK ACCELEROGRAPHS
a. Containment Base El. -240 outside of 0 to 1 g 1 Slab containment
b. Steam Generator El. -07 S/G #1 0 to 1 g 1 Support
c. Pressurizer Support El. 146 0 to 1 g 1
d. Safety Injection Tank El. 386 0 to 1 g 1 Support
3. SEISMIC TRIGGER
a. Containment Base El. -240 @ 215° .005 to .02 g 1 Slab outside of containment
4. RESPONSE SPECTRUM RECORDER
a. Containment Base El. -240 outside of - 1 Slab containment MILLSTONE - UNIT 2 TRM 3/4.3-45 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 4.3-4 Seismic Monitoring Instrumentation Technical Surveillance Requirements CHANNEL CHANNEL CHANNEL FUNCTIONAL INSTRUMENT CHANNEL CHECK CALIBRATION TEST

1. TIME HISTORY ACCELEROGRAPHS
a. Containment Base Slab M R SA
b. Containment Structure M R SA
c. Auxiliary Building M R SA
d. Intake Structure M R SA
e. Free Field M R SA
2. PEAK ACCELEROGRAPHS
a. Containment Base Slab N.A. R N.A.
b. Steam Generator Support N.A. R N.A.
c. Pressurizer Support N.A. R N.A.
d. Safety Injection Tank Support N.A. R N.A.
3. SEISMIC TRIGGER
a. Containment Base Slab N.A. R SA
4. RESPONSE SPECTRUM RECORDER
a. Containment Base Slab N.A. R N.A.

MILLSTONE - UNIT 2 TRM 3/4 3-46 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.4 METEOROLOGICAL INSTRUMENTATION TECHNICAL REQUIREMENT 3.3.3.4 The meteorological monitoring instrumentation channels shown in TRM Table 3.3-8 shall be FUNCTIONAL.

APPLICABILITY:

All MODES.

ACTION:

a. With the number of FUNCTIONAL meteorological monitoring channels less than required by TRM Table 3.3-8, suspend all releases of gaseous radioactive material from the radwaste gas decay tanks until the nonfunctional channel(s) is restored to FUNCTIONAL status.
b. With one or more required meteorological monitoring channels nonfunctional for more than 7 days, enter condition into the corrective action program.

MILLSTONE - UNIT 2 TRM 3/4 3-47 LBDCR 09-MP2-026 January 12, 2010

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.4 METEREOLOGICAL INSTRUMENTATION TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.3.4 Each meteorological monitoring instrumentation channel shall be demonstrated FUNCTIONAL by the performance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in TRM Table 4.3-5.

BASES:

The FUNCTIONALITY of the meteorological instrumentation ensures that sufficient meteorological data is available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere. This capability is required to evaluate the need for initiating protective measures to protect the health and safety of the public. This instrumentation is consistent with the recommendations of Regulatory Guide 1.23, Onsite Meteorological Programs.

If the ACTIONS of the TECHNICAL REQUIREMENT cannot be met, the condition is documented in the corrective action program and assessed, as appropriate.

REFERENCE:

1. Condition Report M3-00-02659 MILLSTONE - UNIT 2 TRM 3/4 3-48 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.3-8 Meteorological Monitoring InstrumentatioN INSTRUMENT MINIMUM MINIMUM CHANNELS INSTRUMENT LOCATION ACCURACY FUNCTIONAL

1. WIND SPEED
a. Nominal 142 ft. +/- 0.22 m/sec* 1 Elev.
b. Nominal 374 ft. +/- 0.22 m/sec* 1 Elev.
2. WIND DIRECTION
a. Nominal 142 ft. +/- 5° 1 Elev.
b. Nominal 374 ft. +/- 5° 1 Elev.
3. AIR TEMPERATURE - DELTA T
a. Nominal 142 ft. +/- 0.18°F 1 Elev.
b. Nominal 374 ft. +/- 0.18°F 1 Elev.
  • Starting speed of anemometer shall be < 0.45 m/sec.

MILLSTONE - UNIT 2 TRM 3/4 3-49 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 4.3-5 Meteorological Monitoring Instrumentation Technical Surveillance Requirements CHANNEL CHANNEL INSTRUMENT CHANNEL CHECK CALIBRATION

1. WIND SPEED
a. Nominal Elev. 142 D SA
b. Nominal Elev. 374 D SA
2. WIND DIRECTION
a. Nominal Elev. 142 D SA
b. Nominal Elev. 374 D SA
3. AIR TEMPERATURE - DELTA T
a. Nominal Elev. 142 D SA
b. Nominal Elev. 374 D SA MILLSTONE - UNIT 2 TRM 3/4 3-50 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.7 FIRE DETECTION INSTRUMENTATION TECHNICAL REQUIREMENT 3.3 3.7 As a minimum, the fire detection instrumentation for each fire detection zone in TRM Table 3.3-10 shall be FUNCTIONAL.

APPLICABILITY:

Whenever equipment in that fire detection zone is required to be FUNCTIONAL.

ACTION:

With the number of FUNCTIONAL fire detection instrument(s) less than the minimum number of FUNCTIONAL requirements of TRM Table 3.3-10:

a. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, establish a fire watch patrol to inspect the zone(s) with the nonfunctional instrument(s) at least once per hour unless the instrument(s) is located inside the containment. Roving fire watches must monitor the area of the device in question, as a minimum, within the specified time frame, plus or minus 25% of the time interval specified in the ACTION statement for periodic roving fire watches. The 25% extension of the time interval specified does not degrade the reliability that results from performing the rove at the specified interval, based on plant experience, and Fire Protection Engineering analysis as documented in Technical Evaluation M3-EV-02-2005.

If the instrument(s) are located inside the containment, then inspect the associated containment area at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor and record the average containment air temperatures manually once an hour or rely on the plant process computer to continuously monitor associated area containment temperatures with an alarm setpoint of 150°F using the following temperature elements:

  • TE8098 (located 30 elev. C and D RCPs)
  • TE9770 (located 18 elev. West Penetration)
  • TE9771 (located 18 elev. East Penetration)
  • TE8097 (located 30 elev. A and B RCPS)
b. Restore the nonfunctional equipment to FUNCTIONAL status within 14 days, or develop a plan and schedule for restoring the equipment to FUNCTIONAL status.

MILLSTONE - UNIT 2 TRM 3/4 3-51 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.7 FIRE DETECTION INSTRUMENTATION TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.3.7.1 Each of the above required fire detection instruments, which are accessible during plant operation, shall be demonstrated FUNCTIONAL at least once per 6 months by performance of a CHANNEL FUNCTIONAL TEST. Fire detectors which are not accessible during plant operation shall be demonstrated FUNCTIONAL by the performance of a CHANNEL FUNCTIONAL TEST during each COLD SHUTDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.

4.3.3.7.2 The circuitry associated with the supervision of the above fire detection instruments and circuits, per NFPA 72-D, shall be demonstrated FUNCTIONAL at least once per 6 months.

BASES:

FUNCTIONALITY of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This capability is required in order to detect and locate fires in their early stages. Prompt detection of fires will reduce the potential for damage to safety related equipment and is an integral element in the overall facility Fire Protection program.

In the event that a portion of the fire detection instrumentation is nonfunctional, the establishment of frequent fire patrols in the affected areas is required to provide detection capability until the nonfunctional instrumentation is restored to FUNCTIONALITY.

Roving fire watches must monitor the area of the device in question, as a minimum, within the specified time frame, plus or minus 25% of the time interval specified in the ACTION statement for periodic roving fire watches. The 25% extension of the time interval specified does not degrade the reliability that results from performing the rove at the specified interval, based on plant experience, and Fire Protection Engineering analysis as documented in Technical Evaluation M3-EV-02-2005.

Fire detection in containment is limited to the areas above the reactor coolant pumps and above the electrical penetration areas. The plant process computer (PPC) continuously monitors air temperatures throughout containment to compute technical specification containment average air temperature. However monitoring the average temperature is not ideal for detecting incipient stage fires in the reactor coolant pump and the cable penetration areas.

MILLSTONE - UNIT 2 TRM 3/4 3-52 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.7 FIRE DETECTION INSTRUMENTATION BASES: (Continued)

Individual temperature monitoring elements located in containment are set to alarm at 150°F. When the PPC alarms it will display any appropriate AOPs associated with the alarm. The PPC must display the procedure for fire response A0P2559, Fire to credit these points as an appropriate compensatory measure for a nonfunctional fire detection system in containment.

The temperature monitoring elements indicated were chosen based on their proximity to the existing fire detection systems. In the event the temperature element associated with the nonfunctional fire detector or the PPC fails, it is acceptable to monitor and record average containment air temperatures manually once an hour.

Based on the ability of the PPC to produce historic records of temperatures for the locations specified, this compensatory measure would provide an acceptable means of monitoring for fire conditions and would document regulatory adherence.

REFERENCE:

1. Condition Report M3-00-2659 MILLSTONE - UNIT 2 TRM 3/4 3-53 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)

Table 3.3-10 Fire Detection Instruments Heat Smoke Minimum Minimum Total No. Channels Total No. Channels Instrument Location (Zone) of Channels FUNCTIONAL of Channels FUNCTIONAL

1. Containment East Penetration (37) -- FLP 3-3 -- -- 7 5 West Penetration (37) -- FLP 3-7 -- -- 7 5
2. Control Room Vent Duct (42) Z-2 -- -- 1 1 Control Room Vent Duct (2) Z-1 -- -- 1 1
3. Cable Vaults & Areas Aux. Bldg Cable Vault (256) (10) 5 4 16 12 Turbine Bldg. Cable Vault & Vertical Shaft (256) (30) -- -- 17 17 Turbine Bldg Cable Vault & Vertical Shaft (256) (32) -- -- 17 17 Turbine Bldg Cable Vault Area (45) (21) -- -- 8 6 Lunch Room Cable Chase Area (366) (24) -- -- 4 3
4. 4.16 & 6.9 kV Switchgear Room (566) (40) -- -- 4 3 4.16 & 6.9 kV Switchgear Room (316) (18) -- -- 4 3 480 V West Switchgear Room (366) (18) -- -- 2 1 480 V East Switchgear Room (366) (28) -- -- 2 1 MILLSTONE - UNIT 2 TRM 3/4 3-54 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)

Table 3.3-10 (Continued)

Fire Detection Instruments Heat Smoke Minimum Minimum Total No. Channels Total No. Channels Instrument Location (Zone) of Channels FUNCTIONAL of Channels FUNCTIONAL East DC Equipment Room (43 Alarm) (FLP 5) -- -- 6 6 West DC Equipment Room (45 Alarm) (FLP 6) -- -- 6 6 East Cable Vault Ventilation Opening (44) (FLP 7) -- -- 1 1 West Cable Vault Ventilation Opening (44) (FLP 7) -- -- 1 1

5. Battery Rooms West Battery Room (146) (39) -- -- 1 1 East Battery Room (146) (39) -- -- 2 1
6. Electrical Penetration Rooms East (146) (20) -- -- 3 2 West (146) (17) -- -- 2 1
7. Diesel Generators Diesel 1221 (12) 8 8 -- --

Diesel 1321 (13) 8 8 -- --

8. Main Exhaust Equipment Room and B52 Enclosure Room (EL 386) (5) -- -- 3 3 MILLSTONE - UNIT 2 TRM 3/4 3-55 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)

Table 3.3-10 (Continued)

Fire Detection Instruments Heat Smoke Minimum Minimum Total No. Channels Total No. Channels Instrument Location (Zone) of Channels FUNCTIONAL of Channels FUNCTIONAL

9. Auxiliary Building (-456) (FLP - 1)

General Area (48) -- -- 3 2 A. Safe Guards Room (48) -- -- 2 1 B. Safe Guards Room (48) -- -- 2 1 C. Safe Guards Room (48) -- -- 1 1

10. Auxiliary Building (-256) (FLP-2)

General Area (-256) (52) -- -- 9 7 Charging Pump Rooms (-256) (52) -- -- 5 3

11. Containment Building FLP-3 (37)

RCP A - (FLP 3-1) 5 3 -- --

RCP B - (FLP 3-2) 5 3 -- --

RCP C - (FLP 3-6) 5 3 -- --

RCP D - (FLP 3-5) 5 3 -- --

12. Auxiliary Building (-5/146) (FLP-4)

Auxiliary Building General Area 146 (41) -- -- 9 7 MILLSTONE - UNIT 2 TRM 3/4 3-56 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)

Table 3.3-10 (Continued)

Fire Detection Instruments Heat Smoke Minimum Minimum Total No. Channels Total No. Channels Instrument Location (Zone) of Channels FUNCTIONAL of Channels FUNCTIONAL Auxiliary Building West Piping Penetration Room -5 (41) -- -- 3 2 Auxiliary Building -5 (41) -- -- 13 10

13. Hydrogen Seal Oil (31) 7 7 -- --
14. Intake Structure (6) -- -- 10 10
15. Motor Driven Aux. Feed Pump Rm (22) -- -- 2 2
16. Turbine Driven Aux. Feed Pump Rm (22) -- -- 2 1
17. Turbine Battery Area (27) -- -- 2 1
18. Filtration System Equip. Rm. (13) -- -- 12 12 MILLSTONE - UNIT 2 TRM 3/4 3-57 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3.8 ACCIDENT RADIATION MONITORING INSTRUMENTATION TECHNICAL REQUIREMENT 3.3.3.8 The mid and high range channels of the Wide Range Gas Monitor (WRGM) shall be FUNCTIONAL with an alarm setpoint set less than the EAL Alert Classification level.

APPLICABILITY:

MODES 1, 2, 3, 4, 5, and 6.

ACTION:

a. With an alarm setpoint of the mid or high range channel(s) of the WRGM exceeding the EAL Alert Classification level, adjust the setpoint to within the required value within twenty-four hours or declare the channel(s) nonfunctional.
b. With mid or high range channel(s) of WRGM nonfunctional, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, initiate an alternate method of monitoring the appropriate parameters (not required if the nonfunctionality is only due to alarm setpoint)

AND Restore required channel(s) to FUNCTIONAL status within 30 days, or otherwise initiate corrective actions.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.3.3.8 The mid and high range channels of the WRGM shall be demonstrated FUNCTIONAL by the performance of the following surveillances at the frequencies shown:

a. CHANNEL CHECK once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b. CHANNEL FUNCTIONAL TEST once per 31 days.
c. CHANNEL CALIBRATION once per 18 months.

MILLSTONE - UNIT 2 TRM 3/4 3-58 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.3 INSTRUMENTATION 3/4.3.3.8 ACCIDENT RADIATION MONITORING INSTRUMENTATION BASES:

When the Unit 1 stack high range radiation monitor was deactivated and removed, Unit 2 had to install a new high range radiation monitor (the Wide Range Gas Monitor, or WRGM, RM-8169) to monitor its release to the Millstone stack during an accident.

FUNCTIONALITY and TECHNICAL SURVEILLANCE REQUIREMENT for RM-8169 are needed to replace the equivalent requirements applicable to the Unit 1 high range monitor. FUNCTIONALITY and TECHNICAL SURVEILLANCE REQUIREMENT for the WRGM are consistent with technical specifications which have similar requirements for the Unit 2 vent high range radiation monitor (RM-8168). These requirements will assure that radiation monitoring is available during an accident with releases to the environment for assessment purposes.

The alternate method of monitoring specified in TR ACTION b. is contained in procedures. It includes use of the lower range (channel 1) of the WRGM, if FUNCTIONAL and on scale.

REFERENCE:

1. CR-01-01975, New Wide Range Gas Monitor Does Not Appear to Meet NUREG-0737 Requirement MILLSTONE - UNIT 2 TRM 3/4 3-59 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.7 CHEMISTRY TECHNICAL REQUIREMENT 3.4.7 The reactor coolant system chemistry shall be maintained within the limits specified in TRM Table 3.4-1.

APPLICABILITY:

All MODES.

ACTION:

MODES 1, 2, 3 and 4.

a. With any one or more chemistry parameter in excess of its Steady State Limit but within its Transient Limit, implement established plant chemistry guidelines.
b. With any one or more chemistry parameter in excess of its Transient Limit, implement established plant chemistry guidelines.

MODES 5 and 6.

With the concentration of either chloride or fluoride in the reactor coolant system in excess of its Steady State Limit for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or in excess of its Transient Limit, reduce the pressurizer pressure to 500 psia, if applicable, and perform an analysis to determine the effects of the out-of-limit condition on the structural integrity of the reactor coolant system; determine that the reactor coolant system remains acceptable for continued operations prior to increasing the pressurizer pressure above 500 psia or prior to proceeding to MODE 4.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.4.7 The reactor coolant system chemistry shall be determined to be within the limits by analysis of those parameters at the frequencies specified in TRM Table 4.4-1.

MILLSTONE - UNIT 2 TRM 3/4 4-1 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.7 CHEMISTRY BASES:

The limitations on reactor coolant system contaminants ensure that corrosion of the reactor coolant system is minimized and reduce the potential for reactor coolant system leakage or failure due to stress corrosion. Maintaining the concentrations of the contaminants within the Steady State Limits shown on TRM Table 3.4-1 provides adequate corrosion protection to ensure the structural integrity of the reactor coolant system over the life of the plant. The associated effects of exceeding the oxygen, chloride and fluoride limits are time and temperature dependent.

Established plant chemistry guidelines are contained in MP-PROC-CH-CP 2802A, Primary Chemistry Control.

The TECHNICAL SURVEILLANCE REQUIREMENTS provide adequate assurance that concentrations in excess of the limits will be detected in sufficient time to take corrective action.

REFERENCE:

1. License Amendment No. 266 MILLSTONE - UNIT 2 TRM 3/4 4-2 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 3.4-1 Reactor Coolant System Chemistry Limits STEADY STATE TRANSIENT PARAMETER LIMIT LIMIT DISSOLVED OXYGEN 0.10 ppm* 1.00 ppm*

CHLORIDE 0.15 ppm 1.50 ppm FLUORIDE 0.10 ppm 1.00 ppm

  • Limit not applicable with Tavg 250°F.

MILLSTONE - UNIT 2 TRM 3/4 4-3 LBDCR No. 02-2-7 June 17, 2002

TECHNICAL REQUIREMENTS Table 4.4-1 Reactor Coolant System Chemistry Limits Technical Surveillance Requirements MINIMUM MAXIMUM TIME PARAMETER SAMPLING FREQUENCIES BETWEEN SAMPLES DISSOLVED OXYGEN 3 times per 7 days* 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> CHLORIDE 3 times per 7 days 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> FLUORIDE 3 times per 7 days 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

  • Not required with Tavg 250°F.

MILLSTONE - UNIT 2 TRM 3/4 4-4 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.9 PRESSURE/TEMPERATURE LIMITS TECHNICAL REQUIREMENT 3.4.9.1 In accordance with Technical Specification LCO 3.4.9.1, Pressure/

Temperature Limits.

APPLICABILITY:

In accordance with Technical Specification 3.4.9.1.

ACTION:

In accordance with Technical Specification 3.4.9.1.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.4.9.1

a. In accordance with Technical Specifications Surveillance Requirement 4.4.9.1a.
b. The reactor vessel material irradiation surveillance specimens shall be removed and examined, to determine changes in material properties, at the intervals shown in Table 4.4-3.
c. The results of the examinations in TECHNICAL SURVEILLANCE REQUIREMENT 4.4.9.1b shall be used to update Technical Specifications Table 3.4-2 and Technical Specifications Figures 3.4-2a and 3.4-2b.

MILLSTONE - UNIT 2 TRM 3/4 4-5 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS Table 4.4-3 Reactor Vessel Material Irradiation Surveillance Schedule CAPSULE WITHDRAWAL SCHEDULE (EFPY)

W-97 3.0 W-97 10.0 (Flux Monitor)

W-104 10.0 W-83 15.3 W-277 EOL W-263 Spare W-284 Spare MILLSTONE - UNIT 2 TRM 3/4 4-6 LBDCR 05-MP2-011 August 4, 2005

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.9 PRESSURE/TEMPERATURE LIMITS BASES:

The number of reactor vessel irradiation surveillance specimens and the frequencies for removing and testing these specimens are provided in Table 4.4-3 to assure compliance with the requirements of Appendix H to 10 CFR Part 50. Removal of reactor vessel irradiation surveillance specimens does not constitute a CORE ALTERATION per Technical Specification 1.12.

REFERENCE:

1. License Amendment No. 272
2. NRC safety evaluation for approval of changes to Table 4.4-3, Millstone Power Station, Unit No. 2 - Changes to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule (TAC No. MB9149), dated October 1, 2003 MILLSTONE - UNIT 2 TRM 3/4 4-7 LBDCR 05-MP2-011 August 4, 2005

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.9.2 PRESSURIZER TECHNICAL REQUIREMENT 3.4.9.2 The pressurizer temperature shall be limited to:

a. A maximum heatup of 100°F in any one hour period,
b. A maximum cooldown of 200°F in any one hour period, and
c. A maximum spray water temperature differential of 350°F.

APPLICABILITY:

MODES 1, 2, 3, 4 and 5.

ACTION:

With any of the above limits exceeded, perform the following:

a. Restore the temperature to within limit within 30 minutes.

AND

b. Perform an engineering evaluation to determine the effects of the out of limit condition on the structural integrity of the pressurizer and determine that the pressurizer remains acceptable for continued operation within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Otherwise, be in at least MODE 3 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 500 psia within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.4.9.2 The pressurizer temperature and spray water temperature differential shall be determined to be within the limits at least once per 30 minutes during system heatup or cooldown.

MILLSTONE - UNIT 2 TRM 3/4 4-8 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.9.2 PRESSURIZER BASES:

The limitations imposed on the pressurizer heatup and cooldown rates and spray water temperature differential are provided to assure that the pressurizer is operated within the design criteria assumed for the fatigue analysis performed in accordance with the ASME Code requirements. Verification that pressurizer temperature conditions are within the limits of TECHNICAL REQUIREMENT 3.4.9.2, at least once per 30 minutes, is required when undergoing planned changes of 10°F. The 30 minute time interval permits assessment and correction for temperature deviations within a reasonable time.

REFERENCE:

1. License Amendment No. 266 MILLSTONE - UNIT 2 TRM 3/4 4-9 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.9.4 SHUTDOWN COOLING OVERPRESSURE PROTECTION TECHNICAL REQUIREMENT 3.4.9.4 Shutdown Cooling System overpressure protection shall be provided as follows: (1)

a. All HPSI pumps shall be prevented from automatically injecting into the RCS when the RCS is not vented through a vent of 2.2 in2.
b. A maximum of one HPSI pump may be capable of automatically injecting into the RCS when the RCS is vented through a vent of 2.2 in2.

APPLICABILITY:

When the Shutdown Cooling System is connected to the RCS and the head is on the reactor vessel.

ACTION:

With more than the maximum allowed number of HPSI pumps capable of automatically injecting into the RCS, take immediate ACTION to comply with the TECHNICAL REQUIREMENT 3.4.9.4 above.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.4.9.4 Verify all required HPSI pumps are prevented from automatically injecting into the RCS at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:(2)

a. Racking down the motor circuit breaker from the power supply circuit; or
b. Shutting and tagging the discharge valve with the key lock on the control panel (2-51-654 or 2-SI-656); or
c. Placing the pump control switch in the pull-to-lock position.

(1) Refer to Technical Specification 3.4.9.3 for additional restrictions concerning HPSI pump operation.

(2) In MODE 4, Technical Specification 3.5.3 requires at least one HPSI pump to be OPERABLE. The only acceptable method to provide Shutdown Cooling System overpressure protection, without affecting the OPERABILITY of this HPSI pump, is to place the pump control switch in the pull-to-lock position.

MILLSTONE - UNIT 2 TRM 3/4 4-10 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.9.4 SHUTDOWN COOLING OVERPRESSURE PROTECTION BASES:

An inadvertent start of a HPSI pump could result in the overpressurization of the SDC System. To prevent this, it is necessary to disable HPSI pump automatic injection capability into the RCS whenever the SDC System is connected to the RCS. If the RCS is not vented, the automatic injection capability of all HPSI pumps must be prevented.

This restriction may be relaxed if the RCS is adequately vented. If a vent of 2.2 in2 has been established, a maximum of one HPSI may be capable of automatically injecting into the RCS. If the reactor vessel head has been removed, there is no restriction on HPSI pump automatic injection capability.

If a loss of RCS inventory or reduction in SHUTDOWN MARGIN event occurs, the appropriate response will be to correct the situation by starting RCS makeup pumps. If the loss of inventory or SHUTDOWN MARGIN is significant, this may necessitate the use of HPSI pumps that are being maintained not capable of automatically injecting into the RCS in accordance with this requirement. The use of the HPSI pump(s) to restore RCS inventory or SHUTDOWN MARGIN will require entry into the associated ACTION statement. The ACTION statement requires immediate ACTION to comply with the requirements. The restoration of RCS inventory or SHUTDOWN MARGIN can be considered to be part of the immediate ACTION to restore the HPSI pump(s) to a not capable of automatically injecting status. While recovering RCS inventory or SHUTDOWN MARGIN, RCS pressure will be maintained below SDC design pressure.

After RCS inventory or SHUTDOWN MARGIN has been restored, the HPSI pump(s) should be immediately made not capable of automatically injecting and the ACTION statement exited.

REFERENCE:

1. Technical Specification LCO 3.4.9.3
2. Technical Specification LCO 3.5.3
3. Condition Report M3-00-02659 MILLSTONE - UNIT 2 TRM 3/4 4-11 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.10 STRUCTURAL INTEGRITY - ASME CODE CLASS 1, 2, 3 COMPONENTS TECHNICAL REQUIREMENT 3.4.10 The structural integrity of ASME Code Class 1, 2 and 3 components shall be maintained in accordance with TECHNICAL SURVEILLANCE REQUIREMENT 4.4.10.

APPLICABILITY:

MODES 1, 2, 3, 4, 5, and 6, except when a ASME Code Class 1, 2, or 3 component is not required to be FUNCTIONAL.

ACTION:

a. With one or more ASME Code Class 1, 2 and 3 component(s) in a degraded or nonconforming condition(s), perform the following ACTIONS within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s:*
1. Determine that structural integrity is still maintained in the degraded or nonconforming condition; or
2. Isolate the affected component(s) from service.
b. If the above ACTION is not completed within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, immediately declare the affected component(s) nonfunctional.
  • - For ASME Code Class 1 and 2 components which have PRESSURE BOUNDARY LEAKAGE, the affected component(s) must be immediately isolated from service or declared nonfunctional.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.4.10 The structural integrity of ASME Code Classes 1, 2 and 3 components shall be inspected in accordance with the Inservice Inspection Program.

MILLSTONE - UNIT 2 TRM 3/4 4-12 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.10 STRUCTURAL INTEGRITY - ASME CODE CLASS 1, 2, 3 COMPONENTS BASES:

The inservice inspection and testing programs for ASME Code Class 1, 2 and 3 components ensure that the structural integrity and operational readiness of these components will be maintained at an acceptable level throughout the life of the plant.

These programs are in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR Part 50.55a.

This TR requires that the structural integrity of ASME Code Class 1, 2 and 3 components be maintained. Structural integrity is the ability to withstand specified loading, with an acceptable margin, without collapse, rupture, brittle fracture, or unstable flaw growth.

Components that may experience unanalyzed loads, have a deficient original design analysis, or have pressure boundary wall loss, but nevertheless can be shown to meet the minimum requirements of the original construction Code or ASME Section III Appendix F, are considered to retain their structural integrity. For components with degraded material properties or relevant conditions as defined in ASME Section XI, the criteria for structural integrity are contained or referenced in Section XI.

Alternative evaluation criteria may be used to determine structural integrity when approved by the NRC. In addition to the initial discovery, supplemental NDE may be required to fully characterize the degraded condition. Preliminary judgments regarding structural integrity may be expressed considering the available information and the expectation that a final determination of structural integrity will result once all characterization, evaluation and documentation are complete.

For ASME Code Class 1 or 2 components which have PRESSURE-BOUNDARY LEAKAGE, the structural integrity of the component is considered not to be maintained and the affected component(s) must be immediately isolated from service. If the affected component(s) cannot be isolated from service, the affected component(s) is immediately declared nonfunctional and the required ACTIONS of the applicable TS and TRs apply.

For all other structural integrity (i.e. non pressure boundary leakage) degraded or nonconforming conditions of Class 1 and Class 2 components, the structural integrity of the affected component will be evaluated consistent with the requirements of this TR.

If the required determination of structural integrity cannot be accomplished within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or the results are indeterminate or structural integrity is not maintained, or the affected component is not isolated, or cannot be isolated, ACTION must proceed to declare the affected component(s) nonfunctional, as specified in ACTION statement 'b.'

The appropriate TS or TR shall be considered not met, as appropriate.

MILLSTONE - UNIT 2 TRM 3/4 4-13 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.10 STRUCTURAL INTEGRITY - ASME CODE CLASS 1, 2, 3 COMPONENTS BASES: (Continued)

Surveillance Requirement 4.4.10 requires performing inservice inspections of ASME Section XI Code Class 1, 2 and 3 components in accordance with TS 4.0.5.

Inservice inspection of ASME Code Class 1, 2 and 3 components are performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda, as required by 10 CFR 50.55a(g), to ensure that the structural integrity of these components will be maintained at an acceptable level throughout the life of the plant. Exception to these requirements apply where relief has been granted by the Commission pursuant to 10 CFR 50.55a(a)(3) and (g)(6)(i). The surveillance intervals specified in Section XI of the ASME Code apply.

REFERENCE:

1. Generic Letter 91-18, "Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability," November 7, 1991, and Revision 1, October 8, 1997.
2. 10 CFR 50.55a(b)(2)(xiii), "Flaws in Class 3 Piping," Federal Register (Vol. 64, No. 183), September 22,1999.
3. Generic Letter 90-05, "Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 and 3 Piping," June 15,1990; and August 16,1990.
4. Code Case N-513, "Evaluation Criteria for Temporary Acceptance of Flaws in Class 3 Piping."
5. Code Case N-523-1, "Mechanical Clamping Devices for Class 2 and 3 Piping."
6. Elinor G. Adensam, U.S. NRC to Martin L. Bowling, "Millstone Nuclear Power Station, Unit Nos. 2 and 3 - Request for an Alternative to the Requirements of the ASME Code," TAC Nos. MA3889 and MA3884, dated February 23,1999.
7. License Amendment No. 264. LBDCR 02-2-11 September 13, 2002.

MILLSTONE - UNIT 2 TRM 3/4 4-14 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.11 REACTOR COOLANT SYSTEM VENTS TECHNICAL REQUIREMENT 3.4.11 At least one reactor coolant system vent path consisting of at least two valves in series capable of being powered from emergency buses shall be FUNCTIONAL at each of the following locations:

a. Reactor vessel head
b. Pressurizer steam space APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

a. With any one of the PORVs or PORV block valves of the pressurizer steam space vent path nonfunctional in MODES 1, 2 or 3, follow the ACTION requirements of Technical Specification 3.4.3.
b. With any one of the PORVs or PORV block valves of the pressurizer steam space vent path nonfunctional in MODE 4, follow the ACTION requirements of Technical Specification 3.4.9.3.
c. With the reactor vessel head vent path nonfunctional, STARTUP and/or POWER OPERATION may continue provided that the nonfunctional vent path is maintained closed with power removed from the valve actuator of all the valves in the nonfunctional vent path. Restore the reactor vessel head vent path to FUNCTIONAL status within 30 days or otherwise enter the condition into the corrective action program.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.4.11 Each reactor coolant system vent path shall be demonstrated FUNCTIONAL at least once per 18 months by:

1. Verifying all manual isolation valves in each vent path are locked in the open position.
2. Cycling each valve in the vent path through at least one complete cycle of full travel from the control room during COLD SHUTDOWN or REFUELING.
3. Verifying flow through the reactor coolant vent system vent paths during COLD SHUTDOWN or REFUELING.

MILLSTONE - UNIT 2 TRM 3/4 4-15 LBDCR 09-MP2-026 January 12, 2010

TECHNICAL REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.11 REACTOR COOLANT SYSTEM VENTS BASES:

Reactor Coolant System Vents are provided to exhaust noncondensible gases and/or steam from the primary system that could inhibit natural circulation core cooling. The FUNCTIONALITY of at least one reactor coolant system vent path from the reactor vessel head and the pressurizer steam space ensures that the capability exists to perform this function.

The valve redundancy of the reactor coolant system vent paths serves to minimize the probability of inadvertent or irreversible actuation while ensuring that a single failure of a vent valve, power supply or control system does not prevent isolation of the vent path.

The flow test verifies that each flowpath for the reactor vessel head vent and the pressurizer steam space vent is FUNCTIONAL. This verification can be performed by using a series of overlapping tests to ensure flow is verified through all parts of the system.

REFERENCE:

1. License Amendment No. 266
2. DCR M2-02006
3. DCR M2-05002 MILLSTONE - UNIT 2 TRM 3/4 4-16 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.5 EMERGENCY CORE COOLING SYSTEMS 3/4.5.2 ECCS SUBSYSTEMS - TAVG 300°F TECHNICAL REQUIREMENT 3.5.2 In accordance with Technical Specification LCO 3.5.2, ECCS Subsystems -

Tavg >300°F APPLICABILITY: In accordance with Technical Specification LCO 3.5.2.

ACTION:

In accordance with Technical Specification LCO 3.5.2.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.5.2 Each ECCS subsystem shall be demonstrated FUNCTIONAL:

a. By a visual inspection which verifies that no loose debris (rags, trash, clothing, etc.) is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during LOCA conditions. This visual inspection shall be performed:
1. For all accessible areas of the containment prior to establishing CONTAINMENT INTEGRITY, and
2. Of the areas affected within containment at the completion of containment entry when CONTAINMENT INTEGRITY is established.
b. By conducting a flow balance verification immediately prior to returning to service any portion of a subsystem after the completion of a modification that could alter system flow characteristics. The injection leg flow rate shall be as follows:
1. HPSI Headers - the sum of the three lowest injection flows must be 471 gpm. The sum of the four injection flows must be 675 gpm.
2. LPSI Header - the sum of the three lowest injection flows must be 2850 gpm. The sum of the four injection flows must be RWST level (%) - 10(%)

4500 + ------------------------------------------------------------------ x 200 90%

MILLSTONE - UNIT 2 TRM 3/4 5-1 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS SUBSYSTEMS - TAVG 300°F TECHNICAL SURVEILLANCE REQUIREMENTS BASES:

TECHNICAL SURVEILLANCE REQUIREMENT 4.5.2.a verifies by a visual inspection that no loose debris (rags, trash, clothing, etc.) is present in the containment that could be transported to the containment sumps and cause restriction of the pump suction during LOCA conditions. This is a good housekeeping item, which is an integral part of any maintenance or surveillance activity. It does not verify FUNCTIONALITY of the ECCS or any ECCS functions assumed in the safety analysis. This approach is consistent with NUREG-1432, which does not contain a requirement to inspect the containment sump prior to establishing CONTAINMENT INTEGRITY. In addition, the containment sump will continue to be inspected every 18 months as required by Technical Specification SR 4.5.2.j.

TECHNICAL SURVEILLANCE REQUIREMENT 4.5.2.b verifies proper flow distribution following any modifications that could alter system flow characteristics. The purpose of the ECCS throttle valve surveillance requirements is to provide assurance that proper ECCS flows will be maintained in the event of a LOCA. Maintenance of proper flow resistance and pressure drop in the piping system to each injection point is necessary to:

(1) prevent total pump flow from exceeding runout conditions when the system is in its minimum resistance configuration, (2) provide the proper flow split between injection points in accordance with the assumptions used in the ECCS-LOCA analyses, and (3) provide an acceptable level of total ECCS flow to all injection points equal to or above that assumed in the ECCS-LOCA analyses.

Verification of the correct position for the mechanical and/or electrical valve stops can be performed by either of the following methods:

1. Visually verify the valve opens to the designated throttled position; or
2. Manually position the valve to the designated throttled position and verify that the valve does not move when the applicable valve control switch is placed to OPEN.

Post maintenance testing associated with a system modification, which is controlled by plant procedures, will include verification of proper flow distribution if the associated modification could adversely affect the flow distribution. Without this verification, the respective system could not be declared FUNCTIONAL.

REFERENCE:

1. License Amendment 283 MILLSTONE - UNIT 2 TRM 3/4 5-2 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS 3/4.6.3 CONTAINMENT ISOLATION VALVES TECHNICAL REQUIREMENT 3.6.3.1 The Containment Isolation Valves listed in TRM Table 3.6-1 Containment Isolation Valve List, shall be FUNCTIONAL.

APPLICABILITY:

In accordance with Technical Specification 3.6.3.1.

ACTION:

In accordance with Technical Specification 3.6.3.1.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.6.3.1 In accordance with Technical Specification 3.6.3.1 Surveillance Requirements.

BASES:

In accordance with the Technical Specifications Bases section 3/4.6.3 (Containment Isolation Valves).

In addition, the attached TRM Table 3.6-1 provides a list of containment isolation valves which are a subset of those valves identified by the FSAR, Table 5.2-11, Containment Structure Isolation Valve Information. The containment isolation valves identified are main process isolation valves that are within the containment penetration boundary and conform to the requirements of 10 CFR 50 Appendix A (GDC 55, 56, or 57). Manual test, vent or drain valves within the containment penetration boundary are also identified. An explanation of the several notes included on TRM Table 3.6-1 follows:

Column 1 provides the containment penetration number and containment isolation valve description.

Column 2 provides the component local identification.

Column 3 provides the stroke time closure requirements.

Note a provides the extended allowed outage time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for those isolation valves that are located on penetrations for closed systems as defined by the Standard Review Plan (SRP) 6.2.4. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed outage time also applies to the RBCCW containment isolation valves, which are located on a closed system as defined by Millstone Unit 2 original design basis.

MILLSTONE - UNIT 2 TRM 3/4 6-1 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS 3/4.6.3 CONTAINMENT ISOLATION VALVES Note b indicates the small (1 inch or less) valves used as Test, Drain or Vent valves, which are normally closed.

REFERENCE:

The attached TRM Table has been compiled from a review of the P&ID drawings, the FSAR Chapter 5 and has been supplemented by plant inspections of the listed penetrations.

1. MP2 Final Safety Analysis Report (FSAR) Sections 5.2.8.1.2, 5.2.8.2.1 and Table 5.2-11.b.
2. Condition Report M3-00-02659
3. Amendment 278 to Millstone Unit 2 Technical Specifications MILLSTONE - UNIT 2 TRM 3/4 6-2 LBDCR 03-2-7 September 11, 2003

Table 3.6-1 Containment Isolation Valve List Pen. No. and Function Description Valve No. Maximum IsolationTime (seconds)

No. 1 - Demin Water to Ctmt Iso - Inner - check 2-PMW-3 NA No. 1 - Demin Water to Ctmt Iso - Outer - AOV, CIAS 2-PMW-43 5 No. 1 - Demin Water to Ctmt Iso - Outer - manual 2-PMW-165 NA No. 2 - RCS Letdown Iso - Inner - AOV, SIAS 2-CH-515 5 No. 2 - RCS Letdown Iso - Inner - AOV, CIAS 2-CH-516 5 No. 2 - RCS Letdown Iso - Outer- AOV, CIAS 2-CH-089 5 No. 2 - RCS Letdown Isolation - Inner - manual - b 2-CH-763 NA No. 2 - RCS Letdown Isolation - Inner - manual - b 2-CH-658 NA No. 2 - RCS Letdown Isolation - Inner - manual - b 2-CH-260 NA No. 2 - RCS Letdown Isolation - Inner - manual - b 2-CH-082 NA No. 2 - RCS Letdown Isolation - Inner - manual - b 2-CH-083 NA No. 2 - RCS Letdown Isolation - Outer - manual - b 2-CH-067 NA No. 2 - RCS Letdown Isolation - Inner - manual - b 2-CH-991 NA No. 3 - RCS Charging Isolation - Inner - AOV 2-CH-517 NSR No. 3 - RCS Charging Isolation - Inner - AOV 2-CH-518 NSR No. 3 - RCS Charging Isolation - Inner - AOV 2-CH-519 NSR No. 3 - RCS Charging Isolation - Outer - MOV 2-CH-429 NSR No. 3 - RCS Charging Isolation - Inner - manual 2-CH-434 NA No. 3 - RCS Charging Isolation - Inner - manual - b 2-CH-001 NA No. 3 - RCS Charging Isolation - Inner - manual - b 2-CH-002 NA No. 3 - RCS Charging Iso - Inner - manual - b 2-CH-003 NA No. 3 - RCS Charging Iso - Inner - manual - b 2-CH-004 NA No. 3 - RCS Charging Iso - Inner - manual - b 2-CH-443 NA No. 3 - RCS Charging Iso - Outer - manual - b 2-CH-710 NA No. 3 - RCS Charging Iso - Inner - manual - b 2-CH-714 NA No. 3 - RCS Charging Iso - Inner - manual - b 2-CH-661 NA No. 3 - RCS Charging Iso - Outer - Relief 2-CH-986 NA No. 3 - RCS Charging Iso - Inner - manual 2-RC-071 NA No. 4 - Containment Spray Iso - Outer - MOV-CSAS 2-CS-4.1A NSR No. 4 - Containment Spray Iso - Inner - check 2-CS-5A NA No. 4 - Containment Spray Iso - Outer - manual - b 2-CS-049A NA No. 4 - Containment Spray Iso - Outer - manual - b 2-CS-049C NA MILLSTONE - UNIT 2 TRM 3/4 6-3 LBDCR 03-2-7 September 11, 2003

Table 3.6-1 Containment Isolation Valve List Pen. No. and Function Description Valve No. Maximum IsolationTime (seconds)

No. 5 - Containment Spray Iso - Outer - MOV-CSAS 2-CS-4.1B NSR No. 5 - Containment Spray Iso - Inner - check 2-CS-5B NA No. 5 - Containment Spray Iso - Outer - manual - b 2-CS-101 NA No. 6 - Safety Inj. Isolation - Inner - check 2-SI-706D NA No. 6 - Safety Inj. Isolation - Outer - manual - b 2-SI-095 NA No. 6 - Safety Inj. Isolation - Outer - manual - b 2-SI-041F NA No. 6 - Safety Inj. Isolation - Outer - manual - b 2-SI-742D NA No. 6 - Safety Inj. Isolation - Outer - MOV - SIAS 2-SI-645 NSR No. 6 - Safety Inj. Isolation - Outer - MOV - SIAS 2-SI-646 NSR No. 6 - Safety Inj. Isolation - Outer - MOV - SIAS 2-SI-647 NSR No. 6 - Safety Inj. Isolation - Outer - manual - b 2-SI-734 NA No. 6 - Safety Inj. Isolation - Outer - manual - b 2-SI-735 NA No. 6 - Safety Inj. Isolation - Outer - manual - b 2-SI-848 NA No. 6 - Safety Inj. Isolation - Outer - manual 2-SI-160 NA No. 6 - Safety Inj. Isolation - Outer - manual 2-SI-161 NA No. 6 - Safety Inj. Isolation - Outer - manual - b 2-SI-163 NA No. 7 - Safety Inj. Isolation - Inner - check 2-SI-706A NA No. 7 - Safety Inj. Isolation - Outer - manual - b 2-SI-742A NA No. 7 - Safety Inj. Isolation - Outer - manual - b 2-SI-107 NA No. 7 - Safety Inj. Isolation - Outer - manual - b 2-SI-715 NA No. 7 - Safety Inj. Isolation - Outer - manual - b 2-SI-717 NA No. 7 - Safety Inj. Isolation - Outer -MOV SIAS 2-SI-615 NSR No. 7 - Safety Inj. Isolation - Outer -MOV SIAS 2-SI-616 NSR No. 7 - Safety Inj. Isolation - Outer -MOV SIAS 2-SI-617 NSR No. 7 - Safety Inj. Isolation - Outer -manual - b 2-SI-041A NA No. 7 - Safety Inj. Isolation - Outer -manual - b 2-SI-716 NA No. 7 - Safety Inj. Isolation - Outer -manual - b 2-SI-718 NA No. 8 - Safety Inj. Isolation - Inner -check 2-SI-706C NA No. 8 - Safety Inj. Isolation - Outer - manual - b 2-SI-733 NA No. 8 - Safety Inj. Isolation - Outer - manual - b 2-SI-041D NA No. 8 - Safety Inj. Isolation - Outer - manual - b 2-SI-742C NA No. 8 - Safety Inj. Isolation - Outer - MOV - SIAS 2-SI-635 NSR No. 8 - Safety Inj. Isolation - Outer - MOV - SIAS 2-SI-636 NSR No. 8 - Safety Inj. Isolation - Outer - MOV - SIAS 2-SI-637 NSR No. 8 - Safety Inj. Isolation - Outer - manual - b 2-SI-041E NA No. 8 - Safety Inj. Isolation - Outer - manual - b 2-SI-110 NA No. 8 - Safety Inj. Isolation - Outer - manual - b 2-SI-846 NA MILLSTONE - UNIT 2 TRM 3/4 6-4 LBDCR 13-MP2-015 October 16, 2013

Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description Valve No. Maximum IsolationTime (seconds)

No. 9 - Safety Inj. Isolation - Inner - check 2-SI-706B NA No. 9 - Safety Inj. Isolation - Outer - manual - b 2-SI-722 NA No. 9 - Safety Inj. Isolation - Outer - manual - b 2-SI-721 NA No. 9 - Safety Inj. Isolation - Outer - manual - b 2-SI-742B NA No. 9 - Safety Inj. Isolation - Outer - MOV - SIAS 2-SI-625 NSR No. 9 - Safety Inj. Isolation - Outer - MOV - SIAS 2-SI-626 NSR No. 9 - Safety Inj. Isolation - Outer - MOV - SIAS 2-SI-627 NSR No. 9 - Safety Inj. Isolation - Outer - manual - b 2-SI-723 NA No. 9 - Safety Inj. Isolation - Outer - manual - b 2-SI-720 NA No. 10 - RCS-SDC Suction Isolation - Inner - MOV 2-SI-651 NSR No. 10 - RCS-SDC Suction Isolation - Inner - manual - b 2-SI-043A NA No. 10 - RCS-SDC Suction Isolation - Outer - manual - b 2-SI-102A NA No. 10 - RCS-SDC Suction Isolation - Outer - manual - b 2-SI-101A NA No. 10 - RCS-SDC Suction Isolation - Outer - manual 2-SI-709 NA No. 11 - SIT Recirc & Test Line Isolation - Outer - manual - a 2-SI-463 NA No. 12 - Ctmt Sump SI Recirc Line Iso - Outer - MOV-SRAS 2-CS-16.1A NSR No. 12 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b 2-CS-130 NA No. 12 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b 2-CS-132 NA No. 12 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b 2-CS-133 NA No. 12 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b 2-CS-134 NA No. 13 - Ctmt Sump SI Recirc Line Iso - Outer - MOV-SRAS 2-CS-16.1B NSR No. 13 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b 2-CS-135 NA No. 13 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b 2-CS-137 NA No. 13 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b 2-CS-138 NA No. 13 - Ctmt Sump SI Recirc Line Iso - Outer - manual - b 2-CS-139 NA No. 14 - Ctmt Sump Drain Line Iso - Inner - AOV-CIAS 2-SSP-16.1 5 No. 14 - Ctmt Sump Drain Line Iso - Outer - AOV-CIAS 2-SSP-16.2 5 No. 14 - Ctmt Sump Drain Line Iso - Outer - manual - b 2-SSP-51 NA No. 14 - Ctmt Sump Drain Line Iso - Outer - manual - b 2-SSP-73 NA MILLSTONE - UNIT 2 TRM 3/4 6-5 LBDCR 03-2-7 September 11, 2003

Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description Valve No. Maximum IsolationTime (seconds)

No. 15 - Main Fd Iso - Outer - Check; Air Assist Open - AOV-MSI - a 2-FW-5A NA No. 15 - Aux Fd Iso - Outer - Check; Air Assist Open - AOV - a 2-FW-12A NA No. 15 - Main Fd Iso - Outer - manual - b, a 2-FW-86 NA No. 15 - Main Fd Iso - Outer - manual - b, a 2-FW-261A NA No. 15 - Main Fd Iso - Outer - manual - Hydrazine supply - a 2-FW-15A NA No. 16 - Main Fd Iso - Outer - Check; Air Assist Open - AOV-MSI - a 2-FW-5B NA No. 16 - Main Fd Iso - Outer - Check; Air Assist Open - AOV - a 2-FW-12B NA No. 16 - Main Fd Iso - Outer - manual - Hydrazine supply - a 2-FW-15B NA No. 16 - Main Fd Iso - Outer - manual - b, a 2-FW-182 NA No. 17 - Personnel Airlock LLRT Iso - b 2-AC-520 NA No. 17 - Personnel Airlock LLRT Iso - b 2-AC-521 NA No. 17 - Personnel Airlock LLRT Iso - b 2-AC-522 NA No. 17 - Personnel Airlock Equalizing - Outer - Ball 2-AC-523 NA No. 17 - Personnel Airlock Equalizing - Inner - Ball 2-AC-524 NA No. 19 - Main Stm Iso - Outer -AOV - Steam dump valve - a 2-MS-190A NSR No. 19 - Main Stm Iso - Outer - manual - b, a 2-MS-371 NA No. 19 - Main Stm Iso - Outer - MOV-Stm to AFW pump - a 2-MS-201 NSR No. 19 - Main Stm Iso - Outer - manual bypass, a 2-MS-459 NA No. 19 - Main Stm Iso - Outer -manual - b, a 2-MS-297 NA No. 19 - Main Stm Iso - Outer - AOV - MSI closes valve - a 2-MS-265B 6 No. 19 - Main Stm Iso - Outer - Relief valves(8) - a 2-MS-247 thru 254 NA No. 19 - Main Stm Iso - Outer - MSI - air open - check - a 2-MS-64A 6 No. 19 - Main Stm Iso - Outer - MOV - MSI closes - a 2-MS-65A NSR No. 19 - Main Stm Iso - Outer - manual - b, a 2-MS-255 NA No. 20 - Main Stm Iso - Outer - AOV - Steam dump valve, - a 2-MS-190B NSR No. 20 - Main Stm Iso - Outer - manual - b, a 2-MS-369 NA No. 20 - Main Stm Iso - Outer - MOV - Stm to AFW pump - a 2-MS-202 NSR No. 20 - Main Stm Iso - Outer - manual bypass - a 2-MS-458 NA No. 20 - Main Stm Iso - Outer - manual - b, a 2-MS-296 NA No. 20 - Main Stm Iso - Outer - AOV - MSI closes valve - a 2-MS-266B 6 No. 20 - Main Stm Iso - Outer - Relief valves (8), a 2-MS-239 thru 246 NA No. 20 - Main Stm Iso - Outer - MSI - air open - check - a 2-MS-64B 6 MILLSTONE - UNIT 2 TRM 3/4 6-6 LBDCR 03-2-7 September 11, 2003

Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description Valve No. Maximum IsolationTime (seconds)

No. 20 - Main Stm Iso - Outer - MOV - MSI closes - a 2-MS-65B NSR No. 20 - Main Stm Iso - Outer - manual - b, a 2-MS-258 NA No. 21 - RCS Loop 1 smpl Iso. - Inner - AOV-CIAS 2-RC-001 5 No. 21 - RCS Pzr Surge Line smpl Iso - Inner - AOV-CIAS 2-RC-002 5 No. 21 - RCS Pzr Stm Space smpl Iso - Inner - AOV-CIAS 2-RC-003 5 No. 21 - RCS - PDT&QT smpl Iso - Inner - AOV-CIAS 2-LRR-61.1 5 No. 21 - RCS Sample Line Iso - Inner - sample valve - manual - b 2-RC-434 NA No. 21 - RCS Sample Line Iso - Outer - AOV-CIAS 2-RC-045 5 No. 21 - RCS Sample Line Iso - Inner - sample valve - manual - b 2-RC-435 NA No. 22 - SG No. 1 Blwdwn Iso - Outer - AOV-CIAS, AFAIS, Hi Rad - a 2-MS-220A 5 No. 23 - SG No. 2 Blwdwn Iso - Outer - AOV-CIAS, AFAIS, Hi Rad - a 2-MS-220B 5 No. 24 - RBCCW Sply to RCPs Iso - Outer - MOV - a 2-RB-30.1A NSR No. 24 - RBCCW Sply to RCPs - Outer - manual - b, a 2-RB-289 NA No. 25 - RBCCW Sply to CAR coolers - Outer - AOV - a 2-RB-28.1D NSR No. 25 - RBCCW Sply to CAR coolers - Outer - manual - b, a 2-RB-282 NA No. 26 - RBCCW Sply to CAR coolers - Outer - AOV - a 2-RB-28.1B NSR No. 26 - RBCCW Sply to CAR coolers - Outer - manual - b, a 2-RB-283 NA No. 26 - RBCCW Sply to CAR coolers - Outer - manual - b, a 2-RB-345 NA No. 27 - RBCCW Sply to CAR coolers - Outer - AOV - a 2-RB-28.1A NSR No. 27 - RBCCW Sply to CAR coolers - Outer - manual - b, a 2-RB-236 NA No. 28 - RBCCW Sply to CAR coolers - Outer - AOV - a 2-RB-28.1C NSR No. 28 - RBCCW Sply to CAR coolers - Outer - manual - b, a 2-RB-237 NA No. 29 - RBCCW Return fm RCPs - Outer - MOV - a 2-RB-37.2A NSR No. 29 - RBCCW Return fm RCPs - Outer - manual - b, a 2-RB-298 NA No. 29 - RBCCW Return fm RCPs - Outer - manual - b, a 2-RB-297A NA No. 30 - RBCCW Ret fm CAR cooler - Outer - AOV - a 2-RB-28.2D NSR MILLSTONE - UNIT 2 TRM 3/4 6-7 LBDCR 03-2-7 September 11, 2003

Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description Valve No. Maximum IsolationTime (seconds)

No. 30 - RBCCW Ret fm CAR cooler - Outer - SIAS AOV - a 2-RB-28.3D NSR No. 31 - RBCCW Ret fm CAR cooler - Outer - AOV - a 2-RB-28.2B NSR No. 31 - RBCCW Ret fm CAR cooler - Outer - SIAS AOV - a 2-RB-28.3B NSR No. 32 - RBCCW Ret fm CAR cooler - Outer - AOV - a 2-RB-28.2A NSR No. 32 - RBCCW Ret fm CAR cooler - Outer - SIAS AOV - a 2-RB-28.3A NSR No. 33 - RBCCW Ret fm CAR cooler - Outer - AOV - a 2-RB-28.2C NSR No. 33 - RBCCW Ret fm CAR cooler - Outer - SIAS AOV - a 2-RB-28.3C NSR No. 34 - Nitrogen Sply to Ctmt Iso - Outer - AOV-CIAS 2-SI-312 5 No. 34 - Nitrogen Sply to Ctmt - Outer - manual - b 2-SI-045 NA No. 35 - Prim Drain Tank Disch - Inner Iso - AOV-CIAS 2-LRR-43.1 5 No. 35 - Prim Drain Tank Disch - Outer Iso - AOV-CIAS 2-LRR-43.2 5 No. 35 - Prim Drain Tank Disch - Outer Iso - manual - b 2-LRR-291 NA No. 35 - Prim Drain Tank Disch - Outer Iso - manual - b 2-LRR-293 NA No. 35 - Prim Drain Tank Disch - Outer Iso - manual - b 2-LRR-295 NA No. 36 - Instr Air BU to Ctmt - Inner Iso check 2-IA-569 NA No. 36 - Instr Air BU to Ctmt - Inner - manual - b 2-IA-572 NA No. 36 - Instr Air BU to Ctmt - Outer Iso - manual 2-IA-566 NA No. 37 - Instr Air Sply to Ctmt - Inner - Iso - check 2-IA-43 NA No. 37 - Instr Air Sply to Ctmt - Outer Iso - AOV 2-IA-27.1 NSR No. 37 - Instr Air Sply to Ctmt - Outer - Manual - b 2-IA-40 NA No. 38 - Station Air Sply to Ctmt - Inner - manual - b 2-SA-28 NA No. 38 - Station Air Sply to Ctmt - Outer Iso - manual 2-SA-19 NA No. 38 - Station Air Sply to Ctmt - Inner Iso - check 2-SA-22 NA No. 39 - Ctmt Air PURGE Sply - Outer Iso - AOV-HiRad 2-AC-4 NSR No. 39 - Ctmt Air PURGE Sply - Inner Iso - AOV-HiRad 2-AC-5 NSR No. 39 - Ctmt Air PURGE Sply - Outer Iso - manual - b 2-AC-21 NA MILLSTONE - UNIT 2 TRM 3/4 6-8 LBDCR 07-MP2-010 October 5, 2009

Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description Valve No. Maximum IsolationTime (seconds)

No. 40 - Ctmt Air PURGE Sply - Outer Iso - AOV-HiRad 2-AC-7 NSR No. 40 - Ctmt Air PURGE Sply - Inner Iso - AOV-HiRad 2-AC-6 NSR No. 40 - Ctmt Air PURGE Sply - Inner - manual - b 2-AC-31 NA No. 42 - Fuel Transfer Tube - Inner - manual Blank Flange NA No. 42 - Fuel Transfer Tube Flange Test - Inner - manual - b 2-RW-31 NA No. 42 - Fuel Transfer Tube - Inner - manual - b 2-RW-291 NA No. 42 - Sleeve Drain Valve - Inner - manual - b 2-RW-292 NA No. 43 - RCP seals bleedoff Inner AOV-CIAS 2-CH-506 5 No. 43 - RCP seals bleedoff Outer AOV-CIAS 2-CH-505 5 No. 43 - RCP seals bleedoff Outer AOV-CIAS 2-CH-198 5 No. 43 - RCP seals bleedoff Line Outer - manual - b 2-CH-744 NA No. 43 - RCP seals bleedoff Line Outer - manual - b 2-CH-768 NA No. 43 - RCP seals bleedoff Line Outer - manual - b 2-CH-758 NA No. 43 - RCP seals bleedoff Line Outer - manual - b 2-CH-701 NA No. 49 - Fire Header Ctmt Sply - Outer Iso - manual 2-FIRE-108 NA No. 49 - Fire Header Ctmt Sply - Outer - manual - b 2-FIRE-125 NA No. 49 - Fire Header Ctmt Sply - Inner Iso - check 2-FIRE-109 NA No. 51 - Waste Gas fm Ctmt - Inner Iso - AOV-CIAS 2-GR-11.1 5 No. 51 - Waste Gas fm Ctmt - Outer - manual - b 2-GR-63 NA No. 51 - Waste Gas fm Ctmt - Outer Iso - AOV-CIAS 2-GR-11.2 5 No. 53 - RBCCW Sply to RCPs - Outer - MOV -a 2-RB-30.1B NSR No. 53 - RBCCW Sply to RCPs - Outer - manual - b, a 2-RB-291 NA No. 54 - RBCCW Return fm RCPs - Outer - MOV - a 2-RB-37.2B NSR No. 54 - RBCCW Return fm RCPs - Outer - manual - b, a 2-RB-300 NA No. 54 - RBCCW Return fm RCPs - Outer - manual - b, a 2-RB-299A NA No. 61 - Ctmt Air Monitor Sply - Inner Iso - AOV, CIAS 2-EB-88 5 No. 61 - Ctmt Air Monitor Sply - Outer - manual - b 2-AC-101 NA No. 61 - Ctmt Air Monitor Sply - Outer Iso - AOV, CIAS 2-AC-12 5 MILLSTONE - UNIT 2 TRM 3/4 6-9 LBDCR 07-MP2-010 October 5, 2009

Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description Valve No. Maximum IsolationTime (seconds)

No. 62 - Ctmt Air Monitor Rtrn - Inner Iso - check 2-AC-54 5 No. 62 - Ctmt Air Monitor Rtrn - Outer Iso - manual - b 2-AC-103 NA No. 62 - Ctmt Air Monitor Rtrn - Outer Iso - AOV, CIAS 2-AC-15 5 No. 63 - Ctmt ILRT Instrument Test - Inner Iso - manual 2-AC-117 NA No. 63 - Ctmt ILRT Instrument Test - Outer Iso - manual 2-AC-114 NA No. 63 - Ctmt ILRT Instr. - Outer Test Flange Blank Flange NA No. 64 - Ctmt ILRT Instrument Test - Inner Iso - manual 2-AC-116 NA No. 64 - Ctmt ILRT Instrument Test - Outer Iso - manual 2-AC-112 NA No. 64 - Ctmt ILRT Instr. - Outer Test Flange Blank Flange NA No. 65 - SG #1 Bldn Sample - Outer Iso - AOV, CIAS a 2-MS-191A 5 No. 67 - Refueling Water Purif. Rtrn - Inner Iso - manual 2-RW-232 NA No. 67 - Refueling Water Purif. Rtrn - Outer Iso - manual 2-RW-21 NA No. 67 - Refueling Water Purif. Rtrn - Outer - manual - b 2-RW-158 NA No. 68 - Refueling Water Purif. Sply - Inner Iso - manual 2-RW-154 NA No. 68 - Refueling Water Purif. Sply - Outer Iso - manual 2-RW-63 NA No. 68 - Refueling Water Purif. Sply - Outer - manual - b 2-RW-159 NA No. 72 - SG #2 Bldn Sample - Outer Iso - AOV, CIAS a 2-MS-191B 5 No. 82 - Hyd. PURGE - Inner Iso - AOV - CIAS, HiRad 2-EB-91 5 No. 82 - Hyd. PURGE - Outer Iso - AOV - CIAS, HiRad 2-EB-92 5 No. 82 - Hyd. PURGE -Outer - manual - b 2-EB-120 NA No. 82 - Hyd. PURGE - Inner - manual 2-EB-86 NA No. 83 - Hyd. PURGE - Inner Iso - AOV - CIAS, HiRad 2-EB-100 5 No. 83 - Hyd. PURGE - Outer Iso - AOV - CIAS, HiRad 2-EB-99 5 No. 83 - Hyd. PURGE -Outer - manual - b 2-EB-121 NA No. 85 - Ctmt ILRT Pressurization - Outer Iso. - manual SF-01 Sp. Flnge NA No. 85 - Ctmt ILRT Pressurization - Outer - manual - b 2-AC-107 NA No. 85 - Ctmt ILRT Pressurization - Inner Iso Flange Blank Flange NA MILLSTONE - UNIT 2 TRM 3/4 6-10 LBDCR 07-MP2-010 October 5, 2009

Table 3.6-1 Containment Isolation Valve LisT Pen. No. and Function Description Valve No. Maximum IsolationTime (seconds)

No. 86 - Ctmt Air Monitor Sply - Inner Iso - AOV, CIAS 2-EB-89 5 No. 86 - Ctmt Air Monitor Sply - Outer - manual - b 2-AC-102 NA No. 86 - Ctmt Air Monitor Sply - Outer Iso - AOV, CIAS 2-AC-47 5 No. 87 - Ctmt Air Monitor Rtrn - Inner Iso - check 2-AC-55 NA No. 87 - Ctmt Air Monitor Rtrn - Outer - manual - b 2-AC-104 NA No. 87 - Ctmt Air Monitor Rtrn - Outer Iso - AOV, CIAS 2-AC-20 5 a = The Allowed Outage Time = 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> b = Vent, Drain, or Test Connection NA = Closure Time is Not Applicable to Manual Valves, Relief Valves, Blind Flanges and Check Valves NSR = No Stroke time Required. This is applicable for valves that are open, go open, open during an accident or valves that are normally shut and stay shut during an accident.

MILLSTONE - UNIT 2 TRM 3/4 6-11 LBDCR 03-2-7 September 11, 2003

TECHNICAL REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS TECHNICAL REQUIREMENT 3.6.4.1 Two independent containment hydrogen monitors shall be FUNCTIONAL.

APPLICABILITY: MODES 1 and 2.

ACTION:

a. With one hydrogen monitor nonfunctional, restore the nonfunctional monitor to FUNCTIONAL status within 30 days or otherwise initiate corrective actions.
b. With both hydrogen monitors nonfunctional, restore at least one monitor to FUNCTIONAL status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or otherwise initiate corrective actions.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.6.4.1 Each hydrogen monitor shall be demonstrated FUNCTIONAL:

a. By the performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days, and
b. By the performance of a CHANNEL CALIBRATION at least once per 92 days on a STAGGERED TEST BASIS.

BASES:

The containment hydrogen monitors are used to assess the degree of core damage during beyond-design-basis accidents and to confirm that random or deliberate ignition of hydrogen in the containment atmosphere has taken place. Each containment hydrogen monitor is required to be FUNCTIONAL within 90 minutes after initiation of safety injection. The requirement that monitors be FUNCTIONAL within 90 minutes is based on the NRCs expectation outlined in Regulatory Guide 1.7, Revision 3, Control of Combustible Gas Concentration in Containment Following a LOCA. If an explosive gas mixture threatens CONTAINMENT INTEGRITY during beyond-design-basis events, then severe accident management guidelines use the hydrogen monitors to implement strategies that protect the integrity of the containment boundary.

MILLSTONE - UNIT 2 TRM 3/4 6-12 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS BASES: (Continued)

The equipment for monitoring containment hydrogen levels must be FUNCTIONAL, reliable and capable of continuously measuring the concentration of hydrogen in the containment atmosphere following beyond-design-basis accidents to facilitate accident management, including emergency planning. Since these monitors are not required to mitigate the effects of design basis events, entry into other operational MODES is permitted while taking ACTIONS to restore these monitors to service.

The hydrogen monitors are connected directly to the containment boundary and are an extension of the containment boundary during post accident conditions. When placed into service, any leakage from these monitors would bypass the enclosure building filtration region and discharge to atmosphere. Therefore, pressure boundary integrity is subject to Technical Specification 6.13 "Systems Integrity," which establishes a program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels.

The TECHNICAL SURVEILLANCE REQUIREMENT To perform a CHANNEL CALIBRATION at least every 92 days is based upon vendor recommendations to maintain sensor calibration. This calibration consists of a two-point calibration, utilizing the following sample gases:

a. One volume percent hydrogen, balance nitrogen
b. Four volume percent hydrogen, balance nitrogen The ACTION requirement to initiate corrective actions means that the problem is entered into the Millstone Corrective Action Program and addresses why the hydrogen monitor(s) was (were) not restored to FUNCTIONAL status within the specified time. Use of the corrective action process in this situation will ensure management attention and oversight to minimize the additional time the containment hydrogen monitor(s) is (are) nonfunctional. ACTIONS shall be taken in a timely manner to establish alternate methods for determining hydrogen concentration levels as needed and determined by management.

MILLSTONE - UNIT 2 TRM 3/4 6-13 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS

REFERENCE:

1. Amendment No. 287, dated June 29, 2005
2. DCR M2-04009, Implementation of Revised Combustible Gas (Hydrogen) Control Requirements in Containment
3. Regulatory Commitment RCR-42915 as described in Letter Serial No.04-386, dated September 8, 2004
4. Consolidated Line Item Improvement Process Notice of Availability, published September 25, 2003 (68 FR 55416) in support of TSTF-447 MILLSTONE - UNIT 2 TRM 3/4 6-14 LBDCR 05-MP2-007 August 4, 2005

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION TECHNICAL REQUIREMENT 3.7.2.1 The temperatures of both the primary and secondary coolants in the steam generators shall be > 70°F when the pressure of either coolant in the steam generator is > 200 psig.

APPLICABILITY:

All MODES.

ACTION:

With the requirements of the above specification not satisfied:

a. Immediately reduce the steam generator pressure to 200 psig, and
b. Perform an analysis to determine the effect of the overpressurization on the structural integrity of the steam generator. Determine that the steam generator remains acceptable for continued operation prior to increasing its temperatures above 200°F.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.2.1 The temperatures of both the primary and secondary coolants in the steam generators shall be determined to be > 70°F at least once per hour when pressures in the steam generators are > 200 psig and Tavg is < 200°F.

MILLSTONE - UNIT 2 TRM 3/4 7-1 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION BASES:

The limitation on steam generator pressure and temperature ensures that the pressure-induced stresses in the steam generators do not exceed the maximum allowable fracture toughness stress limits. The limitations of 70°F and 200 psig are based on a steam generator RTNDT of 50°F and are sufficient to prevent brittle fracture.

REFERENCE:

1. License Amendment No. 272 MILLSTONE - UNIT 2 TRM 3/4 7-2 LBDCR 03-2-1 February 27, 2003

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.5 FLOOD LEVEL TECHNICAL REQUIREMENT 3.7.5.1 At least one FUNCTIONAL service water pump motor shall be protected against flooding to a minimum elevation of 28 feet Mean Sea Level USGS datum if either:

a. The water level, including wave crest height, is exceeding plant grade level (14.0 feet Mean Sea level USGS datum), or
b. Three or more of the following conditions are occurring simultaneously:
1. The center of circulation of a storm with sustained winds greater than 60 miles per hour, as determined by radar, or reconnaissance, is presently located within the critical area as defined on Figure 3.7-1.
2. The projected track of a storm, with sustained winds greater than 60 miles per hour, which is expected to strike the facility within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> as determined by radar, reconnaissance, or forecasted track projection, is from between 130° clockwise to 350°.
3. The central pressure of the storm expected to strike the facility within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is or is forecasted to be 28.0 in. Hg; or the measured 15 minute average wind speed at nominal elevation 33 feet from on site meteorological instrumentation exceeds 60 miles per hour.
4. A storm with sustained winds greater than 60 miles per hour is: expected to strike the facility within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />; and the 15 minute average wind direction at nominal elevation 33 feet from on site meteorological instrumentation is from the sector 150° clockwise to 300°.

APPLICABILITY:

ALL MODES.

ACTION:

With the water level, including wave crest height, exceeding either plant grade or with three or more of the above specified meteorological conditions being exceeded simultaneously, immediately initiate ACTION to protect at least one service water pump motor against flooding to a minimum elevation of 28 feet; complete this protective ACTION within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

MILLSTONE - UNIT 2 TRM 3/4 7-3 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.5 FLOOD LEVEL TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.5.1.1 The water level, including wave crest height, shall be determined to be below plant grade at least once per hour when the center of circulation of a storm with sustained winds greater than 60 miles per hour is expected to strike the facility within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.7.5.1.2 The following conditions shall be determined at least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> when the center of circulation of a storm with sustained winds greater than 60 miles per hour is expected to strike the facility within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The meteorological conditions shall be determined from weather service forecasts and/or from the site meteorological instrumentation:

  • location of center of storm
  • forecasted time storm is expected to strike
  • storm track (actual and forecasted)
  • storm approach angle
  • central pressure of storm
  • 33 feet 15 minute average wind speed
  • 33 feet 15 minute average wind direction MILLSTONE - UNIT 2 TRM 3/4 7-4 LBDCR 07-MP2-010 October 5, 2009

FIGURE 3.7-1 CRITICAL AREA MILLSTONE - UNIT 2 TRM 3/4 7-5 LBDCR 03-2-1 February 27, 2003

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.5 FLOOD LEVEL BASES:

Water level must rise above 22 feet above mean sea level before reaching the base of the service water pump motors. Therefore service water pump motors are normally protected against water damage to an elevation of 22 feet. If the water level is exceeding plant grade level or if a severe storm is approaching the plant site, one service water pump motor will be protected against flooding to a minimum elevation of 28 feet. This will ensure that this pump will continue to be capable of removing decay heat from the reactor. In order to ensure accessibility to the intake structure, ACTION to provide pump motor protection will be initiated when the water level including wave crest height reaches plant grade level. Entry into the ACTION to protect one service water pump from the flooding precludes any need to perform surveillance requirements.

REFERENCE:

1. License Amendment No. 272 MILLSTONE - UNIT 2 TRM 3/4 7-6 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.7 SEALED SOURCE CONTAMINATION TECHNICAL REQUIREMENT 3.7.7.1 Each sealed source containing radioactive material either in excess of 100 microcuries of beta and/or gamma emitting material or 5 microcuries of alpha emitting material shall be free of 0.005 microcuries of removable contamination.

APPLICABILITY:

AT ALL TIMES.

ACTION:

a. Each sealed source having removable contamination in excess of the above limit shall be immediately withdraw from use and:
1. Either decontaminated and repaired, or
2. Disposed of in accordance with Commission Regulations.
b. The provisions of TECHNICAL REQUIREMENT 3.0.3 are not applicable.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.7.1.1 Test Requirements - Each sealed source shall be tested for leakage and/or contamination by:

a. The licensee, or
b. Other persons specifically authorized by the Commission or an Agreement State.

The test method shall have a detection sensitivity of at least 0.005 microcuries per test sample.

4.7.7.1.2 Test Frequencies - Each category of sealed sources shall be tested at the frequencies described below.

a. Sources in use (excluding STARTUP sources previously subjected to core flux) - At least once per six months for all sealed sources containing radioactive materials:

MILLSTONE - UNIT 2 TRM 3/4 7-7 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.7 SEALED SOURCE CONTAMINATION TECHNICAL SURVEILLANCE REQUIREMENTS (Continued)

1) With a half-life greater than 30 days (excluding Hydrogen 3), and
2) In any form other than gas.
b. Stored sources not in use - Each sealed source shall be tested prior to use or transfer to another licensee unless tested within the previous six months. Sealed sources transferred without a certificate indicating the last test date shall be tested prior to being placed into use.
c. STARTUP sources - Each sealed STARTUP source shall be tested prior to being subjected to core flux and following repair or maintenance to the source.

MILLSTONE - UNIT 2 TRM 3/4 7-8 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.7 SEALED SOURCE CONTAMINATION BASES:

The limitations on sealed source removable contamination ensure that the total body or individual organ irradiation does not exceed allowable limits in the event of ingestion or inhalation of the source material. The limitations on removable contamination for sources requiring leak testing, including alpha emitters, is based on 10 CFR 70.39(a)(3) limits for plutonium. Leakage of sources excluded from the requirements of this specification represent less than one maximum permissible body burden for total body irradiation if the source material is inhaled or ingested.

Sealed sources are classified into three groups according to their use, with TECHNICAL SURVEILLANCE REQUIREMENTS commensurate with the probability of damage to a source in that group. Those sources, which are not frequently handled, are required to be tested more often than those which are not. Sealed sources, which are continuously enclosed within a shielded mechanism (i.e., sealed sources within radiation monitoring or boron measuring devices), are considered to be stored and need not be tested unless they are removed from the shield mechanism.

REFERENCE:

1. License Amendment No. 272 MILLSTONE - UNIT 2 TRM 3/4 7-9 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.1 FIRE SUPPRESSION WATER SYSTEM TECHNICAL REQUIREMENT 3.7.9.1 The fire suppression water system shall be FUNCTIONAL with:

a. Three high pressure fire pumps, each with a capacity of at least 1,800 gpm, with pump discharge aligned to the fire suppression header,
b. Two water supplies, each with a minimum contained volume of 200,000 gallons, and
c. A FUNCTIONAL flow path capable of taking suction from the fire water tanks and transferring the water through distribution piping with FUNCTIONAL sectionalizing control or isolation valves to the yard hydrant curb valves and the first valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser required to be FUNCTIONAL per TECHNICAL REQUIREMENTS 3.7.9.2 (Spray/Sprinkler TECHNICAL REQUIREMENT) and 3.7.9.3 (Fire Hose Stations TECHNICAL REQUIREMENT).

APPLICABILITY:

At all times.

ACTION:

a. With one pump and/or one water supply nonfunctional:
1. Restore the nonfunctional equipment to FUNCTIONAL status within 7 days OR
2. Provide an alternate backup pump or water supply within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND develop a plan and schedule, within 14 days, for restoring the system to FUNCTIONAL status.
b. With two pumps nonfunctional:
1. Establish a continuous fire watch in the Turbine Building with backup suppression within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND
2. Provide an alternate backup pump within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND MILLSTONE - UNIT 2 TRM 3/4 7-10 LBDCR 07-MP2-015 February 2, 2010

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.1 FIRE SUPPRESSION WATER SYSTEM TECHNICAL SURVEILLANCE REQUIREMENTS

3. Restore the nonfunctional equipment to FUNCTIONAL status within 7 days OR develop a plan and schedule, within 14 days, for returning the equipment to FUNCTIONAL status.
c. With the Fire Suppression Water System otherwise nonfunctional:
1. Establish a continuous fire watch in the Turbine Building with backup suppression within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND
2. Restore the fire suppression water distribution system to FUNCTIONAL within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OR
3. Establish a backup Fire Suppression Water System within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND develop a plan and schedule, within 14 days, for restoring the system to FUNCTIONAL status.

4.7.9.1 The fire suppression water system shall be demonstrated FUNCTIONAL:

a. At least once per 7 days, by verifying the contained water supply volume.
b. At least once per 31 days, on a STAGGERED TEST BASIS, by starting each electric motor driven pump and operating it for at least 15 minutes on recirculation flow.
c. At least once per 31 days, by verifying that each valve (manual, power operated or automatic) in the flow path is in its correct position.
d. At least once per 12 months, by cycling each testable valve in the flow path through at least one complete cycle of full travel.
e. At least once per 18 months, by performing a system FUNCTIONAL test which includes simulated automatic actuation of the system throughout its operating sequence, and:
1. Verifying that each pump develops at least 1800 gpm at a pump differential pressure of 100 psid, and MILLSTONE - UNIT 2 TRM 3/4 7-11 LBDCR 07-MP2-015 February 2, 2010

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.1 FIRE SUPPRESSION WATER SYSTEM TECHNICAL SURVEILLANCE REQUIREMENTS

2. Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel, and
3. Verifying that each pump starts (sequentially) to maintain the fire suppression water system pressure greater than or equal to 75 psig.
f. At least once per 3 years, by performing a flow test of the system in accordance with Chapter 5, Section 11, of the Fire Protection Handbook, 14th Edition, published by the National Fire Protection Association.
g. The fire pump diesel engine shall be demonstrated FUNCTIONAL:
1. At least once per 31 days, by verifying:
a. The fuel storage tank contains at least 125 gallons of fuel; and
b. The engine starts from ambient conditions and operates for at least 30 minutes, while loaded with the fire pump on recirculation flow.
2. By verifying:
a. At least once per 92 days, a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTM D270-65, is within the acceptable limits specified in Table 1 of ASTM D975-74 when checked for viscosity, water, and sediment.
b. At least once per 18 months, by subjecting the engine to an inspection in accordance with procedures prepared in conjunction with its manufacturers recommendations for the class of service.
3. The diesel engine starting 12-volt batteries and charger shall be demonstrated FUNCTIONAL:
a. At least once per 7 days, by verifying:
1. The electrolyte level of each battery cell is above the plates.
2. The voltage of each battery is greater than or equal to 12 volts.

MILLSTONE - UNIT 2 TRM 3/4 7-12 LBDCR 07-MP2-015 February 2, 2010

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.1 FIRE SUPPRESSION WATER SYSTEM

b. At least once per 92 days, by verifying the specific gravity is appropriate for continued service of the batteries.
c. At least once per 18 months, by verifying:
1. The batteries, cell plates, and battery racks show no visual indication of physical damage or abnormal deterioration; and
2. The battery-to-battery and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material.

BASES:

1. The FUNCTIONALITY of the fire suppression system ensures adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the high pressure fire pumps, water supply tanks, fire hydrants, fire hose stations, distribution piping and valves, spray and/

or sprinkler systems and Halon systems.

In the event that portions of the fire suppression systems are nonfunctional, alternate backup fire fighting equipment is required to be made available in the affected areas until the nonfunctional equipment is restored to service.

In the event the fire suppression water system becomes nonfunctional, immediate corrective measures must be taken since this system provides the major fire suppression capability of the plant.

2. It is the intent of monthly diesel engine fire pump testing to conduct this test during a different week than electric motor pump testing. Nominal monthly (once per 31 days) and 18 month surveillance requirements are consistent with the Unit 1 and 3 surveillance requirements. The surveillance procedures for each of the three fire pumps are common to Units 1, 2, and 3.

(See AR 97026324-03 for additional information).

REFERENCE:

1. Condition Report M3-00-2659 MILLSTONE - UNIT 2 TRM 3/4 7-12a LBDCR 07-MP2-015 February 2, 2010

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.2 SPRAY AND/OR SPRINKLER SYSTEMS TECHNICAL REQUIREMENT 3.7.9.2 The following spray and/or sprinkler systems shall be FUNCTIONAL:

a. Diesel Generator Rooms
b. Diesel Generator Day Tank Rooms
c. Cable Vault (Aux. Building)
1. Sprinkler (in tray)
2. Sprinkler (ceiling level)
d. Cable Vault (Turbine Building)
1. Automatic Wet Pipe Sprinkler System (450)
2. Automatic Deluge System (vertical cable shaft and elevation 250 cable vault)
e. Hydrogen Seal Oil Unit
f. Turbine Building Northeast Corner
g. Turbine Building 316/146 - North
h. Turbine Building 316/146 - South
i. Lube Oil Room
j. Aux. Building (-456) General Area
k. Aux. Building (146) Truck Access
l. Turbine Bearing
m. Steam Generator Feed Pumps
n. Aux. Bldg. (146) at MCC B-61
o. Aux. Bldg. (-256) at Charging Pump Cubicle
p. Aux. Bldg. (146) General Area APPLICABILITY:

Whenever equipment in the spray/sprinkler protected areas is required to be FUNCTIONAL.

ACTION:

a. With one or more of the above required spray and/or sprinkler systems nonfunctional, establish a continuous fire watch with backup fire suppression equipment for the unprotected area(s) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Restore the nonfunctional equipment to FUNCTIONAL status within 14 days, or develop a plan and schedule for restoring the equipment to FUNCTIONAL status.

MILLSTONE - UNIT 2 TRM 3/4 7-13 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.2 SPRAY AND/OR SPRINKLER SYSTEMS TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.9.2 Each of the above required spray and/or sprinkler systems shall be demonstrated FUNCTIONAL:

a. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
b. At least once per 18 months:
1. By performing a system FUNCTIONAL test which includes simulated automatic actuation of the system; and:

a) Verifying that the automatic valves in the flow path actuate to their correct positions on a simulated test signal, and b) Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel.

2. By inspection of the spray headers to verify their integrity, and
3. By inspection of each nozzle to verify no blockage.
c. At least once per 3 years by performing an air or water flow test through each open head spray/sprinkler header and verifying each open head spray/sprinkler nozzle is unobstructed.

MILLSTONE - UNIT 2 TRM 3/4 7-14 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.2 SPRAY AND/OR SPRINKLER SYSTEMS BASES:

The FUNCTIONALITY of the fire suppression system ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.

In the event that portions of the fire suppression systems are nonfunctional, alternate backup fire fighting equipment is required to be made available in the affected areas until the nonfunctional equipment is restored to service.

In the event the fire suppression water system becomes nonfunctional, immediate corrective measures must be taken since this system provides the major fire suppression capability of the plant.

REFERENCE:

1. Condition Report M3-00-2659 MILLSTONE - UNIT 2 TRM 3/4 7-15 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.3 FIRE HOSE STATIONS TECHNICAL REQUIREMENT 3.7.9.3 The fire hose stations shown in TRM Table 4.7-5 shall be FUNCTIONAL.

APPLICABILITY:

Whenever equipment in the areas protected by the fire hose stations is required to be FUNCTIONAL*.

ACTION:

With one or more of the fire hose stations shown in TRM Table 4.7-5 nonfunctional, route an additional equivalent capacity fire hose to the unprotected area(s) from an FUNCTIONAL hose station within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or establish a continuous fire watch with backup fire suppression equipment for the unprotected area(s). If the nonfunctional hose station(s) is not the primary means of fire suppression, then route the additional fire hose(s) or establish a continuous fire watch with fire suppression equipment within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.9.3 Each of the fire hose stations shown in TRM Table 4.7-5 shall be demonstrated FUNCTIONAL.

a. At least once per 31 days by visual inspection of the station to assure all required equipment is at the station. The exception to the above will be the containment hose stations. The equipment will be located outside containment except when the unit is in COLD SHUTDOWN.
b. At least once per 18 months by:
1. Removing the hose for inspection and re-racking, and
2. Replacement of all degraded gaskets in couplings.
c. At least once per 3 years by:
1. Partially opening each hose station valve to verify valve FUNCTIONALITY and no flow blockage.
2. Conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at that hose station.
  • Containment hose stations shall be FUNCTIONAL in MODE 5 when required to support maintenance activities and MODE 6.

MILLSTONE - UNIT 2 TRM 3/4 7-16 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.3 FIRE HOSE STATIONS BASES:

The FUNCTIONALITY of the fire suppression system ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.

In the event that portions of the fire suppression systems are nonfunctional, alternate backup fire fighting equipment is required to be made available in the affected areas until the nonfunctional equipment is restored to service.

In the event the fire suppression water system becomes nonfunctional, immediate corrective measures must be taken since this system provides the major fire suppression capability of the plant.

REFERENCE:

1. Condition Report M3-00-2659 MILLSTONE - UNIT 2 TRM 3/4 7-17 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)

Table 4.7-5 Fire Hose Stations Hose Station Bldg/Elevation Area Number 201-207 Turbine/146 Turbine Building 208-214 Turbine/316 Turbine Building 215-221 Turbine/546 Turbine Building 222 Auxiliary/-456 Center of Open Area 223 Auxiliary/-256 Near Elevator 224 Auxiliary/-50 Near Elevator 225 Auxiliary/146 Near Elevator 226 Auxiliary/386 Spent Fuel Pool - Northwest Corner 227 Auxiliary/146 Boric Acid Batch Tank Area 228 Auxiliary/146 Near MCC 22-1E (B51) 229 Auxiliary/146 Railway Access 230 Auxiliary/386 Spent Fuel Pool - South Wall 231 Auxiliary/146 Outside Diesel Room 234 Auxiliary/386 Southeast Corner Stairway 240 Auxiliary/-50 Southeast Corner Stairway 241 Auxiliary/256 Cable Vault Southeast Entrance 242 Auxiliary/366 Control Room Ventilation Area 243 Turbine/450 North Entrance of Turbine Bldg. Cable Vaults 250-251 Containment/386 East & West Stairwells 248-249 Containment/146 East & West Stairwells 244-245 Containment/-226 East & West Stairwells MILLSTONE - UNIT 2 TRM 3/4 7-18 TRMCR 01-2-11 December 6, 2001

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.4 HALON FIRE SUPPRESSION SYSTEM TECHNICAL REQUIREMENT 3.7.9.4 The following Halon 1301 fire suppression systems shall be FUNCTIONAL with an intact gas boundary, a FUNCTIONAL activation system, and a container having a net weight of not less than 95% of full charge weight at 325 psig minimum (corrected to 70°F).

a. West D.C. Switchgear Room.
b. East D.C. Switchgear Room.

APPLICABILITY:

At all times.

ACTION:

With one or more of the above systems nonfunctional, establish a continuous fire watch with backup fire suppression equipment for the unprotected area(s) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Restore the system to FUNCTIONAL status within 14 days, or develop a plan and schedule for restoring the system to FUNCTIONAL status.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.9.4 Each of the above halon fire suppression systems shall be demonstrated FUNCTIONAL.

a. At least once per 6 months:
1. By performing a system FUNCTIONAL test which includes simulated automatic operation of the system; and,
a. Simulated manual actuation of the system.
b. Verifying that the storage containers have a net weight of not less than 95% of full charge weight at 325 psig (corrected to 70°F).
c. Verifying the associated dampers close.
b. At least once per 18 months;
1. By performing a visual inspection of the discharge nozzles to assure no blockage.
2. By performing a visual inspection to assure the gas boundary is intact.

MILLSTONE - UNIT 2 TRM 3/4 7-19 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.9 FIRE PROTECTION SYSTEMS 3/4.7.9.4 HALON FIRE SUPPRESSION SYSTEM BASES:

The FUNCTIONALITY of the fire suppression system ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers, halon fire suppression system and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.

In the event that portions of the fire suppression systems are nonfunctional, alternate backup fire fighting equipment is required to be made available in the affected areas until the nonfunctional equipment is restored to service.

REFERENCE:

1. Condition Report M3-00-2659 MILLSTONE - UNIT 2 TRM 3/4 7-20 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.10 PENETRATION FIRE BARRIERS TECHNICAL REQUIREMENT 3.7.10 All fire rated assemblies (walls, floor/ceilings, cable tray enclosures, and other fire barriers) separating safety-related fire areas or separating portions of redundant systems important to safe shutdown within a fire area and all sealing devices in fire rated assembly penetrations (fire doors, fire windows, fire dampers, cable, piping, and ventilation duct penetration seals) shall be FUNCTIONAL.

APPLICABILITY:

At all times unless otherwise determined that the separation of safety-related fire areas or separating portions of redundant systems important to safe shutdown within a fire area is not required based on the MODE of operation.

ACTION:

With one or more of the above required fire rated assemblies and/or penetration sealing devices nonfunctional, within 1 hour:

1. Verify the fire areas/zones on at least one side of the affected fire rated assembly contains a FUNCTIONAL fire detection or automatic suppression system at the fire barrier and establish a fire watch patrol that inspects both areas at least once per hour. Roving fire watches must monitor the area of the device in question, as a minimum, within the specified time frame, plus or minus 25% of the time interval specified in the ACTION statement for periodic roving fire watches. The 25%

extension of the time interval specified does not degrade the reliability that results from performing the rove at the specified interval, based on plant experience, and Fire Protection Engineering analysis as documented in Technical Evaluation M3-EV-02-2005, or

2. Establish a continuous fire watch on at least one side of the affected fire rated assembly and/or penetration seal, or
3. Temporarily repair the nonfunctional fire rated assembly and/or sealing device and classify it as temporary.

All temporary repairs of nonfunctional fire rated assemblies and/or sealing devices shall be permanently repaired within 30 days, or implement ACTION 1 or 2 above.

MILLSTONE - UNIT 2 TRM 3/4 7-21 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.10 PENETRATION FIRE BARRIERS TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.10 The above required fire rated assemblies and penetration sealing devices shall be verified to be FUNCTIONAL by a visual inspection:

a. At least once per 18 months for fire doors.
b. At least once per 18 months for fire barrier penetration seals, on at least 10% of the total number of penetration seals. If any of the penetration seals in the inspection sample are found to be nonfunctional, then an additional 10% sample of the total number of penetration seals shall be visually inspected. Sampling and inspection shall continue until all of the seals in a sample are found FUNCTIONAL or 100% of the seals are inspected.
c. At least once per 18 months for fire dampers, on at least 10% of the total number of fire dampers. If any of the fire dampers in the inspection sample are found to be nonfunctional, then an additional 10% sample of the total number of dampers shall be inspected. Sampling and inspection shall continue until all the fire dampers in a sample are found FUNCTIONAL or 100% of the fire dampers are inspected.
d. Prior to returning a fire rated assembly and/or penetration sealing device to FUNCTIONAL
e. status following repairs or maintenance.

BASES:

The FUNCTIONAL integrity of the penetration fire barriers ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility. This design feature minimizes the possibility of a single fire rapidly involving several areas of the facility prior to detection and extinguishment. The penetration fire barriers are a passive element in the facility fire protection program and are subject to periodic inspections.

During a period of time when a barrier is not FUNCTIONAL, alternate measures are taken to prevent the possible spread of fire. These measures include verifying the FUNCTIONALITY of fire detection or suppression systems on one side of the affected barrier and establishing a fire watch patrol, or posting a continuous, fire watch in the vicinity of the affected barrier, or installation of a temporary fire stop pending restoration of the permanent seal.

MILLSTONE - UNIT 2 TRM 3/4 7-22 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.10 PENETRATION FIRE BARRIERS BASES: (Continued)

Roving fire watches must monitor the area of the device in question, as a minimum, within the specified time frame, plus or minus 25% of the time interval specified in the ACTION statement for periodic roving fire watches. The 25% extension of the time interval specified does not degrade the reliability that results from performing the rove at the specified interval, based on plant experience, and Fire Protection Engineering analysis as documented in Technical Evaluation M3-EV-02-2005.

REFERENCE:

1. Condition Report M3-00-2659
2. TRM Table 7-1: Barrier Fire Watch Matrix LBDCR 07-MP2-010 MILLSTONE - UNIT 2 TRM 3/4 7-23 October 5, 2009

TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)

Table 7-1 Barrier Fire Watch Matrix Firewatch Determination - Index of Fire Areas/Zones FIRE BUILDING DESCRIPTION ELEV. APP R/ SUPPR OR *BARRIER AREA/ZONE SFTY REL DETECTION FW REQD A-1 A Auxiliary Spent Resin Shipping Area -456 Y S,D Y A-1 B Auxiliary RBCCW Pump and Hx. Area -256 Y S1,D Y A-1 C Auxiliary Waste Tank Pump Room -456 Y N Y A-1 D Auxiliary Waste Tank Room -456 N N N A-1 E Auxiliary Waste Gas Decay Tank Room -256 N N N A-1 F Auxiliary Waste Gas Comp. and Surge Tank -256 N N N A-1 G Auxiliary Boric Acid PP, SFP Hx. -50 Y D Y A-1 H Auxiliary Volume Control Tank Room -50 Y N Y A-1 I Auxiliary Auxiliary Evaporator and Tanks -50 Y N N A-1 J Auxiliary Evaporator and Tanks -50 N N N A-3 Auxiliary Safety Injection Pump Room -456 Y D Y A-4 Auxiliary HPSI Pump Room -456 Y D Y A-5 Auxiliary Coolant Tanks Area -256+ Y N Y A-6 A Auxiliary Charging Pump Room -256 Y S1,D Y A-6 B Auxiliary Degasifier Area -256 Y S1,D Y A-7 Auxiliary Spent Resin Tank Area -256 N N Y A-8 A Auxiliary Safety Injection Pump Room -456 Y D Y A-8 B Auxiliary Recirculation Valve Access -256 Y N Y A-8 C Auxiliary West Piping Penetration Room -50 Y D Y A-8 D Auxiliary West Ele Penetration Area -146 Y D Y A-8 E Auxiliary West Main Steam Safety Valve Room 386 Y N Y A-9 Auxiliary Maintenance Storage Crib -50 N D Y A-10A Auxiliary East Piping Penetration Room -50 Y D Y A-10 B Auxiliary East Ele Penetration Area 147 Y D Y MILLSTONE - UNIT 2 TRM 3/4 7-24 LBDCR 14-MP2-015 September 24, 2014

TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)

Table 7-1 Barrier Fire Watch Matrix Firewatch Determination - Index of Fire Areas/Zones FIRE BUILDING DESCRIPTION ELEV. APP R/ SUPPR OR *BARRIER AREA/ZONE SFTY REL DETECTION FW REQD A-10 C Auxiliary East Main Steam Safety Valve Room 386 Y N Y A-11 Auxiliary Ion Exchanger Room -50 N N Y A-12 A Auxiliary Boric Acid and Chem Add. Tank 146 Y S,D Y A-12 B Auxiliary Sample Area 146 N N Y A-12 C Auxiliary Borometer 146 N N Y A-13 Auxiliary 480 Volt MCC B61 146 Y S1D Y A-14A Auxiliary SFP and Cask Laydown Area -50 Y N Y A-14B Auxiliary Railroad Bay Area 146 Y S Y A-14C Auxiliary SFP and Fuel Handling Area 386 Y N Y A-14D Auxiliary Filtration System Equip. Room 146 Y S1D Y A-14E Auxiliary Cask Washdown Area 386 N N N A-15 Auxiliary Diesel Generator Room A 146 Y S,D Y A-16 Auxiliary Diesel Generator Room B 146 Y S,D Y A-17 Auxiliary Solid Radwaste Drumming Storage Area 146 Y S Y A-18 Auxiliary Storage Area (Former Snubber Repair Shop) 146 N S Y A-19 A Auxiliary HP Access/Control Area (Former Maintenance 146 N S Y Shop)

A-19B Auxiliary RCP Seal Rebuild Area 386 Y S1D1 Y A-20 Auxiliary DC Equipment Room A (East) 146 Y S,D Y A-21 Auxiliary DC Equipment Room B (West) 146 Y S,D Y A-22 Auxiliary East Battery Room 146 Y D Y A-23 Auxiliary West Battery Room 146 Y D Y A-24 Auxiliary Cable Vault 256 Y S,D Y MILLSTONE - UNIT 2 TRM 3/4 7-25 LBDCR 02-2-10 August 8, 2002

TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)

Table 7-1 Barrier Fire Watch Matrix Firewatch Determination - Index of Fire Areas/Zones FIRE BUILDING DESCRIPTION ELEV. APP R/ SUPPR OR *BARRIER AREA/ZONE SFTY REL DETECTION FW REQD A-25 Auxiliary Main Control Room 386 Y D1 Y A-26 Auxiliary Operator Break Room (Former Computer Room) 386 N S1D Y A-27 Auxiliary New Computer Room 386 N S,D Y A-28 Auxiliary East 480V Load Center Room 386 Y D Y A-29 Auxiliary RCP Rebuild Shop Prep. Room 386 N S Y A-30 Auxiliary Diesel Oil Day Tank Room B 386 Y S Y A-31 Auxiliary Diesel Oil Day Tank Room A 386 Y S Y A-32 Auxiliary Air Handling Units 386 Y D Y A-33 Auxiliary Ventilation Equipment Room 386 Y D Y T-1 A Turbine General Area Elevation 146 Y S Y T-1 B Turbine Hydrogen Seal Oil Unit 146 N S,D Y T-1 C Turbine Mezzanine Equipment Area/Heater Bay 316 Y S Y T-1 D Turbine DC Switchgear Area 316 N S,D Y T-1 E Turbine Auxiliary Battery Room 316 N D Y T-1 F Turbine Operating Floor/Turbine Deck 546 Y S1D1 Y T-2 Turbine Turbine Lube Oil System 146 N S Y T-3 Turbine Motor-Driven Aux. Feed Pump Pit 16 Y D Y T-4 Turbine Steam-Driven Aux. Feed Pump Pit 16 Y D Y T-5 Turbine I and C Equipment Storage Room 256 N S Y T-6 Turbine West 480V Load Center Room 366 Y D Y T-7 Turbine 6.9 and 4.16 kV Switchgear Room 316 Y D Y T-8 Turbine West Cable Vault 450 Y S,D Y T-9 Turbine East Cable Vault 450 Y S,D Y T-10 Turbine 6.9 and 4.16 kV Switchgear Room 566 Y D Y MILLSTONE - UNIT 2 TRM 3/4 7-26 LBDCR 02-2-10 August 8, 2002

TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)

Table 7-1 Barrier Fire Watch Matrix Firewatch Determination - Index of Fire Areas/Zones FIRE BUILDING DESCRIPTION ELEV. APP R/ SUPPR OR *BARRIER AREA/ZONE SFTY REL DETECTION FW REQD C-1 Containment Containment Building -256+ Y D1 Y I-1 A Intake Pump Room 140 Y D N I-1 B Intake Sodium Hypochlorite Room 140 N D N I-1 C Intake MCC Room 140 N D N FP-2 Yard Unit 2 Fire Pumphouse 146 Y N Y PDC-1 Yard Power Distribution Center #1 (VFD A & C) 146 N D N PDC-2 Yard Power Distribution Center #2 (VFD B & D) 146 N D N Y-1 Yard Ecolochem Building 146 N D N Y-2 Yard Millstone Radwaste Reduction Facility - MRRF Building 146 N D N Y-3 Yard Flammable/Hazardous Waste Storage 146 N S,D N Y-4 Yard South Access Point Mod. Bldg. 146 N D N Y-5 Yard Unit 2 Maint. Bldg. Snubber Shop 146 N D N Y-7 Yard Unit 2 Maintenance Building 146 N S,D N Y-8 Yard Maintenance Air Compressor 146 N S N Y-9 Yard Service Water Piping Tunnel (Under Turbine and Aux 30 Y N Y Bldgs)

Y-10 Yard Bulk Hydrogen Storage Area 146 N N N Y-12 Yard EDG Aboveground Fuel Storage Tank 146 N N N Y-13 Yard GSU Transformer Deluge Building 146 N D N Y-14 Yard Security Diesel Enclosure 146 N S,D N TS-1 Turbine General Electric Turbine Outage Office 546 N S N (in Fire Zone T-1F)

XR-2 Yard Normal Transformer 146 N S,D N XR-3 Yard Reserve Transformer 146 N S,D N MILLSTONE - UNIT 2 TRM 3/4 7-27 LBDCR 10-MP2-015 November 2, 2010

TECHNICAL REQUIREMENTS SECURITY-RELATED-INFORMATIONWithheld under 10 CFR 2.390 (d) (1)

Table 7-1 Barrier Fire Watch Matrix Firewatch Determination - Index of Fire Areas/Zones FIRE BUILDING DESCRIPTION ELEV. APP R/ SUPPR OR *BARRIER AREA/ZONE SFTY REL DETECTION FW REQD XR-4 Yard Main GSU Transformer 15G-2XA 146 N S,D N XR-5 Yard Main GSU Transformer 15G-2XB 146 N S,D N XR-6 Yard Main GSU Transformer 15G-2XC 146 N S,D N XR-7 Yard Main GSU Transformer 15G-2XD 146 N S,D N Notes

  • The Barrier FW Reqd column provides a conservative overview as to whether or not a fire watch could be required. To identify a specific boundary (i.e., wall, floor, ceiling), consult MP2 Barrier Boundary drawing series 25203 sheets 24093, 24095, 24097, 24099, 24101, 24103, 24105, 24107, and 24109. To determine type of firewatch (i.e., rove, continuous), evaluate TR against specific suppression/detection configuration.
1. Partial Coverage - consult Fire Hazard Analysis (FHA) for specific configuration
2. Curbing MILLSTONE - UNIT 2 TRM 3/4 7-28 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY TECHNICAL REQUIREMENT 3.8.1.1.c The diesel oil storage tank (T-148) shall contain at least 18,620 total gallons of fuel.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

a. With the diesel oil storage tank volume less than 18,620 total gallons, restore diesel oil storage tank level within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or declare one emergency diesel generator nonfunctional.
b. With the diesel oil storage tank fuel oil volume less than 13,357 total gallons, declare one emergency diesel generator nonfunctional.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.8.1.1.3 Verify the diesel oil storage tank contains at least 18,620 total gallons of fuel at least once per 31 days.

BASES:

There are two emergency diesel generators (EDG) for Millstone Nuclear Power Station Unit No. 2. Each EDG is provided with a separate fuel oil supply system, which consists of a diesel oil supply tank and associated piping, valves, and instrumentation controls.

Technical Specifications require a minimum of 12,000 gallons of fuel oil to be stored in each diesel oil supply tank (T-48A and T-48B).

A cross-tie with two locked-closed valves for the diesel oil supply tanks is provided so that a total inventory of 24,000 gallons would be available to either one of the EDGs. In addition, a 25,000 gallon above ground fuel oil storage tank (T-148), which is common for both EDGs, is provided to receive fuel oil from delivery trucks prior to placing fuel oil in the diesel oil supply tanks.

MILLSTONE - UNIT 2 TRM 3/4 8-1 LBDCR 20-MP2-002 February 27, 2020

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY BASES: (Continued):

ETE-MP-2020-1002,(1) determined that a total useable fuel oil volume of 42,106 gallons is necessary to support initial operation of both EDGs for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and then allow one of the EDGs to continue operation at its rated load for a total of 7 days. This 42,106 gallon requirement for total minimum fuel oil inventory is greater than the combined usable capacity of 24,000 gallons available from the two supply tanks.

The EDG supply tanks require an additional 18,106 gallons(2) to satisfy the 42,106 gallon total minimum inventory of useable fuel oil. The 18,106 gallons of additional volume of fuel oil is supplied from the common storage tank T-148. A minimum volume of 18,106 useable gallons equates to a fuel oil level of approximately 80 inches above the bottom of tank T-148. To ensure a usable volume of 18,106 gallons is maintained in tank T-148, a tank low-level alarm based on maintaining 18,620 total gallons is necessary to annunciate whenever the stored volume decreases below this value.

TR ACTION Statement b requires the operator to declare one of the EDGs nonfunctional if the total fuel oil inventory in tank T-148 decreases to 13,357 total gallons (i.e. six day supply) or less. A minimum volume of 13,357 total gallons (12,843 usable gallons) equates to a fuel oil level of approximately 63.3 inches above the bottom of the tank T-148. The Plant Process Computer (PPC) point L7004 will provide a low-low level alarm function based on the 13,357 gallon requirement whenever the stored volume decreases below this value.

Due to equipment uncertainties and oil density fluctuations plus an additional volume allowing operators time to respond to the alarm, the low-level alarm setpoint corresponding to the 7-day requirement must be set to approximately 88 inches above the bottom of tank T-148 to ensure the low-level alarm occurs prior to actual tank level falling below the minimum fuel oil requirement. In terms of volume indication, the nominal setpoint corresponds to 19,628 gallons. Additionally, due to the same uncertainties and oil density fluctuations plus an additional volume allowing operators time to respond to the alarm, the low-low-level alarm setpoint corresponding to the 6-day requirement must be set to approximately 66.9 inches above the bottom of tank t-148 to ensure the low-low level alarm occurs prior to the actual tank level falling below the (1) ETE-MP-2020-1002 Increasing the TRM required Diesel Fuel Oil Storage for T-148.

(2) The 18,620 gallon minimum fuel oil volume requirement determined in ETE-MP-2020-1002 assumed fuel is initially stored at 24°F (delivered) and experiences a temperature elevation of 86°F. This assumption was made in order to address the effects elevated temperature has on volume, and consequently, the heating value of the oil.

MILLSTONE - UNIT 2 TRM 3/4 8-2 LBDCR 20-MP2-002, February 27, 2020 LBDCR 20-MP2-005, April 02, 2020

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY BASES: (Continued):

minimum fuel oil requirement. In terms of volume indication, the nominal setpoint corresponds to 14,300 gallons.

Alternate measures may be taken for verifying the minimum fuel oil volume requirement given failure of the level instrumentation or annunciator circuitry. Fuel oil volume may be verified by manual means by use of an oil dipstick or through the use of PPC point L7004.

A digital indicator, LI-7004A, is located on Control Room panel CO6F to provide the operator with a continuous indication of the fuel oil level in EDG storage tank T-148. This indicator is a dual bar graph style with the right side providing height of fuel in inches above the bottom of the tank and the left side providing net volume in gallons. The visible scale range of fuel height is 0-120 inches and the scale range for volume is 0-25 (x1000) gallons. Above each bar graph is a digital display of the scale reading. Also, the PPC has the capability of providing the operator with EDG storage tank T-148 fuel oil level and volume in terms of instrument range.

The above ground fuel oil storage tank T-148 contains a temperature element for monitoring the fuel oil bulk temperature. A low temperature alarm will annunciate when the fuel oil temperature falls below 40°F indicating the possible failure of the tank heating system and the need for compensatory ACTIONS to maintain the fuel oil temperature above the established cloud point. Should the fuel oil temperature fall below the cloud point, the quality of the fuel within the storage tank T-148 becomes questionable due to wax formation and the operator is to declare one of the EDGs nonfunctional in accordance with ACTION Statement b since the storage tank design volume cannot be considered available. The fuel oil temperature is available on the PPC to provide the operator with continuous temperature monitoring.

ETE-MP-2020-1002 Increasing the TRM required Diesel Fuel Oil Storage for T-148 and calculation 97-ENG-1804E2, Rev 4,(3) provide the basis for establishing the following correlation between components of level monitoring lop L7004:

TRM Table 3.8.1.1.c-1 provides a correlation between tank level in inches from the bottom of tank to volume indication for both the process minimum limit and the instrumentation setpoint associated with the 18,620 gallons requirement.

TRM Table 3.8.1.1.c-2 provides a correlation between tank level in inches from bottom of tank to volume indication for both the process minimum limit and the instrumentation setpoint associated with the 13,357 total gallons requirement.

(3) Calculation 97-ENG-1804E2, Rev. 4, Diesel Oil Storage Tank (T-148) Level Loop Uncertainty and Alarm Setpoint, L-7004.

MILLSTONE - UNIT 2 TRM 3/4 8-3 LBDCR 20-MP2-002 February 27, 2020

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY BASES: (Continued):

TRM TABLE 3.8.1.1.C-1 18,620 Total Gallons Requirement Corresponding Level Values 18,620 Total Gallons T-148 level T-148 VOLUME Requirement (inches above bottom of GALLONS (18,106 Useable Gallons) tank)

(7 day supply)

Low-level Alarm 88 inches 19,628 Setpoint Fuel Volume @ minimum 83.8 inches 18,620 TRM limit of TRM TABLE 3.8.1.1.C-2 13,357 Total Gallons Requirement Corresponding Level Values 13,357 Total Gallons T-148 Level T-148 VOLUME Requirement (inches above bottom GALLONS (12,842 Useable Gallons) of tank)

(6 day supply)

Low-Low Level 66.9 inches 14,300 Alarm Setpoint Fuel Volume @ minimum 63.3 inches 13,357 TRM limit MILLSTONE - UNIT 2 TRM 3/4 8-4 LBDCR 20-MP2-002,February 27, 2020 LBDCR 20-MP2-005, April 02, 2020

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY TECHNICAL REQUIREMENT BASES: (Continued):

Following a loss of coolant accident, both EDGs will operate initially at the continuous rated loads of 2750 kW for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at which time (assuming no fuel oil replenishment is provided) one of the EDGs may be secured and the other EDG may continue operation at its rated load for an additional six (6) days. The total volume of fuel oil required for two EDGs to initially operate for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and then allow one of the EDGs to continue to operate at its rated load for six additional days, is 42,106 useable gallons out of which 24,000 gallons are stored in diesel oil supply tanks (T-48A and T-48B). Therefore, the extra requirement of fuel oil of approximately 18,106 useable gallons will be stored in the diesel oil storage tank T-148. The value of 13,357 total gallons (12,842 useable gallons) corresponds to a reduced level of stored fuel oil equivalent to 6 days.(1)

The TECHNICAL REQUIREMENT cannot be met if less than the seven (7) days diesel oil supply for the EDG is available. However, the ACTION statement allows for temporarily maintaining a reduced diesel oil supply level for a maximum time duration of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> before declaring one EDG nonfunctional. This temporary reduction in diesel oil supply level may be caused by events, such as full load operation required after an inadvertent start while at minimum required level, or feed and bleed operations which may be necessitated by increasing particulate levels or any number of other oil quality degradations. A period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is considered sufficient to complete restoration of the required level prior to declaring the DG nonfunctional. This period is acceptable based on the remaining capacity (>6 days), the fact that ACTIONS will be initiated to obtain replenishment, and the low probability of an event during this brief period.

The TECHNICAL SURVEILLANCE REQUIREMENT provides verification that there is an adequate inventory of diesel fuel oil in the storage tank to support the operation of EDGs at the continuous rated load of 2750 kW for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, at which time (assuming no fuel oil replenishment is provided) one of the EDGs may be secured and the other EDG may continue operation at its rated load for an additional six (6) days. The seven (7) day period is sufficient time to place the unit in a safe condition and to bring in replenishment fuel from an offsite location. The 31 day frequency is adequate to ensure that a sufficient supply of oil is available, since low-level alarms are provided and unit operators would be aware of any large uses of fuel oil during this period.

The above requirement is consistent with NUREG-1432, Standard Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air.

MILLSTONE - UNIT 2 TRM 3/4 8-5 LBDCR 20-MP2-002 February 27, 2020

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY

REFERENCE:

1. ETE-MP-2020-1002 Increasing the TRM required Diesel Fuel Oil Storage for T-148.
2. Calculation 97-ENG-1804E2, Rev. 4, Diesel Oil Storage Tank (T-47A) Level Loop Uncertainty and Alarm Setpoint, L-7004.
3. Condition Report M3-00-02659.

MILLSTONE - UNIT 2 TRM 3/4 8-6 LBDCR 20-MP2-002 February 27, 2020

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OFFSITE LINE POWER SOURCES TECHNICAL REQUIREMENT 3.8.1.2 The offsite lines to the Millstone Switchyard: 310, 348 (includes 3252 line), 371 (includes 364 line), and 383, shall be FUNCTIONAL.

APPLICABILITY:

When Millstone Power Station (MPS) electrical output exceeds 1650 MWe net.

ACTION:

a. With one offsite line nonfunctional, perform the following or reduce total station output to < 1650 MWe net within the next 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />s:
1. Restore FUNCTIONALITY of the affected offsite line within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or
2. Establish the following ACTION requirements AND restore FUNCTIONALITY within 7 days for Lines 310, 348/3252, and 383, or within 14 days for Line 371364.
a. Once per shift, verify the remaining offsite lines to the MPS switchyard are FUNCTIONAL.
b. Perform an initial weather assessment for the scheduled line outage duration and then once per shift thereafter.
1. If the assessment predicts adverse or inclement weather will exist while the offsite line is nonfunctional (i.e., out of service), reduce total station output to < 1650 MWe net prior to arrival of the adverse or inclement weather.
c. Within one hour prior to or after entering this condition and at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter, verify that both the Millstone Unit 2 EDGs and the Millstone Unit 3 EDGs are OPERABLE and the Millstone Unit 3 SBO diesel generator is available. Restore any inoperable Millstone Unit 2 EDG or Millstone Unit 3 EDG to OPERABLE status and/or the Millstone Unit 3 SBO to available status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or reduce total station output to < 1650 MWe net within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With two offsite lines nonfunctional, reduce total station output to < 1650 MWe net within the next 30 minutes.

MILLSTONE - UNIT 2 TRM 3/4 8-7 LBDCR 16-MP2-018 March 23, 2017

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY TECHNICAL SURVEILLANCE REQUIREMENTS 4.8.1.2 The four offsite lines to the Millstone Switchyard shall be determined to be FUNCTIONAL at least once per 7 days when station output exceeds 1650 MWe net.

BASES:

TR 3.8.1.2 requires that all four offsite 345 kV transmission lines are FUNCTIONAL when MPS electrical output exceeds 1650 MWe net. TR 3.8.1.2 contains ACTIONS that must be performed when one offsite 345 kV transmission line is nonfunctional.

TR 3.8.1.2 provides flexibility to preclude plant downpowers due to planned and unplanned offsite transmission line outages. The TRM requirements provide this flexibility while also maintaining adequate defense-in-depth to ensure grid reliability and stability are preserved and the ability of the plants to respond to design basis accidents is not adversely affected.

With one offsite line nonfunctional, ACTION a.1 allows 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore FUNCTIONALITY. This 72-hour allowed outage time (AOT) is conservatively based on the loss of one offsite line being equal to the risk of losing one onsite connection to the offsite power system (i.e., TS 3.8.1.1).

With one offsite line nonfunctional, ACTION a.2 contains the provision to allow up to 7 days for Lines 310, 348/3252, and 383, or 14 days for Line 371/364 to restore FUNCTIONALITY if ACTIONS a.2.a, a.2.b, and a.2.c are met. The applicable AOT reduces the risk of a plant perturbation as a result of having to downpower the unit for short duration line outages and provides flexibility for conducting maintenance and improves operational safety margin by the following:

  • Minimizes the number of plant downpowers for short duration 345 kV transmission line outages.
  • Reduces the likelihood of a loss of offsite power event by establishing an AOT with additional defense-in-depth measures to minimize the potential for a double circuit failure scenario which can result in grid instability.

During the applicable AOT, ACTION a.2.a ensures there are no known issues that could threaten the reliability of the remaining 345 kV transmission lines. Verifying the remaining 345 kV offsite transmission lines to the MPS switchyard are FUNCTIONAL, increases confidence that the remaining 345 kV lines will remain FUNCTIONAL during the planned outage of the affected 345 kV line.

MILLSTONE - UNIT 2 TRM 3/4 8-8 LBDCR 16-MP2-018 March 23, 2017

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY BASES: (Continued):

During the applicable AOT, the action to perform weather assessments as required by ACTION a.2.b ensures appropriate actions are taken to minimize the potential for adverse or inclement weather event to impact grid reliability with one line nonfunctional.

If adverse or inclement weather is predicted, the nonfunctional 345 kV line would be restored to FUNCTIONAL status or station output would be reduced to < 1650 MWe net prior to the arrival of the adverse or inclement weather.

During the applicable AOT, ACTION a.2.c (i.e., both the Millstone Unit 2 and Millstone Unit 3 EDGs are operable and the Millstone Unit 3 SBO is available) provides assurance that AC power will be available to support required safety-related equipment in the unlikely event of a complete loss of offsite power during the time one of the 345 kV lines is nonfunctional. This ACTION ensures that electrical power will be available in a timely manner to perform the required functions to maintain cooling to the reactor core in the unlikely event a loss of offsite power was to occur during the AOT.

For the condition where the applicable AOT is in use for one nonfunctional transmission line and one or more of the following components is out-of-service:

  • a Millstone Unit 2 EDG
  • a Millstone Unit 3 EDG
  • the Millstone Unit 3 SBO diesel generator 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed for restoration of the out-of-service component. If any one of these components is not restored within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, reduce total station output to < 1650 MWe net within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

The allowed outage times for Lines 310, 348/3252, 371/364, and 383 are based on the configuration of the transmission lines at Hunts Brook Junction where Lines 383 and 310 cross over Line 371/364 and Line 348/3252 runs to the west of the crossover. With Line 348/3252, 310, or 383 nonfunctional, the possibility exists that either Line 383 or 310 could drop on Line 371/364 and result in three lines nonfunctional. This condition would impact grid stability and therefore, a 7-day AOT is allowed with the specified ACTION requirements in place. When Line 371/364 is nonfunctional, if either Line 310 or 383 drops, two transmission lines remain FUNCTIONAL. Therefore, a 14-day AOT is allowed with the specified ACTION requirements in place.

REFERENCE:

1. License Amendment 328 MILLSTONE - UNIT 2 TRM 3/4 8-9 LBDCR 16-MP2-018 March 23, 2017

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER AC DISTRIBUTION SYSTEMS ELECTRICAL SWITCHGEAR ROOM VENTILATION TECHNICAL REQUIREMENT 3.8.2.1.b The ventilation trains for the following switchgear rooms shall be FUNCTIONAL:

a. Upper and Lower 4160 VAC Switchgear Rooms.
b. East and West 480 VAC Switchgear Rooms.
c. B51 and B61 MCC Cubicles.
d. East and West DC Switchgear Rooms.

APPLICABILITY:

When associated switchgear is required to be OPERABLE.

ACTION:

Note: Separate ACTION entry is allowed for each switchgear/MCC cubicle ventilation train.

  • Upper and Lower 4160 VAC Switchgear Rooms,
  • East and West 480 VAC Switchgear Rooms, and
  • East and West DC Switchgear Rooms.
a. With a switchgear ventilation train nonfunctional, immediately implement the applicable switchgear ventilation system compensatory ACTIONS in accordance with the applicable operating procedure or enter the applicable Technical Specification ACTION Statement for the associated switchgear. If compensatory ACTIONS have been implemented, within 30 days, either restore the affected switchgear ventilation train to FUNCTIONAL status or prepare a FUNCTIONALITY assessment, including a Reasonable Assurance of Safety (RAS) determination. Applicable time constraints for continued operation with a switchgear ventilation train nonfunctional and the compensatory ACTIONS in place shall be identified and justified in the assessment.

MILLSTONE - UNIT 2 TRM 3/4 8-10 LBDCR 15-MP2-014 June 2, 2016

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER AC DISTRIBUTION SYSTEMS ELECTRICAL SWITCHGEAR ROOM VENTILATION TECHNICAL REQUIREMENT ACTION: (Continued)

b. With both trains of a switchgear ventilation system nonfunctional, immediately implement the applicable switchgear ventilation system compensatory ACTIONS in accordance with the applicable operating procedure or enter the applicable Technical Specification ACTION Statement for the associated switchgear. If compensatory actions have been implemented, within 7 days, either restore at least one train of the switchgear ventilation system to FUNCTIONAL status or prepare a FUNCTIONALITY assessment, including a Reasonable Assurance of Safety (RAS) determination.

Applicable time constraints for continued operation with both switchgear ventilation trains nonfunctional and the compensatory ACTIONS in place shall be identified and justified in the assessment.

  • B51 and B61 MCC Cubicles.

Note: The compensatory ACTIONS contained in the applicable operating procedure for B51 and B61 MCC Cubicles switchgear ventilation trains may adversely affect enclosure building integrity. Evaluate and enter Technical Specification ACTION Statement 3.6.5.2, Containment Systems - Enclosure Building, as necessary.

c. With either B51 or B61 MCC switchgear ventilation train nonfunctional, immediately implement the applicable switchgear ventilation system compensatory ACTIONS in accordance with the applicable operating procedure and enter Technical Specification ACTION Statement 3.6.5.2, if necessary. Otherwise, enter the applicable Technical Specification ACTION Statement for the associated switchgear. If entry into Technical Specification ACTION Statement 3.6.5.2 is required as a result of the use of compensatory ACTIONS, restore the affected switchgear ventilation train to FUNCTIONAL status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or terminate the use of compensatory measures per the applicable operating procedure and enter the applicable Technical Specification ACTION Statement for the associated switchgear. If entry into Technical Specification ACTION Statement 3.6.5.2 is NOT required and compensatory ACTIONS have been implemented, within 30 days, either restore the affected switchgear ventilation train to FUNCTIONAL status or prepare a FUNCTIONALITY assessment, including a Reasonable Assurance of Safety (RAS) determination.

Applicable time constraints for continued operation with a switchgear ventilation train nonfunctional and the compensatory ACTIONS in place shall be identified and justified in the assessment.

MILLSTONE - UNIT 2 TRM 3/4 8-11 LBDCR 15-MP2-014 June 2, 2016

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER AC DISTRIBUTION SYSTEMS ELECTRICAL SWITCHGEAR ROOM VENTILATION TECHNICAL SURVEILLANCE REQUIREMENTS

d. With both B51 and B61 MCC switchgear ventilation trains nonfunctional and entry into Technical Specification ACTION Statement 3.6.5.2 is required, restore both trains of the switchgear ventilation system to FUNCTIONAL status and operation within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or terminate the use of compensatory measures per the applicable operating procedure and enter the applicable Technical Specification ACTION Statement for the associated switchgear. With both B51 and B61 MCC switchgear ventilation trains nonfunctional and entry into Technical Specification ACTION Statement 3.6.5.2 is NOT required, within 7 days, either restore at least one train of the switchgear ventilation system to FUNCTIONAL status or prepare a FUNCTIONALITY assessment, including a Reasonable Assurance of Safety (RAS) determination.

Applicable time constraints for continued operation with both switchgear ventilation trains nonfunctional and the compensatory ACTIONS in place shall be identified and justified in the assessment.

4.8.2.1b Normal daily plant equipment operator rounds verify the switchgear ventilation systems are FUNCTIONAL.

BASES:

This TECHNICAL REQUIREMENT provides guidance to address switchgear ventilation systems that are nonfunctional. If any switchgear ventilation train is nonfunctional the compensatory measures contained in the applicable operating procedure must be implemented immediately (pursued without delay and in a controlled manner) or the associated switchgear shall be declared INOPERABLE and the appropriate Technical Specification ACTION Statement (TSAS) entered. Since the compensatory measures contained in the applicable operating procedure will ensure the associated switchgear will remain OPERABLE for all design basis events, it is acceptable to address each switchgear ventilation train separately.

The ACTION requirements are preceded by a note that states separate ACTION entry for each switchgear/MCC cubicle ventilation train is allowed. This is acceptable since the required ACTIONS for each condition provide appropriate compensatory ACTIONS for each nonfunctional ventilation train.

  • Upper and Lower 4160 VAC Switchgear Rooms,
  • East and West 480 VAC Switchgear Rooms, and
  • East and West DC Switchgear Rooms.

MILLSTONE - UNIT 2 TRM 3/4 8-12 LBDCR 15-MP2-014 June 2, 2016

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER AC DISTRIBUTION SYSTEMS ELECTRICAL SWITCHGEAR ROOM VENTILATION BASES: (Continued)

a. If one switchgear ventilation train for any switchgear is under compensatory measures a 30 day allowed outage time (AOT) is specified. The use of compensatory ACTIONS for the AOT or other applicable time constraint is acceptable since the compensatory measures ensure the associated switchgear will remain OPERABLE for all design basis events.
b. If both switchgear ventilation trains for any switchgear are under compensatory measures, a 7 day AOT is specified to restore at least one of the switchgear ventilation trains to FUNCTIONAL status.

Within the specified AOT either restore the switchgear ventilation trains to FUNCTIONAL status or a FUNCTIONALITY assessment will be prepared, including a Reasonable Assurance of Safety (RAS) determination. Applicable time constraints for continued operation with both switchgear ventilation trains nonfunctional and the compensatory ACTIONS in place shall be identified and justified in the assessment.

  • B51 and B61 MCC Cubicles:

The ACTION requirements are preceded by a note that states the compensatory ACTIONS contained in the applicable operating procedure for B51 and B61 MOC Cubicles switchgear ventilation trains may adversely affect enclosure building integrity. If enclosure building integrity is adversely affected, entry into Technical Specification ACTION Statement 3.6.5.2, Containment Systems - Enclosure Building, may be necessary. This ACTION statement requires restoration of enclosure building integrity within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or a plant shutdown to MODE 5 will be required.

a. If one switchgear ventilation train for either B51 or B61 switchgear is under compensatory measures and the compensatory measures result in a loss of enclosure building integrity, the ventilation train shall be restored to FUNCTIONAL status and operation within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The use of a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AOT is specified to be consistent with the AOT for Technical Specification 3.6.5.2. If the ventilation train is not restored to FUNCTIONAL status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the use of compensatory measures shall be terminated to restore enclosure building integrity and the appropriate TSAS shall be entered for the affected switchgear. If the use of compensatory ACTIONS does not result in a loss of enclosure building integrity, a 30 day AOT is specified. The use of compensatory ACTIONS for the AOT or other applicable time constraint is acceptable since the compensatory measures ensure the associated switchgear will remain OPERABLE for all design basis events.

MILLSTONE - UNIT 2 TRM 3/4 8-13 LBDCR 15-MP2-014 June 2, 2016

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER AC DISTRIBUTION SYSTEMS ELECTRICAL SWITCHGEAR ROOM VENTILATION BASES: (Continued)

b. If both B51 and B61 switchgear ventilation trains are under compensatory measures, and the compensatory measures result in a loss of enclosure building integrity, the ventilation trains shall be restored to FUNCTIONAL status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The use of a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AOT is specified to be consistent with the AOT for Technical Specification 3.6.5.2. If the ventilation trains are not restored to FUNCTIONAL status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the use of compensatory measures shall be terminated to restore enclosure building integrity and the appropriate TSAS shall be entered for the affected switchgear. If the use of compensatory ACTIONS does not result in a loss of enclosure building integrity, a 7 day AOT is specified to restore at least one of the switchgear ventilation trains to FUNCTIONAL status.

Within the specified AOT either restore the switchgear ventilation trains to FUNCTIONAL status or a FUNCTIONALITY assessment will be prepared, including a Reasonable Assurance of Safety (RAS) determination. Applicable time constraints for continued operation with both switchgear ventilation trains nonfunctional and the compensatory ACTIONS in place shall be identified and justified in the assessment.

  • Upper and Lower 4160 VAC Switchgear Rooms
  • East and West 480 VAC Switchgear Rooms
  • B51 and B61 MCC Cubicles
  • East and West DC Switchgear Rooms.
a. Periodic testing of system valves and fans may interrupt cooling flow to one of these rooms for a short period of time (< 5 minutes). The ventilation for the affected room remains FUNCTIONAL during this testing. However, if the component being tested cannot be restored, i.e. ventilation/ventilation cooling cannot be restored, then the applicable ACTION statement for the affected ventilation train/system will be entered.

REFERENCE:

1. Technical Specification Section 3/4.8.2, Onsite Power Distribution Systems.
2. Technical Evaluation M2-EV-99-0093, Rev. 04.

MILLSTONE - UNIT 2 TRM 3/4 8-14 LBDCR 10-MP2-013 August 24, 2010

TECHNICAL REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER AC DISTRIBUTION SYSTEMS ELECTRICAL SWITCHGEAR ROOM VENTILATION

REFERENCE:

(Continued)

3. Regulatory Issue Summary - RIS-05-020, Revision to Guidance Formerly Contained in NRC Generic Letter 91-18, information to Licensees regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability.
4. NRR Staff Analysis response to Clinton Power Station regarding Technical Specification Requirements which were based on NRC Inspection Manuel, Part 9900, STS10 OP STS.
5. CR M2-98-2661, was initiated against OP2315 SD to re-evaluate compensatory measures established to enhance identified weaknesses. This TRM addition is a corrective action for CR M2-98-2661.
6. 10 CFR Part 50.59 Safety Evaluation S2-EV-99-0090.
7. Condition Report M3-00-02659.

MILLSTONE - UNIT 2 TRM 3/4 8-15 LBDCR 15-MP2-014 June 2, 2016

TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.3.2 SPENT FUEL POOL TEMPERATURE TECHNICAL REQUIREMENT 3.9.3.2 The spent fuel pool bulk temperature shall be maintained at less than or equal to 150°F.

APPLICABILITY:

Whenever irradiated fuel is stored in the spent fuel pool.

ACTION:

With the above conditions not satisfied:

a. Immediately initiate ACTIONS to restore the spent fuel pool temperature to less than or equal to 150°F, and
b. Within one hour, suspend all fuel movement in the spent fuel pool, and
c. At least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, record the spent fuel pool bulk temperatures.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.9.3.2 The spent fuel pool bulk temperature shall be verified to be less than or equal to 150°F at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

BASES:

The requirement that the spent fuel pool bulk temperature be maintained at or below 150°F ensures that the bulk water temperature will not exceed 200°F with the loss of spent fuel pool cooling assumed following a design basis LOCA. This ensures the post-LOCA function of the spent fuel pool cooling system.

The requirements that the spent fuel pool bulk temperature be maintained at or below 150°F ensures that the temperature and humidity above the pool are compatible with personnel comfort and safety requirements. The maximum temperature limit of 150°F in the spent fuel pool ensures that the design temperature of the spent fuel pool cooling system, liner/building structures, and racks are not exceeded. The heat removal capacity of the spent fuel pool cooling system, and/or shutdown cooling system (in MODES 5 or 6, or with core defueled) is sufficient to maintain the spent fuel pool bulk water temperature to less than or equal to 150°F.

REFERENCE:

1. Condition Report M3-00-02659
2. DCR M2-01001, TRMCR 01-2-5 MILLSTONE - UNIT 2 TRM 3/4 9-1 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.3.3 SPENT FUEL POOL DECAY TIME TECHNICAL REQUIREMENT 3.9.3.3 The reactor shall be maintained in MODE 5 or 6, or core defueled until either:

a. 616 hours0.00713 days <br />0.171 hours <br />0.00102 weeks <br />2.34388e-4 months <br /> has passed since sub-criticality for the fuel bundles remaining in the spent fuel pool which were discharged from the previous REFUELING*, of less than or equal to 81 fuel bundles, or
b. The heat load in the spent fuel pool is less than 10.16x106 BTU/hr.

APPLICABILITY**:

MODES 5 and 6, and core defueled.

ACTION:

With the above conditions not satisfied, immediately initiate ACTIONS to restore the reactor to MODE 5 or 6, or core defueled.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.9.3.3 Prior to entry into MODE 4 from MODE 5, verify that either:

a. 616 hours0.00713 days <br />0.171 hours <br />0.00102 weeks <br />2.34388e-4 months <br /> has passed since sub-criticality for the fuel discharged from the previous REFUELING,* of less than or equal to 81 fuel bundles, or
b. The heat load in the spent fuel pool is less than 10.16x106 BTU/hr.
  • For the purpose of this requirement, the fuel bundles remaining in the spent fuel pool which were discharged from the previous REFUELING, is defined as the fuel bundles discharged at the end of the most recent REFUELING, that will not be reloaded into the next fuel cycle.
    • When either TECHNICAL REQUIREMENT, Item (a) or (b) has been satisfied following a REFUELING, the TECHNICAL REQUIREMENT is satisfied for the remainder of the fuel cycle, until the next REFUELING.

MILLSTONE - UNIT 2 TRM 3/4 9-2 LBDCR 17-MP2-002 March 16, 2017

TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.3.3 SPENT FUEL POOL DECAY TIME BASES:

The requirement for the reactor to remain in MODE 5 or 6, or core defueled until either:

a. 616 hours0.00713 days <br />0.171 hours <br />0.00102 weeks <br />2.34388e-4 months <br /> has passed since sub-criticality for the fuel bundles remaining in the SFP which were discharged from the previous REFUELING of less than or equal to 81 fuel bundles, or
b. The heat load in the SFP is less than 10.16x106 BTU/hr. At a SFP heat load of 10.16x106 BTU/hr, adequate cooling is available to maintain the SFP bulk temperature less than or equal to 150°F should a single failure occur in the SFP cooling system.

This ensures that adequate cooling is available to maintain the SFP bulk temperature less than or equal to 150°F should a single failure occur in the SFP cooling system.

If either TECHNICAL REQUIREMENT Item (a) or (b) are met, then the SFP heat load will be less than 10.16x106 BTU/hr. Once the SFP heat load is below this value, the SFP cooling system can accommodate a single failure and maintain the SFP bulk water temperature to less than 150°F. The decay time of 616 hours0.00713 days <br />0.171 hours <br />0.00102 weeks <br />2.34388e-4 months <br /> for recently discharge fuel is the bounding decay time for a discharge of less than or equal to 81 fuel bundles to assure a SFP decay heat load of less than or equal to 10.16x106 BTU/hr.

If the spent fuel pool decay heat load is greater than 10.16x106 BTU/hr, then entry into MODE 4 from MODE 5 is not allowed. The reason for this restriction on entering MODE 4 with this heat load, is that one train of shutdown cooling must be available to either supplement or replace SFP cooling, and thus could not also be aligned to support MODE 4 ECCS requirements. One train of the shutdown cooling system is capable of cooling both the core and the SFP, should a failure occur in the SFP cooling system, and maintain the SFP water temperature to less than 150°F.

REFERENCE:

1. Condition Report M3-00-02659
2. DCR M2-01001, TRMCR 01-2-5 MILLSTONE - UNIT 2 TRM 3/4 9-3 LBDCR 17-MP2-002 March 16, 2017

TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.5 COMMUNICATIONS TECHNICAL REQUIREMENT 3.9.5 Direct communications shall be maintained between the control room and personnel at the REFUELING station during fuel or CEA movement within the reactor pressure vessel.

APPLICABILITY:

MODE 6.

ACTION:

When direct communications between the control room and personnel at the REFUELING station cannot be maintained, suspend all operations involving fuel or CEA movement within the reactor pressure vessel.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.9.5 Direct communications between the control room and personnel at the REFUELING station shall be demonstrated within one hour prior to the start of and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during fuel or CEA movement within the reactor pressure vessel.

BASES:

The requirement for communications capability ensures that REFUELING station personnel can be promptly informed of significant changes in the facility status or core reactivity condition during fuel or CEA movement within the reactor pressure vessel.

REFERENCE:

1. Condition Report M3-00-02659 MILLSTONE - UNIT 2 TRM 3/4 9-4 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.6 CONTAINMENT BUILDING REFUELING MACHINE TECHNICAL REQUIREMENT 3.9.6 The containment building REFUELING machine used for movement of fuel assemblies shall be FUNCTIONAL with:

a. A minimum capacity of 1600 pounds in the fuel only region,
b. An overload cutoff limit of less than or equal to 1700 pounds in the fuel only region.
c. A minimum capacity of 2900 pounds in the fuel plus hoist region, and
d. An overload cutoff limit of less than or equal to 3590 pounds in the fuel plus hoist region.

APPLICABILITY:

During movement of fuel assemblies.

ACTION:

With the requirements of TECHNICAL REQUIREMENT 3.9.6 listed above not satisfied, suspend all REFUELING machine operations involving movement of fuel assemblies.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.9.6 The containment building REFUELING machine used for movement of fuel assemblies shall be demonstrated FUNCTIONAL within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of moving fuel assemblies by performing applicable load tests of at least 1600 and 2900 pounds and demonstrating applicable automatic load cutoffs of less than or equal to 1700 and 3590 pounds.

MILLSTONE - UNIT 2 TRM 3/4 9-5 LBDCR 12-MP2-006 October 3, 2012

TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.6 CONTAINMENT BUILDING REFUELING MACHINE BASES:

The fuel hoist assembly is located on the REFUELING platform and is positioned over a specific core location using the joysticks located on the console shelf panel. The hoist and grapple assembly is lowered to a position over the fuel assembly (Upper Grapple Operate Zone - UGOZ). The operator turns the grapple selector switch to open the grapple at the bottom of the hoist assembly. The grapple is lowered over the fuel assembly to the Lower Grapple Operating Zone (LGOZ) and the operator turns the grapple selector switch to close the grapple, engaging the top fitting of the fuel assembly.

The grapple and fuel assembly are raised using the joystick on the console shelf panel, as the fuel assembly is hoisted out of the core it is protected by an overload cutoff provided in the Programmable Logic Controller (PLC) software until it is safely inside the hoist box (fuel only region). This overload limit protects the fuel assembly, core internals and pressure vessel from excessive lifting force in the event they are inadvertently engaged during lifting operations.

After the fuel is inside the hoist box, the fuel and hoist box are lifted into the trolley mast with the loads carried by the hoist assembly (fuel plus hoist region). Overload cutoff settings are provided by the PLC software and an external hard wire setting in the load weighing system to prevent the forces from exceeding the maximum design lifting capacity of the refuel machine.

The basis for TECHNICAL REQUIREMENT 3/4.9.6 is to ensure that: 1) the REFUELING machine has sufficient load capacity to lift a fuel element, 2) the core internals and pressure vessel are protected from excessive lifting force in the event they are inadvertently engaged during lifting operations, and 3) the REFUELING machine is protected from excessive lifting forces that may exceed its design rated maximum load capacity.

REFERENCE:

1. Condition Report M3-00-2659.
2. TRMCR 00-2-19.
3. PaR Nuclear, Software Requirements Specification (SRS) Refueling Machine Millstone Power Station - Unit 2, Procedure No. 70587896.
4. DNC drawing 25203-39277 SH 354, Drive Assembly Hoist, Refuel Machine.

MILLSTONE - UNIT 2 TRM 3/4 9-6 LBDCR 12-MP2-006 October 3, 2012

TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.7 SPENT FUEL POOL CASK CRANE TRAVEL LIMITS TECHNICAL REQUIREMENT 3.9.7 Loads in excess of 1800 pounds shall be prohibited from travel over irradiated fuel assemblies in the storage pool spent fuel racks, with the following exceptions:

a. Heavy Dummy Fuel Assembly,
b. Consolidated Fuel Storage Box,
c. Single-failure-proof lifts in accordance with the guidelines of NUREG-0612.

APPLICABILITY:

With irradiated fuel assemblies in the storage pool spent fuel racks.

ACTION:

With the requirements of the above specification not satisfied, place cask crane load in a safe condition.

TECHNICAL SURVEILLANCE REQUIREMENTS 4.9.7 Crane interlocks and/or physical stops which prevent cask crane travel with loads in excess of 1800 pounds over irradiated fuel assemblies shall be demonstrated FUNCTIONAL at least once per calendar quarter.

BASES:

The restriction on movement of loads in excess of the combined nominal weight of a fuel assembly, CEA and associated handling tool over irradiated fuel assemblies in the storage pool spent fuel racks using the spent fuel pool cask crane ensures that no more than the contents of one fuel assembly will be ruptured in the event of a fuel handling accident. This assumption is consistent with the activity release assumed in the accident analysis. Specific analysis has been performed for the drop of a consolidated fuel storage box on an intact fuel assembly. The results of this analysis determined that the impacted assembly would not fail. The drop of the heavy dummy fuel assembly is bounded by the consolidated fuel storage box drop analysis.

MILLSTONE - UNIT 2 TRM 3/4 9-7 LBDCR 11-MP2-001 February 1, 2011

TECHNICAL REQUIREMENTS 3/4.9 REFUELING OPERATIONS 3/4.9.7 SPENT FUEL POOL CASK CRANE TRAVEL LIMITS TECHNICAL REQUIREMENT BASES: continued With the cask crane design and application of single-failure-proof lifting devices that satisfy the increased design margins of NUREG-0612, a load drop onto irradiated fuel assemblies is not credible and need not be postulated. For other cranes capable of travel with loads in excess of 1800 pounds over irradiated fuel assemblies, administrative controls are in place to ensure compliance with the heavy loads guidelines of NUREG-0612.

REFERENCE:

1. Condition Report M3-00-02659.

MILLSTONE - UNIT 2 TRM 3/4 9-8 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 6.0 ADMINISTRATIVE CONTROLS 6.2.2 FIRE PROTECTION ADMINISTRATIVE REQUIREMENTS The following administrative requirements for staffing and training are applicable to support the Fire Protection System TECHNICAL REQUIREMENTS in the below listed TRM sections:

3/4.3.3.7 Fire Detection Instrumentation 3/4.7.9.1 Fire Suppression Water System 3/4.7.9.2 Spray and/or Sprinkler Systems 3/4.7.9.3 Fire Hose Stations 3/4.7.9.4 Halon Fire Suppression System 3/4.7.10 Penetration Fire Barriers ADMINISTRATIVE REQUIREMENTS

a. A site Fire Brigade of at least five members* shall be maintained on site at all times.

The Fire Brigade shall not include two members of the minimum shift crew necessary for safe shutdown of the unit and any personnel required for other essential functions during a fire emergency.

b. A training program for the Fire Brigade shall be maintained and shall meet or exceed the requirements of NFPA 27 - 1975, except for Fire Brigade training sessions which shall be held at least quarterly.
  • The Fire Brigade composition may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to accommodate unexpected absence, provided immediate ACTION is taken to fill the required positions.

MILLSTONE - UNIT 2 TRM 6.0-1 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 6.0 ADMINISTRATIVE CONTROLS 6.13 SYSTEM INTEGRITY REQUIREMENTS The licensee shall implement a program to reduce leakage from systems outside containment that would, or could, contain highly radioactive fluids during a serious transient, or accident, to as low as practical levels. This program shall include the following:

a. Provisions establishing preventive maintenance and periodic visual inspection requirements, and
b. Integrated leak test requirements for each system at a frequency not to exceed REFUELING cycle intervals.

PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT LEAKAGE REDUCTION PROGRAM

1. PURPOSE:

This program provides controls to minimize LEAKAGE from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to levels as low as practicable. The program shall include the following:

a. Preventive maintenance and periodic visual inspection requirements; and
b. Integrated leak test requirements for each system at REFUELING cycle intervals or less.
2. SCOPE:

The systems, or portions of the systems, included in this program are limited to those which penetrate containment and may contain highly radioactive fluids after a serious transient or accident. The applicable systems are:

a. Containment Spray System;
b. Low Pressure Safety Injection;
c. Shutdown Cooling System;
d. Chemical and Volume Control System (boron precipitation control only);
e. High Pressure Safety Injection System;
f. Reactor Coolant System Post Accident Sample System;
g. Containment Air Post Accident Sample System; and
h. Hydrogen Sampling System.

MILLSTONE - UNIT 2 TRM 6.0-2 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 6.0 ADMINISTRATIVE CONTROLS 6.13 SYSTEMS INTEGRITY PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT LEAKAGE REDUCTION PROGRAM

3. PREVENTIVE MAINTENANCE:

Each applicable system, or portion of the system is included in the plant Preventive Maintenance Program. Since LEAKAGE from these systems would have to penetrate welded or passive barriers (i.e. gaskets, packing, pump seals, etc.), and is subject to the visual inspections described below, the normal plant Preventive Maintenance Program satisfies the intent of this program.

4. PERIODIC VISUAL INSPECTIONS:

Each applicable system, or portion of the system is subject to periodic visual inspections.

Periodic visual inspection are performed during such activities as ASME Section XI pressure tests, operator rounds, health physics surveillances, and for systems not routinely in service during FUNCTIONALITY surveillance testing. Any LEAKAGE or residual boric acid buildup is identified using a trouble report and corrected in accordance with the Corrective Action Program.

5. INTEGRATED LEAK TEST REQUIREMENTS:

Integrated leak test requirements for each system are performed at REFUELING cycle intervals, or less. This testing will verify the external leak tightness of the applicable systems, or portions of the systems, by inspecting the system or subsystem boundary, measuring visible LEAKAGE from mechanical joints, summing the total LEAKAGE, and comparing the individual and total LEAKAGE results with the acceptance criteria. In addition, testing is performed to verify system-to-system LEAKAGE is within the acceptance criteria. This testing is performed by the following procedures.

Procedure Title Frequency SP 21157 HPSI System and ECCS Suction Piping Leakage Test REFUELING SP 21162 Volume Control Portion of the CVCS Leakage Test REFUELING SP 21198 Containment Spray System Leakage Test REFUELING SP 21199 LPSI System and Shutdown Cooling Heat Exchangers REFUELING Leakage Test SP 2849 Surveillance Test for Reactor Coolant PASS REFUELING SP 2608G Leak Test of the Containment Air Post-Accident Sample REFUELING System SP 2608H Leak Check of the Hydrogen Sampling System REFUELING MILLSTONE - UNIT 2 TRM 6.0-3 LBDCR 07-MP2-010 October 5, 2009

TECHNICAL REQUIREMENTS 6.0 ADMINISTRATIVE CONTROLS 6.13 SYSTEMS INTEGRITY PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT LEAKAGE REDUCTION PROGRAM

6.

REFERENCES:

1. NUREG 0737, Clarification of TMI Action Plan Requirements, Section Ill.D.1.1, Integrity of Systems Outside Containment Likely to Contain Radioactive Material for Pressurized Water Reactors.
2. NRC Information Notice 91-56, Potential Radioactive Leakage to Tank Vented to Atmosphere, dated September 19, 1991
3. Millstone Unit No. 2 Technical Specification 6.13, Systems Integrity.
4. Condition Report M3-00-02659.

MILLSTONE - UNIT 2 TRM 6.0-4 TRMCR 01-2-11 December 6, 2001

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: As Identified In Each TECHNICAL REQUIREMENT TECHNICAL REQUIREMENT IS AS SPECIFIED IN THE FOLLOWING COMPONENT SECTIONS.

APPLICABILITY:

Is as specified in the following component sections.

ACTION:

With an Appendix R Safe Shutdown Related (ARSR) component listed in the following component tables nonfunctional (unable to meet its intended Appendix R shutdown function), perform the following:

a. Restore FUNCTIONALITY of the affected component(s) within 14 days*, or
b. Establish the following compensatory measures to satisfy the FUNCTIONALITY requirements of ARSR components listed in the following component tables unless other compensatory measures are stated:
1. Establish a one-hour roving fire watch for all affected areas identified in the following component tables (except the control room, containment, waste gas decay tanks room, spent resin tank area, ion exchange room, spent fuel pool and cask laydown area and service water cable tunnels). Refer to the Appendix R Compliance Report for fire watch patrol areas. Roving fire watches must monitor the area of the device in question, as a minimum, within the specified time frame, plus or minus 25% of the time interval specified in the ACTION statement for periodic roving fire watches. The 25%

extension of the time interval specified does not degrade the reliability that results from performing the rove at the specified interval, based on plant experience, and Fire Protection Engineering analysis as documented in Technical Evaluation M3-EV-02-2005.

2. Verify the FUNCTIONALITY of all fire suppression and detection systems, note required transient combustibles, and verify the lack of substantial new transient combustibles, in the affected areas (except containment) on a Daily Basis. Bring any changes to the attention of the Shift Manager.

Establishment of the above compensatory measures will allow continued operation for up to sixty (60) days pending restoration of the component(s)

FUNCTIONALITY, or

  • Compensatory measures will be established prior to the end of the 14 day window when it is apparent that the 14 day restoration period cannot be met.

MILLSTONE - UNIT 2 TRM 7.1-1 LBDCR 17-MP2-007 May 23, 2017

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: As Identified In Each TECHNICAL REQUIREMENT TECHNICAL REQUIREMENT IS AS SPECIFIED IN THE FOLLOWING COMPONENT SECTIONS. (Continued)

ACTION: (continued)

c. Prepare a FUNCTIONALITY assessment, including a Reasonable Assurance of Safety (RAS) determination, if warranted, for the function described in the Appendix R Compliance Report, if component FUNCTIONALITY cannot be established within 60 days per ACTION Statement b. Applicable time constraints for continued operation with ARSR component(s) nonfunctional will be identified and justified in the assessment.
d. Restore FUNCTIONALITY of the affected Risk Significant component within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or
e. Establish the following risk management action (RMA) Defense-In-Depth compensatory measures for the next 30 days to limit transient combustible material and ignition sources identified in the following component tables:
1. Review existing transient combustible material permits for the affected areas.
2. Review existing ignition source permits for the affected areas.
3. Perform an area walkdown of the affected areas.
4. Evaluate all work requiring transient combustibles, hot work, or racking of breakers in the affected areas.
5. On a daily basis, brief the shift operators and the fire brigade lead on the significance of a fire in the affected areas.
6. Restore FUNCTIONALITY of the affected Risk Significant component within the 30 days or prepare a RAS determination for the Risk Significant component out of service.
f. For ARSR components requiring prompt action, establish compensatory measures within the time specified in the component table.

MILLSTONE - UNIT 2 TRM 7.1-1a LBDCR 14-MP2-005 March 18, 2014

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: As Identified In Each TECHNICAL REQUIREMENT ADMINISTRATIVE REQUIREMENT:

During Modes 1, 2, 3, or 4, each on duty operating shift shall have one licensed or nonlicensed operator in addition to the minimum shift crew composition required by Section 6.2.2 of the Millstone Unit 2 Safety Technical Specifications. The shift manager shall call in personnel to meet this requirement, if needed. If this requirement cannot be met within eight hours, TECHNICAL REQUIREMENT ACTION Statement b shall be implemented for Appendix R Fire Areas R-1, R-2, R-3, R-14, and R-16 within the next four hours.

BASES:

1. ARSR equipment are those components used in plant systems to achieve and maintain HOT STANDBY and COLD SHUTDOWN when a fire disables any area or system(s) at Millstone Unit 2. This Appendix R Safe Shutdown TECHNICAL REQUIREMENTS section addresses the FUNCTIONALITY of ARSR equipment not addressed in Millstone Unit 2 Technical Specifications. Specifically, this document:
a. Identifies ARSR equipment not addressed in Technical Specifications required to support plant safe shutdown following a fire.
b. Identifies the FUNCTIONALITY requirements for the ARSR equipment.
c. Identifies the conditions (such as local or remote) and plant location (fire areas) in which ARSR equipment FUNCTIONALITY is required.
d. Provides compensatory measures in the event ARSR equipment becomes nonfunctional.
e. Provides TECHNICAL SURVEILLANCE REQUIREMENTS for ARSR equipment.
f. Provides a basis for establishing administrative controls over ARSR equipment.

MILLSTONE - UNIT 2 TRM 7.1-2 LBDCR 11-MP2-005 May 10, 2011

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS BASES (Continued)

2. The consequences of a fire at a nuclear plant are considered to be less severe than those for Design Basis Accidents. The 14-day window for restoration of ARSR component FUNCTIONALITY, the establishment of compensatory measures, and the once per cycle TECHNICAL SURVEILLANCE REQUIREMENT reflect this decreased level of risk. Compensatory measures will be established prior to the 14-day window when it is apparent that the 14-day restoration period cannot be met.
3. ARSR equipment which are addressed in more restrictive technical specifications are not addressed in this document. Exceptions include shutdown process instrumentation which are allowed to be out of service by technical specifications based upon the availability of redundant channels. If the redundant channel(s) are not ARSR equipment, the redundant channel cannot be credited as ARSR redundant and the instrumentation is included in this document for further administrative control.
4. The compensatory measures are intended to ensure that either an alternative component is available to fulfill the shutdown function after a fire, or to minimize the possibility that a fire will occur in an area of the plant which relies on the particular component for safe shutdown. Roving fire watches must monitor the area of the device in question, as a minimum, within the specified time frame, plus or minus 25%

of the time interval specified in the ACTION statement for periodic roving fire watches. The 25% extension of the time interval specified does not degrade the reliability that results from performing the rove at the specified interval, based on plant experience, and Fire Protection Engineering analysis as documented in Technical Evaluation M3-EV-02-2005.

5. The lack of fire watch requirements for the control room is based upon continuous staffing by trained operators. The lack of fire watch requirements for containment is based upon the administrative control of transient combustibles and the low potential of introducing transient combustibles or ignition sources, since containment is not normally accessible during POWER OPERATION. The lack of fire watch requirements for the waste gas decay tanks room, spent resin tank area and ion exchange area is based upon the fact that the areas contain negligible combustible loading and are normally inaccessible, limiting the potential of introducing combustibles or ignition sources. The lack of fire watch requirements for the spent fuel pool and cask laydown area is based upon the fact that the area is underwater.

Further, these areas contain no ARSR components or cables. The lack of fire watch requirements for the service water cable tunnels is based upon the low potential of introducing transient combustibles or ignition sources, since these tunnels are normally inaccessible. While this area contains ARSR cables, alternate shutdown methods are available were a fire to affect both cable tunnels.

MILLSTONE - UNIT 2 TRM 7.1-3 LBDCR 17-MP2-007 May 23, 2017

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS BASES (Continued)

6. The FUNCTIONALITY Assessment, including a Reasonable Assurance of Safety (RAS) determination, if warranted, for continued plant operation is intended to ensure the nonfunctionality of the ARSR equipment has been thoroughly evaluated in accordance with existing engineering guidelines and that the appropriate level of plant management is cognizant of the status of the equipment.

MILLSTONE - UNIT 2 TRM 7.1-3a LBDCR 17-MP2-007 May 23, 2017

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS BASES (Continued)

7. Entry into MODE 4 or higher is permitted with ARSR components nonfunctional. The ACTIONS identified in the Compensatory Measures column of the component FUNCTIONALITY Requirements and Compensatory Measures tables shall be implemented at the time of entry into MODE 4 for components found to be nonfunctional during MODES 5 or 6. Compensatory ACTIONS shall be implemented when the component is declared nonfunctional for components found to be nonfunctional during MODES 1, 2, 3, or 4.
8. TECHNICAL SURVEILLANCE REQUIREMENT of the Turbine Driven Auxiliary Feedwater Pump (P4) cannot be implemented before entering MODE 3. If the previous TECHNICAL SURVEILLANCE REQUIREMENT was satisfactory, and P4 has not been declared nonfunctional for other reasons, MODES 3 and 4 can be entered without restriction. This approach is consistent with Technical Specification 4.7.1.2.a.2.b which allows entry into MODE 3, even though the Technical Specification surveillance for the Turbine Driven Auxiliary Feedwater Pump is not performed prior to MODE 3 entry.
9. Electrical Breaker TECHNICAL SURVEILLANCE REQUIREMENT Testing
a. TECHNICAL SURVEILLANCE REQUIREMENT Frequency TECHNICAL SURVEILLANCE REQUIREMENT frequency are as specified in the Preventive Maintenance Program. Changes in the frequency for breaker PMs, as allowed by the Preventive Maintenance Program, continue to fulfill the Appendix R TECHNICAL SURVEILLANCE REQUIREMENT and prove FUNCTIONALITY of these breakers. The electrical breaker TECHNICAL SURVEILLANCE REQUIREMENTS may be performed in any MODE when preventive maintenance on the breakers is allowed by either the Preventive Maintenance Program or by breaker availability, such as during a train outage.
b. Breaker Manual Cycling Manual cycling of a breaker is defined as cycling the breaker via the mechanical trip and close buttons.
c. ARSR Equipment Isolation When ARSR equipment (not a breaker) is removed from service for maintenance, repairs, testing, etc. and its associated power supply breaker(s) and/or control power breaker(s) are intentionally opened, no additional Appendix R compensatory ACTIONS specifically for the opened breakers are required since removal of the ARSR equipment from service already has adequate compensatory ACTIONS.

MILLSTONE - UNIT 2 TRM 7.1-4 LBDCR 07-MP2-015 February 2, 2010

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS BASES (Continued)

d. NON-ARSR Equipment Isolation When equipment not listed as ARSR equipment is removed from service but its associated power supply breaker(s) and/or control power breaker(s) is listed as ARSR equipment, no Appendix R compensatory ACTION is required for the open breaker(s) since the component is not credited for operation in any Appendix R shutdown scenario.
e. When D0105 is out for maintenance, D0111 will be used to jumper out D0105 to supply panel DV10.

When D0108 is out for maintenance, D0111 will be used to jumper out D0108 to supply panel DV30.

When D0205 is out for maintenance, D0211 will be used to jumper out D0205 to supply panel DV40.

When D0208 is out for maintenance, D0211 will be used to jumper out D0208 to supply panel DV20.

10. Existing compensatory ACTION(s) for a nonfunctional fire suppression and/or detection system may be utilized in lieu of FUNCTIONALITY for that suppression and/or detection system when equal compensatory ACTIONS are required for additional ARSR equipment TECHNICAL REQUIREMENT for the same fire area.
11. ACTION c requires that the impact be managed by performance of a FUNCTIONALITY Assessment, including a Reasonable Assurance of Safety (RAS) determination, if warranted, if ARSR component FUNCTIONALITY cannot be established within 60 days. The use of a FUNCTIONALITY Assessment, including a RAS determination, if warranted, assures the FUNCTIONALITY of ARSR components through evaluation or the use of compensatory measures if needed.
12. The intent of limiting transient combustibles as a compensatory measure is to create a heightened awareness of potential fire hazards (combustibles), limit to the extent possible the introduction of new hazards, and limit existing hazards through removal as work is completed. This would be accomplished by the fire watch, and the administrate controls of the permitting process. It is not the intent to prevent the introduction of materials required for repair of the system(s) in question, or fire protection systems used as compensatory measures.

(See AR 06000479-02 for additional information)

MILLSTONE - UNIT 2 TRM 7.1-5 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS BASES (Continued)

13. Risk Significant Components According to Regulatory Guide 1.160, Revision 3 Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, the NRC determined additional guidance was necessary to adequately assess and manage the risk from internal fires in the conduct of activities required by MRule (a)(4). Revision 4A of NUMARC 93-01, Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, addresses this concern by providing methods licensees can use to identify equipment important to mitigation of risk of core damage from fire initiators.

The revision also describes approaches to developing and implementing fire Risk Management Actions (RMAs) and the tools for effective implementation of the guidance.

The risk associated with the performance of maintenance activities having the potential to cause a fire (e.g., welding, use of cutting and grinding tools, transient combustibles, etc.), removal of fire detection or suppression equipment from service, and removal or impairment of fire barriers (e.g., opening of fire doors to facilitate maintenance, removal of protective barriers on cable trays or conduit, etc.) are all addressed by the existing Appendix R program. No additional action is warranted under MRule (a)(4) for these items. However, under the new guidance, removal of equipment from service important to core damage mitigation requires additional action to ensure adequate risk assessment for the impact of fire risk.

According to NUMARC 93-01, Revision 4A, the identification of equipment important for mitigating core damage resulting from fire initiating events can come from either:

10 CFR 50.58/Appendix R, a screening analysis (e.g. Fire Induced Vulnerability Evaluation), or a fire Probability Risk Assessment (PRA). MPS3 does not have fire PRAs, so Appendix R was used as the basis to identify the equipment within the existing MRule (a)(4) scope that is found to have appreciable impact on core damage mitigation for fire initiators.

The Fire Related Safe Shutdown Component list was compared with the PRA Internal Events model list of components which are risk significant for core damage frequency. Those components that were common to both lists, comprised the population of components considered for inclusion in the MRule (a)(4) program for fire risk impact. This component list was further refined down to a risk-informed list through site-specific working groups and a fleet expert panel. Once the appropriate scope of components was determined, RMAs to compensate for the reduction of the fire Safe Shutdown Capability when the component is removed from service, were developed based on guidance provided in NUMARC 93-01, Section 11.3.7.5.

The RMAs will be implemented using the method detailed in NUMARC 93-01, Section 11.3.7.3, Item 2. If a component important for mitigating core damage MILLSTONE - UNIT 2 TRM 7.1-5a LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS BASES (Continued)

13. (continued) resulting from fire initiating events is out of service for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, RMAs must be implemented. Within 30 days, the component is to be returned to service. If the component is not returned to service within 30 days, additional risk evaluations to determine additional actions must be performed.

It is important to note, the RMAs developed under the new guidance only address incremental risk from fire events. It is not appropriate to utilize the fire risk RMA implementation methods to address aggregate risk from fire and internal events.

Risk from internal events will continue to be evaluated under the current MRule (a)(4) program.

REFERENCE:

1. Condition Report M3-00-02659.
2. RP-5, Operability Determinations.

MILLSTONE - UNIT 2 TRM 7.1-5b LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Appendix R Safe Shutdown TECHNICAL REQUIREMENTS Index TR No. System Description Component ID ADDITIONAL TRM 7.1 REQUIREMENTS Page No.

7.1.1 Charging Pumps P18A, 18B, 18C TR 3.1.2.4 10 7.1.1 Regen HX outlet iso CH-089 TR 3.1.2.4 10 7.1.1 Charging to RCS loops CH-518, 519 TR 3.1.2.4 11 7.1.1 Aux Spray to PZR (RCS) CH-517 TR 3.1.2.4 11 7.1.1 Charging pump header iso MOV CH-429 TR 3.1.2.4 11 7.1.1 VCT outlet MOV CH-501 TR 3.1.2.4 11 7.1.1 Chrg Pps suct fm RWST MOV CH-504 TR 3.1.2.4 12 7.1.1 Chrg Pps suct fm RWST AOV CH-192 TR 3.1.2.4 12 7.1.2 Instr, Monitor local BAST level LI-206A, 208A TR 3.1.2.8.a 16 7.1.3 MS Low Pt Drain -ESF-MSI MS-265B TS 3.3.2.1 19 7.1.3 MS Low Pt Drain -ESF-MSI MS-266B TS 3.3.2.1 19 7.1.4 Instr, Monitor SG Press PT-1023B TS 3.3.3.5 22 7.1.4 Instrument, Monitoring Pzr Press PT-102B-1 TS 3.3.3.5 22 7.1.4 Instr, Monitor NI, wide rang QEXC2PDA, 4PDA TS 3.3.3.5 22 7.1.4 Instr, Monitor NI, wide range QEXC1PDA, 3PDA TS 3.3.3.5 22 7.1.4 Instr, Monitor Pzr Press low rng PT-103, 103-1 TS 3.3.3.5 22 7.1.4 Instr, monitor Pzr level, cold, nor LT-103, 110X, 110Y TS 3.3.3.5 23 7.1.4 Instr, Monitor SG 2 level, nar rng LT-1123B TS 3.3.3.5 23 7.1.4 Instr, Monitor SG 2 level,wide rng LT-1124A, 1124B TS 3.3.3.5 23 7.1.4 Instr, monitor SG 1 level,wide rng LT-1114A, 1114B TS 3.3.3.5 24 7.1.5 Instr, Monitoring hot leg temp TE-121X TS 3.3.3.8 27 7.1.5 Instr, Monitoring hot leg temp TE-111X TS 3.3.3.8 27 7.1.5 Instr, Monitoring cold leg temp TE-125 TS 3.3.3.8 27 7.1.5 Instr, Monitoring cold leg temp TE-115 TS 3.3.3.8 27 7.1.5 Instr, Monitor AFW flow to SG 2 FT-5278A. 5278B TS 3.3.3.8 28 7.1.5 Instr, Monitor AFW flow to SG 1 FT-5277A, 5277B TS 3.3.3.8 28 7.1.6 6900 V breakers for RCPs Bus 25A (H1) TS 3.4.1.2 31 7.1.6 6900 V breakers for RCPs Bus 25B (H2) TS 3.4.1.2 31 7.1.7 SDC HX bypass SI-306 TS 3.4.1.3 34 7.1.7 SDC suct MOVs SI-651, 652 TS 3.4.1.3 34 7.1.7 SDC sup, ret temp monitors TE-351X, 351Y TS 3.4.1.3 34 7.1.7 SDC HXs outlet temps indication TE-303X, 303Y TS 3.4.1.3 35 7.1.8 RCS- PORVs RC-402/ 404 TS 3.4.3 38 7.1.9 SIT Nitrogen vent valves SI-613,623,633,643 TS 3.5.1.a 41 7.1.9 SIT Outlet MOVs SI-614,624,634,644 TS 3.5.1.a 41 7.1.10 LPSI flow MOVs SI-615,625,635,645 TS 3.4.1.3 44 7.1.10 SDC min flow alt SI-449, 450 TS 3.4.1.3 44 7.1.10 SDC HX outlet SI-657 TS 3.4.1.3 44 7.1.10 LPSI suct fm RWST SI-432, 444 TS 3.4.1.3 44 7.1.10 LPSI suct fm RCS SI-440, 441 TS 3.4.1.3 44 7.1.10 LPSI disch to SDC HX SI-452, 453 TS 3.4.1.3 45 7.1.10 SDC HX outlet SI-456, 457 TS 3.4.1.3 45 7.1.11 RWST outlet MOV CS-13.1B n/a 48 MILLSTONE - UNIT 2 TRM 7.1-6 LBDCR 16-MP2-003 February 29, 2016

ADDITIONAL REQUIREMENTS Appendix R Safe Shutdown TECHNICAL REQUIREMENTS Index (Continued)

TR No. System Description Component ID ADDITIONAL TRM 7.1 REQUIREMENTS Page No.

7.1.12 Boric Acid Grav feed MOVs CH-508, 509 TR 3.1.2.2.a 51 7.1.13 Ctmt Ambient Temp monitoring TE-8108 TS 3.6.1.5 54 7.1.14 Ctmt Spray Stop Valves CS-4A, 4B TS 3.6.2.1 57 7.1.15 AFW Turbine SV-4188 TS 3.7.1.2 60 7.1.15 AFW Turbine P4 & H-21 TS 3.7.1.2 60 7.1.15 AFW Turbine steam stop MOV MS-202 TS 3.7.1.2 60 7.1.15 AFW pumps, motor driven P9A, P9B TS 3.7.1.2 60 7.1.15 AFW P4 Discharge Iso MOV FW-44 TS 3.7.1.2 61 7.1.15 AFW flow control valves FW-43A/43B TS 3.7.1.2 61 7.1.16 Instr, Monitor CST level LT-5282 TS 3.7.1.3 64 7.1.16 Instr, Local CST level Ind LIS-5489 TS 3.7.1.3 64 7.1.17 MSIVs MS-64A/64B TS 3.7.1.5 67 7.1.17 MSIV Bypass M S-65A/65B TS 3.7.1.5 67 7.1.18 ADVs MS-190A/190B TS 3.7.1.7 70 7.1.19 SG Blowdown Valves MS-220A/220B TS 3.7.1.8 73 7.1.20 RBCCW out of SDC HXs RB-13.1A, 13.1B TS 3.7.3.1 76 7.1.20 RBCCW Pp A Inlet AOVs RB-211A, 211B TS 3.7.3.1 76 7.1.20 RBCCW Pp B Inlet AOV's RB-211C, 211D TS 3.7.3.1 77 7.1.20 RBCCW Pp C Inlet AOVs RB-211E, 211F TS 3.7.3.1 77 7.1.20 RBCCW Hx A outlet AOVs RB-4.1A, 4.1B TS 3.7.3.1 78 7.1.20 RBCCW Hx B outlet AOVs RB-4.1C, 4.1D TS 3.7.3.1 78 7.1.20 RBCCW Hx C outlet AOVs RB-4.1E, 4.1F TS 3.7.3.1 79 7.1.20 RBCCW pumps P11A, P11B, P11C TS 3.7.3.1 79 7.1.20 RBCCW pp disch x-tie AOVs RB-251A, 251B TS 3.7.3.1 79a 7.1.21 SW pumps & Strainers P5A, P5C, L1A, L1C TS 3.7.4.1 82 7.1.21 SW Disch hdr x-tie valves SW-97A/ 97B TS 3.7.4.1 82 7.1.21 SW pump disch valves SW-2A, 2B, 2C TS 3.7.4.1 83 7.1.21 SW inlet to RBCCW HXs SW-3.1A/ 3.1B TS 3.7.4.1 83 7.1.21 SW outlet fm RBCCW HXs SW-9A/ 9B/ 9C TS 3.7.4.1 84 7.1.21 SW inlet to TBCCW HXs SW-5A/ 5B/ 5C TS 3.7.4.1 84 7.1.21 SW iso to EDG A & B SW-12B/ 12C TS 3.7.4.1 84 7.1.21 Drain on SW to EDG B SW-296 TS 3.7.4.1 84a 7.1.22 Alternate AC diesel gen SBO DG TS 3.8.1.1.a 87 7.1.23 4160 volt switchgear Bus 24C (A3) TS 3.8.2.1 90 7.1.23 4160 volt switchgear Bus 24D (A4) TS 3.8.2.1 91 7.1.23 4160 volt switchgear Bus 24E (A5) TS 3.8.2.1 91 7.1.23 4160 volt switchgear Bus 24A (A1) TS 3.8.2.1 92 7.1.23 4160 volt switchgear Bus 24B (A2) TS 3.8.2.1 92 7.1.23 480 volt load center Bus 22A (B01) TS 3.8.2.1 92 7.1.23 480 volt load center Bus 22B (B02) TS 3.8.2.1 92 7.1.23 480 volt switchgear Bus 22E (B05) TS 3.8.2.1 93 7.1.23 480 volt switchgear Bus 22F (B06) TS 3.8.2.1 93 7.1.23 MCC B51 B51 (MCC-22-1E) TS 3.8.2.1 93 MILLSTONE - UNIT 2 TRM 7.1-7 LBDCR 16-MP2-003 February 29, 2016

ADDITIONAL REQUIREMENTS Appendix R Safe Shutdown TECHNICAL REQUIREMENTS Index (Continued)

TR No. System Description Component ID ADDITIONAL TRM 7.1 REQUIREMENTS Page No.

7.1.23 MCC B52 B52 (MCC-22-2E) TS 3.8.2.1 93 7.1.23 MCC B61 B61 (MCC-22-1F) TS 3.8.2.1 94 7.1.23 MCC B62 B62 (MCC-22-2F) TS 3.8.2.1 94 7.1.23 120 VAC panel VIAC-2 VA 20 TS 3.8.2.1 94 7.1.23 Em. Light Units ELUs TS 3.8.2.1 95 7.1.24 125 VDC Bus 201A Bus D01 TS 3.8.2.3 99 7.1.24 125 VDC Bus 201B Bus D02 TS 3.8.2.3 99 7.1.24 125 VDC panel 201A-1V DV 10 TS 3.8.2.3 100 7.1.24 125 VDC panel 201B-1V DV 20 TS 3.8.2.3 101 7.1.24 125 VDC panel 201A-1 D11 TS 3.8.2.3 101 7.1.24 125 VDC panel 201A-2 D12 TS 3.8.2.3 101 7.1.24 125 VDC panel 201B-1 D21 TS 3.8.2.3 102 7.1.24 125 VDC panel 201B-2 D22 TS 3.8.2.3 102 7.1.25 Alt (Fire Pro) cooling to EDGs FIRE-258,259,559,560 n/a 105 7.1.25 Fire Supp System Fire Suppression sys n/a 105 7.1.25 Cross-tie to AFW suction 2-FIRE-34 n/a 105 7.1.26 Radio Communication System Hand-held Radios n/a 108 7.1.26 Box Inventory items available HSD Storage Box n/a 108 7.1.26 Box Inventory items available FSD Storage Box n/a 108 7.1.26 Materials available for repairs CSD Repair Material n/a 109 7.1.26 Fans-East & West DC rooms F156A, B, C, D n/a 109 7.1.26 Fans-East & West 480 V rooms F157A, B, C, D n/a 109 7.1.26 Bottles & Valves Bottle 3A, 3B, 3C n/a 110 7.1.27 Emergency Diesel Generators H7A, H7B TS 3.8.1.1 113 MILLSTONE - UNIT 2 TRM 7.1-8 LBDCR 16-MP2-003 February 29, 2016

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL REQUIREMENT: 3.1.2.4 - Charging Pumps TECHNICAL REQUIREMENT 7.1.1 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.1-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.1 The capability of equipment listed in TRM Table 7.1.1-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.1-2.

MILLSTONE - UNIT 2 TRM 7.1-9 LBDCR 14-MP2-015 September 24, 2014

ADDITIONAL REQUIREMENTS Table 7.1.1-1 CVCS Components FUNCTIONALITY Requirements and Compensatory Measures TR Comp ID FUNCTIONALITY Description Compensatory Measures if Component Risk Significant Component Item Not Restored in 14 Days Not Restored in 72 Hours (see ACTION a) (see Action d)

A P18A Charging Pump Pump must be FUNCTIONAL from With P18A nonfunctional perform ACTIONS With P18A pump nonfunctional, control room b.1, b.2 for Fire Area R-2. Risk Mitigation Areas are: R-2 (FHA A-8B, A-8D, A-13 and T-10),

R-3 (FHA T-1A, T-1C and T-1F), R-5 (FHA A-8A), R-8 (FHA A-16), R-10 (FHA A-21 and A-23) and R-11 (FHA A-28)

B P18B Charging Pump Pump must be controllable from panel 1. With P18B nonfunctional from C10 ensure N/A C10 P18C is FUNCTIONAL from C10 or perform ACTIONS b.1, b.2 for Fire Areas R-1 & R-13.

2. With P18B nonfunctional from panel C10 perform ACTIONS b.1, b.2 for fire area R-4.

C P18C Charging Pump 1. Pump must be controllable from 1. With P18C nonfunctional from C10 ensure N/A panel C10. P18B is FUNCTIONAL from C10 or perform

2. Pump must be FUNCTIONAL from ACTIONS b.1, b.2 for Fire Areas R-1 & R-13.

control room 2. With P18C nonfunctional from CR perform ACTIONS b.1, b.2 for Fire Area R-4.

D Z2 Powered Charging At least one pump must be powered N/A With Z2 pump nonfunctional, Risk Pump from facility Z2. Mitigation Areas are: R-1 (FHA A-1B, A-24 and A-25), R-4 (FHA A-6A), R-7 (FHA A-15), R-9 (FHA A-20 and A-22), R-13 (FHA T-6, R-14 (FHA T-7 and T-9) and R-17 (FHA A-10B)

E CH-089 Regen HX Outlet Valve must be controllable from panel Perform ACTIONS b.1, b.2 for Fire Area R-1 N/A Iso C10 MILLSTONE - UNIT 2 TRM 7.1-10 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.1-1 CVCS Components FUNCTIONALITY Requirements and Compensatory Measures TR Comp ID FUNCTIONALITY Description Compensatory Measures if Component Risk Significant Component Item Not Restored in 14 Days Not Restored in 72 Hours (see ACTION a) (see Action d)

F CH-518 Charging to RCS Valve must be capable of being Verify that valve CH-518 & 519 can be cycled N/A cycled by local manual hand-wheel from the CR and BU air bottles are available or perform ACTIONS b.1, b.2 for all fire areas except R-1.

G CH-519 Charging to RCS 1. Valve must be capable of being 1. Verify that valve CH-518 & 519 can be N/A cycled by local manual hand- cycled from the CR and BU air bottles are wheel. available or perform ACTIONS b.1, b.2 for all

2. Valve must be controllable from fire areas except R-1.

panel C10. 2. Perform ACTIONS b.1, b.2 for fire area R-1.

H CH-517 Auxiliary Spray 1. Valve must be capable of being 1. With hand-wheel nonfunctional perform N/A to Pressurizer AOV cycled by local manual hand- ACTIONS b.1, b.2 for fire areas R-2, R-10 &

wheel. R-15.

2. Valve must be capable of being 2. Verify valve can be cycled by local manual cycled using BU air bottles by hand-wheel or perform ACTIONS b.1, b.2 for remote CR operation. ALL fire areas except R-1.
3. Valve must be controllable from 3. With valve nonfunctional perform ACTIONS panel C10 using BU air bottles. b.1, b.2 for Fire area R-1.
4. Valve must fail closed when 4. With valve nonfunctional perform ACTIONS solenoid is de-energized. b.1, b.2 for Fire areas R-2 & R-15 I CH-429 Charging Pp Hdr 1. Valve must be capable of being 1. With valve nonfunctional perform ACTIONS N/A Iso MOV cycled by local manual hand- b.1, b.2 for fire areas R-1 & R-2.

wheel. 2. With valve nonfunctional, ensure manual

2. Valve must be controllable from capability is available.

panel C10 MILLSTONE - UNIT 2 TRM 7.1-11 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.1-1 CVCS Components FUNCTIONALITY Requirements and Compensatory Measures TR Comp ID FUNCTIONALITY Description Compensatory Measures if Component Risk Significant Component Item Not Restored in 14 Days Not Restored in 72 Hours (see ACTION a) (see Action d)

J CH-501 VCT Outlet MOV Valve must be capable of being With valve nonfunctional perform ACTIONS b.1, N/A cycled by local manual hand-wheel. b.2 for fire areas R-1,R-4, R-7, R-9, R-13, R-14, R-16 & R-17.

K CH-504 Chrg Pps Suct Valve must be capable of being With valve nonfunctional perform ACTIONS b.1, N/A fm RWST cycled by local manual hand-wheel. b.2 for fire areas R-1.

L CH-192 Charging Pps Valve must be capable of being 1. With the hand-wheel nonfunctional perform N/A Suct fm RWST AOV cycled by local manual hand-wheel. ACTIONS b.1, b.2 for fire areas R-1, R-4, R-7, R-9, R-13, R-14, R-16 & R-17; and

2. Verify valve can be operated using BU air or perform ACTIONS b.1, b.2 for fire areas R-2, R-3,R-5, R-6, R-8, R-10, R-11, R-12 & R-15.

MILLSTONE - UNIT 2 TRM 7.1-12 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.1-2 CVCS Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR No. Comp ID TECHNICAL SURVEILLANCE REQUIREMENT Frequency A P18A Verify P18A can be operated from the control room. Once per REFUELING Charging cycle Pump B P18B Verify control of P18B can be isolated from the Once per REFUELING Charging control room and that it can be operated from C10. cycle Pump C P18C 1. Verify control of P18C can be isolated from the Once per REFUELING Charging control room and that it can be operated from cycle Pump C10.

2. Verify P18C can be operated from the control room.

D Z2 N/A N/A Powered Charging Pump E CH-089 Verify control can be isolated from the control room Once per REFUELING Regen HX and operated room C10. cycle Outlet Iso F CH-518 Verify valve can be manually cycled using its hand- Once every 48 months.

Charging to wheel.

RCS G CH-519 1. Verify valve can be manually cycled using its 1. Once every 48 Charging to hand- wheel. months.

RCS

2. Verify control of 2-CH-519 can be isolated from 2. Once per the control room and operated from panel C10. REFUELING cycle.

H CH-517 1. Verify valve can be manually cycled using its 1. Once every 48 Auxiliary hand-wheel. months.

Spray to Pressurizer 2. Verify valve can be operated from control room 2. Once per using backup air bottles. REFUELING cycle

3. Verify valve control can be isolated from control 3. Once per room and operated from C10, using backup air REFUELING cycle bottles. 4. Once per
4. Verify valve fails closed on loss of control power. REFUELING cycle MILLSTONE - UNIT 2 TRM 7.1-13 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.1-2 CVCS Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR No. Comp ID TECHNICAL SURVEILLANCE REQUIREMENT Frequency I CH-429 1. Verify valve can be manually cycled using its 1. In accordance with Charging hand-wheel. the MOV surveillance Pp Hdr Iso frequency established MOV 2. Verify valve control can be isolated from control room and operated from Panel C10. by the PM Program.

2. Once per REFUELING cycle J CH-501 Verify valve can be manually cycled using its hand- In accordance with the VCT Outlet wheel. MOV surveillance MOV frequency established by the PM Program.

K CH-504 Verify valve can be manually cycled using its hand- In accordance with the Chrg Pps wheel MOV surveillance Suct fm frequency established by RWST the PM Program L CH-192 Verify valve can be manually cycled using its hand- Once every 48 months.

Chrg Pps wheel Suct fm RWST AOV MILLSTONE - UNIT 2 TRM 7.1-14 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL REQUIREMENT: 3.1.2.8.a - Boric Acid Storage Tanks TECHNICAL REQUIREMENT 7.1.2 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.2-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.2 The capability of equipment listed in TRM Table 7.1.2-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.2-2.

MILLSTONE - UNIT 2 TRM 7.1-15 LBDCR 14-MP2-015 September 24, 2014

ADDITIONAL REQUIREMENTS Table 7.1.2-1 BAST Local Level Instruments FUNCTIONALITY Requirements and Compensatory Measures TR Item Comp ID FUNCTIONALITY Compensatory Measures if Description Component Not Restored in 14 Days (see ACTION a)

A LI-206A Local level indicator With local level indication nonfunctional, perform Local BAST must be ACTIONS b.1, b.2 listed for Fire Areas R-2 and R-10.

Level Ind FUNCTIONAL.

B LI-208A Local level indicator With local level indication nonfunctional, perform Local BAST must be ACTIONS b.1, b.2 listed for Fire Areas R-2 and R-10.

Level Ind FUNCTIONAL.

MILLSTONE - UNIT 2 TRM 7.1-16 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.2-2 BAST Local Level Indicators TECHNICAL SURVEILLANCE REQUIREMENTS TSR Comp ID TECHNICAL Frequency Item SURVEILLANCE REQUIREMENT A LI-206A Local Verify the instrument is Once per REFUELING cycle BAST Level calibrated.

Ind B LI-208A Local Verify the instrument is Once per REFUELING cycle BAST Level calibrated.

Ind MILLSTONE - UNIT 2 TRM 7.1-17 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.3.2.1 Engineered Safety Feature Actuation System Instrumentation TECHNICAL REQUIREMENT 7.1.3 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.3-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.3 The capability of equipment listed in TRM Table 7.1.3-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.3-2.

MILLSTONE - UNIT 2 TRM 7.1-18 LBDCR 14-MP2-015 September 24, 2014

ADDITIONAL REQUIREMENTS Table 7.1.3-1 MSI Components Functionality Requirements And Compensatory Measures TR Comp ID FUNCTIONALITY Compensatory Measures if Item Description Component Not Restored in 14 Days (see ACTION a)

A 2-MS- Valve must be capable of With valve nonfunctional, perform 265B Mn failing closed when the ACTIONS b.1, b.2 for Fire Areas R-1 Steam solenoid is de-energized. and R-17.

Low Point Drain B 2-MS- Valve must be capable of With valve nonfunctional, perform 266B Mn failing closed when the ACTIONS b.1, b.2 for Fire Areas R-1 Steam solenoid is de-energized. and R-2.

Low Point Drain MILLSTONE - UNIT 2 TRM 7.1-19 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.3-2 MSIV Components Technical Surveillance Requirements TECHNICAL TSR Comp ID SURVEILLANCE Frequency No. REQUIREMENT A 2-MS-265B Mn Steam Low Verify valve will fail closed Once per REFUELING cycle Point Drain on loss of control power B 2-MS-266B Mn Steam Low Verify valve will fail closed Once per REFUELING cycle Point Drain on loss of control power MILLSTONE - UNIT 2 TRM 7.1-20 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.3.3.5 REMOTE SHUTDOWN INSTRS TECHNICAL REQUIREMENT 7.1.4 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.4-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.4 The capability of equipment listed in TRM Table 7.1.4-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.4-2.

MILLSTONE - UNIT 2 TRM 7.1-21 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.4-1 Remote Shutdown Instruments, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures TR FUNCTIONALITY Compensatory Measures if Component Not Item Comp ID Description Restored in 14 Days (see ACTION a)

A PT-102B-1 Instrument loop and With loop nonfunctional from Panel C10, perform ACTIONS b.1, b.2 for fire area R-1.

Pressurizer pressure indicator Pressure must be FUNCTIONAL at Panel C10.

B PT-1023B Instrument loop must With loop nonfunctional from Panel C10, perform ACTIONS b.1, b.2 for fire area R-1.

Stm Gen # 2 be FUNCTIONAL at Pressure Panel C10.

C QEXC2PDA Instrument loops must 1. With both B and D loops nonfunctional from the Control Room, perform ACTIONS (WR-DET-B), be FUNCTIONAL from b.1, b.2 for fire areas R-7, R-9, R-14, R-16, and R-17.

the Control Room.

QEXC4PDA 2. With loop D nonfunctional from the Control Room, perform ACTIONS b.1, b.2 for (WR-DET-D), fire area R-13 QEXC1PDA 3. With both A and C loops nonfunctional from the Control Room, perform ACTIONS (WR-DET-A), b.1, b.2 for fire areas R-2 and R-10 QEXC3PDA 4. With all loops (A,B,C,D) nonfunctional from the Control Room, perform ACTIONS (WR-DET-C) b.1, b.2 for fire areas R-2, R-3, R-4, R-5, R-6, R-7, R-8, R-9, R-10, R-11, R-12, R-13, R-14, R-15, R-16 and R-17.

D PT-103, Instrument loops must 1. With 103 loop nonfunctional from Control Room, perform ACTIONS b.1, b.2 for fire PT-103-1 be FUNCTIONAL from areas R-7, R-9, R-13, R-14, R-16 and R-17.

Pressurizer the Control Room. 2. With 103-1 loop nonfunctional from Control Room, perform ACTIONS b.1, b.2 for Pressure fire areas R-2, R-3, and R-10.

Low Range

3. With loops 103 and 103-1 nonfunctional from Control Room, perform ACTIONS b.1, b.2 for fire areas R-4, R-5, R-6, R-8, R-11, and R-12.

MILLSTONE - UNIT 2 TRM 7.1-22 LBDCR 11-MP2-002 April 19, 2011

ADDITIONAL REQUIREMENTS Table 7.1.4-1 Remote Shutdown Instruments, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures TR FUNCTIONALITY Compensatory Measures if Component Not Comp ID Item Description Restored in 14 Days (see ACTION a)

E LT-103 1. Loop LT-103 must 1. With loop LT-103 nonfunctional from Panel C10, perform ACTIONS b.1, b.2 for fire (Cold) be FUNCTIONAL area R-1.

LT-110X from Panel C10. 2. With loop LT-110X nonfunctional from Control Room, perform ACTIONS b.1, b.2 LT-110Y 2. Loop LT-110X must for fire area R-2, R-10, and R-15.

Pressurizer be FUNCTIONAL Level from Control Room. 3. for With loop LT-110Y nonfunctional from Control Room, perform ACTIONS b.1, b.2 fire area R-7, R-9, R-14, R-15, R-16, and R-17.

3. Loop LT-110Y must be FUNCTIONAL from Control Room.

F LT-1123B 1. Loops L-1123B and 1. With either loop F-5278B or L-1123B nonfunctional from Panel C10, perform SG 2 Water F-5278B must be ACTIONS b.1, b.2 for fire area R-1.

Level Narrow FUNCTIONAL from 2. With loop L-1124A nonfunctional from Control Room, perform ACTIONS b.1, b.2 Range Panel C10. for fire area R-2.

LT-1124A 2. SG WR Level, or LT-1124B 3. With loops L-1124A and F-5278A nonfunctional from Control room perform AFW Flow and NR SG2 Water ACTIONS b.1, b.2 for fire area R-10.

Level for same SG Level Wide must be 4. With Loop L-1124B nonfunctional from Control Room, perform ACTIONS b.1, b.2 Range FUNCTIONAL from for Fire Area R-13.

Control Room. 5. With loops L-1124B & F-5278B nonfunctional from Control Room, perform ACTIONS b.1, b.2 for fire areas R-7, 9, 14, 16 and R-17.

MILLSTONE - UNIT 2 TRM 7.1-23 LBDCR 11-MP2-002 April 19, 2011

ADDITIONAL REQUIREMENTS Table 7.1.4-1 Remote Shutdown Instruments, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures TR FUNCTIONALITY Compensatory Measures if Component Not Comp ID Item Description Restored in 14 Days (see ACTION a)

G LT-1114A SG Wide Range 1. With loop L-1114A nonfunctional from Control Room, perform ACTIONS b.1, b.2 LT-1114B Water Level or AFW for fire area R-2.

SG 1 Water Level Flow must be 2. With loops L-1114A and F-5277A nonfunctional from Control room perform Wide Range FUNCTIONAL from ACTIONS b.1, b.2 for fire area R-10.

Control Room

3. With loops L-1114B and F-5277B nonfunctional from Control room perform ACTIONS b.1, b.2 for fire area R-7, 9, 13, 14, 16 & R-17.

MILLSTONE - UNIT 2 TRM 7.1-24 LBDCR 11-MP2-002 April 19, 2011

ADDITIONAL REQUIREMENTS Table 7.1.4-2 Remote Shutdown Instruments, Appendix R Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT PT-102B-1 Perform a CHANNEL CALIBRATION to Once per REFUELING A Pressurizer verify that the instrument is calibrated. cycle.

Pressure PT-1023B Perform a CHANNEL CALIBRATION to Once per REFUELING B Stm Gen # 2 verify that the instrument is calibrated. cycle.

Pressure QEXC2PDA Perform a CHANNEL CALIBRATION to Once per REFUELING (WR-DET-B), verify that the instrument is calibrated. cycle.

QEXC4PDA (WR-DET-D),

C QEXC1PDA (WR-DET-A),

QEXC3PDA (WR-DET-C)

PT-103, Perform a CHANNEL CALIBRATION to Once per REFUELING PT-103-1 verify that the instrument is calibrated. cycle.

D Pressurizer Pressure Low Range LT-103 (Cold) Perform a CHANNEL CALIBRATION to Once per REFUELING LT-110X verify that the instrument is calibrated. cycle.

E LT-110Y Pressurizer Level LT-1123B Perform a CHANNEL CALIBRATION to Once per REFUELING LT-1124A verify that the instrument is calibrated. cycle.

F SG 2 Water Level Wide Range LT-1124B LT-1114A Perform a CHANNEL CALIBRATION to Once per REFUELING LT-1114B verify that the instrument is calibrated. cycle.

G SG 1 Water Level Wide Range MILLSTONE - UNIT 2 TRM 7.1-25 LBDCR 11-MP2-002 April 19, 2011

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.3.3.8 Accident Monitor Instrs TECHNICAL REQUIREMENT 7.1.5 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.5-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.5 The capability of equipment listed in TRM Table 7.1.5-1 to meet its Appendix R shutdown related FUNCTIONALity requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.5-2.

MILLSTONE - UNIT 2 TRM 7.1-26 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.5-1 Accident Monitoring Instrumentation, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures TR FUNCTIONALITY Compensatory Measures if Component Not Comp ID Item Description Restored in 14 Days (see ACTION a)

A TE-121X 1. Loop must be FUNCTIONAL at 1. With loop nonfunctional from Panel C10, perform ACTIONS RCS Hot Panel C10. b.1, b.2 for fire area R-1.

Leg 2 Temperature 2. Loop must be FUNCTIONAL at 2. With loop nonfunctional from the Control Room, perform Control Room. ACTIONS b.1, b.2 for all fire areas EXCEPT R-1, R-2, and R-10.

B TE-111X Loop must be FUNCTIONAL at With loop nonfunctional from Control Room, perform ACTIONS RCS Hot Control Room. b.1, b.2 for fire areas R-2, R-3, R-4, R-5, R-6, R-8, R-10, R-11, R-Leg 1 12, and R-15.

Temperature C TE-125 RCS 1. Loop must be FUNCTIONAL at 1. With loop nonfunctional from Panel C10, perform ACTIONS Cold Leg 2 Panel C10. b.1, b.2 for fire area R-1.

Temperature 2. Loop must be FUNCTIONAL at 2. With loop nonfunctional from Control Room, perform ACTIONS Control Room. b.1, b.2 for all fire areas EXCEPT R-1, R-2, and R-10.

D TE-115 RCS Cold Loop must be FUNCTIONAL at With loop nonfunctional from Control Room, perform ACTIONS Leg 1 Control Room. b.1, b.2 for fire areas R-2, R-3, R-4, R-5, R-6, R-8, R-10, R-11, R-Temperature 12, and R-15.

MILLSTONE - UNIT 2 TRM 7.1-27 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.5-1 Accident Monitoring Instrumentation, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures TR FUNCTIONALITY Compensatory Measures if Component Not Comp ID Item Description Restored in 14 Days (see ACTION a)

E FT-5278A, 1. Loops F-5278B and L-1123B must 1. With either loop F-5278B or L-1123B nonfunctional from Panel FT-5278B be FUNCTIONAL from Panel C10. C10, perform ACTIONS b.1, b.2 for fire area R-1.

AFW Flow to SG 2. 2. SG WR Level, or AFW Flow and 2. With loop L-1124A nonfunctional from Control Room, perform NR Level for same SG must be ACTIONS b.1, b.2 for fire area R-2.

FUNCTIONAL from Control Room. 3. With loops L-1124A and F-5278A nonfunctional from Control room perform ACTIONS b.1, b.2 for fire area R-10.

4. With Loop L-1124B nonfunctional from Control Room, perform ACTIONS b.1, b.2 for Fire Area R-13.
5. With loops L-1124B & F-5278B nonfunctional from Control Room, perform ACTIONS b.1, b.2 for fire areas R-7, 9, 14, 16 &

R-17.

F FT-5277A, SG Wide Range Water Level or AFW 1. With loop L-1114A nonfunctional from Control Room, perform FT-5277B Flow must be FUNCTIONAL from ACTIONS b.1, b.2 for fire area R-2.

AFW Flow to SG 1 Control Room 2. With loops L-1114A and F-5277A nonfunctional from Control room perform ACTIONS b.1, b.2 for fire area R-10.

3. With loops L-1114B and F-5277B nonfunctional from Control room perform ACTIONS b.1, b.2 for fire area R-7, 9, 13, 14, 16

& R-17.

MILLSTONE - UNIT 2 TRM 7.1-28 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.5-2 Accident Monitoring Instrumentation, Appendix R Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT A TE-121X RCS 1. Perform CHANNEL CALIBRATION to Once per REFUELING Hot Leg 2 verify the instrument is calibrated. cycle.

Temperature 2. Perform CHANNEL CALIBRATION as presently stated.

B TE-111X RCS Perform CHANNEL CALIBRATION to Once per REFUELING Hot Leg 1 verify the instrument is calibrated. cycle.

Temperature C TE-125 RCS 1. Perform CHANNEL CALIBRATION to Once per REFUELING Cold Leg 2 verify the instrument is calibrated. cycle.

Temperature 2. Perform CHANNEL CALIBRATION as presently stated.

D TE-115 RCS Perform CHANNEL CALIBRATION to Once per REFUELING Cold Leg 1 verify the instrument is calibrated. cycle.

Temperature E FT-5278A, Perform a CHANNEL CALIBRATION to Once per REFUELING verify that the instruments are calibrated. cycle.

FT-5278B AFW Flow to SG 2.

F FT-5277A, Perform a CHANNEL CALIBRATION to Once per REFUELING verify that the instruments are calibrated. cycle.

FT-5277B AFW Flow to SG 1

MILLSTONE - UNIT 2 TRM 7.1-29 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.4.1.2 Coolant Loops and Circulation TECHNICAL REQUIREMENT 7.1.6 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.6-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.6 The capability of equipment listed in TRM Table 7.1.6-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.6-2.

MILLSTONE - UNIT 2 TRM 7.1-30 LBDCR 16-MP2-003 February 29, 2016

ADDITIONAL REQUIREMENTS Table 7.1.6-1 6900 Volt Bus 25A (H1) and 25B (H2) Switchgear - RCP Breakers FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR FUNCTIONALITY Component Not Comp ID Item Description Restored in 14 Days (see ACTION a) 6900 Volt RCP Breaker must be With local breaker control RCP capable of being cycled nonfunctional, perform ACTIONS b.1, A Breaker (tripped) by local b.2 for fire areas R-9 and R-17.

H104 manual operation.

6900 Volt RCP Breaker must be With local breaker control RCP capable of being cycled nonfunctional, perform ACTIONS b.1, B Breaker (tripped) by local b.2 for fire areas R-9 and R-17.

H105 manual operation.

6900 Volt RCP Breaker must be With local breaker control RCP capable of being cycled nonfunctional, perform ACTIONS b.1, C Breaker (tripped) by local b.2 for fire area R-10.

H201 manual operation.

6900 Volt RCP Breaker must be With local breaker control RCP capable of being cycled nonfunctional, perform ACTIONS b.1, D Breaker (tripped) by local b.2 for fire area R-10.

H202 manual operation.

MILLSTONE - UNIT 2 TRM 7.1-31 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.6-2 6900 Volt Bus 25A (H1) and 25B (H2) Switchgear - RCP Breakers TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT 6900 Volt Verify that the circuit breaker can be In accordance with the RCP cycled (tripped) by local manual surveillance frequency A Breaker operation. established by the Preventive H104 Maintenance Program: See Bases item No. 9.

6900 Volt Verify that the circuit breaker can be In accordance with the RCP cycled (tripped) by local manual surveillance frequency B Breaker operation. established by the Preventive H105 Maintenance Program: See Bases item No. 9.

6900 Volt Verify that the circuit breaker can be In accordance with the RCP cycled (tripped) by local manual surveillance frequency C Breaker operation. established by the Preventive H201 Maintenance Program: See Bases item No. 9.

6900 Volt Verify that the circuit breaker can be In accordance with the RCP cycled (tripped) by local manual surveillance frequency D Breaker operation. established by the Preventive H202 Maintenance Program: See Bases item No. 9.

MILLSTONE - UNIT 2 TRM 7.1-32 LBDCR 10-MP2-004 March 30, 2010

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.4.1.3 Coolant Loops and Circulation TECHNICAL REQUIREMENT 7.1.7 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.7-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.7 The capability of equipment listed in TRM Table 7.1.7-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.7-2.

MILLSTONE - UNIT 2 TRM 7.1-33 LBDCR 16-MP2-003 February 29, 2016

ADDITIONAL REQUIREMENTS Table 7.1.7-1 Shutdown Cooling Components, Hot Shutdown FUNCTIONALITY Requirements and Compensatory Measures TR Compensatory Measures if Component Not Comp ID FUNCTIONALITY Description Item Restored in 14 Days (see ACTION a)

A 2-SI-306 SDC HX Valve must be capable of being cycled by With the valve nonfunctional, perform ACTIONS b.1, b.2 for Bypass AOV local manual hand-wheel operation. all fire areas.

B 2-SI-651,2-SI-652 1. Each valve must be closed and 1. N/A SDC Suction electrically disconnected or made NOTES: For plant operation in MODES 1 - 4, Technical Isolation MOVs nonfunctional. Valve 2-SI-651 shall have Specification LCO 3.6.3.1, Containment Isolation Valves, manual disconnect switch NSI651 locked also applies. Thus for MODES 1 - 4, valves must be open. Valve 2-SI-652 shall have manual OPERABLE to satisfy Technical Specifications and disconnect switch 89-SI-652 open. FUNCTIONAL to satisfy Appendix R requirements.

2. Each valve must be capable of being 2. With one valve nonfunctional, perform ACTIONS b.1, b.2 electrically opened. fire area R-1.
3. Each valve must be capable of being 3. With one valve nonfunctional, perform ACTIONS b.1, b.2 opened by local manual hand-wheel for fire area R-2, R-3, R- 7, R-8, R-9, R-10, R-11,R-13, R-operation. 14, R-15, R-16, R-17.

C TE-351X, TE-351Y Both instrument loops must be With either instrument loop nonfunctional from the Control SDC combined FUNCTIONAL from Control Room. Room, perform ACTIONS b.1, b.2 for fire areas R-2, R-3, R-suction/ return 5, R-6, R-8, R-10, R-11, R-12, and R-15.

header temperature MILLSTONE - UNIT 2 TRM 7.1-34 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.7-1 Shutdown Cooling Components, Hot Shutdown FUNCTIONALITY Requirements and Compensatory Measures TR Compensatory Measures if Component Not Item Comp ID FUNCTIONALITY Description Restored in 14 Days (see ACTION a)

D TE-303X, TE-303Y Both instrument loops must be 1. With instrument loop TE-303X nonfunctional from the SDC Heat FUNCTIONAL from the Control Room. Control Room, perform ACTIONS b.1, b.2 for fire areas Exchanger Outlets R-2, R-3, R-4, R-6, R-8, R-10, and R-11.

Temperature 2. With instrument loop TE-303Y nonfunctional from the Control Room, perform ACTIONS b.1, b.2 for fire areas R-5, R-7, R-9, R-13, R-14, R-16, and R-17.

MILLSTONE - UNIT 2 TRM 7.1-35 LBDCR 11-MP2-002 April 19, 2011

ADDITIONAL REQUIREMENTS Table 7.1.7-2 Shutdown Cooling Components, Hot Shutdown TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT A 2-SI-306 SDC Verify that the valve can be manually cycled Once every 48 months.

HX Bypass AOV using its hand-wheel.

B 2-SI-651, 2-SI- 1. Administrative control over manual 8. N/A 652 SDC disconnect switch NSI651 locked open, Suction Isolation for 2-SI-651, and manual disconnect MOVs switch 89-SI-652 operation for 2-SI-652 are provided in plant heat-up and cool-down procedures.

2. Verify that each valve can be remotely 9. Once per REFUELING cycled from the Control Room. Valves are cycle.

electrically cycled when entering shutdown cooling and when securing from shutdown cooling, during plant heat-up. No additional surveillance testing needs to be performed.

3. Verify that each valve can be manually 10.In accordance with the cycled using its hand-wheel. MOV surveillance frequency established by the PM Program.

C TE-351X, TE- Perform CHANNEL CALIBRATION to verify Once per REFUELING 351Y SDC each instrument loop is calibrated. cycle.

combined suction/return header temperature D TE-303X, TE- Perform CHANNEL CALIBRATION to verify Once per REFUELING 303Y SDC Heat each instrument loop is calibrated. cycle.

Exchanger Outlets Temperature MILLSTONE - UNIT 2 TRM 7.1-36 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.4.3 RCS Relief Valves TECHNICAL REQUIREMENT 7.1.8 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.8-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.8 The capability of equipment listed in TRM Table 7.1.8-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.8-2.

MILLSTONE - UNIT 2 TRM 7.1-37 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.8-1 RCS Relief Valves - PORVs FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR FUNCTIONALITY Component Not Comp ID Item Description Restored in 14 Days (see ACTION a) 2-RC-402, Valve 2-RC-402 must With 2-RC-402 nonfunctional perform Pressurizer be capable of closure ACTIONS b.1, b.2 for fire areas R-1, A Relief Valve from Panel C70A. R-9, and R-15.

(PORV) 2-RC-404, Valve 2-RC-404 must With 2-RC-404 nonfunctional perform Pressurizer be capable of closure ACTIONS b.1, b.2 for fire areas R-1, B Relief Valve from Panel C70B. R-10, and R-15.

(PORV)

MILLSTONE - UNIT 2 TRM 7.1-38 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.8-2 RCS Relief Valves - PORVs TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT 2-RC-402, Verify that valve 2-RC-402 can be closed at Once per A Pressurizer Relief Panel C70A. REFUELING cycle.

Valve (PORV) 2-RC-404, Verify that valve 2-RC-404 can be closed at Once per B Pressurizer Relief Panel C70b. REFUELING cycle.

Valve (PORV)

MILLSTONE - UNIT 2 TRM 7.1-39 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.5.1.a SIT Isolation Valves TECHNICAL REQUIREMENT 7.1.9 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.9-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.9 The capability of equipment listed in TRM Table 7.1.9-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.9-2.

MILLSTONE - UNIT 2 TRM 7.1-40 LBDCR 16-MP2-003 February 29, 2016

ADDITIONAL REQUIREMENTS Table 7.1.9-1 Safety Injection Tank Isolation Valves FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component TR FUNCTIONALITY Comp ID Not Restored in 14 Days Item Description (see ACTION a) 2-SI-614 Each valve must be With one valve nonfunctional, perform 2-SI-624 capable of being ACTIONS b.1, b.2 for all fire areas 2-SI-634 closed by local EXCEPT R-1, R- 2, R-15, R-17.

A 2-SI-644 manual hand-wheel SIT Block operation.

Valve (MOVs) 2-SI-613 Each valve must be With any valve nonfunctional, perform 2-SI-623 capable of being ACTIONS b.1, b.2 for fire area R-1.

2-SI-633 electrically opened.

B 2-SI-643 SIT Vent Valve (AOVs)

MILLSTONE - UNIT 2 TRM 7.1-41 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.9-2 Safety Injection Tank Isolation Valves TECHNICAL SURVEILLANCE REQUIREMENTS TSR Comp ID TECHNICAL SURVEILLANCE REQUIREMENT Frequency Item 2-SI-614 Verify the MOV can be manually cycled. In accordance with the 2-SI-624 MOV surveillance 2-SI-634 frequency established A 2-SI-644 by the PM Program.

SIT Block Valve (MOVs) 2-SI-613 Verify that each valve can be remotely opened Once per REFUELING 2-SI-623 from the Control Room. cycle 2-SI-633 B 2-SI-643 SIT Vent Valve (AOVs)

MILLSTONE - UNIT 2 TRM 7.1-42 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.4.1.3 Coolant Loops and Circulation TECHNICAL REQUIREMENT 7.1.10 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.10-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.10 The capability of equipment listed in TRM Table 7.1.10-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.10-2.

MILLSTONE - UNIT 2 TRM 7.1-43 LBDCR 16-MP2-003 February 29, 2016

ADDITIONAL REQUIREMENTS Table 7.1.10-1 ECCS - LPSI Valves FUNCTIONALITY Requirements and Compensatory Measures TR FUNCTIONALITY Compensatory Measures if Component Not Restored in 14 Days Comp ID Item Description (see ACTION a)

A 2-SI-615 Each valve must be capable of 1. With either 2-SI-615 or 2-SI-625 nonfunctional, perform ACTIONS 2-SI-625 being cycled by local manual b.1, b.2 for fire areas R-1, R- 2,R-3, R-7, R-9, R-13, R-14,R-16,and 2-SI-635 hand-wheel operation. R-17.

2-SI-645 2. With either 2-SI-635 or 2-SI-645 nonfunctional, perform ACTIONS LPSI Flow b.1, b.2 for fire areas R-1, R- 2,R-8, R-10, and R-11.

MOV B 2-SI-449 Each valve must be capable of With one valve nonfunctional, perform ACTIONS b.1, b.2 for all fire 2-SI-450 being closed by local manual areas.

LPSI (SDC) hand-wheel operation.

Min Flow AOV C 2-SI-657 Valve must be capable of being With the valve nonfunctional, perform ACTIONS b.1, b.2 for all fire (LPSI) SDC cycled by local manual hand- areas.

HX Outlet wheel operation.

AOV D 2-SI-432 Each valve must be capable of 1. With 2-SI-432 nonfunctional, perform ACTIONS b.1, b.2 for fire 2-SI-444 being closed by local manual areas R-1, R-5, R-7, R-9, R-13, R- 14, R-16,and R-17.

LPSI Suction hand-wheel operation. 2. With 2-SI-444 nonfunctional, perform ACTIONS b.1, b.2 for fire from RWST areas R-2, R-3, R-6, R-8, R-10, and R-11.

AOV E 2-SI-440 Each valve must be capable of 1. With 2-SI-441 nonfunctional, perform ACTIONS b.1, b.2 for fire 2-SI-441 being opened by local manual areas R-2, R-3, R-6, R-8, R-10, and R-11.

LPSI/SDC hand-wheel operation. 2. With 2-SI-440 nonfunctional, perform ACTIONS b.1, b.2 for fire Suction areas R-1, R-5, R-7, R-9, R-13, R-14,R-16, and R-17.

from RCS AOV MILLSTONE - UNIT 2 TRM 7.1-44 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.10-1 ECCS - LPSI Valves FUNCTIONALITY Requirements and Compensatory Measures TR FUNCTIONALITY Compensatory Measures if Component Not Restored in 14 Days Comp ID Item Description (see ACTION a)

F 2-SI-452 Each valve must be capable of 1. With 2-SI-452 nonfunctional, perform ACTIONS b.1, b.2 for fire 2-SI-453 being opened by local manual areas R-2, R-3, R-6, R-8, R-10, and R-11.

LPSI hand-wheel operation. 2. With 2-SI-453 nonfunctional, perform ACTIONS b.1, b.2 for fire disch to areas R-1, R-5, R-7, R-9, R-13, R-14,R-16, and R-17.

SDC HX AOV G 2-SI-456 Each valve must be capable of 1. With 2-SI-456 nonfunctional, perform ACTIONS b.1, b.2 for fire 2-SI-457 being opened by local manual areas R-2, R-3, R-6, R-8, R-10, and R-11.

SDC HX hand-wheel operation. 2. With 2-SI-457 nonfunctional, perform ACTIONS b.1, b.2 for fire outlet areas R-1, R-5, R-7, R-9, R-13, R-14,R-16, and R-17.

AOV MILLSTONE - UNIT 2 TRM 7.1-45 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.10-2 ECCS - LPSI Valves TECHNICAL SURVEILLANCE REQUIREMENTS TSR Comp ID TECHNICAL SURVEILLANCE REQUIREMENT Frequency Item 2-SI-615 Verify that each valve can be manually cycled In accordance with the 2-SI-625 using its hand-wheel. MOV surveillance 2-SI-635 frequency established A 2-SI-645 by the PM Program.

LPSI Flow MOV 2-SI-449 Verify that each valve can be manually cycled Once every 48 2-SI-450 using its hand-wheel. Valves are manually cycled months.

LPSI (SDC) when entering shutdown cooling, and securing B Min Flow from shutdown cooling during plant heat-up. No AOV additional surveillance testing needs to be performed.

2-SI-657 Verify that the valve can be manually cycled Once every 48 (LPSI) SDC using its hand-wheel. months.

C HX Outlet AOV 2-SI-432 Verify that each valve can be manually cycled Once every 48 2-SI-444 using its hand-wheel. Valves are manually cycled months.

LPSI when entering shutdown cooling. No additional D Suction surveillance testing needs to be performed.

from RWST AOV 2-SI-440 Verify that each valve can be manually cycled Once every 48 2-SI-441 using its hand-wheel. Valves are manually cycled months.

LPSI/SDC when entering shutdown cooling. No additional E Suction surveillance testing needs to be performed.

from RCS AOV 2-SI-452 Verify that each valve can be manually cycled Once every 48 2-SI-453 using its hand-wheel. Valves are manually cycled months.

F LPSI disch when entering shutdown cooling. No additional to SDC HX surveillance testing needs to be performed.

AOV 2-SI-456 Verify that each valve can be manually cycled Once every 48 2-SI-457 using its hand-wheel. Valves are manually cycled months.

G SDC HX when entering shutdown cooling. No additional outlet AOV surveillance testing needs to be performed.

MILLSTONE - UNIT 2 TRM 7.1-46 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: None TECHNICAL REQUIREMENT 7.1.11 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.11-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.11 The capability of equipment listed in TRM Table 7.1.11-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.11-2.

MILLSTONE - UNIT 2 TRM 7.1-47 LBDCR 14-MP2-015 September 24, 2014

ADDITIONAL REQUIREMENTS Table 7.1.11-1 ECCS - RWST Outlet Valve FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR FUNCTIONALITY Comp ID Component Not Restored in 14 Days Risk Significant Component Not Item Description (see ACTION a) Restored in 72 Hours (see ACTION d) 2-CS-13.1B Valve must be capable With the valve nonfunctional, perform With valve nonfunctional, Risk Mitigation RWST Stop of being opened by ACTIONS b.1, b.2 for fire areas R-1, and Areas are: R-1 (FHA A-1G, A-12A and A (outlet) MOV local manual R-2. A-24) handwheel operation.

MILLSTONE - UNIT 2 TRM 7.1-48 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.11-2 ECCS - RWST Outlet Valve TECHNICAL SURVEILLANCE REQUIREMENTS TECHNICAL TSR Comp ID SURVEILLANCE Frequency Item REQUIREMENT 2-CS-13.1B Verify that the valve can be In accordance with the MOV surveillance A RWST Stop manually cycled using its frequency established by the PM Program.

(outlet) MOV hand-wheel.

MILLSTONE - UNIT 2 TRM 7.1-49 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL REQUIREMENT: 3.1.2.2.a Reactivity Control System Flow Paths - Operating TECHNICAL REQUIREMENT 7.1.12 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.12-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.12 The capability of equipment listed in TRM Table 7.1.12-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.12-1.

MILLSTONE - UNIT 2 TRM 7.1-50 LBDCR 14-MP2-015 September 24, 2014

ADDITIONAL REQUIREMENTS Table 7.1.12-1 ECCS - Boric Acid Gravity Feed Valves FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR FUNCTIONALITY Comp ID Component Not Restored in 14 Days Item Description (see ACTION a) 2-CH-508 Both valves must With one valve nonfunctional, establish 2-CH-509, be capable of being minimum TECHNICAL REQUIREMENT Boric Acid cycled by local (3.1.2.7) inventory in the Boric Acid A Gravity manual hand-wheel Storage Tank (BAST) associated with the Feed operation. FUNCTIONAL valve, or perform ACTIONS MOVs b.1, b.2 for fire areas R-1, R-7, R-9, R-13, R-14, R-16, and R-17.

MILLSTONE - UNIT 2 TRM 7.1-51 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.12-2 ECCS - Boric Acid Gravity Feed Valves TECHNICAL SURVEILLANCE REQUIREMENTS TSR Comp ID TECHNICAL SURVEILLANCE REQUIREMENT Frequency Item 2-CH-508 Verify that both valves can be manually cycled In accordance with the 2-CH-509, using their hand-wheels. MOV surveillance A Boric Acid frequency established Gravity Feed by the PM Program.

MOVs MILLSTONE - UNIT 2 TRM 7.1-52 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.6.1.5 Containment Air Temperature TECHNICAL REQUIREMENT 7.1.13 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.13-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.13 The capability of equipment listed in TRM Table 7.1.13-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.13-2.

MILLSTONE - UNIT 2 TRM 7.1-53 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.13-1 Containment Systems - Air Temperature Indication FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR FUNCTIONALITY Comp ID Component Not Restored in 14 Days Item Description (see ACTION a)

TE-8108 Instrument loop With instrument loop nonfunctional from Containment must be Control Room, perform ACTIONS b.1, b.2 A Ambient FUNCTIONAL from for fire areas R-2, R-3, R-4, R-5, R-6, R-8, Temperature the Control Room. R-10, R-11, and R-12.

Indication MILLSTONE - UNIT 2 TRM 7.1-54 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.13-2 Containment Systems - Air Temperature Indication TECHNICAL SURVEILLANCE REQUIREMENTS TSR Comp ID TECHNICAL SURVEILLANCE REQUIREMENT Frequency Item TE-8108 Perform CHANNEL CALIBRATION to verify the Once per Containment instrument loop is calibrated. REFUELING cycle A Ambient Temperature Indication MILLSTONE - UNIT 2 TRM 7.1-55 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.6.2.1 Containment Spray and Cooling Systems TECHNICAL REQUIREMENT 7.1.14 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.14-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.14 The capability of equipment listed in TRM Table 7.1.14-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.14-2.

MILLSTONE - UNIT 2 TRM 7.1-56 LBDCR 14-MP2-015 September 24, 2014

ADDITIONAL REQUIREMENTS Table 7.1.14-1 Containment Systems - Containment Spray and Cooling Systems FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR FUNCTIONALITY Comp ID Component Not Restored in 14 Days Item Description (see ACTION a) 2-CS-4A Each valve must be With valve 2-CS-4A nonfunctional, 2-CS-4B capable of being perform ACTIONS b.1, b.2 for fire area Containment closed by local R-2.

A Spray Stop manual hand-wheel With valve 2-CS-4B nonfunctional, Valves operation. perform ACTIONS b.1, b.2 for fire areas R-1, and R-17.

MILLSTONE - UNIT 2 TRM 7.1-57 LBDCR 14-MP2-015 September 24, 2014

ADDITIONAL REQUIREMENTS Table 7.1.14-2 Containment Systems - Containment Spray and Cooling Systems TECHNICAL SURVEILLANCE REQUIREMENTS TSR Comp ID TECHNICAL SURVEILLANCE REQUIREMENT Frequency Item 2-CS-4A Verify that each valve can be manually cycled Once every 48 2-CS-4B using its hand-wheel. Valves are manually cycled months.

A Containment when entering shutdown cooling, and securing Spray Stop from shutdown cooling during plant heat-up. No Valves additional surveillance testing needs to be done.

MILLSTONE - UNIT 2 TRM 7.1-58 LBDCR 14-MP2-015 September 24, 2014

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.1.2 Auxiliary Feedwater Pumps TECHNICAL REQUIREMENT 7.1.15 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.15-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.15 The capability of equipment listed in TRM Table 7.1.15-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.15-2.

MILLSTONE - UNIT 2 TRM 7.1-59 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.15-1 Plant System - Auxiliary Feedwater Pumps FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR FUNCTIONALITY Risk Significant Component Not Comp ID Component Not Restored in 14 Days Item Description Restored in 72 Hours (see ACTION a) (see ACTION d)

A SV-4188 AFW Valve must be capable of With valve nonfunctional from Panel C10, With valve nonfunctional, Risk Pump Turbine being operated from Panel perform ACTIONS b.1, b.2 for fire areas R-1 Mitigation Areas are: R-1 (FHA A-24),

Stm Supply C10. and R-13. R-3 (FHA T-1A)

Valve B P4 & H-21 1. Pump/Turbine must be With Pump/Turbine nonfunctional, from With Pump/Turbine nonfunctional, Risk AFW Pump FUNCTIONAL from the either location, perform ACTIONS b.1, b.2 Mitigation Areas are: R-1 (FHA A-24),

and Turbine Control Room. for fire areas R-3, R-11, R-16, and R-17. R-3 (FHA T-1A)

Governor 2. Pump/Turbine must be Control FUNCTIONAL from Panel C10.

C 2-MS-202 Valve must be open, With the valve closed and/or disconnect N/A AFW Steam incapable of remote closed, perform ACTIONS b.1, b.2 for fire Supply from operation with disconnect areas R-1, R-2, and R-13.

SG 2, MOV switch opened (off position).

D P-9A Pumps must be 1. With P-9A nonfunctional: 1. With P-9A nonfunctional Risk P-9B FUNCTIONAL from the Mitigation Areas are: R-2 (FHA A-a) Perform ACTIONS b.1, b.2 for fire Motor Driven Control Room. 8D, T-8, T-10) areas R-2 and R-10 AFW pumps 2. With P-9B nonfunctional Risk b) Verify P4 FUNCTIONAL, or Perform Mitigation Areas are: R-14 (FHA T-7, ACTIONS b.1, b.2 for fire area R-8 T-9) c) Verify P9B FUNCTIONAL, or Perform ACTIONS b.1, b.2 for fire area R-12.

2. With P-9B nonfunctional, verify P4 FUNCTIONAL, or Perform ACTIONS b.1, b.2 for fire areas R-7 and R-14.

MILLSTONE - UNIT 2 TRM 7.1-60 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.15-1 Plant System - Auxiliary Feedwater Pumps FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR FUNCTIONALITY Risk Significant Component Not Item Comp ID Description Component Not Restored in 14 Days Restored in 72 Hours (see ACTION a) (see ACTION d)

E 2-FW-44 AFW Valve must be capable of With valve nonfunctional, perform ACTIONS N/A Pump P4 being opened by local b.1, b.2 for fire areas R-1 and R-13.

Discharge Iso manual handwheel MOV operation.

F 2-FW-43A 1. Each valve must be 1. Verify that the applicable AFW regulating N/A 2-FW-43B capable of local manual valve bypass valves 2-FW-56A and/or 2-AFW Flow handwheel operation, FW-56B, and isolation valves 2-FW-10A/

Control (AOVs) and failing open when 10B and/or 2-FW-11A/B can be manually de-energized. cycled.

2. Valve 2-FW-43B must 2. Verify that the AFW regulating valve be capable of remote bypass valve 2-FW-56B, and isolation operation from Panel valves 2-FW-10B or 2-FW-11B can be C10. manually cycled.

MILLSTONE - UNIT 2 TRM 7.1-61 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.15-2 Plant System - Auxiliary Feedwater Pumps Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT A SV-4188 AFW Verify that control of the steam supply valve Once per REFUELING Pump Turbine SV-4188 can be isolated from the Control cycle.

Stm Supply Room and operated from Panel C10.

Valve B P4 & H-21 1. In accordance with Technical Specification 1. In accordance with AFW Pump 4.7.1.2.a.1 and 4.7.1.2.a.2.b. Technical and Turbine Specification

2. In accordance with Technical Specification Governor 4.7.1.2.a.

4.7.1.2.a.2.b.

Control 2. In accordance with Technical Specification 4.7.1.2.a.

C 2-MS-202 Administrative control over the disconnect N/A AFW Steam switch key found in procedure SP-2610C, and Supply from plant heatup procedure.

SG 2, MOV D P-9A In accordance with Technical Specification In accordance with P-9B Motor 4.7.1.2.a.1 and 4.7.1.2.a.2.a for each motor Technical Specification Driven AFW driven pump. 4.7.1.2.a.

pumps E 2-FW-44 Verify that the valve can be manually cycled In accordance with the AFW Pump using its handwheel. MOV surveillance P4 Discharge frequency established Iso MOV. by the PM Program.

F 2-FW-43A 1.a. Verify that each valve can be manually 1. Once every 48 2-FW-43B cycled using its handwheel, and months.

AFW Flow 1.b. That each valve will fail open on loss of 2. Once per Control control power. REFUELING cycle.

(AOVs)

2. Verify that 2-FW-43B can be isolated from the Control Room and operated from Panel C10.

MILLSTONE - UNIT 2 TRM 7.1-62 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.1.3 Condensate Storage Tank TECHNICAL REQUIREMENT 7.1.16 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.16-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.16 The capability of equipment listed in TRM Table 7.1.16-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.16-2.

MILLSTONE - UNIT 2 TRM 7.1-63 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.16-1 Condensate Storage Tank (CST) Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component TR FUNCTIONALITY Comp ID Not Restored in 14 Days Item Description (see ACTION a)

A LT-5282 1. Instrument loop 1. With loop nonfunctional from Panel C10, CST must be perform ACTIONS b.1, b.2 for fire areas Level FUNCTIONAL at R-1 & R-13.

Indication Panel C10. 2. With loop nonfunctional from Control

2. Instrument loop Room, verify that the local CST level must be indicator (LIS-5489) is FUNCTIONAL, or FUNCTIONAL perform ACTIONS b.1, b.2 for all fire from the Control areas.

Room.

B LIS-5489 Local CST Level With local indication nonfunctional, perform CST local Indication must be ACTIONS b.1, b.2 for fire areas R-2, R-3, Level available. and R-10.

Indicator MILLSTONE - UNIT 2 TRM 7.1-64 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.16-2 Condensate Storage Tank Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT LT-5282 CST Perform CHANNEL CALIBRATION to verify Once per A Level the instrument loop is calibrated. REFUELING cycle.

Indication LIS-5489 CST Perform Instrument Calibration to verify the Once per B local Level instrument is calibrated. REFUELING cycle.

Indication MILLSTONE - UNIT 2 TRM 7.1-65 LBDCR 14-MP2-015 September 24, 2014

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.1.5 Main Steam Isolation Valves TECHNICAL REQUIREMENT 7.1.17 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.17-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.17 The capability of equipment listed in TRM Table 7.1.17-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.17-2.

MILLSTONE - UNIT 2 TRM 7.1-66 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.17-1 Main Steam Isolation Valves FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR FUNCTIONALITY Comp ID Component Not Restored in 14 Days Item Description (see ACTION a) 2-MS-64A 2-MS-64A must be With one valve nonfunctional, perform 2-MS-64B capable of closure from ACTIONS b.1, b.2 for fire areas R-1, R-2, Main Steam Bottle-up Panel C70A. and R-17.

A Iso Valves 2-MS-64B must be (AOVs) capable of closure from Bottle-up Panel C70B.

2-MS-65A Valve must be closed With 2-MS-65A open or disconnect SG MSIV with its disconnect closed, perform ACTIONS b.1, b.2 for B Bypass switch locked open. fire areas R-1 and R-17.

Valve (MOV) 2-MS-65B Valve must be closed With 2-MS-65B open or disconnect SG MSIV with its disconnect closed, perform ACTIONS b.1, b.2 for C Bypass switch locked open. fire areas R-1 and R-2.

Valve (MOV)

MILLSTONE - UNIT 2 TRM 7.1-67 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.17-2 Main Steam Isolation Valves TECHNICAL SURVEILLANCE REQUIREMENTS TSR Comp ID TECHNICAL SURVEILLANCE REQUIREMENT Frequency Item A 2-MS-64A 1. Verify that 2-MS-64A can be closed from Bottle-up Once per 2-MS-64B Panel C70A. REFUELING Main Steam 2. Verify that 2-MS-64B can be closed from Bottle-up cycle.

Iso Valves Panel C70B.

(AOVs)

B 2-MS-65A Administrative control for disconnect switch key N/A SG MSIV provided in plant start-up procedure.

Bypass Valve (MOV)

C 2-MS-65B Administrative control for the opening coil provided in N/A SG MSIV plant start-up procedure.

Bypass Valve (MOV)

MILLSTONE - UNIT 2 TRM 7.1-68 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.1.7 Atmospheric Dump Valves TECHNICAL REQUIREMENT 7.1.18 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.18-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.18 The capability of equipment listed in TRM Table 7.1.18-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.18-2.

MILLSTONE - UNIT 2 TRM 7.1-69 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.18-1 Atmospheric Dump Valves FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR FUNCTIONALITY Comp ID Component Not Restored in 14 Days Item Description (see ACTION a)

A 2-MS-190A 1. Each valve must be 1. Failure to close with solenoid 2-MS-190B capable of failing deenergized requires isolation of Atmospheri closed when the instrument air to the affected valve, for c valves solenoid is fire area Steam deenergized. R-11.

Dump 2.a. Valve 2-MS-190A 2.a. With 2-MS-190A nonfunctional from Valves must be capable of C70A perform ACTIONS b.1, b.2 for (AOVs) closure from Panel fire areas R-1, R-13 and R-17.

C70A, and, 2.b. With 2-MS-190B nonfunctional from 2.b. Valve 2-MS-190B C70B, perform ACTIONS b.1, b.2 must be capable of for fire areas R-1, and R-2.

closure from Panel

3. With one valve nonfunctional, perform C70B. ACTIONS b.1, b.2 for all fire areas.
3. Each valve must be 4. With loss of remote operation from capable of local Panel C10 for 2-MS-190B, ensure manual handwheel local manual operation is available.

operation.

4. Valve 2-MS-190B must be capable of remote operation from panel C10.

MILLSTONE - UNIT 2 TRM 7.1-70 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.18-2 Atmospheric Dump Valves TECHNICAL SURVEILLANCE REQUIREMENTS TSR Comp ID TECHNICAL SURVEILLANCE REQUIREMENT Frequency Item A 2-MS-190A 1. From the Control room verify each valve will Once per REFUELING 2-MS-190B close when its quick open solenoid is de- cycle.

Atmospheric energized and its valve positioning instrument Steam Dump loop is FUNCTIONAL and set to close.

Valves 2.a. Verify that valve 2-MS-190A can be closed at (AOVs) Panel C70A.

2.b. Verify that valve 2-MS-190B can be closed at Panel C70B

3. Addressed under Tech. Spec. 4.7.1.7.
4. Verify that 2-MS-190B can be operated from Panel C10.

MILLSTONE - UNIT 2 TRM 7.1-71 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.1.8 Steam Generator Blowdown Isolation Valves TECHNICAL REQUIREMENT 7.1.19 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.19-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.19 The capability of equipment listed in TRM Table 7.1.19-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.19-2.

MILLSTONE - UNIT 2 TRM 7.1-72 LBDCR 16-MP2-003 February 29, 2016

ADDITIONAL REQUIREMENTS Table 7.1.19-1 Steam Generator Blowdown Isolation Valves FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if TR FUNCTIONALITY Comp ID Component Not Restored in 14 Days Item Description (see ACTION a)

A 2-MS-220A 1.b. Valve 2-MS-220A 1. With one valve nonfunctional, perform 2-MS-220B must be capable ACTIONS b.1, b.2 for fire areas R-1, SG of closure from and R-17.

Blowdown Panel C70A, and 2. With one valve nonfunctional, perform Isolation 1.c. Valve 2-MS-220B ACTIONS b.1, b.2 for fire area R-11.

AOVs must be capable of closure from Panel C70B.

2. Each valve must be capable of failing closed when the valves solenoid is deenergized.

MILLSTONE - UNIT 2 TRM 7.1-73 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.19-2 Steam Generator Blowdown Isolation Valves TECHNICAL SURVEILLANCE REQUIREMENTS TSR Comp ID TECHNICAL SURVEILLANCE REQUIREMENT Frequency Item A 2-MS-220A 1.b. Verify that valve 2-MS-220A can be closed Once per REFUELING 2-MS-220B at Panel C70A. cycle.

(SG 1.c. Verify that valve 2-MS-220B can be closed Blowdown at Panel C70B.

Isolation AOVs) 2. Verify that each valve will fail closed on loss of control power.

MILLSTONE - UNIT 2 TRM 7.1-74 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.3.1 RBCCW System TECHNICAL REQUIREMENT 7.1.20 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.20-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.20 The capability of equipment listed in TRM Table 7.1.20-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.20-2.

MILLSTONE - UNIT 2 TRM 7.1-75 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.20-1 Reactor Building Closed Cooling Water (RBCCW) System FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR FUNCTIONALITY Comp ID Risk Significant Component Not Item Description Component Not Restored in 14 Days Restored in 72 Hours (see ACTION a) (see ACTION d)

A 2-RB-13.1A Each Valve must be With valve 2-RB-13.1A nonfunctional, verify that 2- N/A 2-RB-13.1B capable of being RB-14A is FUNCTIONAL, or perform ACTIONS Shutdown cycled by local manual b.1, b.2 for fire areas R-2, R-3, R-6, R-8, R-10, HX Disch handwheel operation. and R-11.

Header AOVs With valve 2-RB-13.1B nonfunctional, verify that 2-RB-14B is FUNCTIONAL, or perform ACTIONS listed for fire areas R-1, R-5, R-7, R-9, R-13, R-14, R-16, and R-17.

With valves 2-RB-13.1A and 2-RB-13.1B nonfunctional, verify that valves 2-RB-14A and 2-RB-14B are FUNCTIONAL, or perform ACTIONS listed for all fire areas.

B 2-RB-211A Each Valve must be Verify that RBCCW System can be manually N/A 2-RB-211B capable of being aligned to provide cooling flow from P-11A to SDC RBCCW cycled by local manual HX A, or perform ACTIONS listed for Fire Areas Pump A inlet handwheel operation. R-2, and R-3.

AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.

Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.

MILLSTONE - UNIT 2 TRM 7.1-76 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.20-1 Reactor Building Closed Cooling Water (RBCCW) System FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR FUNCTIONALITY Comp ID Risk Significant Component Not Item Description Component Not Restored in 14 Days Restored in 72 Hours (see ACTION a) (see ACTION d)

C 2-RB-211C Each Valve must be Verify that RBCCW System can be manually N/A 2-RB-211D capable of being aligned to provide cooling flow from P-11A to SDC RBCCW cycled by local manual HX A, or perform ACTIONS listed for Fire Areas Pump B inlet handwheel operation. R-2, and R-3.

AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.

Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.

D 2-RB-211E Each Valve must be Verify that RBCCW System can be manually N/A 2-RB-211F capable of being aligned to provide cooling flow from P-11A to SDC RBCCW cycled by local manual HX A, or perform ACTIONS listed for Fire Areas Pump C inlet handwheel operation. R-2, and R-3.

AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.

Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.

MILLSTONE - UNIT 2 TRM 7.1-77 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.20-1 Reactor Building Closed Cooling Water (RBCCW) System FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR FUNCTIONALITY Comp ID Risk Significant Component Not Item Description Component Not Restored in 14 Days Restored in 72 Hours (see ACTION a) (see ACTION d)

E 2-RB-4.1A Each Valve must be Verify that RBCCW System can be manually N/A 2-RB-4.1B capable of being aligned to provide cooling flow from P-11A to SDC RBCCW HX cycled by local manual HX A, or perform ACTIONS listed for Fire Areas A Outlet handwheel operation. R-2, and R-3.

AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.

Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.

F 2-RB-4.1C Each Valve must be Verify that RBCCW System can be manually N/A 2-RB-4.1D capable of being aligned to provide cooling flow from P-11A to SDC RBCCW HX cycled by local manual HX A, or perform ACTIONS listed for Fire Areas B Outlet handwheel operation. R-2, and R-3.

AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.

Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.

MILLSTONE - UNIT 2 TRM 7.1-78 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.20-1 Reactor Building Closed Cooling Water (RBCCW) System FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR FUNCTIONALITY Comp ID Risk Significant Component Not Item Description Component Not Restored in 14 Days Restored in 72 Hours (see ACTION a) (see ACTION d)

G 2-RB-4.1E Each Valve must be Verify that RBCCW System can be manually N/A 2-RB-4.1F capable of being aligned to provide cooling flow from P-11A to SDC RBCCW HX cycled by local manual HX A, or perform ACTIONS listed for Fire Areas C Outlet handwheel operation. R-2, and R-3.

AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.

Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.

H P11A Each RBCCW Pump With P11A nonfunctional, perform ACTIONS listed With P11B supplying A train, Risk P11B must be FUNCTIONAL for fire areas R-2 and R-3. Mitigation Areas are: R-2 (FHA T-P11C from the control room. 8, T-10), R-3 (FHA T-1A, T-1C), R-RBCCW With P11B nonfunctional, perform ACTIONS listed 16 (FHA I-1A, I-1C).

Pumps for fire area R-11.

With P11B supplying B train, Risk With P11C nonfunctional, perform ACTIONS listed Mitigation Areas are: R-11 (FHA A-for fire areas R-3 and R-14. 28), R-14 (FHA T-7).

MILLSTONE - UNIT 2 TRM 7.1-79 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.20-1 Reactor Building Closed Cooling Water (RBCCW) System FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR FUNCTIONALITY Comp ID Risk Significant Component Not Item Description Component Not Restored in 14 Days Restored in 72 Hours (see ACTION a) (see ACTION d)

I 2-RB-251A Each Valve must be Verify that RBCCW System can be manually N/A 2-RB-251B capable of being aligned to provide cooling flow from P-11A to SDC RBCCW cycled by local manual HX A, or perform ACTIONS listed for Fire Areas Pump Disch. handwheel operation. R-2, and R-3.

Cross-connect AOVs Verify that RBCCW System can be manually aligned to provide cooling flow from P-11A or P-11B to SDC HX A, or perform ACTIONS listed for Fire Areas R-8, R-10, and R-11.

Verify that RBCCW System can be manually aligned to provide cooling flow from P-11B or P-11C to SDC HX B, or perform ACTIONS listed for Fire Areas R-7, R-9, R-13, R-14, R-16, and R-17.

MILLSTONE - UNIT 2 TRM 7.1-79a LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.20-2 Reactor Building Closed Cooling Water (RBCCW) System Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT 2-RB-13.1A Verify that each valve can be manually Once every 48 months.

2-RB-13.1B cycled using is handwheel.

A Shutdown HX Disch Header AOVs 2-RB-211A Verify that each valve can be manually Once every 48 months.

2-RB-211B cycled using is handwheel.

B RBCCW Pump A inlet AOVs 2-RB-211C Verify that each valve can be manually Once every 48 months.

2-RB-211D cycled using is handwheel.

C RBCCW Pump B inlet AOVs 2-RB-211E Verify that each valve can be manually Once every 48 months.

2-RB-211F cycled using is handwheel.

D RBCCW Pump C inlet AOVs 2-RB-4.1A Verify that each valve can be manually Once every 48 months.

2-RB-4.1B cycled using is handwheel.

E RBCCW HX A Outlet AOVs 2-RB-4.1C Verify that each valve can be manually Once every 48 months.

2-RB-4.1D cycled using is handwheel.

F RBCCW HX B Outlet AOVs 2-RB-4.1E Verify that each valve can be manually Once every 48 months.

2-RB-4.1F cycled using is handwheel.

G RBCCW HX C Outlet AOVs P11A In accordance with Technical Specification In accordance with P11B Surveillance Requirement 4.0.5. Technical Specification H P11C RBCCW Surveillance Pumps Requirement 4.0.5 2-RB-251A Verify that each valve can be manually Once every 48 months.

2-RB-251B cycled using is handwheel.

RBCCW Pump I Disch. Cross-connect AOVs MILLSTONE - UNIT 2 TRM 7.1-80 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.7.4.1 Service Water System TECHNICAL REQUIREMENT 7.1.21 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.21-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.21 The capability of equipment listed in TRM Table 7.1.21-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.21-2.

MILLSTONE - UNIT 2 TRM 7.1-81 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.21-1 Service Water System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR FUNCTIONALITY Comp ID Compensatory Measures if Component Risk Significant Component Item Description Not Restored in 14 Days Not Restored in 72 Hours (see ACTION a) (see ACTION d)

P5A & L1A Each Service Water Pump With P5A or its Strainer L1A nonfunctional, With P5B supplying A train, P5C & L1C and its associated Strainer perform ACTIONS b.1, b.2 for fire areas R-2, Risk Mitigation Areas are: R-2 SW Pumps & must be FUNCTIONAL from R-3, R-8, R-10, and R-11. (FHA T-8,T-10), R-3 (FHA T-1A, A Strainers the Control Room. T-1C)

With P5C or its Strainer L1C nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-1, With P5B supplying B train, R-7, R-9, R-13, R-14, R-16 and R-17. Risk Mitigation Areas are: R-11 (FHA A-28) R-14 (FHA T-7) 2-SW-97A 1. Each Valve must be 1. With one or both valve(s) nonfunctional, N/A 2-SW-97B capable of being cycled by perform ACTIONS b.1, b.2 for fire areas R-1, SW Pump local manual handwheel R-3 and R-16.

B Discharge Hdr operation. 2. When 2-SW-97A is open remove the Crossconn. AOVs 2. Valve 2-SW-97A must be instrument air source from 2-SW-97B so it maintained in the closed cannot spuriously open due to a fire or position. perform ACTIONS b.1, b.2 for fire area R-2.

MILLSTONE - UNIT 2 TRM 7.1-82 LBDCR 14-MP2-012 July 29, 2014

ADDITIONAL REQUIREMENTS Table 7.1.21-1 Service Water System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR FUNCTIONALITY Comp ID Compensatory Measures if Component Risk Significant Component Item Description Not Restored in 14 Days Not Restored in 72 Hours (see ACTION a) (see ACTION d) 2-SW-2A Each Valve must be capable With 2-SW-2A nonfunctional, align SW pump N/A 2-SW-2B of being cycled by local P5B to cool Train A, or perform ACTIONS 2-SW-2C manual handwheel b.1, b.2 for fire areas R-3 and R-11.

SW Pump Disch operation. With 2-SW-2B nonfunctional, align SW pump Valve P5A to cool Train A and P5C to cool Train B, C

or perform ACTIONS b.1, b.2 for fire areas R-1, R-3, R-11, and R-16.

With 2-SW-2C nonfunctional, align SW pump P5B to cool Train B, or perform ACTIONS b.1, b.2 for fire areas R-1 and R-16.

2-SW-3.1A Each Valve must be capable With 2-SW-3.1A nonfunctional, perform N/A 2-SW-3.1B of being cycled by local ACTIONS b.1, b.2 for fire area R-1 and R-14.

D RBCCW HX Inlet manual handwheel With 2-SW-3.1B nonfunctional, perform AOVs operation. ACTIONS b.1, b.2 for fire area R-1 and R-2.

MILLSTONE - UNIT 2 TRM 7.1-83 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.21-1 Service Water System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR FUNCTIONALITY Comp ID Compensatory Measures if Component Risk Significant Component Item Description Not Restored in 14 Days Not Restored in 72 Hours (see ACTION a) (see ACTION d) 2-SW-9A Each Valve must be capable With valves 2-SW-9A and 2-SW-9B N/A 2-SW-9B of being closed by local nonfunctional, perform ACTIONS b.1, b.2 for 2-SW-9C manual handwheel fire areas R-2, R-3, R-8, R-10, and R-11.

RBCW HX Outlet operation. With valves 2-SW-9B and 2-SW-9C Valves E nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-1, R-7, R-9, R-13, R-14, R-16, and R-17.

With all valves nonfunctional, perform ACTIONS b.1, b.2 for all fire areas.

2-SW-5A Each Valve must be capable With a valve nonfunctional, perform N/A 2-SW-5B of being closed by local ACTIONS b.1, b.2 for all fire areas except R-F 2-SW-5C manual handwheel 12.

TBCCW HX A, B operation.

& C Inlet Valves 2-SW-12B Valve must be capable of With 2-SW-12B nonfunctional, perform N/A 2-SW-12C being closed by local ACTIONS b.1, b.2 for fire area R-3 and R-14.

G SW Isolation to manual handwheel With 2-SW-12C nonfunctional, perform EDG A and EDG operation. ACTIONS b.1, b.2 for fire area R-2.

B MILLSTONE - UNIT 2 TRM 7.1-84 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.21-1 Service Water System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures TR FUNCTIONALITY Comp ID Compensatory Measures if Component Risk Significant Component Item Description Not Restored in 14 Days Not Restored in 72 Hours (see ACTION a) (see ACTION d) 2-SW-296 Valve must be capable of With 2-SW-296 nonfunctional, perform N/A Fire Water Cross- being cycled by local ACTIONS b.1, b.2 for fire area R-3.

H Tie to A EDG manual handwheel Service Water operation.

Header MILLSTONE - UNIT 2 TRM 7.1-84a LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.21-2 Service Water System Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT P5A & L1A In accordance with Technical Specification In accordance with P5C & L1C Surveillance Requirement 4.0.5. Technical Specification A S.W. Pumps & Surveillance Strainers Requirement 4.0.5.

2-SW-97A Verify that each valve can be manually cycled Once every 48 months.

2-SW-97B using its handwheel.

SW Pump B Discharge Hdr Cross-conn.

AOVs 2-SW-2A Verify that each valve can be manually cycled Once every 48 months.

2-SW-2B using its handwheel.

C 2-SW-2C SW Pump Disch Valves.

2-SW-3.1A Verify that each valve can be manually cycled Once every 48 months.

2-SW-3.1B using its handwheel.

D RBCCW HX Inlet AOVs 2-SW-9A Verify that each valve can be manually cycled Once every 48 months.

2-SW-9B using its handwheel.

E 2-SW-9C RBCW HX Outlet Valves 2-SW-5A Verify that each valve can be manually cycled Once every 48 months.

2-SW-5B using its handwheel.

2-SW-5C F TBCCW HX A, B & C Inlet Valves 2-SW-12B Verify that each valve can be manually cycled Once every 48 months.

2-SW-12C using its handwheel.

G SW Isolation to EDG A and EDG B 2-SW-296 Verify valve can be manually cycled using its Once every 48 months.

H Drain on SW handwheel.

to EDG B MILLSTONE - UNIT 2 TRM 7.1-85 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.8.1.1 Electrical Power Systems AC Sources TECHNICAL REQUIREMENT 7.1.22 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.22-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.22 The capability of equipment listed in TRM Table 7.1.22-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.22-2.

MILLSTONE - UNIT 2 TRM 7.1-86 LBDCR 14-MP2-015 September 24, 2014

ADDITIONAL REQUIREMENTS Table 7.1.22-1 Electrical Power, AC Sources FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component TR FUNCTIONALITY Comp ID Not Restored in 14 Days Item Description (see ACTION a)

A Station The Unit 3 Alternate With the Unit 3 Alternate AC (SBO) Diesel Blackout AC (Station Generator nonfunctional, perform ACTIONS (SBO) Blackout) Diesel b.1, b.2 for fire areas R-1, R-11, and R-16.

Alternate Generator must be AC Diesel capable of powering Gen. Unit 2 Bus 24E.

MILLSTONE - UNIT 2 TRM 7.1-87 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.22-2 Electrical Power, AC Sources TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT A Station 1. Verify availability of Unit 3 1. Once per REFUELING Blackout Alternate AC (SBO) Diesel cycle.

(SBO) Generator.

Alternate AC Diesel Gen. 2. Verify that breakers required to 2. In accordance with the align electric power from Unit 3 breaker surveillance SBO Diesel Generator to Unit 2 frequency established can be manually cycled. by the Preventive Maintenance Program (Refer to TRM Appendix R Bases, item No. 9).

MILLSTONE - UNIT 2 TRM 7.1-88 LBDCR 10-MP2-004 March 30, 2010

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.8.2.1 Onsite AC PWR Distribution TECHNICAL REQUIREMENT 7.1.23 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.23-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.23 The capability of equipment listed in TRM Table 7.1.23-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.23-2.

MILLSTONE - UNIT 2 TRM 7.1-89 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.23-1 Onsite Power - AC Distribution System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component Not TR Comp ID FUNCTIONALITY Description Restored in 14 Days Item (see ACTION a)

A Bus 24C (A3) All 4160 V breakers must be capable of being cycled 1. With any local breaker control nonfunctional, 4160 V using local manual controls. perform ACTIONS b.1, b.2 for fire area R-11; Switchgear and in addition if:

Facility Z1 2. With breaker A302 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-1 and R-9;

3. With breaker A303 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-13;
4. With breaker A304 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-1;
5. With breaker A305 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-1, R-2, R-3, and R-16;
6. With breaker A307 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-13;
7. With breaker A310 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-7, 9, 10, 13, 16 and R-17;
8. With breaker A312 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-1.

MILLSTONE - UNIT 2 TRM 7.1-90 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.23-1 Onsite Power - AC Distribution System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component Not TR Comp ID FUNCTIONALITY Description Restored in 14 Days Item (see ACTION a)

B Bus 24D (A4) All 4160 V breakers must be capable of being cycled 1. With any local breaker control nonfunctional, 4160 V using local manual controls. perform ACTIONS b.1, b.2 for fire area R-1, Switchgear and R-16; and in addition if:

Facility Z2 2. With breaker A401 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-14;

3. With breaker A408 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-14;
4. With breaker A410 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-14;
5. With breaker A405 nonfunctional, perform ACTIONS b.1, b. 2 for fire areas R-7, R-9, R-10, 13, 14, and R-17;
6. With breaker A406 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-13;
7. With breaker A409 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-11;
8. With breaker A411 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-10, and R-14.

C Bus 24E (A5) All 4160 V breakers must be capable of being cycled With any local breaker control nonfunctional, 4160 V using local manual controls. perform ACTIONS b.1, b.2 for fire areas R-1, R-Switchgear 11, and R-16.

Facility Z5 MILLSTONE - UNIT 2 TRM 7.1-91 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.23-1 Onsite Power - AC Distribution System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component Not TR Comp ID FUNCTIONALITY Description Restored in 14 Days Item (see ACTION a)

D Bus 24A (A1) 4160 V feeder breakers A102, A103, and A104 must be 1. With breaker A102 local control nonfunctional, 4160 V capable of being cycled using local manual controls. perform ACTIONS b.1, b.2 for fire area R-1.

Switchgear 2. With breaker A103 local control nonfunctional, Facility 1 perform ACTIONS b.1, b.2 for fire areas R-3 and R-13.

3. With breaker A104 local control nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-11 and R-13.

E Bus 24B (A2) 4160 V feeder breakers A204, A205, and A206 must be 1. With breaker A204 local control nonfunctional, 4160 V capable of being cycled using local manual controls. perform ACTIONS b.1, b.2 for fire area R-13.

Switchgear 2. With breaker A205 local control nonfunctional, Facility 2 perform ACTIONS b.1, b.2 for fire areas R-11 and R-13.

3. With breaker A206 local control nonfunctional, perform ACTIONS b.1, b.2 for fire area R-1.

F Bus 22A (B01) MCC feeder breaker B0105 must be capable of being With breaker B0105 nonfunctional, perform 480 V load center tripped using local manual controls. ACTIONS b.1, b.2 for fire areas R-2, R-3 and R-16.

G Bus 22B (B02) MCC feeder breaker B0205 must be capable of being With breaker B0205 nonfunctional, perform 480 V load center tripped using local manual controls. ACTIONS b.1, b.2 for fire areas R-2, R-3 and R-16.

MILLSTONE - UNIT 2 TRM 7.1-92 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.23-1 Onsite Power - AC Distribution System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component Not TR Comp ID FUNCTIONALITY Description Restored in 14 Days Item (see ACTION a)

H Bus 22E (B05) Breakers B0504 and B0505 must be capable of being With any one of these breakers nonfunctional, 480 V Switchgear cycled using local manual controls. perform ACTIONS b.1, b.2 for fire area R-11.

Facility Z1 I Bus 22F (B06) Breakers B0603, B0605, B0606, B0608, B0609, and With any one of these breakers nonfunctional, 480 V Switchgear B0611 must be capable of being cycled using local perform ACTIONS b.1, b.2 for fire areas R-1 and Facility Z2 manual controls. R-16.

J MCC B51 (MCC- Breakers B5105, B5110, B5111, B5112, B5118, B5119, 1. With breaker B5105 nonfunctional perform 22- 1E) and B5145 must be capable of being cycled using local ACTIONS b.1, b.2 fire areas R-2 and R-4.

manual controls. 2. With breaker B5110, B5111, or B5112 nonfunctional perform ACTIONS b.1, b.2 fire area R-15.

3. With breaker B5118, or B5119 nonfunctional perform ACTIONS b.1, b.2 fire area R-2.
4. With breaker B5145 nonfunctional perform ACTIONS b.1, b.2 fire area R-4.

K MCC B52 (MCC- Breaker B5222 must be capable of being cycled using With breaker B5222 nonfunctional perform 22- 2E) local manual controls. ACTIONS b.1, b.2 fire areas R-2,R-3, and R-16.

MILLSTONE - UNIT 2 TRM 7.1-93 LBDCR 12-MP2-002 May 31, 2012

ADDITIONAL REQUIREMENTS Table 7.1.23-1 Onsite Power - AC Distribution System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component Not TR Comp ID FUNCTIONALITY Description Restored in 14 Days Item (see ACTION a)

L MCC B61 (MCC- Breakers B6105, B6109, B6110, and B6119 must be 1. With breaker B6105 nonfunctional, perform 22- 1F) capable of being cycled using local manual controls. ACTIONS b.1, b.2 for fire area R-4.

2. With breaker B6109, B6110 or B6119 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-15 and R-17.

M MCC B62 (MCC- Breakers B6203 and B6226 must be capable of being 1. With breaker B6203 nonfunctional, perform 22- 2F) cycled using local manual controls. ACTIONS b.1, b.2 for fire area R-13.

2. With breaker B6226 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-2, R-3 and R-16.

N VA 20 120VAC All 120 VAC breakers must be capable of being cycled 1. With any local breaker control nonfunctional, Instrument Panel using local manual operation. perform ACTIONS b.1, b.2 for fire area R-1, VIAC-2 and if

2. Breaker VA2004 is nonfunctional, perform LCO 3.7.13.23 ACTION Statement for fire area R-2.

MILLSTONE - UNIT 2 TRM 7.1-94 LBDCR 10-MP2-004 March 30, 2010

ADDITIONAL REQUIREMENTS Table 7.1.23-1 Onsite Power - AC Distribution System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Component Not TR Comp ID FUNCTIONALITY Description Restored in 14 Days Item (see ACTION a)

R Emergency All ELUs must be capable of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of With any ELUs nonfunctional, replace defective Lighting Units illumination. ELUs with battery powered lanterns, and verify (ELUs) proper placement on a daily basis.

MILLSTONE - UNIT 2 TRM 7.1-95 LBDCR 09-MP2-027 January 7, 2010

ADDITIONAL REQUIREMENTS Table 7.1.23-2 Onsite Power - AC Distribution System Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT A Bus 24C (A3) Verify that each breaker can be In accordance with the breaker 4160 V manually cycled. surveillance frequency established by Switchgear the Preventive Maintenance Program Facility Z1 (Refer to TRM Appendix R Bases, item No. 9).

B Bus 24D (A4) Verify that each breaker can be In accordance with the breaker 4160 V manually cycled. surveillance frequency established by Switchgear the Preventive Maintenance Program Facility Z2 (Refer to TRM Appendix R Bases, item No. 9).

C Bus 24E (A5) Verify that each breaker can be In accordance with the breaker 4160 V manually cycled. surveillance frequency established by Switchgear the Preventive Maintenance Program Facility Z5 (Refer to TRM Appendix R Bases, item No. 9).

D Bus 24A (A1) Verify that breakers A102, A103, In accordance with the breaker 4160 V and A104 can be manually cycled. surveillance frequency established by Switchgear the Preventive Maintenance Program Facility 1 (Refer to TRM Appendix R Bases, item No. 9).

E Bus 24B (A2) Verify that breakers A204, A205, In accordance with the breaker 4160 V and A206 can be manually cycled. surveillance frequency established by Switchgear the Preventive Maintenance Program Facility 2 (Refer to TRM Appendix R Bases, item No. 9).

F Bus 22A Verify that breaker B0105 can be In accordance with the breaker (B01) 480 V manually cycled. surveillance frequency established by load center the Preventive Maintenance Program (Refer to TRM Appendix R Bases, item No. 9).

G Bus 22B Verify that breaker B0205 can be In accordance with the breaker (B02) 480 V manually cycled. surveillance frequency established by load center the Preventive Maintenance Program (Refer to TRM Appendix R Bases, item No. 9).

H Bus 22E Verify that breakers B0504 and In accordance with the breaker (B05) 480 V B0505 can be manually cycled. surveillance frequency established by Switchgear the Preventive Maintenance Program Facility Z1 (Refer to TRM Appendix R Bases, item No. 9).

MILLSTONE - UNIT 2 TRM 7.1-96 LBDCR 12-MP2-002 May 31, 2012

ADDITIONAL REQUIREMENTS Table 7.1.23-2 Onsite Power - AC Distribution System Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT I Bus 22F Verify that breakers B0603, In accordance with the breaker (B06) 480 V B0605, B0606, B0608, B0609, surveillance frequency established by Switchgear and B0611 can be manually the Preventive Maintenance Program Facility Z2 cycled. (Refer to TRM Appendix R Bases, item No. 9).

J MCC B51 Verify that Breakers B5105, In accordance with the breaker (MCC-22-1E) B5110, B5111, B5112, B5118, surveillance frequency established by B5119, and B5145 can be the Preventive Maintenance Program manually cycled. (Refer to TRM Appendix R Bases, item No. 9).

K MCC B52 Verify that breakers that supply In accordance with the breaker (MCC-22-2E) Appendix R loads are capable of surveillance frequency established by being manually cycled. the Preventive Maintenance Program (Refer to TRM Appendix R Bases, item No. 9).

L MCC B61 Verify that breakers B6105, In accordance with the breaker (MCC-22-1F) B6109, B6110, and B6119 can be surveillance frequency established by manually cycled. the Preventive Maintenance Program (Refer to TRM Appendix R Bases, item No. 9).

M MCC B62 Verify that breakers that supply In accordance with the breaker (MCC-22-2F) Appendix R loads are capable of surveillance frequency established by being manually cycled. the Preventive Maintenance Program (Refer to TRM Appendix R Bases, item No. 9).

N VA 20 Verify that breakers are capable of In accordance with the breaker 120VAC being manually cycled. surveillance frequency established by Instrument the Preventive Maintenance Program Panel VIAC-2 (Refer to TRM Appendix R Bases, item No. 9).

R Emergency Verify capability of ELUs to In accordance with the Emergency Lighting Units provide at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of Lighting Unit (ELU) surveillance (ELUs) operation. frequency established by the Preventive Maintenance Program.

MILLSTONE - UNIT 2 TRM 7.1-97 LBDCR 12-MP2-002 May 31, 2012

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.8.2.3 DC Power Distribution TECHNICAL REQUIREMENT 7.1.24 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.24-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.24 The capability of equipment listed in TRM Table 7.1.24-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.24-2.

MILLSTONE - UNIT 2 TRM 7.1-98 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.24-1 Electric Power - D.C. Distribution Components FUNCTIONALITY Requirements and Compensatory Measures TR Compensatory Measures if Component Not Comp ID FUNCTIONALITY Description Item Restored in 14 Days (see ACTION a)

B D01 BUS 201A 125 Breakers D0103, D0104, D0105, 1. With breaker D0103 nonfunctional, perform ACTIONS b.1, b.2 for VDC Switchgear D0108, and D0111 must be capable fire area R-1.

of being cycled using local manual

2. With breaker D0104 or D0111 nonfunctional, perform ACTIONS operation. b.1, b.2 for fire areas R- 3, R-8 and R-11.
3. With breaker D0105 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-3, R-13, R-14 and R-17.
4. With breaker D0108 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-15.

C D02 BUS 201B 125 All breakers on this panel must be 1. With any breaker nonfunctional, perform ACTIONS b.1, b.2 for VDC Switchgear capable of being cycled using local fire area R-1.

manual operation.

2. With breaker D0204 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-3, R-8 and R-11.
3. With breaker D0205 nonfunctional, perform ACTIONS b.1, b.2 for fire area R-15.
4. With breaker D0208 nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-2 and R-8.

MILLSTONE - UNIT 2 TRM 7.1-99 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.24-1 Electric Power - D.C. Distribution Components FUNCTIONALITY Requirements and Compensatory Measures TR Compensatory Measures if Component Not Comp ID FUNCTIONALITY Description Item Restored in 14 Days (see ACTION a)

D DV10 Panel 201A-1V All 125 VDC breakers on Panel DV10 1. With any breaker nonfunctional perform ACTIONS b.1, b.2 for fire 125 VDC Vital must be capable of being cycled area R-15, and in addition if:

Instrument Panel. using local manual operation. 2. Breakers DV1011, DV1015, DV1017, or DV1020 are nonfunctional perform ACTIONS b.1, b.2 for fire area R-17;

3. Breaker DV1008 is nonfunctional perform ACTIONS b.1, b.2 for fire area R-3;
4. Breaker DV1013 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-4 and R-17;
5. Breaker DV1014 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-2, 4, 5, 6, 8, 10, 11 and R-17;
6. Breaker DV1018 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-2, 3, 11, 13 and R-14;
7. Breaker DV1019 is nonfunctional perform ACTIONS b.1, b.2 for fire area R-13;
8. Breaker DV1008 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-3, 13 and R-14.

MILLSTONE - UNIT 2 TRM 7.1-100 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.24-1 Electric Power - D.C. Distribution Components FUNCTIONALITY Requirements and Compensatory Measures TR Compensatory Measures if Component Not Comp ID FUNCTIONALITY Description Item Restored in 14 Days (see ACTION a)

E DV20 Panel 201B-1V All 125 VDC breakers on Panel DV20 1. With any breaker nonfunctional perform ACTIONS b.1, b.2 for fire 125 VDC Vital must be capable of being cycled areas R-1 and R-15, and in addition if:

Instrument Panel. using local manual operation. 2. Breaker DV2014 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-4, 5, 6, 7, 9, 13, 14, 16 and R-17;

3. Breaker DV2015 is nonfunctional perform ACTIONS b.1, b.2 for fire area R-8;
4. Breaker DV2018 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-3, 11 and R- 14;
5. Breaker DV2020 is nonfunctional perform ACTIONS b.1, b.2 for fire area R-8;
6. Breaker DV2021 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-13 and R- 14.

F D11 Panel 201A-1 All 125 VDC breakers on Panel 1. With any breaker nonfunctional perform ACTIONS b.1, b.2 for fire 125 VDC Distribution D11must be capable of being cycled area R-15, and in addition if:

using local manual operation. 2. Breaker D1104 is nonfunctional perform ACTIONS b.1, b.2 for fire area R-11.

G D12 Panel 201A-2 All 125 VDC breakers on Panel D12 With any local breaker control nonfunctional perform ACTIONS b.1, 125 VDC Distribution must be capable of being cycled b.2 for fire area R-15.

using local manual operation.

MILLSTONE - UNIT 2 TRM 7.1-101 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.24-1 Electric Power - D.C. Distribution Components FUNCTIONALITY Requirements and Compensatory Measures TR Compensatory Measures if Component Not Comp ID FUNCTIONALITY Description Item Restored in 14 Days (see ACTION a)

H D21 Panel 201B-1 All 125 VDC breakers on Panel D21 1. With any breaker nonfunctional perform ACTIONS b.1, b.2 for fire 125 VDC Distribution must be capable of being cycled area R-15, and in addition if:

using local manual operation. 2. Breaker D2104 is nonfunctional perform ACTIONS b.1, b.2 for fire areas R-3 and R-11.

I D22 Panel 201B-2 All 125 VDC breakers on Panel D22 1. With any breaker nonfunctional perform ACTIONS b.1, b.2 for fire 125 VDC Distribution must be capable of being cycled area R-15, and in addition if:

using local manual operation. 2. Breaker D2216 is nonfunctional perform ACTIONS b.1, b.2 for fire area R-2.

MILLSTONE - UNIT 2 TRM 7.1-102 LBDCR 10-MP2-009 May 27, 2010

ADDITIONAL REQUIREMENTS Table 7.1.24-2 Electric Power - D.C. Distribution Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT B D01 BUS Verify that breakers D0103, In accordance with the breaker 201A 125 D0104, D0105, D0108, and surveillance frequency established by the VDC D0111 can be manually cycled. Preventive Maintenance Program (Refer Switchgear to TRM Appendix R Bases, item No. 9).

C D02 BUS Verify that breakers D0204, In accordance with the breaker 201B 125 D0205, and D0208 and D0211 surveillance frequency established by the VDC can be manually cycled. Preventive Maintenance Program (Refer Switchgear to TRM Appendix R Bases, item No. 9).

D DV10 Panel Verify that all breakers on Panel In accordance with the breaker 201A-1V DV10 can be manually cycled. surveillance frequency established by the 125 VDC Preventive Maintenance Program (Refer Vital to TRM Appendix R Bases, item No. 9).

Instrument Panel.

E DV20 Panel Verify that all breakers on Panel In accordance with the breaker 201B-1V DV20 can be manually cycled. surveillance frequency established by the 125 VDC Preventive Maintenance Program (Refer Vital to TRM Appendix R Bases, item No. 9).

Instrument Panel.

F D11 Panel Verify that all breakers on Panel In accordance with the breaker 201A-1 125 D11 can be manually cycled. surveillance frequency established by the VDC Preventive Maintenance Program (Refer Distribution to TRM Appendix R Bases, item No. 9).

G D12 Panel Verify that all breakers on Panel In accordance with the breaker 201A-2 125 D12 can be manually cycled. surveillance frequency established by the VDC Preventive Maintenance Program (Refer Distribution to TRM Appendix R Bases, item No. 9).

H D21 Panel Verify that all breakers on Panel In accordance with the breaker 201B-1 125 D21 can be manually cycled. surveillance frequency established by the VDC Preventive Maintenance Program (Refer Distribution to TRM Appendix R Bases, item No. 9).

I D22 Panel Verify that all breakers on Panel In accordance with the breaker 201B-2 125 D22 can be manually cycled. surveillance frequency established by the VDC Preventive Maintenance Program (Refer Distribution to TRM Appendix R Bases, item No. 9).

MILLSTONE - UNIT 2 TRM 7.1-103 LBDCR 10-MP2-004 March 30, 2010

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: None TECHNICAL REQUIREMENT 7.1.25 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.25-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.25 The capability of equipment listed in TRM Table 7.1.25-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.25-2.

MILLSTONE - UNIT 2 TRM 7.1-104 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.25-1 Fire Protection Miscellaneous System Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Risk Significant Component Not TR Component Not Restored in Item Comp ID FUNCTIONALITY Description 14 Days Restored in 72 Hours (see Action d)

(see ACTION a)

A 2-FIRE-258 1. Valve 2-FIRE-258 must be With any valve nonfunctional, N/A 2-FIRE-259 capable of being opened, and; perform ACTIONS b.1, b.2 for fire 2-FIRE-559 area R-3. Evaluation for continued

2. Valves 2-FIRE-259, 2-FIRE-2-FIRE-560 operation.

559, and 2-FIRE-560 must be Fire Prot. capable of being closed, by Cross-tie to local manual handwheel EDG SW operation.

Cooling B Fire Refer to the following TRs: 3.7.9.1 As specified in the ACTION N/A Suppression Fire Suppression Water 3.7.9.2 Statements for the following:

Systems Spray/Sprinkler Systems 3.7.9.3 TR 3.7.9.1 Fire Hose Stations 3.7.9.4 Halon TR 3.7.9.2 System TR 3.7.9.3 TR 3.7.9.4 C 2-FIRE-34 Valve 2-FIRE-34 must be capable N/A With 2-FIRE-34 nonfunctional, Risk Cross-tie to of being opened. Mitigation Areas are: R-1 (FHA A-1A, AFW suction A-1B, A-1G, A-12A and A-24), R-3 (FHA T-1A), R-11 (FHA A-28 and R-16 (FHA I-1A and I-1B)

MILLSTONE - UNIT 2 TRM 7.1-105 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS Table 7.1.25-2 Fire Protection Miscellaneous System Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT A 2-FIRE-258 Verify that each valve can be Once every 48 months.

2-FIRE-259 manually cycled by local manual 2-FIRE-559 handwheel operation.

2-FIRE-560 Fire Prot.

Crosstie to EDG SW Cooling B Fire Refer to the following TSRs: As specified in the TSRs for the Suppression 4.7.9.1 Fire Suppression Water following:

Systems 4.7.9.2 Spray/Sprinkler Systems 4.7.9.1 Fire Suppression Water 4.7.9.3 Fire Hose Stations 4.7.9.2 Spray/Sprinkler Systems 4.7.9.4 Halon System 4.7.9.3 Fire Hose Stations 4.7.9.4 Halon System C 2-FIRE-34 N/A N/A Cross-tie to AFW suction MILLSTONE - UNIT 2 TRM 7.1-106 LBDCR 13-MP2-009 November 26, 2013

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: None TECHNICAL REQUIREMENT 7.1.26 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.26-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.26 The capability of equipment listed in TRM Table 7.1.26-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements shall be verified per the TECHNICAL SURVEILLANCE REQUIREMENTS of TRM Table 7.1.26-2.

MILLSTONE - UNIT 2 TRM 7.1-107 LBDCR 07-MP2-010 October 5, 2009

ADDITIONAL REQUIREMENTS Table 7.1.26-1 Support Equipment, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Compensatory Measures for TR FUNCTIONALITY Comp ID Component Not Restored in 14 Days Components Requiring Prompt Item Description (see ACTION a) Action (see ACTION f)

A Hand-held Radios 1. At least eight (8) hand-held 1. With less than 8 hand-held radios N/A radios must be FUNCTIONAL, replace or restore FUNCTIONAL. Three (3) in radios to FUNCTIONALITY within 7 the Control Room, and five days or perform ACTIONS b.1, b.2 (5) in the Fire Shutdown for all fire areas EXCEPT R-12.

Storage Box. 2. With Remote Desktop Controller

2. Communications from nonfunctional, perform ACTIONS manual action locations to b.1, b.2 for all fire areas EXCEPT R-Control Room base station 3, R-11, R-12, and R-16.

(using Remote Desktop 3. With dedicated portable radio Controller and hand-held nonfunctional, perform ACTIONS radios) must be b.1, b.2 for fire areas R-3, R-11, and FUNCTIONAL. R-16.

Note: If Main Radio Control Station located in MPS1 4. If the primary repeater is Control Room is nonfunctional, verify that the nonfunctional than Remote Secondary Repeater is Desktop Controller in MPS2 FUNCTIONAL, or perform Control Room will also be ACTIONS b.1, b.2 for all fire areas.

nonfunctional. 5. If the Secondary repeater is

3. Communications from nonfunctional, verify that the Primary manual action locations to Repeater is FUNCTIONAL, and dedicated Control Room perform ACTIONS b.1, b.2 for fire portable radio unit (with area R-3.

hardwired external 6. If neither repeater is FUNCTIONAL, antenna) must be immediately attempt to restore one FUNCTIONAL. repeater to operation, and perform

4. Primary or Secondary (800 ACTIONS b.1, b.2 for all fire areas.

MHz) Repeaters must be FUNCTIONAL.

MILLSTONE - UNIT 2 TRM 7.1-108 LBDCR 19-MP2-001 September 13, 2019

ADDITIONAL REQUIREMENTS Table 7.1.26-1 Support Equipment, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Compensatory Measures for TR FUNCTIONALITY Comp ID Component Not Restored in 14 Days Components Requiring Prompt Item Description (see ACTION a) Action (see ACTION f)

B HOT SHUTDOWN All items on inventory must be With any inventory item missing, N/A (HSD) Storage Box available to support COLD perform ACTIONS b.1, b.2 for fire area Inventory SHUTDOWN for fire area R-2. R- 2.

Refer to applicable station procedure for inventory.

C Fire Shutdown (FSD) All items on inventory must be With any inventory item missing, N/A Storage Box Inventory available to support COLD perform ACTIONS b.1, b.2 for fire SHUTDOWN for fire area(s) area(s) where required.

where required. Refer to applicable station procedure for inventory.

D COLD SHUTDOWN All materials required to With any inventory item missing or non- Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of any inventory Repair Material support COLD SHUTDOWN functional perform ACTION b.1 for fire item identified as missing or non-repairs must be available in areas where item is required. This functional, perform ACTION b.2 the Unit 2 Appendix R storage ACTION is in addition to the Prompt for fire area where item is area. Repair Material shall not ACTION b.2 taken. required. See applicable station be utilized as plant spare procedure for fire area See applicable station procedure for material. Refer to applicable identification. Note: Some items fire area identification. Note: Some station procedure for materials are shared with Unit 3. Notify the items are shared with Unit 3. Notify the required. Shift Manager of any impacts.

Shift Manager of any impacts.

MILLSTONE - UNIT 2 TRM 7.1-109 LBDCR 14-MP2-005 March 18, 2014

ADDITIONAL REQUIREMENTS Table 7.1.26-1 Support Equipment, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Compensatory Measures for TR FUNCTIONALITY Comp ID Component Not Restored in 14 Days Components Requiring Prompt Item Description (see ACTION a) Action (see ACTION f)

E F156A, F156B, F156C, 1. A minimum of two fans shall 1. With less than 2 fans FUNCTIONAL, N/A F156D Portable Fans be FUNCTIONAL and or the dedicated power supply stored in designated (REC-1,2 and 3) in the East (Z1) DC cabinets in the corridor, el. Switchgear Room nonfunctional, 14-6 adjacent to the perform ACTIONS b.1, b.2 for fire Turbine Bldg entrance. area R-3.

2. Power shall be available at 2. With less than 2 fans FUNCTIONAL, the dedicated 480V outlets or the dedicated power supply in both DC Switchgear (REC-7, 8, and 9) in the West (Z2)

Rooms. DC Switchgear Room nonfunctional, perform ACTIONS b.1, b.2 for fire areas R-1 and R-16.

F F157A, F157B, F157C, 1. A minimum of two fans shall 1. With less than 2 fans FUNCTIONAL, N/A F157D Portable Fans be FUNCTIONAL, and or the dedicated power supply stored in designated (REC-4, 5, and 6) in the West (Z1) cabinet on the platform 480V Switchgear Room (El.46-10) in the West nonfunctional, perform ACTIONS 480V Switchgear Room. b.1, b.2 for fire areas R-2 and R-3.

2. Power shall be available at 2. With less than 2 fans FUNCTIONAL, the dedicated 480V outlets or the dedicated power supply in both 480V Switchgear (REC-10, 11, and 12) in the East Rooms. (Z2) 480V Switchgear Room nonfunctional, perform ACTIONS b.1, b.2 for fire area R-1.

MILLSTONE - UNIT 2 TRM 7.1-110 LBDCR 14-MP2-005 March 18, 2014

ADDITIONAL REQUIREMENTS Table 7.1.26-1 Support Equipment, Appendix R Components FUNCTIONALITY Requirements and Compensatory Measures Compensatory Measures if Compensatory Measures for TR FUNCTIONALITY Comp ID Component Not Restored in 14 Days Components Requiring Prompt Item Description (see ACTION a) Action (see ACTION f)

G Compressed air bottle A minimum of one With all three compressed air bottles N/A 3A and valves 2-IA-601, compressed air bottle shall be nonfunctional, 598, 600, 891, 910, FUNCTIONAL (1000 psig 1. Perform ACTIONS b.1, b.2 for fire 566, and 2- IA-599 min.) and capable of alignment area R-1, AND (regulator). to 2-CH-517, 2-CH-518, and Compressed air bottle 2-CH-519 using indicated 2. Verify that 2-CH-517, 2-CH-518, and 3B and valves 2-IA-603, valving. 2-CH-519 can be cycled by manual 590, 595, 566 and 2-IA- operation or perform ACTIONS b.1, 591 (regulator). b.2 for ALL remaining fire areas.

Compressed air bottle 3C and valves 2-IA-885, 887, 889, 910, 566, and 2-IA-886 (regulator).

MILLSTONE - UNIT 2 TRM 7.1-111 LBDCR 14-MP2-005 March 18, 2014

ADDITIONAL REQUIREMENTS Table 7.1.26-2 Support Equipment, Appendix R Components TECHNICAL SURVEILLANCE REQUIREMENTS TSR TECHNICAL SURVEILLANCE Comp ID Frequency Item REQUIREMENT A Hand-held Radios 1. Verify FUNCTIONALITY of the Once per portable radios from all remote REFUELING cycle shutdown areas.

2. Verify FUNCTIONALITY of both Control Room base stations and repeaters.

B HOT SHUTDOWN (HSD) Verify all items are available to support Once per Storage Box Inventory COLD SHUTDOWN. REFUELING cycle C Fire Shutdown (FSD) Verify all items are available to support Once per Storage Box Inventory COLD SHUTDOWN. REFUELING cycle D COLD SHUTDOWN Verify all materials available in the Unit Once per Repair Material 2 Appendix R Storage Area to support REFUELING cycle COLD SHUTDOWN.

E F156A, F156B, F156C, Verify each fan can be powered from Once per F156D Portable Appendix the outlets in both DC Switchgear REFUELING cycle R fans Rooms, and fans are stored in their designated location.

F F157A, F157B, F157C, Verify each fan can be powered from Once per F157D Portable Appendix the outlets in both 480 V Switchgear REFUELING cycle R fans Rooms, and fans are stored in their designated location.

G Compressed air bottle 3A 1. Verify each required instrument air Once per and valves 2-IA-601, 598, valve and regulator can be manually REFUELING cycle 600, 891, 910, 566, and 2- opened.

IA-599 (regulator). 2. Verify each compressed air bottle is Compressed air bottle 3B FUNCTIONAL.

and valves 2-IA-603, 590, 595, 566, and 2-IA-591 (regulator).

Compressed air bottle 3C and valves 2-IA-885, 887, 889, 910, 566, and 2-IA-886 (regulator).

MILLSTONE - UNIT 2 TRM 7.1-112 LBDCR 14-MP2-005 March 18, 2014

ADDITIONAL REQUIREMENTS 7.1 APPENDIX R SAFE SHUTDOWN REQUIREMENTS REFERENCE TECHNICAL SPECIFICATION: 3.8.1.1 - A. C. Sources Operating TECHNICAL REQUIREMENT 7.1.27 The Appendix R Safe Shutdown Related (ARSR) equipment listed in the TRM Table 7.1.27-1 shall be FUNCTIONAL.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With an ARSR component listed in the above referenced component table nonfunctional (unable to meet its intended Appendix R shutdown function), take the ACTION as specified in the above table under Compensatory Measures.

TECHNICAL SURVEILLANCE REQUIREMENTS 7.1.27 The capability of equipment listed in TRM Table 7.1.27-1 to meet its Appendix R shutdown related FUNCTIONALITY requirements are verified per the SURVEILLANCE REQUIREMENTS of TS 4.8.1.1.2.a & b.

MILLSTONE - UNIT 2 TRM 7.1-113 LBDCR 14-MP2-005 March 18, 2014

ADDITIONAL REQUIREMENTS Table 7.1.27-1 Plant System - Emergency Diesel Generators FUNCTIONALITY Requirements and Compensatory Measures Risk Significant Component TR FUNCTIONALITY Component Not Restored in 14 Days Comp ID Not Restored in 72 Hours Item Description (see ACTION a) (see ACTION d)

H7A (includes The A Emergency Diesel (Tech Spec Limiting) With A EDG nonfunctional, F38A, A312, 2- Generator must be capable Risk Mitigation Areas are: R-1 SW-89A, 2-SW- of powering Bus 24C (FHA A-12A, A-14B, A-14D, A-A 231A) 17, A-24) R-2 (FHA A-13, T-8, T-10) R-3 (FHA T-1A, T-1C, T-1F) R-10 (FHA A-21) R16 (FHA I-1A)

H7B (includes The B Emergency Diesel (Tech Spec Limiting) With B EDG nonfunctional, F38B, A401, 2- Generator must be capable Risk Mitigation Areas are: R-1 SW-89B, 2-SW- of powering Bus 24D (FHA A-12A, A-14B, A-14D, A-B 231B) 24) R-3 (FHA T-1A) R-7 (FHA A-15, A-31) R-9 (FHA A-20) R-14 (FHA T-7, T-9) R16 (FHA I-1A) R-17 (FHA A-15)

MILLSTONE - UNIT 2 TRM 7.1-114 LBDCR 14-MP2-005 March 18, 2014

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27

1. CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT for Millstone 2 has been prepared in accordance with the requirements of Technical Specification 6.9.1.8 a through 6.9.1.8 d.

The Technical Specifications affected by this report are listed below:

Section Specification 2.1 3/4.1.1.1 SHUTDOWN MARGIN - (SDM) 2.2 Deleted (Ref. License Amendment 280) 2.3 3/4.1.1.4 Moderator Temperature Coefficient (MTC) 2.4 3/4.1.3.6 Regulating CEA Insertion Limits 2.5 3/4.2.1 Linear Heat Rate 2.6 3/4.2.3 TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR -- FrT 2.7 3/4.2.6 DNB Margin Terms appearing in capitalized type are DEFINED TERMS as defined in Section 1.0 of the Technical Specifications.

2. OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Section 3.

2.1 SHUTDOWN MARGIN - (SDM) (Specification 3/4.1.1.1)

The SHUTDOWN MARGIN shall be 3.6% K/K 2.2 Deleted 2.3 Moderator Temperature Coefficient (Specification 3/4.1.1.4)

The moderator temperature coefficient shall be:

a. Less positive than 0.7x10-4 K/K/°F whenever THERMAL POWER is 70% of RATED THERMAL POWER,
b. Less positive than 0.4x10-4 K/K/°F whenever THERMAL POWER is > 70%

of RATED THERMAL POWER,

c. Less negative than -3.0x10-4 K/K/°F at RATED THERMAL POWER.

MILLSTONE - UNIT 2 TRM 8.1-1 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 2.4 Regulating CEA Insertion Limits (Technical Specification 3/4.1.3.6)

The regulating CEA groups shall be limited to the withdrawal sequence and to the insertion limits shown in Figure 2.4-1. CEA insertion between the Long Term Steady State Insertion Limits and the Transient Insertion Limits is restricted to:

a. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> interval,
b. 5 Effective Full Power Days per 30 Effective Full Power Day interval, and
c. 14 Effective Full Power Days per 365 Effective Full Power Day interval.

2.5 Linear Heat Rate (Technical Specification 3/4.2.1)

The linear heat rate, including heat generated in the fuel, clad and moderator, shall not exceed:

a. 15.1 kw/ft whenever the reactor coolant flow rate (determined per Technical Specification 3/4.2.1) is 360,000 gpm.
b. 15.0 kw/ft whenever the reactor coolant flow rate (determined per Technical Specification 3/4.2.1) is < 360,000 gpm and 354,600 gpm.
c. 14.9 kw/ft whenever the reactor coolant flow rate (determined per Technical Specification 3/4.2.1) is < 354,600 gpm and 349,200 gpm.

During operation with the linear heat rate being monitored by the Excore Detector Monitoring System, the AXIAL SHAPE INDEX shall remain within the limits of Figure 2.5-1.

During operation with the linear heat rate being monitored by the Incore Detector Monitor System, the alarm setpoints shall be adjusted to less than or equal to the limit when the following factors are appropriately included in the setting of the alarms:

1. A measurement-calculational uncertainty factor of 1.07,
2. An engineering uncertainty factor of 1.03, and
3. A THERMAL POWER measurement uncertainty factor of 1.02.

MILLSTONE - UNIT 2 TRM 8.1-2 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 2.6 TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR -- FrT (Technical Specification 3/4.2.3)

The calculated value of FrT at RATED THERMAL POWER shall be:

1.690 whenever the reactor coolant flow rate is 360,000 gpm.

1.664 whenever the reactor coolant flow rate is < 360,000 gpm and 354,600 gpm.

1.639 whenever the reactor coolant flow rate is < 354,600 gpm and 349,200 gpm.

2.6.1 The Power Dependent FrT limits, whenever the reactor coolant flow rate is 360,000 gpm, are shown in Figure 2.6-1.

2.6.2 The Power Dependent FrT limits, whenever the reactor coolant flow rate is < 360,000 gpm and 354,600 gpm, are shown in Figure 2.6-2.

2.6.3 The Power Dependent FrT limits, whenever the reactor coolant flow rate is < 354,600 gpm and 349,200 gpm, are shown in Figure 2.6-3.

2.7 DNB Margin (Technical Specification 3/4.2.6)

The DNB margin shall be preserved by maintaining the cold leg temperature, pressurizer pressure, reactor coolant flow rate, and AXIAL SHAPE INDEX within the following limits:

Parameter Limits Four Reactor Coolant Pumps Operations

a. Cold Leg Temperature 549°F
b. Pressurizer Pressure > 2225 psia*
c. Reactor Coolant Flow Rate 360,000 gpm with Linear Heat Rate and F T limits as r

specified in Sections 2.5 and 2.6.

or 354,600 gpm with Linear Heat Rate and FrT limit reductions as specified in Sections 2.5 and 2.6.

or 349,200 gpm with Linear Heat Rate and FrT limit reductions as specified in Sections 2.5 and 2.6.

d. AXIAL SHAPE INDEX Figure 2.7-1
  • Limit not applicable during either the THERMAL POWER ramp increase in excess of 5% of RATED THERMAL POWER per minute or a THERMAL POWER step increase of greater than 10% of RATED THERMAL POWER.

MILLSTONE - UNIT 2 TRM 8.1-3 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27

3. ANALYTICAL METHODS The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:

3.1 EMF-96-029(P)(A) Volumes 1 and 2, Reactor Analysis System for PWRs Volume 1 - Methodology Description, Volume 2 - Benchmarking Results, Siemens Power Corporation, January 1997.

Methodology for:

TS 3.1.1.1 - Shutdown Margin - (SDM)

TS 3.1.1.4 - Moderator Temperature Coefficient (MTC)

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.2 ANF-84-73 Revision 5 Appendix B(P)(A), Advanced Nuclear Fuels Methodology for Pressurized Water Reactors: Analysis of Chapter 15 Events, Advanced Nuclear Fuels, July 1990.

Methodology for:

TS 3.1.1.1 - Shutdown Margin - (SDM)

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.3 XN-NF-82-21(P)(A) Revision 1, Application of Exxon Nuclear Company PWR Thermal Margin Methodology to Mixed Core Configurations, Exxon Nuclear Company, September 1983.

Methodology for:

TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.4 XN-75-32(P)(A) Supplements 1 through 4, Computational Procedure for Evaluating Fuel Rod Bowing, Exxon Nuclear Company, October 1983.

Methodology for:

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr MILLSTONE - UNIT 2 TRM 8.1-4 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 3.5 EMF-2328(P)(A), Revision 0 and Supplement 1(P)(A), PWR Small Break LOCA Evaluation Model S-RELAP5 Based, Framatome ANP, September 2015.

Methodology for:

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.6 EMF-2087(P)(A), SEM/PWR-98: ECCS Evaluation Model for PWR LBLOCA Applications, Siemens Power Corporation, June 1999.

Methodology for:

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.7 XN-NF-78-44(NP)(A), A Generic Analysis of the Control Rod Ejection Transient for Pressurized Water Reactors, Exxon Nuclear Company, October 1983.

Methodology for:

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.8 XN-NF-621(P)(A) Revision 1, Exxon Nuclear DNB Correlation for PWR Fuel Designs, Exxon Nuclear Company, September 1983.

Methodology for:

TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.9 XN-NF-82-06(P)(A) Revision 1 and Supplements 2, 4, and 5, Qualification of Exxon Nuclear Fuel for Extended Burnup, Exxon Nuclear Company, October 1986.

Methodology for:

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr MILLSTONE - UNIT 2 TRM 8.1-5 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 3.10 ANF-88-133(P)(A) and Supplement 1, Qualification of Advanced Nuclear Fuels PWR Design Methodology for Rod Burnups of 62 GWd/MTU, Advanced Nuclear Fuels Corporation, December 1991.

Methodology for:

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.11 XN-NF-85-92(P)(A) Exxon Nuclear Uranium Dioxide/Gadolinia Irradiation Examination and Thermal Conductivity Results, Exxon Nuclear Company, November 1986.

Methodology for:

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.12 ANF-89-151(P)(A), ANF-RELAP Methodology for Pressurized Water Reactors:

Analysis of Non-LOCA Chapter 15 Events, Advanced Nuclear Fuels Corporation, May 1992.

Methodology for:

TS 3.1.1.4 - Moderator Temperature Coefficient (MTC)

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.13 EMF-1961(P)(A) Revision 0, Statistical Setpoint/Transient Methodology for Combustion Engineering Type Reactors, Siemens Power Corporation, July 2000.

Methodology for:

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr TS 3.2.6 - DNB Margin MILLSTONE - UNIT 2 TRM 8.1-6 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 3.14 EMF-2310(P)(A), Revision 1, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors, Framatome ANP, May 2004.

Methodology for:

TS 3.1.1.4 - Moderator Temperature Coefficient (MTC)

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.15 EMF-92-153(P)(A), Revision 1, HTP: Departure from Nucleate Boiling Correlation for High Thermal Performance Fuel, Siemens Power Corporation, January 2005.

Methodology for:

TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.16 EMF-92-116(P)(A) Revision 0 and Supplement 1(P)(A), Generic Mechanical Design Criteria for PWR Fuel Designs, Siemens Power Corporation, February 2015.

Methodology for:

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.17 BAW-10240(P)(A), Revision 0, Incorporation of M5' Properties in Framatome ANP Approved Methods, Framatome ANP, Inc., May 2004.

Methodology for:

TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr 3.18 EMF-2103(P)(A), Revision 3, Realistic Large Break LOCA Methodology for Pressurized Water Reactors, AREVA Inc., June 2016.

Methodology for:

TS 3.1.3.6 - Regulating CEA Insertion Limits TS 3.2.1 - Linear Heat Rate TS 3.2.3 - Total Unrodded Integrated Radial Peaking Factor - FTr MILLSTONE - UNIT 2 TRM 8.1-7 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 Note: Regulating CEAs that are > 176 steps withdrawn are considered fully withdrawn and are acceptable per this figure.

Figure 2.4-1 CEA Insertion Limit vs. THERMAL POWER With Four Reactor Coolant Pumps Operating MILLSTONE - UNIT 2 TRM 8.1-8 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 Figure 2.5-1 AXIAL SHAPE INDEX vs.

PERCENT OF ALLOWABLE POWER LEVEL MILLSTONE - UNIT 2 TRM 8.1-9 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 Note: The FrT limit should be reduced for reactor coolant flow rates 349,200 gpm and < 360,000 gpm (see Section 2.6).

Figure 2.6-1 TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR vs. Allowable RATED THERMAL POWER For Reactor Coolant Flow Rates 360,000 gpm MILLSTONE - UNIT 2 TRM 8.1-10 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 Figure 2.6-2 TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR vs. Allowable RATED THERMAL POWER For Reactor Coolant Flow Rates < 360,000 gpm and 354,600 gpm MILLSTONE - UNIT 2 TRM 8.1-11 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 Figure 2.6-3 TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR vs. Allowable RATED THERMAL POWER For Reactor Coolant Flow Rates < 354,600 gpm and 349,200 gpm MILLSTONE - UNIT 2 TRM 8.1-12 LBDCR 20-MP2-003 March 19, 2020

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT, CYCLE 27 Figure 2.7-1 AXIAL SHAPE INDEX Operating Limits With Four Reactor Coolant Pumps Operating MILLSTONE - UNIT 2 TRM 8.1-13 LBDCR 20-MP2-003 March 19, 2020