Letter Sequence Acceptance Review |
---|
EPID:L-2021-LLA-0149, License Amendment Request to Revise Technical Specifications Related to Reactor Protection System Instrumentation (Approved, Closed) |
|
|
|
---|
Category:E-Mail
MONTHYEARML24025A1592024-01-25025 January 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) ML23177A1992023-06-26026 June 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078) ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23082A0432023-03-23023 March 2023 002 Radiation Safety Baseline Inspection Information Request Final ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23065A0942023-03-0606 March 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081 - LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020) ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML22237A1632022-08-25025 August 2022 004 Radiation Safety Baseline Inspection Information Request ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22108A0182022-04-15015 April 2022 NRR E-mail Capture - Accepted for Review - Duke Energy Relief Request for Harris Nuclear Plant Inservice Testing Program Plan - Fourth Ten-Year Interval to Extend Type C Test to 75 Months ML22083A0702022-03-24024 March 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR ML22083A0282022-03-23023 March 2022 Email Snsb Safety Evaluation for Harris LAR to Revise Reactor Protection System TS ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21288A0802021-10-15015 October 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0213 - Remove Limitations to Perform Certain SRs During Shutdown (L-2021-LLA-0167) ML21295A0372021-10-0505 October 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML21252A0112021-08-30030 August 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1- RA-21-0191 - Revised TS Related to Reactor Trip System Instrumentation (L-2021-LLA-0149) ML21189A0282021-07-0101 July 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0112 - Revise TS to Reflect Development of TRM (L-2021-LLA-0108) ML21172A2432021-06-21021 June 2021 NRR E-mail Capture - Request for Additional Information - Harris RA-20-0252 - LAR to Remove Extraneous Requirements from OL and TS (L-2021-LLA-0027) ML21106A0112021-04-15015 April 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0052 - Revise Containment Spray Nozzle Surveillance Frequency (L-2021-LLA-0058) ML21084A2492021-03-24024 March 2021 Notification of Inspection and Request for Information ML21084A2512021-03-22022 March 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-20-0252 - LAR to Remove Extraneous Content and Requirements from the OL and TS (L-2021-LLA-0027) ML21039A6382021-02-0808 February 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1-RA-20-0311 - 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach (L-2021-LLA-0003) ML21036A1142021-02-0505 February 2021 NRR E-mail Capture - Request for Additional Information - Harris - Relief Request RA-20-0312 - SW Pinhole Leak (L-2020-LLR-0143) ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21033A8452021-02-0202 February 2021 NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References ML21033B1062021-02-0202 February 2021 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References ML21032A0492021-02-0101 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet RA-20-0263 - Use of Later ASME B&Pv, XI for Repair - Replacement (L-2020-LLR-0124) ML21025A2922021-01-25025 January 2021 NRR E-mail Capture - (External_Sender) State Notification of Amendment to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21006A4042021-01-0606 January 2021 NRR E-mail Capture - State Notification of Amendment to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System ML20345A3052020-12-10010 December 2020 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 ML20344A4192020-12-0909 December 2020 NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 ML20328A0802020-11-23023 November 2020 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-20-0312-Relief Request, Service Water Pinhole Leak in a Socket Weld, Inservice Inspection (L-2020-LLR-0143) ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3072020-10-13013 October 2020 NRR E-mail Capture - Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - RCS Flowrate Reduction/Lbloca LAR ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20274A0462020-09-29029 September 2020 Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 ML20247J3822020-09-0303 September 2020 Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS Related to Accident Monitoring and RFO Instrumentation 2024-01-25
[Table view] |
Text
From: Mahoney, Michael Sent: Monday, August 30, 2021 11:17 AM To: dennis.Earp@duke-energy.com Cc: Arthur.Zaremba@duke-energy.com
Subject:
Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1- RA-21-0191
- Revised TS Related to Reactor Trip System Instrumentation (L-2021-LLA-0149)
Hi Dennis, By letter RA-21-0191, dated August 6, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21218A197) Duke Energy Progress, LLC (Duke Energy, the licensee) submitted a license amendment request (LAR) to revise the Shearon Harris Nuclear Power Plant, Unit 1 (HNP) technical specifications (TS). Specifically, the proposed amendment would revise TS 3.3.1, Reactor Trip System Instrumentation, to adjust the reactor trip on turbine trip interlock from P-7 (Low Power Reactor Trips Block) to P-8 (Power Range Neutron Flux).
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is August 30, 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
If you have any questions, please contact me.
Thanks Mike Mahoney Project Manager, LPL2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Desk: (301)-415-3867 Mobile: (301)-250-0450 Email: Michael.Mahoney@nrc.gov
Hearing Identifier: NRR_DRMA Email Number: 1328 Mail Envelope Properties (BLAPR09MB6017B94D2E201C126F52ABFAE5CB9)
Subject:
Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1- RA-21-0191 -
Revised TS Related to Reactor Trip System Instrumentation (L-2021-LLA-0149)
Sent Date: 8/30/2021 11:17:21 AM Received Date: 8/30/2021 11:17:21 AM From: Mahoney, Michael Created By: Michael.Mahoney@nrc.gov Recipients:
"Arthur.Zaremba@duke-energy.com" <Arthur.Zaremba@duke-energy.com>
Tracking Status: None "dennis.Earp@duke-energy.com" <dennis.Earp@duke-energy.com>
Tracking Status: None Post Office: BLAPR09MB6017.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3575 8/30/2021 11:17:21 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: