UNITED STATES | *7 UNITED STATES T-8 NUCLEAR REGULATORY COMMISSION o | ||
r, wasMincrow. o. c.20ssa | |||
[ | [ | ||
\\..... )g MEMORANDUM FOR: | |||
Vincent S. Noonan Director Comanche Peak Project I | |||
FROM:. | |||
Herbert H. Livennore QA/QC Group Leader | |||
==SUBJECT:== | ==SUBJECT:== | ||
RECORD REVIEW GROUP FINDINGS I | RECORD REVIEW GROUP FINDINGS I | ||
j' | j' As requested in your letter of May '3,1985, the QA/QC Group has reviewed the listing of allegation identified by the Records Review Group. Three items were identified as being potentially applicable to the QA/QC Group. These l | ||
three items (Nos. 17, 2 & 9) were reviewed with the following results: | |||
I | ? | ||
I Item No. 17: | |||
"NRC inspectors spent insufficient time on i | |||
each hanger inspection." | |||
This testimony was not related to the TRT, but involved three individuals from Region IV (i.e., | This testimony was not related to the TRT, but involved three individuals from Region IV (i.e., | ||
Taylor Smith and Gilbert). | Taylor Smith and Gilbert). | ||
No TRT action required. | No TRT action required. | ||
Item No. 2: | |||
"ASME audit team rejected ASME N-Stamp for Brown & | |||
Root." | Root." | ||
This deposition is inaccurate as renewal of B&R's | This deposition is inaccurate as renewal of B&R's N-Stamp was delayed on one occasion for two months but was not rejected.,The TRT had already looked | ||
.{ | |||
at this subject and it is explained in our SSERs (AQ5). | |||
.{ | ] | ||
No TRT action required. | No TRT action required. | ||
j Item No. 9: | |||
j | "NRC was not finding the problem." | ||
"NRC was not investigating all allegations." | |||
"NRC was not monitoring construction." | |||
khetestimonyindicatesthatthesubjectwas i | khetestimonyindicatesthatthesubjectwas i | ||
Region IV personnel (i.e., Taylor) not the TRT. | |||
No TRT action reqtired. | No TRT action reqtired. | ||
In conclusion, two of the three items above do not relate to the QA/QC group, and the other one has already been addressed. | In conclusion, two of the three items above do not relate to the QA/QC group, and the other one has already been addressed. | ||
8606250079 860611 | 8606250079 860611 W | ||
#L h _. | |||
cc: | PDR FOIA Herbert H. Livermore ARDE85-59 PDR QA/QC Group Leader 2 | ||
cc: | |||
C. Poslusny | |||
<-....n.+mm.-m.,,,-__ | |||
,..,,m | |||
.,., - - ~.-,--v, y, _..- | |||
m-m- | |||
':.= | |||
'/ | |||
UNITED STATES i | |||
NUCLEAR REGULATORY COMMISSION g | |||
l g | |||
j WASHINGTON, D. C. 20555 i | |||
\\,...../ | |||
t a | t a | ||
MEMORAh0VM FOR: | MEMORAh0VM FOR: | ||
Vincent S. Noonan, Director Comanche Peak Project FROM:. | |||
' Herbert H. Livermore h | |||
QA/QC Group Leader 1 | |||
==SUBJECT:== | ==SUBJECT:== | ||
RECORD REVIEW GROUP FINDINGS l | RECORD REVIEW GROUP FINDINGS l | ||
i I | i I | ||
As requested in your letter of May 3,1985, the QA/QC Group has reviewed the listing of allegation identified by the Records Review Group. Three~ items | As requested in your letter of May 3,1985, the QA/QC Group has reviewed the listing of allegation identified by the Records Review Group. Three~ items were identified as being potentially applicable to the QA/QC Group. These i | ||
three items (Nos.17, 2 & 9) were reviewed with the following results: | |||
l l | l l | ||
Item No. 17: | |||
i | "NRC inspectors spent insufficient time on j | ||
each hanger inspection." | |||
) | |||
i This testimony was not related to the TRT, but i | |||
involved three individuals from Region IV (i.e., | |||
Taylor, Smith and Gilbert). | Taylor, Smith and Gilbert). | ||
3 No TRT action required. | 3 No TRT action required. | ||
j | j Item No. 2: | ||
l | "ASME audit team rejected ASME N-Stamp for Brown & | ||
l Rcot." | |||
1 1 | 1 1 | ||
This deposition is inaccurate as renewal of B&R's | This deposition is inaccurate as renewal of B&R's N-Stamp was delayed on one occasion for two months | ||
? | |||
? | but was not rejected..The TRT had already looked j | ||
at this subject and it is explained in our SSERs (AQS). | |||
{ | { | ||
~ | |||
j | {. | ||
j | IfoTRTactionrequired. | ||
j Item No. 9: | |||
i | "NRC was not finding the problem." | ||
j "NRC was not investigating all allegations." | |||
"NRC was not monitoring construction." | |||
i The testimony indicates that the subject was Region IV personnel (i.e., Taylor) not the TRT. | |||
) | ) | ||
No TRT action required. | No TRT action required. | ||
In conclusion, two of the three items above do not relate to the QA/QC group, j | |||
and the other one has already been addressed. | |||
Wf | |||
QA/QC Group Leader | <4u< c% _ | ||
i Herbert H. Livermore QA/QC Group Leader 1 | |||
4 | cc: | ||
C. Poslusny 4 | |||
= | |||
_ _ _}} | |||
Latest revision as of 07:37, 10 December 2024
| ML20199G116 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak, 05000000 |
| Issue date: | 06/11/1986 |
| From: | Livermore H NRC |
| To: | Noonan V NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM) |
| Shared Package | |
| ML20197J178 | List:
|
| References | |
| FOIA-85-59 NUDOCS 8606250079 | |
| Download: ML20199G116 (2) | |
Text
(
n.
A
- 7 UNITED STATES T-8 NUCLEAR REGULATORY COMMISSION o
r, wasMincrow. o. c.20ssa
[
\\..... )g MEMORANDUM FOR:
Vincent S. Noonan Director Comanche Peak Project I
FROM:.
Herbert H. Livennore QA/QC Group Leader
SUBJECT:
RECORD REVIEW GROUP FINDINGS I
j' As requested in your letter of May '3,1985, the QA/QC Group has reviewed the listing of allegation identified by the Records Review Group. Three items were identified as being potentially applicable to the QA/QC Group. These l
three items (Nos. 17, 2 & 9) were reviewed with the following results:
?
I Item No. 17:
"NRC inspectors spent insufficient time on i
each hanger inspection."
This testimony was not related to the TRT, but involved three individuals from Region IV (i.e.,
Taylor Smith and Gilbert).
No TRT action required.
Item No. 2:
"ASME audit team rejected ASME N-Stamp for Brown &
Root."
This deposition is inaccurate as renewal of B&R's N-Stamp was delayed on one occasion for two months but was not rejected.,The TRT had already looked
.{
at this subject and it is explained in our SSERs (AQ5).
]
No TRT action required.
j Item No. 9:
"NRC was not finding the problem."
"NRC was not investigating all allegations."
"NRC was not monitoring construction."
khetestimonyindicatesthatthesubjectwas i
Region IV personnel (i.e., Taylor) not the TRT.
No TRT action reqtired.
In conclusion, two of the three items above do not relate to the QA/QC group, and the other one has already been addressed.
8606250079 860611 W
- L h _.
PDR FOIA Herbert H. Livermore ARDE85-59 PDR QA/QC Group Leader 2
cc:
C. Poslusny
<-....n.+mm.-m.,,,-__
,..,,m
.,., - - ~.-,--v, y, _..-
m-m-
':.=
'/
UNITED STATES i
NUCLEAR REGULATORY COMMISSION g
l g
j WASHINGTON, D. C. 20555 i
\\,...../
t a
MEMORAh0VM FOR:
Vincent S. Noonan, Director Comanche Peak Project FROM:.
' Herbert H. Livermore h
QA/QC Group Leader 1
SUBJECT:
RECORD REVIEW GROUP FINDINGS l
i I
As requested in your letter of May 3,1985, the QA/QC Group has reviewed the listing of allegation identified by the Records Review Group. Three~ items were identified as being potentially applicable to the QA/QC Group. These i
three items (Nos.17, 2 & 9) were reviewed with the following results:
l l
Item No. 17:
"NRC inspectors spent insufficient time on j
each hanger inspection."
)
i This testimony was not related to the TRT, but i
involved three individuals from Region IV (i.e.,
Taylor, Smith and Gilbert).
3 No TRT action required.
j Item No. 2:
"ASME audit team rejected ASME N-Stamp for Brown &
l Rcot."
1 1
This deposition is inaccurate as renewal of B&R's N-Stamp was delayed on one occasion for two months
?
but was not rejected..The TRT had already looked j
at this subject and it is explained in our SSERs (AQS).
{
~
{.
IfoTRTactionrequired.
j Item No. 9:
"NRC was not finding the problem."
j "NRC was not investigating all allegations."
"NRC was not monitoring construction."
i The testimony indicates that the subject was Region IV personnel (i.e., Taylor) not the TRT.
)
No TRT action required.
In conclusion, two of the three items above do not relate to the QA/QC group, j
and the other one has already been addressed.
Wf
<4u< c% _
i Herbert H. Livermore QA/QC Group Leader 1
cc:
C. Poslusny 4
=