ML20199G306

From kanterella
Jump to navigation Jump to search
Advises That Concerns Re Two Nonconformance Repts,Concerning Falsification of QC Insp Rept & Insp Results for non-ASME Inspectors Involving Drug Usage on Site Adequately Addressed & Satisfied,Per 841114-16 Trip Rept
ML20199G306
Person / Time
Site: Comanche Peak, 05000000
Issue date: 06/11/1986
From: Livermore H
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML20197J178 List: ... further results
References
FOIA-85-59 NUDOCS 8606250163
Download: ML20199G306 (1)


Text

__ _ _ _ _ - _ _ _ _ _ . _

j ,&, {; UNITED STATES t'

NUCLEAR REGULATORY COMMISSION =

5 E CASHINGTON, D. C. 20555 <

s 1 7000//

j '% *. . . + $,

l l Docket Nos: 50-445/446 l

) MEMORANDUM FOR: Vincent S. Noonan, Director l tomanche Pea.k Project l FROM: Herbert Livennore, QA/QC Group Leader i Comanche Peak Technical Review Team l

SUBJECT:

NOVEMBFR 14-16, 1984,~ TRIP REPORT TO

! COMANCHE PEAK - QA/QC FOLLOW-UP ON RAISED CONCERNS On November 15, 1984, several concerns were voiced regarding two specific Nonconformance Reports (NCRs). Neither originator had been contacted as to the status of the NCRs by the utility. Both NCRs were approximately four months old. One addressed the falsification of a QC inspection report. The other questioned inspection results for non-ASME inspectors involved in the drug usage on site. Since the NCRs dealt with sensitive subjects, the NCR originators were concerned about the close-out and dispositions of the NCRs.

While on site, the NRC resident inspectors were contactcd by the TRT as to their knowledge of the NCRs. The resident inspectors were involved with monitoring the status and dispositioning of the NCRs. One resident contacted the utility's QA manager and asked him to apprise the NCR originators of current status. Upon-follow-up, the resident found that the originators were contacted and satisfied with dispositioning and outcome of the NCRs. The falsification NCR has been closed out. Investigation of the drug NCR is ongoing and has been expanded to include ASME as well as non-ASME inspectors.

Consequently, the raised concerns have been adequately addressed and satisified.

Ma ovw Herbert Livermore, QA/QC Group Leader Comanche Peak Technical Review Team cc: V. Wenczel QA/QC Group Fil.es 8606250163 860611 PDR FOIA GARDE 85-59 PDR