i MEMORANDUM FOR:
V. Noonan, Project Manager Comanche Peak TRT FROM:
H. Livemore. QA/QC Group Leader
SUBJECT:
OVERSIGHTS AND OMISSIONS IN SUPPLEMENT NOS. 7 AND 8 RE QA/QC Enclosed are oversights and omissions we have identified in SSER Nos. 7 and 8 as they pertain to the QA/QC Group effort. These fall into two categories:
(1) statements that specific issues will be covered in the QA/QC SSER, when in actuality they have not, and (2) allegations or concerns that were transferred from the QA/QC Group to the Electrical / Instrumentation, Civil / Structural Test Programs, and Miscellaneous groups but whose assessment was not included in Supplement Nos. 7 and 8.
With this memo I am requesting assistance in initiating action to correct these oversights and omissions so that all TRT supplements will be in agreement. Regarding the reference (1) above, I recommend the issue of an errata for Mos. 7 and 8 correcting the references, or a statement in the QA/QC supplement addressing these references, the latter being preferred. To correct the omissions, (2) above, I recommend they be included in subsequent supplements by these groups which I understand is,being anticipated.
f
' Since the QA/QC Group SSER is near final completion, I request your timely action on these items.
r
&t44v2 si H. H. Livemore
~
QA/QC Group Leader
Enclosure:
As stated Q
I cc: All TRT Group Leaders i
A. Vietti
[
g s
m w, ese.,,
e CARDEBS-59 PDR
.(y, d
1 ll!
,. m
-:n
. 7
?
s t
ATTACHMENT 1.'
The following are pages and actions that Supplement Nos. 7 and 8 state the i
QA/QC Group has taken or will take, but that the QA/QC Group has not taken nor plan to take.
J-16(1st1)
... integrated with other actions concerning cr:ft i
J-65 (1st 1) personnel training addressed under QA/QC Category 8, i
'As-Built' 1
j The QA/QC Group does not address craft personnel training.
1 a
J-43 (1st 1)
... weakness in the... design control...is addressed in QA/QC Category 1,...."
8
!]
Not fully addressed in Category 1.
i l
J-43(5th1)
... poor QC personnel training... addressed under QA/QC Category 6.,.."
QC personnel training is not addressed in Category 8, and electrical QC is not addressed in QA/QC at all.
J-47 (3rd 1
... weakness in... design control... addressed under QA/QC h
andlast1)
QA/QC Category 1,...."
L; Not fully addressed and no actions are required.
h l
J-50(1st1)
"For detailed discussion of the 'T-shirt' incident, see g"
QA/QC Category 6,...."
i The QA/QC discussion is not detailed.
l li-J-58 (3rd 1)
... electrical QC inspector training and qualification j;
will be further assessed under QA/QC Category 4,...."
lj Elictrical QC inspector training, etc. is not addressed by j-QA/QC.
N Jj J-59 (6th 1)
"This area (electrical splices) is further addressed under l
QA/QC Category 8,...."
3 Electrical splices are not addressed in any QA/QC Category.
- i.
7 b
.l Attachment J-68(4th1)
...results...will be further assessed (deficiency identification program)...under QA/QC Category 5...."
Category 50 does not address the deficiency identification program.
1
]1 J-95(1st1) reference QA/QC Category 5, ' Document Control'..."."
j Minor error, Document Control is Category 2.
K-11 (4th 1) the results of the evaluations for Categories (Civil /
Structural) 1, 3, 4, 5, 6, 7, 8, 9,10,15, and 17 are being further assessed by the QA/QC Group...."
l In the broadest sense, only C&S Categories 7 and 8 may be
]
construed to have been included in the QA/QC assessments.
K-29 (4th 1) the lack of laboratory (concrete) signatures will be j
further assessed...under QA/QC Category 6...."
]
Category 6 has no such assessment.
J l
K-37(1st1) all retesting (Sche.idt hanner)...will be investigated by ll K-38 (1st 1) the TRT QA/QC group."
QA/QC did r.o investigation of retests, procedure, etc.
N 4
4 1
K-42(last1)
(procedures for) consolidation of concrete will be further assessed...under QA/QC Category 6...."
h 1
Procedures nor other issues associated with concrete or its j
consolidation were assessed by QA/QC.
a K-47 (1st 1)
(procedures for) premature loading (of grout) will be assessed...under QA/QC C1tegory 6...."
Such procedures, etc. were not assessed by QA/QC.
i K-56(1st1)
QC rebar placement and receipt inspection procedures will be further assessed...under QA/QC Category 6,...."
QA/QC has not assessed rebar placement or inspection procedures.
__NA..
L.m d__.
__-_._e-.-
Y
-^
" A
r 1
r.
Attachment,
4 K-65(5th1)
...QC inspection procedures will be further assessed...
under QA/QC Category 3,...."
This general reference is not inaccurate, but Category 3 is the wrong category.
I K-69(3rd1)
...results of these evaluations will be... assessed... con-2 cerninginspectorqualifications(intheareaofconcrete tests)...under QA/QC Category 4,...."
i e
Such evaluations have not been conducted.
!i y
K-74(1st1)
...qualitycontrolinthelaboratory(concrete)willbe j
further assessed...under QA/QC Category 6,...."
l Such assessments have not been made, i
K-91(1st1)
...these evaluations (cut rebar) will be further assessed l
...under QA/QC Category 6,...."
h Such evaluations have not been made, s
K-96 (2nd 1)
...results of this evaluation pertaining to QC controls at the batch plant will be further assessed...under QA/QC i
Category 6....."
- i ll-No such evaluation has been made.
e n.
l.
4 1-}
lit b
4
' - - ~ -
y a
\\~e f
Attachment 2.
The QA/QC Group transferred 18 AQ-numbers to others during the course of our assessment. These are listed below, but as indicated many have not been addressed in the issued SSERs, Nos. 7 and 8.
k OdQ wg Y JY 1
, to Civil /5L o iural, but not in Supp. 8
- ger,
, to Piping / Mechanical i
to Office of Investigation
[
M, to Office of Investigation M to Office of Investigation j
AQD.B - M, to Coatings Group l
9 g/M -
, to Piping / Mechanical %,/, *w Me.-
j Ac.-yf -ho Civil / Structural, but not in Supp. 8 N
AC W, 4::fL -g, to Civil / Structural, but not in Supp. 8 j
Ag ff0 - % to Misc. Group, but not in Supp 8 7-
, to Civil / Structural, assessed on p. K-93 of Supp. 8
' /* O
, to Electrical / Instrumentation, but not in Supp. 7
- Mo Electrical / Instrumentation, but not in Supp. 7 N to Electrical / Instrumentation, but not in Supp. 7 L
Mnot an allegation, but used as OI tracking I
M to Test Programs, but not in Supp. 7 S
- M to Test Programs, but not in Supp. 7 g
' @ o Test Programs, but not in Supp. 7 g,
, to Office of Investigation n
b a
l N'
1 i
1
.y
or s
V /w 4,
UNITED STATES NUCLEAR REGULATOnY COMMisslON a
g WAsmNcTON, D.C. 20556 E
[
l MEMORANDUM FOR:
V. Noonan, Project Manager Comanche Peak TRT FROM:
H. Livemore, QA/QC Group Leader
SUBJECT:
OVERSIGHTS AND OMISSIONS IN SUPPLEMENT N05. 7 AND 8 RE QA/QC
- \\
Enclosed are oversights and omissions we have identified in SSER Nos. 7 and 8 i
as they pertain to the QA/QC Group effort. These fall into two categories:
1
- (1) statements that specific issues will be covered in the QA/QC SSER, when in actuality they have not, and (2) allegations or concerns that were transferred from the QA/QC Group to the Electrical / Instrumentation, Civil / Structural, Test Programs, and Miscellaneous groups but whose assessment was not included in Supplement Nos. 7 and 8.
With this memo I am requesting assistance in initiating action to correct these oversights and omissions so that all TRT supplements will be in agreement. Regarding the reference (1) above, I reccennend the issue of an errata for Nos. 7 and 8 correcting the referencas, or a statement in the QA/QC supplement addressing these references, the latter being preferred. To L
correct the omissions, (2) above, I recommend they be included in subsequent
(
supplements by these groups which I understand is being anticipated.
Since the QA/QC Group SSER is near final completion, I request your timely action on these items.
-?!3W
%)
g A
/
5 y2
~
m ff l"
3 L :
,,.z. ' ^
.am.<
.u U Nk 4
L>
'.,4.
~~ ~
T. L
~
ATTACEENT 1.
The following are pages and actions that Supplement Nos. 7 and 8 state the
[
QA/QC Group has taken or will take, but that the QA/QC Group has not taken nor plan to take.
I J-16(1st1)
... integrated with other actions concerning craft i
J-65(1st1) personnel training addressed under QA/QC Category 8,
'As-Built'."
l The QA/QC Group does not address craft personnel training.
l 1
J-43(1st1)
... weakness in the... design control...is addressed ' n QA/QC i
]
Category 1,...."
Not ful.ly addressed in Category 1.
J-43(5th1)
... poor QC personnel training... addressed under QA/QC Category 8...."
QC personnel training is not addressed in Category 8, and electrical QC is not addressed in QA/QC at all.
J-47 (3rd 1
... weakness in... design control... addressed under QA/QC andlast1)
QA/QC Category 1,...."
l Not fully addressed and no, actions are required.
I J-50(1st1)
"For detailed discussion of the 'T-shirt' incident, see QA/QC Category 6,...."
h
(
The QA/QC discussion is not detailed.
l 0
J-58(3rd1)
... electrical QC inspector training and qualification f
will be further assessed under QA/QC Category 4...."
i l
Electrical QC inspector training, etc. is not addressed by QA/QC.
1 l
J-59(6th1)
"This area (electrical splices) is further addressed under QA/QC Category 8,...."
iI-Electrical splices are not addressed in any QA/QC Category.
4 W
n._
I V'
~ _
~
QW M
f 95-()) of (1 f
(
~
- \\
@# 6 %~'
Attachment.
[
I J-68(4th1)
...results...will be further assessed (deficiency identification program)...under QA/QC Category 5....."
j Category H does not address the deficiency identification
- Yh d
d9 % - m o
Ij J-95(1st1)
... reference QA/QC Category 5. ' Document Control'...."
j Minor error Document Control is Category 2.
4 K-11 (4th 1)
"...the results of the evaluations for Categories (Civil /
Structural) 1, 3, 4, 5, 6, 7, 8, 9,10,15, and 17 are being further assessed by the QA/QC Group...."
In the broadest sense, only C&S Categories 7 and 8 may be i
construed to have been included in the QA/QC assessments.
1 K-29(4th1)
...the lack of laboratory (concrete) signatures will be j
further assessed...under QA/QC Category 6...."
i J
Category 6 has no such assessment.
)
l K-37(1st1)
...all retesting (Schmidt hanner)...will be investigated by K-38 (1st 1) the TRT QA/QC group."
k QA/QC did no investigation of retests, procedure, etc.
K-42(last1)
...(procedures for) consolidation of concrete will be further assessed...under QA/QC Category 6...."
s t
Procedures nor other issues associated with concrete or its j
consolidation were assessed by QA/QC.
I l
K-47(1st1)
...(procedures for) premature loading (of grout) will be l
assessed...under QA/QC Category 6...."
i l
Such procedures, etc. were not assessed by QA/QC.
f K-56(1st1)
...QC rebar placement and receipt inspection procedures
[
will be further assessed...under QA/QC Category 6...."
l QA/QC has not assessed rebar placement or inspection g
procedures.
~.
7 Attachment '
t k
~
K-65(5th1)
...QC inspection procedures will be further assessed...
under QA/QC Category 3...."
This general reference is not inaccurate, but Category 3 is f
the wrong category.-
I K-69(3rd1)
"..results of these evaluations will be... assessed... con-l cerning inspector qualifications (in the area of concrete i
i tests)...under QA/QC Category 4....."
i A
Such evaluations have not been conducted.
l
?
I K-74(1st1)
... quality control in the laboratory (concrete) will be further assessed...under QA/QC Category 6....."
Such assessments have not been made.
l
\\
l K-91(1st1)
...these evaluations (cut rebar) will be further assessed
...under QA/QC Category 6,...."
l Such evaluations have not been made.
K-96(2nd1)
...results of this evaluation pertaining to QC controls at the batch plant will be further assessed...under QA/QC Category 6...."
No such evaluation has been made.
i i
Q l
1 I
i
~
N t.
22
.<s 1.
1, -
4
-(
i 4
l Attachment t
[
2.
The QA/QC Group transferred 18 AQ-numbers to others during the course of i
our assessment. These are listed below, but as indicated many have not i
been addressed in the issued SSERs Nos. 7 and 8.
i Od%
AQ-1, to C;.;1/5i..-.ial, but not in Supp. 8
{
AQ-2, to Piping / Mechanical i
AQ-8 to Office of Investigation AQ-10, to Office of Investigation AQ-11, to Office of Investigation A
AQ-29, to Coatings Group l
AQ-39, to Piping / Mechanical l
AQ-56, to Civil / Structural, but not in Supp. 8 L
AQ-62, to Civil / Structural, but not in Supp. 8 AQ-63, to Misc. Group, but not in Supp 8 i
AQ-64, to Civil / Structural, assessed on p. K-93 of Supp. 8 AQ-66, to Electrical / Instrumentation, but not in Supp. 7 AQ-67, to Electrical / Instrumentation, but not in Supp. 7 l
AQ-81, to Electrical /Instrunentation, but not in Supp. 7 AQ-84, not an allegation, but used as 0I tracking i
AQ-92, to Test Programs, but not in Supp. 7 AQ-93, to Test Programs, but not in Supp. 7 AQ-94, to Test Programs, but not in Supp. 7 AQ-118 to Office of Investigation
?