.r UNITED STATES l
fo NUCLEAR REGULATORY COMMISSION
/
IND.
I/FO.
ACTION g.
j
{
,I wasHmotow. o. c. aoses k,,,,,+
MAY 0 3 S85'
"-/
/
]
I6 1985 MEMORANDUM FOR:
Larry Shao, Engineering Group Leader vrc Jose Calvo, Electrical / Operations
[
7
/
)
'j Group Leader
/
/
Comanche Peak Project i
James Gagliardo, Chaiman ct.w
{
Intimidation Panel
/-
Comanche Peak Project Fit.E
/
FROM:
Vincent S. Noonan, Director Comanche Peak Project j
SUBJECT:
RECORD REVIEW GROUP FINDINGS P
Over the past fsw months a contractor team has been reviewing Comanche Peak hearing transcripts, depositions, and alleger meeting transcripts for the
- I purpose of insuring that no allegations have been missed by the TRT review.
Attached is a list of 27 items which the group has identified as allegations a
which were potentially not followed up by the TRT. I am fairly confident that
]
these can be tied to existing allegations or sununary dispositions.
J Please review these items, interface with Luke Jones (37991, NL, or Delray Bldg.) and Chet Poslusny (27066) to detemine if in fact, any action items have been missed. Please provide feedback to me by May 1.
b i
f1 e
, D' ector t{
che Peak Projec1.k I!
it cc:
D. Eisenhut
?
R. Keimig
()
if.~1.ivermore h
y "A
L C. McCracken
[.'
S. Phillips I
~
C. Hale
/
I C. Transnell
[
- l E. Jordan
}
1 p
APR g g 1985 l
e 230 GARDEkg2860612 DR 39 PDR L
~-