- NEMORANDUM FOR
- V. Noonan, Project Director Comanche Peak TRT FROM: H. Livermore,-QA/QC Group Leader Comanche Peak TRT
SUBJECT:
POSSIBLE FALSIFICATION OF FUEL P0OL TRAVELERS The following scenario relates to the sign-off of Traveler #591, and is based on the signatures and dates on the document. The scenario is speculative, but the implications are that James W. Cole and Sam Bell were colluding in falsify-i ing sign off of inspection hold points on fuel pool travelers. The falsifica-i tion, if true, would be in signing off inspection activities that were not I
conducted.
The scenario, associated with the attached traveler #591, follows:
o About 1/10/82 Cole noticed that #591 was due final QC inspection. At this point only one page existed and Hold Points 7 and 8 had SAT results with the 12/4/81 and 1/15/82 dates pre-entered (the common practice at Comanche Peak) and only the inspectors' signatures remained to be filled in.
o Cole added the second page (page 2 of 2), since this would be needed to complete the inspection record, then sent both' sheets to his pal Bell to complete the V.T. and P.T. inspection.
o Bell filled in the P.T. part, backdating it to 11/30/81, and changed the step 7 V.T date to 11/30/81, to give Cole a few days to complete the vacuum box test before the originally scheduled 12/4/81 date, returning the form to Cole by 1/13/82.
o Cole made some corrections in procedure numbers on Bell's P.T.
sign-off on page 2, then filled in the vacuum box test data backdating the entry to 12/4/81; but in entering the date he made a revealing blunder; he put 12/4/82 (having already programmed himself to write the new year) and then had to correct it to 1981.
o Cole then chan1ed the Hold Point 8 date to the current date 1/13/82, completing the inspection sign-off for #591.
In all likelihood the V.T., P.T., and vacuum box tests were not done. Being generous, one could concede that the V.T. and P.T. may have been done, but it is patently obvious that if the vacuum box test was done at all it certainly was not done on 12/4/81, as the record now indicates.
8606250197 860611 PDR FOIA GARDEBS-59 PDR
V. Noonan . In discussions with the lawyers during our SSER review they believe falsification does not belong in our effort but should be assessed by the Office of Investigation. After discussion with A. Vietti we contacted RIV OI, Brooks Griffin, who agreed it should be sent to their office. We, therefore, request that this matter be transferred to RIV OI.
Enclosed is a copy of traveler #591 and a listing of other travelers involving the two specific individuals that we have in our backup files. This would obviously be only a partial list of travelers on which these two were involved.
- #h H. Livermore QA/QC Group Leader Comanche Peak TRT
Enclosure:
As stated cc: TRT Group Leaders A. Vietti e
9 9
,see e s e- wew=- .=*-e .__ w ==em-e--e-- .=_p ., . . .-. w we ega.*** yam-e. eem . -e.e-- ==m-=ee--e
1 k
- e .
I r
l-Travelers in the QA/QC Backup Files Involving James W. Cole
~
l 139 547 567 584 877 537A* 548A 568* 585 878 538A* 548A 569* 586 879 539A . 549A 570 587 1091*
540A 558 5 71 * ' 719 541A 559 - 572* 720 1 542A* 561 573 721 543A 563 575 729*
l 544A 562 580 73 0 l
. 546 564 581 780 l 565 583 l Travelers in the QA/QC backup files involving Cole and Sam Bell:
~
44 588 591* 595 L 536A 598 592
- Denotes those travelers that have questionable entries, i.e. potential i
falsifications.
l i
i
. w .+ , . . . - - . . - + . . . - _ % . - , - - - . . . . = , .,,_--w--...... - - . _ _ . . . . . --
s ,
j * . BrtSwnO'N PERM. PLT. RECOfD
"' " /- l "MT?? 9. 'l
...nm i.x. af }l WELD NO.
B&R Stainless Steel Liner Inspection Traveler PROJECT: CPSES JOB NO: 35-1195 UNIT t'.- PAGE / OF 2-l .'dfdoo9!! A/. ?& dd ) Metal( A~Type JGal I///
Mtl . Thk.
- AIP) fZ //.3 sA.
PC. to PC.
Drawing No. Pool l
3- R Plate to Plate Insert to' Plate I. I Angle to Plate I # Other /2% /de.0-Walder WFML Weld Hold j Symbol No. Proced. Point 1. Fit up and Cleanliness of Above:
.$A b'~ h bl5 $0E] l .h %pDh b 2 '1 B F- P Results Inspector Sigr(a,ture Date her D-709 99030 /
- 2. V.T. of Backing Strip Tack / Fillet Welds:
i(M4 i
i D - 77) 92 O 3 (
h)A nim AJA 8 FP
' 4 z n> D-3% 9943 0 7 Results inspector Signature ,
0 ate
.- 3. Cle:nlir=. Sf Ch.2nnel, Liner, and B. Strip:
I It/4 OA /1) A-Results inspector Signature Da te
- 4. Final V.T. of Channel Fillet Weld:
GROW N & R C O}. .
ilm R E U c. i V -- - :
NA 10 A mA
_ 1. -
Results Inspector Signature Date J Air i . , ' . i
- l4ll 1 W 5. Inside Fit Up and Cleanliness
- -
i li ;;igs iio'56 ll no P- ed 4 vo I\
, n .-
Results inspector Signature Date
,uAi_lTY Q ;, SOLD.W -
- 6. V.T. of FitTet Prior to Grinding:
h klhbffk bi i
- IN Results MA inspector Signature NA Da te
- 7. Final V.T. of Inside Weld: , ,,
I GnT VM \ 'a-Cr- b Results inrpector Signature Da te l
I
~~
6
w-r- -w mw, ------,_,.__c , _ , , , , _ _ _ _ _ _ _
p
. - o ~ .
.* ,y&
i l
[ .
l 57/
Weld No.
l Acceptance Std. -
, Gibbs & Hill 2323-S5-18 .
5b. Penetrant Mfg. Magnaflux-Spotcheck X Cleaner Mfg. Magnaflux-Spotcheck [
Developer Mfg. Magnaflux-Spotcheck N d
i gEf.,rocepe,
.w, w . w n . . w ... m RZ-48'-/o
- 2 - [ j j3 g Final P.T. Level II U_Y N DATE e/rf RESULTS INSPECTOR SIGN.
Sc. Vacuum Box GASKET TYPE SOLUTION TYPE lY by
,y Y Y)e4 A4e/
/-/3 f2_
- Pretest Cleaning M' Pre ssure2-f TemperaturempNDE Procedure fr-fy/
Solution Application Method /fo7726 Post Test Cleaning s
Gauge Serial Number
[N Maintained for 7e Preassure Differential Sec. O Min.
. Final V.B. -
M [M-N/A - Not App able Satisfactory atisfactory nsp /d e Date /f/ g(/
[!'.jD e i .n 'L a E[E 0Wh........N'. . ,,,
4
(
- ~ ~ ~ - .- - . . . . . ,_ ..-. __ . , . . - . , _ . _ , _ . . . _ _ . ..., . _
'= -
't <m---
.mm- v -w ---w . Mo
, .y..
- l. UNITED STATES e f[.. Nog4 NUCLEAR REGULATORY COMMISSION f
je WASHINGTON. D. C. 2C555
}
l \;'
4..**
/
MEMORANDUM FOR: V. Noonan, Project Director Comanche Peak TRT FROM: H. Livermore QA/QC Group Leader Comanche Peak TRT
SUBJECT:
POSSIBLE FALSIFICATION OF FUEL P00L TRAVELERS l The following scenario relates to the sign-off of Traveler #591, and is based on the signatures and dates on the document. The scenario is speculative, but the implications are that James W. Cole and Sam Bell were colluding in falsify-
) ing sign off of inspection hold points on fuel pool traveler 3. The falsifica-tion, if true, would be in signing off inspection activities that were not condu::ted.
The scenario, associated with the attached traveler #591, follows:
o About 1/10/82 Cole noticed that #591 was due final QC inspection. At this point only one page existed and Hold Points 7 and 8 had SAT results with the 12/4/81 and 1/15/82 dates pre-entered (the common practice at Comanche Peak) and only the inspectors' signatures remained to be filled in.
c Cole added the second page (page 2 of 2), since this would be needed to complete the inspection record, then sent both sheets to his pal Bell to complete the V.T. and P.T. inspection.
o Bell filled in the P.T. part, backdating it to 11/30/81, and changed
- the step 7 V.T date to 11/30/81, to give Cole a few days to complete the vacuum box test before the originally scheduled 12/4/81 date, f returning the fonn to Cole by 1/13/82.
o Cole made some corrections in procedure numbers on Bell's P.T.
sign-off on page 2, then filled in the vacuum box test data backdating the entry to 12/4/81; but in entering the date he made a revealing blunder; he put 12/4/82 (having already programmed himself to write the new year) and then had to correct it to 1981.
o Cole then changed the Hold Poin't 8 date to the current date 1/13/82, comp'.eting the inspection sign-off for #591.
I In all likelihood the V.T., P.T., and vacuum box tests were not done. Being I generous, one could concede that the V.T. and P.T. may have been done, but it is patently obvious that if the vacuum box test was done at all it certainly l was not done on 12/4/81, as the record now indicates.
l
, pw q~ i g),
- .r q\
n s ~,
.~
.,;' u.
t 7/
g- -_.
L,. V. Noonan Q' In discussions with the lawyers during our SSER review they believe falsification does not belong'in our effort but should be assessed by the
/
Office of Investigation. After discussion with A. Vietti we contacted RIV OI, Brooks Griffin, who agreed it should be sent to their office. We, therefore, request that this matter be transferred to RIV 01.
Enclosed is a copy of traveler #591 and a listing of other travelers involving ii the two specific individuals that we have in our backup files. This would obviously be only a partial list of travelers on which these two were involved. .-
1
, % Ot %
. H. Livermore QA/QC Group Leader Comanche Peak TRT
Enclosure:
As' stated cc: TRT Group Leaders A. Vietti i
e I
l . !
k I
g t
l I
Travelers in the QA/QC Backup Files Involving James W. Cole l 139 547 567 5 84 877 537A* 548A _ 568* 585 878 538A* 548A '
569* 586 879 f 539A 549A 570 587 1091*
540A 558 571* 719 l 541A 559 572* 720
- 542A* 561 573 721 l 543A 563 575 72 9*
544A 562 580 73 0 546 564 581 780 565 5 83 l
Travelers in the QA/QC backup files involving Cole and Sam Bell:
44 588 591* 595 i 536A 598 592
- Denotes those travelers. that have questionable entries, i.e. potential falsifications.
m i
4 e
e i
1 t
i f
l -
I' L
~' ... . . _ . . . . . ...... . . . ~ ,- , - - .. . . - - . . . . - - .
i n .
y > w i'
'BrowW5Rocuric. PERM. PLT. RECOO
"'"J l T'lYR 9. 'l l
! suern.z Loc. ,g y /
WELD NO.
B&R Stainless Steel Liner Inspection Trayaler B
PROJECT: CPSES JOB N0: 35-1195 UNIT '2 PAGE / OF 2
} {'~ s , & Uli /BAiry$~65:e/Y^
.WFAO091! A/. 54 N s Metal Type Mtl . Thk. PC. to PC.
j Drawing No. Pool j -
R Plate to Plate l I Insert to Plate O Angle to Plate i W Other ff % / M '.G -
i Walder WFML Weld liold i Symbol No. Proced. Point 1. Fit up and Cleanliness of Above:
k .6A&- d-6/5 $01] l hm yDuh k ? 'f
' Results Inspector Siggture Date
" e4 F- P h-709 99 0 Lo /
i 6 6T- 2. V.T. of Backing Strip Tack / Fillet Welds:
(414 D ~ 97I y 20 A ( A/A
- tl FF A)a nila
~
4 z n> D-3% 99dc 0 7 Results inspector Signature ,
0 ate
- .- 3. Cleanli: r : Sf Ch.innel, Liner, and 8. Strip:
111 4 f) A Al f-Results inspector Signature Date s 4. Final V.T. of Channel Fillet Weld:
W N & R C O'. . . . . ; ,
RRO r0 n ni A REUc: V...- .
Na Q Results Inspector Signature Date a.. hi - - - -
2 -
? l- J Mn . , " ' li 5. Inside Fit Up and Cleanliness:
, i tt ECEs . M ll #tm ed 4 ni n
{ -f -
Results inspector Signature cate 60Ai ITY /.S u L d.m -
- 6. V.T. of FilTet Prior to Grinding:
MA NA hh kbb/ IN Results inspector Signature Date l
- 7. Final V.T. of Inside Weld:
- 1 If3N ' '.*." .
! $gT \ f M. \ a-@b Date
- Resul ts inspector Signature 1
$~b
'Kesul ts b o "# f d / S h '
nspector Signature Da te j
w
r -
-- ~ - - -------~ - - = ~ - - - - - - " - - --
- 5 L l ,
t l
57/
I
- Weld No.
I -
Acceptance Std.
Gibbs & Hill 2323-55-18 .
I' Sb. Penetrant Mfg. Magnaflux-Spotcheck X Cleaner Mfg. Magnaflux-Spotcheck Developer Mfg. Magnaflux-Spotcheck M ND{ f,mcegre. - ,
4 ,
- . . - ~ ~ . -
W-4N-/o*2-/h ,_ u .a Final P,T,. Level II Um%d8 INSPECTOR SIGN.
DATE e/n RESULTS Sc. Vacuum Box GASXET TYPE SOLUTION TYPE lf by Y YY}&f. ^46/
/~/3~ 72 Pretest Cleaning dih Pre ssure2-f Temperature @DE Precedure fr - 4 4#'
Solution Application Method gof72P Post Test Cleaning d Gauge Serial Nunter eIN Preassure 01fferential Sec. O Min.
Maintained for ze s Final V.S. M [M-N/A - Not App ble Satisfactory atisfactory nsp /d e Data / g/ g(7
, i m.w cijn L: .p. m......
- t. y c:
- ; j
! /3 r2 f ~. .
l -
1, l
[p acoy'o UNITED STATES
' f Cj (
cc qWc W
,f &
~
g NUCLEAR REGULATORY COMMISSION I
-p,l <.
f,g WASHINGTON, D. C. 20555
- ....,* WR 16 1985 L_
MEMORANDUM FOR: Guy Arlotto, RES Robert Bernero, DSI g'L -g Hugh L. Thompson, DL Robert Martin, Region IV "
James P. Knight,_DE James G. Keppler, Region III C _ _
Thomas E. Murley, Region I FROM: Darrell G. Eisenhut, Deputy Director Office of Nuclear Reactor Regulation -
QQ/
SUBJECT:
COMANCHE PEAK SCHEDULE AND ORGANIZATIONAL CHART hva k. --
The purpose of this memorandum is to provide you with the Comanche Peak schequie, which identifies all activities that must be ccmplete prior to the resumption of the ASLB hearings, and the organizational chart for accomplishing these activities (Enclosure 1 and 2, respectively).
Since the Cemanche Peak Technical Review Team (TRT) work as it relates principally to construction at the site is nearly complete, the Comanche Peek Task Force must integrate the TRT findings with all activities necessary to conclude the overall licensing effort. This will include all remaining safety issues relating to design, construction and operation of Comanche Peak that must be addressed in order to resume the ASLB hearings.
All remaining licensing actions required for Comanche Peak will remain under the management of V. Nocnan, Director of the Comanche Peak Project. The enc'losed organizational chart sets forth the arrangement for carrying out the responsibilities for the project. As previously indicated, Mr. Noonan will coordinate these efforts with NRR, IE, and Region IV. In order for V. Noonan to properly carry out the responsibility of completing all matters affecting the licensing of Ccmanche Peak and ensure consistent communication with the applicant and entervenors, all routine licensing correspondence should be prepared for V. Noonan's signature. In addition, he should continue to concur in all Comanche Peak external correspondence prepared by Region IV, such as, inspection reports and enforcement actions.
The organizational chart reflects three major groups: the Engineering Group, headed by L. Shao; the Licensing Grcup, headed by C. Trammell; and the Electrical / Operational Group, headad by J. Calvo and identifies those individuals who are responsible for activities within these groups.
Enclosure 3 identifies those individuals who will be needed on a full or part time basis through the completion of the ASLB bearings, and major areas of responsibility.
c.., .
p '.,~
,e .
^
n'~ , tR %;
rW
- y. >a i
n m. i /- .
APW I 6 UWE5
- 2-t As before, the Task Force will continue to rely on the line organization and
, contractor support for the technical issues being addressed by the staff and i managed by the foregoing individuals.
l
____/
gg Da rre l l G.
(P is nhut, Depu y Director Office of Nuclear Reactor Regulation
Enclosure:
As stated I
i cc: TRT Group Leaders f W. J. Dircks I V. Stello i H. Denton '
J. Taylor F. Miraglia G. Lainas D. Crutchfield R. Bosnak E. Jordan ,
J. Scinto R. Wessman CPP Staff 4
6 0
9 e
1'
'l .
i
$ - - - - m p -y - -
COMANCHE PEAK' SCHEDULE '
Enclosurs 1
! 3/1/85 5/1/85 6/1/85 7/1/8 8/1/85 9/1/85 t
Prepare j Testimony
- amme +
k * ' '
Commence Design OELD Ready on Outstanding l Review Ef fort Hearing Issues l
l Obtalri Source i
Information CVGNA SSER (SAL P. CAT. SRT.
}
. Completed J Inspection ,
I Ileports, Hearing
-- 1 r
! TRT SSERs flocords' Completed ,
,,,, g_ . . . . Data & Complete Draft Staff
~
Is' sue Staff 1 T (Mechanical, I f form Personnel SSER Position Position Awailable Outline Discipline ' OELD & HDOTRS Staff Road.
QA/OC) Disciplin.e_ SSER SSER -- --
,1 Ev_aluat_ ion of , Review .
Prepare Testimony ,
for Hearind L Evaluation lleadmess
- Effort l'ar License ; ,
[ t 3
Mejor Filings:~
Intimidation Panel Pipe / Design
- - s=me + Welding O*s Coatinos Carstention S Panel Prepare Testimony
- Room Inspections ,
- ammena-o + intimidation QA/OC T IT policy Decision Enforcement Made by Directors y o ,,;
! Inputsto from IllV, IE, NRR Region IV on Enforcement Prepare Enforcement' Package
(
l Licen ctions: tin L ensing' ~ ~~
g; , Complate Herdelning NconsIn'g items.
Tech Spocs, License Conditions I
Appilc' ants' Pro 0 ram Opan items Contirmatory items Applican Plan Suln41sted p,,, g,,,ts*, Programej 1
~ ~
Onoolng fiesp~oss'e~t'o Alleg'a'tlons - Roolon IV & 01 Itoutine inspections Roo'lon IV issue 94300 ler.
Commence Conflamatory inspections 7 @ __ -- . _ . _ b Prepare inspection Testimony Discipline Evaluation Areas Consider ilHW FSAll Commitments, SER's. IR's, SALP, 4/10/85 CAT. SBT, SilI, TitT. Bloating Ilocord, etc.
- l' f
"' COMANCHE PdXI(f55K F6RCf5 STAFF i
,. . l PROJECT DIRECTOR l
. o V. Noonan ,
DELD CONTENTION S fr J. Scinto .
INT 1MIDATION PANELS S. Treby ,
'i 5
'p SECRETARIES . SUPPORT STAFF d' A. Stang P. Fischetti 5, C. Posiusny i* o 3 .
1 i i
. 3:
LICENSING LB 1 MNIN ENCINEERING OPERA
.L. Sheo C. Trammelt ~~B. Younstdoo d 4:
a
- Region IV - S. Burwell -fleglass IV
- NRR - A. Vietti -WRR
-TRT/QA (Civil / Mech./ Misc.) - R. C. Tang (compL 6/1/85) -TRT/CA (Elec./ Test (H. Livermere) Prograrnal (H.livermorel
- C. McCracken .
- M"9 - Contractors - U"*'I"U
! - Enforcement -Enforcement l - IE (CAT) -IE (CAT)
!- - Cygna (R. Bosnak) - Contractors
! - Walsh/Doyle (R. Bosnak) -Routine L ~ g Matters re: Electrical /
- Summary Dispositions Operational j (R. Bosnak)
-Testing (R. Keimig)
- Corrtractors h.
J
- Routine Ucensing Matters
- Electrical (E. Marinos) re: Engineering
. - Miscellaneous (S.Phillips) .
l 1 .
r 1 ,
e
}
I i
I
- ~ ~ . . . - - - - _ _ _ _ _ , , , _ _ , ,, ,, _ __ _ _
r - - - , - - - - , . - - , - - - , ,. ,.-------,.-----.n.- , . . - , . , , . ,
Enclosure 3 Enaineerina L. Shao (full-time) Manager, all engineering activi{ ties, hearing support.
-i and motions R. Bosnak (part-time) Responsible for closecut of
-sa for summary disposition issues, hearing support.
S. Phillips (part-time) Closecut of TRT miscellaneous issues, hearing support.
H. Livermore (part-time)'Closecut of TRT/QA issues as they relate to ,
Civil / Mechanical and miscellaneous areas.
Licensing C. Trammell (full-time) Manager, all licensing activities, provides coordination between the engineering and electrical / operational groups for preparation of final staff positions (SSER #13).
S. Burwell/A. Vietti (full-time) Licensing Project Managers, routine licensing, hearing support.
R.C. Tang (full-time) (completion 6/1/85) Project Manager, TRT SSER's.
t C. Mc'Cracken (part-time) Followup of protective coatings actions, hearing
) support. .
i Electrical /0cerational J. Calva (full-time) Manager, all electrical / operational activities, hearing support.
E. Marinos (full-time) Deputy, electrical / operational activities, closecut of TRT electrical issues.
I H. Livermore (part-time) TRT/QA issues as they relate to closecut of
- electrical and test program areas.
l l R. Keimig (part-time) Closecut of TRT test program issues.
l Succort Staff l
! C. Poslusny (full-time) Allegation tracking system, contractual support,
! administrative support to Contention 5 and Intimidation Panels.
I A. Stang/P. Fischetti (part-time) Secretary i