Line 38: Line 38:


r --
r --
             %                                                                            4 U.S. Nucleaar Regulatory Commission                                                          MAY 261988 By letter dated December 23, 1986, TVA committed to submit the unit 2 technical specification change within 60 days of completion of the mode 3 testing.
             %                                                                            4 U.S. Nucleaar Regulatory Commission                                                          MAY 261988 By {{letter dated|date=December 23, 1986|text=letter dated December 23, 1986}}, TVA committed to submit the unit 2 technical specification change within 60 days of completion of the mode 3 testing.
Jack Donohew was notified by telephone that the AFH mode 3 testing for unit 2 was considered field complete on March 23, 1988. Therefore, the proposed change was due to NRC May 22, 1988. Mr. Donohew was notified by telephone on May 19, 1988, that because of a temporary redirection of resources, the May 22 date-would not be met. During the telephone call, Mr Donohew was informed that the technical specification change would be submitted on or before May 27, 1988.
Jack Donohew was notified by telephone that the AFH mode 3 testing for unit 2 was considered field complete on March 23, 1988. Therefore, the proposed change was due to NRC May 22, 1988. Mr. Donohew was notified by telephone on May 19, 1988, that because of a temporary redirection of resources, the May 22 date-would not be met. During the telephone call, Mr Donohew was informed that the technical specification change would be submitted on or before May 27, 1988.
Please direct questions you may have concerning this issue to Russell R. Thompson at (615) 870-7470.
Please direct questions you may have concerning this issue to Russell R. Thompson at (615) 870-7470.

Latest revision as of 04:47, 10 December 2021

Application for Amend to License DPR-79,revising Tech Specs Surveillance Requirement 4.7.1.2.a to Add pump-specific, Differential Pressure Test Values for Auxiliary Feedwater Pump & Associated Bases Section for Clarification.Fee Paid
ML20154M690
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/26/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20154M695 List:
References
TAC-R00353, TAC-R353, NUDOCS 8806020041
Download: ML20154M690 (3)


Text

c- v-g TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENNESSEE 37401 ,

SN 1578 Lookout Place MAY 261988 TVA-SQN-TS-88-02 10 CFR 50.90 s

U.S. Nuclear Regulatory Commission ATTN: Doc.ument Control Desk Hashington, D.C. 20555 Gentlemen:

In the Matter of ) Docket No. 50-328 Tennessee Valley Authority )

SEQUOYAH NUCLEAR PLANT (SQN) UNIT 2 - TECHNICAL SPECIFICATION CHANGE 88-02

References:

1. Letter from J. A. Zwolinski to S. A. White dated November 2, 1987, "Auxiliary Feedwater Pump P essure Drop Requirements and Operability (TAC 00060, 00061)"

^

2. Letter from TVA to NRC dated September 24, 1987, "Sequoyah Nuclear Plant (SQN) - Auxiliary Feedwater (AFH) System Operability Determination"
3. Letter from TVA to NRC dated June 26, 1987, "Sequoyah Nuclear Plant (SQN) - NRC Request for Additional Information Regarding Auxiliary feedwater (AFH) Flow and Pressure Requirements" In accordance with 10 CFR 50.90, we are enclosing a requested amendment to license DPR-79 to change the technical specifications of SQN unit 2. The proposed change revises the unit 2 surveillance requirement (SR) 4.7.1.2.a to add pump-specific, differential pressure test values for each AFH pump. The associated bases section of the unit 2 technical specifications is revised for clarification.

The proposed technical specification change is identified in enclosure 1. The justification for the proposed technical specification change is provided in enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided la cnclosure 3.

Enclosed is a check for the $150 amendment application fee required by 10 CFR 170.12.

0 10

~

[ b (14.9 8806020041 880526 PDR P

ADOCK 05000328 DCD h' $ 0I An Equal opportunity Employer

r --

% 4 U.S. Nucleaar Regulatory Commission MAY 261988 By letter dated December 23, 1986, TVA committed to submit the unit 2 technical specification change within 60 days of completion of the mode 3 testing.

Jack Donohew was notified by telephone that the AFH mode 3 testing for unit 2 was considered field complete on March 23, 1988. Therefore, the proposed change was due to NRC May 22, 1988. Mr. Donohew was notified by telephone on May 19, 1988, that because of a temporary redirection of resources, the May 22 date-would not be met. During the telephone call, Mr Donohew was informed that the technical specification change would be submitted on or before May 27, 1988.

Please direct questions you may have concerning this issue to Russell R. Thompson at (615) 870-7470.

Very truly yours, TENNESSEE VA LEY AUTHORITY

/ -

R. Gridley, Dir ctor Nuclear Licensing and Regulatory Affairs Sworn . o gd subscribeA before me this- (OIS day of F////Zo 1988

~

/tL_ l b Notary Public G' MyCommissionExpiresA(/ - qJo Enclosures cc: See page 3 l

l l

l l

l

U.S. Nuclear Regulatory Commission yay 261988 cc (Enclosures):

Mr. K. P. Barr, Acting Assistant Director for Inspection Programs TVA Projects. Division U.S. Nuclear Regulatory Ccamission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Michael H. Mobley; Director (w/o enclosures)

Division of Radiological Health T.E.R.R.A. Building 150 9th Avenue, N Nashville, Tennessee 37203 Mr. G. G. Zech, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

.Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 l

i l

<