| number = ML11215A089
| number = ML11215A089
| issue date = 08/03/2011
| issue date = 08/03/2011
| title = Kewaunee Power Station - Notification of an NRC Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Inspection; and Request for Information 05000305/2011005
| title = Notification of an NRC Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Inspection; and Request for Information 05000305/2011005
| author name = Stone A M
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Dominion Energy Kewaunee, Inc
| addressee affiliation = Dominion Energy Kewaunee, Inc
| docket = 05000305
| docket = 05000305
Line 14: Line 14:
| page count = 8
| page count = 8
}}
}}
See also: [[followed by::IR 05000305/2011005]]
See also: [[see also::IR 05000305/2011005]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::August 3, 2011]]
                              NUCLEAR REGULATORY COMMISSION
                                              REGION III
                                2443 WARRENVILLE ROAD, SUITE 210
                                        LISLE, IL 60532-4352
                                            August 3, 2011
Mr. David A. Heacock
President and Chief Nuclear Officer
Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center
5000 Dominion Boulevard
Glen Allen, VA 23060-6711
SUBJECT:       KEWAUNEE POWER STATION - NOTIFICATION OF AN NRC MANAGEMENT
                OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT
                REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION; AND
                REQUEST FOR INFORMATION 05000305/2011005 (DRS)
Dear Mr. Heacock:
On November 14, 2011, the U. S. Nuclear Regulatory Commission (NRC) will begin the on-site
portion of the Temporary Instruction (TI) 2515/177 inspection, Gas Accumulation Management
in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, at your
Kewaunee Power Station. This inspection will be performed in accordance with NRC
TI 2515/177 Procedure.
In order to minimize the impact that the inspection may have on the site and to ensure
productive inspections, we have enclosed a request for documents needed for the inspection.
The documents have been divided into three groups.
*  The first group lists information necessary for our initial inspection scoping activities. This
    information should be available to the inspector no later than September 26, 2011. By
    September 30, 2011, the inspector will communicate the initial selected samples.
*  The second group of documents requested are those items needed to support our in-office
    preparation activities. This set of documents should be available at the Regional Office no
    later than October 31, 2011. This information should be separated by information request
    number, especially if provided electronically (e.g., folder with the information request
    number). During the in-office preparation activities, the inspector may identify additional
    information needed to support the inspection.
*  The last group includes additional information above, as well as plant specific reference
    material. This information should be available to the inspector on November 14, 2011. It is
    also requested that corrective action documents and/or questions developed during the
    inspection be provided to the inspector as the documents are generated.
Please send the information to the following e-mail address nestor.feliz-adorno@nrc.gov.
A hard-copy with the required information is also an acceptable option. It is important that these
documents be as complete as possible, in order to minimize the number of documents
requested during the preparation week or during the on-site inspection.


Mr. David President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc. Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
D. Heacock                                      -2-
If no activities were accomplished associated with a specific request, then provide a statement
indicating that the request is not applicable.
The lead inspector for this inspection is Mr. Néstor J. Féliz Adorno. If there are questions about
the material requested, or the inspection, please call Mr. Féliz Adorno at (630) 829-9739.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
                                              Sincerely,
                                              /RA by R. C. Daley For/
                                              Ann Marie Stone, Chief
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket Nos. 50-305
License Nos. DPR-43
Enclosures:      TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
cc w/encl:      Distribution via ListServe


SUBJECT: KEWAUNEE POWER STATION - NOTIFICATION OF AN NRC MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION; AND REQUEST FOR INFORMATION 05000305/2011005 (DRS)
                TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
Inspection Report:             05000305/2011005(DRS)
Inspection Dates:              November 14 - 18, 2011; and November 28 - December 02, 2011
Inspection Procedure:          Temporary Instruction (TI) 2515/177, Management of Gas
                              Accumulation in Emergency Core Cooling, Decay Heat Removal,
                              and Containment Spray Systems
Inspectors:                    Néstor J. Féliz Adorno
                              (630) 829-9739
                              nestor.feliz-adorno@nrc.gov
                              Jorge Corujo-Sandín
                              (630) 829-9741
                              jorge.corujo-sandin@nrc.gov
I.    Information Requested By September 26, 2011
      1. Copy of the station response to Generic Letter (GL) 2008-01 and any supplemental
          report.
      2. Copies of all the requests for additional information (RAIs) and the associated
          responses.
      3. List of corrective action program documents (with a short description) associated
          with GL 2008-01, voids in piping, gas intrusion events, and pressure transients for
          the previous three years that affected the subject systems (i.e., emergency core
          cooling, decay heat removal, and containment spray systems).
      4. List of the suction piping sections identified as susceptible to gas accumulation (the
          list should identify the corresponding system).
      5. List of the discharge piping sections identified as susceptible to gas accumulation
          (the list should identify the corresponding system).
      6. List of changes (with a short description and tracking number) to the Final Safety
          Evaluation Report (FSAR), Technical Specifications, Technical Specification Bases,
          and Technical Requirement Manual associated with the resolution of GL 2008-01.
      7. List of calculations associated with GL 2008-01 (with a short description of the
          calculation and the change), including calculations that have been changed or
          created in response to GL 2008-01.
                                            1                                        Enclosure


==Dear Mr. Heacock:==
            TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
On November 14, 2011, the U. S. Nuclear Regulatory Commission (NRC) will begin the on-site portion of the Temporary Instruction (TI) 2515/177 inspection, "Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," at your Kewaunee Power Station. This inspection will be performed in accordance with NRC TI 2515/177 Procedure. In order to minimize the impact that the inspection may have on the site and to ensure productive inspections, we have enclosed a request for documents needed for the inspection. The documents have been divided into three groups. The first group lists information necessary for our initial inspection scoping activities. This information should be available to the inspector no later than September 26, 2011. By September 30, 2011, the inspector will communicate the initial selected samples. The second group of documents requested are those items needed to support our in-office preparation activities. This set of documents should be available at the Regional Office no later than October 31, 2011. This information should be separated by information request number, especially if provided electronically (e.g., folder with the information request number). During the in-office preparation activities, the inspector may identify additional information needed to support the inspection. The last group includes additional information above, as well as plant specific reference material. This information should be available to the inspector on November 14, 2011. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the inspector as the documents are generated. Please send the information to the following e-mail address nestor.feliz-adorno@nrc.gov. A hard-copy with the required information is also an acceptable option. It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the on-site inspection. If no activities were accomplished associated with a specific request, then provide a statement indicating that the request is not applicable. The lead inspector for this inspection is Mr. Néstor J. Féliz Adorno. If there are questions about the material requested, or the inspection, please call Mr. Féliz Adorno at (630) 829-9739. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number." In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
II. Information Requested By October 31, 2011
    1.  Copies of program documents and procedures developed to implement the
        resolution of GL 2008-01.
    2.  Copies of the selected corrective action program documents.
    3.   Copies of the selected licensing and design basis document changes.
    4.  Copies of the selected calculations.
    5.  List of commitments (with a description) done in response to GL 2008-01.
    6.  List of actions that were completed in response to GL 2008-01.
    7.   List of outstanding actions that will be completed in response to GL 2008-01 and the
        completion schedule (include the documents that are tracking their completion such
        as work orders or corrective action documents).
    8.   Copies of all the corrective actions identified in the nine-month response and
        supplemental reports.
    9.   List (with a short description) of gas intrusion mechanisms that apply to the plant
        and the affected system locations (e.g., identify the source, conditions, and
        expected void locations).
    10. Design basis documents of the subject systems.
    11. Design basis documents of keep-full systems of the subject systems.
    12. Copies of the construction code pages of the subject systems that discuss water
        hammer or flow-induced dynamic loading. Also, include the associated Design
        Specification pages.
    13. Provide the following description for the pumps of the subject systems:
        (1) flowrate at best efficiency point; (2) maximum and minimum flowrate during
        accident conditions and shutdown cooling; (3) number of pump stages; (4) if a pump
        is multi-stage, indicate if the shaft is stiff or flexible (include the basis for this
        determination); (5) pump head required; and (6) un-degraded pump head.
    14. Copies of self-assessments associated with the implementation of the GL 2008-01
        program and the associated corrective action program documents (include the
        attachments, if any).
    15. Copies of corrective action program implementing procedures.
    16. Copies of the operability determination procedures.
                                          2                                                Enclosure


Sincerely,/RA by R. C. Daley For/ Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-305 License Nos. DPR-43
              TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
      17. Electronic copies of piping and instrumentation diagrams (P&IDs) of the subject
          systems.
      18. If available, electronic copies of the current Technical Specifications, Technical
          Specifications Basis, Final Safety Analysis Report, and Technical Report Manual.
III.  Information Requested to be Available on First Day of Inspection, November 14,
      2011
      1. Copies of surveillance procedures associated with the resolution of GL 2008-01 and
          the results of the last two surveillances for the subject systems.
      2. Copies of the modification packages for hardware modifications as part of the
          resolution of GL 2008-01.
      3. Copies of procedures use for detecting and determining void volumes.
      4. Copies of procedures use for filling and venting.
      5. Copies of surveillance procedures that establish flow at the subject systems (e.g.,
          surveillances where the pumps are operated)
      6. Subject systems walkdown work documents associated with the resolution of
          GL 2008-01 and the results of these walkdowns.
      7. Copies of the engineering evaluations performed for all identified voids.
      8. Provide a list of all piping locations that are currently voided and their associated
          evaluation.
      9. Copies of trends of periodic gas accumulation monitoring results (e.g., venting, UTs).
    10. Copy of the design change review checklist.
    11. Copies of training documents that ensure that personnel are aware of gas-related
          concerns. Include the scheduled or attendance list of training that was already
          conducted.
    12. Copy of the void transport analysis.
    13. Basis for the void acceptance criteria (e.g., calculation). If applicable, provide the
          justification for any deviation from the void acceptance criteria established by the
          Office of Nuclear Reactor Regulations (NRR).
    14. Basis for horizontal pipe acceptance criteria (e.g., calculation).
                                            3                                          Enclosure


===Enclosures:===
                TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST cc w/encl: Distribution via ListServe TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST 1 Enclosure Inspection Report: 05000305/2011005(DRS) Inspection Dates: November 14 - 18, 2011; and November 28 - December 02, 2011 Inspection ProcedureInspectors: Néstor J. Féliz Adorno : Temporary Instruction (TI) 2515/177, "Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (630) 829-9739 nestor.feliz-adorno@nrc.gov Jorge Corujo-Sandín (630) 829-9741 jorge.corujo-sandin@nrc.gov I. Information Requested By September 26, 2011 1. Copy of the station response to Generic Letter (GL) 2008-01 and any supplemental report. 2. Copies of all the requests for additional information (RAIs) and the associated responses. 3. List of corrective action program documents (with a short description) associated with GL 2008-01, voids in piping, gas intrusion events, and pressure transients for the previous three years that affected the subject systems (i.e., emergency core cooling, decay heat removal, and containment spray systems). 4. List of the suction piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system). 5. List of the discharge piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system). 6. List of changes (with a short description and tracking number) to the Final Safety Evaluation Report (FSAR), Technical Specifications, Technical Specification Bases, and Technical Requirement Manual associated with the resolution of GL 2008-01. 7. List of calculations associated with GL 2008-01 (with a short description of the calculation and the change), including calculations that have been changed or created in response to GL 2008-01.
      15. If applicable, provide a list of inaccessible locations where plant walkdowns of the
            subject systems have not been completed. Include an explanation of why each
            area is considered inaccessible.
      16. Hardcopies of isometric drawings of the subject systems (11X17 or similar size is
            preferred if legible).
      17. Hardcopies of piping and instrumentation diagrams (P&IDs) of the subject systems
            (11X17 or similar size is preferred if legible).
If you have questions regarding the information requested, please contact the lead inspector.
                                              4                                        Enclosure


TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST 2 Enclosure II. Information Requested By October 31, 2011 1. Copies of program documents and procedures developed to implement the resolution of GL 2008-01. 2. Copies of the selected corrective action program documents. 3. Copies of the selected licensing and design basis document changes. 4. Copies of the selected calculations. 5. List of commitments (with a description) done in response to GL 2008-01. 6. List of actions that were completed in response to GL 2008-01. 7. List of outstanding actions that will be completed in response to GL 2008-01 and the completion schedule (include the documents that are tracking their completion such as work orders or corrective action documents). 8. Copies of all the corrective actions identified in the nine-month response and supplemental reports. 9. List (with a short description) of gas intrusion mechanisms that apply to the plant and the affected system locations (e.g., identify the source, conditions, and expected void locations). 10. Design basis documents of the subject systems. 11. Design basis documents of keep-full systems of the subject systems. 12. Copies of the construction code pages of the subject systems that discuss water hammer or flow-induced dynamic loading. Also, include the associated Design Specification pages. 13. Provide the following description for the pumps of the subject systems: (1) flowrate at best efficiency point; (2) maximum and minimum flowrate during accident conditions and shutdown cooling; (3) number of pump stages; (4) if a pump is multi-stage, indicate if the shaft is stiff or flexible (include the basis for this determination); (5) pump head required; and (6) un-degraded pump head. 14. Copies of self-assessments associated with the implementation of the GL 2008-01 program and the associated corrective action program documents (include the attachments, if any). 15. Copies of corrective action program implementing procedures. 16. Copies of the operability determination procedures.
D. Heacock                                                                  -2-
If no activities were accomplished associated with a specific request, then provide a statement indicating
that the request is not applicable.
The lead inspector for this inspection is Mr. Néstor J. Féliz Adorno. If there are questions about the
material requested, or the inspection, please call Mr. Féliz Adorno at (630) 829-9739.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements
were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not
conduct or sponsor, and a person is not required to respond to, a request for information or an
information collection requirement unless the requesting document displays a currently valid Office of
Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure
will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
                                                                          Sincerely,
                                                                          /RA by R. C. Daley For/
                                                                          Ann Marie Stone, Chief
                                                                          Engineering Branch 2
                                                                          Division of Reactor Safety
Docket Nos. 50-305
License Nos. DPR-43
Enclosures:                TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
cc w/encl:                Distribution via ListServe
DISTRIBUTION:
See next page
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\-Ltr 08__11 Kewaunee RFI - TI177 NFA.docx
Publicly Available                        Non-Publicly Available                    Sensitive              Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE                    RIII                              RIII
NAME                NJFeliz Adorno:ls                      AMStone
DATE                08/03/11                              08/03/11
                                                          OFFICIAL RECORD COPY


TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST 3 Enclosure 17. Electronic copies of piping and instrumentation diagrams (P&IDs) of the subject systems. 18. If available, electronic copies of the current Technical Specifications, Technical Specifications Basis, Final Safety Analysis Report, and Technical Report Manual. III. Information Requested to be Available on First Day of Inspection, November 14, 2011 1. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the results of the last two surveillances for the subject systems. 2. Copies of the modification packages for hardware modifications as part of the resolution of GL 2008-01. 3. Copies of procedures use for detecting and determining void volumes. 4. Copies of procedures use for filling and venting. 5. Copies of surveillance procedures that establish flow at the subject systems (e.g., surveillances where the pumps are operated) 6. Subject systems walkdown work documents associated with the resolution of GL 2008-01 and the results of these walkdowns. 7. Copies of the engineering evaluations performed for all identified voids. 8. Provide a list of all piping locations that are currently voided and their associated evaluation. 9. Copies of trends of periodic gas accumulation monitoring results (e.g., venting, UTs). 10. Copy of the design change review checklist. 11. Copies of training documents that ensure that personnel are aware of gas-related concerns. Include the scheduled or attendance list of training that was already conducted. 12. Copy of the void transport analysis. 13. Basis for the void acceptance criteria (e.g., calculation). If applicable, provide the justification for any deviation from the void acceptance criteria established by the Office of Nuclear Reactor Regulations (NRR). 14. Basis for horizontal pipe acceptance criteria (e.g., calculation).
Letter to Mr. David A. Heacock from Ms. Ann Marie Stone dated August 3, 2011.
 
SUBJECT:       KEWAUNEE POWER STATION - NOTIFICATION OF AN NRC MANAGEMENT
TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST 4 Enclosure 15. If applicable, provide a list of inaccessible locations where plant walkdowns of the subject systems have not been completed. Include an explanation of why each area is considered inaccessible. 16. Hardcopies of isometric drawings of the subject systems (11"X17" or similar size is preferred if legible). 17. Hardcopies of piping and instrumentation diagrams (P&IDs) of the subject systems (11"X17" or similar size is preferred if legible). If you have questions regarding the information requested, please contact the lead inspector. If no activities were accomplished associated with a specific request, then provide a statement indicating that the request is not applicable. The lead inspector for this inspection is Mr. Néstor J. Féliz Adorno. If there are questions about the material requested, or the inspection, please call Mr. Féliz Adorno at (630) 829-9739. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number." In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
              OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT
 
              REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION; AND
Sincerely,/RA by R. C. Daley For/
              REQUEST FOR INFORMATION 05000305/2011005 (DRS)
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-305 License Nos. DPR-43
DISTRIBUTION:
 
Daniel Merzke
===Enclosures:===
RidsNrrDorlLpl3-1 Resource
TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST cc w/encl: Distribution via ListServe DISTRIBUTION: See next page DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\-Ltr 08__11 Kewaunee RFI - TI177 NFA.docx -Publicly Available -Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME NJFeliz Adorno:ls AMStone DATE 08/03/11 08/03/11 OFFICIAL RECORD COPY Letter to Mr. David from Ms. Ann Marie Stone dated August 3, 2011. SUBJECT: KEWAUNEE POWER STATION - NOTIFICATION OF AN NRC MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION; AND REQUEST FOR INFORMATION 05000305/2011005 (DRS) DISTRIBUTION: Daniel Merzke RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
RidsNrrPMKewaunee
RidsNrrDirsIrib Resource
Cynthia Pederson
Steven Orth
Jared Heck
Allan Barker
Carole Ariano
Linda Linn
DRPIII
DRSIII
Patricia Buckley
Tammy Tomczak
ROPreports Resource
}}
}}

Latest revision as of 16:42, 12 November 2019

Notification of an NRC Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Inspection; and Request for Information 05000305/2011005
ML11215A089
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 08/03/2011
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Heacock D
Dominion Energy Kewaunee
References
IR-11-005
Download: ML11215A089 (8)


See also: IR 05000305/2011005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

August 3, 2011

Mr. David A. Heacock

President and Chief Nuclear Officer

Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT: KEWAUNEE POWER STATION - NOTIFICATION OF AN NRC MANAGEMENT

OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT

REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION; AND

REQUEST FOR INFORMATION 05000305/2011005 (DRS)

Dear Mr. Heacock:

On November 14, 2011, the U. S. Nuclear Regulatory Commission (NRC) will begin the on-site

portion of the Temporary Instruction (TI) 2515/177 inspection, Gas Accumulation Management

in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, at your

Kewaunee Power Station. This inspection will be performed in accordance with NRC

TI 2515/177 Procedure.

In order to minimize the impact that the inspection may have on the site and to ensure

productive inspections, we have enclosed a request for documents needed for the inspection.

The documents have been divided into three groups.

  • The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the inspector no later than September 26, 2011. By

September 30, 2011, the inspector will communicate the initial selected samples.

  • The second group of documents requested are those items needed to support our in-office

preparation activities. This set of documents should be available at the Regional Office no

later than October 31, 2011. This information should be separated by information request

number, especially if provided electronically (e.g., folder with the information request

number). During the in-office preparation activities, the inspector may identify additional

information needed to support the inspection.

  • The last group includes additional information above, as well as plant specific reference

material. This information should be available to the inspector on November 14, 2011. It is

also requested that corrective action documents and/or questions developed during the

inspection be provided to the inspector as the documents are generated.

Please send the information to the following e-mail address nestor.feliz-adorno@nrc.gov.

A hard-copy with the required information is also an acceptable option. It is important that these

documents be as complete as possible, in order to minimize the number of documents

requested during the preparation week or during the on-site inspection.

D. Heacock -2-

If no activities were accomplished associated with a specific request, then provide a statement

indicating that the request is not applicable.

The lead inspector for this inspection is Mr. Néstor J. Féliz Adorno. If there are questions about

the material requested, or the inspection, please call Mr. Féliz Adorno at (630) 829-9739.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA by R. C. Daley For/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-305

License Nos. DPR-43

Enclosures: TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST

cc w/encl: Distribution via ListServe

TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST

Inspection Report: 05000305/2011005(DRS)

Inspection Dates: November 14 - 18, 2011; and November 28 - December 02, 2011

Inspection Procedure: Temporary Instruction (TI) 2515/177, Management of Gas

Accumulation in Emergency Core Cooling, Decay Heat Removal,

and Containment Spray Systems

Inspectors: Néstor J. Féliz Adorno

(630) 829-9739

nestor.feliz-adorno@nrc.gov

Jorge Corujo-Sandín

(630) 829-9741

jorge.corujo-sandin@nrc.gov

I. Information Requested By September 26, 2011

1. Copy of the station response to Generic Letter (GL) 2008-01 and any supplemental

report.

2. Copies of all the requests for additional information (RAIs) and the associated

responses.

3. List of corrective action program documents (with a short description) associated

with GL 2008-01, voids in piping, gas intrusion events, and pressure transients for

the previous three years that affected the subject systems (i.e., emergency core

cooling, decay heat removal, and containment spray systems).

4. List of the suction piping sections identified as susceptible to gas accumulation (the

list should identify the corresponding system).

5. List of the discharge piping sections identified as susceptible to gas accumulation

(the list should identify the corresponding system).

6. List of changes (with a short description and tracking number) to the Final Safety

Evaluation Report (FSAR), Technical Specifications, Technical Specification Bases,

and Technical Requirement Manual associated with the resolution of GL 2008-01.

7. List of calculations associated with GL 2008-01 (with a short description of the

calculation and the change), including calculations that have been changed or

created in response to GL 2008-01.

1 Enclosure

TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST

II. Information Requested By October 31, 2011

1. Copies of program documents and procedures developed to implement the

resolution of GL 2008-01.

2. Copies of the selected corrective action program documents.

3. Copies of the selected licensing and design basis document changes.

4. Copies of the selected calculations.

5. List of commitments (with a description) done in response to GL 2008-01.

6. List of actions that were completed in response to GL 2008-01.

7. List of outstanding actions that will be completed in response to GL 2008-01 and the

completion schedule (include the documents that are tracking their completion such

as work orders or corrective action documents).

8. Copies of all the corrective actions identified in the nine-month response and

supplemental reports.

9. List (with a short description) of gas intrusion mechanisms that apply to the plant

and the affected system locations (e.g., identify the source, conditions, and

expected void locations).

10. Design basis documents of the subject systems.

11. Design basis documents of keep-full systems of the subject systems.

12. Copies of the construction code pages of the subject systems that discuss water

hammer or flow-induced dynamic loading. Also, include the associated Design

Specification pages.

13. Provide the following description for the pumps of the subject systems:

(1) flowrate at best efficiency point; (2) maximum and minimum flowrate during

accident conditions and shutdown cooling; (3) number of pump stages; (4) if a pump

is multi-stage, indicate if the shaft is stiff or flexible (include the basis for this

determination); (5) pump head required; and (6) un-degraded pump head.

14. Copies of self-assessments associated with the implementation of the GL 2008-01

program and the associated corrective action program documents (include the

attachments, if any).

15. Copies of corrective action program implementing procedures.

16. Copies of the operability determination procedures.

2 Enclosure

TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST

17. Electronic copies of piping and instrumentation diagrams (P&IDs) of the subject

systems.

18. If available, electronic copies of the current Technical Specifications, Technical

Specifications Basis, Final Safety Analysis Report, and Technical Report Manual.

III. Information Requested to be Available on First Day of Inspection, November 14,

2011

1. Copies of surveillance procedures associated with the resolution of GL 2008-01 and

the results of the last two surveillances for the subject systems.

2. Copies of the modification packages for hardware modifications as part of the

resolution of GL 2008-01.

3. Copies of procedures use for detecting and determining void volumes.

4. Copies of procedures use for filling and venting.

5. Copies of surveillance procedures that establish flow at the subject systems (e.g.,

surveillances where the pumps are operated)

6. Subject systems walkdown work documents associated with the resolution of

GL 2008-01 and the results of these walkdowns.

7. Copies of the engineering evaluations performed for all identified voids.

8. Provide a list of all piping locations that are currently voided and their associated

evaluation.

9. Copies of trends of periodic gas accumulation monitoring results (e.g., venting, UTs).

10. Copy of the design change review checklist.

11. Copies of training documents that ensure that personnel are aware of gas-related

concerns. Include the scheduled or attendance list of training that was already

conducted.

12. Copy of the void transport analysis.

13. Basis for the void acceptance criteria (e.g., calculation). If applicable, provide the

justification for any deviation from the void acceptance criteria established by the

Office of Nuclear Reactor Regulations (NRR).

14. Basis for horizontal pipe acceptance criteria (e.g., calculation).

3 Enclosure

TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST

15. If applicable, provide a list of inaccessible locations where plant walkdowns of the

subject systems have not been completed. Include an explanation of why each

area is considered inaccessible.

16. Hardcopies of isometric drawings of the subject systems (11X17 or similar size is

preferred if legible).

17. Hardcopies of piping and instrumentation diagrams (P&IDs) of the subject systems

(11X17 or similar size is preferred if legible).

If you have questions regarding the information requested, please contact the lead inspector.

4 Enclosure

D. Heacock -2-

If no activities were accomplished associated with a specific request, then provide a statement indicating

that the request is not applicable.

The lead inspector for this inspection is Mr. Néstor J. Féliz Adorno. If there are questions about the

material requested, or the inspection, please call Mr. Féliz Adorno at (630) 829-9739.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA by R. C. Daley For/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-305

License Nos. DPR-43

Enclosures: TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST

cc w/encl: Distribution via ListServe

DISTRIBUTION:

See next page

DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\-Ltr 08__11 Kewaunee RFI - TI177 NFA.docx

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII

NAME NJFeliz Adorno:ls AMStone

DATE 08/03/11 08/03/11

OFFICIAL RECORD COPY

Letter to Mr. David A. Heacock from Ms. Ann Marie Stone dated August 3, 2011.

SUBJECT: KEWAUNEE POWER STATION - NOTIFICATION OF AN NRC MANAGEMENT

OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT

REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION; AND

REQUEST FOR INFORMATION 05000305/2011005 (DRS)

DISTRIBUTION:

Daniel Merzke

RidsNrrDorlLpl3-1 Resource

RidsNrrPMKewaunee

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

ROPreports Resource