ML19350B736: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-w-                    +                      -          __,        m          -+J-    - - " . - - - -                          e        an,.        u      m,_    p, -
{{#Wiki_filter:-w-                    +                      -          __,        m          -+J-    - - " . - - - -                          e        an,.        u      m,_    p, -
          -
: o.                            .
: o.                            .
                                                        .
4 i                                                                CPERATING DATA REPORT DOCKET NO.
4 i                                                                CPERATING DATA REPORT DOCKET NO.
50-293
50-293
                                                                                                                                                           "' us, o i
                                                                                                                                                           "' us, o i DATE COMPLETED BY            G.G.Whieney TELEPHONE      617-746-7900 OPERATLNG STATUS PILGRIM 1                                  Notes
_
DATE COMPLETED BY            G.G.Whieney TELEPHONE      617-746-7900 OPERATLNG STATUS PILGRIM 1                                  Notes
: 1. Unit Name:
: 1. Unit Name:
February, 1981
February, 1981
Line 33: Line 29:
4 Nameplate Rating (Gross MWe):
4 Nameplate Rating (Gross MWe):
678.
678.
                  .
: 5. Design Elecmcal Rating (Net MWe).                      655.
: 5. Design Elecmcal Rating (Net MWe).                      655.
: 6. Maximum Dependable Qpedty (Gross MWe):
: 6. Maximum Dependable Qpedty (Gross MWe):
Line 39: Line 34:
: 7. Maximum Dependable Qpacity (Net MWe):                  670.
: 7. Maximum Dependable Qpacity (Net MWe):                  670.
: 3. If Changes Occur in Qpacity Ratings (Items Number 3 Throu6h 7) Since List Report. Give Reasons:
: 3. If Changes Occur in Qpacity Ratings (Items Number 3 Throu6h 7) Since List Report. Give Reasons:
!
NONE NONE.
NONE NONE.
: 9. Power Level To which Restricted. If Any (Net Mwe):
: 9. Power Level To which Restricted. If Any (Net Mwe):
Line 51: Line 45:
: 16. Gross Thermal Energy Generated (MWH)                                                                                      _
: 16. Gross Thermal Energy Generated (MWH)                                                                                      _
j 313960.0                                759370.0                  2808/734.0
j 313960.0                                759370.0                  2808/734.0
!
: 17. Gross Electrical Energy Genersted (MWH)                                          _
: 17. Gross Electrical Energy Genersted (MWH)                                          _
301665.0                            j29025.0                      26979632.0
301665.0                            j29025.0                      26979632.0
Line 64: Line 57:
NONE Unit Ooerating l
NONE Unit Ooerating l
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup.
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup.
i              '6. Units In Test Status (Pnor to Commere:al Operation):                                                  Forecast                    Achieved
i              '6. Units In Test Status (Pnor to Commere:al Operation):                                                  Forecast                    Achieved INITIAL CRITICALITY INITIAL ELECTRICITY l                                      COMME?CIAL OPERATION l
                                                                                                                  '
INITIAL CRITICALITY INITIAL ELECTRICITY l                                      COMME?CIAL OPERATION l
!
                                                                                                                                                                    '"
_- _ . _
8103330551
8103330551
                        . _ _ . .          . ,  . _ _      _ . _ . . . . _ _ _ _ . _ _ _                                - . _ _ . _ _ . _ _                          _ . . . . .


            ._            .          ___-  _      .__                                .    .                    . _ . - .
AVERAGE DAILY UNIT FowER LEVEL 50-293 COCK.ET NO.
AVERAGE DAILY UNIT FowER LEVEL
gy;7 PILGRIM 1 03/09/81 COMPLETED BY C'C*#*it"*7 617-746-M00
                                                .
            .                                            .
      .
50-293 COCK.ET NO.
gy;7 PILGRIM 1 03/09/81
                                                  .
COMPLETED BY C'C*#*it"*7
                                                                                                                                                          .
617-746-M00
                               --                                                                            TT' ** HONE FEBRUARY, 1981 M0g
                               --                                                                            TT' ** HONE FEBRUARY, 1981 M0g
                                                                                                                                                         ~
                                                                                                                                                         ~
                                                                                                                                                            '
DAY      AVERAGI DAILY POWER !.ST.L                                    DAY        AVERAGE DAILY POWER LEVEL (MWe Net)                                                                (MWe Net) 4 36.                                                                475.
DAY      AVERAGI DAILY POWER !.ST.L                                    DAY        AVERAGE DAILY POWER LEVEL (MWe Net)                                                                (MWe Net) 4 36.                                                                475.
g
g
* 448.                                            gg'                  4 76 .                      ,
* 448.                                            gg'                  4 76 .                      ,
426.                                              19 475.
426.                                              19 475.
3
3 433.                -
                                                                                          -
433.                -
                                                                                     ,j                  4 74 .
                                                                                     ,j                  4 74 .
4 473.                                              og                  476.
4 473.                                              og                  476.
5 4 74                                            ~,
5 4 74                                            ~,
_
473.
473.
S 4 74.                                                                466.                                      ,
S 4 74.                                                                466.                                      ,
          -
3                                                            ,
3                                                            ,
                                                                                                                                                            '
4 76 .                                          ,4                  404'.
4 76 .                                          ,4                  404'.
3 475.                                            3                  446.
3 475.                                            3                  446.
Line 111: Line 83:
g3                                                                          3 477.                                                                      0.
g3                                                                          3 477.                                                                      0.
g                                                                          30 475.                                                                      O.
g                                                                          30 475.                                                                      O.
gg                                                                          3,
gg                                                                          3, 16 477-t-              ,
* 16 477-
                                                                                                          .
.
t-              ,
  .
INSTRUCTIONS                      .
INSTRUCTIONS                      .
On this t'cr=2t.!!st the average dsHy unit power !evel in MWe. Net for each day in the repornns month. Campute to the nearest whole mepwatt.
On this t'cr=2t.!!st the average dsHy unit power !evel in MWe. Net for each day in the repornns month. Campute to the nearest whole mepwatt.
i h
i h
                             *                                                                                                          (0/77)
                             *                                                                                                          (0/77)
                                                                  . . . _ . _ _ _ . _          _ -__-_                      _ - __    . . _ . __ _ __


  ,_. _ -. _ _ _ _ - _ _ _ _ _ - _ _ - _ _ - - _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ -                          .
                                                                                                                                                                                                                                        .
                                                                                                                                                                                              .
t IW'KEl NO.            50-293 UNil SHUIDOWNS AND POWER REDUCIlONS                                                PILCRIM l U Nil' N A M E DNIE _ 03/0_2/81 COMPl.EIED BY            C.C.Wh1tney REPORTipONils FEBRilARY. 1981                        .lEEEPilONE          617-746-799Q
t IW'KEl NO.            50-293 UNil SHUIDOWNS AND POWER REDUCIlONS                                                PILCRIM l U Nil' N A M E DNIE _ 03/0_2/81 COMPl.EIED BY            C.C.Wh1tney REPORTipONils FEBRilARY. 1981                        .lEEEPilONE          617-746-799Q
                                                                                                                                                                          -
                                                                                                                                       'l EE      3              liccusee        {g            L                  Cause & Couettive No.                              D.lic N
                                                                                                                                       'l EE      3              liccusee        {g            L                  Cause & Couettive No.                              D.lic N
                                                                                                  ,
p                  Eg      3 )Ysac        Event EY
p                  Eg      3 )Ysac        Event
* EY
                                                                                                                                                               $G k*3 u
                                                                                                                                                               $G k*3 u
Atsion to
Atsion to
                                                                                                                       $$      $  jiji g      Repost #                                        Paesent Recunen(c 6
                                                                                                                       $$      $  jiji g      Repost #                                        Paesent Recunen(c 6
                                                                                                                                                                                                                                      .
4                    81/01/29                                      F                    0.0    11    1        N/A            IIB    llTEXCll    "B" liigh & l.ow Pressure lleater Trains have been isolated I?miting power to 75%.
4                    81/01/29                                      F                    0.0    11    1        N/A            IIB    llTEXCll    "B" liigh & l.ow Pressure lleater Trains have been isolated I?miting power to 75%.
5                    81/02/28                                      s                22.2      B      1        N/A            IIB    llTEXCll    Unit shutdown to install bypass of 4 th point. heat exchanger.
5                    81/02/28                                      s                22.2      B      1        N/A            IIB    llTEXCll    Unit shutdown to install bypass of 4 th point. heat exchanger.
                                                    .
4 1                                                                2                                                                .I                                4 F: Emced                                                          Reason:                                                    Method:                            Enh6 bis G Insisuttions S: Scheduled                                                      A-lk luipment Fallme(limplain)                              1-Manual                            fos Psepasation of Dai.
4 1                                                                2                                                                .I                                4 F: Emced                                                          Reason:                                                    Method:                            Enh6 bis G Insisuttions
B Maintenance of Tes                                        2 Manual Sceam.                    linssy Sheets fm 1.icensee C Refueling                                                  3- Anlumalle Sesam.                I: vent Repose (l.l!R)l'ile INilHin i                                                                                                l) Regulaimy itestsitsion                                  4 Othes (limplain)                  0161) li Opesato Tsaining & Iicense linamination i
,
F Adminisisative                                                                          5 G-Operational I nos (F = plain)                                                                taliibit 1 - Same Sousce raf17)                                                                    11 Othes (lixplain) l l
S: Scheduled                                                      A-lk luipment Fallme(limplain)                              1-Manual                            fos Psepasation of Dai.
B Maintenance of Tes                                        2 Manual Sceam.                    linssy Sheets fm 1.icensee C Refueling                                                  3- Anlumalle Sesam.                I: vent Repose (l.l!R)l'ile INilHin i                                                                                                l) Regulaimy itestsitsion                                  4 Othes (limplain)                  0161)
;
li Opesato Tsaining & Iicense linamination i
F Adminisisative                                                                          5
'
G-Operational I nos (F = plain)                                                                taliibit 1 - Same Sousce raf17)                                                                    11 Othes (lixplain) l l
L
L


Line 155: Line 107:
_*            D E                    G
_*            D E                    G
             ,              T 1
             ,              T 1
_
A I
A I
8                  C                                                      9 9                  O
8                  C                                                      9 9                  O
'      1 S
'      1 S
          ,
S Y                  A R
S Y                  A R
A U
A U
Line 171: Line 121:
CN
CN
                                               =
                                               =
                                          . -
2.
2.
Pv E            - me
Pv E            - me 2r Op                -
                                          -
Cp e
2r Op                -
m                .
Cp
_
_
e m                .
                                    "          .
                                          .
w E
w E
N C O    N I          A  E T    N        C A    E        N                                  a T    T        A S    N        N I    E              -
N C O    N I          A  E T    N        C A    E        N                                  a T    T        A S    N        N I    E              -
Line 187: Line 130:
  . E H            N            E g
  . E H            N            E g
  -    W              I N
  -    W              I N
                                                          .
e O D            A            O P E            H            N                            e T
e O D            A            O P E            H            N                            e T
R A                            -
R A                            -
Line 193: Line 135:
I          O                                                                    0 P I M                                    m e
I          O                                                                    0 P I M                                    m e
e s
e s
                                                    ,
N O                            m-I                              ,
N O                            m-I                              ,
T                            .-
T                            .-
Line 199: Line 140:
U F
U F
L                            e A                            w H
L                            e A                            w H
                                  -
                                    ,
                        ,
                                .      .
T N
T N
E N
E N
n                  O T
n                  O T
                                        ,
                     )
                     )
O        -
O        -
Line 214: Line 150:
:                                                  em
:                                                  em


                .    ..    - _                  _ _ _ __ _-          _-        -    . .
    *
  .
      .
  .
J REFUELING INFORMATION.
J REFUELING INFORMATION.
The following refueling infor=ation is included in the Monthly Report          as  .
The following refueling infor=ation is included in the Monthly Report          as  .
Line 237: Line 168:
l
l
(
(
                                                                                  .
\
\
l l
l l
t e
t e
                                                                '
l l
l l
l I
l I
l t
l t


__        -_      . _ . _                _  _
30STON EttSON COMPANY a          .
30STON EttSON COMPANY a          .
*
      .
        '
                .
PILGRTM NUCI. EAR POk*2R STATION
PILGRTM NUCI. EAR POk*2R STATION
          '


==SUMMARY==
==SUMMARY==
Line 261: Line 184:
down to repair feedwater heater leaks.
down to repair feedwater heater leaks.
The uni: was li=1:ed to 75% during de ::enth of February because of lini.ations en the turbine with the    "3" Feedwa:er Eea:e train isola:ed.
The uni: was li=1:ed to 75% during de ::enth of February because of lini.ations en the turbine with the    "3" Feedwa:er Eea:e train isola:ed.
SAFETY /PILIEF VALVE CEALLENGES ENT'4 0F FEBRUARY,1981
SAFETY /PILIEF VALVE CEALLENGES ENT'4 0F FEBRUARY,1981 4
:
1 REQUIREME'C: TMI T.A.P. II.K.3.3 DATE:          February 28, 1981 VALVE d's:    RV-203-3A 4                                  RV-203-3D REACIOR PRESSURE:    960 PSIG RIASON:        Response to IE Bulletin 80-25      .
4 1
l l
REQUIREME'C: TMI T.A.P. II.K.3.3 DATE:          February 28, 1981 VALVE d's:    RV-203-3A 4                                  RV-203-3D REACIOR PRESSURE:    960 PSIG RIASON:        Response to IE Bulletin 80-25      .
l I
:
l
!
l l
l l
:
l I
I l
I l                                            -
l
l t}}
!
l
.
I I
l                                            -
!
l
!
,
t}}

Latest revision as of 04:11, 18 February 2020

Monthly Operating Rept for Feb 1981
ML19350B736
Person / Time
Site: Pilgrim
Issue date: 03/09/1981
From: Whitney G
BOSTON EDISON CO.
To:
Shared Package
ML19350B733 List:
References
NUDOCS 8103230551
Download: ML19350B736 (6)


Text

-w- + - __, m -+J- - - " . - - - - e an,. u m,_ p, -

o. .

4 i CPERATING DATA REPORT DOCKET NO.

50-293

"' us, o i DATE COMPLETED BY G.G.Whieney TELEPHONE 617-746-7900 OPERATLNG STATUS PILGRIM 1 Notes

1. Unit Name:

February, 1981

2. Reportin6 Period:

1998.

3. LicWThermalPower(MWt):

4 Nameplate Rating (Gross MWe):

678.

5. Design Elecmcal Rating (Net MWe). 655.
6. Maximum Dependable Qpedty (Gross MWe):

690.

7. Maximum Dependable Qpacity (Net MWe): 670.
3. If Changes Occur in Qpacity Ratings (Items Number 3 Throu6h 7) Since List Report. Give Reasons:

NONE NONE.

9. Power Level To which Restricted. If Any (Net Mwe):
10. Roanoc eor Restrictions.If Any: L A.

l This. Month Yrao-Date Cumulative 672.0 14 16.0 -72096.0

11. Hours In Reportms Period 649.8 1375.9 51560.5
12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
13. Rescr- Reserve Shutdown Hours 649.8 1366.1 49873.0
14. Sours Generator On.Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 10G0224.0 2297160.0 84566536.0 ,
16. Gross Thermal Energy Generated (MWH) _

j 313960.0 759370.0 2808/734.0

17. Gross Electrical Energy Genersted (MWH) _

301665.0 j29025.0 26979632.0

18. Net Electrical Energy Genensted (MWH) 96.7 96.5 69.2 l 19. Unit Service Factor ,

96.7 96.5 69.2

20. Unit Availability Fsetor l

67.0 76 .8 55.9

21. Unit Qpacity Factor (Using MDC Net) 68.5 78.6 57.1
22. Unit Capacity Factor (Using DER Net) 0.0 2.0 10.2
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eschi:

NONE Unit Ooerating l

25. If Shut Down At End Of Report Period. Estimated Date of Startup.

i '6. Units In Test Status (Pnor to Commere:al Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY l COMME?CIAL OPERATION l

8103330551

AVERAGE DAILY UNIT FowER LEVEL 50-293 COCK.ET NO.

gy;7 PILGRIM 1 03/09/81 COMPLETED BY C'C*#*it"*7 617-746-M00

-- TT' ** HONE FEBRUARY, 1981 M0g

~

DAY AVERAGI DAILY POWER !.ST.L DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 4 36. 475.

g

  • 448. gg' 4 76 . ,

426. 19 475.

3 433. -

,j 4 74 .

4 473. og 476.

5 4 74 ~,

473.

S 4 74. 466. ,

3 ,

4 76 . ,4 404'.

3 475. 3 446.

9 gn 475. *6 473*

gg 476.  ; 472.

473. 17.

g, 3 4 75. 0.

g3 3 477. 0.

g 30 475. O.

gg 3, 16 477-t- ,

INSTRUCTIONS .

On this t'cr=2t.!!st the average dsHy unit power !evel in MWe. Net for each day in the repornns month. Campute to the nearest whole mepwatt.

i h

  • (0/77)

t IW'KEl NO. 50-293 UNil SHUIDOWNS AND POWER REDUCIlONS PILCRIM l U Nil' N A M E DNIE _ 03/0_2/81 COMPl.EIED BY C.C.Wh1tney REPORTipONils FEBRilARY. 1981 .lEEEPilONE 617-746-799Q

'l EE 3 liccusee {g L Cause & Couettive No. D.lic N

p Eg 3 )Ysac Event EY

$G k*3 u

Atsion to

$$ $ jiji g Repost # Paesent Recunen(c 6

4 81/01/29 F 0.0 11 1 N/A IIB llTEXCll "B" liigh & l.ow Pressure lleater Trains have been isolated I?miting power to 75%.

5 81/02/28 s 22.2 B 1 N/A IIB llTEXCll Unit shutdown to install bypass of 4 th point. heat exchanger.

4 1 2 .I 4 F: Emced Reason: Method: Enh6 bis G Insisuttions S: Scheduled A-lk luipment Fallme(limplain) 1-Manual fos Psepasation of Dai.

B Maintenance of Tes 2 Manual Sceam. linssy Sheets fm 1.icensee C Refueling 3- Anlumalle Sesam. I: vent Repose (l.l!R)l'ile INilHin i l) Regulaimy itestsitsion 4 Othes (limplain) 0161) li Opesato Tsaining & Iicense linamination i

F Adminisisative 5 G-Operational I nos (F = plain) taliibit 1 - Same Sousce raf17) 11 Othes (lixplain) l l

L

j y R E

L '

O

_* D E G

, T 1

A I

8 C 9 9 O

' 1 S

S Y A R

A U

R $

B E

F 9 l

F Nc h OM t I F n Th o CD H AU

  • P EF
  • VD ,e I =

TT .

CN

=

2.

Pv E - me 2r Op -

Cp e

m .

w E

N C O N I A E T N C A E N a T T A S N N I E -

R A T

. E H N E g

- W I N

e O D A O P E H N e T

R A -

A L E E L R g C o U Y N T E 9 6 M F E e I A S R S U e C A L R C e.

I O 0 P I M m e

e s

N O m-I ,

T .-

e C' e N

U F

L e A w H

T N

E N

n O T

)

O -

C I

< D -

T

em

J REFUELING INFORMATION.

The following refueling infor=ation is included in the Monthly Report as .

requested in a letter to Mr. G. C. Andognini dated January 18, 19 78:

For your convenicnce, the information supplied has been enunerated so that each number corresponds to equivalent notation utilized in the request.

1. The name of this facility is Pilgrim Nuclear Power Station, Dockat Number 50-29 3,
2. Scheduled dat.e for next Refueling Shutdown: Sep tenber, 1981

, 3. Scheduled date for restart following refueling:

4.

5. Due to their similarity, requests 4, 5, & 6 are responded to collectively:
6. The fuel, which had been loaded during the 1980 scheduled refueling outage, is of the new P8x8R design, consisting of approxi:aately 64 P8DR3282 assemblies and 120 P80R3265 assemblies.
7. (a) There are 580 fuel assemblies in the core.

(b) There are 764 fuel assemblies in the spent fuel pool.

8. (a) The station is presently licensed to store 2320 spent fuel assemblies.

The actual spent fuel storage capacity'is 1770 fuel assemblies at present.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

9. With present spent fuel in storage, the spent fuel pool now has the f capacity to acco:nnodate an additional 1006 fuel assemblies.

l

(

\

l l

t e

l l

l I

l t

30STON EttSON COMPANY a .

PILGRTM NUCI. EAR POk*2R STATION

SUMMARY

OF OPERATIONS FOR FE3*tCARY,1981 The Unit operated at approxi ately 73% reactor power (67% Electrical) fro:

February 1 to February 2a. On February 2?., de reac:or power was reduced :o 20 :o facili: ate an entr/ in:o :he dr/well :o decernine cause for excessive uniden:ified leakage. ~'c.e leakage was identified to be packing on de ' A' reac:or recirculation pu::p discharge valve. The valve was backsea:ed, leakage reduced to acceptable le.vals and power returned :o 75%.

On ?chruarf 25 the uni: was reduced to 50% pcuer to backwash de =ain condenser because 1:1 gh winds and heavy seas had broken up large arioun:s of seaweed which clogged the ::aveling screens. Power was re:urned to 75% af:e the backwash and naintained a: tha: level until 0145 on Fe'eruarf 23 when the uni: was shu:

down to repair feedwater heater leaks.

The uni: was li=1:ed to 75% during de ::enth of February because of lini.ations en the turbine with the "3" Feedwa:er Eea:e train isola:ed.

SAFETY /PILIEF VALVE CEALLENGES ENT'4 0F FEBRUARY,1981 4

1 REQUIREME'C: TMI T.A.P. II.K.3.3 DATE: February 28, 1981 VALVE d's: RV-203-3A 4 RV-203-3D REACIOR PRESSURE: 960 PSIG RIASON: Response to IE Bulletin 80-25 .

l l

l I

l l

l I

I l -

l t