MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station ML20148K4161997-05-31031 May 1997 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20141B9631997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Pilgrim Nuclear Power Station ML20137T5631997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Pilgrim Nuclear Power Station ML20136G7791997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20138K5811997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Pilgrim Nuclear Power Station ML20133G5831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Pilgrim Nuclear Power Station BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station ML20128N2611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-083, Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr1996-08-31031 August 1996 Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr ML20116L0841996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station ML20117E0961996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-034, Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station ML20095E7351995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Pilgrim Nuclear Power Station Unit 1 BECO-LTR-95-116, Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station ML20093F5221995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-071, Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
-w- + - __, m -+J- - - " . - - - - e an,. u m,_ p, -
- o. .
4 i CPERATING DATA REPORT DOCKET NO.
50-293
"' us, o i DATE COMPLETED BY G.G.Whieney TELEPHONE 617-746-7900 OPERATLNG STATUS PILGRIM 1 Notes
- 1. Unit Name:
February, 1981
- 2. Reportin6 Period:
1998.
- 3. LicWThermalPower(MWt):
4 Nameplate Rating (Gross MWe):
678.
- 5. Design Elecmcal Rating (Net MWe). 655.
- 6. Maximum Dependable Qpedty (Gross MWe):
690.
- 7. Maximum Dependable Qpacity (Net MWe): 670.
- 3. If Changes Occur in Qpacity Ratings (Items Number 3 Throu6h 7) Since List Report. Give Reasons:
NONE NONE.
- 9. Power Level To which Restricted. If Any (Net Mwe):
- 10. Roanoc eor Restrictions.If Any: L A.
l This. Month Yrao-Date Cumulative 672.0 14 16.0 -72096.0
- 11. Hours In Reportms Period 649.8 1375.9 51560.5
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
- 13. Rescr- Reserve Shutdown Hours 649.8 1366.1 49873.0
- 14. Sours Generator On.Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 10G0224.0 2297160.0 84566536.0 ,
- 16. Gross Thermal Energy Generated (MWH) _
j 313960.0 759370.0 2808/734.0
- 17. Gross Electrical Energy Genersted (MWH) _
301665.0 j29025.0 26979632.0
- 18. Net Electrical Energy Genensted (MWH) 96.7 96.5 69.2 l 19. Unit Service Factor ,
96.7 96.5 69.2
- 20. Unit Availability Fsetor l
67.0 76 .8 55.9
- 21. Unit Qpacity Factor (Using MDC Net) 68.5 78.6 57.1
- 22. Unit Capacity Factor (Using DER Net) 0.0 2.0 10.2
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eschi:
NONE Unit Ooerating l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup.
i '6. Units In Test Status (Pnor to Commere:al Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY l COMME?CIAL OPERATION l
8103330551
AVERAGE DAILY UNIT FowER LEVEL 50-293 COCK.ET NO.
gy;7 PILGRIM 1 03/09/81 COMPLETED BY C'C*#*it"*7 617-746-M00
-- TT' ** HONE FEBRUARY, 1981 M0g
~
DAY AVERAGI DAILY POWER !.ST.L DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 4 36. 475.
g
426. 19 475.
3 433. -
,j 4 74 .
4 473. og 476.
5 4 74 ~,
473.
S 4 74. 466. ,
3 ,
4 76 . ,4 404'.
3 475. 3 446.
9 gn 475. *6 473*
gg 476. ; 472.
473. 17.
g, 3 4 75. 0.
g3 3 477. 0.
g 30 475. O.
gg 3, 16 477-t- ,
INSTRUCTIONS .
On this t'cr=2t.!!st the average dsHy unit power !evel in MWe. Net for each day in the repornns month. Campute to the nearest whole mepwatt.
i h
t IW'KEl NO. 50-293 UNil SHUIDOWNS AND POWER REDUCIlONS PILCRIM l U Nil' N A M E DNIE _ 03/0_2/81 COMPl.EIED BY C.C.Wh1tney REPORTipONils FEBRilARY. 1981 .lEEEPilONE 617-746-799Q
'l EE 3 liccusee {g L Cause & Couettive No. D.lic N
p Eg 3 )Ysac Event EY
$G k*3 u
Atsion to
$$ $ jiji g Repost # Paesent Recunen(c 6
4 81/01/29 F 0.0 11 1 N/A IIB llTEXCll "B" liigh & l.ow Pressure lleater Trains have been isolated I?miting power to 75%.
5 81/02/28 s 22.2 B 1 N/A IIB llTEXCll Unit shutdown to install bypass of 4 th point. heat exchanger.
4 1 2 .I 4 F: Emced Reason: Method: Enh6 bis G Insisuttions S: Scheduled A-lk luipment Fallme(limplain) 1-Manual fos Psepasation of Dai.
B Maintenance of Tes 2 Manual Sceam. linssy Sheets fm 1.icensee C Refueling 3- Anlumalle Sesam. I: vent Repose (l.l!R)l'ile INilHin i l) Regulaimy itestsitsion 4 Othes (limplain) 0161) li Opesato Tsaining & Iicense linamination i
F Adminisisative 5 G-Operational I nos (F = plain) taliibit 1 - Same Sousce raf17) 11 Othes (lixplain) l l
L
j y R E
L '
O
_* D E G
, T 1
A I
8 C 9 9 O
' 1 S
S Y A R
A U
R $
B E
F 9 l
F Nc h OM t I F n Th o CD H AU
TT .
CN
=
2.
Pv E - me 2r Op -
Cp e
m .
w E
N C O N I A E T N C A E N a T T A S N N I E -
R A T
. E H N E g
- W I N
e O D A O P E H N e T
R A -
A L E E L R g C o U Y N T E 9 6 M F E e I A S R S U e C A L R C e.
I O 0 P I M m e
e s
N O m-I ,
T .-
e C' e N
U F
L e A w H
T N
E N
n O T
)
O -
C I
< D -
T
- em
J REFUELING INFORMATION.
The following refueling infor=ation is included in the Monthly Report as .
requested in a letter to Mr. G. C. Andognini dated January 18, 19 78:
For your convenicnce, the information supplied has been enunerated so that each number corresponds to equivalent notation utilized in the request.
- 1. The name of this facility is Pilgrim Nuclear Power Station, Dockat Number 50-29 3,
- 2. Scheduled dat.e for next Refueling Shutdown: Sep tenber, 1981
, 3. Scheduled date for restart following refueling:
4.
- 5. Due to their similarity, requests 4, 5, & 6 are responded to collectively:
- 6. The fuel, which had been loaded during the 1980 scheduled refueling outage, is of the new P8x8R design, consisting of approxi:aately 64 P8DR3282 assemblies and 120 P80R3265 assemblies.
- 7. (a) There are 580 fuel assemblies in the core.
(b) There are 764 fuel assemblies in the spent fuel pool.
- 8. (a) The station is presently licensed to store 2320 spent fuel assemblies.
The actual spent fuel storage capacity'is 1770 fuel assemblies at present.
(b) The planned spent fuel storage capacity is 2320 fuel assemblies.
- 9. With present spent fuel in storage, the spent fuel pool now has the f capacity to acco:nnodate an additional 1006 fuel assemblies.
l
(
\
l l
t e
l l
l I
l t
30STON EttSON COMPANY a .
PILGRTM NUCI. EAR POk*2R STATION
SUMMARY
OF OPERATIONS FOR FE3*tCARY,1981 The Unit operated at approxi ately 73% reactor power (67% Electrical) fro:
February 1 to February 2a. On February 2?., de reac:or power was reduced :o 20 :o facili: ate an entr/ in:o :he dr/well :o decernine cause for excessive uniden:ified leakage. ~'c.e leakage was identified to be packing on de ' A' reac:or recirculation pu::p discharge valve. The valve was backsea:ed, leakage reduced to acceptable le.vals and power returned :o 75%.
On ?chruarf 25 the uni: was reduced to 50% pcuer to backwash de =ain condenser because 1:1 gh winds and heavy seas had broken up large arioun:s of seaweed which clogged the ::aveling screens. Power was re:urned to 75% af:e the backwash and naintained a: tha: level until 0145 on Fe'eruarf 23 when the uni: was shu:
down to repair feedwater heater leaks.
The uni: was li=1:ed to 75% during de ::enth of February because of lini.ations en the turbine with the "3" Feedwa:er Eea:e train isola:ed.
SAFETY /PILIEF VALVE CEALLENGES ENT'4 0F FEBRUARY,1981 4
1 REQUIREME'C: TMI T.A.P. II.K.3.3 DATE: February 28, 1981 VALVE d's: RV-203-3A 4 RV-203-3D REACIOR PRESSURE: 960 PSIG RIASON: Response to IE Bulletin 80-25 .