Text

.. m _ _ _ _ _ _ _ _ _ . _ _ _ . - - - - .- . _ _ . . _ _ ._ _._ ___ __._..._ _ __

f .. ,

, Tech. Spic. 6.9.A.2 Boston Edison l Pilgrim Nuclear Power Staten Rocky Hill Road Plyrnouth, Massachusetts 02360 A

I L J. Olivier Vice President Nuclear operations January 13, 1997 i and station oirector BECo Ltr. #97- 2.97.001 U.S. Nuclear Regulatory Commission Attention: Document Control Desk

Washington, DC 20555 i

Docket No. 50-293

{ License No. DPR-35 l DECEMBER 1996 MONTHLY REPORT in accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and l 1

planning. Should you have any questions conceming this report, please contact me directly. l D*-

. . J. Olivier i

RLC/dmc/9458 i

Attachment

cc
Mr. Hubert Miller j Regional Administrator, Region I

? U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector 9701160091 961231 "

PDR ADOCK 05000293 R PDR

\

OPERATING DATA REPORT DOCKET NO. 50-293 NAME: Pilorim i COMPLETED BY: R.L. Cannon

TELEPHONE: (508) 830-8321 REPORT MONTH December 1996 h.

OPERATING STATUS NOTES

1. Unit Name Pilgrim i
2. Reporting Period December 1996
3. Licensed Thermal Power (MWt) 1998

, 4. Nameplate Rating (Gross MWe) 678

5. Design Electrical Rating (Net MWe) 655
6. Maximum Dependable Capacity (Gross MWe) 696

, 7. Maximum Dependable Capacity (Net MWe) 670 8.- If Changes Occur in Capacity Ratings (Item Number 3 Through 7) Since Last Report, Give Reasons:

No Chances l

9. Power Level To Which Restricted, If Any (Net MWe)
None l l 10. Reasons For Restrictions, If Any: N/A i n l This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 744.0 8784.0 210936.0
12. Hours Reactor Critical 744.0 8380.8 134646.9
13. Hours Reactor Reserve Shutdown 0.0 0.0 0.0
14. Hours Generator On-Line - 744.0 8345.9 130169.8
15. Hours Unit Reserve Shutdown 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1473914.0- 16173760.0 232475930.0

,~

17.- Gross Electrical Energy Generated (MWH) 506590.0 5530290.0 78807614.0 1

18. Net Electrical Energy Generated (MWH) 487073.0 5324341.0 75767963.0

. 19. Unit Service Factor - 100.0 95.0 61.7

20. Unit Availability Factor 100.0 95.0 61.7 )
21. Unit Capacity Factor (Using MDC Net) 97.7 90.5 53.6
22. Unit Capacity Factor (Using DER Net) 99.9 92.5 54.8
23. Unit Forced Outage Rate 0.0 3.5 11.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)- RFO-11, February 15,1997,42 days
25. If Shutdown at End of Report Period, 4

Estimated Date of Startup - UNIT OPERATING l

i 4

l

AVERAGE DAILY UNIT POWER LEVEL l DOCKET NO. 50-293 NAME: Pilarim COMPLETED BY: R.L. Cannon TELEPHONE: (508) 830-8321 REPORT MONTH December 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MWe-Net) (MWe-Net) 1 661 17 660 l 2 659 18 659 3 659 19 659 l

4 660 20 659 l 5 659 21 668 6 659 22 660 7 656 23 660 8 659 24 660 9 bio 25 659 10 657 26 660 11 657 27 659  !

12 651 28 657 13 613 29 659 14 586 30 658  ;

15 659 31 655 16 660 This format lists the average daily unit power level in MWe-Net for each day in the reporting month, computed to the nearest whole megawatt. 4 i

i i

- ._ . _. ..- . . _ . _ _ . _ - - . . - _ ~ - - . _ . . _ _ - .. .- _. -

~

OPERATIONAL

SUMMARY

DOCKET NO. 50-293 NAME: Pilarim COMPLETED BY: R.L. Cannon TELEPHONE: (508)830-8321_

REPORT MONTH December 1996  :

The plant entered the period at 100% core thermal power (CTP). On December 10,1996, at approximately 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />, limited by the control rod pattem, the plant commenced a scheduled reduction in power to approximately 67% CTP to perform a control rod pattem change. On December 14,1996, at approximately 1950 hours0.0226 days <br />0.542 hours <br />0.00322 weeks <br />7.41975e-4 months <br />, the plant attained 100% CTP where it was essentially maintained until December 30,1996. On D:cember 30,1996 at approximately 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br />, the plant commenced end of cycle coastdown. The plant anded the period at 98.9% CTP.

SAFETY RELIEF VALVE CHALLENGES MONTH OF DECEMBER 1996 Requirement
NUREG-0737 T.A.P. II.K.3.3 There were no safety relief valve challenges during the reporting period.

An SRV challenge is defined as anytime an SRV has received a signal to operate via reactor pressure signal  !

(ADS) or control switch (manual). Reference BECo Ltr. #81-01 dated January 5,1981.

4 1

_ - . - . . .~. - - - - - . - - - . - - ..- - - . -._ .- _ _- .-_ .-. _ - . -

1 ,.

REFUELING INFORMATION

{'

DOCKET NO. 50-293 NAME: Pilorim

COMPLETED BY; R.L. Cannon i j TELEPHONE
(508) 830-8321 ll

{ REPORT MONTH December 19% '

Tha following refueling information is included in the Monthly Report as requested in an NRC letter to BECo, j dited January 18,1978:

For your convenience, the information supplied has been enumerated so that each number corresponds to i cquivalent notation utilized in the request.

l 1. The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.

d

2. Scheduled date for next refueling shutdown
February 15,1997.

j 3. Scheduled date for restart following next refueling: March 29,1997.

4. Due to their similarity, requests 4, 5, & 6 are responded to collectively under #6.

l

! 5. See #6.

l 6. The new fuel loaded during the 1995 refueling outage (RFO-10) is of a different design than that loaded in the previous refueling outage and consists of 136 new fuel assemblies.

j 7. (a) There are 580 fuel assemblies in the core.

i (b) There are 1973 fuel assemblies in the spent fuel pool. This includes 208 new fuel assemblies awaiting fuelloading for cycle 12.

8. (a) The station is presently licensed to store 3859 spent fuel assemblies. The spent fuel storage j capacity is 2891 fuel assemblies. However,23 spent fuel locations cannot be used due to i refuel bridge limitations.

e i

j (b) The planned spent fuel storage capacity is 3859 fuel assemblies.

l 9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an j additional 1103 fuel assemblies.

! l 4

i

=

1 f

4 i

PILGRIM NUCLEAR POWER STATION MAJOR SAFETY RELATED MAINTENANCE DOCKET NO. 50-293 NAME: Pilorim COMPLETED BY: R.L. Cannon TELEPHONE: (508) 830-8321' REPORT MONTH December 1996 SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE CORRECTIVE - ASSOCIATED ACTION TO LER PREVENT RECURRENCE No significant or major safety-related maintenance was performed during the period.

4

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-293 NAME: Pilorim COMPLETED BY: R.L. Cannon TELEPHONE: (508) 830-8321' REPORT MONTH December 1996 METHOD OF LICENSE SYSTEM COMPONENT CAUSE & CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO PREVENT NO. DATE 1 (HOURS) '2 REACTOR REPORT 4 5 RECURRENCE 28 12/13/96 S 0.0 B N/A N/A N/A N/A Power reduction to approximately 67% CTP to perform a control rod pattern '

change.

1 2 3 4&S F-Forced A-Equip Failuro 1-Manual Exhibit F & H S-Sched B-Main or Test 2-Manual Scram Instructions for C-Refueling 3-Auto Scram Preparations of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Ucensee Event Report

& License Examination 9-Other (LER) File (NUREG-1022)

F-Admin G-Operator Error H-Other

. _ . _ _ _ _ _ . _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ . _ . _ . _ _ _ _ . _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ . _ _ _ . _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ ,