{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES


NUCLEAR REGULATORY COMMISSION
===NUCLEAR REGULATORY COMMISSION===
 
OFFICE OF NUCLEAR REACTOR REGULATION
OFFICE OF NUCLEAR REACTOR REGULATION


WASHINGTON, D.C. 20555 December 13, 1993 NRC INFORMATION NOTICE 93-95:   STORM-RELATED LOSS OF OFFSITE POWER EVENTS
===WASHINGTON, D.C. 20555===
December 13, 1993 NRC INFORMATION NOTICE 93-95: STORM-RELATED LOSS OF OFFSITE POWER EVENTS


DUE TO SALT BUILDUP ON SWITCHYARD INSULATORS
===DUE TO SALT BUILDUP ON SWITCHYARD INSULATORS===


==Addressees==
==Addressees==
Line 52: Line 52:
generator was used to power safety-related loads including shutdown cooling
generator was used to power safety-related loads including shutdown cooling


until the 230 kV switchyard was restored. The ABE emergency diesel generator
until the 230 kV switchyard was restored.


===The ABE emergency diesel generator===
was unavailable due to maintenance. The 500 kV switchyard supplied nonvital
was unavailable due to maintenance. The 500 kV switchyard supplied nonvital


Line 73: Line 74:
the 345 kV switchyard causing the insulators to arc to ground.
the 345 kV switchyard causing the insulators to arc to ground.


9312070298 LAe~ffL.A~1241{3/f3P
9312070298  
 
1P4 X tE N4 e, 9 3-95* 777 LAe~ffL.A~1241{3/f3P
tE
 
X1P4        N4 e, 93-95*                777


k IN 93-95 K>
K>
                                                            December 13, 1993 Discussion
k IN 93-95


===December 13, 1993 Discussion===
Intense and unusual storms on March 13 and 14, 1993, produced high tides and
Intense and unusual storms on March 13 and 14, 1993, produced high tides and


Line 156: Line 155:
experience at Pilgrim indicates that the coating is effective for a much
experience at Pilgrim indicates that the coating is effective for a much


`- IN 93-95 December 13, 1993 shorter period of time. Consequently, the Insulators at Pilgrim were cleaned
`-  
IN 93-95
 
===December 13, 1993===
shorter period of time. Consequently, the Insulators at Pilgrim were cleaned


and coated with RTV again during the spring 1993 refueling outage. As a long- term option, the licensee is considering a replacement of the existing 345 kV
and coated with RTV again during the spring 1993 refueling outage. As a long- term option, the licensee is considering a replacement of the existing 345 kV
Line 176: Line 179:
Nuclear Regulation (NRR) project manager.
Nuclear Regulation (NRR) project manager.


Bran . Grimes, Director
===Bran . Grimes, Director===
Division of Operating Reactor Support


Division of Operating Reactor Support
===Office of Nuclear Reactor Regulation===
Technical contacts:


Office of Nuclear Reactor Regulation
===R. Schin, RII===
(404) 331-5561


Technical contacts:  R. Schin, RII           P. Fillion, RII
===P. Fillion, RII===
(404) 331-7288 P. Holmes-Ray, RII


(404) 331-5561          (404) 331-7288 P. Holmes-Ray, RII      P. Kang, NRR
(904) 795-7677


(904) 795-7677          (301) 504-2779 R. Prevatte, RII
===P. Kang, NRR===
(301) 504-2779


===R. Prevatte, RII===
(919) 457-9531 Attachment:
(919) 457-9531 Attachment:


Line 194: Line 203:
Attachment
Attachment


IN 93-95 December 13, 1993 LIST OF RECENTLY ISSUED
IN 93-95


===December 13, 1993 LIST OF RECENTLY ISSUED===
NRC INFORMATION NOTICES
NRC INFORMATION NOTICES


Informati on                                 Date of
Informati on
 
Date of
 
Notice No.


Notice No.            Subject                 Issuance    Issued to
Subject


93-94          Unauthorized Forced            12/09/93    All holders of OLs or CPs
Issuance


Entry into the Pro-                        for nuclear power reactors.
Issued to


tected Area at Three
93-94
93-93
93-92
91-21, Supp. 1
89-77, Supp. 1
93-91


Mile Island Unit 1 on
===Unauthorized Forced===
Entry into the Pro- tected Area at Three


===Mile Island Unit 1 on===
February 7, 1993
February 7, 1993
93-93          Inadequate Control of          12/08/93  All holders of OLs or CPs


Reactor Coolant System                     for nuclear power reactors.
===Inadequate Control of===
Reactor Coolant System


Conditions During Shutdown
===Conditions During Shutdown===
Plant Improvements to


93-92          Plant Improvements to          12/07/93  All holders of OLs or CPs
Mitigate Common Depend- encies in Component


Mitigate Common Depend-                    for nuclear power reactors.
===Cooling Water Systems===
Inadequate Quality


encies in Component
===Assurance Program of===
Vendor Supplying


Cooling Water Systems
Safety-Related Equipment


91-21,          Inadequate Quality            12/07/93    All holders of OLs or CPs
===Debris in Containment===
Emergency Sumps and


Supp. 1        Assurance Program of                      for nuclear power reactors
===Incorrect Screen===
Configurations


Vendor Supplying                          and all recipients of
===Misadjustment Between===
General Electric 4.16-KV


Safety-Related Equipment                  NUREG-0040, "License Con- tractor and Vendor Inspec- tion Status Report" (White
===Circuit Breakers and Their===
Associated Cubicles


Book).
===Unisolatable Reactor===
Coolant System Leak


89-77,        Debris in Containment          12/03/93    All holders of OLs or CPs
===Following Repeated===
Applications of Leak


Supp. 1        Emergency Sumps and                        for nuclear power reactors.
Sealant


Incorrect Screen
12/09/93
12/08/93
12/07/93
12/07/93
12/03/93
12/03/93
12/01/93


Configurations
===All holders of OLs or CPs===
for nuclear power reactors.


93-91          Misadjustment Between          12/03/93    All holders of OLs or CPs
===All holders of OLs or CPs===
for nuclear power reactors.


General Electric 4.16-KV                  for nuclear power reactors.
===All holders of OLs or CPs===
for nuclear power reactors.


Circuit Breakers and Their
===All holders of OLs or CPs===
for nuclear power reactors


Associated Cubicles
and all recipients of


93-90          Unisolatable Reactor          12/01/93    All holders of OLs or CPs
NUREG-0040, "License Con- tractor and Vendor Inspec- tion Status Report" (White


Coolant System Leak                        for nuclear power reactors.
Book).


Following Repeated
===All holders of OLs or CPs===
for nuclear power reactors.


Applications of Leak
===All holders of OLs or CPs===
for nuclear power reactors.


Sealant
===All holders of OLs or CPs===
for nuclear power reactors.


93-90
OL - Operating License
OL - Operating License


Line 273: Line 317:
resistant to the coastal environment.
resistant to the coastal environment.


These events Illustrate the significance of maintaining reliable offsite and
===These events Illustrate the significance of===
onsite power sources during outages as well
 
maintaining reliable offsite and
 
as during operation.


onsite power sources during outages as well as during operation.
This information notice requires no specific action or written response.


This information notice requires no specific action or written response. If
If


you have any questions about the information in this notice, please contact
you have any questions about the information in this notice, please contact
Line 285: Line 334:
Nuclear Regulation (NRR) project manager.
Nuclear Regulation (NRR) project manager.


OgItf Ognefw   5 Brian K. Grimeg
OgItf Ognefw
 
5


===Brian K. Grimeg===
Brian K. Grimes, Director
Brian K. Grimes, Director


Division of Operating Reactor Support
===Division of Operating Reactor Support===
Office of Nuclear Reactor Regulation
 
Technical contacts:


Office of Nuclear Reactor Regulation
===R. Schin, RII===
(404) 331-5561


Technical contacts:          R. Schin, RII             P. Fillion, RII
===P. Fillion, RII===
(404) 331-7288 P. Holmes-Ray, RII


(404) 331-5561            (404) 331-7288 P. Holmes-Ray, RII        P. Kang, NRR
(904) 795-7677 P. Kang, NRR


(904) 795-7677            (301) 504-2779 R. Prevatte, RII
(301) 504-2779


===R. Prevatte, RII===
(919) 457-9531 Attachment:
(919) 457-9531 Attachment:


Line 304: Line 362:
*SEE PREVIOUS CONCURRENCE
*SEE PREVIOUS CONCURRENCE


OFFICE     *RII                   *TECH ED         *EELB           *C:EELB:NRR
OFFICE
 
*RII
 
*TECH ED
 
*EELB
 
*C:EELB:NRR
 
NAME
 
RSchin
 
JBeeson
 
PKang
 
CBerlinger
 
DATE
 
_07/13/93
08/09/93
11/03/93
/03/93 I_
77
1
10
nlnr
 
*OGCB!DORS
 
*C:OGCB:DORS
 
JTWiggins


NAME        RSchin                JBeeson          PKang            CBerlinger
NECampbell


DATE            _07/13/93        08/09/93        11/03/93            /03/93 I_                                                      1077    1 nlnr              *OGCB!DORS            *C:OGCB:DORS
GHMarcus


JTWiggins        NECampbell            GHMarcus    /       /IIIl
/  
/IIIl


11/04/93           11/18/93             11/23/93           12/1'5/93
11/04/93  
1LOUMtNi  NAIt: Ns-V*.zN
11/18/93  
1 1/23/93  
12/1'5/93
1L OUMtNi
 
NAIt: Ns-V*.zN


IN 93-XX
IN 93-XX


December xx, 1993 shorter period of time. Consequently, the insulators at Pilgrim were cleaned
===December xx, 1993===
shorter period of time. Consequently, the insulators at Pilgrim were cleaned


and coated with protective RTV coating again during the spring 1993 refueling
and coated with protective RTV coating again during the spring 1993 refueling
Line 339: Line 439:
Nuclear Regulation (NRR) project manager.
Nuclear Regulation (NRR) project manager.


Brian K. Grimes, Director
===Brian K. Grimes, Director===
Division of Operating Reactor Support


Division of Operating Reactor Support
===Office of Nuclear Reactor Regulation===
Technical contacts:


Office of Nuclear Reactor Regulation
===R. Schin, RII===
(404) 331-5561


Technical contacts:    R. Schin, RII                  P. Fillion, R11
===P. Fillion, R11===
                        (404) 331-5561                (404) 331-7288 P. Holmes-Ray, RII             P. Kang, NRR
(404) 331-7288 P. Holmes-Ray,
(904) 795-7677 RII


(904) 795-7677                (301) 504-2779 R. Prevatte, RII
===P. Kang, NRR===
(301) 504-2779


===R. Prevatte, RII===
(919) 457-9531 Attachment:
(919) 457-9531 Attachment:
List of Recently Issued NRC Information Notices


===List of Recently Issued NRC Information Notices===
*SEE PREVIOUS CONCURRENCE
*SEE PREVIOUS CONCURRENCE


OFFICE     *RII               *TECH ED           *EELB           *C:EELB:NRR
OFFICE
 
*RII
 
*TECH ED
 
*EELB
 
*C:EELB:NRR
 
NAME
 
RSchin
 
JBeeson
 
PKang
 
CBerlinger
 
DATE
 
07/13/93
-08/09/93
,11/03/93
11/03/93 D: DE
 
I *OGCB:DORS
 
*C:OGCB:DORS
 
D: DORS
 
JTWiggins


NAME        RSchin            JBeeson            PKang            CBerlinger
NECampbell


DATE        07/13/93        -08/09/93            ,11/03/93          11/03/93 D: DE          I *OGCB:DORS          *C:OGCB:DORS    D: DORS
l GHMarcus


JTWiggins        NECampbell        l GHMarcus        BKGrimes       l
BKGrimes


11/04/93          11/18/93            11/23/93        112/  /93
l
                                                                            -J


r
11/04/93
11/18/93
11/23/93
112/
/93
-J


UCLUMNI  NAMt: bWIl1H1N.NMC                                           /Wr PD
rUCLUMNI NAMt: bWIl1H1N.NMC
 
/Wr PD


IN 93-XX
IN 93-XX


November xx, 1993 NRC review of these events concluded that the safety-related equipment at the
===November xx, 1993===
NRC review of these events concluded that the safety-related equipment at the


affected units performed as designed and there were no increased risks to the
affected units performed as designed and there were no increased risks to the
Line 386: Line 532:
Nuclear Regulation (NRR) project manager.
Nuclear Regulation (NRR) project manager.


Brian K. Grimes, Director
===Brian K. Grimes, Director===
Division of Operating Reactor Support
 
===Office of Nuclear Reactor Regulation===
Technical contacts:


Division of Operating Reactor Support
===R. Schin, RII===
(404) 331-5561


Office of Nuclear Reactor Regulation
===P. Fillion, RII===
(404) 331-7288 P. Holmes-Ray, RII


Technical contacts:        R. Schin, RII            P. Fillion, RII
(904) 795-7677


(404) 331-5561          (404) 331-7288 P. Holmes-Ray, RII      P. Kang, NRR
===P. Kang, NRR===
(301) 504-2779


(904) 795-7677          (301) 504-2779 R. Prevatte, R11
===R. Prevatte, R11===
                            (919) 457-9531 Attachment:
(919) 457-9531 Attachment:


===List of Recently Issued NRC Information Notices===
===List of Recently Issued NRC Information Notices===
*SEE PREVIOUS CONCURRENCE
*SEE PREVIOUS CONCURRENCE


OFFICE         *RII              *TECH ED        *EELB          *C:EELB:NRR
OFFICE


NAME            RSchin            JBeeson          PKang          CBerlinger
*RII


DATE         J07/13/93 o08/09/93 i11/03/930,                                     11/03/93
*TECH ED
                                                                    1I
 
*EELB
 
*C:EELB:NRR
 
NAME
 
RSchin
 
JBeeson
 
PKang
 
CBerlinger
 
DATE
 
J07/13/93 o08/09/93 i11/03/930,  
11/03/93  
1I


~1*
~1*
  D: DE               *OGCB:DORS        C:OGCB:DORS    D: DORS
D: DE
 
*OGCB:DORS


JTWiggins            NECampbell        GHMarcus        BKGrimes L
C:OGCB:DORS


11/04/93           111/18/93           11/Z/93         11/ /93
D: DORS
  -   - -- -- - -   - -- - -
 
JTWiggins
 
NECampbell
 
GHMarcus
 
BKGrimes L
 
11/04/93  
111/18/93  
11/Z/93  
11/ /93
-
---
-- - -
- - - - -
DOCUMENT NAME: SWITCHIN.NEC
DOCUMENT NAME: SWITCHIN.NEC


IN 93-XX
IN 93-XX


November xx, 1993 NRC review of these events concluded that the safety-related equipment at the
===November xx, 1993===
NRC review of these events concluded that the safety-related equipment at the


affected units performed as designed and there were no increased risks to the
affected units performed as designed and there were no increased risks to the
Line 434: Line 625:
Nuclear Regulation (NRR) project manager.
Nuclear Regulation (NRR) project manager.


Brian K. Grimes, Director
===Brian K. Grimes, Director===
Division of Operating Reactor Support


Division of Operating Reactor Support
===Office of Nuclear Reactor Regulation===
Technical contacts:


Office of Nuclear Reactor Regulation
===R. Schin, RII===
(404) 331-5561


Technical contacts:            R. Schin, RII              P. Fillion, RII             P. Kang, NRR
===P. Fillion, RII===
(404) 331-7288


(404) 331-5561              (404) 331-7288              (301) 504-2779 P. Holmes-Ray, SRI, Crystal River
===P. Kang, NRR===
(301) 504-2779 P. Holmes-Ray, SRI, Crystal River


(904) 795-7677 R. Prevatte, SRI, Brunswick
(904) 795-7677


===R. Prevatte, SRI, Brunswick===
(919) 457-9531 Attachment:
(919) 457-9531 Attachment:
  List of Recently Issued NRC Information Notices
 
===List of Recently Issued NRC Information Notices===
*SEE PREVIOUS CANCUIRRFNCr


-
-
  *SEE PREVIOUS CANCUIRRFNCr
OFFICE
 
*RII
 
*TECH ED
 
*EELB
 
*C:EELB:NRR
 
NAME
 
RSchin
 
JBeeson
 
PKang
 
CBerlinger
 
DATE
 
07/13/93
08/09/93
11/03/93
11/03/93 D: DE
 
OGCB:DORS
 
c:OGCB:RSfl
 
n-nnl* z
 
JTWiggins
 
N ECampbell
 
GHMacus
 
BKGrimes
 
11/04/93
11/1!/93
'f I II/
/93 II/
/93
1flPkrilIT
 
,k*IAr- tLI
 
.-
nUUvUtICNI


OFFICE            *RII              *TECH ED                *EELB                *C:EELB:NRR
MIAMEi: 3Wl1tlnrN.NLLv


NAME              RSchin            JBeeson                PKang                  CBerlinger
7Vt C


DATE              07/13/93          08/09/93                11/03/93              11/03/93 D: DE                  OGCB:DORS        c:OGCB:RSfl            n-nnl* z
,
I,/-?


JTWiggins              NECampbell        GHMacus                BKGrimes
d2.,
Pe


11/04/93                11/1!/93    'f I II/        /93          II/      /93 n 1flPkrilIT  ,k*IAr-  tLI      .-
~z
UUvUtICNI    MIAMEi: 3Wl1tlnrN.NLLv


7Vt C          ,                                 I,/-?    d2., ~z Pe
no,&
AAW&WetfA.


no,&  AAW&WetfA.                              7
7


IN 93-XX
IN 93-XX


November xx, 1993 This information notice requires no specific action or written response. If
===November xx, 1993===
This information notice requires no specific action or written response.
 
If


you have any questions about the information in this notice, please contact
you have any questions about the information in this notice, please contact
Line 477: Line 732:
Nuclear Regulation (NRR) project manager.
Nuclear Regulation (NRR) project manager.


Brian K. Grimes, Director
===Brian K. Grimes, Director===
 
Division of Operating Reactor Support
Division of Operating Reactor Support


Office of Nuclear Reactor Regulation
===Office of Nuclear Reactor Regulation===
Technical contacts:


Technical contacts:    R. Schin, RII           P. Fillion, RII
===R. Schin, RII===
(404) 331-5561


(404) 331-5561          (404) 331-7288 P. Holmes-Ray, SRI, Crystal River
===P. Fillion, RII===
(404) 331-7288 P. Holmes-Ray, SRI, Crystal River


(904) 795-7677 R. Prevatte, SRI, Brunswick
(904) 795-7677


===R. Prevatte, SRI, Brunswick===
(919) 457-9531 Attachment:
(919) 457-9531 Attachment:


Line 494: Line 752:
*SEE PREVIOUS CONCURRENCE
*SEE PREVIOUS CONCURRENCE


OFFICE     *RII             *TECH ED             *EELB         *C:EELB:NRR
OFFICE
 
*RII
 
*TECH ED
 
*EELB
 
*C:EELB:NRR
 
NAME
 
RSchin
 
JBeeson


NAME        RSchin            JBeeson              PKang         CBerlinger
PKang


DATE      1 07/13/93        - 08/09/93            11/03/93        ,11/03/93 D:DE              OGCB:DORS            C:OGCB:DORS      D:DORS
CBerlinger


JTWiggins      l NECampbell          GHMarcus        BKGrimes
DATE


A /f/9/                 /93       -9I/     /93         U/   /93 DOCUME     3E: SWITCHIN.NEC
1 07/13/93
- 08/09/93
11/03/93
,11/03/93 D:DE
 
OGCB:DORS
 
C:OGCB:DORS
 
D:DORS
 
JTWiggins
 
l NECampbell
 
GHMarcus
 
BKGrimes
 
A / f/9/  
/93  
-9I/  
/93 U/  
/93 DOCUME
 
3E: SWITCHIN.NEC


IN 93-XX
IN 93-XX


August xx, 1993 This information notice requires no specific action or written response. If
August xx, 1993 This information notice requires no specific action or written response.
 
If


you have any questions about the information in this notice, please contact
you have any questions about the information in this notice, please contact
Line 514: Line 813:
Nuclear Regulation (NRR) project manager.
Nuclear Regulation (NRR) project manager.


Brian K. Grimes, Director
===Brian K. Grimes, Director===
Division of Operating Reactor Support


Division of Operating Reactor Support
===Office of Nuclear Reactor Regulation===
Technical contacts:


Office of Nuclear Reactor Regulation
===R. Schin, RII===
(404) 331-5561


Technical contacts:        R. Schin, RII
===P. Fillion, RII===
(404) 331-7288 P. Holmes-Ray, SRI, Crystal River


(404) 331-5561 P. Fillion, RII
(904) 795-7677


(404) 331-7288                                      di
===R. Prevatte, SRI, Brunswick===
(919) 457-9531 di


P. Holmes-Ray, SRI, Crystal River
6 4'
I o. .erg BUD.


(904) 795-7677
II
                                                                                                  6 4'
                          R. Prevatte, SRI, Brunswick


(919) 457-9531 Attachment:
Attachment:
List of Recently Issued NRC Information Notices


===List of Recently Issued NRC===
*SFF PREVIOUS CONCURRENCE
*SFF PREVIOUS CONCURRENCE


---
===Information Notices===
  OFFICE
---  
-
I____
I-  
__
I_ ., -n e
 
OFFICE
 
*RII
 
W'
I


-  I____
ttLLx
                *RII


I-
LLL;
                                    W'
"Ir
                                      IttLLx


I
I


__         I_ .,-n
V,
NAME
 
RSchin
 
JBeeson
 
VS/ PKang
 
CBerlinger
 
DATE
 
07/13/ 93
093
________
__93
__#
_ _/93
--
39 nffF
 
===I Onrr FtlORS===
C !OGCR :DORS


LLL;V,
D: DORS
                                                                  e


"Ir
vI
 
o


I o..erg BUD.
.


II
-.


NAME        RSchin              JBeeson              VS/ PKang                CBerlinger
__
____ ._ _
JTWiggins


DATE        07/13/ 93            093                          ________      __#
NECampbell
                                                                                  __93  _ _/93
                                              --    39 nffF            Io Onrr FtlORS        C!OGCR :DORS            D:  DORS


vI                                                      .  -. ____
GHMarcus
                                                                      __ ._
  JTWiggins          NECampbell          GHMarcus                 BKGrimes


08/    /93        08/  /93          08/    /93              08/      /93 DOCUMENT NAML: SMILHIN.iLL
BKGrimes


* w
08/ /93
08/ /93
08/ /93
08/ /93 DOCUMENT NAML: SMILHIN.iLL


-  IN 93-XX
*
w


August xx, 1993 This information notice requires no specific action or written response. If
-
IN 93-XX
 
August xx, 1993 This information notice requires no specific action or written response.
 
If


you have any questions about the information in this notice, please contact
you have any questions about the information in this notice, please contact
Line 584: Line 928:
Nuclear Regulation (NRR) project manager.
Nuclear Regulation (NRR) project manager.


Brian K. Grimes, Director
===Brian K. Grimes, Director===
 
Division of Operating Reactor Support
Division of Operating Reactor Support


Office of Nuclear Reactor Regulation
===Office of Nuclear Reactor Regulation===
Technical contacts:


Technical contacts:    R. Schin, RII             P. Fillion, RII
===R. Schin, RII===
(404) 331-5561


(404) 331-5561            (404) 331-7288 P. Holmes-Ray, SRI, Crystal River
===P. Fillion, RII===
(404) 331-7288 P. Holmes-Ray, SRI, Crystal River


(904) 795-7677 R. Prevatte, SRI, Brunswick
(904) 795-7677


===R. Prevatte, SRI, Brunswick===
(919) 457-9531 Attachment:
(919) 457-9531 Attachment:
    List of Recently Issued NRC Information Notices


===List of Recently Issued NRC Information Notices===
*SFF PREVIOUS CONCURRENCE
*SFF PREVIOUS CONCURRENCE


OFFICE     RII             *TECH ED               EELB             C:EELB:NRR
OFFICE
 
RII
 
*TECH ED
 
EELB
 
C:EELB:NRR
 
NAME
 
. RSchin
 
JBeeson
 
SSaba (I
 
.
 
¢
CBerlinger
 
DATE
 
______08/7
/93
08/ /93
08/ /93
-~.1 D: DE
 
OGCB:DORS
 
C:OGCB:DORS
 
D: DORS
 
JTWiggins


NAME      . RSchin          JBeeson                SSaba    (I. ¢  CBerlinger
NECampbell


DATE                                /93
GHMarcus
                                      ______08/7        08/  /93        08/  /93
                                                                  -~.1 D: DE            OGCB:DORS        C:OGCB:DORS            D: DORS


JTWiggins        NECampbell        GHMarcus              BKGrimes
BKGrimes


08/ /93         08/ /93           08/       /93       1 08/     /93 DOCUMENT NAME: SWITCHIN.NEC}}
08/ /93  
08/ /93  
08/ /93  
1 08/ /93 DOCUMENT NAME: SWITCHIN.NEC}}


{{Information notice-Nav}}
{{Information notice-Nav}}

Latest revision as of 10:47, 16 January 2025

Storm-Related Loss of Offsite Power Events Due to Salt Buildup on Switchyard Insulators
ML031070158
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Crane  
Issue date: 12/13/1993
From: Grimes B
Office of Nuclear Reactor Regulation
To:
References
IN-93-095, NUDOCS 9312070298
Download: ML031070158 (11)


UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, D.C. 20555

December 13, 1993 NRC INFORMATION NOTICE 93-95: STORM-RELATED LOSS OF OFFSITE POWER EVENTS

DUE TO SALT BUILDUP ON SWITCHYARD INSULATORS

Addressees

All holders of operating licensees or construction permits for nuclear power

reactors located close to a large body of salt water.

PurDose

The U.S. Nuclear Regulatory Commission (NRC) is issuing this information

notice to alert addressees to the potential for loss of offsite power due to

salt contamination of switchyard insulators. It is expected that recipients

will review the information for applicability to their facilities and consider

actions, as appropriate, to avoid similar problems. However, no specific

action or written response is required.

Description of Circumstances

On March 17, 1993, the Florida Power Corporation Crystal River Unit 3 experienced a loss of the 230 kV switchyard (normal offsite power to safety- related busses) when a light rain caused arcing across salt-laden 230 kV

insulators and opened breakers in the switchyard. At the time, the unit was

in cold shutdown during a maintenance outage. The 'Al emergency diesel

generator was used to power safety-related loads including shutdown cooling

until the 230 kV switchyard was restored.

The ABE emergency diesel generator

was unavailable due to maintenance. The 500 kV switchyard supplied nonvital

loads throughout the event.

On March 16 through 18, 1993, Carolina Power and Light Company's Brunswick

Units 1 and 2 experienced a loss of the 230 kV switchyards (all offsite power)

when light rain caused arcing across salt-laden insulators and opened breakers

in the switchyard. At the time, both units were in cold shutdown during an

extended outage. Emergency diesel generators were used to power safety- related loads including shutdown cooling until the offsite power was restored.

Since 1982, the Boston Edison Company Pilgrim station has also experienced

several loss of offsite power events when heavy ocean storms deposited salt on

the 345 kV switchyard causing the insulators to arc to ground.

9312070298

1P4 X tE N4 e, 9 3-95* 777 LAe~ffL.A~1241{3/f3P

K>

k IN 93-95

December 13, 1993 Discussion

Intense and unusual storms on March 13 and 14, 1993, produced high tides and

high winds (average of 80 to 97 kilometers/hour high winds (50 to 60

miles/hour], with gusts up to 160 kilometers/hour [100 miles/hour] blowing

ashore from the ocean i.e., Gulf of Mexico and Atlantic Ocean. These storms

caused an unusual buildup of salt on the switchyard insulators at

Crystal River Unit 3 and Brunswick Units 1 and 2. The storms were unusual in

that they included high winds but little or no precipitation. As a result, salt from ocean spray built up on the switchyard insulators and was not washed

away by rain.

Days later, light rain increased the electrical conductivity of the salt, resulting in arcing across the insulators at both sites. To remove the salt

from the insulators, Florida Power Corporation and Carolina Power and Light

Company deenergized the affected switchyards, washed the insulators with high

pressure demineralized water, then returned the switchyards to service. The

washing stopped the electrical arcing across the insulators.

The 500 kV switchyard for Crystal River Unit 3 is located adjacent to the

230 kV switchyard. It was relatively unaffected. The 500 kV switchyard is

used for main generator output when Unit 3 is operating and is used for an

alternate source of offsite power (i.e., backfeeding of nonvital loads) during

Unit 3 outages. The 500 kV switchyard experienced less arcing across the

insulators than the 230 kV switchyard and no tripped breakers. As a

precautionary measure, the licensee also deenergized and washed the 500 kV

switchyard insulators. Factors that may have reduced the storm inpact on the

500 kV switchyard included location (farther away from the shore) and higher

insulation level (the 500 kV insulators were designed for up to 700 kV

operation while the 230 kV insulators were designed for up to 242 kV

operation). In addition, the licensee observed that, of the two types of

230 kV insulators installed, the newer post type had less arcing than the

older cap and pin type.

Licensee followup action in response to these events, to improve the future

performance of non-safety switchyard equipment, included: investigating

available salt buildup monitoring systems, evaluating insulator washing

methods/capabilities, considering the use of room temperature vulcanized (RTV)

silicon rubber coatings, installing newer metal oxide gapless surge arrestors

to replace older silicon carbide gap type surge arrestors, and replacing

cellon-treated wood transmission towers.

The 345 kV switchyard insulators at Pilgrim were coated with RTV silicon

rubber (Sylgard) in 1987. It was expected that the RTV coating, when applied

in 1987, would be effective for a period of 15 years. However, actual

experience at Pilgrim indicates that the coating is effective for a much

`-

IN 93-95

December 13, 1993

shorter period of time. Consequently, the Insulators at Pilgrim were cleaned

and coated with RTV again during the spring 1993 refueling outage. As a long- term option, the licensee is considering a replacement of the existing 345 kV

switchyard with a modern compactly designed switchyard which would be more

resistant to the coastal environment.

These events illustrate the significance of maintaining reliable offsite and

onsite power sources during outages as well as during operation.

This information notice requires no specific action or written response. If

you have any questions about the information in this notice, please contact

one of the technical contacts listed below or the appropriate Office of

Nuclear Regulation (NRR) project manager.

Bran . Grimes, Director

Division of Operating Reactor Support

Office of Nuclear Reactor Regulation

Technical contacts:

R. Schin, RII

(404) 331-5561

P. Fillion, RII

(404) 331-7288 P. Holmes-Ray, RII

(904) 795-7677

P. Kang, NRR

(301) 504-2779

R. Prevatte, RII

(919) 457-9531 Attachment:

List of Recently Issued NRC Information Notices

Attachment

IN 93-95

December 13, 1993 LIST OF RECENTLY ISSUED

NRC INFORMATION NOTICES

Informati on

Date of

Notice No.

Subject

Issuance

Issued to

93-94

93-93

93-92

91-21, Supp. 1

89-77, Supp. 1

93-91

Unauthorized Forced

Entry into the Pro- tected Area at Three

Mile Island Unit 1 on

February 7, 1993

Inadequate Control of

Reactor Coolant System

Conditions During Shutdown

Plant Improvements to

Mitigate Common Depend- encies in Component

Cooling Water Systems

Inadequate Quality

Assurance Program of

Vendor Supplying

Safety-Related Equipment

Debris in Containment

Emergency Sumps and

Incorrect Screen

Configurations

Misadjustment Between

General Electric 4.16-KV

Circuit Breakers and Their

Associated Cubicles

Unisolatable Reactor

Coolant System Leak

Following Repeated

Applications of Leak

Sealant

12/09/93

12/08/93

12/07/93

12/07/93

12/03/93

12/03/93

12/01/93

All holders of OLs or CPs

for nuclear power reactors.

All holders of OLs or CPs

for nuclear power reactors.

All holders of OLs or CPs

for nuclear power reactors.

All holders of OLs or CPs

for nuclear power reactors

and all recipients of

NUREG-0040, "License Con- tractor and Vendor Inspec- tion Status Report" (White

Book).

All holders of OLs or CPs

for nuclear power reactors.

All holders of OLs or CPs

for nuclear power reactors.

All holders of OLs or CPs

for nuclear power reactors.

93-90

OL - Operating License

CP - Construction Permit

IN 93-95 December 13, 1993 shorter period of time. Consequently, the Insulators at Pilgrim were cleaned

and coated with RTV again during the spring 1993 refueling outage. As a long- term option, the licensee is considering a replacement of the existing 345 kV

switchyard with a modern compactly designed switchyard which would be more

resistant to the coastal environment.

These events Illustrate the significance of

onsite power sources during outages as well

maintaining reliable offsite and

as during operation.

This information notice requires no specific action or written response.

If

you have any questions about the information in this notice, please contact

one of the technical contacts listed below or the appropriate Office of

Nuclear Regulation (NRR) project manager.

OgItf Ognefw

5

Brian K. Grimeg

Brian K. Grimes, Director

Division of Operating Reactor Support

Office of Nuclear Reactor Regulation

Technical contacts:

R. Schin, RII

(404) 331-5561

P. Fillion, RII

(404) 331-7288 P. Holmes-Ray, RII

(904) 795-7677 P. Kang, NRR

(301) 504-2779

R. Prevatte, RII

(919) 457-9531 Attachment:

List of Recently Issued NRC Information Notices

  • SEE PREVIOUS CONCURRENCE

OFFICE

  • RII
  • EELB
  • C:EELB:NRR

NAME

RSchin

JBeeson

PKang

CBerlinger

DATE

_07/13/93

08/09/93

11/03/93

/03/93 I_

77

1

10

nlnr

  • OGCB!DORS
  • C:OGCB:DORS

JTWiggins

NECampbell

GHMarcus

/

/IIIl

11/04/93

11/18/93

1 1/23/93

12/1'5/93

1L OUMtNi

NAIt: Ns-V*.zN

IN 93-XX

December xx, 1993

shorter period of time. Consequently, the insulators at Pilgrim were cleaned

and coated with protective RTV coating again during the spring 1993 refueling

outage. As an alternate long term option, the licensee is considering a

replacement of the existing 345 kV switchyard with a modern compactly designed

switchyard which would be more resistant to the coastal environment.

These events illustrate the significance of maintaining reliable offsite and

onsite power sources during outages as well as during operation.

This information notice requires no specific action or written response. If

you have any questions about the information in this notice, please contact

one of the technical contacts listed below or the appropriate Office of

Nuclear Regulation (NRR) project manager.

Brian K. Grimes, Director

Division of Operating Reactor Support

Office of Nuclear Reactor Regulation

Technical contacts:

R. Schin, RII

(404) 331-5561

P. Fillion, R11

(404) 331-7288 P. Holmes-Ray,

(904) 795-7677 RII

P. Kang, NRR

(301) 504-2779

R. Prevatte, RII

(919) 457-9531 Attachment:

List of Recently Issued NRC Information Notices

  • SEE PREVIOUS CONCURRENCE

OFFICE

  • RII
  • EELB
  • C:EELB:NRR

NAME

RSchin

JBeeson

PKang

CBerlinger

DATE

07/13/93

-08/09/93

,11/03/93

11/03/93 D: DE

I *OGCB:DORS

  • C:OGCB:DORS

D: DORS

JTWiggins

NECampbell

l GHMarcus

BKGrimes

l

11/04/93

11/18/93

11/23/93

112/

/93

-J

rUCLUMNI NAMt: bWIl1H1N.NMC

/Wr PD

IN 93-XX

November xx, 1993

NRC review of these events concluded that the safety-related equipment at the

affected units performed as designed and there were no increased risks to the

public.

This information notice requires no specific action or written response. If

you have any questions about the information in this notice, please contact

one of the technical contacts listed below or the appropriate Office of

Nuclear Regulation (NRR) project manager.

Brian K. Grimes, Director

Division of Operating Reactor Support

Office of Nuclear Reactor Regulation

Technical contacts:

R. Schin, RII

(404) 331-5561

P. Fillion, RII

(404) 331-7288 P. Holmes-Ray, RII

(904) 795-7677

P. Kang, NRR

(301) 504-2779

R. Prevatte, R11

(919) 457-9531 Attachment:

List of Recently Issued NRC Information Notices

  • SEE PREVIOUS CONCURRENCE

OFFICE

  • RII
  • EELB
  • C:EELB:NRR

NAME

RSchin

JBeeson

PKang

CBerlinger

DATE

J07/13/93 o08/09/93 i11/03/930,

11/03/93

1I

~1*

D: DE

  • OGCB:DORS

C:OGCB:DORS

D: DORS

JTWiggins

NECampbell

GHMarcus

BKGrimes L

11/04/93

111/18/93

11/Z/93

11/ /93

-

---

-- - -

- - - - -

DOCUMENT NAME: SWITCHIN.NEC

IN 93-XX

November xx, 1993

NRC review of these events concluded that the safety-related equipment at the

affected units performed as designed and there were no increased risks to the

public.

This information notice requires no specific action or written response. If

you have any questions about the information in this notice, please contact

one of the technical contacts listed below or the appropriate Office of

Nuclear Regulation (NRR) project manager.

Brian K. Grimes, Director

Division of Operating Reactor Support

Office of Nuclear Reactor Regulation

Technical contacts:

R. Schin, RII

(404) 331-5561

P. Fillion, RII

(404) 331-7288

P. Kang, NRR

(301) 504-2779 P. Holmes-Ray, SRI, Crystal River

(904) 795-7677

R. Prevatte, SRI, Brunswick

(919) 457-9531 Attachment:

List of Recently Issued NRC Information Notices

  • SEE PREVIOUS CANCUIRRFNCr

-

OFFICE

  • RII
  • EELB
  • C:EELB:NRR

NAME

RSchin

JBeeson

PKang

CBerlinger

DATE

07/13/93

08/09/93

11/03/93

11/03/93 D: DE

OGCB:DORS

c:OGCB:RSfl

n-nnl* z

JTWiggins

N ECampbell

GHMacus

BKGrimes

11/04/93

11/1!/93

'f I II/

/93 II/

/93

1flPkrilIT

,k*IAr- tLI

.-

nUUvUtICNI

MIAMEi: 3Wl1tlnrN.NLLv

7Vt C

,

I,/-?

d2.,

Pe

~z

no,&

AAW&WetfA.

7

IN 93-XX

November xx, 1993

This information notice requires no specific action or written response.

If

you have any questions about the information in this notice, please contact

one of the technical contacts listed below or the appropriate Office of

Nuclear Regulation (NRR) project manager.

Brian K. Grimes, Director

Division of Operating Reactor Support

Office of Nuclear Reactor Regulation

Technical contacts:

R. Schin, RII

(404) 331-5561

P. Fillion, RII

(404) 331-7288 P. Holmes-Ray, SRI, Crystal River

(904) 795-7677

R. Prevatte, SRI, Brunswick

(919) 457-9531 Attachment:

List of Recently Issued NRC Information Notices

  • SEE PREVIOUS CONCURRENCE

OFFICE

  • RII
  • EELB
  • C:EELB:NRR

NAME

RSchin

JBeeson

PKang

CBerlinger

DATE

1 07/13/93

- 08/09/93

11/03/93

,11/03/93 D:DE

OGCB:DORS

C:OGCB:DORS

D:DORS

JTWiggins

l NECampbell

GHMarcus

BKGrimes

A / f/9/

/93

-9I/

/93 U/

/93 DOCUME

3E: SWITCHIN.NEC

IN 93-XX

August xx, 1993 This information notice requires no specific action or written response.

If

you have any questions about the information in this notice, please contact

one of the technical contacts listed below or the appropriate Office of

Nuclear Regulation (NRR) project manager.

Brian K. Grimes, Director

Division of Operating Reactor Support

Office of Nuclear Reactor Regulation

Technical contacts:

R. Schin, RII

(404) 331-5561

P. Fillion, RII

(404) 331-7288 P. Holmes-Ray, SRI, Crystal River

(904) 795-7677

R. Prevatte, SRI, Brunswick

(919) 457-9531 di

6 4'

I o. .erg BUD.

II

Attachment:

List of Recently Issued NRC

  • SFF PREVIOUS CONCURRENCE

Information Notices

---

-

I____

I-

__

I_ ., -n e

OFFICE

  • RII

W'

I

ttLLx

LLL;

"Ir

I

V,

NAME

RSchin

JBeeson

VS/ PKang

CBerlinger

DATE

07/13/ 93

093

________

__93

__#

_ _/93

--

39 nffF

I Onrr FtlORS

C !OGCR :DORS

D: DORS

vI

o

.

-.

__

____ ._ _

JTWiggins

NECampbell

GHMarcus

BKGrimes

08/ /93

08/ /93

08/ /93

08/ /93 DOCUMENT NAML: SMILHIN.iLL

w

-

IN 93-XX

August xx, 1993 This information notice requires no specific action or written response.

If

you have any questions about the information in this notice, please contact

one of the technical contacts listed below or the appropriate Office of

Nuclear Regulation (NRR) project manager.

Brian K. Grimes, Director

Division of Operating Reactor Support

Office of Nuclear Reactor Regulation

Technical contacts:

R. Schin, RII

(404) 331-5561

P. Fillion, RII

(404) 331-7288 P. Holmes-Ray, SRI, Crystal River

(904) 795-7677

R. Prevatte, SRI, Brunswick

(919) 457-9531 Attachment:

List of Recently Issued NRC Information Notices

  • SFF PREVIOUS CONCURRENCE

OFFICE

RII

EELB

C:EELB:NRR

NAME

. RSchin

JBeeson

SSaba (I

.

¢

CBerlinger

DATE

______08/7

/93

08/ /93

08/ /93

-~.1 D: DE

OGCB:DORS

C:OGCB:DORS

D: DORS

JTWiggins

NECampbell

GHMarcus

BKGrimes

08/ /93

08/ /93

08/ /93

1 08/ /93 DOCUMENT NAME: SWITCHIN.NEC