Information Notice 1993-23, Weschler Instruments Model 252 Switchboard Meters
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, D.C.
20555
March 31, 1993
NRC INFORMATION NOTICE NO. 93-23:
WESCHLER INSTRUMENTS MODEL 252
SWITCHBOARD METERS
Addressees
All holders of operating licenses or construction permits for nuclear power
reactors.
7
Purpose
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information
notice to alert addressees to possible problems with Weschler Instruments
(Weschler) Model 252 commercial grade switchboard meters.
It is expected that
recipients will review the information for applicability to their facilities
and consider actions, as appropriate, to avoid similar problems.
However, suggestions contained in this information notice are not NRC requirements;
therefore, no specific action or written response is required.
Description of Circumstances
On November 9, 1992, Weschler informed the NRC of sticking meter movements in
some Model 252 meters manufactured and supplied as commercial grade items.
Although Weschler reported having no evidence that meters manufactured
specifically for safety-related service are affected, Weschler was concerned
that affected commercial grade meters could have been dedicated for use in
nuclear safety-related applications.
Discussion
Weschler determined that some of the commercial grade meters returned for
repair or calibration were inaccurate and erratic. The vendor engineering
report attributed this problem to sticking of the meter movement because of an
off-center torsion spring. Weschler determined that this condition resulted
from a deviation in the dimensions associated with the torsion head screws
combined with several coincidental factors that included (1) degradation of
clip-to-torsion screw lubrication, (2) low initial force from the spring- retaining clip or fatigue of the spring-retaining clip, (3) variations in the
alignment of the meter movement during initial assembly, and (4) the effect of
the summation of the dimensional tolerances in the assembly of the
subcomponents.
9303240274 P
P
5tC
C* i\\
9I _X3 C9c
IN 93-23 March 31, 1993 To prevent this deficiency in future products, Weschler revised its production
inspection procedures to specifically require checking the dimensions in
question. Weschler also revised its nuclear quality assurance procedures to.
require specific checks of torsion head screw dimensions, although the vendor
has not detected a problem with meters manufactured specifically for safety- related applications.
Weschler could not determine whether or not any Model 252 switchboard meters
sold as commercial grade items through the various distributors had been
dedicated for use in nuclear safety-related applications.
Therefore, Weschler
has not directly notified any licensees about this problem.
Weschler stated that the principal corrective action it has taken for affected
meters returned for repair and recalibration is to replace the faulty torsion
head screws because they can't be repaired. Upon request, Weschler will give
licensees information about the problem and the recommended corrective
measures.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
the technical contact listed below or the appropriate Office of Nuclear
Reactor Regulation (NRR) project manager.
Brian K. Grimes, Director
Division of Operating Reactor Support
Office of Nuclear Reactor Regulation
Technical contact: S. V. Athavale, NRR
(301) 504-2974 Attachment:
List of Recently Issued NRC Information Notices
K-I
Attachment
March 31, 1993 LIST OF RECENTLY ISSUED
NRC INFORMATION NOTICES
Information
Date of
Notice No.
Subject
Issuance
Issued to
93-22
93-21
93-20
93-19
93-18 Tripping of Klockner- Moeller Molded-Case
Circuit Breakers due to
Support Level Failure
Summary of NRC Staff
Observations Compiled
during Engineering Audits
or Inspections of Licen- see Erosion/Corrosion
Programs
Thermal Fatigue Cracking
of Feedwater Piping to
Steam Generators
Slab Hopper Bulging
Portable Moisture-Density
Gauge User Responsibilities
during Field Operations
Safety Systems Response
to Loss of Coolant and
Loss of Offsite Power
Failures of Nut-Locking
Devices in Check Valves
Failure to Verify the
Continuity of Shunt Trip
Attachment Contacts in
Manual Safety Injection
and Reactor Trip Switches
Clarification of
10 CFR 40.22, Small
Quantities of Source
Material
03/26/93
03/25/93
03/24/93
03/17/92
03/10/93
03/08/93
02/19/93
02/18/93
02/18/93
All holders of OLs or CPs
for nuclear power reactors.
All holders of OLs or CPs
for light water nuclear
power reactors.
All holders of OLs or CPs
for PWRs supplied by
Westinghouse or Combustion
Engineering.
All nuclear fuel cycle
licensees.
All U.S. Nuclear Regulatory
Commission licensees that
possess moisture-density
All holders of OLs or CPs
for nuclear power reactors.
All holders of OLs or CPs
for nuclear power reactors.
All holders of OLs or CPs
for nuclear power reactors.
All licensees who possess
source material.
93-17
93-16
93-15
93-14 OL = Operating License
CP -
Construction Permit
~'-2 IN 93-23 March 31, 1993 To prevent this deficiency in future products, Weschler revised its production
inspection procedures to specifically require checking the dimensions in
question. Weschler also revised its nuclear quality assurance procedures to
require specific checks of torsion head screw dimensions, although the vendor
has not detected a problem with meters manufactured specifically for safety- related applications.
Weschler could not determine whether or not any Model 252 switchboard meters
sold as commercial grade items through the various distributors had been
dedicated for use in nuclear safety-related applications. Therefore, Weschler
has not directly notified any licensees about this problem.
Weschler stated that the principal corrective action it has taken for affected
meters returned for repair and recalibration is to replace the faulty torsion
head screws because they can't be repaired. Upon request, Weschler will give
licensees information about the problem and the recommended corrective
measures.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
the technical contact listed below or the appropriate Office of Nuclear
Reactor Regulation (NRR) project manager.
orig /s/'d by BKGrimes
Brian K. Grimes, Director
Division of Operating Reactor Support
Office of Nuclear Reactor Regulation
Technical contact: S. V. Athavale, NRR
(301) 504-2974 Attachment: % L
List of Receitly Issudd NRC Information Notices
DOCUMENT NAME: 93-2IN
- D/DRIL:NRR
- D/DRCH:NRR
- C/OGCB: DORS:NRR
CERossi
BABoger
GHMarcus
3
03/11/93
02/11/93
03/15/93
- OGCB:DORS:NRR*HICB:DRCH:NRR*SC/HICB:DRCH:NRR*C/HICB:DRCH:NRR*RPB:ADM
AJKugler
SVAthavale
JMauck
JWermiel
TechEd
02/08/93
02/08/93
02/10/93
02/10/93
02/08/93
IN 93-XX
March XX, 1993 To prevent this deficiency in future products, Weschler revised its production
inspection procedures to specifically require checking the dimensions in
question. Weschler also revised its nuclear quality assurance procedures to
require specific checks of torsion head screw dimensions, although the vendor
has not detected a problem with meters manufactured specifically for safety- related applications.
Weschler could not determine whether or not any Model 252 switchboard meters
sold as commercial grade items through the various distributors had been
dedicated for use in nuclear safety-related applications. Therefore, Weschler
has not directly notified any licensees about this problem.
Weschler stated that the principal corrective action it has taken for affected
meters returned to it for repair and recalibration is to replace the faulty
torsion head screws because they can't be repaired. Upon request, Weschler
will give licensees information about the problem and the recommended
corrective measures.
This information notice requires no specific action or written response.
If
you have any questions about the information in this notice, please contact
the technical contact listed below or the appropriate Office of Nuclear
Reactor Regulation (NRR) project manager.
Brian K. Grimes, Director
Division of Operating Reactor Suppprt
Office of Nuclear Reactor Regulation
Technical contact:
S. V. Athavale
(301)
504-2974 Attachment: List of Recently Issued NRC Information Notices
D/DORS:NRR
- D/DRIL:NRR
- D/DRCH:NRR
C/OGCB:DORS:NRR
BKGrimes
CERossi
BABoger
GHMarcu
03/
/93
03/11/93
02/11/93
/ xi 9
- OGCB:DORS:NRR*HICB:DRCH:NRR*SC/HICB:DRCH:NRR*C/HICB:DRCH:NRR*RPB:ADM
AJKugler
SVAthavale
JMauck
JWermiel
TechEd
02/08/93
02/08/93
02/10/93
02/10/93
02/08/93
-C
K>~
1
IN 93-XX
March XX, 1993 To prevent this deficiency in future products, Weschler revised its production
inspection procedures to specifically require checking the dimensions in
question. Weschler also revised its nuclear quality assurance procedures to
require specific checks of torsion head screw dimensions, although the vendor
has not detected a problem with meters manufactured specifically for safety- related applications.
Weschler could not determine whether or not any Model 252 switchboard meters
sold as commercial grade items through the various distributors had been
dedicated for use in nuclear safety-related applications. Therefore, Weschler
has not directly notified any licensees about this problem.
Weschler stated that the principal corrective action it has taken for affected
meters returned to it for repair and recalibration is to replace the faulty
torsion head screws because they can't be repaired. Upon request, Weschler
will give licensees information about the problem and the recommended
corrective measures.
This information notice requires no specific action or written response.
If
you have any questions about the information in this notice, please contact
the technical contact listed below or the appropriate Office of Nuclear
Reactor Regulation (NRR) project manager.
Brian K. Grimes, Director
Division of Operating Reactor Support
Office of Nuclear Reactor Regulation
Technical contact:
S. V. Athavale
(301) 504-2974 Attachment:
List of Recently Issued NRC Information Notices
D/DORS:NRR
C' *D/DRCH:NRR
C/OGCB:DORS:NRR
BKGrimes
BABoger
GHMarcus
03/ /93
03//l/93
02/11/93
02/ /93
- OGCB:DORS:NRR*HICB:DRCH:NRR*SC/HICB:DRCH:NRR*C/HICB:DRCH:NRR*RPB:ADM
MD:DRIL:NRR gtt
AJKugler
SVAthavale
JMauck
JWermiel
TechEd
RZinmerman:ld
02/08/93
02/08/93
02/10/93
02/10/93
02/08/93 03/S/93
'S
K>
IN 93-XX
February XX, 1993
To prevent this deficiency in future products, Weschler revised its production
inspection procedures to specifically require checking the dimensions in
question. Weschler also revised its nuclear quality assurance procedures to
require specific checks of torsion head screw dimensions, although the vendor
has not detected a problem with meters manufactured specifically for safety- related applications.
Weschler could not determine whether or not any Model 252 switchboard meters
sold as commercial grade items through the various distributors had been
dedicated for use in nuclear safety-related applications. Therefore, Weschler
has not directly notified any licensees about this problem.
Weschler stated that the principal corrective action it has taken for affected
meters returned to it for repair and recalibration is to replace the faulty
torsion head screws because they can not be repaired.
Upon request, Weschler
will give licensees information about the problem and the recommended
corrective measures.
This information notice requires no specific action or written response.
If
you have any questions about the information in this notice, please contact
the technical contact listed below or the appropriate Office of Nuclear
Reactor Regulation (NRR) project manager.
Brian K. Grimes, Director
Division of Operating Reactor Support
Office of Nuclear Reactor Regulation
Technical contact:
S. V. Athavale
(301) 504-2974 Attachment: List of Recentl
Issued NRC Information Notices
D/DORS:NRR
/DRIL:NRR
Di
q
C/OGCB:DORS:NRR
BKGrimes
CERossi
er +'%
GHMarcus
02/ /93
02/ /93 U02/ 1/93
02/ /93
- OGCB:DORS:NRR*HICB:DRCH:NRR*SC/HICB:DRCH:NRR*C/H B:DRCH:NRR*RPB:ADM
AJKugler
SVAthavale
JMauck
JWermiel
TechEd
02/08/93
02/08/93
02/10/93
02/10/93
02/08/93
il C 0 "V C__ .1~o
2 k2%~-m
&_
C6Q
a
e P. . TVA
-
IN 93-XX
-
-February
XX, 1993 To prevent this deficiency in future products, Weschler has revised its
production inspection procedures to specifically require checking the
dimensions in question. In addition, Weschler has revised its nuclear quality
assurance procedures to require specific checks of torsion head screw
dimensions, although the vendor has not detected a problem with meters
manufactured specifically for safety-related applications.
Weschler could not determine whether or not any Model 252 switchboard meters
sold as commercial grade items through the various distributors had been
dedicated for use in nuclear safety-related applications. Therefore, Weschler
has not directly notified any licensees about this problem.
Weschler stated that the principal corrective action it has taken for affected
meters returned to it for repair and recalibration is to replace the faulty
torsion head screws because they can not be repaired.
Weschler will provide
information about the problem and the recommended corrective measures to
licensees upon request.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
the technical contact listed below or the appropriate Office of Nuclear
Reactor Regulation (NRR) project manager.
Brian K. Grimes, Director
Division of Operating Reactor Support
Office of Nuclear Reactor Regulation
Technical contact:
S. V. Athavale
(301) 504-2974 Attachment:
List of Recently Issued NRC Information Notices
OGCB:DORS:NRR
AJKugler.it
02/ S/9?3U
D/DORS:NRR
BKGrimes
02/ /93 HICB:DRCH: RR
SVAthavale
02/8 /93 a-.
D/DRIL:NRR
CERossi
02/ /93
&J
.DRCH:NRR
02/ /9<
Lif
D/DRCH:NRR
BABoger
C/H
RCH:NRR
JWe lel
02/10/93 C/OGCB:DORS:NRR
GHMarcus
02/ /93 RPB:ADM
TechEd
02/ /93
IN 93-XX
February XX, 1993 To prevent this deficiency in future products, Weschler has revised its
production inspection procedures to specifically require checking the
dimensions in question. In addition, Weschler has revised its nuclear quality
assurance procedures to require specific checks of torsion head screw
dimensions, although the vendor has not detected a problem with meters
manufactured specifically for safety-related applications.
Weschler could not determine whether or not any Model 252 switchboard meters
sold as commercial grade items through the various distributors had been
dedicated for use in nuclear safety-related applications. Therefore, Weschler
has not directly notified any licensees about this problem.
Weschler stated that the principal corrective action it has taken for affected
meters returned to it for repair and recalibration is to replace the faulty
torsion head screws because they can not be repaired. Weschler will provide
information about the problem and the recommended corrective measures to
licensees upon request.
This information notice requires no specific action or written response.
If
you have any questions about the information in this notice, please contact
the technical contact listed below or the appropriate Office of Nuclear
Reactor Regulation (NRR) project manager.
Brian K. Grimes, Director
Division of Operating Reactor Support
Office of Nuclear Reactor Regulation
Technical contact: S. V. Athavale
(301) 504-2974 Attachment: List of Recently Issued NRC Information Notices
D/DORS:NRR
D/DRIL:NRR
D/DRCH:NRR
C/OGCB:DORS:NRR
BKGrimes
CERossi
BABoger
GHMarcus
02/
/93
02/
/93
02/
/93
02/ /93 OGCB:DORS:NRR HICB:DRCH:NRR SC/HICB:DRCH:NRR C/HICB:DRCH:NRR RPB:ADM
AJKugler
SVAthavale
JMauck
JWermiel
TechEd 1&'a;n ap
02/
/93
02/ /93
02/
/93
02/
/93
02/1 /93 a