ML14156A255: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML14156A255
| number = ML14156A255
| issue date = 06/05/2014
| issue date = 06/05/2014
| title = 06/24/2014, Notice of Public Meeting with Seabrook, Unit 1 to Discuss the Nrc'S Assessment of Safety Performance for 2013
| title = Notice of Public Meeting with Seabrook, Unit 1 to Discuss the Nrc'S Assessment of Safety Performance for 2013
| author name = Dentel G
| author name = Dentel G
| author affiliation = NRC/RGN-I/DRP/PB3
| author affiliation = NRC/RGN-I/DRP/PB3
Line 18: Line 18:
{{#Wiki_filter:MN No. 14-008 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING June 5, 2014 Licensee:            NextEra Energy, Seabrook, LLC Facilities:          Seabrook Station, Unit No. 1 (Seabrook)
{{#Wiki_filter:MN No. 14-008 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING June 5, 2014 Licensee:            NextEra Energy, Seabrook, LLC Facilities:          Seabrook Station, Unit No. 1 (Seabrook)
Docket Nos:          50-443 Date/ Time:          June 24, 2014, from 6:30 p.m. to 8:30 p.m.
Docket Nos:          50-443 Date/ Time:          June 24, 2014, from 6:30 p.m. to 8:30 p.m.
Open House from 5:30 pm - 6:30 pm Location:            Best Western Plus The Inn at Hampton 815 Lafayette Road Hampton, New Hampshire, 03842 (603) 926-6771 Purpose:             The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRCs assessment of safety performance at Seabrook for 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.
Open House from 5:30 pm - 6:30 pm Location:            Best Western Plus The Inn at Hampton 815 Lafayette Road Hampton, New Hampshire, 03842 (603) 926-6771
 
==Purpose:==
The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRCs assessment of safety performance at Seabrook for 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.
NRC Attendees:        J. Trapp, Deputy Director, Division of Reactor Safety G. Dentel, Chief, Division of Reactor Projects, Branch 3 W. Cook, Senior Reactor Analyst, Division of Reactor Safety P. Cataldo, Senior Resident Inspector, Seabrook C. Newport, Resident Inspector, Seabrook A. Buford, Structural Engineer, NRR License Renewal Public Participation: This is a Category 3 Meeting. The NRC will host a one-hour open house, as well as a question and answer session, to discuss NextEras performance at Seabrook during calendar year 2013. NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Seabrook during the open house.
NRC Attendees:        J. Trapp, Deputy Director, Division of Reactor Safety G. Dentel, Chief, Division of Reactor Projects, Branch 3 W. Cook, Senior Reactor Analyst, Division of Reactor Safety P. Cataldo, Senior Resident Inspector, Seabrook C. Newport, Resident Inspector, Seabrook A. Buford, Structural Engineer, NRR License Renewal Public Participation: This is a Category 3 Meeting. The NRC will host a one-hour open house, as well as a question and answer session, to discuss NextEras performance at Seabrook during calendar year 2013. NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Seabrook during the open house.
Meeting Contact:     Glenn T. Dentel, Chief, Projects Branch 3 (610) 337-5233 E-mail: Glenn.Dentel@NRC.Gov
Meeting
 
==Contact:==
Glenn T. Dentel, Chief, Projects Branch 3 (610) 337-5233 E-mail: Glenn.Dentel@NRC.Gov


2 The NRCs annual assessment letter regarding Seabrooks performance during 2013 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML14062A021. ADAMS is accessible from the NRC website at:
2 The NRCs annual assessment letter regarding Seabrooks performance during 2013 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML14062A021. ADAMS is accessible from the NRC website at:

Latest revision as of 05:50, 5 December 2019

Notice of Public Meeting with Seabrook, Unit 1 to Discuss the Nrc'S Assessment of Safety Performance for 2013
ML14156A255
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 06/05/2014
From: Glenn Dentel
Reactor Projects Branch 3
To:
dentel, gt
References
MN 14-008
Download: ML14156A255 (3)


Text

MN No.14-008 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING June 5, 2014 Licensee: NextEra Energy, Seabrook, LLC Facilities: Seabrook Station, Unit No. 1 (Seabrook)

Docket Nos: 50-443 Date/ Time: June 24, 2014, from 6:30 p.m. to 8:30 p.m.

Open House from 5:30 pm - 6:30 pm Location: Best Western Plus The Inn at Hampton 815 Lafayette Road Hampton, New Hampshire, 03842 (603) 926-6771

Purpose:

The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRCs assessment of safety performance at Seabrook for 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: J. Trapp, Deputy Director, Division of Reactor Safety G. Dentel, Chief, Division of Reactor Projects, Branch 3 W. Cook, Senior Reactor Analyst, Division of Reactor Safety P. Cataldo, Senior Resident Inspector, Seabrook C. Newport, Resident Inspector, Seabrook A. Buford, Structural Engineer, NRR License Renewal Public Participation: This is a Category 3 Meeting. The NRC will host a one-hour open house, as well as a question and answer session, to discuss NextEras performance at Seabrook during calendar year 2013. NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Seabrook during the open house.

Meeting

Contact:

Glenn T. Dentel, Chief, Projects Branch 3 (610) 337-5233 E-mail: Glenn.Dentel@NRC.Gov

2 The NRCs annual assessment letter regarding Seabrooks performance during 2013 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML14062A021. ADAMS is accessible from the NRC website at:

http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs annual assessment process and the safety performance of Seabrook can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by June 20, 2014 via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by: /RA/

Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects cc: Distribution via ListServ