| document type = License-Technical Assistance Request (TAR), Reply to, Memoranda
| document type = License-Technical Assistance Request (TAR), Reply to, Memoranda
| page count = 2
| page count = 2
| project =  
| project = TAC:L24940
| stage = Approval
| stage = Approval
}}
}}
Line 30: Line 30:
NSIR/DSP Project Completion Date:            _________________________________
NSIR/DSP Project Completion Date:            _________________________________
NSIR/DSP Branch Chief Signature:            _________________________________
NSIR/DSP Branch Chief Signature:            _________________________________
Contact:       Raynard Wharton (301) 287-9196 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.
 
==Contact:==
Raynard Wharton (301) 287-9196 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.


August 20, 2014 MEMORANDUM TO:            Sandra Wastler, Chief Materials, Waste, and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM:                    Stephen S. Koenick, Acting Chief        /RA/
August 20, 2014 MEMORANDUM TO:            Sandra Wastler, Chief Materials, Waste, and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM:                    Stephen S. Koenick, Acting Chief        /RA/
Line 44: Line 46:
NSIR/DSP Project Completion Date:          _________________________________
NSIR/DSP Project Completion Date:          _________________________________
NSIR/DSP Branch Chief Signature:          _________________________________
NSIR/DSP Branch Chief Signature:          _________________________________
Contact:   Raynard Wharton (301) 287-9196 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.
 
==Contact:==
Raynard Wharton (301) 287-9196 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.
Distribution:    SFST r/f DMarcano ADAMS P8 No.: ML14232A301 OFC        SFST                SFST                  SFST NAME        RWharton            WWheatley via e-mail  SKoenick DATE        08/12/14            08/13 /14              08/20/14 OFFICIAL RECORD COPY}}
Distribution:    SFST r/f DMarcano ADAMS P8 No.: ML14232A301 OFC        SFST                SFST                  SFST NAME        RWharton            WWheatley via e-mail  SKoenick DATE        08/12/14            08/13 /14              08/20/14 OFFICIAL RECORD COPY}}

Latest revision as of 05:37, 5 December 2019

Memo s Wastler, Technical Assistance Request - Review of Physical Security Plan for the Pilgrim Nuclear Power Stations (TAC No. L24940) Docket Nos. 72-1044, 50-293
ML14232A301
Person / Time
Site: Pilgrim
Issue date: 08/20/2014
From: Stephen Koenick
NRC/NMSS/SFST/LID/RIOB
To: Wastler S
NRC/NSIR/DSP/DDMS/MTWSB
Wharton L
References
EA-13-132, TAC L24940
Download: ML14232A301 (2)


Text

August 20, 2014 MEMORANDUM TO: Sandra Wastler, Chief Materials and Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Stephen S. Koenick, Acting Chief /RA/

Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards

SUBJECT:

TECHNICAL ASSISTANCE REQUEST - REVIEW OF PHYSICAL SECURITY PLAN FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. L24940)

The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project:

PROJECT: Review Pilgrim Nuclear Power Station (Pilgrim) response to Order (EA 132) and the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP) and verify implementation of the additional security measures.

DOCKET NOS.: 50-293, 72-1044 TAC NO: L24940 REQUESTED ACTION: NMSS/SFST requests NSIR/DSP review of the PSP and the security Order response for the Pilgrim Nuclear Power Station supporting NRCs safety inspection prior to its initial loading campaign. Prepare a memorandum documenting the results of NSIRs review.

Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.

Name of NSIR/DSP assigned Reviewer: _________________________________

NSIR/DSP Project Completion Date: _________________________________

NSIR/DSP Branch Chief Signature: _________________________________

Contact:

Raynard Wharton (301) 287-9196 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.

August 20, 2014 MEMORANDUM TO: Sandra Wastler, Chief Materials, Waste, and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Stephen S. Koenick, Acting Chief /RA/

Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards

SUBJECT:

TECHNICAL ASSISTANCE REQUEST - REVIEW OF PHYSICAL SECURITY PLAN FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. L24940)

The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project:

PROJECT: Review Pilgrim Nuclear Power Station (Pilgrim) response to Order (EA-13-132) and the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP) and verify implementation of the additional security measures.

DOCKET NOS.: 50-293, 72-1044 TAC NO: L24940 REQUESTED ACTION: NMSS/SFST requests NSIR/DSP review of the PSP and the security Order response for the Beaver Valley Power Station supporting NRCs safety inspection prior to its initial loading campaign. Prepare a memorandum documenting the results of NSIRs review.

Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.

Name of NSIR/DSP assigned Reviewer: _________________________________

NSIR/DSP Project Completion Date: _________________________________

NSIR/DSP Branch Chief Signature: _________________________________

Contact:

Raynard Wharton (301) 287-9196 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.

Distribution: SFST r/f DMarcano ADAMS P8 No.: ML14232A301 OFC SFST SFST SFST NAME RWharton WWheatley via e-mail SKoenick DATE 08/12/14 08/13 /14 08/20/14 OFFICIAL RECORD COPY