ML18277A232: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML18277A232
| number = ML18277A232
| issue date = 10/04/2018
| issue date = 10/04/2018
| title = Acceptance Review for EPID L-2018-LLA-0239 Callaway Emergency Action Level Changes - Accepted
| title = NRR E-mail Capture - Acceptance Review for EPID L-2018-LLA-0239 Callaway Emergency Action Level Changes - Accepted
| author name = Klos J
| author name = Klos J
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
Line 24: Line 24:
: Tom, By letter dated September 4, 2018, Union Electric Company (the licensee) dba Ameren Missouri, submitted a license amendment for the Callaway Plant Unit 1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
: Tom, By letter dated September 4, 2018, Union Electric Company (the licensee) dba Ameren Missouri, submitted a license amendment for the Callaway Plant Unit 1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 85 hours to complete. The NRC staff expects to complete this review in approximately 12 months, which is August 30, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately [[estimated NRC review hours::85 hours]] to complete. The NRC staff expects to complete this review in approximately 12 months, which is August 30, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
If you have any questions, please contact me.
If you have any questions, please contact me.

Latest revision as of 05:43, 6 March 2020

NRR E-mail Capture - Acceptance Review for EPID L-2018-LLA-0239 Callaway Emergency Action Level Changes - Accepted
ML18277A232
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/04/2018
From: John Klos
Plant Licensing Branch IV
To: Elwood T
AmerenUE
References
L-2018-LLA-0239
Download: ML18277A232 (2)


Text

NRR-DMPSPEm Resource From: Klos, John Sent: Thursday, October 4, 2018 11:37 AM To: 'Telwood@ameren.com' Cc: Klos, John

Subject:

Acceptance review for EPID L-2018-LLA-0239 Callaway Emergency Action Level Changes - accepted

Tom, By letter dated September 4, 2018, Union Electric Company (the licensee) dba Ameren Missouri, submitted a license amendment for the Callaway Plant Unit 1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 85 hours3.542 days <br />0.506 weeks <br />0.116 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is August 30, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me.

John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O9D22 NRC/NRR/DORL/LPL4, MS O9E3 Washington, DC 20555-0001 301.415.5136, John.Klos@NRC.gov 1

Hearing Identifier: NRR_DMPS Email Number: 601 Mail Envelope Properties (BL2PR09MB11395723D5F40AEF9CFA0F8BE3EA0)

Subject:

Acceptance review for EPID L-2018-LLA-0239 Callaway Emergency Action Level Changes - accepted Sent Date: 10/4/2018 11:37:19 AM Received Date: 10/4/2018 11:37:20 AM From: Klos, John Created By: John.Klos@nrc.gov Recipients:

"Klos, John" <John.Klos@nrc.gov>

Tracking Status: None

"'Telwood@ameren.com'" <Telwood@ameren.com>

Tracking Status: None Post Office: BL2PR09MB1139.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2682 10/4/2018 11:37:20 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: