{{#Wiki_filter:December 16, 2008  
{{#Wiki_filter:UNITED S TATE S
  James R. Douet, Vice President of Operations  
                                N UCLE AR REGU LATORY COMMI SS ION
Grand Gulf Nuclear Station Entergy Operations, Inc. P.O. Box 756 Port Gibson, MS 39150  
                                                  R E GI ON I V
                                        612 E. LAMAR BLVD., SU ITE 40 0
SUBJECT: GRAND GULF NUCLEAR STATION
                                        AR LIN GTON , TEXAS 7 6 01 1- 4125
- INFORMATION REQUEST FOR NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION NRC INSPECTION REPORT 05000416/2009006  
                                        December 16, 2008
Dear Mr. Douet:  
James R. Douet, Vice President of Operations
On February 2, 2009, the NRC will begin a triennial baseline Component Design Bases  
Grand Gulf Nuclear Station
Inspection at the Grand Gulf Nuclear Station. A seven-person team will perform this inspection using NRC Inspection Procedure 71111.21, "Component Design Bases Inspection."
Entergy Operations, Inc.
The inspection focuses on components and operator actions that have high risk and low design margins. The samples reviewed during this inspection will be identified during an information  
P.O. Box 756
gathering visit and during the subsequent in-office preparation week. In addition, a number of operating experience issues will also be selected for review.
Port Gibson, MS 39150
The inspection will include an information gathering site visit by the team leader and a senior reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of  
SUBJECT: GRAND GULF NUCLEAR STATION - INFORMATION REQUEST FOR NRC
seven NRC inspectors, of which six will focus on engineering and one on operations. The current inspection schedule is as follows:  
              TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION NRC
Onsite information gathering visit: Week of January 19, 2009 Onsite weeks: February 2, February 16, and February 23, 2009  
              INSPECTION REPORT 05000416/2009006
The purpose of the information gathering visit is to meet with members of your staff to identify potential risk-significant components and operator actions. The lead inspector will also request a tour of the plant with members of your operations staff and probabilistic safety assessment staff. Additional information and documentation needed to support the inspection will be identified, including interviews with engineering managers, engineers, and probabilistic safety assessment staff.
Dear Mr. Douet:
On February 2, 2009, the NRC will begin a triennial baseline Component Design Bases
Inspection at the Grand Gulf Nuclear Station. A seven-person team will perform this inspection
using NRC Inspection Procedure 71111.21, Component Design Bases Inspection.
The inspection focuses on components and operator actions that have high risk and low design
margins. The samples reviewed during this inspection will be identified during an information
gathering visit and during the subsequent in-office preparation week. In addition, a number of
operating experience issues will also be selected for review.
The inspection will include an information gathering site visit by the team leader and a senior
reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of
seven NRC inspectors, of which six will focus on engineering and one on operations. The
current inspection schedule is as follows:
        Onsite information gathering visit: Week of January 19, 2009
        Onsite weeks: February 2, February 16, and February 23, 2009
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant components and operator actions. The lead inspector will also request
a tour of the plant with members of your operations staff and probabilistic safety assessment
staff. Additional information and documentation needed to support the inspection will be
identified, including interviews with engineering managers, engineers, and probabilistic safety
assessment staff.
Our experience with these inspections has shown they are extremely resource intensive, both
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the
site and to ensure a productive inspection, we have enclosed a request for information needed
for the inspection. The request has been divided into three groups. The first group lists
information necessary for the information gathering visit and for general preparation. This


Our experience with these inspections has shown they are extremely resource intensive, both for the NRC inspectors and the licensee staff.  In order to minimize the inspection impact on the site and to ensure a productive inspection, we have enclosed a request for information needed for the inspection.  The request has been divided into three groups.  The first group lists
Entergy Operations, Inc.                         -2-
information necessary for the information gathering visit and for general preparation.  This UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 E. LAMAR BLVD., SUITE 400ARLINGTON, TEXAS 76011-4125
information should be available to the regional office no later than January 27, 2009. Insofar as
Entergy Operations, Inc. - 2 -  
possible, this information should be provided electronically to the lead inspector. Since the
    information should be available to the regional office no later than January 27, 2009. Insofar as possible, this information should be provided electronically to the lead inspector. Since the inspection will be concentrated on high risk/low margin components, calculations associated  
inspection will be concentrated on high risk/low margin components, calculations associated
with your list of high risk components should be available to review during the information gathering visit to assist in our selection of components based on available design margin.
with your list of high risk components should be available to review during the information
The second group of documents requested are those items that the team will need access to when onsite and after the inspection samples are selected. The third group lists information  
gathering visit to assist in our selection of components based on available design margin.
necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and completed in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we request that a contact individual be assigned to each inspector to ensure information requests, questions, and concerns are addressed in a timely manner.  
The second group of documents requested are those items that the team will need access to
when onsite and after the inspection samples are selected. The third group lists information
necessary to aid the inspection team in tracking issues identified as a result of the inspection. It
is requested that this information be provided to the lead inspector as the information is
generated during the inspection. It is important that all of these documents are up to date and
completed in order to minimize the number of additional documents requested during the
preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we
request that a contact individual be assigned to each inspector to ensure information requests,
questions, and concerns are addressed in a timely manner.
The lead inspector for this inspection is Mr. Ronald A. Kopriva. We understand that our
licensing engineer contact for this inspection is Mr. Dennis Coulter. If there are any questions
about the inspection or the requested materials, please contact the lead inspector at (817) 860-
8104 or via e-mail at ron.kopriva@nrc.gov.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
                                                Sincerely,
                                                /RA/
                                                Thomas Farnholtz, Chief
                                                Engineering Branch 1
                                                Division of Reactor Safety
Docket: 50-416
License: NPF-29
Enclosure:
Information Request For Grand Gulf Plant Component Design Bases Inspection.
cc w/enclosure
Senior Vice President
Entergy Nuclear Operations
P.O. Box 31995
Jackson, MS 39286-1995


The lead inspector for this inspection is Mr. Ronald A. Kopriva. We understand that our licensing engineer contact for this inspection is Mr. Dennis Coulter. If there are any questions about the inspection or the requested materials, please contact the lead inspector at (817) 860-8104 or via e-mail at ron.kopriva@nrc.gov.   In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Entergy Operations, Inc.                -3-
      Sincerely,       /RA/
Senior Vice President and COO
  Thomas Farnholtz, Chief      Engineering Branch 1 Division of Reactor Safety  
Entergy Operations, Inc.                   Attorney General
  Docket:  50-416 License:  NPF-29
P.O. Box 31995                              Department of Justice
Enclosure: Information Request For Grand Gulf Plant Component Design Bases Inspection.  
Jackson, MS 39286-1995                      State of Louisiana
                                            P.O. Box 94005
Vice President, Oversight                  Baton Rouge, LA 70804-9005
Entergy Services, Inc.
P.O. Box 31995                              Office of the Governor
Jackson, MS 39286-1995                      State of Mississippi
                                            Jackson, MS 39201
Chief, Energy and Transportation Branch
Environmental Compliance and                Attorney General
  Enforcement Division                      Asst. Attorney General
Mississippi Department of                   State of Mississippi
Environmental Quality                      P.O. Box 22947
P.O. Box 10385                              Jackson, MS 39225-2947
Jackson, MS 39289-0385
                                            State Health Officer
President                                  State Health Board
Claiborne County                            P.O. Box 1700
Board of Supervisors                        Jackson, MS 39215
P.O. Box 339
Port Gibson, MS 39150                      Associate General Counsel
                                            Entergy Nuclear Operations
Senior Manager                              P.O. Box 31995
Nuclear Safety & Licensing                  Jackson, MS 39286-1995
Entergy Nuclear Operations
P.O. Box 31995                              Richard Penrod, Senior Environmental
Jackson, MS 39286-1995                      Scientist/State Liaison Officer
                                            Office of Environmental Services
Manager, Licensing                          Northwestern State University
Entergy Operations, Inc.                    Russell Hall, Room 201
Grand Gulf Nuclear Station                  Natchitoches, LA 71497
P.O. Box 756
Port Gibson, MS 39150


  cc w/enclosure Senior Vice President Entergy Nuclear Operations
Entergy Operations, Inc.                       -4-
P.O. Box 31995 Jackson, MS  39286-1995
Electronic distribution by RIV:
 
Regional Administrator (Elmo.Collins@nrc.gov )
Entergy Operations, Inc. - 3 -
DRP Director (Dwight.Chamberlain@nrc.gov )
    Senior Vice President and COO Entergy Operations, Inc. P.O. Box 31995
DRP Deputy Director (Anton.Vegel@nrc.gov )
Jackson, MS  39286-1995
DRS Director (Roy.Caniano@nrc.gov )
Vice President, Oversight Entergy Services, Inc. P.O. Box 31995
DRS Deputy Director (Troy.Pruett@nrc.gov )
Jackson, MS  39286-1995
Senior Resident Inspector (Rich.Smith@nrc.gov )
Chief, Energy and Transportation Branch Environmental Compliance and    Enforcement Division Mississippi Department of    Environmental Quality
Resident Inspector (Andy.Barrett@nrc.gov )
P.O. Box 10385 Jackson, MS  39289-0385
Branch Chief, DRP/C (Geoffrey.Miller@nrc.gov )
President Claiborne County
Senior Project Engineer, DRP/C (Wayne.Walker@nrc.gov
Board of Supervisors P.O. Box 339 Port Gibson, MS  39150
GG Site Secretary (Nancy.Spivey@nrc.gov )
Senior Manager
Public Affairs Officer (Victor.Dricks@nrc.gov )
Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov)
Manager, Licensing Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS  39150
RC/ACES (Karla.Fuller@nrc.gov )
Attorney General Department of Justice
C. A. Carpenter, OE Cynthia.Carpenter@nrc.gov
State of Louisiana P.O. Box 94005 Baton Rouge, LA  70804-9005 
OEMAIL.Resource@nrc.gov
Office of the Governor
Senior Enforcement Specialist (Mark.Haire@nrc.gov)
State of Mississippi Jackson, MS  39201
Only inspection reports to the following:
Attorney General Asst. Attorney General State of Mississippi P.O. Box 22947
DRS STA (Dale.Powers@nrc.gov )
Jackson, MS  39225-2947
Mark Cox, OEDO RIV Coordinator (Mark.Cox@nrc.gov )
State Health Officer State Health Board P.O. Box 1700
SUNSI Review Completed: _ __ ADAMS: Yes No Initials: _RAK_
Jackson, MS  39215 
Publicly Available Non-Publicly Available       Sensitive Non-Sensitive
Associate General Counsel Entergy Nuclear Operations P.O. Box 31995
R:\_REACTORS\GG\2009\GG2009-006RFI-RAK.doc                        ML
Jackson, MS  39286-1995
SRI:DRS/EB1 C:DRS/EB1
Richard Penrod, Senior Environmental  Scientist/State Liaison Officer Office of Environmental Services
RAKopriva         TFarnholtz
Northwestern State University Russell Hall, Room 201 Natchitoches, LA  71497
/RA/             /RA/
 
12/16/08         12/16/08
Entergy Operations, Inc. - 4 -  
OFFICIAL RECORD COPY                                 T=Telephone     E=E-mail F=Fax
    Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) DRP Director (Dwight.Chamberlain@nrc.gov ) DRP Deputy Director (Anton.Vegel@nrc.gov ) DRS Director (Roy.Caniano@nrc.gov ) DRS Deputy Director (Troy.Pruett@nrc.gov ) Senior Resident Inspector (Rich.Smith@nrc.gov ) Resident Inspector (Andy.Barrett@nrc.gov ) Branch Chief, DRP/C (Geoffrey.Miller@nrc.gov ) Senior Project Engineer, DRP/C (Wayne.Walker@nrc.gov
  GG Site Secretary (Nancy.Spivey@nrc.gov ) Public Affairs Officer (Victor.Dricks@nrc.gov ) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov ) RITS Coordinator (Marisa.Herrera@nrc.gov) RC/ACES (Karla.Fuller@nrc.gov ) C. A. Carpenter, OE Cynthia.Carpenter@nrc.gov
  OEMAIL.Resource@nrc.gov
  Senior Enforcement Specialist (Mark.Haire@nrc.gov) Only inspection reports to the following:
DRS STA (Dale.Powers@nrc.gov ) Mark Cox, OEDO RIV Coordinator (Mark.Cox@nrc.gov )  
   
    SUNSI Review Completed: _   __   ADAMS:   Yes       No   Initials: _RAK
_    Publicly Available   Non-Publicly Available   Sensitive   Non-Sensitive R:\_REACTORS\GG\2009\GG2009-006RFI-RAK.doc                        ML SRI:DRS/EB1 C:DRS/EB1  
    RAKopriva TFarnholtz    
/RA/ /RA/     12/16/08 12/16/08                             OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax  
  - 1 - Enclosure INFORMATION REQUEST FOR GRAND GULF NUCLEAR STATION  COMPONENT DESIGN BASES INSPECTION (CDBI)
    Inspection Report:    05000416/2009006
Information Gathering Dates: January 21-23, 2009
On-site Inspection Dates:  February 2-6, 2009 and February 16-27, 2009
Inspection Procedure:  IP 71111.21, "Component Design Bases Inspection"
Lead Inspector/Team Leader: Ronald A. Kopriva      817-860-8104
    Ron.Kopriva@nrc.gov
I. Information Requested Prior to the information Gathering Visit
  The following information is requested by January 27, 2009, or sooner, to facilitate inspection preparation.  If you have any questions regarding this
information, pleased call the lead inspector as soon as possible.  (Please provide the information electronically in "pdf" files, Excel, or other searchable formats.  The information should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.  Information in "lists" should contain enough information to be easily understood by someone who has knowledge of boiling
water reactor technology).
  1. An excel spreadsheet of equipment basic events (with definitions) including importance measures sorted by risk achievement worth (RAW)
and Fussell-Vesely (FV) from your internal events probabilistic risk assessment (PRA). Include basic events with RAW value of 1.3 or greater. 
2. Provide a list of the top 500 cut-sets from your PRA. 
  3. Copies of PRA "system notebooks," and the latest PRA summary document.
  4. An excel spreadsheet of PRA human action basic events or risk ranking of operator actions from your site specific PSA sorted by RAW and FV.  Provide copies of your human reliability worksheets for these items. 
  5. If you have an external events or fire PSA model, provide the information requested in items 1-4 for external events and fire.
 
  - 2 - Enclosure  6.  Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal, etc.).
  7.  List of high risk maintenance rule systems/components and functions; based on engineering or expert panel judgment.
  8. A list of operating experience evaluations for the last 2 years. 
  9.  A list of all time-critical operator actions in procedures.


  10. A list of permanent and temporary modifications sorted by component identified in Item 1.
        INFORMATION REQUEST FOR GRAND GULF NUCLEAR STATION
  11. List of current "operator work arounds/burdens."
                    COMPONENT DESIGN BASES INSPECTION (CDBI)
  12. A list of the design calculations, which provide the design margin information for components included in Item 1. (Calculations should be available during the information gathering visit).
Inspection Report:                      05000416/2009006
  13. List of root cause evaluations associated with component failures or design issues initiated/completed in the last 5 years.
Information Gathering Dates:            January 21-23, 2009
  14.   Current management and engineering organizational charts.
On-site Inspection Dates:              February 2-6, 2009 and February 16-27, 2009
  15. Grand Gulf Nuclear Station Plant IPEEE, if available electronically.  
Inspection Procedure:                  IP 71111.21, Component Design Bases
                                        Inspection
16. Mechanical piping drawings for:
Lead Inspector/Team Leader:            Ronald A. Kopriva
  Engineered safety features  Emergency core cooling Systems  Emergency diesel generators
                                        817-860-8104
                                        Ron.Kopriva@nrc.gov
I.     Information Requested Prior to the information Gathering Visit
      The following information is requested by January 27, 2009, or sooner, to
      facilitate inspection preparation. If you have any questions regarding this
      information, pleased call the lead inspector as soon as possible. (Please provide
      the information electronically in pdf files, Excel, or other searchable formats.
      The information should contain descriptive names, and be indexed and
      hyperlinked to facilitate ease of use. Information in "lists" should contain enough
      information to be easily understood by someone who has knowledge of boiling
      water reactor technology).
      1.       An excel spreadsheet of equipment basic events (with definitions)
                including importance measures sorted by risk achievement worth (RAW)
                and Fussell-Vesely (FV) from your internal events probabilistic risk
                assessment (PRA). Include basic events with RAW value of 1.3 or
                greater.
      2.      Provide a list of the top 500 cut-sets from your PRA.
      3.       Copies of PRA system notebooks, and the latest PRA summary
                document.
      4.       An excel spreadsheet of PRA human action basic events or risk ranking
                of operator actions from your site specific PSA sorted by RAW and FV.
                Provide copies of your human reliability worksheets for these items.
      5.       If you have an external events or fire PSA model, provide the information
                requested in items 1-4 for external events and fire.
                                                  -1-                          Enclosure


  17 Electrical one-line drawings for:  
6.  Any pre-existing evaluation or list of components and associated
    Offsite power/switchyard supplies   Normal ac power systems  
    calculations with low design margins, (i.e., pumps closest to the design
  Emergency ac/dc power systems including   120Vac power, and   125Vdc/24Vdc safety class systems  
    limit for flow or pressure, diesel generator close to design required output,
18. List of any common-cause failures of components in the last 3 years.  
    heat exchangers close to rated design heat removal, etc.).
7.  List of high risk maintenance rule systems/components and functions;
    based on engineering or expert panel judgment.
8.  A list of operating experience evaluations for the last 2 years.
9.  A list of all time-critical operator actions in procedures.
10. A list of permanent and temporary modifications sorted by component
    identified in Item 1.
11. List of current operator work arounds/burdens.
12. A list of the design calculations, which provide the design margin
    information for components included in Item 1. (Calculations should be
    available during the information gathering visit).
13. List of root cause evaluations associated with component failures or
    design issues initiated/completed in the last 5 years.
14. Current management and engineering organizational charts.
15. Grand Gulf Nuclear Station Plant IPEEE, if available electronically.
16. Mechanical piping drawings for:
            Engineered safety features
            Emergency core cooling Systems
            Emergency diesel generators
17 Electrical one-line drawings for:
            Offsite power/switchyard supplies
            Normal ac power systems
            Emergency ac/dc power systems including
            120Vac power, and
            125Vdc/24Vdc safety class systems
18. List of any common-cause failures of components in the last 3 years.
19. An electronic copy of the Design Bases Documents.
20. An electronic copy of the System Health notebooks.
                                        -2-                        Enclosure


19. An electronic copy of the Design Bases Documents.
II. Information Requested to be Available on First Day of Inspection (February
20. An electronic copy of the System Health notebooks. 
    2, 2009)
  - 3 - Enclosure
    1.     List of condition reports (corrective action documents) associated with
II.   Information Requested to be Available on First Day of Inspection (February 2, 2009)   1. List of condition reports (corrective action documents) associated with each of the selected components for the last 5 years.  
          each of the selected components for the last 5 years.
  2. The corrective maintenance history associated with each of the selected components for the last 2 years.
    2.     The corrective maintenance history associated with each of the selected
  3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files. Please review the calculations and also provide copies of reference material (such as drawings, engineering requests, and vendor letters).  
          components for the last 2 years.
  4. Copies of operability evaluations associated with each of the selected components and plans for restoring operability, if applicable.
    3.     Copies of calculations associated with each of the selected components
          (if not previously provided), excluding data files. Please review the
5. Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable.  
          calculations and also provide copies of reference material (such as
  6. Copies of any open temporary modifications associated with each of the selected components, if applicable.  
          drawings, engineering requests, and vendor letters).
  7. Trend data on the selected electrical/mechanical components' performance for last 3 years (for example, pumps' performance including in-service testing, other vibration monitoring, oil sample results, etc., as applicable).  
    4.     Copies of operability evaluations associated with each of the selected
  8. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.
          components and plans for restoring operability, if applicable.
  9. A copy of engineering/operations related audits completed in the last 2 years.   10. List of motor operated valves (MOVs) in the program, design margin and risk ranking.  
    5.     Copies of selected operator work-around evaluations associated with
          each of the selected components and plans for resolution, if applicable.
11. List of air operated valves (AOVs) in the valve program, design and risk ranking.   12. Structure, system and components in the Maintenance Rule (a)(1) category.  
    6.     Copies of any open temporary modifications associated with each of the
  13. Site top 10 issues list.  
          selected components, if applicable.
    7.     Trend data on the selected electrical/mechanical components
          performance for last 3 years (for example, pumps performance including
          in-service testing, other vibration monitoring, oil sample results, etc., as
          applicable).
    8.     A copy of any internal/external self-assessments and associated
          corrective action documents generated in preparation for the inspection.
    9.     A copy of engineering/operations related audits completed in the last 2
          years.
    10.   List of motor operated valves (MOVs) in the program, design margin and
          risk ranking.
    11.   List of air operated valves (AOVs) in the valve program, design and risk
          ranking.
    12.   Structure, system and components in the Maintenance Rule (a)(1)
          category.
    13.   Site top 10 issues list.
    14.    Procedures used to accomplish operator actions associated with the
          basic events in your PRA.
    15.    List of licensee contacts for the inspection team with pager or phone
          numbers.
                                            -3-                          Enclosure


  14. Procedures used to accomplish operator actions associated with the basic events in your PRA.
III.   Information Requested to be provided throughout the inspection.
  15.  List of licensee contacts for the inspection team with pager or phone numbers. 
        1.     Copies of any corrective action documents generated as a result of the
  - 4 - Enclosure III. Information Requested to be provided throughout the inspection.
              teams questions or queries during this inspection.
  1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection.  
        2.     Copies of the list of questions submitted by the team members and the
  2. Copies of the list of questions submitted by the team members and the status/ resolution of the information requested (provide daily during the inspection to each team member).  
              status/ resolution of the information requested (provide daily during the
  3. Reference materials (available electronically and as needed during all onsite weeks):  
              inspection to each team member).
  General set of plant drawings   IPE/PRA report   Procurement documents for components selected   Plant procedures (normal, abnormal, emergency, surveillance, etc.)   Technical Specifications   Updated Final Safety Analysis Report  
        3.     Reference materials (available electronically and as needed during all
  Vendor manuals  
              onsite weeks):
  Inspector Contact Information
              General set of plant drawings
:
              IPE/PRA report
Ronald A. Kopriva Senior Reactor Inspector (817) 860-8104 Ron.Kopriva@nrc.gov  
              Procurement documents for components selected
              Plant procedures (normal, abnormal, emergency, surveillance, etc.)
Mailing Address
              Technical Specifications
: US NRC, Region IV Attn: Ronald A. Kopriva 612 East Lamar Blvd., Ste 400 Arlington, TX 76011
              Updated Final Safety Analysis Report
              Vendor manuals
Inspector Contact Information:
Ronald A. Kopriva
Senior Reactor Inspector
(817) 860-8104
Ron.Kopriva@nrc.gov
Mailing Address:
US NRC, Region IV
Attn: Ronald A. Kopriva
612 East Lamar Blvd., Ste 400
Arlington, TX 76011
                                                -4-                          Enclosure
}}
}}

Latest revision as of 11:16, 14 November 2019

IR 05000416-09-006, on February 2-6, 2009, February 16-27, 2009, Grand Gulf Nuclear Station - Information Request for NRC Triennial Baseline Component Design Basses Inspection
ML083570174
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/16/2008
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Douet J
Entergy Operations
References
IR-09-006
Download: ML083570174 (8)


See also: IR 05000416/2009006

Text

UNITED S TATE S

N UCLE AR REGU LATORY COMMI SS ION

R E GI ON I V

612 E. LAMAR BLVD., SU ITE 40 0

AR LIN GTON , TEXAS 7 6 01 1- 4125

December 16, 2008

James R. Douet, Vice President of Operations

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - INFORMATION REQUEST FOR NRC

TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION NRC

INSPECTION REPORT 05000416/2009006

Dear Mr. Douet:

On February 2, 2009, the NRC will begin a triennial baseline Component Design Bases

Inspection at the Grand Gulf Nuclear Station. A seven-person team will perform this inspection

using NRC Inspection Procedure 71111.21, Component Design Bases Inspection.

The inspection focuses on components and operator actions that have high risk and low design

margins. The samples reviewed during this inspection will be identified during an information

gathering visit and during the subsequent in-office preparation week. In addition, a number of

operating experience issues will also be selected for review.

The inspection will include an information gathering site visit by the team leader and a senior

reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of

seven NRC inspectors, of which six will focus on engineering and one on operations. The

current inspection schedule is as follows:

Onsite information gathering visit: Week of January 19, 2009

Onsite weeks: February 2, February 16, and February 23, 2009

The purpose of the information gathering visit is to meet with members of your staff to identify

potential risk-significant components and operator actions. The lead inspector will also request

a tour of the plant with members of your operations staff and probabilistic safety assessment

staff. Additional information and documentation needed to support the inspection will be

identified, including interviews with engineering managers, engineers, and probabilistic safety

assessment staff.

Our experience with these inspections has shown they are extremely resource intensive, both

for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the

site and to ensure a productive inspection, we have enclosed a request for information needed

for the inspection. The request has been divided into three groups. The first group lists

information necessary for the information gathering visit and for general preparation. This

Entergy Operations, Inc. -2-

information should be available to the regional office no later than January 27, 2009. Insofar as

possible, this information should be provided electronically to the lead inspector. Since the

inspection will be concentrated on high risk/low margin components, calculations associated

with your list of high risk components should be available to review during the information

gathering visit to assist in our selection of components based on available design margin.

The second group of documents requested are those items that the team will need access to

when onsite and after the inspection samples are selected. The third group lists information

necessary to aid the inspection team in tracking issues identified as a result of the inspection. It

is requested that this information be provided to the lead inspector as the information is

generated during the inspection. It is important that all of these documents are up to date and

completed in order to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we

request that a contact individual be assigned to each inspector to ensure information requests,

questions, and concerns are addressed in a timely manner.

The lead inspector for this inspection is Mr. Ronald A. Kopriva. We understand that our

licensing engineer contact for this inspection is Mr. Dennis Coulter. If there are any questions

about the inspection or the requested materials, please contact the lead inspector at (817) 860-

8104 or via e-mail at ron.kopriva@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Thomas Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-416

License: NPF-29

Enclosure:

Information Request For Grand Gulf Plant Component Design Bases Inspection.

cc w/enclosure

Senior Vice President

Entergy Nuclear Operations

P.O. Box 31995

Jackson, MS 39286-1995

Entergy Operations, Inc. -3-

Senior Vice President and COO

Entergy Operations, Inc. Attorney General

P.O. Box 31995 Department of Justice

Jackson, MS 39286-1995 State of Louisiana

P.O. Box 94005

Vice President, Oversight Baton Rouge, LA 70804-9005

Entergy Services, Inc.

P.O. Box 31995 Office of the Governor

Jackson, MS 39286-1995 State of Mississippi

Jackson, MS 39201

Chief, Energy and Transportation Branch

Environmental Compliance and Attorney General

Enforcement Division Asst. Attorney General

Mississippi Department of State of Mississippi

Environmental Quality P.O. Box 22947

P.O. Box 10385 Jackson, MS 39225-2947

Jackson, MS 39289-0385

State Health Officer

President State Health Board

Claiborne County P.O. Box 1700

Board of Supervisors Jackson, MS 39215

P.O. Box 339

Port Gibson, MS 39150 Associate General Counsel

Entergy Nuclear Operations

Senior Manager P.O. Box 31995

Nuclear Safety & Licensing Jackson, MS 39286-1995

Entergy Nuclear Operations

P.O. Box 31995 Richard Penrod, Senior Environmental

Jackson, MS 39286-1995 Scientist/State Liaison Officer

Office of Environmental Services

Manager, Licensing Northwestern State University

Entergy Operations, Inc. Russell Hall, Room 201

Grand Gulf Nuclear Station Natchitoches, LA 71497

P.O. Box 756

Port Gibson, MS 39150

Entergy Operations, Inc. -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov )

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov )

Senior Resident Inspector (Rich.Smith@nrc.gov )

Resident Inspector (Andy.Barrett@nrc.gov )

Branch Chief, DRP/C (Geoffrey.Miller@nrc.gov )

Senior Project Engineer, DRP/C (Wayne.Walker@nrc.gov

GG Site Secretary (Nancy.Spivey@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov)

RC/ACES (Karla.Fuller@nrc.gov )

C. A. Carpenter, OE Cynthia.Carpenter@nrc.gov

OEMAIL.Resource@nrc.gov

Senior Enforcement Specialist (Mark.Haire@nrc.gov)

Only inspection reports to the following:

DRS STA (Dale.Powers@nrc.gov )

Mark Cox, OEDO RIV Coordinator (Mark.Cox@nrc.gov )

SUNSI Review Completed: _ __ ADAMS: Yes No Initials: _RAK_

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

R:\_REACTORS\GG\2009\GG2009-006RFI-RAK.doc ML

SRI:DRS/EB1 C:DRS/EB1

RAKopriva TFarnholtz

/RA/ /RA/

12/16/08 12/16/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

INFORMATION REQUEST FOR GRAND GULF NUCLEAR STATION

COMPONENT DESIGN BASES INSPECTION (CDBI)

Inspection Report: 05000416/2009006

Information Gathering Dates: January 21-23, 2009

On-site Inspection Dates: February 2-6, 2009 and February 16-27, 2009

Inspection Procedure: IP 71111.21, Component Design Bases

Inspection

Lead Inspector/Team Leader: Ronald A. Kopriva

817-860-8104

Ron.Kopriva@nrc.gov

I. Information Requested Prior to the information Gathering Visit

The following information is requested by January 27, 2009, or sooner, to

facilitate inspection preparation. If you have any questions regarding this

information, pleased call the lead inspector as soon as possible. (Please provide

the information electronically in pdf files, Excel, or other searchable formats.

The information should contain descriptive names, and be indexed and

hyperlinked to facilitate ease of use. Information in "lists" should contain enough

information to be easily understood by someone who has knowledge of boiling

water reactor technology).

1. An excel spreadsheet of equipment basic events (with definitions)

including importance measures sorted by risk achievement worth (RAW)

and Fussell-Vesely (FV) from your internal events probabilistic risk

assessment (PRA). Include basic events with RAW value of 1.3 or

greater.

2. Provide a list of the top 500 cut-sets from your PRA.

3. Copies of PRA system notebooks, and the latest PRA summary

document.

4. An excel spreadsheet of PRA human action basic events or risk ranking

of operator actions from your site specific PSA sorted by RAW and FV.

Provide copies of your human reliability worksheets for these items.

5. If you have an external events or fire PSA model, provide the information

requested in items 1-4 for external events and fire.

-1- Enclosure

6. Any pre-existing evaluation or list of components and associated

calculations with low design margins, (i.e., pumps closest to the design

limit for flow or pressure, diesel generator close to design required output,

heat exchangers close to rated design heat removal, etc.).

7. List of high risk maintenance rule systems/components and functions;

based on engineering or expert panel judgment.

8. A list of operating experience evaluations for the last 2 years.

9. A list of all time-critical operator actions in procedures.

10. A list of permanent and temporary modifications sorted by component

identified in Item 1.

11. List of current operator work arounds/burdens.

12. A list of the design calculations, which provide the design margin

information for components included in Item 1. (Calculations should be

available during the information gathering visit).

13. List of root cause evaluations associated with component failures or

design issues initiated/completed in the last 5 years.

14. Current management and engineering organizational charts.

15. Grand Gulf Nuclear Station Plant IPEEE, if available electronically.

16. Mechanical piping drawings for:

Engineered safety features

Emergency core cooling Systems

Emergency diesel generators

17 Electrical one-line drawings for:

Offsite power/switchyard supplies

Normal ac power systems

Emergency ac/dc power systems including

120Vac power, and

125Vdc/24Vdc safety class systems

18. List of any common-cause failures of components in the last 3 years.

19. An electronic copy of the Design Bases Documents.

20. An electronic copy of the System Health notebooks.

-2- Enclosure

II. Information Requested to be Available on First Day of Inspection (February

2, 2009)

1. List of condition reports (corrective action documents) associated with

each of the selected components for the last 5 years.

2. The corrective maintenance history associated with each of the selected

components for the last 2 years.

3. Copies of calculations associated with each of the selected components

(if not previously provided), excluding data files. Please review the

calculations and also provide copies of reference material (such as

drawings, engineering requests, and vendor letters).

4. Copies of operability evaluations associated with each of the selected

components and plans for restoring operability, if applicable.

5. Copies of selected operator work-around evaluations associated with

each of the selected components and plans for resolution, if applicable.

6. Copies of any open temporary modifications associated with each of the

selected components, if applicable.

7. Trend data on the selected electrical/mechanical components

performance for last 3 years (for example, pumps performance including

in-service testing, other vibration monitoring, oil sample results, etc., as

applicable).

8. A copy of any internal/external self-assessments and associated

corrective action documents generated in preparation for the inspection.

9. A copy of engineering/operations related audits completed in the last 2

years.

10. List of motor operated valves (MOVs) in the program, design margin and

risk ranking.

11. List of air operated valves (AOVs) in the valve program, design and risk

ranking.

12. Structure, system and components in the Maintenance Rule (a)(1)

category.

13. Site top 10 issues list.

14. Procedures used to accomplish operator actions associated with the

basic events in your PRA.

15. List of licensee contacts for the inspection team with pager or phone

numbers.

-3- Enclosure

III. Information Requested to be provided throughout the inspection.

1. Copies of any corrective action documents generated as a result of the

teams questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/ resolution of the information requested (provide daily during the

inspection to each team member).

3. Reference materials (available electronically and as needed during all

onsite weeks):

General set of plant drawings

IPE/PRA report

Procurement documents for components selected

Plant procedures (normal, abnormal, emergency, surveillance, etc.)

Technical Specifications

Updated Final Safety Analysis Report

Vendor manuals

Inspector Contact Information:

Ronald A. Kopriva

Senior Reactor Inspector

(817) 860-8104

Ron.Kopriva@nrc.gov

Mailing Address:

US NRC, Region IV

Attn: Ronald A. Kopriva

612 East Lamar Blvd., Ste 400

Arlington, TX 76011

-4- Enclosure