| number = ML12087A228
| number = ML12087A228
| issue date = 03/27/2012
| issue date = 03/27/2012
| title = 02/29/2012 and 03/21/2012 Summary of Public Meetings Regarding Palisades Nuclear Plant
| title = and 03/21/2012 Summary of Public Meetings Regarding Palisades Nuclear Plant
| author name = Giessner J
| author name = Giessner J
| author affiliation = NRC/RGN-III/DRP/B4
| author affiliation = NRC/RGN-III/DRP/B4
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 27, 2012 LICENSEE:       Entergy Nuclear Operations, Inc.
 
FACILITY:       Palisades Nuclear Plant
March 27, 2012  
 
LICENSEE: Entergy Nuclear Operations, Inc.  
 
FACILITY: Palisades Nuclear Plant  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE FEBRUARY 29, 2012, AND MARCH 21, 2012, PUBLIC MEETINGS REGARDING PALISADES NUCLEAR PLANT  
OF THE FEBRUARY 29, 2012, AND MARCH 21, 2012, PUBLIC MEETINGS REGARDING PALISADES NUCLEAR PLANT On February 29, 2012, the U.S. Nuclear Regulatory Commission (NRC) held a Public Meeting at the Beach Haven Event Center in South Haven, Michigan. The meeting was held with members of the public to discuss recent performance at the Palisades Nuclear Plant.
 
On February 29, 2012, the U.S. Nuclear Regulatory Commission (NRC) held a Public Meeting at the Beach Haven Event Center in South Haven, Michigan. The meeting was held with members of the public to discuss recent performance at the Palisades Nuclear Plant.
Discussions were held between members of the public and NRC staff regarding the events that led to the issuance of two White findings and a Yellow finding during the fourth quarter of 2011.
Discussions were held between members of the public and NRC staff regarding the events that led to the issuance of two White findings and a Yellow finding during the fourth quarter of 2011.
The NRC discussed actions performed and schedul ed to address Palisades' performance in Column 3 of the Reactor Oversight Process (ROP) Action Matrix. Enclosure 1 is a list of attendees for the meeting, and a copy of the slides used by the NRC staff during the meeting are located in ADAMS (ML12058A491). On March 21, 2012, the NRC held a public meet ing to discuss the 2011 annual assessment results for Palisades Nuclear Plant. The meeting was held at the Beach Haven Event Center in South Haven, Michigan. Enclosure 2 is a list of attendees for the meeting, and copies of the slides used by licensee and the NRC staff during the meeting are located in ADAMS (ML12080A018 and ML12074A069). The meeting was started with the NRC providing an overview of the ROP and the results of the 2011 annual assessment for Palisades Nuclear Plant. The NRC's presentation was followed by a presentation provided by the Palisades Nuclear Plant staff giving an overview of the current and proposed actions to improve performance in 2012, including a description of the major issues. In addition, Palisades' staff discussed the actions that have been accomplished, or are planning to be accomplished, to mitigate the three new substantive cross-cutting issues that were identified by the NRC during the 2011 annual assessment.
The NRC discussed actions performed and scheduled to address Palisades performance in Column 3 of the Reactor Oversight Process (ROP) Action Matrix. Enclosure 1 is a list of attendees for the meeting, and a copy of the slides used by the NRC staff during the meeting are located in ADAMS (ML12058A491).
Entergy Nuclear Operations, Inc. 
On March 21, 2012, the NRC held a public meeting to discuss the 2011 annual assessment results for Palisades Nuclear Plant. The meeting was held at the Beach Haven Event Center in South Haven, Michigan. Enclosure 2 is a list of attendees for the meeting, and copies of the slides used by licensee and the NRC staff during the meeting are located in ADAMS (ML12080A018 and ML12074A069).
The meeting was started with the NRC providing an overview of the ROP and the results of the 2011 annual assessment for Palisades Nuclear Plant. The NRC's presentation was followed by a presentation provided by the Palisades Nuclear Plant staff giving an overview of the current and proposed actions to improve performance in 2012, including a description of the major issues. In addition, Palisades staff discussed the actions that have been accomplished, or are planning to be accomplished, to mitigate the three new substantive cross-cutting issues that were identified by the NRC during the 2011 annual assessment.


After the business part of the meeting ended, the NRC listened to comments and answered questions from the public.  
Entergy Nuclear Operations, Inc.            After the business part of the meeting ended, the NRC listened to comments and answered questions from the public.
 
                                            /RA/
      /RA/ John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20  
John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20


==Enclosures:==
==Enclosures:==
: 1. List of Meeting Attendees for the February 29, 2012, Public Meeting
: 1. List of Meeting Attendees for the February 29, 2012, Public Meeting
: 2. List of Meeting Attendees for the March 21, 2012, Public Meeting  
: 2. List of Meeting Attendees for the March 21, 2012, Public Meeting cc w/encl: Distribution via List Serve
 
cc w/encl: Distribution via List Serve  
 
PUBLIC MEETING PRINCIPAL ATTENDEES FEBRUARY 29, 2012 NRC attendees
 
C. Pederson, Acting Regional Administrator J. Uhle, Acting Deputy Regional Administrator J. Giessner, Chief, Division of Reactor Projects, Branch 4 T. Taylor, Palisades Senior Resident Inspector J. Ellegood, Senior Resident Inspector R. Krsek, Kewaunee Senior Resident Inspector J. Jandovitz, Project Engineer
 
Members of the Public Kevin Kemps, Beyond Nuclear/Don't Waste Michigan
 
Thomas Asperity, Saprodani Associates
 
Mike Mulligan 
 
PUBLIC MEETING PRINCIPAL ATTENDEES MARCH 21, 2012 NRC Attendees
 
C. Pederson, Acting Regional Administrator J. Giessner, Chief, Division of Reactor Projects, Branch 4 T. Taylor, Palisades Senior Resident Inspector A. Scarbeary, Palisades Resident Inspector J. Ellegood, Senior Resident Inspector J. Cassidy, Senior Health Physicist S. Sheldon, Senior Reactor Inspector
 
R. Edwards, Reactor Engineer Entergy Attendees
 
A. Vitale, Site Vice President D. Hamilton, General Manager Plant Operations B. Davis, Engineering Director C. Arnone, Nuclear Safety Assurance Director
 
Members of the Public


Kevin Kemps, Beyond Nuclear/Don't Waste Michigan Mike Mulligan
PUBLIC MEETING PRINCIPAL ATTENDEES FEBRUARY 29, 2012 NRC attendees C. Pederson, Acting Regional Administrator J. Uhle, Acting Deputy Regional Administrator J. Giessner, Chief, Division of Reactor Projects, Branch 4 T. Taylor, Palisades Senior Resident Inspector J. Ellegood, Senior Resident Inspector R. Krsek, Kewaunee Senior Resident Inspector J. Jandovitz, Project Engineer Members of the Public Kevin Kemps, Beyond Nuclear/Dont Waste Michigan Thomas Asperity, Saprodani Associates Mike Mulligan 1          Enclosure 1


Entergy Nuclear Operations, Inc.
2 Enclosure 1 3 Enclosure 1 4 Enclosure 1 5 Enclosure 1 6 Enclosure 1 PUBLIC MEETING PRINCIPAL ATTENDEES MARCH 21, 2012 NRC Attendees C. Pederson, Acting Regional Administrator J. Giessner, Chief, Division of Reactor Projects, Branch 4 T. Taylor, Palisades Senior Resident Inspector A. Scarbeary, Palisades Resident Inspector J. Ellegood, Senior Resident Inspector J. Cassidy, Senior Health Physicist S. Sheldon, Senior Reactor Inspector R. Edwards, Reactor Engineer Entergy Attendees A. Vitale, Site Vice President D. Hamilton, General Manager Plant Operations B. Davis, Engineering Director C. Arnone, Nuclear Safety Assurance Director Members of the Public Kevin Kemps, Beyond Nuclear/Dont Waste Michigan Mike Mulligan 1          Enclosure 2


After the business part of the meeting ended, the NRC listened to comments and answered questions from the public.  
2 Enclosure 2 3 Enclosure 2 Entergy Nuclear Operations, Inc.                                          After the business part of the meeting ended, the NRC listened to comments and answered questions from the public.
 
                                                                          /RA/
      /RA/ John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20  
John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20


==Enclosures:==
==Enclosures:==
: 1. List of Meeting Attendees for the February 29, 2012, Public Meeting
: 1. List of Meeting Attendees for the February 29, 2012, Public Meeting
: 2. List of Meeting Attendees for the March 21, 2012, Public Meeting  
: 2. List of Meeting Attendees for the March 21, 2012, Public Meeting cc w/encl: Distribution via List Serve DISTRIBUTION:
 
See next page DOCUMENT NAME: PALISADES - PUBLIC MEETING  
cc w/encl: Distribution via List Serve DISTRIBUTION
: See next page  
 
DOCUMENT NAME: PALISADES - PUBLIC MEETING  


==SUMMARY==
==SUMMARY==
.DOCX G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JGiessner:cs   DATE 03/27/12   OFFICIAL RECORD COPY  
.DOCX G Publicly Available                       G Non-Publicly Available                   G Sensitive             G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                               RIII                             RIII                               RIII NAME               JGiessner:cs DATE               03/27/12 OFFICIAL RECORD COPY


Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated March 27, 2012  
Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated March 27, 2012


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE FEBRUARY 29, 2012, AND MARCH 21, 2012, PUBLIC MEETINGS REGARDING PALISADES NUCLEAR PLANT DISTRIBUTION
OF THE FEBRUARY 29, 2012, AND MARCH 21, 2012, PUBLIC MEETINGS REGARDING PALISADES NUCLEAR PLANT DISTRIBUTION:
: Breeda Reilly RidsNrrPMPalisades Resource  
Breeda Reilly RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov}}
 
RidsNrrDorlLpl3-1 Resource  
 
RidsNrrDirsIrib Resource  
 
Chuck Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck  
 
Allan Barker  
 
Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov}}

Latest revision as of 23:01, 5 December 2019

and 03/21/2012 Summary of Public Meetings Regarding Palisades Nuclear Plant
ML12087A228
Person / Time
Site: Palisades  Entergy icon.png
Issue date: 03/27/2012
From: Jack Giessner
Reactor Projects Region 3 Branch 4
To:
References
Download: ML12087A228 (13)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 27, 2012 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE FEBRUARY 29, 2012, AND MARCH 21, 2012, PUBLIC MEETINGS REGARDING PALISADES NUCLEAR PLANT On February 29, 2012, the U.S. Nuclear Regulatory Commission (NRC) held a Public Meeting at the Beach Haven Event Center in South Haven, Michigan. The meeting was held with members of the public to discuss recent performance at the Palisades Nuclear Plant.

Discussions were held between members of the public and NRC staff regarding the events that led to the issuance of two White findings and a Yellow finding during the fourth quarter of 2011.

The NRC discussed actions performed and scheduled to address Palisades performance in Column 3 of the Reactor Oversight Process (ROP) Action Matrix. Enclosure 1 is a list of attendees for the meeting, and a copy of the slides used by the NRC staff during the meeting are located in ADAMS (ML12058A491).

On March 21, 2012, the NRC held a public meeting to discuss the 2011 annual assessment results for Palisades Nuclear Plant. The meeting was held at the Beach Haven Event Center in South Haven, Michigan. Enclosure 2 is a list of attendees for the meeting, and copies of the slides used by licensee and the NRC staff during the meeting are located in ADAMS (ML12080A018 and ML12074A069).

The meeting was started with the NRC providing an overview of the ROP and the results of the 2011 annual assessment for Palisades Nuclear Plant. The NRC's presentation was followed by a presentation provided by the Palisades Nuclear Plant staff giving an overview of the current and proposed actions to improve performance in 2012, including a description of the major issues. In addition, Palisades staff discussed the actions that have been accomplished, or are planning to be accomplished, to mitigate the three new substantive cross-cutting issues that were identified by the NRC during the 2011 annual assessment.

Entergy Nuclear Operations, Inc. After the business part of the meeting ended, the NRC listened to comments and answered questions from the public.

/RA/

John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20

Enclosures:

1. List of Meeting Attendees for the February 29, 2012, Public Meeting
2. List of Meeting Attendees for the March 21, 2012, Public Meeting cc w/encl: Distribution via List Serve

PUBLIC MEETING PRINCIPAL ATTENDEES FEBRUARY 29, 2012 NRC attendees C. Pederson, Acting Regional Administrator J. Uhle, Acting Deputy Regional Administrator J. Giessner, Chief, Division of Reactor Projects, Branch 4 T. Taylor, Palisades Senior Resident Inspector J. Ellegood, Senior Resident Inspector R. Krsek, Kewaunee Senior Resident Inspector J. Jandovitz, Project Engineer Members of the Public Kevin Kemps, Beyond Nuclear/Dont Waste Michigan Thomas Asperity, Saprodani Associates Mike Mulligan 1 Enclosure 1

2 Enclosure 1 3 Enclosure 1 4 Enclosure 1 5 Enclosure 1 6 Enclosure 1 PUBLIC MEETING PRINCIPAL ATTENDEES MARCH 21, 2012 NRC Attendees C. Pederson, Acting Regional Administrator J. Giessner, Chief, Division of Reactor Projects, Branch 4 T. Taylor, Palisades Senior Resident Inspector A. Scarbeary, Palisades Resident Inspector J. Ellegood, Senior Resident Inspector J. Cassidy, Senior Health Physicist S. Sheldon, Senior Reactor Inspector R. Edwards, Reactor Engineer Entergy Attendees A. Vitale, Site Vice President D. Hamilton, General Manager Plant Operations B. Davis, Engineering Director C. Arnone, Nuclear Safety Assurance Director Members of the Public Kevin Kemps, Beyond Nuclear/Dont Waste Michigan Mike Mulligan 1 Enclosure 2

2 Enclosure 2 3 Enclosure 2 Entergy Nuclear Operations, Inc. After the business part of the meeting ended, the NRC listened to comments and answered questions from the public.

/RA/

John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20

Enclosures:

1. List of Meeting Attendees for the February 29, 2012, Public Meeting
2. List of Meeting Attendees for the March 21, 2012, Public Meeting cc w/encl: Distribution via List Serve DISTRIBUTION:

See next page DOCUMENT NAME: PALISADES - PUBLIC MEETING

SUMMARY

.DOCX G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JGiessner:cs DATE 03/27/12 OFFICIAL RECORD COPY

Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated March 27, 2012

SUBJECT:

SUMMARY

OF THE FEBRUARY 29, 2012, AND MARCH 21, 2012, PUBLIC MEETINGS REGARDING PALISADES NUCLEAR PLANT DISTRIBUTION:

Breeda Reilly RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov