ML16344A086: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(17 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16344A086
| number = ML16344A086
| issue date = 12/20/2016
| issue date = 12/20/2016
| title = 12/07/2016 Summary of Public Meeting With Entergy Nuclear Operations, Inc. Regarding National Fire Protection Association Standard 805 (CAC No. MF8486)
| title = Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding National Fire Protection Association Standard 805
| author name = Rankin J K
| author name = Rankin J
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000255
| docket = 05000255
| license number = DPR-020
| license number = DPR-020
| contact person = Rankin J K, NRR/DORL/LPL3-1, 415-1530
| contact person = Rankin J, NRR/DORL/LPL3-1, 415-1530
| case reference number = CAC MF8486
| case reference number = CAC MF8486
| document type = Meeting Summary
| document type = Meeting Summary
| page count = 4
| page count = 4
| project = CAC:MF8486
| stage = Meeting
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 20, 2016 LICENSEES:          Entergy Nuclear Operations, Inc.
FACILITIES:        Palisades Nuclear Plant
==SUBJECT:==
==SUMMARY==
OF DECEMBER 7, 2016, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. REGARDING NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (CAC NO. MF8486)
On December 7, 2016, a Category 1 public teleconference meeting was held between the U.S.
Nuclear Regulatory Commission (NRC) staff and representatives of Entergy Nuclear Operations, Inc. (ENO). The purpose of the meeting was to discuss a proposed license amendment request (LAR) to change the license conditions and plant modifications required when adopting National Fire Protection Association Standard 805 (NFPA-805). The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML16305A379.
The licensee presented information on the background, basis, and content of the proposed application, which is available at ADAMS Accession No. ML16344A088.
The licensee presented the scope of the proposed LAR. This includes removing 6 NFPA-805 modifications and clarifying 8 NFPA-805 modification statements as described in Table S-2, "Plant Modifications Committed," and as invoked in the NFPA-805 Transition License Condition 2.C.(3).(c).2. The licensee briefly presented the probabilistic risk assessment strategy and the basis for removing the 6 NFPA-805 modifications. The licensee also briefly reviewed 8 NFPA-805 modification statements to be clarified. The NRC staff provided feedback to the licensee regarding their proposed LAR submittal. This included the licensee ensuring that all deterministic requirements continue to be met following the proposed modification reduction and, ensuring inclusion of information useful to understand the risk results.
There was one action item from the meeting. The NRC staff noted that license condition 2.C.(3).(c).2. requires the licensee to implement the modification to the facility before the end of the second full operating cycle after NRC approval. The NRC staff requested clarification on what constitutes the end of the second full operating cycle. The licensee will clarify this statement with the project manager at a future date.
The public was invited to listen to the meeting and was given an opportunity to communicate with the NRC after the business portion, but before the meeting was adjourned. Members of the public were present and no questions were asked. No public meeting feedback forms were received.
A list of meeting attendees is enclosed.
Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.
                                              ~~
Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
==Enclosure:==
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES DECEMBER 7, 2016, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC.
NATIONAL FIRE PROTECTION ASSOCIATION STANDARD PALISADES NUCLEAR PLANT Licensee Attendees*
A. Hazelhoff, Entergy Nuclear Operations, Inc. (ENO)
: 0. Gustafson, ENO J. Hardy, ENO K. O'Connor, ENO B. White, ENO J. Miksa, ENO R. Nance, ENO F. Yanik, ENO U.S. Nuclear Regulatory Commission S. Dinsmore, NRR/DRA/APLA J. Robsinson, NRR/DRA/AFPB G. Casto, NRR/DRA/AFPB D. O'Neal, NRR/DRA/APLA C. Moulton, NRR/DRA/AFPB J. Rankin, NRR/DORL/LPL3-1 Public M. Lewis J. Quinn, Engineering Planning and Management, Inc.
Enclosure
A list of meeting attendees is enclosed.
Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.
IRA/
Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
==Enclosure:==
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC                                            RidsNrrPMPalisades Resource LPL3-1 Reading                                    RidsRgn3MailCenter Resource RidsACRS_MailCTR Resource                        TWertz, NRR RidsNrrDorl Resource                              TClark, EDO RidsNrrDorllpl3 Resource                          GCasto, NRR RidsNrrDraAfpb Resource                          SRosenberg, NRR RidsNrrDraApla Resource RidsNrrLASRohrer Resource ADAMS Accession Nos.:
Meeting Notice ML16305A379 Handouts ML16344A088 Summary ML16344A086 OFFICE NRR/DORL/LPL3-1 /PM NRR/DORL/LPL3-1/LA            NRR/DORL/LPL3      NRR/DORL/LPL3-1 /PM NAME      JRankin                JRohrer                DWrona              JRankin DATE      12/19/2016            12/12/2016            12/20/2016          12/20/2016 OFFICIAL RECORD    COPY}}

Latest revision as of 12:35, 4 December 2019

Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding National Fire Protection Association Standard 805
ML16344A086
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/20/2016
From: Jennivine Rankin
Plant Licensing Branch III
To:
Entergy Nuclear Operations
Rankin J, NRR/DORL/LPL3-1, 415-1530
References
CAC MF8486
Download: ML16344A086 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 20, 2016 LICENSEES: Entergy Nuclear Operations, Inc.

FACILITIES: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF DECEMBER 7, 2016, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. REGARDING NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (CAC NO. MF8486)

On December 7, 2016, a Category 1 public teleconference meeting was held between the U.S.

Nuclear Regulatory Commission (NRC) staff and representatives of Entergy Nuclear Operations, Inc. (ENO). The purpose of the meeting was to discuss a proposed license amendment request (LAR) to change the license conditions and plant modifications required when adopting National Fire Protection Association Standard 805 (NFPA-805). The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML16305A379.

The licensee presented information on the background, basis, and content of the proposed application, which is available at ADAMS Accession No. ML16344A088.

The licensee presented the scope of the proposed LAR. This includes removing 6 NFPA-805 modifications and clarifying 8 NFPA-805 modification statements as described in Table S-2, "Plant Modifications Committed," and as invoked in the NFPA-805 Transition License Condition 2.C.(3).(c).2. The licensee briefly presented the probabilistic risk assessment strategy and the basis for removing the 6 NFPA-805 modifications. The licensee also briefly reviewed 8 NFPA-805 modification statements to be clarified. The NRC staff provided feedback to the licensee regarding their proposed LAR submittal. This included the licensee ensuring that all deterministic requirements continue to be met following the proposed modification reduction and, ensuring inclusion of information useful to understand the risk results.

There was one action item from the meeting. The NRC staff noted that license condition 2.C.(3).(c).2. requires the licensee to implement the modification to the facility before the end of the second full operating cycle after NRC approval. The NRC staff requested clarification on what constitutes the end of the second full operating cycle. The licensee will clarify this statement with the project manager at a future date.

The public was invited to listen to the meeting and was given an opportunity to communicate with the NRC after the business portion, but before the meeting was adjourned. Members of the public were present and no questions were asked. No public meeting feedback forms were received.

A list of meeting attendees is enclosed.

Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.

~~

Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENDEES DECEMBER 7, 2016, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC.

NATIONAL FIRE PROTECTION ASSOCIATION STANDARD PALISADES NUCLEAR PLANT Licensee Attendees*

A. Hazelhoff, Entergy Nuclear Operations, Inc. (ENO)

0. Gustafson, ENO J. Hardy, ENO K. O'Connor, ENO B. White, ENO J. Miksa, ENO R. Nance, ENO F. Yanik, ENO U.S. Nuclear Regulatory Commission S. Dinsmore, NRR/DRA/APLA J. Robsinson, NRR/DRA/AFPB G. Casto, NRR/DRA/AFPB D. O'Neal, NRR/DRA/APLA C. Moulton, NRR/DRA/AFPB J. Rankin, NRR/DORL/LPL3-1 Public M. Lewis J. Quinn, Engineering Planning and Management, Inc.

Enclosure

A list of meeting attendees is enclosed.

Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.

IRA/

Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMPalisades Resource LPL3-1 Reading RidsRgn3MailCenter Resource RidsACRS_MailCTR Resource TWertz, NRR RidsNrrDorl Resource TClark, EDO RidsNrrDorllpl3 Resource GCasto, NRR RidsNrrDraAfpb Resource SRosenberg, NRR RidsNrrDraApla Resource RidsNrrLASRohrer Resource ADAMS Accession Nos.:

Meeting Notice ML16305A379 Handouts ML16344A088 Summary ML16344A086 OFFICE NRR/DORL/LPL3-1 /PM NRR/DORL/LPL3-1/LA NRR/DORL/LPL3 NRR/DORL/LPL3-1 /PM NAME JRankin JRohrer DWrona JRankin DATE 12/19/2016 12/12/2016 12/20/2016 12/20/2016 OFFICIAL RECORD COPY