| =Text= | | =Text= |
| {{#Wiki_filter:EOP: FR-S.2 RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 1 of 5 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIE DATE PLANT SUPERINTENDENT E FECTIVE DATE CATEGORY 1.0 REVIEWED BY: 9305i40057 930505 PDR ADOCK 05000244~F PDR | | {{#Wiki_filter:EOP: |
| | REV: 3 FR-S.2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 1 of 5 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIE DATE PLANT SUPERINTENDENT E FECTIVE DATE CATEGORY 1.0 REVIEWED BY: |
| | 9305i40057 930505 PDR ADOCK 05000244 |
| | ~F PDR |
|
| |
|
| FR-S.2 RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 2 of 5 A.PURPOSE-This procedure provides actions to restore the core to an adequate shutdown condition. | | REV: 3 FR-S.2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 2 of 5 A. PURPOSE This procedure provides actions to restore the core to an adequate shutdown condition. |
| B.ENTRY CONDITIONS/SYMPTOMS 1.ENTRY CONDITIONS | | B. ENTRY CONDITIONS/SYMPTOMS |
| -This procedure is entered from: a.F-0.1, SUBCRITICALITY Critical Safety Function Status Tree, on either YELLOW condition.
| | : 1. ENTRY CONDITIONS This procedure is entered from: |
| | : a. F-0.1, SUBCRITICALITY Critical Safety Function Status Tree, on either YELLOW condition. |
|
| |
|
| EOP: FR-ST 2 RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 3 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+5 R/hr.o Adverse CNMT conditions or loss of forced air cooling may result in failure of NIS detectors. | | EOP: |
| 1 Check Intermediate Range Flux: a.Flux-EITHER CHANNEL LESS THAN 10-10 AMPS a.Continue with Ste~2.WHEN flux is LESS THAN 10 amps on any operable channel, THEN do Steps lb, c and d.b.Check the following: | | REV: 3 FR-ST 2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 3 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+ 5 R/hr. |
| o Both intermediate range channels-LESS THAN 10 AMPS b.Continue with step 2.WHEN either condition met, THEN do Steps lc and d.-OR-o Greater than 20 minutes since reactor trip c.Verify source range detectors ENERGIZED cd Manually energize source range detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).IF source ranges can NOT be restored, THEN refer to ER-NIS.1, SR MALFUNCTION, and go to Step 2.d, Transfer Rk-45 recorder to one sour'ce'ange and one intermediate range channel
| | o Adverse CNMT conditions or loss of forced air cooling may result in failure of NIS detectors. |
| | 1 Check Intermediate Range Flux: |
| | : a. Flux - EITHER CHANNEL LESS THAN a. Continue with Ste~ 2. WHEN flux 10-10 AMPS is LESS THAN 10 amps on any operable channel, THEN do Steps lb, c and d. |
| | : b. Check the following: b. Continue with step 2. WHEN either condition met, THEN do o Both intermediate range Steps lc and d. |
| | channels - LESS THAN 10 AMPS |
| | -OR-o Greater than 20 minutes since reactor trip |
| | : c. Verify source range detectors cd Manually energize source range ENERGIZED detectors by depressing P-6 permissive defeat pushbuttons (2 of 2). |
| | IF source ranges can NOT be restored, THEN refer to ER-NIS.1, SR MALFUNCTION, and go to Step 2. |
| | d, Transfer Rk-45 recorder to one sour'ce'ange and one intermediate range channel |
|
| |
|
| EOP: FR-Ss2 T!TLE: RESPONSE TO LOSS OF CORE SHUTDOWN REV'PAGE 4 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: If offsite power is lost coincident with SI, then MCC C and MCC D lockout relays must be reset to restore BA and RMW pumps.2 Initiate Immediate Boration Of RCS: a.Check SI status: o All SI annunciators-EXTINGUISHED o All SI pumps-OFF IN AUTO b.Verify at least one charging pump-RUNNING!c.Align boration path: 1)Start tue BA transfer pumps 2)Open MOV-350 I 3)Verify BA flow!d.Verify charging flow path:!o Ch'arging valve to loop B cold 18g"-'(AOV-294) | | EOP: T!TLE: |
| -OPEN~, g'Ch'arging flow control valve (HCV-142)-DEMAND AT 0%1)Complete the immediate actions of E-O, REACTOR TRIP OR SAFETY INJECTION, while continuing with this procedure 2)IF SI flow indicated, THEN go to Step 3.IF NOT, THEN go to Step 2b.b.Perform the following:
| | REV' FR-Ss2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 4 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: If offsite power is lost coincident with SI, then MCC C and MCC D lockout relays must be reset to restore BA and RMW pumps. |
| 1)Reset SI if necessary. | | 2 Initiate Immediate Boration Of RCS: |
| 2)Start one charging pump.c.Initiate normal boration at maximum rate using the boric acid flow control valve, FCV-110A.IF flow can NOT be established, THEN refer to ER-CVCS.l, REACTOR MAKEUP CONTROL MALFUNCTION. | | : a. Check SI status: |
| d.Manually align valves and verify flow. | | o All SI annunciators- 1) Complete the immediate EXTINGUISHED actions of E-O, REACTOR TRIP OR SAFETY INJECTION, while o All SI pumps - OFF IN AUTO continuing with this procedure |
| | : 2) IF SI flow indicated, THEN go to Step 3. IF NOT, THEN go to Step 2b. |
| | : b. Verify at least one charging b. Perform the following: |
| | pump - RUNNING |
| | : 1) Reset SI if necessary. |
| | : 2) Start one charging pump. |
| | : c. Align boration path: c. Initiate normal boration at maximum rate using the boric |
| | : 1) Start tue BA transfer pumps acid flow control valve, FCV-110A. IF flow can NOT be |
| | : 2) Open MOV-350 I established, THEN refer to ER-CVCS.l, REACTOR MAKEUP |
| | : 3) Verify BA flow CONTROL MALFUNCTION. |
| | : d. Verify charging flow path: ! |
| | : d. Manually align valves and verify flow. |
| | o Ch'arging valve to loop B cold 18g"-'(AOV-294) - OPEN |
| | ~, g' Ch'arging flow control valve (HCV-142) - DEMAND AT 0% |
|
| |
|
| EOP: FR-ST 2 TITLE: RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 5 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 3 Check Source Range Channels: o Source range channels-ENERGIZED o Source range channels startup rate-ZERO OR NEGATIVE Continue boration until adequate shutdown margin is verified by RCS sample (Refer to Figure SDM).4 Verify Adequate Shutdown Margin a.Direct HP to sample RCS for boron concentration I b.Verify boron concentration-GREATER THAN REQUIREMENTS OF FIGURE SDM b.Continue boration until adequate shutdown margin verified.c.Stop boration 5 Return To Procedure And Step In Effect.-END- | | EOP: TITLE: |
| | REV: 3 FR-ST 2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 5 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 3 Check Source Range Channels: Continue boration until adequate shutdown margin is verified by RCS o Source range channels - ENERGIZED sample (Refer to Figure SDM). |
| | o Source range channels startup rate - ZERO OR NEGATIVE 4 Verify Adequate Shutdown Margin |
| | : a. Direct HP to sample RCS for boron concentration I |
| | : b. Verify boron concentration- b. Continue boration until adequate GREATER THAN REQUIREMENTS OF shutdown margin verified. |
| | FIGURE SDM |
| | : c. Stop boration 5 Return To Procedure And Step In Effect. |
| | -END- |
|
| |
|
| FR-S.2 TITLE%RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 1 of 1 FR-S.2 APPENDIX LIST TITLE PAGES 1)FIGURE SDM | | TITLE% |
| | REV: 3 FR-S.2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 1 of 1 FR-S. 2 APPENDIX LIST TITLE PAGES |
| | : 1) FIGURE SDM |
|
| |
|
| EOP: FR-ST 2 TITLE: RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 1 of 1 FIGURE SDM NOTE: o Curve includes allowance for one stuck rod.Add 100 ppm for each additional stuck rod.o To obtain core burnup, use PPCS turn on code BURNUP.BORON CONCENTRATION (PPM)1800 1600 BORON INCREMENTS 20 PPM 1400 1200 1000 ADEQUATE SDM 100 PPH CONSERVATISH INCLUDED 800 600 400 TE BORA 200 BURNUP INCREMENTS 100 MWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 CYCLE 23 BURNUP (HWD/HTU)}} | | EOP: TITLE: |
| | REV: 3 FR-ST 2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 1 of 1 FIGURE SDM NOTE: o Curve includes allowance for one stuck rod. Add 100 ppm for each additional stuck rod. |
| | o To obtain core burnup, use PPCS turn on code BURNUP. |
| | BORON CONCENTRATION (PPM) 1800 BORON INCREMENTS 20 PPM 1600 1400 ADEQUATE SDM 1200 100 PPH CONSERVATISH INCLUDED 1000 800 600 400 BORATE 200 BURNUP INCREMENTS 100 MWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 CYCLE 23 BURNUP (HWD/HTU)}} |
Similar Documents at Ginna |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements 1999-06-28
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML20140B8291997-03-24024 March 1997 Rev 3 to EOP ATT-12.0, Attachment N2 Porvs ML17264A8221997-02-0606 February 1997 Rev 15 to FR-P.1, Response to Imminent Pressurized Thermal Shock Condition. ML17264A8201997-02-0606 February 1997 Rev 7 to AP-RCC.2, Rcc/Rpi Malfunction. ML17264A8081997-01-23023 January 1997 Revised Emergency Operating Procedures,Including Rev 14 to E-1,Rev 19 to E-3,Rev 14 to ECA-2.1,Rev ECA-3.3,Rev 20 to ES-1.3,Rev 13 to FR-C.1,Rev 12 to FR-C.2 & Rev 14 to FR-P.1 ML20133N3351997-01-10010 January 1997 Rev 7 to FR-C.3, Response to Saturated Core Cooling ML17264A8881996-10-10010 October 1996 Rev 9 to ODCM for Ginna Station. ML20128N0681996-10-0303 October 1996 Revised Emergency Operating Procedures,Including Rev 5 to Att-10.0, Attachment Faulted S/G & Rev 6 to Att-16.0, Attachment Ruptured S/G ML17264A5311996-05-31031 May 1996 Revised Emergency Operating Procedures,Including Rev 10 to AP-RCP.1,Rev 12 to ECA-0.1,Rev 12 to ECA-2.1,Rev 3 to FR-H.2,Rev 3 to FR-H.4,Rev 7 to FR-I.1,Rev 12 to FR-P.1,Rev 10 to FR-S-1 & Rev 6 to FR-S.2 ML17264A5161996-05-22022 May 1996 Rev 2 to Technical Requirements Manual (TRM) ML17264A4581996-04-0808 April 1996 Rev 7 to ODCM for Ginna Station. ML17264A4371996-04-0101 April 1996 Rev 1 to Technical Requirements Manual (TRM) ML17264A4391996-04-0101 April 1996 Rev 1 to Updated Technical Requirements Manual (TRM) ML17264A4191996-02-24024 February 1996 Rev 0 to Technical Requirements Manual (Trm). ML17264A6901996-02-23023 February 1996 Rev 0 to Inservice Testing Program. 1999-05-12
[Table view] |
Text
EOP:
REV: 3 FR-S.2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 1 of 5 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIE DATE PLANT SUPERINTENDENT E FECTIVE DATE CATEGORY 1.0 REVIEWED BY:
9305i40057 930505 PDR ADOCK 05000244
~F PDR
REV: 3 FR-S.2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 2 of 5 A. PURPOSE This procedure provides actions to restore the core to an adequate shutdown condition.
B. ENTRY CONDITIONS/SYMPTOMS
- 1. ENTRY CONDITIONS This procedure is entered from:
- a. F-0.1, SUBCRITICALITY Critical Safety Function Status Tree, on either YELLOW condition.
EOP:
REV: 3 FR-ST 2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 3 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+ 5 R/hr.
o Adverse CNMT conditions or loss of forced air cooling may result in failure of NIS detectors.
1 Check Intermediate Range Flux:
- a. Flux - EITHER CHANNEL LESS THAN a. Continue with Ste~ 2. WHEN flux 10-10 AMPS is LESS THAN 10 amps on any operable channel, THEN do Steps lb, c and d.
- b. Check the following: b. Continue with step 2. WHEN either condition met, THEN do o Both intermediate range Steps lc and d.
channels - LESS THAN 10 AMPS
-OR-o Greater than 20 minutes since reactor trip
- c. Verify source range detectors cd Manually energize source range ENERGIZED detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).
IF source ranges can NOT be restored, THEN refer to ER-NIS.1, SR MALFUNCTION, and go to Step 2.
d, Transfer Rk-45 recorder to one sour'ce'ange and one intermediate range channel
EOP: T!TLE:
REV' FR-Ss2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 4 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: If offsite power is lost coincident with SI, then MCC C and MCC D lockout relays must be reset to restore BA and RMW pumps.
2 Initiate Immediate Boration Of RCS:
- a. Check SI status:
o All SI annunciators- 1) Complete the immediate EXTINGUISHED actions of E-O, REACTOR TRIP OR SAFETY INJECTION, while o All SI pumps - OFF IN AUTO continuing with this procedure
- 2) IF SI flow indicated, THEN go to Step 3. IF NOT, THEN go to Step 2b.
- b. Verify at least one charging b. Perform the following:
pump - RUNNING
- 1) Reset SI if necessary.
- 2) Start one charging pump.
- c. Align boration path: c. Initiate normal boration at maximum rate using the boric
- 1) Start tue BA transfer pumps acid flow control valve, FCV-110A. IF flow can NOT be
- 2) Open MOV-350 I established, THEN refer to ER-CVCS.l, REACTOR MAKEUP
- 3) Verify BA flow CONTROL MALFUNCTION.
- d. Verify charging flow path: !
- d. Manually align valves and verify flow.
o Ch'arging valve to loop B cold 18g"-'(AOV-294) - OPEN
~, g' Ch'arging flow control valve (HCV-142) - DEMAND AT 0%
EOP: TITLE:
REV: 3 FR-ST 2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 5 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 3 Check Source Range Channels: Continue boration until adequate shutdown margin is verified by RCS o Source range channels - ENERGIZED sample (Refer to Figure SDM).
o Source range channels startup rate - ZERO OR NEGATIVE 4 Verify Adequate Shutdown Margin
- a. Direct HP to sample RCS for boron concentration I
- b. Verify boron concentration- b. Continue boration until adequate GREATER THAN REQUIREMENTS OF shutdown margin verified.
FIGURE SDM
- c. Stop boration 5 Return To Procedure And Step In Effect.
-END-
TITLE%
REV: 3 FR-S.2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 1 of 1 FR-S. 2 APPENDIX LIST TITLE PAGES
- 1) FIGURE SDM
EOP: TITLE:
REV: 3 FR-ST 2 RESPONSE TO LOSS OF CORE SHUTDOWN PAGE 1 of 1 FIGURE SDM NOTE: o Curve includes allowance for one stuck rod. Add 100 ppm for each additional stuck rod.
o To obtain core burnup, use PPCS turn on code BURNUP.
BORON CONCENTRATION (PPM) 1800 BORON INCREMENTS 20 PPM 1600 1400 ADEQUATE SDM 1200 100 PPH CONSERVATISH INCLUDED 1000 800 600 400 BORATE 200 BURNUP INCREMENTS 100 MWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 CYCLE 23 BURNUP (HWD/HTU)