REV' P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 1 of 11 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC, REVIEW DATE PLANT SUPERINTENDENT EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY: | |||
2.SYMPTOMS | 94iOi80209 940930 PDR ADDCK 05000244 P | ||
EOP: P-PRZR.1 | |||
4**%**% | 4I EOP: TITLE: | ||
CAUTION IF, AT ANY TIME DURING THIS PROCEDURE, A REACTOR TRIP OR SI OCCURS, E-O, REACTOR TRIP OR SAFETY INJECTION, SHALL BE PERFORMED. | REV 7 P-PRZR.l ABNORMAL PRESSURIZER PRESSURE PAGE 2 of 11 A. PURPOSE This procedure provides the actions necessary to mitigate the consequences of abnormal PRZR pressure. | ||
**xx***xxx*x*x*xx%%'ex xxk*xxxxx**%x**x%'*xx NOTE: Actual PRZR pressure should be verified by more than 1 indicator. | B. ENTRY CONDITIONS/SYMPTOMS | ||
1 Check PRZR Pressure: o All 4 narrow range channels | : l. ENTRY CONDITIONS This procedure is entered from: | ||
a.IF the controlling PRZR pressure channel has failed, THEN place controller, 431K, in MANUAL and adjust output to restore PRZR pressure.b.Refer to ER-INST.l, REACTOR PROTECTION BISTABLE DEFEAT AFTER INSTRUMENTATION LOOP FAILURE.2 Check Reactor Power | : a. AP-CVCS.1, CVCS LEAK, or b ~ AP FW 1 i PARTIAL OR COMPLETE LOSS OF MAIN FEEDWATER, or | ||
3 Check PRZR Pressure: a.Pressure-LESS THAN 2235 PSIG b.Pressure-GREATER THAN 2000 PSIG | : c. AP-IA.1, LOSS OF INSTRUMENT AIR, or | ||
EOP: P-PRZR.1 | : d. AP-RCC.1, CONTINUOUS CONTROL ROD WITHDRAWAL OR INSERTION, or | ||
: e. AP-RCS.1, REACTOR COOLANT LEAK, or f AP TURB ~ 1 g TURBINE TRI P WITHOUT RX TRI P REQUIRED g or | |||
4 Check PRZR Heater Status: a.PRZR heater control group | : g. AP-TURB.2, TURBINE LOAD REJECTION, when PRZR pressure can NOT be controlled. | ||
1)Place the breaker switch to OFF to reset breaker.2)Place the breaker switch to ON to energize heaters.3)Verify load increase on Bus 16. | : 2. SYMPTOMS The symptoms of ABNORMAL PRZR PRESSURE are; | ||
1 EOP: | : a. Annunciator F-19, or PRZR PORV OUTLET HI TEMP 145'F, lit, | ||
: b. Annunciator F-18, PRZR SAFETY VLV OUTLET HI TEMP 145'F, lit, or | |||
a.Trip the reactor.b.Trip the associated RCP.c.Go to E-O, REACTOR TRIP OR SAFETY INJECTION. | : c. Annunciator AA-13, PRESSURIZER SAFETY VALVE POSITION, lit, or | ||
NOTE: With PRZR pressure controller 431K in manual, PORV-431C will not be operable in the automatic mode.6 Check PRZR Pressure Controller, 431K, Demand | : d. Annunciator F-l, PRT LIQUID HI TEMP 220'F, lit, or | ||
I ll 0 ts EOP: P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE | : e. Annunciator F-9, PRT HI PRESS 5 PSI, lit, or | ||
1)Close PORV block valves one at a time AND check if pressure stabilizes. | : f. Annunciator F-17, PRT LEVEL 60.8 4 84.5, lit, or | ||
~MOV-515~MOV-516 | : g. Annunciator F-2, PRESSURIZER HI PRESS 2310 PSI, lit, or | ||
: h. Annunciator F-10, PRESSURIZER LO PRESS 2185 PSI, lit, or | |||
1)Reclose leaking PORV block valve. | : i. Annunciator F-6, PRESSURIZER HEATER BREAKER TRIP, lit. | ||
(~q I 4~' | : j. Annunciator F-26, 2377 PSI. | ||
EOP: P-PRZR.1 | PRESSURIZER HI PRESS CHANNEL ALERT | ||
CAUTION o IF PRZR PRESSURE IS TO BE REDUCED WHILE AT POWER, IT SHOULD BE DONE SLOWLY SINCE THE PRZR LOW PRESSURE TRIP IS RATE SENSITIVE. | |||
o WHEN REDUCING PRZR PRESSURE, OT4T SETPOINT WILL DECREASE.******%**x'****%x*x x x*x***x******%'***x*** | EOP: TITLE: | ||
9 Check PRZR Safety Valves: o Position indicator-LESS THAN 0.1 INCH.o Annunciator F-18, PRZR SAFETY | REV: 7 P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 3 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED | ||
***************** 4 **% **% **************** | |||
CAUTION IF, AT ANY TIME DURING THIS PROCEDURE, A REACTOR TRIP OR SI OCCURS, E-O, REACTOR TRIP OR SAFETY INJECTION, SHALL BE PERFORMED. | |||
**xx***xxx*x*x*xx%%'ex xxk*xxxxx**%x**x%'*xx NOTE: Actual PRZR pressure should be verified by more than 1 indicator. | |||
1 Check PRZR Pressure: IF one pressure channel deviates significantly from the other 3, o All 4 narrow range channels THEN perform the following: | |||
APPROXIMATELY EQUAL | |||
: a. IF the controlling PRZR pressure o All 4 narrow range channels channel has failed, THEN place TRENDING TOGETHER controller, 431K, in MANUAL and adjust output to restore PRZR pressure. | |||
: b. Refer to ER-INST.l, REACTOR PROTECTION BISTABLE DEFEAT AFTER INSTRUMENTATION LOOP FAILURE. | |||
2 Check Reactor Power STABLE IF the abnormal, PRZR pressure is a result of a power transient, THEN evaluate conditions and go to the appropriate plant procedure. | |||
3 Check PRZR Pressure: | |||
: a. Pressure - LESS THAN 2235 PSIG a. Go to Step 12 | |||
: b. Pressure - GREATER THAN 2000 PSIG b. IF pressure decreasing uncontrollably, THEN trip the reactor and go to E-O, REACTOR TRIP OR SAFETY INJECTION. | |||
EOP: TITLE REV: 7 P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 4 of ll STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED | |||
**x***xx x x**xx x x 4*x x x x x | |||
~ | |||
CAUTION w ~ *x x x x**x******* | |||
OBSERVE D/G LOADING LIMITS OF 2300 KW FOR 1/2 HOUR, 2250 KW FOR 2 HOURS, AND 1950 KW FOR CONTINUOUS SERVICE. | |||
*******xx*xx*xxxxxxxxxx>x****xx**xx**x* | |||
4 Check PRZR Heater Status: | |||
: a. PRZR heater control group a. Place PRZR heater control group BREAKER CLOSED switch to TRIP to reset, then place switch to CLOSE and let return to AUTO. | |||
: b. PRZR heater backup group - ON b. IF PRZR pressure less than 2220 psig, THEN energize PRZR backup heaters. | |||
IF PRZR backup heater breaker has tripped, THEN perform the following: | |||
: 1) Place the breaker switch to OFF to reset breaker. | |||
: 2) Place the breaker switch to ON to energize heaters. | |||
: 3) Verify load increase on Bus 16. | |||
1 EOP: TITLE: | |||
REV' P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 5 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 5 Verify Normal PRZR Spray Place controllers in MANUAL at 0% | |||
Valve Controllers DEMAND AT demand. IF valves can NOT be 0~o closed, THEN perform the following: | |||
: a. Trip the reactor. | |||
: b. Trip the associated RCP. | |||
: c. Go to E-O, REACTOR TRIP OR SAFETY INJECTION. | |||
NOTE: With PRZR pressure controller 431K in manual, PORV-431C will not be operable in the automatic mode. | |||
6 Check PRZR Pressure Place 431K in MANUAL and decrease Controller, 431K, Demand output t:o energize PRZR heaters. | |||
LESS THAN 504 | |||
I ll 0 | |||
ts | |||
EOP: | |||
REV: 7 P-PRZR. 1 ABNORMAL PRESSURIZER PRESSURE PAGE 6 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 7 Check PRZR PORVs: | |||
: a. PORVs - CLOSED a. Manually close PORVs. | |||
IF any valve can NOT be closed, THEN manually close the associated block valve. | |||
~ MOV-516 for PCV-430 | |||
~ MOV-515 for PCV-431C | |||
: b. Annunciator F-19, PRZR PORV b. IF PORV leakage is indicated, OUTLET HI TEMP 145'F THEN perform the following: | |||
EXTINGUISHED | |||
: 1) Close PORV block valves one at a time AND check if pressure stabilizes. | |||
~ MOV-515 | |||
~ MOV-516 | |||
: 2) IF a leaking PRZR PORV is identified, THEN restore any nonleaking PORV to operable AND go to Step 8. | |||
: c. Go to Step 9 | |||
I EOP: TITLE REV: 7 P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 7 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 8 Attempt To Reseat Any Leaking PORV: | |||
: a. Verify affected PORV block valve a. Close the affected PORV block CLOSED valve. | |||
: b. Cycle the leaking PORV open then closed | |||
: c. Open affected PORV block valve | |||
: d. Verify leakage has stopped d. IF leakage continues, THEN perform the following: | |||
: 1) Reclose leaking PORV block valve. | |||
: 2) Refer to Tech Spec section 3.1.1.4 for required actions. | |||
: e. Go to Step 11 | |||
( | |||
~q I | |||
4~ ' | |||
EOP: TITLE: | |||
REV 7 P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 8 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED | |||
**x**x*xx*x**xxx%xx%***x*x*****xx**x** CAUTION o IF PRZR PRESSURE IS TO BE REDUCED WHILE AT POWER, IT SHOULD BE DONE SLOWLY SINCE THE PRZR LOW PRESSURE TRIP IS RATE SENSITIVE. | |||
o WHEN REDUCING PRZR PRESSURE, OT4T SETPOINT WILL DECREASE. | |||
******%**x'****% x*x x x*x ***x******%'***x*** | |||
9 Check PRZR Safety Valves: IF safety valve leakage indicated, THEN perform the following to o Position indicator - LESS THAN attempt to reseat the leaking valve: | |||
0.1 INCH. | |||
: a. SLOWLY reduce PRZR pressure o Annunciator F-18, PRZR SAFETY (remain above 2000 psig). | |||
VLV OUTLET HI TEMP 145'F EXTINGUISHED b. IF symptoms indicate leakage has stopped, THEN restore pressure o Annunciator AA-13, PRESSURIZER to normal. | |||
SAFETY VALVE POSITION EXTINGUISHED c. IF leakage recurs or can NOT be stopped, THEN perform the following: | |||
: 1) Verify leakage within limits of Tech Spec section 3.1.5. | |||
: 2) Go to Step 17. | |||
10 Check AUX Spray'alve, Manually close valve. IF valve can AOV-296 CLOSED NOT be closed, THEN consider isolating letdown and closing cha'rging flow control valve, HCV-142. | |||
I' EOP: TITLE: | |||
REV: 7 P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 9 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 11 Check PRZR Pressure Control Restored: | |||
: a. Pressure - TRENDING TO 2235 PSIG a. IF pressure continues to decrease, THEN return to Step 1. | |||
: b. Go to Step 17 12 Check PRZR Backup Heaters- Verify PRZR backup heater switch in OFF AUTO, AND ensure proper operation. | |||
NOTE: With PRZR pressure controller 431K in manual, PORV-431C will not be operable in the automatic mode. | |||
13 Check PRZR Pressure Place 431K in MANUAL at 50% demand. | |||
Controller, 431K, Demand INCREASING NOTE: o If auxiliary spray is in use, spray flow may be increased by closing normal charging valve AOV-294 and normal PRZR spray valves. | |||
o The bT between the REGEN Hx charging outlet and the PRZR shall NOT exceed 320'F. | |||
14 Check RCPs ANY RUNNING IF letdown in service, THEN perform the following: | |||
: a. Open AUX spray valve, AOV-296, as necessary to control PRZR pressure. | |||
: b. Go to Step 16. | |||
EOP: 'f!TLE: | |||
REV 7 P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 10 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: If either RCP is off, then the associated PRZR spray valve controller should be placed in MANUAL with demand at 0%. | |||
15 Check PRZR Spray Valve Place PRZR spray valve controllers Controllers Demand GREATER in MANUAL and open as required to THAN 0% control pressure. | |||
~ PCV-431A | |||
~ PCV-431B 16 Check PRZR Pressure IF PRZR pressure continues to TRENDING TO 2235 PSIG increase uncontrollably, THEN trip the reactor and go to E-O, REACTOR TRIP or SAFETY INJECTION. | |||
17 Check PRT Indications: | |||
: a. Level - BETWEEN 61% AND 84% a. Drain PRT to RCDT using PRT drain valve, AOV-526. | |||
: b. Pressure - APPROXIMATELY b. Open PRT vent, AOV-527. IF PRT 1.5 PSIG AND STABLE pressure will NOT decrease, THEN open PRT drain valve, AOV-526, to reduce pressure. | |||
: c. Temperature - AT CNMT AMBIENT c. To feed and bleed the PRT, TEMPERATURE AND STABLE perform the following: | |||
: 1) Start a RMW pump. | |||
: 2) Verify RMW to CNMT isolation valve, AOV-508, open. | |||
: 3) Feed and bleed the PRT using PRT fill valve from'RMW, AOV-548, and PRT drain valve, AOV-526. | |||
EOP: TITLE: | |||
~ W REV' P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE ll of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Refer to 0-9.3, NRC IMMEDIATE NOTIFICATION, for reporting requirements. | |||
18 Notify Higher Supervision | |||
-END-}} |
Latest revision as of 17:18, 29 October 2019
ML17263A810 | |
Person / Time | |
---|---|
Site: | Ginna |
Issue date: | 09/21/1994 |
From: | Marlow T ROCHESTER GAS & ELECTRIC CORP. |
To: | |
Shared Package | |
ML17263A809 | List: |
References | |
AP-PRZR.1, NUDOCS 9410180209 | |
Download: ML17263A810 (17) | |
Text
EOP: TITLE:
REV' P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 1 of 11 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC, REVIEW DATE PLANT SUPERINTENDENT EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:
94iOi80209 940930 PDR ADDCK 05000244 P
4I EOP: TITLE:
REV 7 P-PRZR.l ABNORMAL PRESSURIZER PRESSURE PAGE 2 of 11 A. PURPOSE This procedure provides the actions necessary to mitigate the consequences of abnormal PRZR pressure.
B. ENTRY CONDITIONS/SYMPTOMS
- l. ENTRY CONDITIONS This procedure is entered from:
- c. AP-IA.1, LOSS OF INSTRUMENT AIR, or
- d. AP-RCC.1, CONTINUOUS CONTROL ROD WITHDRAWAL OR INSERTION, or
- e. AP-RCS.1, REACTOR COOLANT LEAK, or f AP TURB ~ 1 g TURBINE TRI P WITHOUT RX TRI P REQUIRED g or
- g. AP-TURB.2, TURBINE LOAD REJECTION, when PRZR pressure can NOT be controlled.
- 2. SYMPTOMS The symptoms of ABNORMAL PRZR PRESSURE are;
- a. Annunciator F-19, or PRZR PORV OUTLET HI TEMP 145'F, lit,
- b. Annunciator F-18, PRZR SAFETY VLV OUTLET HI TEMP 145'F, lit, or
- c. Annunciator AA-13, PRESSURIZER SAFETY VALVE POSITION, lit, or
- d. Annunciator F-l, PRT LIQUID HI TEMP 220'F, lit, or
- e. Annunciator F-9, PRT HI PRESS 5 PSI, lit, or
- f. Annunciator F-17, PRT LEVEL 60.8 4 84.5, lit, or
- g. Annunciator F-2, PRESSURIZER HI PRESS 2310 PSI, lit, or
- h. Annunciator F-10, PRESSURIZER LO PRESS 2185 PSI, lit, or
- i. Annunciator F-6, PRESSURIZER HEATER BREAKER TRIP, lit.
- j. Annunciator F-26, 2377 PSI.
PRESSURIZER HI PRESS CHANNEL ALERT
EOP: TITLE:
REV: 7 P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 3 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED
- 4 **% **% ****************
CAUTION IF, AT ANY TIME DURING THIS PROCEDURE, A REACTOR TRIP OR SI OCCURS, E-O, REACTOR TRIP OR SAFETY INJECTION, SHALL BE PERFORMED.
- xx***xxx*x*x*xx%%'ex xxk*xxxxx**%x**x%'*xx NOTE: Actual PRZR pressure should be verified by more than 1 indicator.
1 Check PRZR Pressure: IF one pressure channel deviates significantly from the other 3, o All 4 narrow range channels THEN perform the following:
APPROXIMATELY EQUAL
- a. IF the controlling PRZR pressure o All 4 narrow range channels channel has failed, THEN place TRENDING TOGETHER controller, 431K, in MANUAL and adjust output to restore PRZR pressure.
- b. Refer to ER-INST.l, REACTOR PROTECTION BISTABLE DEFEAT AFTER INSTRUMENTATION LOOP FAILURE.
2 Check Reactor Power STABLE IF the abnormal, PRZR pressure is a result of a power transient, THEN evaluate conditions and go to the appropriate plant procedure.
3 Check PRZR Pressure:
- a. Pressure - LESS THAN 2235 PSIG a. Go to Step 12
- b. Pressure - GREATER THAN 2000 PSIG b. IF pressure decreasing uncontrollably, THEN trip the reactor and go to E-O, REACTOR TRIP OR SAFETY INJECTION.
EOP: TITLE REV: 7 P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 4 of ll STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED
- x***xx x x**xx x x 4*x x x x x
~
CAUTION w ~ *x x x x**x*******
OBSERVE D/G LOADING LIMITS OF 2300 KW FOR 1/2 HOUR, 2250 KW FOR 2 HOURS, AND 1950 KW FOR CONTINUOUS SERVICE.
- xx*xx*xxxxxxxxxx>x****xx**xx**x*
4 Check PRZR Heater Status:
- a. PRZR heater control group a. Place PRZR heater control group BREAKER CLOSED switch to TRIP to reset, then place switch to CLOSE and let return to AUTO.
- b. PRZR heater backup group - ON b. IF PRZR pressure less than 2220 psig, THEN energize PRZR backup heaters.
IF PRZR backup heater breaker has tripped, THEN perform the following:
- 1) Place the breaker switch to OFF to reset breaker.
- 2) Place the breaker switch to ON to energize heaters.
- 3) Verify load increase on Bus 16.
1 EOP: TITLE:
REV' P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 5 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 5 Verify Normal PRZR Spray Place controllers in MANUAL at 0%
Valve Controllers DEMAND AT demand. IF valves can NOT be 0~o closed, THEN perform the following:
- a. Trip the reactor.
- b. Trip the associated RCP.
- c. Go to E-O, REACTOR TRIP OR SAFETY INJECTION.
NOTE: With PRZR pressure controller 431K in manual, PORV-431C will not be operable in the automatic mode.
6 Check PRZR Pressure Place 431K in MANUAL and decrease Controller, 431K, Demand output t:o energize PRZR heaters.
LESS THAN 504
I ll 0
ts
EOP:
REV: 7 P-PRZR. 1 ABNORMAL PRESSURIZER PRESSURE PAGE 6 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 7 Check PRZR PORVs:
IF any valve can NOT be closed, THEN manually close the associated block valve.
~ MOV-516 for PCV-430
~ MOV-515 for PCV-431C
- b. Annunciator F-19, PRZR PORV b. IF PORV leakage is indicated, OUTLET HI TEMP 145'F THEN perform the following:
EXTINGUISHED
- 1) Close PORV block valves one at a time AND check if pressure stabilizes.
~ MOV-515
~ MOV-516
- 2) IF a leaking PRZR PORV is identified, THEN restore any nonleaking PORV to operable AND go to Step 8.
- c. Go to Step 9
I EOP: TITLE REV: 7 P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 7 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 8 Attempt To Reseat Any Leaking PORV:
- b. Cycle the leaking PORV open then closed
- c. Open affected PORV block valve
- d. Verify leakage has stopped d. IF leakage continues, THEN perform the following:
- 1) Reclose leaking PORV block valve.
- 2) Refer to Tech Spec section 3.1.1.4 for required actions.
- e. Go to Step 11
(
~q I
4~ '
EOP: TITLE:
REV 7 P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 8 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED
o WHEN REDUCING PRZR PRESSURE, OT4T SETPOINT WILL DECREASE.
- %**x'****% x*x x x*x ***x******%'***x***
9 Check PRZR Safety Valves: IF safety valve leakage indicated, THEN perform the following to o Position indicator - LESS THAN attempt to reseat the leaking valve:
0.1 INCH.
- a. SLOWLY reduce PRZR pressure o Annunciator F-18, PRZR SAFETY (remain above 2000 psig).
VLV OUTLET HI TEMP 145'F EXTINGUISHED b. IF symptoms indicate leakage has stopped, THEN restore pressure o Annunciator AA-13, PRESSURIZER to normal.
SAFETY VALVE POSITION EXTINGUISHED c. IF leakage recurs or can NOT be stopped, THEN perform the following:
- 1) Verify leakage within limits of Tech Spec section 3.1.5.
- 2) Go to Step 17.
10 Check AUX Spray'alve, Manually close valve. IF valve can AOV-296 CLOSED NOT be closed, THEN consider isolating letdown and closing cha'rging flow control valve, HCV-142.
I' EOP: TITLE:
REV: 7 P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 9 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 11 Check PRZR Pressure Control Restored:
- a. Pressure - TRENDING TO 2235 PSIG a. IF pressure continues to decrease, THEN return to Step 1.
- b. Go to Step 17 12 Check PRZR Backup Heaters- Verify PRZR backup heater switch in OFF AUTO, AND ensure proper operation.
NOTE: With PRZR pressure controller 431K in manual, PORV-431C will not be operable in the automatic mode.
13 Check PRZR Pressure Place 431K in MANUAL at 50% demand.
Controller, 431K, Demand INCREASING NOTE: o If auxiliary spray is in use, spray flow may be increased by closing normal charging valve AOV-294 and normal PRZR spray valves.
o The bT between the REGEN Hx charging outlet and the PRZR shall NOT exceed 320'F.
14 Check RCPs ANY RUNNING IF letdown in service, THEN perform the following:
- a. Open AUX spray valve, AOV-296, as necessary to control PRZR pressure.
- b. Go to Step 16.
EOP: 'f!TLE:
REV 7 P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE 10 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: If either RCP is off, then the associated PRZR spray valve controller should be placed in MANUAL with demand at 0%.
15 Check PRZR Spray Valve Place PRZR spray valve controllers Controllers Demand GREATER in MANUAL and open as required to THAN 0% control pressure.
~ PCV-431A
~ PCV-431B 16 Check PRZR Pressure IF PRZR pressure continues to TRENDING TO 2235 PSIG increase uncontrollably, THEN trip the reactor and go to E-O, REACTOR TRIP or SAFETY INJECTION.
17 Check PRT Indications:
- b. Pressure - APPROXIMATELY b. Open PRT vent, AOV-527. IF PRT 1.5 PSIG AND STABLE pressure will NOT decrease, THEN open PRT drain valve, AOV-526, to reduce pressure.
- c. Temperature - AT CNMT AMBIENT c. To feed and bleed the PRT, TEMPERATURE AND STABLE perform the following:
- 1) Start a RMW pump.
- 2) Verify RMW to CNMT isolation valve, AOV-508, open.
EOP: TITLE:
~ W REV' P-PRZR.1 ABNORMAL PRESSURIZER PRESSURE PAGE ll of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Refer to 0-9.3, NRC IMMEDIATE NOTIFICATION, for reporting requirements.
18 Notify Higher Supervision
-END-