IR 05000293/2018501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/06/2018
| issue date = 12/06/2018
| title = Evaluated Emergency Preparedness Exercise Inspection Report 05000293/2018501
| title = Evaluated Emergency Preparedness Exercise Inspection Report 05000293/2018501
| author name = McKinley R R
| author name = Mckinley R
| author affiliation = NRC/RGN-I/DRS
| author affiliation = NRC/RGN-I/DRS
| addressee name = Sullivan B
| addressee name = Sullivan B
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:D. Stoddard UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 December 6, 2018 Mr. Brian Sullivan Site Vice President Pilgrim Nuclear Power Station Entergy Nuclear Operations, Inc.
{{#Wiki_filter:D. Stoddard UNITED STATES NUCLEAR REGULATORY COMMISSION ber 6, 2018


600 Rocky Hill Road Plymouth, MA 02360-5508 SUBJECT: PILGRIM NUCLEAR POWER STATION - EVALUATED EMERGENCY PREPAREDNESS EXERCISE IN SPECTION REPORT 05000293/2018501
==SUBJECT:==
PILGRIM NUCLEAR POWER STATION - EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT 05000293/2018501


==Dear Mr. Sullivan:==
==Dear Mr. Sullivan:==
On November 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an  
On November 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Pilgrim Nuclear Power Station and the NRC inspectors discussed the results of this inspection with you and members of your staff. The results of this inspection are documented in the enclosed report.
 
inspection at Pilgrim Nuclear Power Station and the NRC inspectors discussed the results of this inspection with you and members of your staff. The results of this inspection are documented in the enclosed report.


The NRC inspectors did not identify any finding or violation of more than minor significance.
The NRC inspectors did not identify any finding or violation of more than minor significance.


This letter, its enclosure, and your response (if any) will be made available for public inspection  
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Sincerely,
Sincerely,
/RA/ Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety  
/RA/
 
Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety Docket Number: 50-293 License Number: DPR-35
Docket Number: 50-293 License Number: DPR-35  
 
Enclosure: Inspection Report 05000293/2018501
 
cc w/encl: Distribution via ListServ S. Colman, RAC Chair, FEMA Region I
 
ML18340A240 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS NAME JAmbrosini/ja RMcKinley/rrm DATE 11/27/18 12/6/18


1 Enclosure U.S. NUCLEAR REGULATORY COMMISSION
===Enclosure:===
Inspection Report 05000293/2018501


==Inspection Report==
==Inspection Report==
 
Docket Number: 50-293 License Number: DPR-35 Report Number: 05000293/2018501 Enterprise Identifier: I-2018-501-0039 Licensee: Entergy Nuclear Operations, Inc. (Entergy)
Docket Number: 50-293 License Number: DPR-35  
Facility: Pilgrim Nuclear Power Station Location: Plymouth, Massachusetts Inspection Dates: November 6 - November 8, 2018 Inspectors: J. Ambrosini, Senior Emergency Preparedness Inspector, Division of Reactor Safety (DRS)
 
J. DeBoer, Emergency Preparedness Inspector, DRS B. Fuller, Senior Operations Engineer, DRS J. Lilliendahl, Senior Emergency Response Coordinator, DRS Approved By: Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety Enclosure
Report Number: 05000293/2018501  
 
Enterprise Identifier: I-2018-501-0039  
 
Licensee: Entergy Nuclear Operations, Inc. (Entergy)  
 
Facility: Pilgrim Nuclear Power Station  
 
Location: Plymouth, Massachusetts  
 
Inspection Dates: November 6 - November 8, 2018 Inspectors: J. Ambrosini, Senior Emergency Preparedness Inspector, Division of Reactor Safety (DRS) J. DeBoer, Emergency Preparedness Inspector, DRS B. Fuller, Senior Operations Engineer, DRS J. Lilliendahl, Senior Emergency Response Coordinator, DRS  
 
Approved By: Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety  
 
2


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Entergy's performance at Pilgrim Nuclear Power Station, by conducting an evaluated emergency preparedness exercise inspection in accordance with the Reactor Oversight Process. The Reactor Oversight  
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Entergys performance at Pilgrim Nuclear Power Station, by conducting an evaluated emergency preparedness exercise inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
Process is the NRC's program for overseeing t he safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


No findings or more-than-minor violations were identified.
No findings or more-than-minor violations were identified.
3


=INSPECTION SCOPES=
=INSPECTION SCOPES=


The inspectors conducted the inspection using the appropriate portions of the inspection procedures in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public  
The inspectors conducted the inspection using the appropriate portions of the inspection procedures in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. The inspectors determined the following samples were complete when the inspection procedure requirements were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
 
website at http://www.nrc.gov/reading-rm/doc-co llections/insp-manual/inspection-procedure/index.html. The inspectors determined the following samples were complete when the inspection procedure requirements were met consistent with Inspection Manual Chapter 2515, "Light-Water Reactor Inspection Program - Operations Phase.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==REACTOR SAFETY==
==REACTOR SAFETY==


==71114.01 - Exercise Evaluation (1 sample)==
==71114.01 - Exercise Evaluation (1 sample)
  ==
The inspectors evaluated the adequacy of Entergys conduct of the exercise and its capability to assess staff performance via a formal critique process, as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.47(b)(14).
==71114.08 - Exercise Evaluation - Scenario Review (1 sample)
  ==
The inspectors reviewed and evaluated the proposed scenario for a biennial emergency


The inspectors evaluated the adequacy of Entergy's conduct of the exercise and its capability to assess staff performance via a formal critique process, as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.47(b)(14).
===plan exercise on October 4.
71151 - Performance Indicator Verification===
{{IP sample|IP=IP 71114.08|count=3}}


==71114.08 - Exercise Evaluation - Scenario Review (1 sample)==
The inspectors verified licensee performance indicators submittals listed below for the period from October 2017 through September 2018.
 
The inspectors reviewed and evaluated the proposed scenario for a biennial emergency
 
plan exercise on October 4.
 
===71151 - Performance Indicator Verification===
{{IP sample|IP=IP 71151|count=3}}
The inspectors verified licensee performance indicators submittals listed below for the  
 
period from October 2017 through September 2018.
: (1) Drill and Exercise Performance
: (1) Drill and Exercise Performance
: (2) Emergency Response Organization Drill Participation
: (2) Emergency Response Organization Drill Participation
: (3) Alert and Notification System  
: (3) Alert and Notification System


==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
Line 109: Line 76:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


71114.01 - Exercise Evaluation Pilgrim Emergency Preparedness Plan
71114.01 - Exercise Evaluation
Pilgrim Emergency Preparedness Plan
Pilgrim Emergency Preparedness Plan Implementing Procedures
Pilgrim Emergency Preparedness Plan Implementing Procedures
Pilgrim November 7, 2018 Evaluated Exercise Scenario Package
Pilgrim November 7, 2018 Evaluated Exercise Scenario Package
Pilgrim Drill Reports 2016-2018
Pilgrim Drill Reports 2016-2018
Condition Reports CR-PNP-2017-11293 CR-PNP-2018-05075
Condition Reports
CR-PNP-2017-11293
CR-PNP-2018-05075
CR-PNP-2018-05276
CR-PNP-2018-05276
CR-PNP-2018-05327
CR-PNP-2018-05327
CR-PNP-2018-07282 CR-PNP-2018-08850 CR-PNP-2018-08857
CR-PNP-2018-07282
CR-PNP-2018-08850
CR-PNP-2018-08857
CR-PNP-2018-08867
CR-PNP-2018-08867
CR-PNP-2018-08869
CR-PNP-2018-08869
CR-PNP-2018-08876 CR-PNP-2018-08898
CR-PNP-2018-08876
71114.08 - Exercise Evaluation - Scenario Review Pilgrim Emergency Preparedness Plan Pilgrim Emergency Preparedness Plan Implementing Procedures
CR-PNP-2018-08898
71114.08 - Exercise Evaluation - Scenario Review
Pilgrim Emergency Preparedness Plan
Pilgrim Emergency Preparedness Plan Implementing Procedures
Pilgrim November 7, 2018 Evaluated Exercise Scenario Package
Pilgrim November 7, 2018 Evaluated Exercise Scenario Package
Pilgrim Drill Reports 2016-2018
Pilgrim Drill Reports 2016-2018
71151 - Performance Indicator Verification DEP PI data, October 2017 - September 2018
71151 - Performance Indicator Verification
DEP PI data, October 2017 - September 2018
ERO Drill Participation PI data, October 2017 - September 2018
ERO Drill Participation PI data, October 2017 - September 2018
ANS Reliability PI data, October 2017 - September 2018
ANS Reliability PI data, October 2017 - September 2018
}}
}}

Latest revision as of 16:28, 18 December 2019

Evaluated Emergency Preparedness Exercise Inspection Report 05000293/2018501
ML18340A240
Person / Time
Site: Pilgrim
Issue date: 12/06/2018
From: Raymond Mckinley
Division of Reactor Safety I
To: Brian Sullivan
Entergy Nuclear Operations
References
IR 2018501
Download: ML18340A240 (6)


Text

D. Stoddard UNITED STATES NUCLEAR REGULATORY COMMISSION ber 6, 2018

SUBJECT:

PILGRIM NUCLEAR POWER STATION - EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT 05000293/2018501

Dear Mr. Sullivan:

On November 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Pilgrim Nuclear Power Station and the NRC inspectors discussed the results of this inspection with you and members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety Docket Number: 50-293 License Number: DPR-35

Enclosure:

Inspection Report 05000293/2018501

Inspection Report

Docket Number: 50-293 License Number: DPR-35 Report Number: 05000293/2018501 Enterprise Identifier: I-2018-501-0039 Licensee: Entergy Nuclear Operations, Inc. (Entergy)

Facility: Pilgrim Nuclear Power Station Location: Plymouth, Massachusetts Inspection Dates: November 6 - November 8, 2018 Inspectors: J. Ambrosini, Senior Emergency Preparedness Inspector, Division of Reactor Safety (DRS)

J. DeBoer, Emergency Preparedness Inspector, DRS B. Fuller, Senior Operations Engineer, DRS J. Lilliendahl, Senior Emergency Response Coordinator, DRS Approved By: Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Entergys performance at Pilgrim Nuclear Power Station, by conducting an evaluated emergency preparedness exercise inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

No findings or more-than-minor violations were identified.

INSPECTION SCOPES

The inspectors conducted the inspection using the appropriate portions of the inspection procedures in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. The inspectors determined the following samples were complete when the inspection procedure requirements were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

==71114.01 - Exercise Evaluation (1 sample)

==

The inspectors evaluated the adequacy of Entergys conduct of the exercise and its capability to assess staff performance via a formal critique process, as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.47(b)(14).

==71114.08 - Exercise Evaluation - Scenario Review (1 sample)

==

The inspectors reviewed and evaluated the proposed scenario for a biennial emergency

===plan exercise on October 4.

71151 - Performance Indicator Verification===

The inspectors verified licensee performance indicators submittals listed below for the period from October 2017 through September 2018.

(1) Drill and Exercise Performance
(2) Emergency Response Organization Drill Participation
(3) Alert and Notification System

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On November 8, the inspectors presented the inspection results to Mr. Brian Sullivan, Site Vice President, and other members of the Pilgrim staff.

DOCUMENTS REVIEWED

71114.01 - Exercise Evaluation

Pilgrim Emergency Preparedness Plan

Pilgrim Emergency Preparedness Plan Implementing Procedures

Pilgrim November 7, 2018 Evaluated Exercise Scenario Package

Pilgrim Drill Reports 2016-2018

Condition Reports

CR-PNP-2017-11293

CR-PNP-2018-05075

CR-PNP-2018-05276

CR-PNP-2018-05327

CR-PNP-2018-07282

CR-PNP-2018-08850

CR-PNP-2018-08857

CR-PNP-2018-08867

CR-PNP-2018-08869

CR-PNP-2018-08876

CR-PNP-2018-08898

71114.08 - Exercise Evaluation - Scenario Review

Pilgrim Emergency Preparedness Plan

Pilgrim Emergency Preparedness Plan Implementing Procedures

Pilgrim November 7, 2018 Evaluated Exercise Scenario Package

Pilgrim Drill Reports 2016-2018

71151 - Performance Indicator Verification

DEP PI data, October 2017 - September 2018

ERO Drill Participation PI data, October 2017 - September 2018

ANS Reliability PI data, October 2017 - September 2018