IR 05000482/2017406: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/29/2017
| issue date = 03/29/2017
| title = Final Significance Determination for a Security Related Green Finding; NRC Security Inspection Report 05000482/2017406
| title = Final Significance Determination for a Security Related Green Finding; NRC Security Inspection Report 05000482/2017406
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Heflin A C
| addressee name = Heflin A
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| docket = 05000482
| docket = 05000482
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:" " March 29, 2017 EA-16-211
{{#Wiki_filter:UNITED STATES rch 29, 2017


Mr. Adam President, Chief Executive Officer, and Chief Nuclear Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
==SUBJECT:==
 
WOLF CREEK GENERATING STATION - FINAL SIGNIFICANCE DETERMINATION FOR A SECURITY-RELATED GREEN FINDING; NRC SECURITY INSPECTION REPORT 05000482/2017406
SUBJECT: WOLF CREEK GENERATING STATION - FINAL SIGNIFICANCE DETERMINATION FOR A SECURITY-RELATED GREEN FINDING; NRC SECURITY INSPECTION REPORT 05000482/2017406


==Dear Mr. Heflin:==
==Dear Mr. Heflin:==
Line 30: Line 29:
At your request, a Regulatory Conference was held on February 3, 2017, to discuss your views on this issue. A copy of the handout provided at this meeting is attached. During the meeting, your staff described your assessment of the significance of the finding and the corrective actions taken to resolve it, including the root cause evaluation of the finding. Specifically, you agreed with the violation, discussed corrective actions that indicated an adequate understanding of the issue, and provided additional information regarding the significance of the finding.
At your request, a Regulatory Conference was held on February 3, 2017, to discuss your views on this issue. A copy of the handout provided at this meeting is attached. During the meeting, your staff described your assessment of the significance of the finding and the corrective actions taken to resolve it, including the root cause evaluation of the finding. Specifically, you agreed with the violation, discussed corrective actions that indicated an adequate understanding of the issue, and provided additional information regarding the significance of the finding.


After thoroughly considering the additional information you provided at the regulatory conference, the NRC has concluded that the f inding is appropriately characterized as having very low security significance (Green), as described in the enclosed report.
After thoroughly considering the additional information you provided at the regulatory conference, the NRC has concluded that the finding is appropriately characterized as having very low security significance (Green), as described in the enclosed report.


You have 30 calendar days from the date of this letter to appeal the staff's determination of significance for the identified Green finding. Such appeals will be considered to have merit only if they meet the criteria provided in NRC Inspection Manual Chapter 0609, "Significance Determination Process," Attachment 2. An appeal must be sent in writing to the Regional Administrator, Region IV, 1600 E. Lamar Blvd., Arlington, TX 76011-4511. This finding involved a violation of NRC requirem ents. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
You have 30 calendar days from the date of this letter to appeal the staffs determination of significance for the identified Green finding. Such appeals will be considered to have merit only if they meet the criteria provided in NRC Inspection Manual Chapter 0609, "Significance Determination Process," Attachment 2. An appeal must be sent in writing to the Regional Administrator, Region IV, 1600 E. Lamar Blvd., Arlington, TX 76011-4511. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.


If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Wolf Creek Generating Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Wolf Creek Generating Station.


One cross-cutting aspect was assigned to a finding in the area of Human Performance. Specifically, the licensee failed to create and maintain complete, accurate, and up-to-date
One cross-cutting aspect was assigned to a finding in the area of Human Performance.
 
documentation [H.7].  


Specifically, the licensee failed to create and maintain complete, accurate, and up-to-date documentation [H.7].
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Line 45: Line 43:


Sincerely,
Sincerely,
/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety  
/RA/
 
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-482 License No. NPF-42 Nonpublic Enclosure:
Docket No. 50-482 License No. NPF-42  
NRC Inspection Report 05000482/2017406 w/Attachment: Supplemental Information Electronic Distribution for Wolf Creek ML17089A756 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
 
SUNSI Review By: MSH Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17089A758 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
Nonpublic Enclosure:  
SUNSI Review By: MSH Yes No Publicly Available Sensitive NRC-002 OFFICE PSI:PSB1 C:PSB1 C:PBB TL:ACES C:PSB1 NAME JBuchanan MHaire NTaylor MHay MHaire SIGNATURE /RA/ /RA/ /RA/ GMiller for via email /RA/
 
DATE 3/23/17 3/23/17 3/28/17 3/29/17 3/29/17 Distribution w/enclosure:
NRC Inspection Report 05000482/2017406 w/Attachment: Supplemental Information Electronic Distribution for Wolf Creek  
NRREnforcement Resource RidsNrrDirsEnforcement Resource RidsSecyMailCenter Resource RidsOcaMailCenter Resource RidsOgcMailCenter Resource RidsEdoMailCenter Resource EDO_Managers RidsOigMailCenter Resource RidsOiMailCenter Resource RidsRgn1MailCenter Resource RidsRgn2MailCenter Resource RidsRgn3MailCenter Resource RidsOcfoMailCenter Resource Distribution w/o enclosure:
 
VDricks, ORA JKlos, NRR THipschman, DRS MHerrera, FRMB KFuller, ORA EUribe, DRS JWeil, RIV/CAO AMoreno RIV/CAO JBowen, RIV/OEDO RIV ACES GWalker, OI BMaier, ORA RidsOeMailCenter Resource
ML17089A756 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: MSH Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17089A758 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: MSH Yes No Publicly Available Sensitive NRC-002 OFFICE PSI:PSB1 C:PSB1 C:PBB TL:ACES C:PSB1 NAME JBuchanan MHaire NTaylor MHay MHaire SIGNATURE /RA/ /RA/ /RA/ GMiller for via email /RA/ DATE 3/23/17 3/23/17 3/28/17 3/29/17 3/29/17 Distribution w/enclosure: NRREnforcement Resource RidsNrrDirsEnforcement Resource RidsSecyMailCenter Resource  
 
RidsOcaMailCenter Resource RidsOgcMailCenter Resource RidsEdoMailCenter Resource EDO_Managers  
 
RidsOigMailCenter Resource  
 
RidsOiMailCenter Resource RidsRgn1MailCenter Resource RidsRgn2MailCenter Resource RidsRgn3MailCenter Resource RidsOcfoMailCenter Resource Distribution w/o enclosure:
VDricks, ORA JKlos, NRR  
 
THipschman, DRS MHerrera, FRMB  
 
KFuller, ORA EUribe, DRS JWeil, RIV/CAO AMoreno RIV/CAO  
 
JBowen, RIV/OEDO RIV ACES GWalker, OI BMaier, ORA  
 
RidsOeMailCenter Resource
}}
}}

Latest revision as of 06:12, 30 October 2019

Final Significance Determination for a Security Related Green Finding; NRC Security Inspection Report 05000482/2017406
ML17089A758
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/29/2017
From: Mark Haire
Plant Support Branch-1
To: Heflin A
Wolf Creek
References
EA-16-211 IR 2017406
Download: ML17089A758 (4)


Text

UNITED STATES rch 29, 2017

SUBJECT:

WOLF CREEK GENERATING STATION - FINAL SIGNIFICANCE DETERMINATION FOR A SECURITY-RELATED GREEN FINDING; NRC SECURITY INSPECTION REPORT 05000482/2017406

Dear Mr. Heflin:

This letter provides the final results of our significance determination of the preliminary Greater than Green finding identified in our previous communication, dated December 20, 2016, Nuclear Regulatory Commission (NRC) Security Inspection Report 05000482/2016411 (ADAMS Accession No. ML16356A392). This preliminary Greater than Green finding was discussed in detail in Section 3S14 of that inspection report. The finding was security-related and the deficiencies were promptly corrected or compensated for and, as such, the plant was in compliance with applicable physical protection and security requirements before the inspection team left the site.

At your request, a Regulatory Conference was held on February 3, 2017, to discuss your views on this issue. A copy of the handout provided at this meeting is attached. During the meeting, your staff described your assessment of the significance of the finding and the corrective actions taken to resolve it, including the root cause evaluation of the finding. Specifically, you agreed with the violation, discussed corrective actions that indicated an adequate understanding of the issue, and provided additional information regarding the significance of the finding.

After thoroughly considering the additional information you provided at the regulatory conference, the NRC has concluded that the finding is appropriately characterized as having very low security significance (Green), as described in the enclosed report.

You have 30 calendar days from the date of this letter to appeal the staffs determination of significance for the identified Green finding. Such appeals will be considered to have merit only if they meet the criteria provided in NRC Inspection Manual Chapter 0609, "Significance Determination Process," Attachment 2. An appeal must be sent in writing to the Regional Administrator, Region IV, 1600 E. Lamar Blvd., Arlington, TX 76011-4511. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Wolf Creek Generating Station.

One cross-cutting aspect was assigned to a finding in the area of Human Performance.

Specifically, the licensee failed to create and maintain complete, accurate, and up-to-date documentation [H.7].

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-482 License No. NPF-42 Nonpublic Enclosure:

NRC Inspection Report 05000482/2017406 w/Attachment: Supplemental Information Electronic Distribution for Wolf Creek ML17089A756 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: MSH Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17089A758 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: MSH Yes No Publicly Available Sensitive NRC-002 OFFICE PSI:PSB1 C:PSB1 C:PBB TL:ACES C:PSB1 NAME JBuchanan MHaire NTaylor MHay MHaire SIGNATURE /RA/ /RA/ /RA/ GMiller for via email /RA/

DATE 3/23/17 3/23/17 3/28/17 3/29/17 3/29/17 Distribution w/enclosure:

NRREnforcement Resource RidsNrrDirsEnforcement Resource RidsSecyMailCenter Resource RidsOcaMailCenter Resource RidsOgcMailCenter Resource RidsEdoMailCenter Resource EDO_Managers RidsOigMailCenter Resource RidsOiMailCenter Resource RidsRgn1MailCenter Resource RidsRgn2MailCenter Resource RidsRgn3MailCenter Resource RidsOcfoMailCenter Resource Distribution w/o enclosure:

VDricks, ORA JKlos, NRR THipschman, DRS MHerrera, FRMB KFuller, ORA EUribe, DRS JWeil, RIV/CAO AMoreno RIV/CAO JBowen, RIV/OEDO RIV ACES GWalker, OI BMaier, ORA RidsOeMailCenter Resource