| {{#Wiki_filter:NMC Committed to Nuclear Excellence Steam Dryer Evaluation Preliminary Results for Monticello Extended Power Uprate (EPU) K February 13, 2008 CacmmtedIo Nuc Ec k Agenda ntroductions)bjectives A.onticello Steam Dryer Information ndustry Steam Dryer Information Aonticello Steam Dryer Evaluation Approach lIosed Session Monticello Steam Dryer Evaluation Results-Power Ascension Plan)ummary and Conclusion CoC-i-ted to a 2 I, bjectrives | | {{#Wiki_filter:NMC Committed to NuclearExcellence Steam Dryer Evaluation Preliminary Results for Monticello Extended Power Uprate (EPU) K February 13, 2008 CacmmtedIo Nuc Ec k |
| 'resent results from Monticello steam I-ryer structural evaluation)btain NRC feedback)chedule Committed to Nuce 3 Montilce-io Steram Dryer Information Square hood design Steam dryer licensing basis accident is ,main steam line break outside of containment Steam dryer inspection per Boiling Water Reactor Vessel Internals Project.ý(BWRVIP) 139 N~i Coomttod to NvdwExce~~
| |
| 4 Mlonitice-fo Steam Dryer Information"This bank partitioned into.-twaosections with flows in opposite directions (Z.Man Way'Cover pItted to NuclearExceRl' Representative
| |
| //>~ ~5 Iindustry Steam Dryer Informationi PRI and BWRVIP initiative to provide consistent steam dryer evaluation iethod:-BWRVIP-182 Guidance for Demonstrating Steam Dryer Integrity for Power Uprate (Submitted January 30, 2008)-BWRVIP-XXX Steam Dryer Integrity Demonstration Methodologies Report -bas~ed-. _--on Continuum Dynamics Incorporated (Cfl)technologies (planned submittal late 2008), .NM Committed t ..Nda 6
| |
|
| |
|
| Steam Dryer Evaluation Approach Consistent with:-BWRVIP-182 | | Agenda ntroductions |
| -Draft BWRVIP Methodologies Report-Recent EPU applicants | | )bjectives A.onticello Steam Dryer Information ndustry Steam Dryer Information Aonticello Steam Dryer Evaluation Approach lIosed Session Monticello Steam Dryer Evaluation Results |
| -RG 1.20, Revision 3 e 90-day startup reporting exception Committed to NulearExce Ir 7 ontiicell Io Steam Dryer Evaluation Approach Steam Dryer Analysis (BWRVI P-1 82)-Screening of susceptibility to acoustic excitation validated by scale model tests (SMTs)-Strain gage measurements of CLTP main steam line (MSL) acoustics-Acoustic circuit model (ACM) of steam dome-Load definition at CLTP-Finite Element Model (FEM) of dryer at CL7.Limit curves for EPU power ascension Committed Ito Nuclear Eacelle c 8 | | - Power Ascension Plan |
| )foitiieeNo Steam Dryer Evaluation Results Closed Session Commilled to 9 | | )ummary and Conclusion CoC-i-ted to a I, |
| Summary and Conclusions Open Session Comm fledtoý Nuer!eoi 10 | | 2 |
| .a Summary and Conclusions 9 Steam Dryer Structural Evaluation Approach-Consistent with EPRI/BWRVIP submittal-Incorporates industry experience | | |
| * Steam Dryer Structural Evaluation Results-Acceptable stress ratio-Highest stresses occur where expected* Power Ascension Plan with Dryer Limit Curves-Schedule-Steam dryer structural evaluation submitted wit Pqc AR, (first quarter 2008) 1/ \ eY NMC Commed tofNclear EXNvdaEo 11 Monticello Projects Time Line}} | | bjectrives |
| | 'resent results from Monticello steam I-ryer structural evaluation |
| | )btain NRC feedback |
| | )chedule Committed to Nuce 3 |
| | |
| | Montilce-io Steram Dryer Information Square hood design Steam dryer licensing basis accident is |
| | ,main steam line break outside of containment Steam dryer inspection per Boiling Water Reactor Vessel Internals Project. |
| | ý(BWRVIP) 139 N~i Coomttod toNvdwExce~~ |
| | 4 |
| | |
| | Mlonitice-fo Steam Dryer Information "This bank partitioned into. |
| | -twaosections with flows in opposite directions (Z. |
| | Man Way |
| | 'Cover pItted to NuclearExceRl' |
| | / |
| | Representative / 5 |
| | >~ ~ |
| | |
| | Iindustry Steam Dryer Informationi PRI and BWRVIP initiative to provide consistent steam dryer evaluation iethod: |
| | - BWRVIP-182 Guidance for Demonstrating Steam Dryer Integrity for Power Uprate (Submitted January 30, 2008) |
| | - BWRVIP-XXX Steam Dryer Integrity Demonstration Methodologies Report - bas~ed-. _ |
| | --on Continuum Dynamics Incorporated (Cfl) technologies (planned submittal late 2008), . |
| | NM..*o*ci:ý,*. |
| | Commit ed t Nda 6 |
| | |
| | )f*jticelilo Steam Dryer Evaluation Approach Consistent with: |
| | - BWRVIP-182 |
| | - Draft BWRVIP Methodologies Report |
| | - Recent EPU applicants |
| | - RG 1.20, Revision 3 e 90-day startup reporting exception Committed to NulearExce Ir 7 |
| | |
| | ontiicell Io Steam Dryer Evaluation Approach Steam Dryer Analysis (BWRVI P-1 82) |
| | - Screening of susceptibility to acoustic excitation validated by scale model tests (SMTs) |
| | - Strain gage measurements of CLTP main steam line (MSL) acoustics |
| | - Acoustic circuit model (ACM) of steam dome |
| | - Load definition at CLTP |
| | - Finite Element Model (FEM) of dryer at CL7 |
| | . Limit curves for EPU power ascension Committed Ito Nuclear Eacelle c 8 |
| | |
| | )foitiieeNo Steam Dryer Evaluation Results Closed Session Commilled to NucearExcelJe* |
| | 9 |
| | |
| | Summary and Conclusions Open Session Commfledtoý Nuer!eoi 10 |
| | |
| | . a Summary and Conclusions 9 Steam Dryer Structural Evaluation Approach |
| | - Consistent with EPRI/BWRVIP submittal |
| | - Incorporates industry experience |
| | * Steam Dryer Structural Evaluation Results |
| | - Acceptable stress ratio |
| | - Highest stresses occur where expected |
| | * Power Ascension Plan with Dryer Limit Curves |
| | -Schedule |
| | - Steam dryer structural evaluation submitted wit Pqc AR, (first quarter 2008) 1/ \ *:eY NMC Commed tofNclearEXNvdaEo 11 |
| | |
| | Monticello Projects Time Line}} |
Letter Sequence Meeting |
---|
TAC:MD5531, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
|
MONTHYEARML0713506492007-05-16016 May 2007 Notice of Meeting with Monticello to Discuss a Future Application for an Extended Power Uprate Amendment Project stage: Meeting ML0715806062007-06-0505 June 2007 Handout for Pre-application Meeting for Monticello Extended Power Uprate Project stage: Meeting ML0715806272007-06-19019 June 2007 Summary of June 5, 2007, Meeting with the Licensee to Discuss Pre-Application Issues Related to a Future Extended Power Uprate Amendment Application Project stage: Meeting ML0725602242007-09-14014 September 2007 Notice of Forthcoming Meeting with Monticello Nuclear Generating Plant Regarding Steam Dryers in Extended Power Uprate Conditions Project stage: Meeting ML0727705082007-10-0303 October 2007 10/3/07 Meeting Handout, Steam Dryer Evaluation Approach for Monticello Extended Power Uprate (Epu). Project stage: Meeting ML0727805992007-10-19019 October 2007 Summary of 10/3/07 Meeting Between NRC and Monticello Personnel a Future Extended Power Uprate Amendment Project stage: Meeting ML0800402012008-01-0707 January 2008 Notice of Meeting with Nuclear Management Company to Discuss Issues for a Future Extended Power Uprate Amendment at Monticello Nuclear Generating Plant Project stage: Meeting ML0804504802008-02-13013 February 2008 2/13/08 Meeting Handout Project stage: Meeting ML0804501682008-02-21021 February 2008 Summary of Meeting with Nuclear Management Company to Discuss Pre-Application Issues Related to a Future Extended Power Uprate Amendment Application Project stage: Meeting ML0810101932008-03-31031 March 2008 Monticello, License Amendment Request: Extended Power Uprate Project stage: Other ML0810101992008-03-31031 March 2008 Identification of Risk Implications Due to Extended Power Uprate at Monticello Project stage: Other ML0810101982008-03-31031 March 2008 Dryer Dynamic Stress Evaluation (Non-Proprietary Version of Enclosure 11) Project stage: Other ML0810101972008-03-31031 March 2008 Piping Flow Induced Vibration Monitoring Program Project stage: Other L-MT-08-018, Extended Power Uprate Startup Test Plan2008-03-31031 March 2008 Extended Power Uprate Startup Test Plan Project stage: Other ML0810101952008-03-31031 March 2008 NEDO-33322, Revision 1, Safety Analysis Report for Monticello Constant Pressure Power Uprate. Project stage: Other ML0810101942008-03-31031 March 2008 Monticello, MNGP Extended Power Uprate Environmental Assessment Project stage: Other 2007-06-05
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24135A2542024-05-15015 May 2024 Deis Public Meeting May 15, 2024 ML24127A2392024-05-0707 May 2024 Presentation Slides for Monticello 2023 End-of-Cycle Meeting ML24127A1982024-05-0707 May 2024 Deis Presentation Slides ML23192A7552023-07-14014 July 2023 July 14, 2023 Alternative Request to Defer Pvt of MO-2397 Pre-submittal Meeting Slides ML23157A0422023-06-0606 June 2023 2022 Monticello End-of-Cycle Meeting Presentation ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML22255A2162022-09-13013 September 2022 Subsequent License Renewal Application- Public Meeting September 13, 2022, Applicant Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22024A3722022-01-24024 January 2022 Pre-application Public Meeting Slides for Potential Relief Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant ML21274A2762021-10-0505 October 2021 Public Preapplication Meeting Presentation for Fuel Oil Storage Tank Amendment ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML20273A3102020-10-0202 October 2020 Xcel Energy Presentation for Forthcoming Public Meeting Related to Safety Limit Minimum Critical Power Ratio Amendment ML20055F8122020-02-27027 February 2020 Pre-Application Meeting - License Amendment Request - Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritsf Initiative 4b ML18039A0892018-02-0808 February 2018 Pre - Application Meeting Risk-Informed Exemption Request Regarding Exposed Structural Steel February 8, 2018 ML17293A4292017-10-23023 October 2017 Pre-Application Meeting October 23, 2017 ML17058A4842017-03-0202 March 2017 03/02/2017 Presentation Slides for the Exemption Request for Restoring Dry Shielded Canister (DSC) 11-15 Compliance to 10 CFR Part 72 Pre-Submittal Meeting ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML16333A3112016-11-17017 November 2016 Excel Energy Meeting Presentation 11/17/2016 ML16312A5072016-11-0909 November 2016 Xcel Energy Presentation - Pre-Application Public Meeting on 11/09/2016 Re: Plan for Restoring DCS Nos. 11 - 16 (Monticello Nuclear Generating Plant, Independent Spent Fuel Storage Installation) (Docket No. 72-58, CAC No. L25156) ML15092A4802015-03-26026 March 2015 Annual Assessment Meeting - Slides ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14108A4012014-03-31031 March 2014 Annual Assessment Meeting - Reactor Oversight Process 2013 Slides ML14108A4052014-03-31031 March 2014 EOC Meeting Licensee Slides ML13171A1522013-06-24024 June 2013 April 24, 2013, Summary of Public Meeting in City of Kewaunee to Make Post-Shutdown Decommissioning of Activities Report (PSDAR) Available for Public Comment ML13066A4462013-02-28028 February 2013 Xcel Energy Presentation Handout Supporting February 28, 2013, Pre-Application Meeting to Discuss Proposed Fuel Transition License Amendment Request ML12093A0982012-04-0202 April 2012 Slides Provided by Monticello Licensee for 4/3/12 Meeting Regarding Containment Accident Pressure Credit for EPU Operation ML12017A0482012-01-17017 January 2012 Handout for 1-17-12 Meeting Re. a Future Application for Amendment Concerning Fuel Storage Criticality Analysis ML0934908762009-12-15015 December 2009 Meeting Slides from December 15, 2009 - Mellla+ LAR ML0912505822009-05-0505 May 2009 Meeting Slides, Monticello, Preparation & Assessment for Hostile Action-based Drill. ML0835703272008-12-17017 December 2008 Meeting Slides, Independent Human Performance Focused Self-Assessment Results, Presented by (Northern States Power Company, Minnesota at Public Meeting ML0810604592008-04-14014 April 2008 Summary of Meeting with Nuclear Management Company, Regarding the Nrc'S 2007 End-of Cycle Assessment of the Monticello Nuclear Generating Plant Safety Performance ML0804504802008-02-13013 February 2008 2/13/08 Meeting Handout ML0800905242008-01-0909 January 2008 Meeting Handout, Nuclear Emergency Plan Submittal for Monticello & Prairie Island, Units 1 and 2 ML0727705082007-10-0303 October 2007 10/3/07 Meeting Handout, Steam Dryer Evaluation Approach for Monticello Extended Power Uprate (Epu). ML0715806062007-06-0505 June 2007 Handout for Pre-application Meeting for Monticello Extended Power Uprate ML0710204892007-04-0404 April 2007 Meeting Slides, Monticello Annual Assessment Meeting Reactor Oversight Process - Cy 2006. ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0609606112006-03-22022 March 2006 Open House Handout for Monticello Draft Supplemental EIS Public Meeting - Monticello Nuclear Genearting Plant ML0606703372006-03-0606 March 2006 NMC Presentation on Alternative Source Term - Full Scope ML0514404942005-05-19019 May 2005 Public Meeting Slides Monticello End-of-Cycle Plant Performance Assessment ML0513802172005-05-11011 May 2005 Presentation Slides Used at Meeting on May 11, 2005, Between the NRC and NMC to Discuss Monticello LRA ML0434900602004-11-30030 November 2004 NMC Slides for 11/30/04 Public Meeting ML0413803782004-05-0707 May 2004 NMC New Fuel Supplier Development Initiative ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2024-05-07
[Table view] |
Text
NMC Committed to NuclearExcellence Steam Dryer Evaluation Preliminary Results for Monticello Extended Power Uprate (EPU) K February 13, 2008 CacmmtedIo Nuc Ec k
Agenda ntroductions
)bjectives A.onticello Steam Dryer Information ndustry Steam Dryer Information Aonticello Steam Dryer Evaluation Approach lIosed Session Monticello Steam Dryer Evaluation Results
- Power Ascension Plan
)ummary and Conclusion CoC-i-ted to a I,
2
bjectrives
'resent results from Monticello steam I-ryer structural evaluation
)btain NRC feedback
)chedule Committed to Nuce 3
Montilce-io Steram Dryer Information Square hood design Steam dryer licensing basis accident is
,main steam line break outside of containment Steam dryer inspection per Boiling Water Reactor Vessel Internals Project.
ý(BWRVIP) 139 N~i Coomttod toNvdwExce~~
4
Mlonitice-fo Steam Dryer Information "This bank partitioned into.
-twaosections with flows in opposite directions (Z.
Man Way
'Cover pItted to NuclearExceRl'
/
Representative / 5
>~ ~
Iindustry Steam Dryer Informationi PRI and BWRVIP initiative to provide consistent steam dryer evaluation iethod:
- BWRVIP-182 Guidance for Demonstrating Steam Dryer Integrity for Power Uprate (Submitted January 30, 2008)
- BWRVIP-XXX Steam Dryer Integrity Demonstration Methodologies Report - bas~ed-. _
--on Continuum Dynamics Incorporated (Cfl) technologies (planned submittal late 2008), .
NM..*o*ci:ý,*.
Commit ed t Nda 6
)f*jticelilo Steam Dryer Evaluation Approach Consistent with:
- BWRVIP-182
- Draft BWRVIP Methodologies Report
- Recent EPU applicants
- RG 1.20, Revision 3 e 90-day startup reporting exception Committed to NulearExce Ir 7
ontiicell Io Steam Dryer Evaluation Approach Steam Dryer Analysis (BWRVI P-1 82)
- Screening of susceptibility to acoustic excitation validated by scale model tests (SMTs)
- Strain gage measurements of CLTP main steam line (MSL) acoustics
- Acoustic circuit model (ACM) of steam dome
- Load definition at CLTP
- Finite Element Model (FEM) of dryer at CL7
. Limit curves for EPU power ascension Committed Ito Nuclear Eacelle c 8
)foitiieeNo Steam Dryer Evaluation Results Closed Session Commilled to NucearExcelJe*
9
Summary and Conclusions Open Session Commfledtoý Nuer!eoi 10
. a Summary and Conclusions 9 Steam Dryer Structural Evaluation Approach
- Consistent with EPRI/BWRVIP submittal
- Incorporates industry experience
- Steam Dryer Structural Evaluation Results
- Acceptable stress ratio
- Highest stresses occur where expected
- Power Ascension Plan with Dryer Limit Curves
-Schedule
- Steam dryer structural evaluation submitted wit Pqc AR, (first quarter 2008) 1/ \ *:eY NMC Commed tofNclearEXNvdaEo 11
Monticello Projects Time Line