MONTHYEARML23192A7552023-07-14014 July 2023 July 14, 2023 Alternative Request to Defer Pvt of MO-2397 Pre-submittal Meeting Slides ML23157A0422023-06-0606 June 2023 2022 Monticello End-of-Cycle Meeting Presentation ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML22255A2162022-09-13013 September 2022 Subsequent License Renewal Application- Public Meeting September 13, 2022, Applicant Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22024A3722022-01-24024 January 2022 Pre-application Public Meeting Slides for Potential Relief Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant ML21274A2762021-10-0505 October 2021 Public Preapplication Meeting Presentation for Fuel Oil Storage Tank Amendment ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML20273A3102020-10-0202 October 2020 Xcel Energy Presentation for Forthcoming Public Meeting Related to Safety Limit Minimum Critical Power Ratio Amendment ML20055F8122020-02-27027 February 2020 Pre-Application Meeting - License Amendment Request - Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritsf Initiative 4b ML18039A0892018-02-0808 February 2018 Pre - Application Meeting Risk-Informed Exemption Request Regarding Exposed Structural Steel February 8, 2018 ML17293A4292017-10-23023 October 2017 Pre-Application Meeting October 23, 2017 ML17058A4842017-03-0202 March 2017 03/02/2017 Presentation Slides for the Exemption Request for Restoring Dry Shielded Canister (DSC) 11-15 Compliance to 10 CFR Part 72 Pre-Submittal Meeting ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML16333A3112016-11-17017 November 2016 Excel Energy Meeting Presentation 11/17/2016 ML16312A5072016-11-0909 November 2016 Xcel Energy Presentation - Pre-Application Public Meeting on 11/09/2016 Re: Plan for Restoring DCS Nos. 11 - 16 (Monticello Nuclear Generating Plant, Independent Spent Fuel Storage Installation) (Docket No. 72-58, CAC No. L25156) ML15092A4802015-03-26026 March 2015 Annual Assessment Meeting - Slides ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14108A4012014-03-31031 March 2014 Annual Assessment Meeting - Reactor Oversight Process 2013 Slides ML14108A4052014-03-31031 March 2014 EOC Meeting Licensee Slides ML13171A1522013-06-24024 June 2013 April 24, 2013, Summary of Public Meeting in City of Kewaunee to Make Post-Shutdown Decommissioning of Activities Report (PSDAR) Available for Public Comment ML13066A4462013-02-28028 February 2013 Xcel Energy Presentation Handout Supporting February 28, 2013, Pre-Application Meeting to Discuss Proposed Fuel Transition License Amendment Request ML12093A0982012-04-0202 April 2012 Slides Provided by Monticello Licensee for 4/3/12 Meeting Regarding Containment Accident Pressure Credit for EPU Operation ML12017A0482012-01-17017 January 2012 Handout for 1-17-12 Meeting Re. a Future Application for Amendment Concerning Fuel Storage Criticality Analysis ML0934908762009-12-15015 December 2009 Meeting Slides from December 15, 2009 - Mellla+ LAR ML0912505822009-05-0505 May 2009 Meeting Slides, Monticello, Preparation & Assessment for Hostile Action-based Drill. ML0835703272008-12-17017 December 2008 Meeting Slides, Independent Human Performance Focused Self-Assessment Results, Presented by (Northern States Power Company, Minnesota at Public Meeting ML0810604592008-04-14014 April 2008 Summary of Meeting with Nuclear Management Company, Regarding the Nrc'S 2007 End-of Cycle Assessment of the Monticello Nuclear Generating Plant Safety Performance ML0804504802008-02-13013 February 2008 2/13/08 Meeting Handout ML0800905242008-01-0909 January 2008 Meeting Handout, Nuclear Emergency Plan Submittal for Monticello & Prairie Island, Units 1 and 2 ML0727705082007-10-0303 October 2007 10/3/07 Meeting Handout, Steam Dryer Evaluation Approach for Monticello Extended Power Uprate (Epu). ML0715806062007-06-0505 June 2007 Handout for Pre-application Meeting for Monticello Extended Power Uprate ML0710204892007-04-0404 April 2007 Meeting Slides, Monticello Annual Assessment Meeting Reactor Oversight Process - Cy 2006. ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0609606112006-03-22022 March 2006 Open House Handout for Monticello Draft Supplemental EIS Public Meeting - Monticello Nuclear Genearting Plant ML0606703372006-03-0606 March 2006 NMC Presentation on Alternative Source Term - Full Scope ML0514404942005-05-19019 May 2005 Public Meeting Slides Monticello End-of-Cycle Plant Performance Assessment ML0513802172005-05-11011 May 2005 Presentation Slides Used at Meeting on May 11, 2005, Between the NRC and NMC to Discuss Monticello LRA ML0434900602004-11-30030 November 2004 NMC Slides for 11/30/04 Public Meeting ML0413803782004-05-0707 May 2004 NMC New Fuel Supplier Development Initiative ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2023-07-14
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23262B2272023-09-21021 September 2023 September 21, 2023, Pre-Submittal Meeting on License Amendment Request to Revise PTLR to Incorporate New Surveillance Capsule Data (EPID L-2023-LRM-0070) (Slides) ML23192A7552023-07-14014 July 2023 July 14, 2023 Alternative Request to Defer Pvt of MO-2397 Pre-submittal Meeting Slides ML23157A0422023-06-0606 June 2023 2022 Monticello End-of-Cycle Meeting Presentation ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML22255A2162022-09-13013 September 2022 Subsequent License Renewal Application- Public Meeting September 13, 2022, Applicant Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22067A0272022-03-16016 March 2022 Subsequent License Renewal Application Pre-Application Meeting March 16, 2022 ML22068A1222022-03-15015 March 2022 pre-application Public Meeting 3/15/22 Slides - Applicant ML22067A0672022-03-15015 March 2022 Pre-application Public Meeting 3/15/22 Slides-NRC ML22024A3722022-01-24024 January 2022 Pre-application Public Meeting Slides for Potential Relief Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant ML21274A2762021-10-0505 October 2021 Public Preapplication Meeting Presentation for Fuel Oil Storage Tank Amendment ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21082A4702021-03-25025 March 2021 Xcel Presentation for Monticello Pre-Application Public Meeting to Adopt Advanced Framatome Methods ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML20212L8622020-07-29029 July 2020 2019 Monticello and Prairie Island EOC Presentation from Webinar ML20055F8122020-02-27027 February 2020 Pre-Application Meeting - License Amendment Request - Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritsf Initiative 4b ML18039A0892018-02-0808 February 2018 Pre - Application Meeting Risk-Informed Exemption Request Regarding Exposed Structural Steel February 8, 2018 ML17346A0842017-12-12012 December 2017 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy Monticello Nuclear Generating Plant ML17293A4292017-10-23023 October 2017 Pre-Application Meeting October 23, 2017 ML17058A4842017-03-0202 March 2017 03/02/2017 Presentation Slides for the Exemption Request for Restoring Dry Shielded Canister (DSC) 11-15 Compliance to 10 CFR Part 72 Pre-Submittal Meeting ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML16312A5072016-11-0909 November 2016 Xcel Energy Presentation - Pre-Application Public Meeting on 11/09/2016 Re: Plan for Restoring DCS Nos. 11 - 16 (Monticello Nuclear Generating Plant, Independent Spent Fuel Storage Installation) (Docket No. 72-58, CAC No. L25156) ML16323A3292016-09-23023 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information ML15092A4802015-03-26026 March 2015 Annual Assessment Meeting - Slides ML15092A4822015-03-26026 March 2015 EOC Licensee Meeting Slides ML14323A9372014-11-19019 November 2014 Regcon, November 19-29, 2014: 02-Panel-3 Presentation Michael Baumann - Ope Experiences Monticello ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14108A4012014-03-31031 March 2014 Annual Assessment Meeting - Reactor Oversight Process 2013 Slides ML14108A4052014-03-31031 March 2014 EOC Meeting Licensee Slides ML13171A1522013-06-24024 June 2013 April 24, 2013, Summary of Public Meeting in City of Kewaunee to Make Post-Shutdown Decommissioning of Activities Report (PSDAR) Available for Public Comment ML13066A4462013-02-28028 February 2013 Xcel Energy Presentation Handout Supporting February 28, 2013, Pre-Application Meeting to Discuss Proposed Fuel Transition License Amendment Request ML12093A0982012-04-0202 April 2012 Slides Provided by Monticello Licensee for 4/3/12 Meeting Regarding Containment Accident Pressure Credit for EPU Operation ML12017A0482012-01-17017 January 2012 Handout for 1-17-12 Meeting Re. a Future Application for Amendment Concerning Fuel Storage Criticality Analysis ML0934908762009-12-15015 December 2009 Meeting Slides from December 15, 2009 - Mellla+ LAR ML0912505822009-05-0505 May 2009 Meeting Slides, Monticello, Preparation & Assessment for Hostile Action-based Drill. ML0835703302008-12-22022 December 2008 Licensee (Northern States Power Company, Minnesota) Slides Presented at Public Meeting: Human Performance Assessment and Improvement ML0835703272008-12-17017 December 2008 Meeting Slides, Independent Human Performance Focused Self-Assessment Results, Presented by (Northern States Power Company, Minnesota at Public Meeting ML0828903572008-10-15015 October 2008 Meeting Slides, Monticello Extended Power Uprate Resubmittal ML0810604592008-04-14014 April 2008 Summary of Meeting with Nuclear Management Company, Regarding the Nrc'S 2007 End-of Cycle Assessment of the Monticello Nuclear Generating Plant Safety Performance ML0800905242008-01-0909 January 2008 Meeting Handout, Nuclear Emergency Plan Submittal for Monticello & Prairie Island, Units 1 and 2 ML0710204892007-04-0404 April 2007 Meeting Slides, Monticello Annual Assessment Meeting Reactor Oversight Process - Cy 2006. ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0625401632006-09-0808 September 2006 Slides: Accelerated ISTS Conversion (Piilot) by P. Hearn, NRR ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0614302562006-05-17017 May 2006 Public Meeting NRC Presentation Slides Monticello Plant Performance Annual Assessment ML0609606272006-03-22022 March 2006 Presentation Slides for Draft SEIS Meeting, Monticello Nuclear Power Plant ML0606703372006-03-0606 March 2006 NMC Presentation on Alternative Source Term - Full Scope ML0520600372005-06-30030 June 2005 Presentation Slides for Scoping Meeting - Monticello Nuclear Generating Plant 2023-09-21
[Table view] |
Text
Nuclear Regulatory Commission Region III, Lisle, IL.
2022 End of Cycle Annual Assessment Webinar Monticello Nuclear Generating Plant
2022 Annual Assessment Webinar Monticello Nuclear Generating Plant For the Q&A Session:
Raise your hand under Reaction on the Teams app Press *5 to raise / lower hand if you are a dial-in caller Email your questions after the Webinar to the PAOs During the presentation, microphones will be muted, and cameras turned off.
NRC Regional Staff Hironori Peterson Roy Elliott Branch Chief Senior Project Engineer Division of Operating Reactor Safety, Division of Operating Reactor Safety, Branch 3 Branch 3 3
Agenda
- NRC Mission
- Reactor Oversight Process (ROP)
- 2022 Safety Performance Overview
- Control of Radiological Effluents
- Question-and-Answer Session 4
OUR MISSION To license and regulate the nations civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and Region III Office, Lisle, IL security and protect the environment.
5
How do we meet our Mission?
Regional Inspector Licensing Ashley Demeter at Monticello Oversight (Inspections)
Enforcement Incident Response Resident NRC Inspector Tom McGowan at Emergency Monticello Operations Center 6
So how did the site do?
Monticello 7
Monticello Resident Inspectors Chuck Norton Tom McGowan Senior Resident Inspector Resident Inspector 8
Reactor Oversight Process www.nrc.gov/reactors/operating/oversight.html 9
Action Matrix Columns Multiple/Repetitive Licensee Regulatory Degraded Unacceptable Degraded Response Response Performance Performance Cornerstone Increasing:
- Regulatory Action www.nrc.gov/reactors/operating/oversight.html 10
Monticello 2022 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- 2225 hours0.0258 days <br />0.618 hours <br />0.00368 weeks <br />8.466125e-4 months <br /> of direct inspection
- All Green Performance Indicators
- One Green Findings with Associated Non-cited Violations
- Failure to Maintain FLEX Equipment Consistent with the Requirements of 10 CFR 50.155(c)(2)
Control of Radiological Effluents 12
Overview
- Nuclear power plants need to discharge radioactive effluents in small amounts in order to operate and have been doing so safely since initial start-up
- Rules limit the amount that can be released to ensure they are a fraction of what is received from background sources
- Release information is publicly available and inspected by the NRC 13
Dose
- A measurement of the energy imparted by radiation
- Conventional units used are mrem (millirem)
- Can be thought of as the overall risk from radiation to a person
- Average dose an individual receives per year from natural sources of radiation (sun, soil, etc.) is about 300 mrem 14
Regulations
- Focus on limiting the dose to people living around the site
- Nuclear power plants must limit dose to the public to 25 mrem/year
- Plants are designed to operate well below 25 mrem/year
- Monticello typically runs with the maximum dose to a member of the public below 0.1 mrem/year 15
Land Use Census Public GPI Health Effluent Controls
& Safety REMP 16
Land Use Census
- How the public is exposed to radiation depends on how the land around the plant is used
- Plants annually perform a census to identify changes in how the land is used
- Looks for things such as large gardens, dairy cows, where residents are located, etc.
17
Land Use Census Public GPI Health Effluent Controls
& Safety REMP 18
Effluent Controls
- We are using effluent as a generic term to describe radioactive material released from the site in gaseous or liquid form
- Effluent controls ensure that what is being released is monitored and controlled to ensure dose limits are met 19
Effluent Controls
- Doses to the public are too small to measure directly
- Sites sample and analyze effluents from the plant piping or tanks they are being released from
- Information from the land use census used to model how an individual would be exposed to the effluent release
- Doses are calculated based on the model 20
Effluent Controls 21
Land Use Census Public GPI Health Effluent Controls
& Safety REMP 22
REMP Radiological Environmental Monitoring Program
- Measures radiation in the environment during the lifetime of the plant
- Determines if any measurable levels of radiation are from plant operation
- Determines if results are commensurate with the radioactive effluents 23
REMP 24
Land Use Census Public GPI Health Effluent Controls
& Safety REMP 25
GPI Groundwater Protection Initiative
- Provide timely detection and effective response to inadvertent on-site releases to groundwater in order to prevent migration off-site and to quantify impacts on decommissioning
- Improve communication with external stakeholders
- Perform program oversight to ensure effective implementation 26
GPI
- How does the groundwater move?
- Where is there potential for leaks?
- Monitoring wells established in strategic locations based on hydrology and risk ranking
- Pumping contaminated water out of the ground for appropriate handling
- Protocols established between site and State/Local governments 27
GPI 28
Recent Tritium Leak
- Site identified elevated tritium levels in one of the GPI monitoring wells during routine monthly sampling
- Site notified the State and NRC of the elevated levels
- Sampling frequencies of nearby monitoring wells increased
- Site started investigation to determine source of the leak 29
Recent Tritium Leak
- Site identified source of leak in pipe that runs between the reactor and turbine buildings, which have a small gap between them.
- Leak was captured and rerouted back into the plant
- Site started recovering contaminated groundwater
- Stored in tanks on-site and reused as plant make-up water
- Site started installing additional monitoring wells 30
Recent Tritium Leak
- Routine sampling of monitoring well indicated some of the leak was again making it to groundwater
- Site shut down the plant to replace the section of pipe
- Permanent repair was originally planned for the routine maintenance outage scheduled in April 2023 31
Recent Tritium Leak
- Site continues to monitor location of tritium
- Monitoring well sample frequency adjusted for each well based on current conditions
- Evaluation for additional monitoring wells continues
- Recovery of contaminated groundwater routinely adjusted for current conditions
- Sites actions are aimed at preventing uncontrolled migration of the tritium off-site 32
Recent Tritium Leak
- Risk from off-site release
- The amount of tritium leaked to the groundwater would not pose a health concern even if all of it reached the Mississippi River
- Dose to a member of the public would be well below 1 mrem
- Remember, 300 mrem/year from natural sources 33
Recent Tritium Leak
- Even though there is no health concern, it does not mean it is okay to do nothing
- NRC expects effluents to be released in a monitored and controlled fashion
- Site had to identify and stop the leak
- Recovery of contaminated groundwater to mitigate off-site release through groundwater is expected
- Extensive monitoring of the groundwater will ensure that any off-site release through the groundwater is appropriately accounted for
- NRC will verify appropriate control 34
Inspections
- The NRC has specialized inspectors perform periodic on-site inspections of the programs discussed today
- The NRC maintains at least two resident inspectors at each site to oversee the day-to-day operation of the site
- NRC will continue to follow the sites actions through the routine inspection program 35
Inspections
- Review implementation and results
- Observe routine effluent sampling and analysis
- Walkdown effluent systems and radiation monitoring equipment
- Review maintenance and calibration records
- Review quality assurance programs
- Review discharges
- Walkdown and observe GPI program elements
- Review monitoring well results and licensee evaluations of results
- Observe sampling activities
- Review laboratory results and licensee evaluation of results
- Review quality assurance programs 36
Annual Reports Nuclear power plants are required to submit annual reports summarizing effluent releases, on-site groundwater monitoring results, and REMP results.
These reports can be found at https://www.nrc.gov/reacto rs/operating/ops-experience/tritium/plant-info.html 37
For more information
- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html
- Reactor Oversight Process
- https://www.nrc.gov/reactors/operating/oversight.html
- Fact Sheets and Brochures
- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/
- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/
- https://www.nrc.gov/reading-rm/doc-collections/cfr/
38
NRC Social Media Channels Facebook: https://www.facebook.com/nrcgov/
Twitter: https://twitter.com/nrcgov YouTube: http://www.youtube.com/user/NRCgov Linkedin: https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/
Flickr: https://www.flickr.com/photos/nrcgov/
39
Meeting Feedback On Any Device or Computer:
Go to the Public Meeting Schedule at (www.nrc.gov/pmns/mtg?do=recent30days)
Locate this meeting using the sorting buttons and click on the Meeting Feedback Form Link.
Note: Meetings are sorted by date and time. Use last to get to the most recently completed meeting.
40
Region III Public Affairs Officers Viktoria Mitlyng Prema Chandrathil Office: 630-829-9662 Office: 630-829-9663 Cell: 630-201-1345 Cell: 630-515-6145 Viktoria.mitlyng@nrc.gov Prema.chandrathil@nrc.gov 41
QUESTIONS?
To ask a question either:
Raise your hand under Reaction on the Teams app Press *5 to raise / lower hand if you are a dial-in caller.
Email your questions after the Webinar to the PAOs.
viktoria.mitlyng@nrc.gov prema.chandrathil@nrc.gov 42
This Concludes the 2022 End of Cycle Annual Assessment Webinar Presentation for Monticello Nuclear Generating Plant Thank You & Goodnight