Monticello Nuclear Generating Plant Annual Assessment Meeting 2023 Reactor Oversight Process Nuclear Regulatory Commission - Region III

Agenda Introduction Reactor Oversight Process Industry Performance Monticello Performance Results Northern States Power Response and Remarks NRC Closing Remarks Public Questions to NRC

Meetings Purpose Public forum for discussion of Monticellos performance in 2023 NRC will address the performance identified in the annual assessment Northern States Power will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance

Security Safety Environment What We Do

Materials Reactors Waste What We Regulate

Radon Military X-Rays What We Dont Regulate

Defense In-Depth Regulation Compliance Continuous Training Assurance of Plant Safety Long-Term Maintenance

How We Regulate

Regulatory Framework

Significance Threshold Increasing Safety Significance Green White Yellow Red Performance Indicators Inspection Findings Green White Yellow Red Increasing Safety Significance

Action Matrix Columns Increasing:

Safety Significance Inspection Management Involvement Regulatory Action Licensee

Response

Regulatory

Response

Degraded Performance Multiple/Repetitive Degraded Cornerstone Unacceptable Performance

Industry-Wide Performance 0

10 20 30 40 50 60 70 80 90 88 6

0 0

0 As of 02/14/2024 0

Industry-Wide Inspection Findings Finding data current as of 02/14/2024 0

50 100 150 200 250 300 350 400 450 447 5

9 0

0 Calendar Year 2023 data

Industry-Wide Performance Indicators 0

1000 2000 3000 4000 5000 6000 7000 Green White Yellow Red 6240 0

0 0

Calendar Year 2023 data

NRC Annual Assessment Summary Northern States Power operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

Monticello was in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2023.

No cross-cutting issues Monticello

NRC Inspection Activities 2559 hours0.0296 days <br />0.711 hours <br />0.00423 weeks <br />9.736995e-4 months <br /> of inspection and related activities*

2 resident inspectors on site - residents make four quarterly inspections per year and walk through the plant every day regional inspections (Inservice Inspection, Radiological Protection, Security) major team inspections Functional Engineering - Commercial Grade Dedication Inspection Emergency Preparedness Exercise 1 refueling inspection and 2 forced outage inspections

  • see presentation notes Monticello for 2023

Summary of Effluent Releases and Environmental monitoring NRC observed the licensees March 2023 shutdown to repair the pipe associated with the tritium leak The NRC continues to track the licensees monitoring and remediation activities The NRC requires all plants to monitor, track, and report all planned and unplanned releases. These reports are due annually to the NRC no later than May 15th and are publicly available NRC has baseline inspection procedures to inspect radioactive effluents and environmental monitoring

Northern States Power Response and Remarks

NRC Social Media Channels NRC:

Facebook:

Twitter:

YouTube:

Flickr:

LinkedIn:

GovDelivery:

https://service.govdelivery.com/accounts/USNRC/subscriber/new 19

Contacting the NRC Report an emergency

  • (301) 816-5100 (call collect)

Report a safety concern

  • (800) 695-7403
  • Allegation@nrc.gov General information or questions
  • www.nrc.gov Contact Monticello Resident Inspectors
  • (630)-829-9592

Feedback/Comments/

General Questions Public Meeting Feedback Form:

1.

Navigate to https://feedback.nrc.gov/pmfs/

2.

Enter meeting code number: 20240590

End of Presentation Nuclear Regulatory Commission Region III Lisle, IL May 7, 2024