ML16159A075: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16159A075 | | number = ML16159A075 | ||
| issue date = 06/07/2016 | | issue date = 06/07/2016 | ||
| title = Acceptance of Requested Licensing Action Relief Request CAC No.S MF7700 Reactor Pressure Vessel Head Leakoff Line Testing | | title = NRR E-mail Capture - Callaway, Unit 1, Acceptance of Requested Licensing Action Relief Request CAC No.S MF7700 Reactor Pressure Vessel Head Leakoff Line Testing | ||
| author name = Klos | | author name = Klos J | ||
| author affiliation = NRC/NRR/DORL/LPLIV-1 | | author affiliation = NRC/NRR/DORL/LPLIV-1 | ||
| addressee name = Elwood T | | addressee name = Elwood T | ||
| addressee affiliation = AmerenUE | | addressee affiliation = AmerenUE | ||
| docket = 05000483 | | docket = 05000483 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:NRR-PMDAPEm Resource From: Klos, John Sent: Tuesday, June 07, 2016 9:20 AM To: 'Telwood@ameren.com' Cc: Klos, John | ||
==Subject:== | ==Subject:== | ||
Callaway, Unit 1, Acceptance of | Callaway, Unit 1, Acceptance of Requested Licensing Action Relief request CAC No.s MF7700 Reactor Pressure Vessel Head leakoff line testing Mr. Elwood, By letter dated May 11 2016, Agency-wide Documents and Access Management System (ADAMS) Accession No. ML16132A330, Union Electric Company, Ameren Missouri submitted a relief request for the Callaway Plant, Unit 1. The proposed relief request would address a certain Inservice Inspection regarding the pressure at which leakage testing of the reactor pressure vessel flange leakoff line must be tested. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to all the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | |||
The NRC staff has reviewed your application and concluded that it does provide technical information in | |||
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the | |||
NRC | |||
If you have any questions, please contact me. | If you have any questions, please contact me. | ||
John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating | John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O8E7 NRC/NRR/DORL/LPL4-1, MS O8H4A Washington, DC 20555-0001 301.415.5136, 301.415.2102 (fax) | ||
John.Klos@NRC.gov 1 | |||
Hearing Identifier: NRR_PMDA Email Number: 2889 Mail Envelope Properties (5f74b55f1a6a4194bfdea03eb47c1e15) | |||
Hearing Identifier: | |||
==Subject:== | ==Subject:== | ||
Callaway, Unit 1, Acceptance of Requested Licensing Action Relief request CAC No.s MF7700 Reactor Pressure Vessel Head leakoff line testing | Callaway, Unit 1, Acceptance of Requested Licensing Action Relief request CAC No.s MF7700 Reactor Pressure Vessel Head leakoff line testing Sent Date: 6/7/2016 9:20:02 AM Received Date: 6/7/2016 9:20:03 AM From: Klos, John Created By: John.Klos@nrc.gov Recipients: | ||
"'Telwood@ameren.com'" <Telwood@ameren.com> | "Klos, John" <John.Klos@nrc.gov> | ||
Tracking Status: None | |||
"'Telwood@ameren.com'" <Telwood@ameren.com> | |||
Tracking Status: None Post Office: HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 2148 6/7/2016 9:20:03 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received: | |||
NRR-PMDAPEm Resource From: Klos, John Sent: Tuesday, June 07, 2016 9:20 AM To: 'Telwood@ameren.com' Cc: Klos, John | |||
==Subject:== | ==Subject:== | ||
Callaway, Unit 1, Acceptance of | Callaway, Unit 1, Acceptance of Requested Licensing Action Relief request CAC No.s MF7700 Reactor Pressure Vessel Head leakoff line testing Mr. Elwood, By letter dated May 11 2016, Agency-wide Documents and Access Management System (ADAMS) Accession No. ML16132A330, Union Electric Company, Ameren Missouri submitted a relief request for the Callaway Plant, Unit 1. The proposed relief request would address a certain Inservice Inspection regarding the pressure at which leakage testing of the reactor pressure vessel flange leakoff line must be tested. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to all the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | |||
The NRC staff has reviewed your application and concluded that it does provide technical information in | |||
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the | |||
NRC | |||
If you have any questions, please contact me. | If you have any questions, please contact me. | ||
John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating | John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O8E7 NRC/NRR/DORL/LPL4-1, MS O8H4A Washington, DC 20555-0001 301.415.5136, 301.415.2102 (fax) | ||
John.Klos@NRC.gov 1 | |||
301.415.5136, 301.415.2102 (fax) | |||
John.Klos@NRC.gov | |||
Hearing Identifier: | Hearing Identifier: NRR_PMDA Email Number: 2889 Mail Envelope Properties (5f74b55f1a6a4194bfdea03eb47c1e15) | ||
==Subject:== | ==Subject:== | ||
Callaway, Unit 1, Acceptance of Requested Licensing Action Relief request CAC No.s MF7700 Reactor Pressure Vessel Head leakoff line testing | Callaway, Unit 1, Acceptance of Requested Licensing Action Relief request CAC No.s MF7700 Reactor Pressure Vessel Head leakoff line testing Sent Date: 6/7/2016 9:20:02 AM Received Date: 6/7/2016 9:20:03 AM From: Klos, John Created By: John.Klos@nrc.gov Recipients: | ||
"'Telwood@ameren.com'" <Telwood@ameren.com> | "Klos, John" <John.Klos@nrc.gov> | ||
Tracking Status: None | |||
Post Office: | "'Telwood@ameren.com'" <Telwood@ameren.com> | ||
Tracking Status: None Post Office: HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 2148 6/7/2016 9:20:03 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Options | Recipients Received:}} |
Latest revision as of 15:11, 4 December 2019
ML16159A075 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 06/07/2016 |
From: | John Klos Plant Licensing Branch IV |
To: | Elwood T AmerenUE |
References | |
MF7700 | |
Download: ML16159A075 (2) | |
Text
NRR-PMDAPEm Resource From: Klos, John Sent: Tuesday, June 07, 2016 9:20 AM To: 'Telwood@ameren.com' Cc: Klos, John
Subject:
Callaway, Unit 1, Acceptance of Requested Licensing Action Relief request CAC No.s MF7700 Reactor Pressure Vessel Head leakoff line testing Mr. Elwood, By letter dated May 11 2016, Agency-wide Documents and Access Management System (ADAMS) Accession No. ML16132A330, Union Electric Company, Ameren Missouri submitted a relief request for the Callaway Plant, Unit 1. The proposed relief request would address a certain Inservice Inspection regarding the pressure at which leakage testing of the reactor pressure vessel flange leakoff line must be tested. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to all the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O8E7 NRC/NRR/DORL/LPL4-1, MS O8H4A Washington, DC 20555-0001 301.415.5136, 301.415.2102 (fax)
John.Klos@NRC.gov 1
Hearing Identifier: NRR_PMDA Email Number: 2889 Mail Envelope Properties (5f74b55f1a6a4194bfdea03eb47c1e15)
Subject:
Callaway, Unit 1, Acceptance of Requested Licensing Action Relief request CAC No.s MF7700 Reactor Pressure Vessel Head leakoff line testing Sent Date: 6/7/2016 9:20:02 AM Received Date: 6/7/2016 9:20:03 AM From: Klos, John Created By: John.Klos@nrc.gov Recipients:
"Klos, John" <John.Klos@nrc.gov>
Tracking Status: None
"'Telwood@ameren.com'" <Telwood@ameren.com>
Tracking Status: None Post Office: HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 2148 6/7/2016 9:20:03 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
NRR-PMDAPEm Resource From: Klos, John Sent: Tuesday, June 07, 2016 9:20 AM To: 'Telwood@ameren.com' Cc: Klos, John
Subject:
Callaway, Unit 1, Acceptance of Requested Licensing Action Relief request CAC No.s MF7700 Reactor Pressure Vessel Head leakoff line testing Mr. Elwood, By letter dated May 11 2016, Agency-wide Documents and Access Management System (ADAMS) Accession No. ML16132A330, Union Electric Company, Ameren Missouri submitted a relief request for the Callaway Plant, Unit 1. The proposed relief request would address a certain Inservice Inspection regarding the pressure at which leakage testing of the reactor pressure vessel flange leakoff line must be tested. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to all the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O8E7 NRC/NRR/DORL/LPL4-1, MS O8H4A Washington, DC 20555-0001 301.415.5136, 301.415.2102 (fax)
John.Klos@NRC.gov 1
Hearing Identifier: NRR_PMDA Email Number: 2889 Mail Envelope Properties (5f74b55f1a6a4194bfdea03eb47c1e15)
Subject:
Callaway, Unit 1, Acceptance of Requested Licensing Action Relief request CAC No.s MF7700 Reactor Pressure Vessel Head leakoff line testing Sent Date: 6/7/2016 9:20:02 AM Received Date: 6/7/2016 9:20:03 AM From: Klos, John Created By: John.Klos@nrc.gov Recipients:
"Klos, John" <John.Klos@nrc.gov>
Tracking Status: None
"'Telwood@ameren.com'" <Telwood@ameren.com>
Tracking Status: None Post Office: HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 2148 6/7/2016 9:20:03 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: