ML17125A135: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 05/05/2017 | | issue date = 05/05/2017 | ||
| title = Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations | | title = Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations | ||
| author name = Bono S | | author name = Bono S | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| addressee name = | | addressee name = | ||
Line 14: | Line 14: | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:Te nn essee | {{#Wiki_filter:Te nn essee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 May 5, 2017 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPRD-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 | ||
Commission | |||
Washington, D.C. 20555-0001 | ==Subject:== | ||
Browns Ferry Nuclear Plant, Units 1 , 2 , and 3 Renewed Facility Operating | Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations | ||
License Nos. DPR-33 , DPRD-52 , and DPR-68 NRC Docket Nos. 50-259 , 50-260 , and 50-296 | |||
Issue Summary 2017-03, Preparation | ==Reference:== | ||
and Scheduling | Nuclear Regulatory Commission , Regulatory Issue Summary 2017-03, "Preparation and Scheduling of Operator Licensing Examinations," dated April 5, 2017 The Nuclear Regulatory Commission (NRC) Regulatory Issues Summary (RIS) 2017-03 (Reference) requested specific information regarding the Browns Ferry Nuclear Plant (BFN) projected operator licensing examination schedules and the estimated number of applicants. The enclosure provides the estimated exam schedule through 2022. | ||
of Operator Licensing | There are no new regulatory commitments associated with this submittal. Should you have any questions concerning this response , please contact Christopher L. Vaughn at (256) 729-3439. | ||
Reference: Nuclear Regulatory | US Nuclear Regulatory Commission Page 2 May 5, 2017 | ||
Commission , Regulatory | |||
Issue Summary 2017-03 , " Preparation | ==Enclosure:== | ||
and Scheduling | Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations cc (w/ Enclosure): | ||
of Operator Licensing | NRC Regional Administrator - Region II | ||
Examinations | |||
," dated April 5 , 2017 The Nuclear Regulatory | ENCLOSURE Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1, 2, and 3 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations See Enclosed | ||
Commission (NRC) Regulatory | |||
Issues Summary (RIS) 2017-03 (Reference) | NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150-0131 EXPIRES : 10/31/2017 (05-2016) | ||
requested | ~¥' | ||
specific information | Estimated burden per response to comply with this voluntary infonmation collection request: 1 hour. This infonmation collection is used to plan budgets and resources for operator examinations. Send | ||
regarding | ~ ,. ' ~ OPERATOR LICENSING comments regarding burden estimate to the FOIA. Privacy, and Information Collections Branch (T-5 | ||
the Browns Ferry Nuclear Plant (BFN) projected | ';; ., F53). U.S. Nuclear Regulatory Commission, Washington , DC20555-0001 , or by e-mail to | ||
operator licensing | ~ ~ EXAMINATION DATA | ||
examination | ....... lnfocollects.Resource@nrc.gov, and to the Desk Officer. Office of Information and Regulatory Affairs, | ||
schedules | ~""11 .~l' NEOB-10202, (3150-0131), Office of Management and Budget. Washington, DC 20503. If a means used to impose an infonmation collection does not display a currently valid OMB control number. the NRC may not conduct or sponsor. and a person is not required to respond to, the information collection. | ||
and the estimated | FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2018 CY 2019 CY2020 PROPOSED NUMBER | ||
number of applicants. | - - - CY 2021 ESTI MATED NUMBER OF LICENSEE-PREPARED I I I l EXAM INATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2018 CY 2019 CY2020 CY 2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 9 6 8 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4 10 4 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 0 4 4 NUMBER OF SENIOR REACTOR OPERA TORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 07/ 16/2018 07/22/2019 05/ l l/2020 05/ 10/2021 ALTERNATE DA TE SCHEDULED 08/ 11 /2019 06/06/2020 06/ 14/2021 | ||
The enclosure | : c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2018 CY 2019 NUMBER MARCH MARCH SEPTEMBER SEPTEMBER ESTIMATED NUMBER OF 16 12 CANDIDATES NRC FORM 536 (05-2016) | ||
provides the estimated | |||
exam schedule through 2022. There are no new regulatory | NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-01 31 EXPIRES : 10/31 /20 17 (05-2016) | ||
commitments | ~"1' "Eoul Estimated burden per response to comply with this voluntary information collection request: 1 hour. This | ||
associated | ~<> ...> information collection is used to plan budgets and resources for operator examinations. Send flJ~ ,~ ~- o~ | ||
with this submittal. | <!!! "0 OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 | ||
Should you have any questions | ';; *'*' J: F53). U.S. Nuclear Regulatory Commission. Washington , DC20555*0001 , or by e-mail to | ||
concerning | ~ | ||
this response , please contact Christopher | EXAMINATION DATA | ||
L. Vaughn at (256) 729-3439. | ~ | ||
US Nuclear Regulatory | ~.is-,., | ||
Commission | ...... " ~o~ | ||
Page 2 May 5 , 2017 Enclosure: | lnfocollects.Resource@nrc.gov, and to the Desk Officer. Office of Information and Regulatory Affairs, NEOB-10202 , (3150-0131). Office of Management and Budget. Washington , DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | ||
Response to NRC Regulatory | FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2022 CY CY CY PROPOSED NUMBER ESTI MATED NUMBER OF LICEN SEE-PREPARED 1 EXAM INATI ONS ESTI MATED NUMBER OF NRG-PREPARED 0 EXAM INATI ONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2022 CY CY CY PROPOSED NUMBER NUM BE R OF REACTOR OPERATORS 8 NUMB ER OF SENIOR REACTOR OPE RATORS* INSTANT 4 | ||
Issue Summary 2017-03 , Preparation | NUMBER OF SENIOR REACTOR OPE RATORS-U PGRADE 4 | ||
and Scheduling | NUM BE R OF SENIOR REACTOR OPERATORS* LI MITED 0 PROPOSED DATES PRIMARY DATE 0510912022 ALTE RNATE DATE 06/06/2022 | ||
of Operator Licensing | : c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 20 PROPOSED NUMBER MARCH CY SEPTEMB ER MARCH CY | ||
Examinations | - 21 SEPTEMBER ESTIMATED NUMBER OF 12 12 CAND IDATES NRC FORM 536 (05*2016)}} | ||
cc (w/ Enclosure) | |||
-Region II | |||
ENCLOSURE | |||
Tennessee | |||
Valley Authority | |||
Browns Ferry Nuclear Plant Units 1, 2, and 3 Response to NRC Regulatory | |||
Issue Summary 2017-03, Preparation | |||
and Scheduling | |||
of Operator Licensing | |||
Examinations | |||
See Enclosed | |||
NRC FORM 536 U.S. NUCLEAR REGULATORY | |||
COMMISSION | |||
APPROVED BY OMB: NO. 3150-0131 | |||
EXPIRES: 10/31/2017 (05-2016) | |||
infonmation | |||
collection | |||
request: 1 hour. This | |||
infonmation | |||
collection | |||
is used to plan budgets and resources | |||
burden estimate to the FOIA. | |||
Collections | |||
Branch (T-5 ';; ., | |||
Affairs , | |||
and Budget. Washington , | |||
collection | |||
does not | |||
valid | |||
collection. | |||
FACILITY NRC REGION A. PROPOSED EXAMINATION | |||
PREPARATION | |||
SCHEDULE | |||
I I I l | |||
0 0 0 0 | |||
B. INITIAL OPERATOR LICENSE EXAMINATIONS | |||
NUMBER OF SENIOR REACTOR 0 0 0 0 | |||
08/11/2019 06/06/2020 06/14/2021 c. PROPOSED GENERIC FUNDAMENTALS | |||
EXAMINATION (GFE) SCHEDULE PROPOSED CY 2018 CY 2019 NUMBER MARCH SEPTEMBER | |||
ESTIMATED | |||
NUMBER OF 16 12 CANDIDATES | |||
NRC FORM | |||
COMMISSION | |||
APPROVED BY OMB: NO. | |||
Estimated | |||
burden per response to comply with this voluntary | |||
information | |||
collection | |||
request: 1 hour. This ... > information | |||
collection | |||
is used to plan budgets and resources | |||
for operator examinations. | |||
Send | |||
!!! " comments regarding | |||
burden estimate to the FOIA , Privacy , and Information | |||
Collections | |||
Branch (T-5 | |||
Commission. Washington , DC20555*0001 , or by e-mail to | |||
.Resource@nrc | |||
.gov , and to the Desk Officer. Office of Information | |||
and Regulatory | |||
Affairs , | |||
and Budget. Washington , | |||
collection | |||
does not display a currently | |||
valid OMB control number , the | |||
collection. | |||
PREPARATION | |||
SCHEDULE | |||
EXAMINATION (GFE) SCHEDULE PROPOSED | |||
}} |
Latest revision as of 18:29, 4 February 2020
ML17125A135 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 05/05/2017 |
From: | Bono S Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RIS-17-003 | |
Download: ML17125A135 (5) | |
Text
Te nn essee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 May 5, 2017 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPRD-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations
Reference:
Nuclear Regulatory Commission , Regulatory Issue Summary 2017-03, "Preparation and Scheduling of Operator Licensing Examinations," dated April 5, 2017 The Nuclear Regulatory Commission (NRC) Regulatory Issues Summary (RIS) 2017-03 (Reference) requested specific information regarding the Browns Ferry Nuclear Plant (BFN) projected operator licensing examination schedules and the estimated number of applicants. The enclosure provides the estimated exam schedule through 2022.
There are no new regulatory commitments associated with this submittal. Should you have any questions concerning this response , please contact Christopher L. Vaughn at (256) 729-3439.
US Nuclear Regulatory Commission Page 2 May 5, 2017
Enclosure:
Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations cc (w/ Enclosure):
NRC Regional Administrator - Region II
ENCLOSURE Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1, 2, and 3 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations See Enclosed
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150-0131 EXPIRES : 10/31/2017 (05-2016)
~¥'
Estimated burden per response to comply with this voluntary infonmation collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infonmation collection is used to plan budgets and resources for operator examinations. Send
~ ,. ' ~ OPERATOR LICENSING comments regarding burden estimate to the FOIA. Privacy, and Information Collections Branch (T-5
';; ., F53). U.S. Nuclear Regulatory Commission, Washington , DC20555-0001 , or by e-mail to
~ ~ EXAMINATION DATA
....... lnfocollects.Resource@nrc.gov, and to the Desk Officer. Office of Information and Regulatory Affairs,
~""11 .~l' NEOB-10202, (3150-0131), Office of Management and Budget. Washington, DC 20503. If a means used to impose an infonmation collection does not display a currently valid OMB control number. the NRC may not conduct or sponsor. and a person is not required to respond to, the information collection.
FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2018 CY 2019 CY2020 PROPOSED NUMBER
- - - CY 2021 ESTI MATED NUMBER OF LICENSEE-PREPARED I I I l EXAM INATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2018 CY 2019 CY2020 CY 2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 9 6 8 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4 10 4 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 0 4 4 NUMBER OF SENIOR REACTOR OPERA TORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 07/ 16/2018 07/22/2019 05/ l l/2020 05/ 10/2021 ALTERNATE DA TE SCHEDULED 08/ 11 /2019 06/06/2020 06/ 14/2021
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2018 CY 2019 NUMBER MARCH MARCH SEPTEMBER SEPTEMBER ESTIMATED NUMBER OF 16 12 CANDIDATES NRC FORM 536 (05-2016)
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-01 31 EXPIRES : 10/31 /20 17 (05-2016)
~"1' "Eoul Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
~<> ...> information collection is used to plan budgets and resources for operator examinations. Send flJ~ ,~ ~- o~
<!!! "0 OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5
';; *'*' J: F53). U.S. Nuclear Regulatory Commission. Washington , DC20555*0001 , or by e-mail to
~
EXAMINATION DATA
~
~.is-,.,
...... " ~o~
lnfocollects.Resource@nrc.gov, and to the Desk Officer. Office of Information and Regulatory Affairs, NEOB-10202 , (3150-0131). Office of Management and Budget. Washington , DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2022 CY CY CY PROPOSED NUMBER ESTI MATED NUMBER OF LICEN SEE-PREPARED 1 EXAM INATI ONS ESTI MATED NUMBER OF NRG-PREPARED 0 EXAM INATI ONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2022 CY CY CY PROPOSED NUMBER NUM BE R OF REACTOR OPERATORS 8 NUMB ER OF SENIOR REACTOR OPE RATORS* INSTANT 4
NUMBER OF SENIOR REACTOR OPE RATORS-U PGRADE 4
NUM BE R OF SENIOR REACTOR OPERATORS* LI MITED 0 PROPOSED DATES PRIMARY DATE 0510912022 ALTE RNATE DATE 06/06/2022
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 20 PROPOSED NUMBER MARCH CY SEPTEMB ER MARCH CY
- 21 SEPTEMBER ESTIMATED NUMBER OF 12 12 CAND IDATES NRC FORM 536 (05*2016)