| title = 2016 Monticello Nuclear Generating Plant Initial License Examination Proposed Admin JPMs - RO and SRO
| title = 2016 Monticello Nuclear Generating Plant Initial License Examination Proposed Admin JPMs - RO and SRO
| author name = Reeser D W
| author name = Reeser D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:QF1075-01 Rev. 5 (FP
{{#Wiki_filter:QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JOB PERFORMANCE MEASURE (JPM)
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   BULK D/W TEMPERATURE MANUAL CALCULATION JPM NUMBER:                   JPM-001                           REV.       5 RELATED PRA                   None INFORMATION:
BULK D/W TEMPERATURE MANUAL CALCULATION JPM NUMBER:
TASK NUMBERS /               CR304.103 TASK TITLE(S):               Perform Actions Associated with Primary Containment Control K/A NUMBERS:                 2.2.15         2.1.45               Rating: SRO/RO:     4.3/3.9-4.3 APPLICABLE METHOD OF TESTING:
JPM-001 REV. 5   RELATED PRA INFORMATION:
Discussion:                 Simulate/walkthrough:               Perform:
None  TASK NUMBERS / TASK TITLE(S): CR304.103 Perform Actions Associated with Primary Containment Control K/A NUMBERS: 2.2.15 2.1.45 Rating: SRO/RO:
EVALUATION LOCATION:             In-Plant:                             Control Room:
4.3/3.9-4.3 APPLICABLE METHOD OF TESTING:
Simulator:                             Other:
Discussion:
Lab:
Simulate/walkthrough:
Time for Completion:         10       Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Perform:   EVALUATION LOCATION:
Developed by:
In-Plant:   Control Room:
Developer                                   Date Validated by:
Simulator:
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Other:           Lab:       Time for Completion:
Approved by:
10 Minutes Time Critical:
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
No     Alternate Path:
 
No     TASK APPLICABILITY:
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                         Page 2 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
SRO:   RO:   NLO   Additional site
-specific signatures may be added as desired.
Developed by:             Developer Date   Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
-T-SAT-75) Page 2 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                            Page 3 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 INITIAL CONDITIONS:
* A Steam Line rupture occurred in the Drywell
* SPDS is OOS and TR-23-115 Point 25 has failed
* Given the following temperatures from TR-23-115 on Panel C-21:
INITIATING CUES (IF APPLICABLE):
* The CRS directs you to manually calculate and report bulk average Drywell temperature using the operator aid below.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF10 75-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 4 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 JPM PERFORMANCE INFORMATION Required Materials:         Calculator General  
-T-SAT-75) Page 3 of 9  JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. INITIAL CONDITIONS:
A Steam Line rupture occurred in the Drywell SPDS is OOS and TR-23-115 Point 25 has failed Given the following temperatures from TR-23-115 on Panel C
-21:    INITIATING CUES (IF APPLICABLE):
The CRS directs you to manually calculate and report bulk average Drywell temperature using the operator aid below.
QF10 75-01 Rev. 5 (FP
-T-SAT-75)  Page 4 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
Calculator General  


==References:==
==References:==
Operator Aid for Bulk Drywell Temperature Manual Calculation Task Standards:              Determine Bulk Drywell Temperature via manual calculation Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1            Apply Weight Factor to the temperatures from previous step to determine Critical: Y                    Weight Temperatures.
* East 932 Point 22 X .400
* South 951 Point 23 X .423
* West 970 Point 21 X .093
* North 994 Point 24 X .084 Standard:                      Apply Weight Factor to the temperatures as follows:
* East 932 Point 22 X .400 = (221.3°F x .4 = 88.52)
* South 951 Point 23 X .423 = (236.9°F x .423 = 100.21)
* West 970 Point 21 X .093 = (224.2°F x .093 = 20.85)
* North 994 Point 24 X .084 = (242.6°F x .084 = 20.38)
Evaluator Note:                These temperatures are approximate for Mode 1.
Performance:                  SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Operator Aid for Bulk Drywell Temperature Manual Calculation Task Standards:
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 5 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 Performance Step: 4           Add weight temperatures to determine Bulk Average Drywell Temperature.
Determine Bulk Drywell Temperature via manual calculation Start Time:
Critical: Y Standard:                     Adds weighted temperatures for a calculated temperature of (88.52+100.21+20.85+20.38) = 229.96 + 2°F Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Performance Step: 5             Reports bulk average Drywell temperature calculated above to CRS.
IMPORTANT:
Critical: N Standard:                       Reports bulk average Drywell temperature calculated above to CRS.
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP
Evaluator Cue:                 When informed of calculated average drywell bulk temperature, acknowledge the report and state that the JPM is complete.
-T-SAT-73 (Licensed Operator Requalification Program Examinations
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
). Performance Step:
Terminating Cues:         When informed of calculated average drywell bulk temperature, acknowledge the report and state that the JPM is complete Stop Time:
1 Critical:  Y Apply Weight Factor to the temperatures from previous step to determine Weight Temperatures.
East 932' Point 22 X .400 South 951' Point 23 X .423 West 970' Point 21 X .093 North 994' Point 24 X .084 Standard: Apply Weight Factor to the temperatures as follows:
East 932' Point 22 X .400 = (221.3°F x .4 = 88.52)  South 951' Point 23 X .423 = (236.9°F x .423 = 100.21)  West 970' Point 21 X .093 = (224.2°F x .093 = 20.85)  North 994' Point 24 X .084 = (242.6°F x .084 = 20.38)  Evaluator Note:
These temperatures are approximate for Mode 1.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF10 75-01 Rev. 5 (FP
-T-SAT-75) Page 5 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
4 Critical:  Y Add weight temperatures to determine Bulk Average Drywell Temperature.
Standard: Adds weighted temperatures for a calculated temperature of (88.52+100.21+20.85+20.38) = 229.96 + 2 F   Performance:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
5 Critical:  N Reports bulk average Drywell temperature calculated above to CRS.
Standard: Reports bulk average Drywell temperature calculated above to CRS.
Evaluator Cue:
When informed of calculated average drywell bulk temperature, acknowledge the report and state that the JPM is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:         Terminating Cues:
When informed of calculated average drywell bulk temperature, acknowledge the report and state that the JPM is complete Stop Time:
Historical Record:
Historical Record:
Operator aid can be used in the control room, however, Point 25 now exists which provides the calculated Drywell temperature without SPDS. JPM updated to include picture s of temperature recorder and operator aid which will allow performance in the classroom.
Operator aid can be used in the control room, however, Point 25 now exists which provides the calculated Drywell temperature without SPDS. JPM updated to include pictures of temperature recorder and operator aid which will allow performance in the classroom.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF10 75-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 6 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 Simulator Setup (as required):
-T-SAT-75) Page 6 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
: 1. This JPM can be run from the following Standard (Specific) IC sets:
-G-RM-01. Simulator Setup (as required)
* IC-* (IC-*), (IC Conditions Summary)
: 1. This JPM can be run from the following Standard (Specific) IC sets:
IC-* (IC-*), (IC Conditions Summary)
SIMULATOR INPUT  
SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==


Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger QF10 75-01 Rev. 5 (FP
Manual                                                                                   Severity    Event Trigger     Type     Code                 Description                   Delay     Ramp Or Value   Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 7 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 7 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
REVIEW STATEMENTS                                                                   YES NO       N/A
: 1. Are all items on the cover page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?   4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 10. Have the performance steps been identified and typed (Critical /
-Licensed Operators
Sequence / Time Critical) appropriately?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Validation Personnel /Date                  Validation Personnel/Date
 
__________________________        __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                            Page 8 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 ATTACHMENT 2 JPM Number: JPM-001 JPM
Validation Personnel /Date                  Validation Personnel/Date
 
__________________________        __________________________
==Title:==
Validation Personnel /Date                  Validation Personnel/Date
Bulk D/W Temperature Manual Calculation Examinee & ID:                                                    Evaluator:
__________________________        __________________________
Job
Validation Personnel /Date                  Validation Personnel/Date
 
==Title:==
Date:
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                      Page 9 of 9 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
* A Steam Line rupture occurred in the Drywell
* SPDS is OOS and TR-23-115 Point 25 has failed
* Given the following temperatures from TR-23-115 on Panel C-21:
INITIATING CUES (IF APPLICABLE):
* The CRS directs you to manually calculate and report bulk average Drywell temperature using the operator aid below.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF10 75-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Page 8 of 9  JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JOB PERFORMANCE MEASURE (JPM)
-G-RM-01. ATTACHMENT 2 JPM Number:
SITE:                        MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   INDEPENDENT VERIFICATION OF RHR JPM NUMBER:                   JPM-4 AWI-04.04.02-005            REV.        0 RELATED PRA                  None INFORMATION:
JPM-001  JPM Title:
TASK NUMBERS /                CR203.104 TASK TITLE(S):                Shutdown RHR - Torus Cooling Mode K/A NUMBERS:                  Generic        2.2.15                Rating: SRO/RO:      4.3/4.3.9 APPLICABLE METHOD OF TESTING:
Bulk D/W Temperature Manual Calculation Examinee & ID:       Evaluator:
Discussion:                Simulate/walkthrough:              Perform:
Job Title:
EVALUATION LOCATION:              In-Plant:                              Control Room:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
Simulator:                             Other:
SAT: UNSAT:         COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
Lab:
EVALUATOR'S SIGNATURE:
Time for Completion:         10       Minutes                  Time Critical:    No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
Developed by:
.
Developer                                  Date Validated by:
QF1075-01 Rev. 5 (FP
Validator                                  Date (See JPM Validation Checklist, Attachment 1)
-T-SAT-75)  Page 9 of 9  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Approved by:
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
Training Supervisor                              Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
A Steam Line rupture occurred in the Drywell SPDS is OOS and TR-23-115 Point 25 has failed Given the following temperatures from TR-23-115 on Panel C
-21:    INITIATING CUES (IF APPLICABLE):
The CRS directs you to manually calculate and report bulk average Drywell temperature using the operator aid below.  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                         Page 2 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification of RHR) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)    SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
INDEPENDENT VERIFICATION OF RHR  JPM NUMBER:
JPM-4 AWI-04.04.02-00 5 REV. 0  RELATED PRA INFORMATION:
None  TASK NUMBERS / TASK TITLE(S):  CR20 3.10 4 Shutdown RHR
- Torus Cooling Mode K/A NUMBERS:
Generic 2.2.15 Rating: SRO/RO:
4.3/4.3.9  APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:    EVALUATION LOCATION:
In-Plant:  Control Room:
Simulator:
Other:          Lab:      Time for Completion:
1 0 Minutes Time Critical:
No      Alternate Path:
No    TASK APPLICABILITY:
SRO:    RO:  NLO    Additional site
-specific signatures may be added as desired.
Developed by:              Developer Date    Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
-T-SAT-75)  Page 2 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification of RHR) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 172: Line 147:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The BOP operator is performing a shutdown of Torus Cooling on RHR Loop A IAW B.03.04
* The BOP operator is performing a shutdown of Torus Cooling on RHR Loop A IAW B.03.04-05 (RHR System).
-05 (RHR System).
* You are an extra operator on shift.
You are an extra operator on shift
INITIATING CUES:
. INITIATING CUES:
* The CRS directs you to perform an independent verification of the shutdown lineup IAW B.03.04-05.F.3 (Torus Cooling Mode - Shutdown) Step 5.
The CRS directs you to perform an independent verification of the shutdown lineup IAW B.03.04-05.F.3 (Torus Cooling Mode  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
- Shutdown) Step 5.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 3 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:           Full Scope simulator General  
-T-SAT-75) Page 3 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
Full Scope simulator General  


==References:==
==References:==
B.03.04-05 (RHR System)
Task Standards:              Independently Verify Torus Cooling Shutdown lineup Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance              Procedure Step 5.a Step: 1                  Independently VERIFY the following valve positions:
Critical: N
: a. MO-2008 CLOSED.
Standard:                Operator observes MO-2008 is closed.
Evaluator Cue:            None Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 2        Procedure Step 5.b Critical: N                Independently VERIFY the following valve positions:
: b. MO-2006 CLOSED.
Standard:                  Operator observes MO-2006 is closed.
Evaluator Cue:              None Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


B.03.04-05 (RHR System)
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                     Page 4 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 Performance               Procedure Step 5.c Step: 3                  Independently VERIFY the following valve positions:
Task Standards:
Critical: Y
Independently Verify Torus Cooling Shutdown lineup Start Time:
: c. CV-1994 CLOSED Standard:                 Operator observes MO-1994 is OPEN and reports out of position valve Evaluator Cue:           Acknowledge the out of position valve and state that you will initiate an investigation. Tell examinee to continue with IV.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Performance:             SATISFACTORY           UNSATISFACTORY Comments:
IMPORTANT:
Performance               Procedure Step 5.d Step: 4                  Independently VERIFY the following valve positions:
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations
Critical: N
). Performance Step:  1 Critical:  N Procedure Step 5.a Independently VERIFY the following valve positions:
: d. CV-1996 CLOSED.
: a. MO-2008 CLOSED
Standard:                 Operator observes CV-1996 is CLOSED Evaluator Cue:           None Performance:             SATISFACTORY           UNSATISFACTORY Comments:
. Standard: Operator observes MO-2008 is closed.
Performance               Procedure Step 5.e Step: 5                  Independently VERIFY the following valve positions:
Evaluator Cue: None  Performance:
Critical: Y
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
: e. MO-2002 is OPEN.
2 Critical: N Procedure Step 5.b Independently VERIFY the following valve positions
Standard:                 Operator observes MO-2002 is in an intermediate position.
:  b. MO-20 06 CLOSED. Standard: Operator observes MO-2006 is closed.
Open valve when directed Evaluator Cue:           Acknowledge the out of position valve and state the following:
Evaluator Cue:
* An investigation is complete
None  Performance:
* The BOP recalled repositioning the switch too soon
SATISFACTORY UNSATISFACTORY Comments:
* They are to fully OPEN the valve.
QF1075-01 Rev. 5 (FP
Performance:             SATISFACTORY           UNSATISFACTORY Comments:
-T-SAT-75) Page 4 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Performance Step:  3 Critical:
 
Y Procedure Step 5.c Independently VERIFY the following valve positions
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 5 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 Terminating Cues:         When operator repositions MO2002, state that the JPM is complete.
: c. CV-1994 CLOSED   Standard: Operator observes MO-1994 is OPEN and reports out of position valve Evaluator Cue:
Stop Time:
Acknowledge the out of position valve and state that you will initiate an investigation. Tell examinee to continue with IV
. Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:  4 Critical:  N Procedure Step 5.d Independently VERIFY the following valve positions
: d. CV-1996 CLOSED
. Standard: Operator observes CV-1996 is CLOSED Evaluator Cue:
None   Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:  5 Critical:
Y Procedure Step 5.e Independently VERIFY the following valve positions
: e. MO-2002 is OPEN
. Standard: Operator observes MO-2002 is in an intermediate position
. Open valve when directed Evaluator Cue:
Acknowledge the out of position valve and state the following:
An investigation is complete The BOP recalled repositioning the switch too soon They are to fully OPEN the valve.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
-T-SAT-75) Page 5 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Terminating Cues:
When operator repositions MO2002, state that the JPM is complete. Stop Time:
Historical Record:
Historical Record:
New create for the 201 6 ILT NRC Exam.  
New create for the 2016 ILT NRC Exam.
 
Simulator Setup (as required):
Simulator Setup (as required)
SIMULATOR SETUP:
SIMULATOR SETUP:
* Initialize to any Mode 1 IC where RHR Loop A is in standby
Initialize to any Mode 1 IC where RHR Loop A is in standby Fail CV-1994 in the OPEN position Position MO
* Fail CV-1994 in the OPEN position
-2002 to an intermediate position and place control switch to STOP.
* Position MO-2002 to an intermediate position and place control switch to STOP.
SIMULATOR INPUT  
SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==


Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger QF1075-01 Rev. 5 (FP
Manual                                                                                 Severity    Event Trigger     Type     Code                 Description                   Delay   Ramp Or Value   Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 6 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 6 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
REVIEW STATEMENTS                                                                   YES NO       N/A
: 1. Are all items on the cover page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?   4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 10. Have the performance steps been identified and typed (Critical /
-Licensed Operators   10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Validation Personnel /Date                  Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 7 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 ATTACHMENT 2 JPM Number: JPM-4 AWI-04.04.02-005 JPM
-T-SAT-75) Page 7 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. ATTACHMENT 2 JPM Number:
==Title:==
JPM-4 AWI-04.04.02-00 5  JPM Title:
Independent Verification of RHR Examinee & ID:                                                   Evaluator:
Independent Verification of RHR Examinee & ID:       Evaluator:
Job
Job Title:
 
Date:       Start Time Finish Time PERFORMANCE RESULTS:
==Title:==
SAT: UNSAT:
Date:
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP
 
-T-SAT-75)  Page 8 of 8  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                      Page 8 of 8 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
* The BOP operator is performing a shutdown of Torus Cooling on RHR Loop A IAW B.03.04-05 (RHR System).
The BOP operator is performing a shutdown of Torus Cooling on RHR Loop A IAW B.03.04
* You are an extra operator on shift.
-05 (RHR System).
You are an extra operator on shift.
INITIATING CUES:
INITIATING CUES:
The CRS directs you to perform an independent verification of the shutdown lineup IAW B.03.04-05.F.3 (Torus Cooling Mode  
* The CRS directs you to perform an independent verification of the shutdown lineup IAW B.03.04-05.F.3 (Torus Cooling Mode - Shutdown) Step 5.
- Shutdown) Step 5.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JOB PERFORMANCE MEASURE (JPM)
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   ELECTRICAL SAFETY REQUIREMENTS FOR RACKING A 4160 KV BREAKER JPM NUMBER:                   JPM-FP-MA-ES-01-001               REV.       0 RELATED PRA                   None INFORMATION:
ELECTRICAL SAFETY REQUIREMENTS FOR RACKING A 4160 K V BREAKER   JPM NUMBER:
TASK NUMBERS /               NL262.104 TASK TITLE(S):               Rack Out a 4 KV Circuit Breaker K/A NUMBERS:                 2.1.26                               Rating: SRO/RO:     3.6/3.4 APPLICABLE METHOD OF TESTING:
JPM-FP-MA-ES-01-001 REV. 0   RELATED PRA INFORMATION:
Discussion:                 Simulate/walkthrough:               Perform:
None  TASK NUMBERS / TASK TITLE(S):
EVALUATION LOCATION:             In-Plant:                             Control Room:
NL262.104 Rack Out a 4 KV Circuit Breaker K/A NUMBERS:
Simulator:                             Other:
2.1.26 Rating: SRO/RO:
Lab:
3.6/3.4 APPLICABLE METHOD OF TESTING:
Time for Completion:         20       Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Discussion:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
Other:           Lab:       Time for Completion:
20 Minutes Time Critical:
No     Alternate Path:
No     TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                   Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 2 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker)
 
Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                       Page 2 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 318: Line 266:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Plant is operating at 100%.
* The Plant is operating at 100%.
1 1 Core Spray pump has been removed from service for testing of breaker 152
* 11 Core Spray pump has been removed from service for testing of breaker 152-505.
-505. Breaker 152
* Breaker 152-505 is to be Racked OUT to the TEST position INITIATING CUES:
-505 is to be Racked OUT to the TEST position INITIATING CUES:
* IAW B.09.06-05.G.1 (Racking Out 4 kV Breakers) and FP-MA-ES-01 (Electrical Safety):
IAW B.09.06-05.G.1 (Racking Out 4 kV Breakers) and F P-MA-ES-01 (Electrical Safety):
* Identify and Locate the required POSTINGS for racking out a 4 kV breaker
Identify and Locate the required POSTINGS for racking out a 4 kV breaker Identify and Locate the required PERSONAL PROTECTIVE EQUIPMENT (PPE) for racking out a 4 kV breaker Discuss the process/procedures for verifying that the PPE is acceptable for use.
* Identify and Locate the required PERSONAL PROTECTIVE EQUIPMENT (PPE) for racking out a 4 kV breaker
EVALUATOR NOTE:
* Discuss the process/procedures for verifying that the PPE is acceptable for use.
This ADMIN JPM should be performed outside the Lower 4KV Room in the plant to allow the examinee to locate and identify the appropriate PPE.
EVALUATOR NOTE: This ADMIN JPM should be performed outside the Lower 4KV Room in the plant to allow the examinee to locate and identify the appropriate PPE.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 3 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev.
-T-SAT-75) Page 3 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
0 JPM PERFORMANCE INFORMATION Required Materials:         Copies of the following:
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
B.09.06-05.G.1 (Racking Out A 4 kV Breaker)
Copies of the following:
FP-MA-ES-01 (Electrical Safety)
B.09.06-05.G.1 (Racking Out A 4 kV Breaker) FP-MA-ES-01 (Electrical Safety)
General  
General  


==References:==
==References:==
 
B.09.06-05 (4.16 KV Station Auxiliary - System Operation)
B.09.06-05 (4.16 KV Station Auxiliary  
- System Operation)
FP-MA-ES-01 (Electrical Safety)
FP-MA-ES-01 (Electrical Safety)
Task Standards:
Task Standards:             Examinee identifies proper electrical safety practices for racking out a 4.16 KV breaker.
Examinee identifies proper electrical safety practices for racking out a 4.16 KV breaker. Start Time:
Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT:
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations
Performance Step: 1             Reviews procedures B.09.06-05 (4.16 KV Station Auxiliary - System Critical: N                    Operation), section G.1 PART A and FP-MA-ES-01 (Electrical Safety).
). Performance Step:
Standard:                       Operator reviews procedures.
1 Critical:  N Review s procedure s B.09.06-05 (4.16 KV Station Auxiliary  
Evaluator Cue:                 Provide a copy of section G.1 of procedure B.09.06-05 and a copy of the fleet electrical safety manual FP-MA-ES-01.
- System Operation), section G.1 PART A and FP-MA-ES-01 (Electrical Safety).
Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
Standard:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Operator reviews procedure
: s. Evaluator Cue:
Provide a copy of section G.1 of procedure B.09.06-05 and a copy of the fleet electrical safety manual FP-MA-ES-01. Performance:
SATISFACTORY UNSATISFACTORY Comments:  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 4 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Performance Step: 2           B.09.06-05.G.1 (Racking Out A 4 kV Breaker) Procedure Prerequisite Critical: Y Switching in Progress warning sign posted outside affected 4 kV room.
-T-SAT-75) Page 4 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Standard:                     Identifies that a Switching in Progress warning sign must be posted on the 4 kV Room Door Evaluator Cue:                 None Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
-G-RM-01. Performance Step: 2 Critical:
Performance Step: 3           B.09.06-05.G.1 (Racking Out A 4 kV Breaker) Procedure step 5.
Y B.09.06-05.G.1 (Racking Out A 4 kV Breaker)
Critical: Y Identifies protective clothing IAW procedure FP-MA-ES-01 (Electrical Safety).
Procedure Prerequisite "Switching in Progress" warning sign posted outside affected 4 kV room.
Standard:                     ATTACHMENT 8
Standard: Identifies that a "Switching in Progress" warning sign must be posted on the 4 kV Room Door Evaluator Cue:
* Class 1 rubber gloves at a minimum (CRITICAL)
None   Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: 3 Critical:
Y B.09.06-05.G.1 (Racking Out A 4 kV Breaker)
Procedure step  
: 5. Identifies protective clothing IAW procedure FP-MA-ES-01 (Electrical Safety).
Standard: ATTACHMENT 8 Class 1 rubber gloves at a minimum (CRITICAL)
ATTACHMENT 4 (SWITCHGEAR 750V to 36 kV)
ATTACHMENT 4 (SWITCHGEAR 750V to 36 kV)
Determines racking breakers is Hazard/Risk Category 4(NOT CRITICAL)
* Determines racking breakers is Hazard/Risk Category 4(NOT CRITICAL)
ATTACHMENT 3 (ARC PROTECTIVE APPAREL)
ATTACHMENT 3 (ARC PROTECTIVE APPAREL)
Identifies the following minimum protective equipment:
* Identifies the following minimum protective equipment: (CRITICAL) o Short sleeve shirt natural fiber (Normal Apparel) o Long pants natural fiber (Normal Apparel) o Category 4 flash suit with pants o Hard hat (part of flash hood) o Safety glasses with side shields o Hearing protection (plugs in ear canal) o Category 4 flash hood o Arc/Voltage rated gloves o Leather Gloves Evaluator Cue:                 None.
(CRITICAL) o Short sleeve shirt natural fiber (Normal Apparel) o Long pants natural fiber (Normal Apparel) o Category 4 flash suit with pants o Hard hat (part of flash hood
Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
) o Safety glasses with side shields o Hearing protection (plugs in ear canal) o Category 4 flash hood o Arc/Voltage rated gloves o Leather Gloves Evaluator Cue:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
None. Performance:
 
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 5 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Performance Step: 4           FP-MA-ES-01 (Electrical Safety)
QF1075-01 Rev. 5 (FP
Critical: N Discusses inspection/testing of PPE specified in FP-MA-ES-01 (Electrical Safety).
-T-SAT-75) Page 5 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Standard:
-G-RM-01. Performance Step: 4 Critical:
* Discusses the minimum inspection/testing for each of the following:
N FP-MA-ES-01 (Electrical Safety)
o Category 4 flash suit with pants (visual inspection - no holes/tears; uncontaminated by oil, grease, flammable, or combustible liquids) o Safety glasses with side shields (non-metallic) o Category 4 flash hood (visual inspection - no holes/tears; uncontaminated by oil, grease, flammable, or combustible liquids; face shield unobstructed by scratches or other damage) o Arc/Voltage rated gloves (visual inspection - general condition and voltage test date; air-test) o Leather Gloves visual inspection - no holes/tears; uncontaminated by oil, grease, flammable, or combustible liquids)
Discusses inspection/testing of PPE specified in FP-MA-ES-01 (Electrical Safety). Standard: Discusses the minimum inspection/testing for each of the following:
Evaluator Cue:                 None.
o Category 4 flash suit with pants (visual inspection  
Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
- no holes/tears; uncontaminated by oil, grease, flammable, or combustible liquids
Terminating Cues:         Terminate the JPM when the examinee has identified the apparel they would don.
) o Safety glasses with side shields (non
Stop Time:
-metallic) o Category 4 flash hood (visual inspection  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
- no holes/tears; uncontaminated by oil, grease, flammable, or combustible liquids
; face shield unobstructed by scratches or other damage) o Arc/Voltage rated gloves (visual inspection - general condition and voltage test date; air-test) o Leather Gloves visual inspection  
- no holes/tears; uncontaminated by oil, grease, flammable, or combustible liquids
Evaluator Cue:
None. Performance:
SATISFACTORY UNSATISFACTORY Comments:       Terminating Cues:
Terminate the JPM when the examinee has identified the apparel they would don.
Stop Time:  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 6 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Historical Record:
-T-SAT-75) Page 6 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
* New Electrical Safety RO Admin JPM for the 2016 ILT NRC Exam Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Historical Record:
New Electrical Safety RO Admin JPM for the 2016 ILT NRC Exam


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 7 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Simulator Setup (as required):
-T-SAT-75) Page 7 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
: 1. This JPM can be run from the following Standard (Specific) IC sets:
-G-RM-01. Simulator Setup (as required)
* IC-* (IC-*), (IC Conditions Summary)
: 1. This JPM can be run from the following Standard (Specific) IC sets: IC-* (IC-*), (IC Conditions Summary)
SIMULATOR INPUT  
SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==


Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger QF1075-01 Rev. 5 (FP
Manual                                                                                   Severity    Event Trigger     Type     Code                 Description                   Delay     Ramp Or Value   Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 8 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 8 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
REVIEW STATEMENTS                                                                   YES NO       N/A
: 1. Are all items on the cover page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?   4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 10. Have the performance steps been identified and typed (Critical /
-Licensed Operators   10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Validation Personnel /Date                  Validation Personnel/Date
 
__________________________        __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                           Page 9 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 ATTACHMENT 2 JPM Number: JPM-FP-MA-ES-01-001 JPM
Validation Personnel /Date                  Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date QF1075-01 Rev. 5 (FP
-T-SAT-75)  Page 9 of 10  JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. ATTACHMENT 2 JPM Number:
JPM-FP-MA-ES-01-001  JPM Title:
Electrical Safety Requirements for Racking A 4160 KV Breaker Examinee & ID:      Evaluator:
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
.
QF1075-01 Rev. 5 (FP
-T-SAT-75) Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
The Plant is operating at 100%. 11 Core Spray pump has been removed from service for testing of breaker 152
-505. Breaker 152
-505 is to be Racked OUT to the TEST position INITIATING CUES:
IAW B.09.06
-05.G.1 (Racking Out 4 kV Breakers) and FP
-MA-ES-01 (Electrical Safety):
Identify and Locate the required POSTINGS for racking out a 4 kV breaker Identify and Locate the required PERSONAL PROTECTIVE EQUIPMENT (PPE) for racking out a 4 kV breaker Discuss the process/procedures for verifying that the PPE is acceptable for use.


QF1075-01 Rev. 5 (FP
==Title:==
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Electrical Safety Requirements for Racking A 4160 KV Breaker Examinee & ID:                                                    Evaluator:
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
Job
EXPECTED DOSE DETERMINATION TO INSPECT EQUIPMENT JPM NUMBER:
 
JPM-4 AWI-08.04.01-006 REV. 4   RELATED PRA INFORMATION:
==Title:==
None  TASK NUMBERS / TASK TITLE(S): CR299.189 Adhere to the Radiation Protection Plan as required by Monticello Tech Specs and 10CFR20 (4AWI
Date:
-08.04.01).
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
NL299.128 Describe Radiological Work Control process K/A NUMBERS:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
Generic 2.3.4 Rating: SRO/RO:
EVALUATORS SIGNATURE:
3.7/3.2 APPLICABLE METHOD OF TESTING:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Discussion:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Simulate/walkthrough:
 
Perform:   EVALUATION LOCATION:
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 10 of 10 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
In-Plant:   Control Room:
* The Plant is operating at 100%.
Simulator:
* 11 Core Spray pump has been removed from service for testing of breaker 152-505.
Other:           Lab:       Time for Completion:
* Breaker 152-505 is to be Racked OUT to the TEST position INITIATING CUES:
10 Minutes Time Critical:
* IAW B.09.06-05.G.1 (Racking Out 4 kV Breakers) and FP-MA-ES-01 (Electrical Safety):
No     Alternate Path:
* Identify and Locate the required POSTINGS for racking out a 4 kV breaker
No     TASK APPLICABILITY:
* Identify and Locate the required PERSONAL PROTECTIVE EQUIPMENT (PPE) for racking out a 4 kV breaker
SRO:   RO:   NLO   Additional site
* Discuss the process/procedures for verifying that the PPE is acceptable for use.
-specific signatures may be added as desired.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF1075-01 Rev. 5 (FP-T-SAT-75)
JOB PERFORMANCE MEASURE (JPM)
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   EXPECTED DOSE DETERMINATION TO INSPECT EQUIPMENT JPM NUMBER:                   JPM-4 AWI-08.04.01-006           REV.       4 RELATED PRA                   None INFORMATION:
TASK NUMBERS /               CR299.189 TASK TITLE(S):               Adhere to the Radiation Protection Plan as required by Monticello Tech Specs and 10CFR20 (4AWI-08.04.01).
NL299.128 Describe Radiological Work Control process K/A NUMBERS:                 Generic         2.3.4                 Rating: SRO/RO:     3.7/3.2 APPLICABLE METHOD OF TESTING:
Discussion:                 Simulate/walkthrough:               Perform:
EVALUATION LOCATION:             In-Plant:                             Control Room:
Simulator:                             Other:
Lab:
Time for Completion:         10       Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                   Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 2 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                         Page 2 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 483: Line 396:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Radiation Protection has informed the Control Room that a Hot Area Inspection is required for a possible steam leak exists in the Steam Chase.
* Radiation Protection has informed the Control Room that a Hot Area Inspection is required for a possible steam leak exists in the Steam Chase.
The CRS has chosen you to perform this inspection.
* The CRS has chosen you to perform this inspection.
The inspection is projected to take 30 minutes
* The inspection is projected to take 30 minutes.
. Your current annual exposure is 1800 mrem.
* Your current annual exposure is 1800 mrem.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Determine what your expected dose will be for the inspection.
* Determine what your expected dose will be for the inspection.
Determine what your annual exposure will be after completing the inspection.
* Determine what your annual exposure will be after completing the inspection.
Determine if any additional permission would be needed to make the inspection.
* Determine if any additional permission would be needed to make the inspection.
EVALUATOR NOTE: The Survey Map for the Steam Chase is provided on the last page of this JPM. Do NOT provide this to the examinee until after Performance Step 1 of the JPM is complete.
EVALUATOR NOTE: The Survey Map for the Steam Chase is provided on the last page of this JPM. Do NOT provide this to the examinee until after Performance Step 1 of the JPM is complete.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 3 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 JPM PERFORMANCE INFORMATION Required Materials:         - 935 Survey Map of the Steam Chase
-T-SAT-75) Page 3 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
* Provided on turnover sheet General  
-G-RM-01. JPM PERFORMANCE INFORMATIO N  Required Materials:
  - 935' Survey Map of the Steam Chase Provided on turnover sheet General  


==References:==
==References:==
4 AWI-08.04.01 Task Standards:            Calculate Expected Dose to Inspect Equipment Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1        Reviews the survey map for the Steam Chase area.
Critical: N Standard:                  Tells evaluator where survey maps are located Evaluator Cue:              Ask Examinee where Survey Maps are located and then provide examinee with the Steam Chase Survey Map on the last page of this JPM.
Evaluator Note:            Survey maps and are located on the basement level of the administration building in the same area where personnel obtain their Electronic Dosimeters.
Other locations are available, but this is the main location.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 2          Determines general area dose rates in the Steam Chase.
Critical: N Standard:                    General area dose rates are determined to be 500 - 2000 mrem/hr.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


4 AWI-08.04.01 Task Standards:
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                   Page 4 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 Performance Step: 3         Calculate expected dose for the inspection.
Calculate Expected Dose to Inspect Equipment Start Time:
Critical: Y Standard:
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
* Determines minimum total dose for the inspection is:
IMPORTANT:
o 500 mrem/hr x 0.5 hr = 250 mrem.
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP
* Determines maximum total dose for the inspection is:
-T-SAT-73 (Licensed Operator Requalification Program Examinations
o 2000 mrem/nr x 0.5 hr = 1000 mrem.
). Performance Step:
Evaluate Cue:               None Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
1 Critical:  N Reviews the survey map for the Steam Chase area.
Performance Step: 4         Calculate the total annual exposure after completion of the inspection.
Standard: Tells evaluator where survey maps are located Evaluator Cue:
Critical: Y Standard:                       1. Determines total minimum annual exposure after the inspection:
Ask Examinee where Survey Maps are located and then provide examinee with the Steam Chase Survey Map on the last page of this JPM.
1800 mrem + 250 mrem = 2050 mrem
Evaluator Note:
: 2. Determines total maximum annual exposure after the inspection:
Survey maps and are located on the basement level of the administration building in the same area where personnel obtain their Electronic Dosimeters
1800 mrem + 1000 mrem = 2800 mrem Evaluate Cue:               None Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
. Other locations are available, but this is the main location.
Performance Step: 5         Determines that the total annual exposure after completion of the inspection Critical: N                  is greater than the administrative dose limit.
Performance:
Standard:                   Determines that the total annual exposure after completion of the inspection is greater than the administrative dose limit of 2000 mrem as stated in 4-AWI-08.04.01 (up to 40% of 10 CFR 20 limit without First Line Supervisor approval).
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
2 Critical:  N Determines general area dose rates in the Steam Chase. Standard: General area dose rates are determined to be 500
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
- 2000 mrem/hr.
 
Performance:
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 5 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 Performance Step: 6         Determines that a dose extension is needed and notifies the CRS that their Critical: Y                  permission will be required to exceed the 2000 mrem limit.
SATISFACTORY UNSATISFACTORY Comments:
Standard:                   1.     Determines that a dose extension is needed.
QF1075-01 Rev. 5 (FP
: 2.     Contacts the CRS to get permission to exceed 2000 mrem.
-T-SAT-75) Page 4 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Evaluator Cue:               State as the CRS that you will complete the necessary paperwork and the he can perform the needed inspection.
-G-RM-01. Performance Step:
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
3 Critical:  Y Calculate expected dose for the inspection.
Performance Step: 7       INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED Critical: N Standard:                 Operator informs evaluator that the task is completed.
Standard: Determines minimum total dose for the inspection is
Evaluator Cue:             Terminate JPM.
: o 500 mrem/hr x 0.5 hr = 250 mrem. Determines maximum total dose for the inspection is
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
: o 2000 mrem/nr x 0.5 hr = 1000 mrem. Evaluate Cue:
Terminating Cues:         Operator informs the evaluator that the task is complete Stop Time:
None   Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
4 Critical:  Y Calculate the total annual exposure after completion of the inspection.
Standard: 1. Determines total minimum annual exposure after the inspection
: 1800 mrem + 250 mrem = 2050 mrem 2. Determines total maximum annual exposure after the inspection
: 1800 mrem + 1000 mrem = 2800 mrem   Evaluate Cue:
None   Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
5 Critical:  N Determines that the total annual exposure after completion of the inspection is greater than the administrative dose limit.
Standard: Determines that the total annual exposure after completion of the inspection is greater than the administrative dose limit of 2000 mrem as stated in 4-AWI-08.04.01 (up to 40% of 10 CFR 20 limit without First Line Supervisor approval).
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
-T-SAT-75) Page 5 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
6 Critical:  Y Determines that a dose extension is needed and notifies the CRS that their permission will be required to exceed the 2000 mrem limit.
Standard: 1. Determines that a dose extension is needed.
: 2. Contacts the CRS to get permission to exceed 2000 mrem.
Evaluator Cue:
State as the CRS that you will complete the necessary paperwork and the he can perform the needed inspection.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: 7 Critical:  N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED   Standard: Operator informs evaluator that the task is completed
. Evaluator Cue:
Terminate JPM.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
Operator informs the evaluator that the task is complete Stop Time:
Historical Record:
Historical Record:
Updated for 201 6 ILT NRC Exam
Updated for 2016 ILT NRC Exam Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 6 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
-T-SAT-75) Page 6 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
REVIEW STATEMENTS                                                                   YES NO       N/A
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
: 1. Are all items on the cover page filled in correctly?
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
?    3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 10. Have the performance steps been identified and typed (Critical /
-Licensed Operators
Sequence / Time Critical) appropriately?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?   13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 12. Are all references identified, current, and accurate?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
__________________________        __________________________
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
Validation Personnel /Date                  Validation Personnel/Date
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
__________________________        __________________________
 
Validation Personnel /Date                  Validation Personnel/Date
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                            Page 7 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 ATTACHMENT 2 JPM Number: JPM-4 AWI-08.04.01-006 JPM
______________________
 
____        __________________________
==Title:==
Validation Personnel /Date                  Validation Personnel/Date
Expected Dose Determination to Inspect Equipment Examinee & ID:                                                    Evaluator:
__________________________        __________________________
Job
Validation Personnel /Date                  Validation Personnel/Date
 
==Title:==
Date:
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 8 of 9 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
-T-SAT-75)  Page 7 of 9  JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
* Radiation Protection has informed the Control Room that a Hot Area Inspection is required for a possible steam leak exists in the Steam Chase.
-G-RM-01. ATTACHMENT 2 JPM Number:
* The CRS has chosen you to perform this inspection.
JPM-4 AWI-08.04.01-006  JPM Title:
* The inspection is projected to take 30 minutes.
Expected Dose Determination to Inspect Equipment Examinee & ID:      Evaluator:
* Your current annual exposure is 1800 mrem.
Job Title:
INITIATING CUES (IF APPLICABLE):
Date:      Start Time Finish Time PERFORMANCE RESULTS:
* Determine what your expected dose will be for the inspection.
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
* Determine what your annual exposure will be after completing the inspection.
EVALUATOR'S SIGNATURE:
* Determine if any additional permission would be needed to make the inspection.
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
.
QF1075-01 Rev. 5 (FP
-T-SAT-75) Page 8 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
Radiation Protection has informed the Control Room that a Hot Area Inspection is required for a possible steam leak exists in the Steam Chase.
The CRS has chosen you to perform this inspection.
The inspection is projected to take 30 minutes
. Your current annual exposure is 1800 mrem. INITIATING CUES (IF APPLICABLE):
Determine what your expected dose will be for the inspection.
Determine what your annual exposure will be after completing the inspection.
Determine if any additional permission would be needed to make the inspection.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 9 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 9 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF1075-01 Rev. 5 (FP
-T-SAT-75)  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)    SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
PRE-JOB BRIEF    JPM NUMBER:
JPM-FP-PA-HU-06-001 REV. 0  RELATED PRA INFORMATION:
None  TASK NUMBERS / TASK TITLE(S):  SS299.297 Conduct Pre
-Job Briefings K/A NUMBERS:


====2.1.1 Conduct====
QF1075-01 Rev. 5 (FP-T-SAT-75)
of operations Rating: SRO/RO:
JOB PERFORMANCE MEASURE (JPM)
4.2/3.8 APPLICABLE METHOD OF TESTING:
SITE:                        MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                    PRE-JOB BRIEF JPM NUMBER:                  JPM-FP-PA-HU-06-001              REV.        0 RELATED PRA                  None INFORMATION:
Discussion:
TASK NUMBERS /                SS299.297 TASK TITLE(S):                Conduct Pre-Job Briefings 2.1.1 K/A NUMBERS:                                                        Rating: SRO/RO:     4.2/3.8 Conduct of operations APPLICABLE METHOD OF TESTING:
Simulate/walkthrough:
Discussion:                 Simulate/walkthrough:               Perform:
Perform:   EVALUATION LOCATION:
EVALUATION LOCATION:             In-Plant:                             Control Room:
In-Plant:   Control Room:
Simulator:                             Other:
Simulator:
Lab:
Other:           Lab:       Time for Completion:
Time for Completion:         10       Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
10 Minutes Time Critical:
No     Alternate Path:
No     TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                   Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 2 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                         Page 2 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 643: Line 520:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Plant is at rated conditions
* Plant is at rated conditions.
. OSP-NIP-0590 (APRM Heat Balance Calibration) is scheduled to be performed.
* OSP-NIP-0590 (APRM Heat Balance Calibration) is scheduled to be performed.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
You are the control room supervisor and designated as the Briefing Leader.
* You are the control room supervisor and designated as the Briefing Leader.
Using the Online Work Schedule , FP-PA-HU-06 (Pre-job Briefs and Post Job Critiques) and QF0465 (Pre-Job Brief Checklist), determine the risk level and minimum required Pre
* Using the Online Work Schedule, FP-PA-HU-06 (Pre-job Briefs and Post Job Critiques) and QF0465 (Pre-Job Brief Checklist), determine the risk level and minimum required Pre-Job Brief Level.
-Job Brief Level. INFORM EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
* INFORM EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
EVALUATOR NOTE: Provide examinee copies of the following:
EVALUATOR NOTE: Provide examinee copies of the following:
OSP-NIP-0590 (APRM Heat Balance Calibration)
* OSP-NIP-0590 (APRM Heat Balance Calibration)
FP-PA-HU-06 (Pre-job Briefs and Post Job Critiques)
* FP-PA-HU-06 (Pre-job Briefs and Post Job Critiques)
QF0465 (Pre
* QF0465 (Pre-Job Brief Checklist)
-Job Brief Checklist)
* Online Work Schedule Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Online Work Schedule  


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                             Page 3 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:         1. FP-PA-HU-06 (Pre-Job Briefs and Post-Job Critiques)
-T-SAT-75) Page 3 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
: 2. QF0465 (Pre-Job Brief Checklist)
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
: 3. Copy of OSP-NIP-0590 and copy of the On-Line Work schedule with the test shown as a risk rating of NM (Nuclear Risk Medium)
: 1. FP-PA-HU-06 (Pre-Job Briefs and Post
-Job Critiques)
: 2. QF0465 (Pre
-Job Brief Checklist)
: 3. Copy of OSP
-NIP-0590 and copy of the On
-Line Work schedule with the test shown as a risk rating of NM (Nuclear Risk Medium)
General  
General  


==References:==
==References:==
: 1. OSP-NIP-0590 (APRM Heat Balance Calibration)
: 1. OSP-NIP-0590 (APRM Heat Balance Calibration)
Task Standards:
Task Standards:             FP-PA-HU-06 (Pre-Job Briefs and Post Job Critiques)
FP-PA-HU-06 (Pre-Job Briefs and Post Job Critiques)
Start Time:
Start Time:  
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                    Page 4 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1            Trainee refers to FP-PA-HU-06 Step 5.1.1 The Briefing Leader screens the Critical N                    planned work activity to determine the appropriate level of briefing warranted for the task or activity (Refer to Attachment 1, Pre-Job Brief Process).
Standard:                      Refers to Attachment 1 - Pre-Job Brief Process Evaluator Note:                None Evaluator Cue:                None Performance:                  SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 2            FP-PA-HU-06 Attachment 1 Pre-Job Brief Process -determines risk based off Critical Y                    entry block of flow chart Standard:                      Determines task is medium risk based off the Online Work Schedule or FP-PA-HU-06 4.15 Risk definitions.
Evaluator Note:                None Evaluator Cue:                None Performance:                  SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 3            FP-PA-HU-06 Attachment 1 Pre-Job Brief Process flow chart Normal Risk Critical N                      block and Medium Risk blocks Standard:                      Trainee follows flow chart and evaluates Normal Risk block as NO and Medium Risk block as YES Evaluator Note:                None Evaluator Cue:                  None Performance:                    SATISFACTORY              UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 5 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 Performance Step: 4            FP-PA-HU-06 Attachment 1 Pre-Job Brief Process flow chart Simple block Critical N Standard:                       Trainee determines task is Simple as defined in HU-PA-HU-06 4.2 Complexity Simple - A task that is typically controlled by one or two individuals and does not involve interaction with other wok groups. A single procedure is used to direct the activity.
-T-SAT-75) Page 4 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Evaluator Note:                 None.
-G-RM-01. NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Evaluator Cue:                 None Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
IMPORTANT:
Performance Step: 5            FP-PA-HU-06 Attachment 1 Pre-Job Brief Process - determines minimum Critical Y                      level of Pre-Job brief required Standard:                       Trainee follows flow chart and determines a standard pre-job brief is the minimum level Evaluator Note:                 If desired, you may ask the examinee to discuss the use of the PJB checklist (QF0465)
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP
Evaluator Cue:                 None Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
-T-SAT-73 (Licensed Operator Requalification Program Examinations
Terminating Cues:         Once the risk and PJB level have been determined, terminate the JPM.
). Performance Step:
1 Critical N Trainee refers to FP
-PA-HU-06 Step 5.1.1 The Briefing Leader screens the planned work activity to determine the appropriate level of briefing warranted for the task or activity (Refer to Attachment 1, "Pre
-Job Brief Process").
Standard: Refers to Attachment 1
- Pre-Job Brief Process Evaluator Note:
None  Evaluator Cue:
None    Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
2 Critical Y FP-PA-HU-06 Attachment 1 Pre
-Job Brief Process  
-determines risk based off entry block of flow chart   Standard: Determines task is medium risk based off the Online Work Schedule or FP
-PA-HU-06 4.15 Risk definitions.
Evaluator Note:
None  Evaluator Cue:
None   Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
3 Critical  N  FP-PA-HU-06 Attachment 1 Pre
-Job Brief Process flow chart "Normal Risk" block and "Medium Risk" blocks Standard: Trainee follows flow chart and evaluates "Normal Risk" block as NO and "Medium Risk" block as YES Evaluator Note:
None  Evaluator Cue:
None     Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
-T-SAT-75)  Page 5 of 8  JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Terminating Cues:
Once the risk and PJB level have been determined, terminate the JPM.
Stop Time:
Stop Time:
Historical Record:
Historical Record: New create for the 2016 ILT NRC Exam.
New create for the 2016 ILT NRC Exam.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance Step:
 
4 Critical  N  FP-PA-HU-06 Attachment 1 Pre-Job Brief Process flow chart "Simple" block Standard: Trainee determines task is Simple as defined in HU
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 6 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
-PA-HU-06 4.2 Complexity Simple
REVIEW STATEMENTS                                                                   YES NO       N/A
- A task that is typically controlled by one or two individuals and does not involve interaction with other wok groups. A single procedure is used to direct the activity.
: 1. Are all items on the cover page filled in correctly?
Evaluator Note: None. Evaluator Cue:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
5 Critical Y FP-PA-HU-06 Attachment 1 Pre
-Job Brief Process
- determines minimum level of P re-Job brief required Standard: Trainee follows flow chart and determines a standard pre
-job brief is the minimum level Evaluator Note:
If desired, you may ask the examinee to discuss the use of the PJB checklist (QF0465)  Evaluator Cue:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP
-T-SAT-75) Page 6 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?   4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 10. Have the performance steps been identified and typed (Critical /
-Licensed Operators   10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Validation Personnel /Date                  Validation Personnel/Date
 
__________________________        __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                            Page 7 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 ATTACHMENT 2 JPM Number: JPM-FP-PA-HU-06-001 JPM
Validation Personnel /Date                  Validation Personnel/Date
 
__________________________        __________________________
==Title:==
Validation Personnel /Date                  Validation Personnel/Date
Pre-Job Brief Examinee & ID:                                                    Evaluator:
__________________________        __________________________
Job
Validation Personnel /Date                  Validation Personnel/Date


QF1075-01 Rev. 5 (FP
==Title:==
-T-SAT-75)  Page 7 of 8  JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Date:
-G-RM-01. ATTACHMENT 2 JPM Number:
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
JPM-FP-PA-HU-06-001  JPM Title:
Pre-Job Brief Examinee & ID:      Evaluator:
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT: UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP
 
-T-SAT-75)  Page 8 of 8  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                          Page 8 of 8 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
* Plant is at rated conditions.
Plant is at rated conditions. OSP-NIP-0590 (APRM Heat Balance Calibration) is scheduled to be performed.
* OSP-NIP-0590 (APRM Heat Balance Calibration) is scheduled to be performed.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
You are the control room supervisor and designated as the Briefing Leader.
* You are the control room supervisor and designated as the Briefing Leader.
Using the Online Work Schedule , FP-PA-HU-06 (Pre-job Briefs and Post Job Critiques) and QF0465 (Pre-Job Brief Checklist), determine the risk level and minimum required Pre
* Using the Online Work Schedule, FP-PA-HU-06 (Pre-job Briefs and Post Job Critiques) and QF0465 (Pre-Job Brief Checklist), determine the risk level and minimum required Pre-Job Brief Level.
-Job Brief Level.
* INFORM EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
INFORM EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 4 (FP
QF-1075-01 Rev. 4 (FP-T-SAT-75)
-T-SAT-75)   Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
JOB PERFORMANCE MEASURE (JPM)
SRO - NRC LICENSE MAINTENANCE RESPONSIBILITIES JPM NUMBER:
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   SRO - NRC LICENSE MAINTENANCE RESPONSIBILITIES JPM NUMBER:                   JPM-OWI-01.08-002                REV.       1 RELATED PRA                   None INFORMATION:
JPM-OWI-01.08-00 2 REV. 1   RELATED PRA INFORMATION:
TASK NUMBERS /               SS299.296 TASK TITLE(S):               Implement the instructions regarding maintenance of active NRC licenses K/A NUMBERS:                 2.1             2.1.4                 Rating: SRO/RO:     3.8 / 3.3 APPLICABLE METHOD OF TESTING:
None  TASK NUMBERS / TASK TITLE(S): SS299.296 Implement the instructions regarding maintenance of active NRC licenses K/A NUMBERS:
Discussion:             Simulate/walkthrough:             Perform:
2.1 2.1.4 Rating: SRO/RO:
EVALUATION LOCATION:               In-Plant:                               Control Room:
3.8 / 3.3 APPLICABLE METHOD OF TESTING:
Simulator:                               Other:
Discussion:
Lab:
Simulate/walkthrough:
Time for Completion:         10       Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:             SRO:               RO:             NLO Additional site-specific signatures may be added as desired.
Perform:   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
Other:           Lab:       Time for Completion:
10 Minutes Time Critical:
No     Alternate Path:
No     TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                   Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF-1075-01 Rev. 4 (FP-T-SAT-75) Page 2 of 8 JPM-OW I-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. JPM Number:
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
JPM-OWI-01.08-00 2  JPM Title:
 
SRO - NRC License Maintenance Responsibilities Examinee:       Evaluator:
QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                           Page 2 of 8 JPM-OWI-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 JPM Number: JPM-OWI-01.08-002 JPM
Job Title:
 
Date:       Start Time Finish Time PERFORMANCE RESULTS:
==Title:==
SAT: UNSAT:         COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
SRO - NRC License Maintenance Responsibilities Examinee:                                                   Evaluator:
EVALUATOR'S SIGNATURE:
Job
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
 
==Title:==
Date:
Start Time                                               Finish Time PERFORMANCE RESULTS:                                 SAT:                       UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 4 (FP-T-SAT-75) Page 3 of 8 JPM-OW I-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. JPM BRIEFING/TURNOVER Provide briefing/turnover in accordance with applicable program description and/or training procedure.
QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                                       Page 3 of 8 JPM-OWI-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 JPM BRIEFING/TURNOVER Provide briefing/turnover in accordance with applicable program description and/or training procedure.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* You are a Licensed Senior Reactor Operator.
* You are qualified to stand the following watches:
o Shift Manager (SM) o Control Room Supervisor (CRS) o Shift Technical Advisor (STA) o Work Execution Center SRO (WEC-SRO)
* You are current in Licensed Operator Requalification training and your medical status is acceptable.
* The dates, shift times and positions are provided for the watches you stood during the 2nd Quarter.
INITIATING CUES:
* Determine if you have met the requirements for maintaining your SRO license active.
Date                              Shift                        Position 4/1                        Days 0700-1900                  WEC-SRO 4/2                        Days 0700-1900                  WEC-SRO 4/3                        Days 0700-1900                  WEC-SRO 4/6                        Nights 1900-0700                      SM 4/7                        Nights 1900-0700                  WEC-SRO 4/8                        Nights 1900-0700                  WEC-SRO 4/9                        Nights 1900-0700                  WEC-SRO 5/2                        Days 0700-1900                  WEC-SRO 5/3                        Days 0700-1900                      SM 5/4                        Days 0700-1900                  WEC-SRO 5/5                        Relief 0700-1500                    CRS 5/6                        Days 0700-1900                  WEC-SRO 5/10                        Nights 1900-0700                  WEC-SRO 5/12                        Nights 1900-0700                  WEC-SRO 5/13                        Nights 1900-0700                  WEC-SRO 5/20                        Days 0700-1900                      SM 5/21                        Days 0700-1900                      SM 5/22                        Days 0700-1900                  WEC-SRO 5/23                        Days 0700-1900                  WEC-SRO 6/4                        Days 0700-1900                  WEC-SRO 6/5                        Days 0700-1900                      STA 6/6                        Days 0700-1900                  WEC-SRO 6/24                        Nights 1900-0700                  WEC-SRO 6/30                        Nights 1900-0700                  WEC-SRO Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


INITIAL CONDITIONS:
QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                                 Page 4 of 8 JPM-OWI-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 JPM PERFORMANCE INFORMATION Required Materials:
You are a Licensed Senior Reactor Operator
* OWI-01.08 (NRC License Maintenance Responsibilities)
. You are qualified to stand the following watches:  o Shift Manager (SM) o Control Room Supervisor (CRS) o Shift Technical Advisor (STA) o Work Execution Center SRO (WEC
-SRO)  You are current in Licensed Operator Requalification training and your medical status is acceptable
. The dates, shift times and positions are provided for the watches you stood during the 2 nd Quarter. INITIATING CUES:
Determine if you have met the requirements for maintaining your SRO license active.
Date Shift Position 4/1 Days 0700-1900 WEC-SRO 4/2 Days 0700-1900 WEC-SRO 4/3 Days 0700-1900 WEC-SRO 4/6 Nights 1900
-0700 SM 4/7 Nights 1900
-0700 WEC-SRO 4/8 Nights 1900
-0700 WEC-SRO 4/9 Nights 1900
-0700 WEC-SRO 5/2 Days 0700-1900 WEC-SRO 5/3 Days 0700-1900 SM 5/4 Days 0700-1900 WEC-SRO 5/5 Relief 0700
-1500 CRS 5/6 Days 0700-1900 WEC-SRO 5/10 Nights 1900
-0700 WEC-SRO 5/12 Nights 1900
-0700 WEC-SRO 5/13 Nights 1900
-0700 WEC-SRO 5/20 Days 0700-1900 SM 5/21 Days 0700-1900 SM 5/22 Days 0700-1900 WEC-SRO 5/23 Days 0700-1900 WEC-SRO 6/4 Days 0700-1900 WEC-SRO 6/5 Days 0700-1900 STA 6/6 Days 0700-1900 WEC-SRO 6/24 Nights 1900
-0700 WEC-SRO 6/30 Nights 1900
-0700 WEC-SRO QF-1075-01 Rev. 4 (FP-T-SAT-75) Page 4 of 8 JPM-OW I-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
OWI-01.08 (NRC License Maintenance Responsibilities)
General  
General  


==References:==
==References:==
* OWI-01.08 (NRC License Maintenance Responsibilities)
* 2142 (Monticello Active NRC SRO/RO Qualification Checklist)
* 10CFR55.53 (Conditions of License)
Task Standards:
* Determine that the minimum number of required licensed watches is NOT met and their NRC RO license is inactive.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1      Locate and review controlled copy of Procedure OWI-01.08 (NRC License Critical: N              Maintenance Responsibilities).
Standard:                Obtains and reviews correct procedure.
Evaluator Cue:            If controlled copy is not available for the performance of the JPM, then provide the examinee with a copy of OWI-01.08.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                                Page 5 of 8 JPM-OWI-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 Performance Step: 2      Procedure Step 4.2.2.c Critical: N Maintaining an NRC license active requires the following:
* Standing the required number of watches as the Licensed Operator on record during each calendar quarter.
Standard:
* Reviews this general requirement Evaluator Cue:            None Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 3      Procedure Step 4.2.4.
Critical: Y Monticellos Technical Specifications requires two SRO and two RO Licensed Operators on shift during routine power operations. Credit for license maintenance is granted when an Operator fills one of these Tech Spec required positions. The Shift Manager, Control Room Supervisor, Nuclear Lead Plant Equipment and Reactor Operator (NLPE&RO) and the Nuclear Plant Equipment and Reactor Operator (NPE&RO) designated as Operator at the Controls (OATC) are considered as licensed duty positions for the purpose of license maintenance credit.
Standard:                Determines that ONLY the SM or CRS positions can be counted toward maintenance of their active NRC license.
Evaluator Cue:            None Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


OWI-01.08 (NRC License Maintenance Responsibilities) 2142 (Monticello Active NRC SRO/RO Qualification Checklist) 10CFR55.53 (Conditions of License)
QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                                 Page 6 of 8 JPM-OWI-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 Performance Step: 4       Procedure Step 4.2.6 Critical: Y To maintain active license status, each licensee SHALL actively perform the functions of the OATC (NPE&RO), Nuclear Lead Plant Equipment and Reactor Operator (NLPE&RO) or Senior Reactor Operator (e.g. Control Room Supervisor or Shift Manager) a minimum of five 12 hour shifts per calendar quarter.
Task Standards:
Standard:
Determine that the minimum number of required licensed watches is NOT met and their NRC RO license is inactive
* Determines that a total of five watches in the required positions of SM or CRS were performed; however, recognizes that the May 5th watch was only an eight hour relief shift.
. Start Time:
* Determines that the minimum of five twelve hour shifts in a required licensed position has not been met to maintain an active NRC license.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
Evaluator Cue:           None Performance:             SATISFACTORY           UNSATISFACTORY Comments:
IMPORTANT:
Terminating Cues:         Once the determination has been made whether the minimum number of watches has been / NOT been met then state JPM complete.
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations
). Performance Step:
1 Critical:  N Locate and review controlled copy of Procedure OWI-01.08 (NRC License Maintenance Responsibilities)
. Standard: Obtains and reviews correct procedure.
Evaluator Cue:
If controlled copy is not available for the performance of the JPM, then provide the examinee with a copy of OWI
-01.08. Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 4 (FP-T-SAT-75) Page 5 of 8 JPM-OW I-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. Performance Step:
2 Critical:  N Procedure Step 4.2.2.c Maintaining an NRC license active requires the following:
Standing the required number of watches as the Licensed Operator on record during each calendar quarter.
Standard:  Reviews this general requirement Evaluator Cue:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
3 Critical:  Y Procedure Step 4.2.4.
Monticello's Technical Specifications requires two SRO and two RO Licensed Operators on shift during routine power operations. Credit for license maintenance is granted when an Operator fills one of these Tech Spec required positions. The Shift Manager , Control Room Supervisor , Nuclear Lead Plant Equipment and Reactor Operator (NLPE&RO) and the Nuclear Plant Equipment and Reactor Operator (NPE&RO) designated as Operator at the Controls (OATC) are considered as licensed duty positions for the purpose of license maintenance credit.
Standard: Determines that ONLY the SM or C RS positions can be counted toward maintenance of their active NRC license.
Evaluator Cue:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 4 (FP-T-SAT-75)  Page 6 of 8 JPM-OW I-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. Performance Step:
4 Critical: Y Procedure Step 4.2.6 To maintain active license status, each licensee SHALL actively perform the functions of the OATC (NPE&RO), Nuclear Lead Plant Equipment and Reactor Operator (NLPE&RO) or Senior Reactor Operator (e.g. Control Room Supervisor or Shift Manager) a minimum of five 12 hour shifts per calendar quarter.
Standard: Determines that a total of five watches in the required positions of SM or CRS were performed; however, recognizes that the May 5 th watch was only an eight hour relief shift. Determines that the minimum of five twelve hour shifts in a required licensed position has not been met to maintain an active NRC license.
Evaluator Cue:
None   Performance:
SATISFACTORY UNSATISFACTORY Comments:           Terminating Cues:
Once the determination has been made whether the minimum number of watches has been / NOT been met then state JPM complete.
Stop Time:
Stop Time:
Historical Record:
Historical Record:
Procedural updates for the 2015 ILT NRC Exam.
* Procedural updates for the 2015 ILT NRC Exam.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 4 (FP
QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                               Page 7 of 8 TURNOVER SHEET INITIAL CONDITIONS:
-T-SAT-75) Page 7 of 8 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
* You are a Licensed Senior Reactor Operator.
-G-RM-01. TURNOVER SHEET INITIAL CONDITIONS:
* You are qualified to stand the following watches:
You are a Licensed Senior Reactor Operator. You are qualified to stand the following watches:
o Shift Manager (SM) o Control Room Supervisor (CRS) o Shift Technical Advisor (STA) o Work Execution Center SRO (WEC-SRO)
o Shift Manager (SM) o Control Room Supervisor (CRS) o Shift Technical Advisor (STA) o Work Execution Center SRO (WEC
* You are current in Licensed Operator Requalification training and your medical status is acceptable.
-SRO) You are current in Licensed Operator Requalification training and your medical status is acceptable
* The dates, shift times and positions are provided for the watches you stood during the 2nd Quarter.
. The dates, shift times and positions are provided for the watches you stood during the 2 nd Quarter. INITIATING CUES:
INITIATING CUES:
Determine if you have met the requirements for maintaining your SRO license active.
* Determine if you have met the requirements for maintaining your SRO license active.
Date Shift Position 4/1 Days 0700-1900 WEC-SRO 4/2 Days 0700-1900 WEC-SRO 4/3 Days 0700-1900 WEC-SRO 4/6 Nights 1900
Date                           Shift                         Position 4/1                     Days 0700-1900                     WEC-SRO 4/2                     Days 0700-1900                     WEC-SRO 4/3                     Days 0700-1900                     WEC-SRO 4/6                   Nights 1900-0700                       SM 4/7                   Nights 1900-0700                   WEC-SRO 4/8                   Nights 1900-0700                   WEC-SRO 4/9                   Nights 1900-0700                   WEC-SRO 5/2                     Days 0700-1900                     WEC-SRO 5/3                     Days 0700-1900                         SM 5/4                     Days 0700-1900                     WEC-SRO 5/5                     Relief 0700-1500                     CRS 5/6                     Days 0700-1900                     WEC-SRO 5/10                   Nights 1900-0700                   WEC-SRO 5/12                   Nights 1900-0700                   WEC-SRO 5/13                   Nights 1900-0700                   WEC-SRO 5/20                     Days 0700-1900                         SM 5/21                     Days 0700-1900                         SM 5/22                     Days 0700-1900                     WEC-SRO 5/23                     Days 0700-1900                     WEC-SRO 6/4                     Days 0700-1900                     WEC-SRO 6/5                     Days 0700-1900                         STA 6/6                     Days 0700-1900                     WEC-SRO 6/24                   Nights 1900-0700                   WEC-SRO 6/30                   Nights 1900-0700                   WEC-SRO Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-0700 SM 4/7 Nights 1900
 
-0700 WEC-SRO 4/8 Nights 1900
QF-1075-01 Rev. 4 (FP-T-SAT-75)                                                             Page 8 of 8 JPM-OWI-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
-0700 WEC-SRO 4/9 Nights 1900
REVIEW STATEMENTS                                                                 YES NO       N/A
-0700 WEC-SRO 5/2 Days 0700-1900 WEC-SRO 5/3 Days 0700-1900 SM 5/4 Days 0700-1900 WEC-SRO 5/5 Relief 0700
: 1. Are all items on the cover page filled in correctly?
-1500 CRS 5/6 Days 0700-1900 WEC-SRO 5/10 Nights 1900
-0700 WEC-SRO 5/12 Nights 1900
-0700 WEC-SRO 5/13 Nights 1900
-0700 WEC-SRO 5/20 Days 0700-1900 SM 5/21 Days 0700-1900 SM 5/22 Days 0700-1900 WEC-SRO 5/23 Days 0700-1900 WEC-SRO 6/4 Days 0700-1900 WEC-SRO 6/5 Days 0700-1900 STA 6/6 Days 0700-1900 WEC-SRO 6/24 Nights 1900
-0700 WEC-SRO 6/30 Nights 1900
-0700 WEC-SRO QF-1075-01 Rev. 4 (FP
-T-SAT-75) Page 8 of 8 JPM-OWI-01.08-00 2 (SRO - NRC License Maintenance Responsibilities) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?   4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 10. Have the performance steps been identified and typed (Critical /
-Licensed Operators
Sequence / Time Critical) appropriately?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Validation Personnel /Date                  Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JOB PERFORMANCE MEASURE (JPM)
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   LCO 3.0.9 APPLICATION DETERMINATION - BLOCKED OPEN HELB DOOR JPM NUMBER:                   JPM-OWI-02.07-002                REV.       0 RELATED PRA                   None INFORMATION:
LCO 3.0.9 APPLICATION DETERMINATION
TASK NUMBERS /               SS299.340 TASK TITLE(S):               Implement Operations Work Control K/A NUMBERS:                 2.2             2.2.40               Rating: SRO/RO:     4.7 / 3.4 APPLICABLE METHOD OF TESTING:
- BLOCKED OPEN HELB DOOR   JPM NUMBER:
Discussion:                 Simulate/walkthrough:               Perform:
JPM-OWI-02.07-00 2 REV. 0   RELATED PRA INFORMATION:
EVALUATION LOCATION:             In-Plant:                             Control Room:
None  TASK NUMBERS / TASK TITLE(S):
Simulator:                             Other:
SS299.340 Implement Operations Work Control K/A NUMBERS:
Lab:
2.2 2.2.40 Rating: SRO/RO:
Time for Completion:         10       Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
4.7 / 3.4 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
Other:           Lab:       Time for Completion:
10 Minutes Time Critical:
No     Alternate Path:
No     TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                   Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 2 of 11 JPM-OWI-02.07-002 (LCO 3.0.9 Application Determination) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                       Page 2 of 11 JPM-OWI-02.07-002 (LCO 3.0.9 Application Determination) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 943: Line 736:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Plant is at 100% power and you are a duty SRO.
* Plant is at 100% power and you are a duty SRO.
HELB Door-479 (TRB Bldg 9 11' North Corridor) is currently blocked open and can NOT be closed.
* HELB Door-479 (TRB Bldg 911 North Corridor) is currently blocked open and can NOT be closed.
Door-479 is NOT a fire door but if blocked OPEN could require Tech Spec related SSCs located in the Div 1 and Div 2 4KV Rooms to be INOPERABLE INITIATING CUES:
* Door-479 is NOT a fire door but if blocked OPEN could require Tech Spec related SSCs located in the Div 1 and Div 2 4KV Rooms to be INOPERABLE INITIATING CUES:
Evaluate Technical Specifications and determine if LCO 3.0.9 can be applied IAW OWI
* Evaluate Technical Specifications and determine if LCO 3.0.9 can be applied IAW OWI-02.07 (Operations Work Control) for Door-479 being blocked OPEN.
-02.07 (Operations Work Control) for Door
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-479 being blocked OPEN.


QF10 75-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 3 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 JPM PERFORMANCE INFORMATION Required Materials:         A standard Operation Manual book cart containing the following:
-T-SAT-75) Page 3 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
* OWIs
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
* AWIs
A standard Operation Manual book cart containing the following:
* Technical Specifications General  
OWIs AWIs Technical Specifications General  


==References:==
==References:==
* OWI-02.07 (Operations Work Control)
* 4 AWI-08.01.03 (HELB Practices)
* Technical Specifications Task Standards:              Determination is made that LCO 3.0.9 cannot be applied for Door-479 being blocked OPEN.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1        Locate and review controlled copy of Procedures OWI-02.07 (Operations Work Critical: N                Control) & 4 AWI-08.01.03 (HELB Practices).
Standard:
* Obtains and reviews correct procedures.
* May also obtain and review LCO 3.0.9 of the Technical Specifications.
Evaluator Cue:            If a book cart is not available, PROVIDE copies of TS 3.0.9, OWI-02.07 &
4 AWI-08.01.03.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                  Page 4 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Performance Step: 2        OWI-02.07 Procedure Step 4.3.1.F.2.
Critical: N Tech Spec ACTION Requirements NOTE: Under limited conditions, Tech Spec LCO 3.0.9 relieves the requirement for barriers to perform their related support function for up to 30 days, before declaring the supported system inoperable. Figure 5.3 LCO 3.0.9 Applicability Determination is used to determine the acceptability of using the degraded barrier allowance.
Perform Figure 5.3 LCO 3.0.9 Applicability Determination when an SSC is to be declared inoperable solely due to a failed supporting barrier, and it is desired to delay the required action associated with the SSC inoperability. If the Applicability Determination permits use of LCO 3.0.9, then a PRA risk assessment must be completed to determine the allowed completion time (TC) before declaring the supported system LCO not met.
Standard:                  Refers to Figure 5.3 (LCO 3.0.9 Applicability Determination)
Evaluator Cue:            None Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 3        OWI-02.07 Figure 5.3, Step 1.
Critical: N Identify the initiating event category for the degraded barrier(s).
Standard:
* Based on the Initial Conditions, determines the initiating event category for this barrier is internal flooding and/or HELB.
* May refer to 4 AWI-08.01.03, Figure 5.1 (Consequences of HELB Doors Out of Position) for clarification of Door-479 requirements and impact on Div. 1 and Div. 2 equipment but use of this procedure is NOT REQUIRED.
Evaluator Note:            Instructions for using Figure 5.3 are on the proceeding procedure pages.
Evaluator Cue:            None Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


OWI-02.07 (Operations Work Control) 4 AWI-08.01.03 (HELB Practices)
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                       Page 5 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Performance Step: 4       OWI-02.07 Figure 5.3, Step 2.
Technical Specifications Task Standards:
Critical: N Is the barrier(s) part of a ventilation system, a fire barrier, protecting only non-Tech Spec Systems, a snubber, or not rendering a Tech Spec System inoperable?
Determination is made that LCO 3.0.9 cannot be applied for Door
Standard:
-479 being blocked OPEN
* Answers this question NO.
. Start Time:
Non-Critical Portion:
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
* Determines the following apply to Door-479:
IMPORTANT:
o NOT part of a ventilation system.
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP
-T-SAT-73 (Licensed Operator Requalification Program Examinations
).
Performance Step:
1 Critical:  N Locate and review controlled copy of Procedures OWI
-02.07 (Operations Work Control) & 4 AWI-08.01.03 (HELB Practices)
. Standard:  Obtains and reviews correct procedure
: s. May also obtain and review LCO 3.0.9 of the Technical Specifications.
Evaluator Cue:
If a book cart is not available, PROVIDE copies of TS 3.0.9, OWI-02.07 & 4 AWI-08.01.03. Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF10 75-01 Rev. 5 (FP
-T-SAT-75) Page 4 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
2 Critical:  N OWI-02.07 Procedure Step 4.3.1.F.2.
Tech Spec ACTION Requirements NOTE:  Under limited conditions, Tech Spec LCO 3.0.9 relieves the requirement for barriers to perform their related support function for up to 30 days, before declaring the supported system inoperable. Figure 5.3 "LCO 3.0.9 Applicability Determination" is used to determine the acceptability of using the degraded barrier allowance.
Perform Figure 5.3 "LCO 3.0.9 Applicability Determination" when an SSC is to be declared inoperable solely due to a failed supporting barrier, and it is desired to delay the required action associated with the SSC inoperability. If the Applicability Determination permits use of LCO 3.0.9, then a PRA risk assessment must be completed to determine the allowed completion time (TC) before declaring the supported system LCO not met.
Standard: Refers to Figure 5.3 (LCO 3.0.9 Applicability Determination)    Evaluator Cue:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
3 Critical:  N OWI-02.07 Figure 5.3, Step 1.
Identify the initiating event category for the degraded barrier(s).
Standard:  Based on the Initial Conditions, determines the initiating event category for this barrier is internal flooding and/or HELB.
May refer to 4 AWI
-08.01.03, Figure 5.1 (Consequences of HELB Doors Out of Position) for clarification of Door
-479 requirements and impact on Div. 1 and Div. 2 equipment but use of this procedure is NOT REQUIRED
. Evaluator Note:
Instructions for using Figure 5.3 are on the proceeding procedure pages.
Evaluator Cue:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF10 75-01 Rev. 5 (FP
-T-SAT-75)  Page 5 of 11  JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
4 Critical:
N OWI-02.07 Figure 5.3, Step 2.
Is the barrier(s) part of a ventilation system, a fire barrier, protecting only non-Tech Spec Systems, a snubber, or not rendering a Tech Spec System inoperable?
Standard: Answers this question NO.
Non-Critical Portion
Determines the following apply to Door
-479: o NOT part of a ventilation system.
o NOT a fire barrier.
o NOT a fire barrier.
o Protects Tech Spec systems.
o Protects Tech Spec systems.
o NOT a snubber.
o NOT a snubber.
o Renders associated Tech Spec SSCs located in the Div 1 and Div 2 4KV Room s INOPERABLE
o Renders associated Tech Spec SSCs located in the Div 1 and Div 2 4KV Rooms INOPERABLE.
. Evaluator Cue:
Evaluator Cue:             None Evaluator Note:           Operator may answer questions without referring to OWI-02.07, OWIs are Information Use Procedures and are not required to be referenced.
None   Evaluator Note:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Operator may answer questions without referring to OWI
Performance Step: 5       OWI-02.07 Figure 5.3, Step 3.
-02.07, OWIs are Information Use Procedures and are not required to be referenced.
Critical: Y Does the degraded barrier (or barriers) protect only one division of a two division system?
Performance:
Standard:
SATISFACTORY UNSATISFACTORY Comments:         Performance Step:
* Answers this question NO.
5 Critical:  Y OWI-02.07 Figure 5.3, Step 3.
* Determines Door-479 protects both divisions of 4KV.
Does the degraded barrier (or barriers) protect only one division of a two division system? Standard: Answers this question NO. Determines Door
Evaluator Cue:             None Evaluator Note:           Operator may answer questions without referring to OWI-02.07, OWIs are Information Use Procedures and are not required to be referenced.
-479 protects both divisions of 4KV
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
. Evaluator Cue:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
None   Evaluator Note:
Operator may answer questions without referring to OWI
-02.07, OWIs are Information Use Procedures and are not required to be referenced.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF10 75-01 Rev. 5 (FP
-T-SAT-75)  Page 6 of 11  JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
6 Critical:
N OWI-02.07 Figure 5.3, Step 4  Does the degraded barrier protect a single division system?
Standard:  Determines No, Door 479 protects 4KV which is a 2 division system Evaluator Cue:
None. Evaluator Note:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
7 Critical:
N OWI-02.07 Figure 5.3, Step 5 NOTE: The following question must be asked for each degraded barrier:  Does the barrier protect both divisions of a two-division system?
Standard:  Determines Yes, Door 479 protects both divisions of a two division sy stem  Evaluator Cue:
None. Evaluator Note:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:          Performance Step:
8 Critical:  Y OWI-02.07 Figure 5.3, Outcome  Standard:  Determines LCO3.09 allowance is NOT permitted Evaluator Cue:
None. Evaluator Note:
None  Performance:
SATISFACTORY UNSATISFACTORY Comments:          Terminating Cues:
Determination is made that LCO 3.0.9 CANNOT be used for Door
-479 HELB barrier.
Stop Time:


QF10 75-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 6 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Performance Step: 6          OWI-02.07 Figure 5.3, Step 4 Critical: N Does the degraded barrier protect a single division system?
-T-SAT-75) Page 7 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Standard:
-G-RM-01.
* Determines No, Door 479 protects 4KV which is a 2 division system Evaluator Cue:              None.
Historical Record:
Evaluator Note:              None Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Created NEW for 2016 ILT NRC Exam
Performance Step: 7          OWI-02.07 Figure 5.3, Step 5 Critical: N NOTE: The following question must be asked for each degraded barrier: Does the barrier protect both divisions of a two-division system?
Standard:
* Determines Yes, Door 479 protects both divisions of a two division system Evaluator Cue:              None.
Evaluator Note:              None Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 8        OWI-02.07 Figure 5.3, Outcome Critical: Y Standard:
* Determines LCO3.09 allowance is NOT permitted Evaluator Cue:            None.
Evaluator Note:            None Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Terminating Cues:        Determination is made that LCO 3.0.9 CANNOT be used for Door-479 HELB barrier.
Stop Time:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Simulator Setup (as required)
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                              Page 7 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Historical Record:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
Created NEW for 2016 ILT NRC Exam Simulator Setup (as required):
IC-* (IC-*), (IC Conditions Summary)
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* IC-* (IC-*), (IC Conditions Summary)
SIMULATOR INPUT  
SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==


Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger QF1075-01 Rev. 5 (FP
Manual                                                                                   Severity    Event Trigger     Type     Code                 Description                   Delay     Ramp Or Value   Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75)  Page 8 of 11  JPM-OWI-02.07-00 2 (LCO 3.0.9 Application Determination) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. ATTACHMENT 1


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 8 of 11 JPM-OWI-02.07-002 (LCO 3.0.9 Application Determination) Rev. 0 ATTACHMENT 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 9 of 11 JPM-OWI-02.07-00 2 (LCO 3.0.9 Application Determination) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                  Page 9 of 11 JPM-OWI-02.07-002 (LCO 3.0.9 Application Determination) Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
REVIEW STATEMENTS                                                                   YES     NO     N/A
: 1. Are all items on the cover page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 10. Have the performance steps been identified and typed (Critical /
-Licensed Operators
Sequence / Time Critical) appropriately?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date ATTACHMENT 2 JPM Number: JPM-OWI-02.07-002 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Validation Personnel /Date                  Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date ATTACHMENT 2 JPM Number:
JPM-OWI-02.07-00 2 QF1075-01 Rev. 5 (FP
-T-SAT-75)  Page 10 of 11  JPM-OWI-02.07-00 2 (LCO 3.0.9 Application Determination) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM Title:
LCO 3.0.9 Application Determination Examinee & ID:      Evaluator:
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
.
QF1075-01 Rev. 5 (FP
-T-SAT-75)  Page 11 of 11  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
Plant is at 100% power and you are a duty SRO.
HELB Door-479 (TRB Bldg 911' North Corridor) is currently blocked open and can NOT be closed.
Door-479 is NOT a fire door but if blocked OPEN could require Tech Spec related SSCs located in the Div 1 and Div 2 4KV Rooms to be INOPERABLE INITIATING CUES:
Evaluate Technical Specifications and determine if LCO 3.0.9 can be applied IAW OWI
-02.07 (Operations Work Control) for Door-479 being blocked OPEN.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                          Page 10 of 11 JPM-OWI-02.07-002 (LCO 3.0.9 Application Determination) Rev. 0 JPM
-T-SAT-75) Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
==Title:==
AUTHORIZATION TO EXCEED ADMINISTRATIVE DOSE GUIDELINES JPM NUMBER:
LCO 3.0.9 Application Determination Examinee & ID:                                                    Evaluator:
JPM-4 AWI-08.04.01-00 8 REV. 0   RELATED PRA INFORMATION:
Job
None  TASK NUMBERS / TASK TITLE(S): CR299.189 Adhere to the Radiation Protection Plan as required by Monticello Tech Specs and 10CFR20 (4AWI
 
-08.04.01).
==Title:==
K/A NUMBERS:
Date:
Generic 2.3.4 Rating: SRO/RO:
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
3.7/3.2 APPLICABLE METHOD OF TESTING:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
Discussion:
EVALUATORS SIGNATURE:
Simulate/walkthrough:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Perform:   EVALUATION LOCATION:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
In-Plant:   Control Room:
 
Simulator:
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                       Page 11 of 11 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
Other:           Lab:       Time for Completion:
* Plant is at 100% power and you are a duty SRO.
1 5 Minutes Time Critical:
* HELB Door-479 (TRB Bldg 911 North Corridor) is currently blocked open and can NOT be closed.
No     Alternate Path:
* Door-479 is NOT a fire door but if blocked OPEN could require Tech Spec related SSCs located in the Div 1 and Div 2 4KV Rooms to be INOPERABLE INITIATING CUES:
No     TASK APPLICABILITY:
* Evaluate Technical Specifications and determine if LCO 3.0.9 can be applied IAW OWI-02.07 (Operations Work Control) for Door-479 being blocked OPEN.
SRO:   RO:   NLO   Additional site
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-specific signatures may be added as desired.
 
Developed by:             Developer Date   Validated by:
QF1075-01 Rev. 5 (FP-T-SAT-75)
Validator (See JPM Validation Checklist, Attachment 1)
JOB PERFORMANCE MEASURE (JPM)
Date    Approved by:
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   AUTHORIZATION TO EXCEED ADMINISTRATIVE DOSE GUIDELINES JPM NUMBER:                   JPM-4 AWI-08.04.01-008            REV.       0 RELATED PRA                   None INFORMATION:
Training Supervisor Date QF1075-01 Rev. 5 (FP
TASK NUMBERS /               CR299.189 TASK TITLE(S):               Adhere to the Radiation Protection Plan as required by Monticello Tech Specs and 10CFR20 (4AWI-08.04.01).
-T-SAT-75) Page 2 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
K/A NUMBERS:                 Generic         2.3.4                 Rating: SRO/RO:     3.7/3.2 APPLICABLE METHOD OF TESTING:
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
Discussion:                 Simulate/walkthrough:               Perform:
EVALUATION LOCATION:             In-Plant:                             Control Room:
Simulator:                             Other:
Lab:
Time for Completion:         15      Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
Developed by:
Developer                                   Date Validated by:
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                       Page 2 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 1,143: Line 888:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A Hot Area Inspection is required for a possible steam leak exists in the Steam Chase.
* A Hot Area Inspection is required for a possible steam leak exists in the Steam Chase.
You are the CRS The inspection is projected to take 30 minutes
* You are the CRS
. The operator you chose to perform the task has a current annual exposure of 1800 mrem. INITIATING CUES (IF APPLICABLE):
* The inspection is projected to take 30 minutes.
Determine what your operator's expected dose will be for the inspection.
* The operator you chose to perform the task has a current annual exposure of 1800 mrem.
Determine what your operator's annual exposure will be after completing the inspection.
INITIATING CUES (IF APPLICABLE):
Using CD 9.2 (RADIATION DOSE GUIDELINES), determine the following:
* Determine what your operators expected dose will be for the inspection.
W hat additional permission s are required to perform this inspection How the additional permission and dose extension is documented on-site   EVALUATOR NOTE: The Survey Map for the Steam Chase is provided on the last page of this JPM. Do NOT provide this to the examinee until after Performance Step 1 of the JPM is complete.
* Determine what your operators annual exposure will be after completing the inspection.
* Using CD 9.2 (RADIATION DOSE GUIDELINES), determine the following:
* What additional permissions are required to perform this inspection
* How the additional permission and dose extension is documented on-site EVALUATOR NOTE: The Survey Map for the Steam Chase is provided on the last page of this JPM. Do NOT provide this to the examinee until after Performance Step 1 of the JPM is complete.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 3 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:         - 935 Survey Map of the Steam Chase
-T-SAT-75) Page 3 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
* Provided on turnover sheet General  
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
  - 935' Survey Map of the Steam Chase Provided on turnover sheet General  


==References:==
==References:==
4 AWI-08.04.01 (Radiation Protection Plan)
4 AWI-08.04.01 (Radiation Protection Plan)
CD 9.2 (Radiation Dose Guidelines)
CD 9.2 (Radiation Dose Guidelines)
Task Standards:
Task Standards:             Calculate Expected Dose to Inspect Equipment Start Time:
Calculate Expected Dose to Inspect Equipment Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
IMPORTANT:
Performance Step: 1         Reviews the survey map for the Steam Chase area.
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP
Critical: N Standard:                   Tells evaluator where survey maps are located Evaluator Cue:             Ask Examinee where Survey Maps are located and then provide examinee with the Steam Chase Survey Map on the last page of this JPM.
-T-SAT-73 (Licensed Operator Requalification Program Examinations
Evaluator Note:             Survey maps and are located on the basement level of the administration building in the same area where personnel obtain their Electronic Dosimeters.
). Performance Step:
Other locations are available, but this is the main location.
1 Critical:  N Reviews the survey map for the Steam Chase area.
Performance:               SATISFACTORY           UNSATISFACTORY Comments:
Standard: Tells evaluator where survey maps are located Evaluator Cue:
Performance Step: 2         Determines general area dose rates in the Steam Chase.
Ask Examinee where Survey Maps are located and then provide examinee with the Steam Chase Survey Map on the last page of this JPM.
Critical: N Standard:                   General area dose rates are determined to be 500 - 2000 mrem/hr.
Evaluator Note:
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
Survey maps and are located on the basement level of the administration building in the same area where personnel obtain their Electronic Dosimeters
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
. Other locations are available, but this is the main location.
 
Performance:
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 4 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Performance Step: 3         Calculate expected dose for the inspection.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Critical: Y Standard:
2 Critical:  N Determines general area dose rates in the Steam Chase. Standard: General area dose rates are determined to be 500  
* Determines minimum total dose for the inspection is:
- 2000 mrem/hr.
o 500 mrem/hr x 0.5 hr = 250 mrem.
Performance:
* Determines maximum total dose for the inspection is:
SATISFACTORY UNSATISFACTORY Comments:
o 2000 mrem/nr x 0.5 hr = 1000 mrem.
QF1075-01 Rev. 5 (FP
Evaluate Cue:               None Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
-T-SAT-75) Page 4 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Performance Step: 4         Calculate the total annual exposure after completion of the inspection.
-G-RM-01. Performance Step:
Critical: Y Standard:                       1. Determines total minimum annual exposure after the inspection:
3 Critical:  Y Calculate expected dose for the inspection.
1800 mrem + 250 mrem = 2050 mrem
Standard: Determines minimum total dose for the inspection is
: 2. Determines total maximum annual exposure after the inspection:
: o 500 mrem/hr x 0.5 hr = 250 mrem. Determines maximum total dose for the inspection is
1800 mrem + 1000 mrem = 2800 mrem Evaluate Cue:               None Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
: o 2000 mrem/nr x 0.5 hr = 1000 mrem. Evaluate Cue:
Performance Step: 5         Determines that the total annual exposure after completion of the inspection Critical: N                  is greater than the administrative dose limit.
None   Performance:
Standard:                   Determines that the total annual exposure after completion of the inspection is greater than the administrative dose limit of 2000 mrem as stated in CD 9.2 and 4-AWI-08.04.01 (up to 40% of 10 CFR 20 limit without First Line Supervisor approval).
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
4 Critical:  Y Calculate the total annual exposure after completion of the inspection.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Standard: 1. Determines total minimum annual exposure after the inspection
 
: 1800 mrem + 250 mrem = 2050 mrem 2. Determines total maximum annual exposure after the inspection
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                 Page 5 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Performance Step: 6         Determines that a dose extension is needed and that as the CRS that they Critical: Y                  may approve the exposure over 2000 mrem.
: 1800 mrem + 1000 mrem = 2800 mrem   Evaluate Cue:
Standard:                   1.     Determines that a dose extension is needed.
None   Performance:
: 2.     Grants permission as CRS to exceed 2000 mrem.
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
Evaluator Cue:               None Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
5 Critical:  N Determines that the total annual exposure after completion of the inspection is greater than the administrative dose limit.
Performance Step: 7         Determines that the dose extension is required to be entered in Action Critical: Y                  Tracking.
Standard: Determines that the total annual exposure after completion of the inspection is greater than the administrative dose limit of 2000 mrem as stated in CD 9.2 and 4-AWI-08.04.01 (up to 40% of 10 CFR 20 limit without First Line Supervisor approval).
Standard:                   Determines extension should be documented in Action Tracking (CAP)
Performance:
Passport to document the dose extension.
SATISFACTORY UNSATISFACTORY Comments:
Evaluator Cue:               When examinee states that they would write a CAP, state that this action is complete.
QF1075-01 Rev. 5 (FP
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
-T-SAT-75) Page 5 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Performance Step: 8       INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED Critical: N Standard:                 Operator informs evaluator that the task is completed.
-G-RM-01. Performance Step:
Evaluator Cue:             Terminate JPM.
6 Critical:  Y Determines that a dose extension is needed and that as the CRS that they may approve the exposure over 2000 mrem.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Standard: 1. Determines that a dose extension is needed.
Terminating Cues:         When examinee identifies that a CAP needs to be written, terminate the JPM.
: 2. Grants permission as CRS to exceed 2000 mrem.
Evaluator Cue:
None   Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step:
7 Critical:  Y Determines that the dose extension is required to be entered in Action Tracking. Standard: Determines extension should be documented in Action Tracking (CAP) Passport to document the dose extension.
Evaluator Cue:
When examinee states that they would write a CAP, state that this action is complete. Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: 8 Critical:  N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED   Standard: Operator informs evaluator that the task is completed
. Evaluator Cue:
Terminate JPM.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
When examinee identifies that a CAP needs to be written, terminate the JPM.
Stop Time:
Stop Time:
Historical Record:
Historical Record:
New create for the 201 6 ILT NRC Exam
New create for the 2016 ILT NRC Exam Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75) Page 6 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 6 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Simulator Setup (as required):
-G-RM-01. Simulator Setup (as required)
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* IC-* (IC-*), (IC Conditions Summary)
IC-* (IC-*), (IC Conditions Summary)
SIMULATOR INPUT  
SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==


Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger QF1075-01 Rev. 5 (FP-T-SAT-75) Page 7 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Manual                                                                                   Severity    Event Trigger     Type     Code                 Description                   Delay     Ramp Or Value   Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
 
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 7 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                   YES NO       N/A
: 1. Are all items on the cover page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?   4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 10. Have the performance steps been identified and typed (Critical /
-Licensed Operators
Sequence / Time Critical) appropriately?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Validation Personnel /Date                  Validation Personnel/Date
 
__________________________        __________________________
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                            Page 8 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 ATTACHMENT 2 JPM Number: JPM-4 AWI-08.04.01-008 JPM
Validation Personnel /Date                  Validation Personnel/Date
 
__________________________        __________________________
==Title:==
Validation Personnel /Date                  Validation Personnel/Date
Authorization To Exceed Administrative Dose Guidelines Examinee & ID:                                                    Evaluator:
__________________________        __________________________
Job
Validation Personnel /Date                  Validation Personnel/Date
 
==Title:==
Date:
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                        Page 9 of 10 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
* A Hot Area Inspection is required for a possible steam leak exists in the Steam Chase.
* You are the CRS
* The inspection is projected to take 30 minutes.
* The operator available to perform the task has a current on file annual exposure of 1800 mrem.
INITIATING CUES (IF APPLICABLE):
* Determine what your operators expected dose will be for the inspection.
* Determine what your operators annual exposure will be after completing the inspection.
* Using CD 9.2 (RADIATION DOSE GUIDELINES), determine the following:
* What additional permissions are required to perform this inspection
* How the additional permission and dose extension is documented on-site Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                      Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF1075-01 Rev. 5 (FP-T-SAT-75)
JOB PERFORMANCE MEASURE (JPM)
SITE:                        MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                    EAL CLASSIFICATION JPM NUMBER:                  A.2-101-002                      REV.        11 RELATED PRA                  None INFORMATION:
TASK NUMBERS /                SS304.103 TASK TITLE(S):                Implement Monticello Emergency Plan during an Alert K/A NUMBERS:                  2.4.41                                Rating: SRO/RO:      4.6/
APPLICABLE METHOD OF TESTING:
Discussion:                Simulate/walkthrough:              Perform:
EVALUATION LOCATION:              In-Plant:                              Control Room:
Simulator:                            Other:
Lab:
Time for Completion:          15      Minutes                  Time Critical:      Yes Alternate Path:              No TASK APPLICABILITY:              SRO:              RO:              NLO Additional site-specific signatures may be added as desired.
Developed by:
Developer                                  Date Validated by:
Validator                                  Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Training Supervisor                              Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75) Page 8 of 10  JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                         Page 2 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
-G-RM-01. ATTACHMENT 2 JPM Number:
JPM-4 AWI-08.04.01-00 8  JPM Title:
Authorization To Exceed Administrative Dose Guidelines Examinee & ID:      Evaluator:
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
.
QF1075-01 Rev. 5 (FP
-T-SAT-75)  Page 9 of 10  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
A Hot Area Inspection is required for a possible steam leak exists in the Steam Chase.
You are the CRS The inspection is projected to take 30 minutes
. The operator available to perform the task has a current on file annual exposure of 1800 mrem. INITIATING CUES (IF APPLICABLE):
Determine what your operator's expected dose will be for the inspection.
Determine what your operator's annual exposure will be after completing the inspection.
Using CD 9.2 (RADIATION DOSE GUIDELINES), determine the following:  What additional permissions are required to perform this inspection How the additional permission and dose extension is documented on-site QF1075-01 Rev. 5 (FP
-T-SAT-75)  Page 10 of 10  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01.
QF1075-01 Rev. 5 (FP
-T-SAT-75)  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)    SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
EAL CLASSIFICATION JPM NUMBER:
A.2-101-002 REV. 11  RELATED PRA INFORMATION:
None  TASK NUMBERS / TASK TITLE(S):  SS304.103 Implement Monticello Emergency Plan during an Alert K/A NUMBERS:
2.4.41        Rating: SRO/RO:
4.6/      APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:    EVALUATION LOCATION:
In-Plant:  Control Room:
Simulator:
Other:          Lab:      Time for Completion:
15 Minutes Time Critical:
Yes      Alternate Path:
No    TASK APPLICABILITY:
SRO:    RO:  NLO    Additional site
-specific signatures may be added as desired.
Developed by:              Developer Date    Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Training Supervisor Date QF1075-01 Rev. 5 (FP
-T-SAT-75)  Page 2 of 9  JPM-A.2-101-002 (EAL Classification) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 1,305: Line 1,031:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant was operating at full power when the Drywell Equipment Drain Sump rate of change (ROC) high alarm comes in and Drywell pressure begins to rise.
* The plant was operating at full power when the Drywell Equipment Drain Sump rate of change (ROC) high alarm comes in and Drywell pressure begins to rise.
The crew discovers that there has been a failure of both No. 11 Recirc pump seals. No. 11 Recirc pump is removed from service and isolated, but leakage continues and the Drywell Equipment Drain Sump ROC has now reached 64 gpm.
* The crew discovers that there has been a failure of both No. 11 Recirc pump seals. No. 11 Recirc pump is removed from service and isolated, but leakage continues and the Drywell Equipment Drain Sump ROC has now reached 64 gpm.
Drywell pressure reaches 2 psig and all required automatic actions are verified to have occurred.
* Drywell pressure reaches 2 psig and all required automatic actions are verified to have occurred.
The applicable abnormal and EOP procedures have been entered.
* The applicable abnormal and EOP procedures have been entered.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Determine the appropriate emergency classification.
* Determine the appropriate emergency classification.
THIS JPM IS TIME CRITICAL INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
* THIS JPM IS TIME CRITICAL
INSTRUCTOR NOTE
* INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
: Start time is when the initiating cue is acknowledged by the examinee. Stop time is when the examinee returns the JPM paper work to you or verbally declares the EAL.
INSTRUCTOR NOTE: Start time is when the initiating cue is acknowledged by the examinee.
Stop time is when the examinee returns the JPM paper work to you or verbally declares the EAL.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75) Page 3 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                     Page 3 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 JPM PERFORMANCE INFORMATION Required Materials:         A.2-101, EAL Chart General  
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
A.2-101, EAL Chart General  


==References:==
==References:==
A.2-101, EAL Chart Task Standards:            Evaluate plant conditions for proper EAL Classification Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).
Performance Step: 1          Locate Procedure A.2-101 (Classification Of Emergencies) and the EAL Critical: N                  Charts.
Standard:                    Locates appropriate procedure and charts.
Performance:                  SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 2          Duty Shift Manager (Interim Emergency Director) Instructions:
Critical: N A. Classification - When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.
: 1. Confirm that the indications have been verified using redundant or coincident indications.
Standard:                    Review and confirm given plant conditions.
Evaluator Cue:                When asked for verification, state that the initial conditions have been verified using redundant indications.
Performance:                  SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


A.2-101, EAL Chart Task Standards:
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                     Page 4 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 Performance Step: 3         Duty Shift Manager (Interim Emergency Director) Instructions:
Evaluate plant conditions for proper EAL Classification Start Time:
Critical: N                      A. Classification - When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
: 2. Refer to Form 5790-101-02 and identify any EALs applicable to the initiating condition.
IMPORTANT:
Standard:                   Refer to Form 5790-101-02 (EAL Chart)
Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
-T-SAT-73 (Licensed Operator Requalification Program Examinations
Performance Step: 4         Duty Shift Manager (Interim Emergency Director) Instructions:
). Performance Step:
Critical: N                      A. Classification - When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.
1 Critical: N Locate Procedure A.2
: 3. Locate the applicable EAL on Form 5790-101-02.
-101 (Classification Of Emergencies) and the EAL Charts. Standard: Locates appropriate procedure and charts.
Standard:                   Locates applicable EAL: EAL FA1.1 Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Performance Step: 5           Duty Shift Manager (Interim Emergency Director) Instructions:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step: 2 Critical:  N Duty Shift Manager (Interim Emergency Director)
Critical: Y                      A. Classification - When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.
Instructions:
A. Classification
- When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.
: 1. Confirm that the indications have been verified using redundant or coincident indications.
Standard: Review and confirm given plant conditions.
Evaluator Cue:
When asked for verification, state that the initial conditions have been verified using redundant indications.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF1075-01 Rev. 5 (FP-T-SAT-75) Page 4 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
3 Critical:
N Duty Shift Manager (Interim Emergency Director)
Instructions:
A. Classification
- When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.
: 2. Refer to Form 5790
-101-02 and identify any EALs applicable to the initiating condition.
Standard: Refer to Form 5790
-101-02 (EAL Chart)
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: 4 Critical:  N Duty Shift Manager (Interim Emergency Director)
Instructions:
A. Classification
- When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.
: 3. Locate the applicable EAL on Form 5790-101-02. Standard: Locates applicable EAL:
EAL FA1.1 Performance:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: 5 Critical:  Y Duty Shift Manager (Interim Emergency Director)
Instructions:
A. Classification
- When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.
: 4. If multiple events and/or indications are involved, classify the emergency based on the event (or indication) that results in the highest (most conservative) emergency classification.
: 4. If multiple events and/or indications are involved, classify the emergency based on the event (or indication) that results in the highest (most conservative) emergency classification.
Standard: Determines EAL FA1.1 is the applicable EAL.
Standard:                     Determines EAL FA1.1 is the applicable EAL.
Evaluator Note:
Evaluator Note:               When the Operator declares the EAL, stop the Time Clock Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
When the Operator declares the EAL, stop the Time Clock Performance:
EAL Declared: _________
SATISFACTORY UNSATISFACTORY Comments:     EAL Declared: _________
Declaration Time: ________
Declaration Time: ________
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP-T-SAT-75) Page 5 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                                     Page 5 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 Performance Step: 6         Duty Shift Manager (Interim Emergency Director) Instructions:
-G-RM-01. Performance Step:
Critical: N                      A. Classification - When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.
6 Critical:  N Duty Shift Manager (Interim Emergency Director) Instructions:
A. Classification
- When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.
: 5. Consider the effect that combinations of events have; that, if taken individually, would constitute a lower emergency classification but collectively may exceed the criteria for a higher classification.
: 5. Consider the effect that combinations of events have; that, if taken individually, would constitute a lower emergency classification but collectively may exceed the criteria for a higher classification.
Standard: Determines EAL FA1.1 is the applicable EAL.
Standard:                   Determines EAL FA1.1 is the applicable EAL.
Performance:
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:     Performance Step: 7 Critical:  N Duty Shift Manager (Interim Emergency Director) Instructions:
Performance Step: 7         Duty Shift Manager (Interim Emergency Director) Instructions:
A. Classification
Critical: N                      A. Classification - When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.
- When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.
: 6. Summon the Shift Emergency Communicator(s) to the Control Room via the Site PA system.
: 6. Summon the Shift Emergency Communicator(s) to the Control Room via the Site PA system.
Standard: Summon the Shift Emergency Communicator(s) to the Control Room.
Standard:                   Summon the Shift Emergency Communicator(s) to the Control Room.
Performance:
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF1075-01 Rev. 5 (FP-T-SAT-75) Page 6 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. Performance Step: 8 Critical:  N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED   Standard: Operator informs evaluator that the task is completed
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 6 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 Performance Step: 8           INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED Critical: N Standard:                     Operator informs evaluator that the task is completed.
. Evaluator Cue:
Evaluator Cue:               Acknowledge task completion.
Acknowledge task completion.
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
Performance:
Terminating Cues:         When The Shift Emergency Communicator Has Been Summoned, Inform The Operator That The JPM Is Complete.
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
When The Shift Emergency Communicator Has Been Summoned, Inform The Operator That The JPM Is Complete.
Stop Time:
Stop Time:
Historical Record:
Historical Record:
Updated for procedure revisions and added to QF
Updated for procedure revisions and added to QF-1075-01 Rev 5 for 2016 ILT NRC Exam Simulator Setup (as required):
-1075-01 Rev 5 for 201 6 ILT NRC Exam Simulator Setup (as required)
: 1. This JPM can be run from the following Standard (Specific) IC sets:
: 1. This JPM can be run from the following Standard (Specific) IC sets:
* IC-* (IC-*), (IC Conditions Summary)
IC-* (IC-*), (IC Conditions Summary)
SIMULATOR INPUT  
SIMULATOR INPUT  


==SUMMARY==
==SUMMARY==


Manual Trigger Type Code Description Delay Ramp Severity Or Value Event Trigger QF1075-01 Rev. 5 (FP
Manual                                                                                   Severity    Event Trigger     Type     Code                 Description                   Delay     Ramp Or Value   Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 7 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                               Page 7 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS YES NO N/A 1. Are all items on the cover page filled in correctly?
REVIEW STATEMENTS                                                                   YES NO       N/A
: 1. Are all items on the cover page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?   4. Do the performance steps accurately reflect trainee's actions in accordance with plant procedures?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non
: 8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
: 9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non
: 10. Have the performance steps been identified and typed (Critical /
-Licensed Operators
Sequence / Time Critical) appropriately?
: 10. Have the performance steps been identified and typed (Critical / Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 11. Have all special tools and equipment needed to perform the task been identified?
: 12. Are all references identified, current, and accurate?
: 12. Are all references identified, current, and accurate?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All applicable questions must be answered "YES" or the JPM is not valid for use. If all applicable questions are answered "YES" then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.
__________________________        __________________________
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Validation Personnel /Date                  Validation Personnel/Date
 
____________________
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                            Page 8 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 ATTACHMENT 2 JPM Number: JPM-A.2-101-002 JPM
______        __________________________
 
Validation Personnel /Date                  Validation Personnel/Date
==Title:==
__________________________        __________________________
EAL Classification Examinee & ID:                                                    Evaluator:
Validation Personnel /Date                  Validation Personnel/Date
Job
__________________________        __________________________
 
Validation Personnel /Date                  Validation Personnel/Date
==Title:==
Date:
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF1075-01 Rev. 5 (FP
QF1075-01 Rev. 5 (FP-T-SAT-75)                                                         Page 9 of 9 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
-T-SAT-75) Page 8 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
* The plant was operating at full power when the Drywell Equipment Drain Sump rate of change (ROC) high alarm comes in and Drywell pressure begins to rise.
-G-RM-01. ATTACHMENT 2 JPM Number:
* The crew discovers that there has been a failure of both No. 11 Recirc pump seals. No. 11 Recirc pump is removed from service and isolated, but leakage continues and the Drywell Equipment Drain Sump ROC has now reached 64 gpm.
JPM-A.2-101-002  JPM Title:
* Drywell pressure reaches 2 psig and all required automatic actions are verified to have occurred.
EAL Classification Examinee & ID:      Evaluator:
* The applicable abnormal and EOP procedures have been entered.
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained
.
QF1075-01 Rev. 5 (FP
-T-SAT-75)  Page 9 of 9  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:
The plant was operating at full power when the Drywell Equipment Drain Sump rate of change (ROC) high alarm comes in and Drywell pressure begins to rise.
The crew discovers that there has been a failure of both No. 11 Recirc pump seals. No. 11 Recirc pump is removed from service and isolated, but leakage continues and the Drywell Equipment Drain Sump ROC has now reached 64 gpm.
Drywell pressure reaches 2 psig and all required automatic actions are verified to have occurred.
The applicable abnormal and EOP procedures have been entered.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
Determine the appropriate emergency classification.
* Determine the appropriate emergency classification.
THIS JPM IS TIME CRITICAL INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.}}
* THIS JPM IS TIME CRITICAL
* INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.}}

Latest revision as of 17:50, 4 February 2020

2016 Monticello Nuclear Generating Plant Initial License Examination Proposed Admin JPMs - RO and SRO
ML17142A415
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/18/2017
From: David Reeser
NRC/RGN-III/DRS/OLB
To:
NRC/RGN-III/DRS/OLB
Shared Package
ML15274A423 List:
References
Download: ML17142A415 (82)


Text

QF1075-01 Rev. 5 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: BULK D/W TEMPERATURE MANUAL CALCULATION JPM NUMBER: JPM-001 REV. 5 RELATED PRA None INFORMATION:

TASK NUMBERS / CR304.103 TASK TITLE(S): Perform Actions Associated with Primary Containment Control K/A NUMBERS: 2.2.15 2.1.45 Rating: SRO/RO: 4.3/3.9-4.3 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 2 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 3 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 INITIAL CONDITIONS:

  • A Steam Line rupture occurred in the Drywell
  • SPDS is OOS and TR-23-115 Point 25 has failed
  • Given the following temperatures from TR-23-115 on Panel C-21:

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to manually calculate and report bulk average Drywell temperature using the operator aid below.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 4 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 JPM PERFORMANCE INFORMATION Required Materials: Calculator General

References:

Operator Aid for Bulk Drywell Temperature Manual Calculation Task Standards: Determine Bulk Drywell Temperature via manual calculation Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Apply Weight Factor to the temperatures from previous step to determine Critical: Y Weight Temperatures.

  • East 932 Point 22 X .400
  • South 951 Point 23 X .423
  • West 970 Point 21 X .093
  • North 994 Point 24 X .084 Standard: Apply Weight Factor to the temperatures as follows:
  • East 932 Point 22 X .400 = (221.3°F x .4 = 88.52)
  • South 951 Point 23 X .423 = (236.9°F x .423 = 100.21)
  • West 970 Point 21 X .093 = (224.2°F x .093 = 20.85)
  • North 994 Point 24 X .084 = (242.6°F x .084 = 20.38)

Evaluator Note: These temperatures are approximate for Mode 1.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 5 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 Performance Step: 4 Add weight temperatures to determine Bulk Average Drywell Temperature.

Critical: Y Standard: Adds weighted temperatures for a calculated temperature of (88.52+100.21+20.85+20.38) = 229.96 + 2°F Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Reports bulk average Drywell temperature calculated above to CRS.

Critical: N Standard: Reports bulk average Drywell temperature calculated above to CRS.

Evaluator Cue: When informed of calculated average drywell bulk temperature, acknowledge the report and state that the JPM is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When informed of calculated average drywell bulk temperature, acknowledge the report and state that the JPM is complete Stop Time:

Historical Record:

Operator aid can be used in the control room, however, Point 25 now exists which provides the calculated Drywell temperature without SPDS. JPM updated to include pictures of temperature recorder and operator aid which will allow performance in the classroom.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 6 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • IC-* (IC-*), (IC Conditions Summary)

SIMULATOR INPUT

SUMMARY

Manual Severity Event Trigger Type Code Description Delay Ramp Or Value Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 7 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 8 of 9 JPM-001 (Bulk D/W Temperature Manual Calculation) Rev. 5 ATTACHMENT 2 JPM Number: JPM-001 JPM

Title:

Bulk D/W Temperature Manual Calculation Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 9 of 9 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • A Steam Line rupture occurred in the Drywell
  • SPDS is OOS and TR-23-115 Point 25 has failed
  • Given the following temperatures from TR-23-115 on Panel C-21:

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to manually calculate and report bulk average Drywell temperature using the operator aid below.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: INDEPENDENT VERIFICATION OF RHR JPM NUMBER: JPM-4 AWI-04.04.02-005 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / CR203.104 TASK TITLE(S): Shutdown RHR - Torus Cooling Mode K/A NUMBERS: Generic 2.2.15 Rating: SRO/RO: 4.3/4.3.9 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 2 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification of RHR) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The BOP operator is performing a shutdown of Torus Cooling on RHR Loop A IAW B.03.04-05 (RHR System).
  • You are an extra operator on shift.

INITIATING CUES:

  • The CRS directs you to perform an independent verification of the shutdown lineup IAW B.03.04-05.F.3 (Torus Cooling Mode - Shutdown) Step 5.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 3 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials: Full Scope simulator General

References:

B.03.04-05 (RHR System)

Task Standards: Independently Verify Torus Cooling Shutdown lineup Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Procedure Step 5.a Step: 1 Independently VERIFY the following valve positions:

Critical: N

a. MO-2008 CLOSED.

Standard: Operator observes MO-2008 is closed.

Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Procedure Step 5.b Critical: N Independently VERIFY the following valve positions:

b. MO-2006 CLOSED.

Standard: Operator observes MO-2006 is closed.

Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 4 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 Performance Procedure Step 5.c Step: 3 Independently VERIFY the following valve positions:

Critical: Y

c. CV-1994 CLOSED Standard: Operator observes MO-1994 is OPEN and reports out of position valve Evaluator Cue: Acknowledge the out of position valve and state that you will initiate an investigation. Tell examinee to continue with IV.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Procedure Step 5.d Step: 4 Independently VERIFY the following valve positions:

Critical: N

d. CV-1996 CLOSED.

Standard: Operator observes CV-1996 is CLOSED Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Procedure Step 5.e Step: 5 Independently VERIFY the following valve positions:

Critical: Y

e. MO-2002 is OPEN.

Standard: Operator observes MO-2002 is in an intermediate position.

Open valve when directed Evaluator Cue: Acknowledge the out of position valve and state the following:

  • An investigation is complete
  • The BOP recalled repositioning the switch too soon
  • They are to fully OPEN the valve.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 5 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 Terminating Cues: When operator repositions MO2002, state that the JPM is complete.

Stop Time:

Historical Record:

New create for the 2016 ILT NRC Exam.

Simulator Setup (as required):

SIMULATOR SETUP:

  • Initialize to any Mode 1 IC where RHR Loop A is in standby
  • Fail CV-1994 in the OPEN position
  • Position MO-2002 to an intermediate position and place control switch to STOP.

SIMULATOR INPUT

SUMMARY

Manual Severity Event Trigger Type Code Description Delay Ramp Or Value Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 6 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 7 of 8 JPM-4 AWI-04.04.02-005 (Independent Verification RHR) Rev. 0 ATTACHMENT 2 JPM Number: JPM-4 AWI-04.04.02-005 JPM

Title:

Independent Verification of RHR Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 8 of 8 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • The BOP operator is performing a shutdown of Torus Cooling on RHR Loop A IAW B.03.04-05 (RHR System).
  • You are an extra operator on shift.

INITIATING CUES:

  • The CRS directs you to perform an independent verification of the shutdown lineup IAW B.03.04-05.F.3 (Torus Cooling Mode - Shutdown) Step 5.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: ELECTRICAL SAFETY REQUIREMENTS FOR RACKING A 4160 KV BREAKER JPM NUMBER: JPM-FP-MA-ES-01-001 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / NL262.104 TASK TITLE(S): Rack Out a 4 KV Circuit Breaker K/A NUMBERS: 2.1.26 Rating: SRO/RO: 3.6/3.4 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 20 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 2 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The Plant is operating at 100%.
  • 11 Core Spray pump has been removed from service for testing of breaker 152-505.
  • Breaker 152-505 is to be Racked OUT to the TEST position INITIATING CUES:
  • IAW B.09.06-05.G.1 (Racking Out 4 kV Breakers) and FP-MA-ES-01 (Electrical Safety):
  • Identify and Locate the required POSTINGS for racking out a 4 kV breaker
  • Identify and Locate the required PERSONAL PROTECTIVE EQUIPMENT (PPE) for racking out a 4 kV breaker
  • Discuss the process/procedures for verifying that the PPE is acceptable for use.

EVALUATOR NOTE: This ADMIN JPM should be performed outside the Lower 4KV Room in the plant to allow the examinee to locate and identify the appropriate PPE.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 3 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev.

0 JPM PERFORMANCE INFORMATION Required Materials: Copies of the following:

B.09.06-05.G.1 (Racking Out A 4 kV Breaker)

FP-MA-ES-01 (Electrical Safety)

General

References:

B.09.06-05 (4.16 KV Station Auxiliary - System Operation)

FP-MA-ES-01 (Electrical Safety)

Task Standards: Examinee identifies proper electrical safety practices for racking out a 4.16 KV breaker.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Reviews procedures B.09.06-05 (4.16 KV Station Auxiliary - System Critical: N Operation), section G.1 PART A and FP-MA-ES-01 (Electrical Safety).

Standard: Operator reviews procedures.

Evaluator Cue: Provide a copy of section G.1 of procedure B.09.06-05 and a copy of the fleet electrical safety manual FP-MA-ES-01.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 4 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Performance Step: 2 B.09.06-05.G.1 (Racking Out A 4 kV Breaker) Procedure Prerequisite Critical: Y Switching in Progress warning sign posted outside affected 4 kV room.

Standard: Identifies that a Switching in Progress warning sign must be posted on the 4 kV Room Door Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 B.09.06-05.G.1 (Racking Out A 4 kV Breaker) Procedure step 5.

Critical: Y Identifies protective clothing IAW procedure FP-MA-ES-01 (Electrical Safety).

Standard: ATTACHMENT 8

  • Class 1 rubber gloves at a minimum (CRITICAL)

ATTACHMENT 4 (SWITCHGEAR 750V to 36 kV)

  • Determines racking breakers is Hazard/Risk Category 4(NOT CRITICAL)

ATTACHMENT 3 (ARC PROTECTIVE APPAREL)

  • Identifies the following minimum protective equipment: (CRITICAL) o Short sleeve shirt natural fiber (Normal Apparel) o Long pants natural fiber (Normal Apparel) o Category 4 flash suit with pants o Hard hat (part of flash hood) o Safety glasses with side shields o Hearing protection (plugs in ear canal) o Category 4 flash hood o Arc/Voltage rated gloves o Leather Gloves Evaluator Cue: None.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 5 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Performance Step: 4 FP-MA-ES-01 (Electrical Safety)

Critical: N Discusses inspection/testing of PPE specified in FP-MA-ES-01 (Electrical Safety).

Standard:

  • Discusses the minimum inspection/testing for each of the following:

o Category 4 flash suit with pants (visual inspection - no holes/tears; uncontaminated by oil, grease, flammable, or combustible liquids) o Safety glasses with side shields (non-metallic) o Category 4 flash hood (visual inspection - no holes/tears; uncontaminated by oil, grease, flammable, or combustible liquids; face shield unobstructed by scratches or other damage) o Arc/Voltage rated gloves (visual inspection - general condition and voltage test date; air-test) o Leather Gloves visual inspection - no holes/tears; uncontaminated by oil, grease, flammable, or combustible liquids)

Evaluator Cue: None.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Terminate the JPM when the examinee has identified the apparel they would don.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 6 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Historical Record:

  • New Electrical Safety RO Admin JPM for the 2016 ILT NRC Exam Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 7 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • IC-* (IC-*), (IC Conditions Summary)

SIMULATOR INPUT

SUMMARY

Manual Severity Event Trigger Type Code Description Delay Ramp Or Value Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 8 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 9 of 10 JPM- FP-MA-ES-01-001 (Electrical Safety Requirements for Racking A 4160 KV Breaker) Rev. 0 ATTACHMENT 2 JPM Number: JPM-FP-MA-ES-01-001 JPM

Title:

Electrical Safety Requirements for Racking A 4160 KV Breaker Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 10 of 10 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • The Plant is operating at 100%.
  • 11 Core Spray pump has been removed from service for testing of breaker 152-505.
  • Breaker 152-505 is to be Racked OUT to the TEST position INITIATING CUES:
  • IAW B.09.06-05.G.1 (Racking Out 4 kV Breakers) and FP-MA-ES-01 (Electrical Safety):
  • Identify and Locate the required POSTINGS for racking out a 4 kV breaker
  • Identify and Locate the required PERSONAL PROTECTIVE EQUIPMENT (PPE) for racking out a 4 kV breaker
  • Discuss the process/procedures for verifying that the PPE is acceptable for use.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: EXPECTED DOSE DETERMINATION TO INSPECT EQUIPMENT JPM NUMBER: JPM-4 AWI-08.04.01-006 REV. 4 RELATED PRA None INFORMATION:

TASK NUMBERS / CR299.189 TASK TITLE(S): Adhere to the Radiation Protection Plan as required by Monticello Tech Specs and 10CFR20 (4AWI-08.04.01).

NL299.128 Describe Radiological Work Control process K/A NUMBERS: Generic 2.3.4 Rating: SRO/RO: 3.7/3.2 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 2 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Radiation Protection has informed the Control Room that a Hot Area Inspection is required for a possible steam leak exists in the Steam Chase.
  • The CRS has chosen you to perform this inspection.
  • The inspection is projected to take 30 minutes.
  • Your current annual exposure is 1800 mrem.

INITIATING CUES (IF APPLICABLE):

  • Determine what your expected dose will be for the inspection.
  • Determine what your annual exposure will be after completing the inspection.
  • Determine if any additional permission would be needed to make the inspection.

EVALUATOR NOTE: The Survey Map for the Steam Chase is provided on the last page of this JPM. Do NOT provide this to the examinee until after Performance Step 1 of the JPM is complete.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 3 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 JPM PERFORMANCE INFORMATION Required Materials: - 935 Survey Map of the Steam Chase

  • Provided on turnover sheet General

References:

4 AWI-08.04.01 Task Standards: Calculate Expected Dose to Inspect Equipment Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Reviews the survey map for the Steam Chase area.

Critical: N Standard: Tells evaluator where survey maps are located Evaluator Cue: Ask Examinee where Survey Maps are located and then provide examinee with the Steam Chase Survey Map on the last page of this JPM.

Evaluator Note: Survey maps and are located on the basement level of the administration building in the same area where personnel obtain their Electronic Dosimeters.

Other locations are available, but this is the main location.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Determines general area dose rates in the Steam Chase.

Critical: N Standard: General area dose rates are determined to be 500 - 2000 mrem/hr.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 4 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 Performance Step: 3 Calculate expected dose for the inspection.

Critical: Y Standard:

  • Determines minimum total dose for the inspection is:

o 500 mrem/hr x 0.5 hr = 250 mrem.

  • Determines maximum total dose for the inspection is:

o 2000 mrem/nr x 0.5 hr = 1000 mrem.

Evaluate Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Calculate the total annual exposure after completion of the inspection.

Critical: Y Standard: 1. Determines total minimum annual exposure after the inspection:

1800 mrem + 250 mrem = 2050 mrem

2. Determines total maximum annual exposure after the inspection:

1800 mrem + 1000 mrem = 2800 mrem Evaluate Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Determines that the total annual exposure after completion of the inspection Critical: N is greater than the administrative dose limit.

Standard: Determines that the total annual exposure after completion of the inspection is greater than the administrative dose limit of 2000 mrem as stated in 4-AWI-08.04.01 (up to 40% of 10 CFR 20 limit without First Line Supervisor approval).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 5 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 Performance Step: 6 Determines that a dose extension is needed and notifies the CRS that their Critical: Y permission will be required to exceed the 2000 mrem limit.

Standard: 1. Determines that a dose extension is needed.

2. Contacts the CRS to get permission to exceed 2000 mrem.

Evaluator Cue: State as the CRS that you will complete the necessary paperwork and the he can perform the needed inspection.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED Critical: N Standard: Operator informs evaluator that the task is completed.

Evaluator Cue: Terminate JPM.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Operator informs the evaluator that the task is complete Stop Time:

Historical Record:

Updated for 2016 ILT NRC Exam Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 6 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 7 of 9 JPM-4 AWI-08.04.01-006 (Expected Dose Determination To Inspect Equipment) Rev. 4 ATTACHMENT 2 JPM Number: JPM-4 AWI-08.04.01-006 JPM

Title:

Expected Dose Determination to Inspect Equipment Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 8 of 9 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • Radiation Protection has informed the Control Room that a Hot Area Inspection is required for a possible steam leak exists in the Steam Chase.
  • The CRS has chosen you to perform this inspection.
  • The inspection is projected to take 30 minutes.
  • Your current annual exposure is 1800 mrem.

INITIATING CUES (IF APPLICABLE):

  • Determine what your expected dose will be for the inspection.
  • Determine what your annual exposure will be after completing the inspection.
  • Determine if any additional permission would be needed to make the inspection.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 9 of 9 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: PRE-JOB BRIEF JPM NUMBER: JPM-FP-PA-HU-06-001 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / SS299.297 TASK TITLE(S): Conduct Pre-Job Briefings 2.1.1 K/A NUMBERS: Rating: SRO/RO: 4.2/3.8 Conduct of operations APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 2 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Plant is at rated conditions.

INITIATING CUES (IF APPLICABLE):

  • You are the control room supervisor and designated as the Briefing Leader.
  • Using the Online Work Schedule, FP-PA-HU-06 (Pre-job Briefs and Post Job Critiques) and QF0465 (Pre-Job Brief Checklist), determine the risk level and minimum required Pre-Job Brief Level.
  • INFORM EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

EVALUATOR NOTE: Provide examinee copies of the following:

  • FP-PA-HU-06 (Pre-job Briefs and Post Job Critiques)
  • QF0465 (Pre-Job Brief Checklist)
  • Online Work Schedule Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 3 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials: 1. FP-PA-HU-06 (Pre-Job Briefs and Post-Job Critiques)

2. QF0465 (Pre-Job Brief Checklist)
3. Copy of OSP-NIP-0590 and copy of the On-Line Work schedule with the test shown as a risk rating of NM (Nuclear Risk Medium)

General

References:

1. OSP-NIP-0590 (APRM Heat Balance Calibration)

Task Standards: FP-PA-HU-06 (Pre-Job Briefs and Post Job Critiques)

Start Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 4 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Trainee refers to FP-PA-HU-06 Step 5.1.1 The Briefing Leader screens the Critical N planned work activity to determine the appropriate level of briefing warranted for the task or activity (Refer to Attachment 1, Pre-Job Brief Process).

Standard: Refers to Attachment 1 - Pre-Job Brief Process Evaluator Note: None Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 FP-PA-HU-06 Attachment 1 Pre-Job Brief Process -determines risk based off Critical Y entry block of flow chart Standard: Determines task is medium risk based off the Online Work Schedule or FP-PA-HU-06 4.15 Risk definitions.

Evaluator Note: None Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 FP-PA-HU-06 Attachment 1 Pre-Job Brief Process flow chart Normal Risk Critical N block and Medium Risk blocks Standard: Trainee follows flow chart and evaluates Normal Risk block as NO and Medium Risk block as YES Evaluator Note: None Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 5 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 Performance Step: 4 FP-PA-HU-06 Attachment 1 Pre-Job Brief Process flow chart Simple block Critical N Standard: Trainee determines task is Simple as defined in HU-PA-HU-06 4.2 Complexity Simple - A task that is typically controlled by one or two individuals and does not involve interaction with other wok groups. A single procedure is used to direct the activity.

Evaluator Note: None.

Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 FP-PA-HU-06 Attachment 1 Pre-Job Brief Process - determines minimum Critical Y level of Pre-Job brief required Standard: Trainee follows flow chart and determines a standard pre-job brief is the minimum level Evaluator Note: If desired, you may ask the examinee to discuss the use of the PJB checklist (QF0465)

Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Once the risk and PJB level have been determined, terminate the JPM.

Stop Time:

Historical Record: New create for the 2016 ILT NRC Exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 6 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 7 of 8 JPM-FP-PA-HU-06-001 (Pre-Job Brief) Rev. 0 ATTACHMENT 2 JPM Number: JPM-FP-PA-HU-06-001 JPM

Title:

Pre-Job Brief Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 8 of 8 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • Plant is at rated conditions.

INITIATING CUES (IF APPLICABLE):

  • You are the control room supervisor and designated as the Briefing Leader.
  • Using the Online Work Schedule, FP-PA-HU-06 (Pre-job Briefs and Post Job Critiques) and QF0465 (Pre-Job Brief Checklist), determine the risk level and minimum required Pre-Job Brief Level.
  • INFORM EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 4 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: SRO - NRC LICENSE MAINTENANCE RESPONSIBILITIES JPM NUMBER: JPM-OWI-01.08-002 REV. 1 RELATED PRA None INFORMATION:

TASK NUMBERS / SS299.296 TASK TITLE(S): Implement the instructions regarding maintenance of active NRC licenses K/A NUMBERS: 2.1 2.1.4 Rating: SRO/RO: 3.8 / 3.3 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 4 (FP-T-SAT-75) Page 2 of 8 JPM-OWI-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 JPM Number: JPM-OWI-01.08-002 JPM

Title:

SRO - NRC License Maintenance Responsibilities Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 4 (FP-T-SAT-75) Page 3 of 8 JPM-OWI-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 JPM BRIEFING/TURNOVER Provide briefing/turnover in accordance with applicable program description and/or training procedure.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are a Licensed Senior Reactor Operator.
  • You are qualified to stand the following watches:

o Shift Manager (SM) o Control Room Supervisor (CRS) o Shift Technical Advisor (STA) o Work Execution Center SRO (WEC-SRO)

  • You are current in Licensed Operator Requalification training and your medical status is acceptable.
  • The dates, shift times and positions are provided for the watches you stood during the 2nd Quarter.

INITIATING CUES:

  • Determine if you have met the requirements for maintaining your SRO license active.

Date Shift Position 4/1 Days 0700-1900 WEC-SRO 4/2 Days 0700-1900 WEC-SRO 4/3 Days 0700-1900 WEC-SRO 4/6 Nights 1900-0700 SM 4/7 Nights 1900-0700 WEC-SRO 4/8 Nights 1900-0700 WEC-SRO 4/9 Nights 1900-0700 WEC-SRO 5/2 Days 0700-1900 WEC-SRO 5/3 Days 0700-1900 SM 5/4 Days 0700-1900 WEC-SRO 5/5 Relief 0700-1500 CRS 5/6 Days 0700-1900 WEC-SRO 5/10 Nights 1900-0700 WEC-SRO 5/12 Nights 1900-0700 WEC-SRO 5/13 Nights 1900-0700 WEC-SRO 5/20 Days 0700-1900 SM 5/21 Days 0700-1900 SM 5/22 Days 0700-1900 WEC-SRO 5/23 Days 0700-1900 WEC-SRO 6/4 Days 0700-1900 WEC-SRO 6/5 Days 0700-1900 STA 6/6 Days 0700-1900 WEC-SRO 6/24 Nights 1900-0700 WEC-SRO 6/30 Nights 1900-0700 WEC-SRO Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 4 (FP-T-SAT-75) Page 4 of 8 JPM-OWI-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 JPM PERFORMANCE INFORMATION Required Materials:

  • OWI-01.08 (NRC License Maintenance Responsibilities)

General

References:

  • OWI-01.08 (NRC License Maintenance Responsibilities)
  • 2142 (Monticello Active NRC SRO/RO Qualification Checklist)

Task Standards:

  • Determine that the minimum number of required licensed watches is NOT met and their NRC RO license is inactive.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Locate and review controlled copy of Procedure OWI-01.08 (NRC License Critical: N Maintenance Responsibilities).

Standard: Obtains and reviews correct procedure.

Evaluator Cue: If controlled copy is not available for the performance of the JPM, then provide the examinee with a copy of OWI-01.08.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 4 (FP-T-SAT-75) Page 5 of 8 JPM-OWI-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 Performance Step: 2 Procedure Step 4.2.2.c Critical: N Maintaining an NRC license active requires the following:

  • Standing the required number of watches as the Licensed Operator on record during each calendar quarter.

Standard:

  • Reviews this general requirement Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Procedure Step 4.2.4.

Critical: Y Monticellos Technical Specifications requires two SRO and two RO Licensed Operators on shift during routine power operations. Credit for license maintenance is granted when an Operator fills one of these Tech Spec required positions. The Shift Manager, Control Room Supervisor, Nuclear Lead Plant Equipment and Reactor Operator (NLPE&RO) and the Nuclear Plant Equipment and Reactor Operator (NPE&RO) designated as Operator at the Controls (OATC) are considered as licensed duty positions for the purpose of license maintenance credit.

Standard: Determines that ONLY the SM or CRS positions can be counted toward maintenance of their active NRC license.

Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 4 (FP-T-SAT-75) Page 6 of 8 JPM-OWI-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 Performance Step: 4 Procedure Step 4.2.6 Critical: Y To maintain active license status, each licensee SHALL actively perform the functions of the OATC (NPE&RO), Nuclear Lead Plant Equipment and Reactor Operator (NLPE&RO) or Senior Reactor Operator (e.g. Control Room Supervisor or Shift Manager) a minimum of five 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts per calendar quarter.

Standard:

  • Determines that a total of five watches in the required positions of SM or CRS were performed; however, recognizes that the May 5th watch was only an eight hour relief shift.
  • Determines that the minimum of five twelve hour shifts in a required licensed position has not been met to maintain an active NRC license.

Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Once the determination has been made whether the minimum number of watches has been / NOT been met then state JPM complete.

Stop Time:

Historical Record:

  • Procedural updates for the 2015 ILT NRC Exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 4 (FP-T-SAT-75) Page 7 of 8 TURNOVER SHEET INITIAL CONDITIONS:

  • You are a Licensed Senior Reactor Operator.
  • You are qualified to stand the following watches:

o Shift Manager (SM) o Control Room Supervisor (CRS) o Shift Technical Advisor (STA) o Work Execution Center SRO (WEC-SRO)

  • You are current in Licensed Operator Requalification training and your medical status is acceptable.
  • The dates, shift times and positions are provided for the watches you stood during the 2nd Quarter.

INITIATING CUES:

  • Determine if you have met the requirements for maintaining your SRO license active.

Date Shift Position 4/1 Days 0700-1900 WEC-SRO 4/2 Days 0700-1900 WEC-SRO 4/3 Days 0700-1900 WEC-SRO 4/6 Nights 1900-0700 SM 4/7 Nights 1900-0700 WEC-SRO 4/8 Nights 1900-0700 WEC-SRO 4/9 Nights 1900-0700 WEC-SRO 5/2 Days 0700-1900 WEC-SRO 5/3 Days 0700-1900 SM 5/4 Days 0700-1900 WEC-SRO 5/5 Relief 0700-1500 CRS 5/6 Days 0700-1900 WEC-SRO 5/10 Nights 1900-0700 WEC-SRO 5/12 Nights 1900-0700 WEC-SRO 5/13 Nights 1900-0700 WEC-SRO 5/20 Days 0700-1900 SM 5/21 Days 0700-1900 SM 5/22 Days 0700-1900 WEC-SRO 5/23 Days 0700-1900 WEC-SRO 6/4 Days 0700-1900 WEC-SRO 6/5 Days 0700-1900 STA 6/6 Days 0700-1900 WEC-SRO 6/24 Nights 1900-0700 WEC-SRO 6/30 Nights 1900-0700 WEC-SRO Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 4 (FP-T-SAT-75) Page 8 of 8 JPM-OWI-01.08-002 (SRO - NRC License Maintenance Responsibilities) Rev. 1 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: LCO 3.0.9 APPLICATION DETERMINATION - BLOCKED OPEN HELB DOOR JPM NUMBER: JPM-OWI-02.07-002 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / SS299.340 TASK TITLE(S): Implement Operations Work Control K/A NUMBERS: 2.2 2.2.40 Rating: SRO/RO: 4.7 / 3.4 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 2 of 11 JPM-OWI-02.07-002 (LCO 3.0.9 Application Determination) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Plant is at 100% power and you are a duty SRO.
  • HELB Door-479 (TRB Bldg 911 North Corridor) is currently blocked open and can NOT be closed.
  • Door-479 is NOT a fire door but if blocked OPEN could require Tech Spec related SSCs located in the Div 1 and Div 2 4KV Rooms to be INOPERABLE INITIATING CUES:
  • Evaluate Technical Specifications and determine if LCO 3.0.9 can be applied IAW OWI-02.07 (Operations Work Control) for Door-479 being blocked OPEN.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 3 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 JPM PERFORMANCE INFORMATION Required Materials: A standard Operation Manual book cart containing the following:

  • OWIs
  • AWIs
  • Technical Specifications General

References:

  • OWI-02.07 (Operations Work Control)
  • 4 AWI-08.01.03 (HELB Practices)
  • Technical Specifications Task Standards: Determination is made that LCO 3.0.9 cannot be applied for Door-479 being blocked OPEN.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Locate and review controlled copy of Procedures OWI-02.07 (Operations Work Critical: N Control) & 4 AWI-08.01.03 (HELB Practices).

Standard:

  • Obtains and reviews correct procedures.
  • May also obtain and review LCO 3.0.9 of the Technical Specifications.

Evaluator Cue: If a book cart is not available, PROVIDE copies of TS 3.0.9, OWI-02.07 &

4 AWI-08.01.03.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 4 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Performance Step: 2 OWI-02.07 Procedure Step 4.3.1.F.2.

Critical: N Tech Spec ACTION Requirements NOTE: Under limited conditions, Tech Spec LCO 3.0.9 relieves the requirement for barriers to perform their related support function for up to 30 days, before declaring the supported system inoperable. Figure 5.3 LCO 3.0.9 Applicability Determination is used to determine the acceptability of using the degraded barrier allowance.

Perform Figure 5.3 LCO 3.0.9 Applicability Determination when an SSC is to be declared inoperable solely due to a failed supporting barrier, and it is desired to delay the required action associated with the SSC inoperability. If the Applicability Determination permits use of LCO 3.0.9, then a PRA risk assessment must be completed to determine the allowed completion time (TC) before declaring the supported system LCO not met.

Standard: Refers to Figure 5.3 (LCO 3.0.9 Applicability Determination)

Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 OWI-02.07 Figure 5.3, Step 1.

Critical: N Identify the initiating event category for the degraded barrier(s).

Standard:

  • Based on the Initial Conditions, determines the initiating event category for this barrier is internal flooding and/or HELB.
  • May refer to 4 AWI-08.01.03, Figure 5.1 (Consequences of HELB Doors Out of Position) for clarification of Door-479 requirements and impact on Div. 1 and Div. 2 equipment but use of this procedure is NOT REQUIRED.

Evaluator Note: Instructions for using Figure 5.3 are on the proceeding procedure pages.

Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 5 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Performance Step: 4 OWI-02.07 Figure 5.3, Step 2.

Critical: N Is the barrier(s) part of a ventilation system, a fire barrier, protecting only non-Tech Spec Systems, a snubber, or not rendering a Tech Spec System inoperable?

Standard:

  • Answers this question NO.

Non-Critical Portion:

  • Determines the following apply to Door-479:

o NOT part of a ventilation system.

o NOT a fire barrier.

o Protects Tech Spec systems.

o NOT a snubber.

o Renders associated Tech Spec SSCs located in the Div 1 and Div 2 4KV Rooms INOPERABLE.

Evaluator Cue: None Evaluator Note: Operator may answer questions without referring to OWI-02.07, OWIs are Information Use Procedures and are not required to be referenced.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 OWI-02.07 Figure 5.3, Step 3.

Critical: Y Does the degraded barrier (or barriers) protect only one division of a two division system?

Standard:

  • Answers this question NO.
  • Determines Door-479 protects both divisions of 4KV.

Evaluator Cue: None Evaluator Note: Operator may answer questions without referring to OWI-02.07, OWIs are Information Use Procedures and are not required to be referenced.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 6 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Performance Step: 6 OWI-02.07 Figure 5.3, Step 4 Critical: N Does the degraded barrier protect a single division system?

Standard:

  • Determines No, Door 479 protects 4KV which is a 2 division system Evaluator Cue: None.

Evaluator Note: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 OWI-02.07 Figure 5.3, Step 5 Critical: N NOTE: The following question must be asked for each degraded barrier: Does the barrier protect both divisions of a two-division system?

Standard:

  • Determines Yes, Door 479 protects both divisions of a two division system Evaluator Cue: None.

Evaluator Note: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 OWI-02.07 Figure 5.3, Outcome Critical: Y Standard:

  • Determines LCO3.09 allowance is NOT permitted Evaluator Cue: None.

Evaluator Note: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Determination is made that LCO 3.0.9 CANNOT be used for Door-479 HELB barrier.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 7 of 11 JPM-OWI-02.07-001 (LCO 3.0.9 Application Determination) Rev. 3 Historical Record:

Created NEW for 2016 ILT NRC Exam Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • IC-* (IC-*), (IC Conditions Summary)

SIMULATOR INPUT

SUMMARY

Manual Severity Event Trigger Type Code Description Delay Ramp Or Value Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 8 of 11 JPM-OWI-02.07-002 (LCO 3.0.9 Application Determination) Rev. 0 ATTACHMENT 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 9 of 11 JPM-OWI-02.07-002 (LCO 3.0.9 Application Determination) Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date ATTACHMENT 2 JPM Number: JPM-OWI-02.07-002 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 10 of 11 JPM-OWI-02.07-002 (LCO 3.0.9 Application Determination) Rev. 0 JPM

Title:

LCO 3.0.9 Application Determination Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 11 of 11 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • Plant is at 100% power and you are a duty SRO.
  • HELB Door-479 (TRB Bldg 911 North Corridor) is currently blocked open and can NOT be closed.
  • Door-479 is NOT a fire door but if blocked OPEN could require Tech Spec related SSCs located in the Div 1 and Div 2 4KV Rooms to be INOPERABLE INITIATING CUES:
  • Evaluate Technical Specifications and determine if LCO 3.0.9 can be applied IAW OWI-02.07 (Operations Work Control) for Door-479 being blocked OPEN.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: AUTHORIZATION TO EXCEED ADMINISTRATIVE DOSE GUIDELINES JPM NUMBER: JPM-4 AWI-08.04.01-008 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / CR299.189 TASK TITLE(S): Adhere to the Radiation Protection Plan as required by Monticello Tech Specs and 10CFR20 (4AWI-08.04.01).

K/A NUMBERS: Generic 2.3.4 Rating: SRO/RO: 3.7/3.2 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 15 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 2 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • A Hot Area Inspection is required for a possible steam leak exists in the Steam Chase.
  • You are the CRS
  • The inspection is projected to take 30 minutes.
  • The operator you chose to perform the task has a current annual exposure of 1800 mrem.

INITIATING CUES (IF APPLICABLE):

  • Determine what your operators expected dose will be for the inspection.
  • Determine what your operators annual exposure will be after completing the inspection.
  • Using CD 9.2 (RADIATION DOSE GUIDELINES), determine the following:
  • What additional permissions are required to perform this inspection
  • How the additional permission and dose extension is documented on-site EVALUATOR NOTE: The Survey Map for the Steam Chase is provided on the last page of this JPM. Do NOT provide this to the examinee until after Performance Step 1 of the JPM is complete.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 3 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials: - 935 Survey Map of the Steam Chase

  • Provided on turnover sheet General

References:

4 AWI-08.04.01 (Radiation Protection Plan)

CD 9.2 (Radiation Dose Guidelines)

Task Standards: Calculate Expected Dose to Inspect Equipment Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Reviews the survey map for the Steam Chase area.

Critical: N Standard: Tells evaluator where survey maps are located Evaluator Cue: Ask Examinee where Survey Maps are located and then provide examinee with the Steam Chase Survey Map on the last page of this JPM.

Evaluator Note: Survey maps and are located on the basement level of the administration building in the same area where personnel obtain their Electronic Dosimeters.

Other locations are available, but this is the main location.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Determines general area dose rates in the Steam Chase.

Critical: N Standard: General area dose rates are determined to be 500 - 2000 mrem/hr.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 4 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Performance Step: 3 Calculate expected dose for the inspection.

Critical: Y Standard:

  • Determines minimum total dose for the inspection is:

o 500 mrem/hr x 0.5 hr = 250 mrem.

  • Determines maximum total dose for the inspection is:

o 2000 mrem/nr x 0.5 hr = 1000 mrem.

Evaluate Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Calculate the total annual exposure after completion of the inspection.

Critical: Y Standard: 1. Determines total minimum annual exposure after the inspection:

1800 mrem + 250 mrem = 2050 mrem

2. Determines total maximum annual exposure after the inspection:

1800 mrem + 1000 mrem = 2800 mrem Evaluate Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Determines that the total annual exposure after completion of the inspection Critical: N is greater than the administrative dose limit.

Standard: Determines that the total annual exposure after completion of the inspection is greater than the administrative dose limit of 2000 mrem as stated in CD 9.2 and 4-AWI-08.04.01 (up to 40% of 10 CFR 20 limit without First Line Supervisor approval).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 5 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Performance Step: 6 Determines that a dose extension is needed and that as the CRS that they Critical: Y may approve the exposure over 2000 mrem.

Standard: 1. Determines that a dose extension is needed.

2. Grants permission as CRS to exceed 2000 mrem.

Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Determines that the dose extension is required to be entered in Action Critical: Y Tracking.

Standard: Determines extension should be documented in Action Tracking (CAP)

Passport to document the dose extension.

Evaluator Cue: When examinee states that they would write a CAP, state that this action is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED Critical: N Standard: Operator informs evaluator that the task is completed.

Evaluator Cue: Terminate JPM.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee identifies that a CAP needs to be written, terminate the JPM.

Stop Time:

Historical Record:

New create for the 2016 ILT NRC Exam Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 6 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • IC-* (IC-*), (IC Conditions Summary)

SIMULATOR INPUT

SUMMARY

Manual Severity Event Trigger Type Code Description Delay Ramp Or Value Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 7 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 8 of 10 JPM-4 AWI-08.04.01-008 (Authorization To Exceed Administrative Dose Guidelines) Rev. 0 ATTACHMENT 2 JPM Number: JPM-4 AWI-08.04.01-008 JPM

Title:

Authorization To Exceed Administrative Dose Guidelines Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 9 of 10 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • A Hot Area Inspection is required for a possible steam leak exists in the Steam Chase.
  • You are the CRS
  • The inspection is projected to take 30 minutes.
  • The operator available to perform the task has a current on file annual exposure of 1800 mrem.

INITIATING CUES (IF APPLICABLE):

  • Determine what your operators expected dose will be for the inspection.
  • Determine what your operators annual exposure will be after completing the inspection.
  • Using CD 9.2 (RADIATION DOSE GUIDELINES), determine the following:
  • What additional permissions are required to perform this inspection
  • How the additional permission and dose extension is documented on-site Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 10 of 10 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: EAL CLASSIFICATION JPM NUMBER: A.2-101-002 REV. 11 RELATED PRA None INFORMATION:

TASK NUMBERS / SS304.103 TASK TITLE(S): Implement Monticello Emergency Plan during an Alert K/A NUMBERS: 2.4.41 Rating: SRO/RO: 4.6/

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 15 Minutes Time Critical: Yes Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 2 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant was operating at full power when the Drywell Equipment Drain Sump rate of change (ROC) high alarm comes in and Drywell pressure begins to rise.
  • The crew discovers that there has been a failure of both No. 11 Recirc pump seals. No. 11 Recirc pump is removed from service and isolated, but leakage continues and the Drywell Equipment Drain Sump ROC has now reached 64 gpm.
  • Drywell pressure reaches 2 psig and all required automatic actions are verified to have occurred.
  • The applicable abnormal and EOP procedures have been entered.

INITIATING CUES (IF APPLICABLE):

  • Determine the appropriate emergency classification.
  • THIS JPM IS TIME CRITICAL
  • INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

INSTRUCTOR NOTE: Start time is when the initiating cue is acknowledged by the examinee.

Stop time is when the examinee returns the JPM paper work to you or verbally declares the EAL.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 3 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 JPM PERFORMANCE INFORMATION Required Materials: A.2-101, EAL Chart General

References:

A.2-101, EAL Chart Task Standards: Evaluate plant conditions for proper EAL Classification Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73 (Licensed Operator Requalification Program Examinations).

Performance Step: 1 Locate Procedure A.2-101 (Classification Of Emergencies) and the EAL Critical: N Charts.

Standard: Locates appropriate procedure and charts.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Duty Shift Manager (Interim Emergency Director) Instructions:

Critical: N A. Classification - When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.

1. Confirm that the indications have been verified using redundant or coincident indications.

Standard: Review and confirm given plant conditions.

Evaluator Cue: When asked for verification, state that the initial conditions have been verified using redundant indications.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 4 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 Performance Step: 3 Duty Shift Manager (Interim Emergency Director) Instructions:

Critical: N A. Classification - When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.

2. Refer to Form 5790-101-02 and identify any EALs applicable to the initiating condition.

Standard: Refer to Form 5790-101-02 (EAL Chart)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Duty Shift Manager (Interim Emergency Director) Instructions:

Critical: N A. Classification - When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.

3. Locate the applicable EAL on Form 5790-101-02.

Standard: Locates applicable EAL: EAL FA1.1 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Duty Shift Manager (Interim Emergency Director) Instructions:

Critical: Y A. Classification - When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.

4. If multiple events and/or indications are involved, classify the emergency based on the event (or indication) that results in the highest (most conservative) emergency classification.

Standard: Determines EAL FA1.1 is the applicable EAL.

Evaluator Note: When the Operator declares the EAL, stop the Time Clock Performance: SATISFACTORY UNSATISFACTORY Comments:

EAL Declared: _________

Declaration Time: ________

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 5 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 Performance Step: 6 Duty Shift Manager (Interim Emergency Director) Instructions:

Critical: N A. Classification - When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.

5. Consider the effect that combinations of events have; that, if taken individually, would constitute a lower emergency classification but collectively may exceed the criteria for a higher classification.

Standard: Determines EAL FA1.1 is the applicable EAL.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Duty Shift Manager (Interim Emergency Director) Instructions:

Critical: N A. Classification - When informed of plant parameters, radiological release levels or events which indicate that an emergency classification may be appropriate, evaluate the emergency classification.

6. Summon the Shift Emergency Communicator(s) to the Control Room via the Site PA system.

Standard: Summon the Shift Emergency Communicator(s) to the Control Room.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 6 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 Performance Step: 8 INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED Critical: N Standard: Operator informs evaluator that the task is completed.

Evaluator Cue: Acknowledge task completion.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When The Shift Emergency Communicator Has Been Summoned, Inform The Operator That The JPM Is Complete.

Stop Time:

Historical Record:

Updated for procedure revisions and added to QF-1075-01 Rev 5 for 2016 ILT NRC Exam Simulator Setup (as required):

1. This JPM can be run from the following Standard (Specific) IC sets:
  • IC-* (IC-*), (IC Conditions Summary)

SIMULATOR INPUT

SUMMARY

Manual Severity Event Trigger Type Code Description Delay Ramp Or Value Trigger Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 7 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 8 of 9 JPM-A.2-101-002 (EAL Classification) Rev. 11 ATTACHMENT 2 JPM Number: JPM-A.2-101-002 JPM

Title:

EAL Classification Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF1075-01 Rev. 5 (FP-T-SAT-75) Page 9 of 9 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • The plant was operating at full power when the Drywell Equipment Drain Sump rate of change (ROC) high alarm comes in and Drywell pressure begins to rise.
  • The crew discovers that there has been a failure of both No. 11 Recirc pump seals. No. 11 Recirc pump is removed from service and isolated, but leakage continues and the Drywell Equipment Drain Sump ROC has now reached 64 gpm.
  • Drywell pressure reaches 2 psig and all required automatic actions are verified to have occurred.
  • The applicable abnormal and EOP procedures have been entered.

INITIATING CUES (IF APPLICABLE):

  • Determine the appropriate emergency classification.
  • THIS JPM IS TIME CRITICAL
  • INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.