ML17156A043

From kanterella
Jump to navigation Jump to search
2016 Monticello Nuclear Generating Plant Initial Licensed Operator Examination ES-301-3
ML17156A043
Person / Time
Site: Monticello 
Issue date: 05/31/2017
From: David Reeser
NRC/RGN-III/DRS/OLB
To:
NRC/RGN-III/DRS/OLB
Shared Package
ML15274A423 List:
References
Download: ML17156A043 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: Monticello Nuclear Generating Plant Date of Examination: November 2016 Operating Test Number: 2016-301

1. General Criteria Initials
a.

The operating test conforms with the previously approved outline; changes are consistent with samoling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).

b.

There is no day-to-day repetition between this and other operating tests to be administered durina this examination.

c.

The ooeratina test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.)

d.

Overlap with the written examination and between different parts of the operating test is within acceotable limits.

e.

It appears that the operating test will differentiate between competent and less-than-competent applicants at the desianated license level.

2. Walk-Through Criteria
a.

Each JPM includes the following, as applicable:

b.

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:

detailed expected actions with exact criteria and nomenclature system response and other Eixaminer cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.

3. Simulator Criteria a

b*

c#

JZ-tJ/A-~

~ I

~~

J...

'eu3

z_

~

I-

~

The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-ir 1 f b ~

301-4 and a copy is attached.

I~

a.
b.
c.
d.

NOTE:

  • The facility signature is not applicable for NRC-developed tests.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.

Date

\\ \\\\1\\ 2.0l,b NlA 1117 / ttp I