2016 Monticello Nuclear Generating Plant Initial Licensed Operator Examination ES-301-3
ML17156A043
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/31/2017
From: David Reeser
NRC/RGN-III/DRS/OLB
To:
NRC/RGN-III/DRS/OLB
Shared Package
ML15274A423 List:
References
Download: ML17156A043 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: Monticello Nuclear Generating Plant Date of Examination : November 2016 Operating Test Number: 2016-301 Initials

1. General Criteria a b* c#
a. The operating test conforms with the previously approved outline; changes are consistent with samoling requirements (e.g., 10 CFR 55 .45, operational importance, safety fu nction distribution). JZ- tJ/A- ~
b. There is no day-to-day repetition between this and other operating tests to be administered durina this examination.

~ I ~~

c. The ooeratina test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.) ;J... 'eu3
z_

~

d. Overlap with the written examination and between different parts of the operating test is within acceotable limits.
e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the desianated license level.
I- ~
2. Walk-Through Criteria - - --
a. Each JPM includes the following , as applicable:

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:

- detailed expected actions with exact criteria and nomenclature

- system response and other Eixaminer cues

- statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the sequence of steps, if applicable

b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached .

ir 1f b ~

I~

Date

a. \\\1\ 2.0l,b
b. NlA
c. 1117 / ttp

' I d.

NOTE:

  • The facility signature is not applicable for NRC-developed tests.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required .