| issue date = 01/13/2006
| issue date = 01/13/2006
| title = IR 05000354-05-301; November 28 to December 5, 2005; Hope Creek; Initial Operator Licensing Examination. Two of Two Applicants Passed the Examination (One Reactor Operator (Ro), One Senior Reactor Operator (SRO) Instant)
| title = IR 05000354-05-301; November 28 to December 5, 2005; Hope Creek; Initial Operator Licensing Examination. Two of Two Applicants Passed the Examination (One Reactor Operator (Ro), One Senior Reactor Operator (SRO) Instant)
| author name = Conte R J
| author name = Conte R
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Levis W
| addressee name = Levis W
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ary 13, 2006
[[Issue date::January 13, 2006]]


Mr. William LevisSenior Vice President and Chief Nuclear Officer PSEG Nuclear LLC - N09
==SUBJECT:==
HOPE CREEK GENERATING STATION OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO. 05000354/2005301


P.O. Box 236 Hancocks Bridge, NJ 08038
==Dear Mr. Levis:==
This report transmits the results of the Reactor Operator (RO) and Senior Reactor Operator (SRO) licensing examination conducted by the NRC during the period of November 28 -
December 5, 2005. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 9).
 
Based on the results of the examination, both applicants, one Senior Reactor Operator and one Reactor Operator passed all portions of the examination. Examination results indicated that the applicants were well prepared for the examination. Mr. Steven Dennis discussed performance insights observed during the examination and provided final examination results, including individual license numbers, during a telephone call with Mr. Pete Tocci and Mr. James Reid on December 8, 2005.


SUBJECT: HOPE CREEK GENERATING STATION OPERATOR AND SENIOR REACTOROPERATOR INITIAL EXAMINATION REPORT NO. 05000354/2005301
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS (Master File Package Accession Number ML050960053; RO and SRO Written Examination with Answer Key - Accession Number ML053570219; RO and SRO Operating Section A - Accession Number ML053570233; RO and SRO Operating Section B - Accession Number ML053570237; and RO and SRO Operating Section C - Accession Number ML053570240). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


==Dear Mr. Levis:==
Mr. William Levis   2 Should you have any questions regarding this examination, please contact me at (610) 337-5183, or by E-mail at RJC@NRC.GOV.
This report transmits the results of the Reactor Operator (RO) and Senior Reactor Operator(SRO) licensing examination conducted by the NRC during the period of November 28 -December 5, 2005. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the "Examination Standards for Power Reactors" (NUREG-1021, Revision 9).Based on the results of the examination, both applicants, one Senior Reactor Operator and oneReactor Operator passed all portions of the examination. Examination results indicated that theapplicants were well prepared for the examination. Mr. Steven Dennis discussed performance insights observed during the examination and provided final examination results, including individual license numbers, during a telephone call with Mr. Pete Tocci and Mr. James Reid on December 8, 2005.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS). These records include the final examination and are available in ADAMS (Master File Package Accession Number ML050960053; RO and SRO Written Examination with Answer Key - Accession Number ML053570219; RO and SRO Operating Section A - Accession Number ML053570233; RO and SRO Operating Section B - Accession Number ML053570237;and RO and SRO Operating Section C - Accession Number ML053570240).


ADAMS isaccessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room).
Sincerely,
/RA/
Richard J. Conte, Chief Operations Branch Division of Reactor Safety Docket No. 50-354 License No. NPF-57


2Mr. William LevisShould you have any questions regarding this examination, please contact me at (610) 337-5183, or by E-mail at RJC@NRC.GOV.
===Enclosure:===
Initial Examination Report No. 05000354/2005301


Sincerely,/RA/Richard J. Conte, ChiefOperations Branch Division of Reactor SafetyDocket No. 50-354License No. NPF-57
REGION I==
Docket No. 05000354 License No. NPF-57 Report No. 05000354/2005301 Licensee:  PSEG Nuclear LLC Facility:  Hope Creek Generating Station Dates:  November 28 & 29, 2005, Operating Test Administration December 5, 2005, Written Examination Administration December 5, 2005, End of Exam Period December 5-7, 2005, Exam Grading Examiners:  S. Dennis, Senior Operations Engineer (Chief Examiner)
J. DAntonio, Operations Engineer M. Brown, Operations Engineer Approved by:
Richard J. Conte, Chief Operations Branch Division of Reactor Safety Enclosure


===Enclosure:===
=SUMMARY OF FINDINGS=
Initial Examination Report No. 05000354/2005301 cc w/encl:G. Barnes, Site Vice President D. Winchester, Vice President - Nuclear Assessments M. Gallagher, Vice President - Engineering and Technical Support W. F. Sperry, Director - Business Support D. Benyak, Director - Regulatory Assurance M. Massaro, Hope Creek Plant Manager J. Reid, Manager, Nuclear Training J. J. Keenan, Esquire M. Wetterhahn, Esquire Consumer Advocate, Office of Consumer Advocate F. Pompper, Chief of Police and Emergency Management Coordinator K. Tosch, Interim Assistant Director of Radiation Programs, State of New Jersey Acting Manager, Bureau of Nuclear Engineering, NJ Dept. of Environmental Protection H. Otto, Ph.D., DNREC Division of Water Resources, State of Delaware N. Cohen, Coordinator - Unplug Salem Campaign W. Costanzo, Technical Advisor - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance S. Glenn, INPO 2Mr. William LevisShould you have any questions regarding this examination, please contact me at (610) 337-5183, or by E-mail at RJC@NRC.GOV.
IR 05000354/2005301; November 28 to December 5, 2005; Hope Creek; Initial Operator


Sincerely,Richard J. Conte, ChiefOperations BranchDivision of Reactor SafetyDocket No. 50-354License No. NPF-57
Licensing Examination. Two of two applicants passed the examination (one reactor operator (RO), one senior reactor operator (SRO) instant).


===Enclosure:===
The examination was conducted by three NRC region-based examiners. There were no inspection findings associated with the examination.
Initial Examination Report No. 05000354/2005301cc w/encl:G. Barnes, Site Vice PresidentD. Winchester, Vice President - Nuclear AssessmentsM. Gallagher, Vice President - Engineering and Technical SupportW. F. Sperry, Director - Business SupportD. Benyak, Director - Regulatory Assurance M. Massaro, Hope Creek Plant ManagerJ. Reid, Manager, Nuclear TrainingJ. J. Keenan, EsquireM. Wetterhahn, EsquireConsumer Advocate, Office of Consumer AdvocateF. Pompper, Chief of Police and Emergency Management Coordinator K. Tosch, Interim Assistant Director of Radiation Programs, State of New JerseyActing Manager, Bureau of Nuclear Engineering, NJ Dept. of Environmental ProtectionH. Otto, Ph.D., DNREC Division of Water Resources, State of DelawareN. Cohen, Coordinator - Unplug Salem CampaignW. Costanzo, Technical Advisor - Jersey Shore Nuclear WatchE. Zobian, Coordinator - Jersey Shore Anti Nuclear AllianceS. Glenn, INPODistribution w/encl: (VIA E-MAIL)S. Collins, RAM. Dapas, DRAA. Blough, DRSM. Gamberoni, DRSR. Conte, DRSS. Dennis, Chief Examiner, DRSC. Bixler, DRS (Master Exam File)M. Gray, DRPG. Malone, DRP, Senior Resident InspectorK. Venuto, DRP, Resident OAS. Lee, RI OEDOD. Roberts, NRRS. Bailey, PM, NRR Region I Docket Room (with concurrences)ROPreports@nrc.gov DOCUMENT NAME: E:\Filenet\ML060130444.wpdADAMS PACKAGE: ML050960050After declaring this document "An Official Agency Record" it will be released to the Public. (SISP Review RJC)To receive a copy of this document, indicate in the box:
" C" = Copy without attachment/enclosure " E" = Copywith attachment/enclosure " N" = No copyOFFICERI/DRS/OSBRI/DRS/OSBRI/DRS/OSBRI/DRP/Br3 NAMECJBixler (CJB)SDennis (SXD)RJConteMGray (MXG)DATE01/04/0601/04/0601/ /0601/06/06OFFICIAL RECORD COPY EnclosureU.S. NUCLEAR REGULATORY COMMISSIONREGION IDocket No.05000354License No.NPF-57 Report No.05000354/2005301 Licensee:PSEG Nuclear LLC Facility:Hope Creek Generating StationDates:November 28 & 29, 2005, Operating Test AdministrationDecember 5, 2005, Written Examination Administration December 5, 2005, End of Exam Period December 5-7, 2005, Exam GradingExaminers:S. Dennis, Senior Operations Engineer (Chief Examiner)J. D'Antonio, Operations Engineer M. Brown, Operations EngineerApproved by:Richard J. Conte, ChiefOperations Branch Division of Reactor Safety iiEnclosure


=SUMMARY OF FINDINGS=
A. Inspector Identified Findings No findings of significance were identified.
IR 05000354/2005301; November 28 to December 5, 2005; Hope Creek; Initial OperatorLicensing Examination. Two of two applicants passed the examination (one reactor operator(RO), one senior reactor operator (SRO) instant). The examination was conducted by three NRC region-based examiners. There were noinspection findings associated with the examination


.A.Inspector Identified FindingsNo findings of significance were identified.B. Licensee Identified FindingsNo findings of significance were identified.
B. Licensee Identified Findings No findings of significance were identified.


Enclosure
ii


=REPORT DETAILS=
=REPORT DETAILS=
1.REACTOR SAFETYMitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) InitialLicense Examination
 
==REACTOR SAFETY==
Mitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) Initial    License Examination


====a. Scope====
====a. Scope====
of ReviewThe NRC examination team developed the written and operating initial examination andtogether with Hope Creek training and operations personnel verified or ensured, as applicable, the following: *The examination was prepared and developed in accordance with the guidelinesof Revision 9 of NUREG-1021, "Operator Licensing Examination Standards forPower Reactors.A review was conducted both in the Region I office and at the Hope Creek plant and training facility. Final resolution of comments andincorporation of test revisions were conducted during and following the onsite preparation week.*Simulation facility operation was proper.*A test item analysis was completed on the written examination for feedback intothe systems approach to training program.*Examination security requirements were met.
of Review The NRC examination team developed the written and operating initial examination and together with Hope Creek training and operations personnel verified or ensured, as applicable, the following:
* The examination was prepared and developed in accordance with the guidelines of Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. A review was conducted both in the Region I office and at the Hope Creek plant and training facility. Final resolution of comments and incorporation of test revisions were conducted during and following the onsite preparation week.
* Simulation facility operation was proper.
* A test item analysis was completed on the written examination for feedback into the systems approach to training program.
* Examination security requirements were met.


The NRC examiners administered the operating portion of the examination to allapplicants from November 28 to 29, 2005
The NRC examiners administered the operating portion of the examination to all applicants from November 28 to 29, 2005. The written examination was administered by the NRC on December 5, 2005.
. The written examination was administered by the NRC on December 5, 2005.


====b. Findings====
====b. Findings====
Grading and ResultsAll two applicants (one SRO instant and one RO) passed all portions of the initiallicensing examination. The facility had no post-examination comments. Examination Administration and PerformanceNo findings of significance were identified.
Grading and Results All two applicants (one SRO instant and one RO) passed all portions of the initial licensing examination. The facility had no post-examination comments.
 
Examination Administration and Performance No findings of significance were identified.
 
{{a|4OA6}}
==4OA6 Exit Meeting Summary==
 
On December 8, 2005, the NRC provided conclusions and examination results to Hope Creek management representatives via telephone. Both applicants passed all portions of the examination and license numbers for both applicants were also provided during this time.
 
The NRC expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff.


2Enclosure4OA6Exit Meeting SummaryOn December 8, 2005, the NRC provided conclusions and examination results to HopeCreek management representatives via telephone. Both applicants passed all portions of the examination and license numbers for both applicants were also provided during this time.The NRC expressed appreciation for the cooperation and assistance that was providedduring the preparation and administration of the examination by the licensee's trainingstaff.ATTACHMENT:
ATTACHMENT:  


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


A-1AttachmentSUPPLEMENTAL INFORMATIONKEY POINTS OF CONTACTLICENSEE
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
LICENSEE
: [[contact::A. Faulkner]], Hope Creek Exam Developer
: [[contact::A. Faulkner]], Hope Creek Exam Developer
: [[contact::J. Berglund]], Hope Creek Exam Developer
: [[contact::J. Berglund]], Hope Creek Exam Developer
Line 75: Line 97:
: [[contact::S. Dennis]], Senior Operations Engineer
: [[contact::S. Dennis]], Senior Operations Engineer
: [[contact::M. Brown]], Operations Engineer
: [[contact::M. Brown]], Operations Engineer
: [[contact::J. D'Antonio]], Operations EngineerLIST OF ITEMS OPENED, CLOSED, AND DISCUSSEDITEM NUMBERTYPEDESCRIPTIONNONE
: [[contact::J. DAntonio]], Operations Engineer
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
ITEM NUMBER                TYPE                  DESCRIPTION
NONE
Attachment
}}
}}

Latest revision as of 16:08, 22 December 2019

IR 05000354-05-301; November 28 to December 5, 2005; Hope Creek; Initial Operator Licensing Examination. Two of Two Applicants Passed the Examination (One Reactor Operator (Ro), One Senior Reactor Operator (SRO) Instant)
ML060130444
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/13/2006
From: Conte R
Operations Branch I
To: Levis W
Public Service Enterprise Group
References
50-354/05-301
Download: ML060130444 (8)


Text

ary 13, 2006

SUBJECT:

HOPE CREEK GENERATING STATION OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO. 05000354/2005301

Dear Mr. Levis:

This report transmits the results of the Reactor Operator (RO) and Senior Reactor Operator (SRO) licensing examination conducted by the NRC during the period of November 28 -

December 5, 2005. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 9).

Based on the results of the examination, both applicants, one Senior Reactor Operator and one Reactor Operator passed all portions of the examination. Examination results indicated that the applicants were well prepared for the examination. Mr. Steven Dennis discussed performance insights observed during the examination and provided final examination results, including individual license numbers, during a telephone call with Mr. Pete Tocci and Mr. James Reid on December 8, 2005.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS (Master File Package Accession Number ML050960053; RO and SRO Written Examination with Answer Key - Accession Number ML053570219; RO and SRO Operating Section A - Accession Number ML053570233; RO and SRO Operating Section B - Accession Number ML053570237; and RO and SRO Operating Section C - Accession Number ML053570240). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Mr. William Levis 2 Should you have any questions regarding this examination, please contact me at (610) 337-5183, or by E-mail at RJC@NRC.GOV.

Sincerely,

/RA/

Richard J. Conte, Chief Operations Branch Division of Reactor Safety Docket No. 50-354 License No. NPF-57

Enclosure:

Initial Examination Report No. 05000354/2005301

REGION I==

Docket No. 05000354 License No. NPF-57 Report No. 05000354/2005301 Licensee: PSEG Nuclear LLC Facility: Hope Creek Generating Station Dates: November 28 & 29, 2005, Operating Test Administration December 5, 2005, Written Examination Administration December 5, 2005, End of Exam Period December 5-7, 2005, Exam Grading Examiners: S. Dennis, Senior Operations Engineer (Chief Examiner)

J. DAntonio, Operations Engineer M. Brown, Operations Engineer Approved by:

Richard J. Conte, Chief Operations Branch Division of Reactor Safety Enclosure

SUMMARY OF FINDINGS

IR 05000354/2005301; November 28 to December 5, 2005; Hope Creek; Initial Operator

Licensing Examination. Two of two applicants passed the examination (one reactor operator (RO), one senior reactor operator (SRO) instant).

The examination was conducted by three NRC region-based examiners. There were no inspection findings associated with the examination.

A. Inspector Identified Findings No findings of significance were identified.

B. Licensee Identified Findings No findings of significance were identified.

ii

REPORT DETAILS

REACTOR SAFETY

Mitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) Initial License Examination

a. Scope

of Review The NRC examination team developed the written and operating initial examination and together with Hope Creek training and operations personnel verified or ensured, as applicable, the following:

  • The examination was prepared and developed in accordance with the guidelines of Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. A review was conducted both in the Region I office and at the Hope Creek plant and training facility. Final resolution of comments and incorporation of test revisions were conducted during and following the onsite preparation week.
  • Simulation facility operation was proper.
  • A test item analysis was completed on the written examination for feedback into the systems approach to training program.
  • Examination security requirements were met.

The NRC examiners administered the operating portion of the examination to all applicants from November 28 to 29, 2005. The written examination was administered by the NRC on December 5, 2005.

b. Findings

Grading and Results All two applicants (one SRO instant and one RO) passed all portions of the initial licensing examination. The facility had no post-examination comments.

Examination Administration and Performance No findings of significance were identified.

4OA6 Exit Meeting Summary

On December 8, 2005, the NRC provided conclusions and examination results to Hope Creek management representatives via telephone. Both applicants passed all portions of the examination and license numbers for both applicants were also provided during this time.

The NRC expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

LICENSEE

A. Faulkner, Hope Creek Exam Developer
J. Berglund, Hope Creek Exam Developer
J. Reid, Hope Creek Operations Training Manager

NRC

S. Dennis, Senior Operations Engineer
M. Brown, Operations Engineer
J. DAntonio, Operations Engineer

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

ITEM NUMBER TYPE DESCRIPTION

NONE