ML062430329: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/31/2006
| issue date = 08/31/2006
| title = 8/31/06 Perry Nuclear Power Plant, Unit 1 - Mid-Cycle Performance Review and Inspection Plan
| title = 8/31/06 Perry Nuclear Power Plant, Unit 1 - Mid-Cycle Performance Review and Inspection Plan
| author name = Caldwell J L
| author name = Caldwell J
| author affiliation = NRC/RGN-III/ORA
| author affiliation = NRC/RGN-III/ORA
| addressee name = Pearce L W
| addressee name = Pearce L
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000440
| docket = 05000440
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:August 31, 2006 Mr. L. William Pearce Vice President
{{#Wiki_filter:August 31, 2006 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road, A290 Perry, OH 44081
 
FirstEnergy Nuclear Operating Company
 
Perry Nuclear Power Plant
 
10 Center Road, A290
 
Perry, OH 44081


==SUBJECT:==
==SUBJECT:==
Line 31: Line 23:
==Dear Mr. Pearce:==
==Dear Mr. Pearce:==


On August 7, 2006, the NRC staff completed its performance review of Perry for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The
On August 7, 2006, the NRC staff completed its performance review of Perry for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Overall, Perry operated in a manner that preserved public health and safety and met all cornerstone objectives. Plant performance for the most recent quarter remained within the Multiple/Repetitive Degraded Cornerstone column of the Action Matrix. This is based on two White findings in the Mitigating Systems cornerstone that have been open since 2003.
FirstEnergy Nuclear Operating Company (FENOC) was initially notified that Perry had entered the Multiple/Repetitive Degraded Cornerstone column in our August 12, 2004, letter. The NRC will continue to closely monitor Perrys performance consistent with the guidance in Inspection Manual Chapter 0305, Operational Assessment Program.
In response to Perrys transition to the Multiple/Repetitive Degraded Cornerstone column, the NRC conducted an Inspection Procedure (IP) 95003 supplemental inspection, which you responded to by letters dated August 8 and August 17, 2005. These letters provided actions that FENOC committed to perform to address issues in the areas of Corrective Action Program Effectiveness, Human Performance, IP 95002 Issue Followup, and Emergency Preparedness, and described your Performance Improvement Initiative (PII). To confirm the agencys understanding of these and other specific improvement actions, the NRC issued a Confirmatory Action Letter (CAL) on September 28, 2005.


purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
L. Pearce                                       In addition to the routine NRC inspection and mid-cycle and end-of-cycle assessment activities, Perry performance is being evaluated quarterly. Consistent with IMC 0305, plants in the Multiple/Repetitive Degraded Cornerstone Column are given consideration at each quarterly performance assessment review for: (1) declaring plant performance to be unacceptable in accordance with the guidance in IMC 0305; (2) transferring to the IMC 0350 Oversight of Operating Reactor Facilities in a Shutdown Condition with Performance Problems process; and (3) taking additional regulatory actions, as appropriate. Our quarterly assessment results, to date, have concluded that Perry has been operated in a manner that preserved the public health and safety; therefore, the plant will remain in Column IV of the NRC Action Matrix.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Exempt from Public Disclosure in
The NRC is in the process of conducting CAL followup inspections, which began in November 2005, in addition to the normal Reactor Oversight Process (ROP) baseline inspection program. The purpose of these followup inspections is to assess the adequacy of your development of corrective actions in the four areas specified in the CAL, review the implementation of those corrective actions, and finally, review the effectiveness of those actions toward realizing sustained plant performance improvements. The NRC has previously reviewed the development and implementation of your corrective actions to address the four areas of the CAL and is currently in the process of assessing the effectiveness of those actions. We will continue to assess your performance in these areas through the implementation of the ROP baseline inspection program and CAL followup inspection activities.
 
Accordance with 10 CFR 2.390" will include the physical protection review and resultant
 
inspection plan.
Overall, Perry operated in a manner that pr eserved public health and safety and met all cornerstone objectives. Plant performance for the most recent quarter remained within the
 
Multiple/Repetitive Degraded Cornerstone column of the Action Matrix. This is based on two
 
White findings in the Mitigating Systems cornerstone that have been open since 2003.
 
FirstEnergy Nuclear Operating Company (FENOC) was initially notified that Perry had entered the Multiple/Repetitive Degraded Cornerstone column in our August 12, 2004, letter. The NRC
 
will continue to closely monitor Perry's perform ance consistent with the guidance in Inspection Manual Chapter 0305, "Operational Assessment Program."
In response to Perry's transition to the Multiple/Repetitive Degraded Cornerstone column, the NRC conducted an Inspection Procedure (IP) 95003 supplemental inspection, which you
 
responded to by letters dated August 8 and August 17, 2005. These letters provided actions
 
that FENOC committed to perform to address issues in the areas of Corrective Action Program
 
Effectiveness, Human Performance, IP 95002 Issue Followup, and Emergency Preparedness, and described your Performance Improvement Initiative (PII). To confirm the agency's understanding of these and other specific improvement actions, the NRC issued a Confirmatory
 
Action Letter (CAL) on September 28, 2005.
L. Pearce In addition to the routine NRC inspection and mid-cycle and end-of-cycle assessment activities, Perry performance is being evaluated quarterly. Consistent with IMC 0305, plants in the
 
Multiple/Repetitive Degraded Cornerstone Column are given consideration at each quarterly
 
performance assessment review for: (1) declaring plant performance to be unacceptable in
 
accordance with the guidance in IMC 0305; (2) transferring to the IMC 0350 "Oversight of
 
Operating Reactor Facilities in a Shutdown Condi tion with Performance Problems" process; and (3) taking additional regulatory actions, as appropriate. Our quarterly assessment results, to
 
date, have concluded that Perry has been operated in a manner that preserved the public health
 
and safety; therefore, the plant will remain in Column IV of the NRC Action Matrix.
The NRC is in the process of conducting CAL followup inspections, which began in November 2005, in addition to the normal Reactor Oversight Process (ROP) baseline inspection
 
program. The purpose of these followup inspections is to assess the adequacy of your
 
development of corrective actions in the four areas specified in the CAL, review the
 
implementation of those corrective actions, and fi nally, review the effectiveness of those actions toward realizing sustained plant performance im provements. The NRC has previously reviewed the development and implementation of your correct ive actions to address the four areas of the CAL and is currently in the process of assessing the effectiveness of those actions. We will
 
continue to assess your performance in these areas through the implementation of the ROP baseline inspection program and CAL followup inspection activities.
In our end-of-cycle assessment letter, dated March 2, 2006, we advised you of the continuation of substantive cross-cutting issues in the areas of problem identification and resolution (PI&R),
In our end-of-cycle assessment letter, dated March 2, 2006, we advised you of the continuation of substantive cross-cutting issues in the areas of problem identification and resolution (PI&R),
and human performance. During this assessment period, there were six inspection findings that
and human performance. During this assessment period, there were six inspection findings that were attributed to weaknesses in PI&R, and ten inspection findings that were attributed to weaknesses in human performance. Based on these findings satisfying the criteria for the continuance of a substantive cross-cutting issue as specified in Inspection Manual Chapter 0305, we have concluded that both substantive cross-cutting issues will remain open.
 
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
were attributed to weaknesses in PI&R, and ten inspection findings that were attributed to
The inspections scheduled within the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
weaknesses in human performance. Based on these findings satisfying the criteria for the
 
continuance of a substantive cross-cutting issue as specified in Inspection Manual
 
Chapter 0305, we have concluded that both substantive cross-cutting issues will remain open.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution
 
of any scheduling conflicts and personnel availability issues well in advance of inspector arrival
 
onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
 
The inspections scheduled within the last 9 months of the inspection plan are tentative and may
 
be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC


Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
L. Pearce                                     If circumstances arise which cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
L. Pearce If circumstances arise which cause us to revi se the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan at (630) 829-9628
Sincerely,
 
                                            /RA/
with any questions you may have regarding this letter or the inspection plan.
James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58
Sincerely,/RA/James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58


==Enclosure:==
==Enclosure:==


Perry Inspection/Activity Plan DISTRIBUTION See next page L. Pearce If circumstances arise which cause us to revi se the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan at (630) 829-9628
Perry Inspection/Activity Plan DISTRIBUTION See next page


with any questions you may have regarding this letter or the inspection plan.
L. Pearce                                                                    If circumstances arise which cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,/RA/James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58
Sincerely,
                                                                          /RA/
James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58


==Enclosure:==
==Enclosure:==


Perry Inspection/Activity Plan DISTRIBUTION See next pageDOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\perry\Perry 2006 MOC ltr.wpdX Publicly Available G Non-Publicly Available G SensitiveX Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIINAMEEDuncan:dtpMSatoriusJCaldwellDATE08/21/0608/25/0608/29/06 OFFICIAL RECORD COPY L. Pearce-4-cc w/encl:G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief
Perry Inspection/Activity Plan DISTRIBUTION See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\perry\Perry 2006 MOC ltr.wpd X Publicly Available                       G Non-Publicly Available                 G Sensitive              X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE            RIII                                RIII                            RIII NAME              EDuncan:dtp                        MSatorius                      JCaldwell DATE              08/21/06                            08/25/06                        08/29/06 OFFICIAL RECORD COPY


Operating Officer - FENOC
L. Pearce                                    cc w/encl: G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC L. Pearce, Vice President - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health President, Geauga County Board Director, Department of Emergency Services Geauga County Sheriff President, Ashtabula County Board of Commissioners Ashtabula County Sheriff Director, Ashtabula County Emergency Management Agency Mayor, Village of Genoa Genoa Village Administrator President, Lake County Board of Commissioners Lake County Sheriff Painesville City Manager Lake County Administrator Director, Lake County Emergency Management Agency President, Village of Fairport Harbor Mayor, City of Eastlake Mayor, City of Wickliffe President, Geneva City Council City Manager, Geneva Mayor, City of Kirtland Mayor, City of Mentor City Manager, Mentor Mayor, City of Mentor on the Lake Administrative Director Mayor, City of Willoughby Hills Mayor, City of Willoughby Mayor, City of Willowick Mayor, Village of Madison Village Administrator, Village of Madison Chairman, Board of Madison Township Trustees Mayor, Village of Kirtland Hills Mayor, Village of Geneva-on-the-Lake Mayor, Lakeline Village Mayor, Village of Timberlake Mayor, Village of Grand River INPO


D. Pace, Senior Vice President, Fleet Engineering - FENOC
L. Pearce          ADAMS Distribution:
DXC1 SJC4 TEB RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Perry DRPIII DRSIII PLB1 TXN


L. Pearce, Vice President - FENOC
Page 1 of 2                                                                                      Perry 08/30/2006    13:02:24                                                                Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                                            No. of Staff    Planned Dates          Inspection Number      Inspection Activity                                                    Title                                          on Site        Start    End            Type MAINRULE - MAINTENANCE EFFECTIVENESS INSPECTION                                                                              1 1              IP 7111112B              Maintenance Effectiveness                                                                              09/11/2006 09/15/2006 Baseline Inspections IP 71114      - EP EXERCISE BASELINE                                                                                        2 1              IP 7111401              Exercise Evaluation                                                                                    10/23/2006 10/27/2006 Baseline Inspections 1              IP 71151                Performance Indicator Verification                                                                    10/23/2006 10/27/2006 Baseline Inspections CAL HP        - HUMAN PERFORMANCE-EFFECTIVENESS REVIEW                                                                      7 1              IP 95003                Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple              10/23/2006 11/03/2006 Supplemental Program CAL-CAP        - CAP EFFECTIVENESS REVIEW                                                                                    4 1              IP 95003                Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple              11/06/2006 11/17/2006 Supplemental Program FPI            - TRIENNIAL FIRE PROTECTION INSPECTION                                                                        3 1              IP 7111105T              Fire Protection [Triennial]                                                                            11/27/2006 12/15/2006 Baseline Inspections ROUTINE        - ACCESS CONTROL, ALARA                                                                                      1 1              IP 7112101              Access Control to Radiologically Significant Areas                                                    11/06/2006 11/10/2006 Baseline Inspections 1              IP 7112102              ALARA Planning and Controls                                                                            11/06/2006 11/10/2006 Baseline Inspections 1              IP 71151                Performance Indicator Verification                                                                    11/06/2006 11/10/2006 Baseline Inspections 71111.11      - LIC OPERATOR REQUAL PROGRAM EVALUATION                                                                      2 1              IP 7111111B              Licensed Operator Requalification Program                                                              12/04/2006 12/08/2006 Baseline Inspections FY 2007        - PERRY INIT PREP 01/2007                                                                                    3 1                W90151                OL - INITIAL EXAM - PERRY - JAN/FEB 2007                                                              01/29/2007 02/02/2007 Not Applicable FY 2007        - PERRY INIT EXAM 02/2007                                                                                    3 1                W90151                OL - INITIAL EXAM - PERRY - JAN/FEB 2007                                                              02/19/2007 03/02/2007 Not Applicable HEATSINK      - HEAT SINK INSPECTION                                                                                        1 1              IP 7111107B              Heat Sink Performance                                                                                  02/26/2007 03/02/2007 Baseline Inspections 7112102        - ALARA OUTAGE                                                                                                2 1              IP 7112101              Access Control to Radiologically Significant Areas                                                    03/26/2007 03/30/2007 Baseline Inspections 1              IP 7112102              ALARA Planning and Controls                                                                            03/26/2007 03/30/2007 Baseline Inspections ISI            - ISI BASELINE INSPECTION                                                                                    1 1              IP 7111108G              Inservice Inspection Activities - BWR                                                                  04/02/2007 04/06/2007 Baseline Inspections 7112201        - EFFLUENTS                                                                                                  1 1              IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                              06/04/2007 06/08/2007 Baseline Inspections 1              IP 71151                Performance Indicator Verification                                                                    06/04/2007 06/08/2007 Baseline Inspections 71121.03      - INSTRUMENTATION                                                                                            1 1              IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                                          07/30/2007 08/03/2007 Baseline Inspections 1              IP 71151                Performance Indicator Verification                                                                    07/30/2007 08/03/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
J. Rinckel, Vice President, Fleet Oversight
 
Director, Site Operations
 
Director, Regulatory Affairs


Manager, Fleet Licensing
Page 2 of 2                                                                                     Perry 08/30/2006     13:02:24                                                               Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                          No. of Staff   Planned Dates        Inspection Number      Inspection Activity                                                    Title                        on Site       Start    End            Type MOD5059       - MODIFICATIONS/50.59 INSPECTION                                                             2 1             IP 7111102               Evaluation of Changes, Tests, or Experiments                                         09/10/2007 09/28/2007 Baseline Inspections 1             IP 7111117B             Permanent Plant Modifications                                                         09/10/2007 09/28/2007 Baseline Inspections EP BI         - BASELINE EP INSPECTION                                                                     1 1             IP 7111402               Alert and Notification System Testing                                                 10/16/2007 10/20/2007 Baseline Inspections 1             IP 7111403               Emergency Response Organization Augmentation Testing                                 10/16/2007 10/20/2007 Baseline Inspections 1             IP 7111405               Correction of Emergency Preparedness Weaknesses and Deficiencies                     10/16/2007 10/20/2007 Baseline Inspections 1             IP 71151-EP01           Drill/Exercise Performance                                                           10/16/2007 10/20/2007 Baseline Inspections 1             IP 71151-EP02           ERO Drill Participation                                                               10/16/2007 10/20/2007 Baseline Inspections 1             IP 71151-EP03           Alert & Notification System                                                           10/16/2007 10/20/2007 Baseline Inspections 7112101        - ACCESS CONTROL                                                                            1 1             IP 7112101               Access Control to Radiologically Significant Areas                                   09/24/2007 09/28/2007 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                   09/24/2007 09/28/2007 Baseline Inspections 71122.02       - TRANSPORTATION & RADWASTE                                                                 1 1              IP 7112202              Radioactive Material Processing and Transportation                                    01/14/2008 01/18/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
 
Manager, Site Regulatory Compliance
 
D. Jenkins, Attorney, FirstEnergy
 
Public Utilities Commission of Ohio
 
Ohio State Liaison Officer
 
R. Owen, Ohio Department of Health
 
President, Geauga County Board
 
Director, Department of Emergency Services
 
Geauga County Sheriff
 
President, Ashtabula County Board of Commissioners
 
Ashtabula County Sheriff
 
Director, Ashtabula County Emergency
 
Management Agency
 
Mayor, Village of Genoa
 
Genoa Village Administrator
 
President, Lake County Board of Commissioners
 
Lake County Sheriff
 
Painesville City Manager
 
Lake County Administrator
 
Director, Lake County Emergency Management Agency
 
President, Village of Fairport Harbor
 
Mayor, City of Eastlake
 
Mayor, City of Wickliffe
 
President, Geneva City Council
 
City Manager, Geneva
 
Mayor, City of Kirtland
 
Mayor, City of Mentor
 
City Manager, Mentor
 
Mayor, City of Mentor on the Lake
 
Administrative Director
 
Mayor, City of Willoughby Hills
 
Mayor, City of Willoughby
 
Mayor, City of Willowick
 
Mayor, Village of Madison
 
Village Administrator, Village of Madison
 
Chairman, Board of Madison Township Trustees
 
Mayor, Village of Kirtland Hills
 
Mayor, Village of Geneva-on-the-Lake
 
Mayor, Lakeline Village
 
Mayor, Village of Timberlake
 
Mayor, Village of Grand River
 
INPO L. Pearce ADAMS Distribution
: DXC1 SJC4 TEB RidsNrrDirslpab
 
JLC1 GEG KGO RML2 SRI Perry
 
DRPIII DRSIII PLB1 TXN Perry Inspection / Activity Plan 09/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 13:02:24 Report 22 1 MAINRULE-MAINTENANCE EFFECTIVENESS INSPECTION Baseline Inspections 09/11/2006 09/15/2006 1    7111112B IP Maintenance Effectiveness 2 IP 71114-EP EXERCISE BASELINE Baseline Inspections 10/23/2006 10/27/2006 1    7111401 IP Exercise Evaluation Baseline Inspections 10/23/2006 10/27/2006 1    71151 IP Performance Indicator Verification 7 CAL HP-HUMAN PERFORMANCE-EFFECTIVENESS REVIEW Supplemental Progra m 10/23/2006 11/03/2006 1    95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 4 CAL-CAP-CAP EFFECTIVENESS REVIEW Supplemental Progra m 11/06/2006 11/17/2006 1    95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 3 FPI-TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 11/27/2006 12/15/2006 1    7111105T IP Fire Protection [Triennial]
1 ROUTINE-ACCESS CONTROL, ALARA Baseline Inspections 11/06/2006 11/10/2006 1    7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 11/06/2006 11/10/2006 1    7112102 IP A LARA Planning and Controls Baseline Inspections 11/06/2006 11/10/2006 1    71151 IP Performance Indicator Verification 2 71111.11-LIC OPERATOR REQUAL PROGRAM EVALUATION Baseline Inspections 12/04/2006 12/08/2006 1    7111111B IP Licensed Operator Requalification Program 3 FY 2007-PERRY INIT PREP 01/2007 Not Applicable 01/29/2007 02/02/2007 1    W90151 OL - INITIAL EXAM - PERRY - JAN/FEB 2007 3 FY 2007-PERRY INIT EXAM 02/2007 Not Applicable 02/19/2007 03/02/2007 1    W90151 OL - INITIAL EXAM - PERRY - JAN/FEB 2007 1 HEATSINK-HEAT SINK INSPECTION Baseline Inspections 02/26/2007 03/02/2007 1    7111107B IP Heat Sink Performance 2 7112102-ALARA OUTAGE Baseline Inspections 03/26/2007 03/30/2007 1    7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 03/26/2007 03/30/2007 1    7112102 IP A LARA Planning and Controls 1 ISI-ISI BASELINE INSPECTION Baseline Inspections 04/02/2007 04/06/2007 1    7111108G IP Inservice Inspection Activities - BWR 1 7112201-EFFLUENTS Baseline Inspections 06/04/2007 06/08/2007 1    7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 06/04/2007 06/08/2007 1    71151 IP Performance Indicator Verification 1 71121.03-INSTRUMENTATION Baseline Inspections 07/30/2007 08/03/2007 1    7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/30/2007 08/03/2007 1    71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Perry Inspection / Activity Plan 09/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 13:02:24 Report 22 2 MOD5059-MODIFICATIONS/50.59 INSPECTION Baseline Inspections 09/10/2007 09/28/2007 1     7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/10/2007 09/28/2007 1     7111117B IP Permanent Plant Modifications 1 EP BI-BASELINE EP INSPECTION Baseline Inspections 10/16/2007 10/20/2007 1     7111402 IP A lert and Notification System Testing Baseline Inspections 10/16/2007 10/20/2007 1     7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 10/16/2007 10/20/2007 1     7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/16/2007 10/20/2007 1     71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/16/2007 10/20/2007 1     71151-EP02 IP ERO Drill Participation Baseline Inspections 10/16/2007 10/20/2007 1     71151-EP03 IP A lert & Notification System 1 7112101-ACCESS CONTROL Baseline Inspections 09/24/2007 09/28/2007 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 09/24/2007 09/28/2007 1     71151 IP Performance Indicator Verification 1 71122.02-TRANSPORTATION & RADWASTE Baseline Inspections 01/14/2008 01/18/2008 1    7112202 IP Radioactive Material Processing and Transportation This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 15:34, 23 November 2019

8/31/06 Perry Nuclear Power Plant, Unit 1 - Mid-Cycle Performance Review and Inspection Plan
ML062430329
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/31/2006
From: Caldwell J
Region 3 Administrator
To: Pearce L
FirstEnergy Nuclear Operating Co
References
Download: ML062430329 (8)


Text

August 31, 2006 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road, A290 Perry, OH 44081

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PERRY NUCLEAR POWER PLANT, UNIT 1

Dear Mr. Pearce:

On August 7, 2006, the NRC staff completed its performance review of Perry for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Overall, Perry operated in a manner that preserved public health and safety and met all cornerstone objectives. Plant performance for the most recent quarter remained within the Multiple/Repetitive Degraded Cornerstone column of the Action Matrix. This is based on two White findings in the Mitigating Systems cornerstone that have been open since 2003.

FirstEnergy Nuclear Operating Company (FENOC) was initially notified that Perry had entered the Multiple/Repetitive Degraded Cornerstone column in our August 12, 2004, letter. The NRC will continue to closely monitor Perrys performance consistent with the guidance in Inspection Manual Chapter 0305, Operational Assessment Program.

In response to Perrys transition to the Multiple/Repetitive Degraded Cornerstone column, the NRC conducted an Inspection Procedure (IP) 95003 supplemental inspection, which you responded to by letters dated August 8 and August 17, 2005. These letters provided actions that FENOC committed to perform to address issues in the areas of Corrective Action Program Effectiveness, Human Performance, IP 95002 Issue Followup, and Emergency Preparedness, and described your Performance Improvement Initiative (PII). To confirm the agencys understanding of these and other specific improvement actions, the NRC issued a Confirmatory Action Letter (CAL) on September 28, 2005.

L. Pearce In addition to the routine NRC inspection and mid-cycle and end-of-cycle assessment activities, Perry performance is being evaluated quarterly. Consistent with IMC 0305, plants in the Multiple/Repetitive Degraded Cornerstone Column are given consideration at each quarterly performance assessment review for: (1) declaring plant performance to be unacceptable in accordance with the guidance in IMC 0305; (2) transferring to the IMC 0350 Oversight of Operating Reactor Facilities in a Shutdown Condition with Performance Problems process; and (3) taking additional regulatory actions, as appropriate. Our quarterly assessment results, to date, have concluded that Perry has been operated in a manner that preserved the public health and safety; therefore, the plant will remain in Column IV of the NRC Action Matrix.

The NRC is in the process of conducting CAL followup inspections, which began in November 2005, in addition to the normal Reactor Oversight Process (ROP) baseline inspection program. The purpose of these followup inspections is to assess the adequacy of your development of corrective actions in the four areas specified in the CAL, review the implementation of those corrective actions, and finally, review the effectiveness of those actions toward realizing sustained plant performance improvements. The NRC has previously reviewed the development and implementation of your corrective actions to address the four areas of the CAL and is currently in the process of assessing the effectiveness of those actions. We will continue to assess your performance in these areas through the implementation of the ROP baseline inspection program and CAL followup inspection activities.

In our end-of-cycle assessment letter, dated March 2, 2006, we advised you of the continuation of substantive cross-cutting issues in the areas of problem identification and resolution (PI&R),

and human performance. During this assessment period, there were six inspection findings that were attributed to weaknesses in PI&R, and ten inspection findings that were attributed to weaknesses in human performance. Based on these findings satisfying the criteria for the continuance of a substantive cross-cutting issue as specified in Inspection Manual Chapter 0305, we have concluded that both substantive cross-cutting issues will remain open.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections scheduled within the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

L. Pearce If circumstances arise which cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58

Enclosure:

Perry Inspection/Activity Plan DISTRIBUTION See next page

L. Pearce If circumstances arise which cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58

Enclosure:

Perry Inspection/Activity Plan DISTRIBUTION See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\perry\Perry 2006 MOC ltr.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME EDuncan:dtp MSatorius JCaldwell DATE 08/21/06 08/25/06 08/29/06 OFFICIAL RECORD COPY

L. Pearce cc w/encl: G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC L. Pearce, Vice President - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health President, Geauga County Board Director, Department of Emergency Services Geauga County Sheriff President, Ashtabula County Board of Commissioners Ashtabula County Sheriff Director, Ashtabula County Emergency Management Agency Mayor, Village of Genoa Genoa Village Administrator President, Lake County Board of Commissioners Lake County Sheriff Painesville City Manager Lake County Administrator Director, Lake County Emergency Management Agency President, Village of Fairport Harbor Mayor, City of Eastlake Mayor, City of Wickliffe President, Geneva City Council City Manager, Geneva Mayor, City of Kirtland Mayor, City of Mentor City Manager, Mentor Mayor, City of Mentor on the Lake Administrative Director Mayor, City of Willoughby Hills Mayor, City of Willoughby Mayor, City of Willowick Mayor, Village of Madison Village Administrator, Village of Madison Chairman, Board of Madison Township Trustees Mayor, Village of Kirtland Hills Mayor, Village of Geneva-on-the-Lake Mayor, Lakeline Village Mayor, Village of Timberlake Mayor, Village of Grand River INPO

L. Pearce ADAMS Distribution:

DXC1 SJC4 TEB RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Perry DRPIII DRSIII PLB1 TXN

Page 1 of 2 Perry 08/30/2006 13:02:24 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type MAINRULE - MAINTENANCE EFFECTIVENESS INSPECTION 1 1 IP 7111112B Maintenance Effectiveness 09/11/2006 09/15/2006 Baseline Inspections IP 71114 - EP EXERCISE BASELINE 2 1 IP 7111401 Exercise Evaluation 10/23/2006 10/27/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/23/2006 10/27/2006 Baseline Inspections CAL HP - HUMAN PERFORMANCE-EFFECTIVENESS REVIEW 7 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 10/23/2006 11/03/2006 Supplemental Program CAL-CAP - CAP EFFECTIVENESS REVIEW 4 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 11/06/2006 11/17/2006 Supplemental Program FPI - TRIENNIAL FIRE PROTECTION INSPECTION 3 1 IP 7111105T Fire Protection [Triennial] 11/27/2006 12/15/2006 Baseline Inspections ROUTINE - ACCESS CONTROL, ALARA 1 1 IP 7112101 Access Control to Radiologically Significant Areas 11/06/2006 11/10/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 11/06/2006 11/10/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 11/06/2006 11/10/2006 Baseline Inspections 71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 2 1 IP 7111111B Licensed Operator Requalification Program 12/04/2006 12/08/2006 Baseline Inspections FY 2007 - PERRY INIT PREP 01/2007 3 1 W90151 OL - INITIAL EXAM - PERRY - JAN/FEB 2007 01/29/2007 02/02/2007 Not Applicable FY 2007 - PERRY INIT EXAM 02/2007 3 1 W90151 OL - INITIAL EXAM - PERRY - JAN/FEB 2007 02/19/2007 03/02/2007 Not Applicable HEATSINK - HEAT SINK INSPECTION 1 1 IP 7111107B Heat Sink Performance 02/26/2007 03/02/2007 Baseline Inspections 7112102 - ALARA OUTAGE 2 1 IP 7112101 Access Control to Radiologically Significant Areas 03/26/2007 03/30/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 03/26/2007 03/30/2007 Baseline Inspections ISI - ISI BASELINE INSPECTION 1 1 IP 7111108G Inservice Inspection Activities - BWR 04/02/2007 04/06/2007 Baseline Inspections 7112201 - EFFLUENTS 1 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/04/2007 06/08/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 06/04/2007 06/08/2007 Baseline Inspections 71121.03 - INSTRUMENTATION 1 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/30/2007 08/03/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/30/2007 08/03/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Perry 08/30/2006 13:02:24 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type MOD5059 - MODIFICATIONS/50.59 INSPECTION 2 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/10/2007 09/28/2007 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 09/10/2007 09/28/2007 Baseline Inspections EP BI - BASELINE EP INSPECTION 1 1 IP 7111402 Alert and Notification System Testing 10/16/2007 10/20/2007 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 10/16/2007 10/20/2007 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/16/2007 10/20/2007 Baseline Inspections 1 IP 71151-EP01 Drill/Exercise Performance 10/16/2007 10/20/2007 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 10/16/2007 10/20/2007 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 10/16/2007 10/20/2007 Baseline Inspections 7112101 - ACCESS CONTROL 1 1 IP 7112101 Access Control to Radiologically Significant Areas 09/24/2007 09/28/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 09/24/2007 09/28/2007 Baseline Inspections 71122.02 - TRANSPORTATION & RADWASTE 1 1 IP 7112202 Radioactive Material Processing and Transportation 01/14/2008 01/18/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.