| issue date = 11/12/1996
| issue date = 11/12/1996
| title = Forwards Rev to Bfn,Unit 2,second ten-year Interval,Isi Program IAW W/Asme Section XI,IWA-1400
| title = Forwards Rev to Bfn,Unit 2,second ten-year Interval,Isi Program IAW W/Asme Section XI,IWA-1400
| author name = ABNEY T E
| author name = Abney T
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEt ORY 1 REGULAT INFORMATION DISTRIBUTIOIISTEM (RIDE)ACCESSION NBR:9611150256.DOC.DATE 96/11/12 NOTARIZED:
{{#Wiki_filter:CATEt ORY 1 REGULAT       INFORMATION DISTRIBUTIOIISTEM             (RIDE)
NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH.NAME AUTHOR AFFILIATION ABNEY,T.E.
ACCESSION NBR:9611150256           .DOC.DATE   96/11/12       NOTARIZED: NO           DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee                     05000260 AUTH. NAME           AUTHOR AFFILIATION ABNEY,T.E.           Tennessee Valley Authority RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)'


==SUBJECT:==
==SUBJECT:==
Forwards rev 7 to 2-SI-4.6.G,"Inservice Inspection Program Uni-t 2".C DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR
Forwards rev     7 to 2-SI-4.6.G,"Inservice Inspection Program Uni-t 2".
~ENCL i SIZE: zz TITLE: OR Submittal:
DISTRIBUTION CODE: A047D TITLE:  OR COPIES RECEIVED:LTR Submittal: Inservice/Testing/Relief from
Inservice/Testing/Relief from ASME Code-GL-89-04 A\NOTES: T RECIPIENT ID CODE/NAME PD2-3 WILLIAMS,J.
                                                              ~  ENCL  i  SIZE:
INTERNAL: ACRS C NU DOC-PPRA8t RES/DET/EMMEB EXTERNAL: LITCO ANDERSON NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID,CODE/NAME PD2-3-PD AEOD/SPD/RAB NRR/DE/EMEB OGC/HDS3 RES/DSIR/EIB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 0 1 1 1 1 0 D NOTE TO ALL NRIDSN RECIPIENTS:
ASME Code GL-89-04 zz        C A
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 p4v-4I t
                                                                                                        \
~4 Tennessee Valley Authority, Post Office Box 2000.Decatur, Alabama 36609 November 12, 1996 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:
NOTES:                                                                                             T RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME        LTTR ENCL          ID,CODE/NAME         LTTR ENCL PD2-3                    1    1      PD2-3-PD                  1    1 WILLIAMS,J.               1    1 0
In the Matter of)Tennessee Valley Authority)Docket No.50-260 BROWNS FERRY NUCLEAR PLANT (BFN)-UNIT 2-AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)r SECTION XI r INSERVICE INSPECTION (ISI)PROGRAM REVISION AND COST BENEFICIAL LICENSING ACTION (CBLA)11 This letter provides a revision to the BFN Unit 2, second ten year interval, ISI program in accordance with ASME Section XI, IWA-1400.The code of record for the current interval is the 1986 Edition (no addenda)of the ASME Boiler and Pressure Vessel Code, Section XI.The enclosure to this letter contains an updated BFN Unit 2 ISI program which conforms to the 1986 Edition (no addenda)of the ASME Section XI code, except where relief has been requested.
INTERNAL: ACRS                         1     1       AEOD/SPD/RAB             1    1 C                  1    1      NRR/DE/EMEB               1    1 NU DOC    PPRA8t        1    1      OGC/HDS3                 1    0 RES/DET/EMMEB            1    1      RES/DSIR/EIB             1     1 EXTERNAL: LITCO ANDERSON              1     1       NOAC                      1     1 NRC PDR                  1     1 D
Program revisions include the following:
NOTE TO ALL NRIDSN RECIPIENTS:
Relief Request ISI-2-4 was updated to increase the examination percentage for residual heat removal (RHR)weld DRHR-2-03 from 52 percent to 65 percent.Relief Request ISI-2-7 is being submitted for approval to provide relief from 100 percent weld examination of the required weld and base material volume required by IWB-2500-15 for Examination Category B-K-1, integrally welded supports.9biii>0~5+
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR             14   ENCL     13                     p4v-
Ogoo02bo qfI'si i i2 pDR pDQC pDR 8


U.S.Nuclear Regulatory Commission Page 2 November 12, 1996~Miscellaneous editorial revisions to reflect current organizations and scheduled'xaminations TVA has determined that Relief Request ISI-2-7 represents a CBLA because continued examination of 100 percent of integral attachment welds would be unnecessarily costly without providing an commensurate level of safety.Further, the examination of accessible areas of integral attachments without removal of support members was approved for a future code revision by the ASME Section XI committee in March 1995.TVA estimates that approval of thi.'s relief request could save approximately
4I t
$1, 600, 000 during the remaining Unit 2 inservice inspection intervals.
 
There are no commitments contained in this letter.If you have any questions, please call me at (205)729-2636.Si erely, T.E.Abney Manager of Licens ng, and Industry Af airs Enclosure cc: See page 3 0 0 U.S'.Nuclear Regulatory.
~4 Tennessee Valley Authority, Post Office Box 2000. Decatur, Alabama 36609 November 12, 1996 U.S. Nuclear Regulatory Commission ATTN:        Document Control Desk Washington,              D.C. 20555 Gentlemen:
Commission Page 3 November 12, 1996  
In the Matter of                                              )                Docket No. 50-260 Tennessee          Valley Authority                          )
BROWNS FERRY NUCLEAR PLANT (BFN)                                    UNIT 2  AMERICAN SOCIETY OF MECHANICAL ENGINEERS                          (ASME) r SECTION XI r INSERVICE INSPECTION (ISI) PROGRAM REVISION AND COST BENEFICIAL LICENSING ACTION (CBLA) 11 This letter provides a revision to the BFN Unit 2, second ten year interval, ISI program in accordance with ASME Section XI, IWA-1400. The code of record for the current interval is the 1986 Edition (no addenda) of the ASME Boiler and Pressure Vessel Code, Section XI.
The    enclosure to this letter contains an updated BFN Unit 2 ISI program which conforms to the 1986 Edition (no addenda) of the ASME Section XI code, except where relief has been requested.              Program revisions include the following:
Relief          Request ISI-2-4 was updated to increase the examination percentage for residual heat removal (RHR) weld DRHR-2-03 from 52 percent to 65 percent.
Relief Request ISI-2-7 is being submitted for approval to provide relief from 100 percent weld examination of the required weld and base material volume required by IWB-2500-15 for Examination Category B-K-1,                  integrally      welded supports.
9biii>0~5+            qfI'si ii2 Ogoo02bo pDR      pDQC                  pDR 8
 
U.S. Nuclear Regulatory Commission Page 2 November 12, 1996
      ~     Miscellaneous editorial revisions to reflect current organizations and scheduled'xaminations TVA has determined that Relief Request ISI-2-7 represents a CBLA because continued examination of 100 percent of integral attachment welds would be unnecessarily costly without providing an commensurate level of safety. Further, the examination of accessible areas of integral attachments without removal of support members was approved for a future code revision by the ASME Section XI committee in March 1995.
TVA estimates that approval of thi.'s relief request could save approximately $ 1, 600, 000 during the remaining Unit 2 inservice inspection intervals.
There are no commitments contained in this letter. If you have any questions, please call me at (205) 729-2636.
Si   erely, T. E. Abney Manager of Licens ng, and Industry Af airs Enclosure cc: See page   3
 
0 0 U.S'. Nuclear Regulatory. Commission Page 3 November 12, 1996


==Enclosure:==
==Enclosure:==


cc (Enclosure):
cc (Enclosure):
Mr.Mark S.Lesser, Branch Chi;ef.U.S.Nuclear Regulatory, Commission Regi;on II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resi.'dent Inspector Browns Ferry,Nucl'ear Plant 10833 Shaw Road Athens, Alabama 35611 Mr.J.F.Williams, Project Manager U.S., Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 0
Mr. Mark S. Lesser, Branch Chi;ef
U.S.Nuclear Regulatory Commission Page 4 November 12, 1996 SMK: JWD: LMG.Enclosure cc (Enclosure):
      .U.S. Nuclear Regulatory, Commission Regi;on II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC   Resi.'dent Inspector Browns Ferry,Nucl'ear Plant 10833 Shaw Road Athens, Alabama 35611 Mr. J. F. Williams, Project Manager U.S., Nuclear Regulatory Commission One White   Flint, North 11555   Rockville Pike Rockville, Maryland 20852
R.R.Baron, BR 4J-C P.P.Carier, BR'4J-C E..S.Christenbury,.ET 1'1H-K K.N.Harris, L'P 3B-C R.D.Machon, PAB 1E-BFN M.O.Medford, LP 6A-C Dale Porter, PEB 1A-BFN E.Preston, POB 2C-BFN C.M'.Root, MOD,2A-BFN Pedro Salas, BR 4J-C T.D.'Shriver, PAB 1A-BFN H.L.Willi'ams, EDB 1A-BFN 0.J.Zeringue, LP GA-C RIMS, WT 3B-K n:Ksubs:Xisi2-7.jwd ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)UNIT 2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), SECTION XI, INSERVICE INSPECTION (ISI)PROGRAM PROGRAM REVISION (SEE ATTACHED)}}
 
0 U.S. Nuclear Regulatory Commission Page 4 November 12, 1996 SMK: JWD: LMG.
Enclosure cc (Enclosure):
R. R. Baron, BR 4J-C P. P. Carier, BR '4J-C E..S. Christenbury, .ET   1'1H-K K. N. Harris, L'P 3B-C R. D. Machon, PAB 1E-BFN M. O. Medford, LP 6A-C Dale Porter, PEB 1A-BFN E. Preston, POB 2C-BFN C. M'. Root, MOD,2A-BFN Pedro Salas, BR 4J-C T. D. 'Shriver, PAB 1A-BFN H. L. Willi'ams, EDB 1A-BFN
: 0. J. Zeringue,   LP GA-C RIMS, WT   3B-K n:Ksubs:Xisi2-7.jwd
 
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNIT 2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME),
SECTION XI, INSERVICE INSPECTION (ISI) PROGRAM PROGRAM REVISION (SEE ATTACHED)}}

Latest revision as of 15:44, 3 February 2020

Forwards Rev to Bfn,Unit 2,second ten-year Interval,Isi Program IAW W/Asme Section XI,IWA-1400
ML18038B779
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 11/12/1996
From: Abney T
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18038B780 List:
References
NUDOCS 9611150256
Download: ML18038B779 (10)


Text

CATEt ORY 1 REGULAT INFORMATION DISTRIBUTIOIISTEM (RIDE)

ACCESSION NBR:9611150256 .DOC.DATE 96/11/12 NOTARIZED: NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH. NAME AUTHOR AFFILIATION ABNEY,T.E. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards rev 7 to 2-SI-4.6.G,"Inservice Inspection Program Uni-t 2".

DISTRIBUTION CODE: A047D TITLE: OR COPIES RECEIVED:LTR Submittal: Inservice/Testing/Relief from

~ ENCL i SIZE:

ASME Code GL-89-04 zz C A

\

NOTES: T RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID,CODE/NAME LTTR ENCL PD2-3 1 1 PD2-3-PD 1 1 WILLIAMS,J. 1 1 0

INTERNAL: ACRS 1 1 AEOD/SPD/RAB 1 1 C 1 1 NRR/DE/EMEB 1 1 NU DOC PPRA8t 1 1 OGC/HDS3 1 0 RES/DET/EMMEB 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D

NOTE TO ALL NRIDSN RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 p4v-

4I t

~4 Tennessee Valley Authority, Post Office Box 2000. Decatur, Alabama 36609 November 12, 1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket No. 50-260 Tennessee Valley Authority )

BROWNS FERRY NUCLEAR PLANT (BFN) UNIT 2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) r SECTION XI r INSERVICE INSPECTION (ISI) PROGRAM REVISION AND COST BENEFICIAL LICENSING ACTION (CBLA) 11 This letter provides a revision to the BFN Unit 2, second ten year interval, ISI program in accordance with ASME Section XI, IWA-1400. The code of record for the current interval is the 1986 Edition (no addenda) of the ASME Boiler and Pressure Vessel Code,Section XI.

The enclosure to this letter contains an updated BFN Unit 2 ISI program which conforms to the 1986 Edition (no addenda) of the ASME Section XI code, except where relief has been requested. Program revisions include the following:

Relief Request ISI-2-4 was updated to increase the examination percentage for residual heat removal (RHR) weld DRHR-2-03 from 52 percent to 65 percent.

Relief Request ISI-2-7 is being submitted for approval to provide relief from 100 percent weld examination of the required weld and base material volume required by IWB-2500-15 for Examination Category B-K-1, integrally welded supports.

9biii>0~5+ qfI'si ii2 Ogoo02bo pDR pDQC pDR 8

U.S. Nuclear Regulatory Commission Page 2 November 12, 1996

~ Miscellaneous editorial revisions to reflect current organizations and scheduled'xaminations TVA has determined that Relief Request ISI-2-7 represents a CBLA because continued examination of 100 percent of integral attachment welds would be unnecessarily costly without providing an commensurate level of safety. Further, the examination of accessible areas of integral attachments without removal of support members was approved for a future code revision by the ASME Section XI committee in March 1995.

TVA estimates that approval of thi.'s relief request could save approximately $ 1, 600, 000 during the remaining Unit 2 inservice inspection intervals.

There are no commitments contained in this letter. If you have any questions, please call me at (205) 729-2636.

Si erely, T. E. Abney Manager of Licens ng, and Industry Af airs Enclosure cc: See page 3

0 0 U.S'. Nuclear Regulatory. Commission Page 3 November 12, 1996

Enclosure:

cc (Enclosure):

Mr. Mark S. Lesser, Branch Chi;ef

.U.S. Nuclear Regulatory, Commission Regi;on II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resi.'dent Inspector Browns Ferry,Nucl'ear Plant 10833 Shaw Road Athens, Alabama 35611 Mr. J. F. Williams, Project Manager U.S., Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

0 U.S. Nuclear Regulatory Commission Page 4 November 12, 1996 SMK: JWD: LMG.

Enclosure cc (Enclosure):

R. R. Baron, BR 4J-C P. P. Carier, BR '4J-C E..S. Christenbury, .ET 1'1H-K K. N. Harris, L'P 3B-C R. D. Machon, PAB 1E-BFN M. O. Medford, LP 6A-C Dale Porter, PEB 1A-BFN E. Preston, POB 2C-BFN C. M'. Root, MOD,2A-BFN Pedro Salas, BR 4J-C T. D. 'Shriver, PAB 1A-BFN H. L. Willi'ams, EDB 1A-BFN

0. J. Zeringue, LP GA-C RIMS, WT 3B-K n:Ksubs:Xisi2-7.jwd

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNIT 2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME),

SECTION XI, INSERVICE INSPECTION (ISI) PROGRAM PROGRAM REVISION (SEE ATTACHED)