ML12087A228: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 | ||
March 27, 2012 | |||
LICENSEE: Entergy Nuclear Operations, Inc. | |||
FACILITY: Palisades Nuclear Plant | |||
==SUBJECT:== | |||
==SUMMARY== | |||
OF THE FEBRUARY 29, 2012, AND MARCH 21, 2012, PUBLIC MEETINGS REGARDING PALISADES NUCLEAR PLANT | |||
On February 29, 2012, the U.S. Nuclear Regulatory Commission (NRC) held a Public Meeting at the Beach Haven Event Center in South Haven, Michigan. The meeting was held with members of the public to discuss recent performance at the Palisades Nuclear Plant. | |||
Discussions were held between members of the public and NRC staff regarding the events that led to the issuance of two White findings and a Yellow finding during the fourth quarter of 2011. | |||
The NRC discussed actions performed and schedul ed to address Palisades' performance in Column 3 of the Reactor Oversight Process (ROP) Action Matrix. Enclosure 1 is a list of attendees for the meeting, and a copy of the slides used by the NRC staff during the meeting are located in ADAMS (ML12058A491). On March 21, 2012, the NRC held a public meet ing to discuss the 2011 annual assessment results for Palisades Nuclear Plant. The meeting was held at the Beach Haven Event Center in South Haven, Michigan. Enclosure 2 is a list of attendees for the meeting, and copies of the slides used by licensee and the NRC staff during the meeting are located in ADAMS (ML12080A018 and ML12074A069). The meeting was started with the NRC providing an overview of the ROP and the results of the 2011 annual assessment for Palisades Nuclear Plant. The NRC's presentation was followed by a presentation provided by the Palisades Nuclear Plant staff giving an overview of the current and proposed actions to improve performance in 2012, including a description of the major issues. In addition, Palisades' staff discussed the actions that have been accomplished, or are planning to be accomplished, to mitigate the three new substantive cross-cutting issues that were identified by the NRC during the 2011 annual assessment. | |||
Entergy Nuclear Operations, Inc. | |||
After the business part of the meeting ended, the NRC listened to comments and answered questions from the public. | |||
/RA/ John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20 | |||
==Enclosures:== | |||
: 1. List of Meeting Attendees for the February 29, 2012, Public Meeting | |||
: 2. List of Meeting Attendees for the March 21, 2012, Public Meeting | |||
cc w/encl: Distribution via List Serve | |||
PUBLIC MEETING PRINCIPAL ATTENDEES FEBRUARY 29, 2012 NRC attendees | |||
C. Pederson, Acting Regional Administrator J. Uhle, Acting Deputy Regional Administrator J. Giessner, Chief, Division of Reactor Projects, Branch 4 T. Taylor, Palisades Senior Resident Inspector J. Ellegood, Senior Resident Inspector R. Krsek, Kewaunee Senior Resident Inspector J. Jandovitz, Project Engineer | |||
Members of the Public Kevin Kemps, Beyond Nuclear/Don't Waste Michigan | |||
Thomas Asperity, Saprodani Associates | |||
Mike Mulligan | |||
PUBLIC MEETING PRINCIPAL ATTENDEES MARCH 21, 2012 NRC Attendees | |||
C. Pederson, Acting Regional Administrator J. Giessner, Chief, Division of Reactor Projects, Branch 4 T. Taylor, Palisades Senior Resident Inspector A. Scarbeary, Palisades Resident Inspector J. Ellegood, Senior Resident Inspector J. Cassidy, Senior Health Physicist S. Sheldon, Senior Reactor Inspector | |||
R. Edwards, Reactor Engineer Entergy Attendees | |||
A. Vitale, Site Vice President D. Hamilton, General Manager Plant Operations B. Davis, Engineering Director C. Arnone, Nuclear Safety Assurance Director | |||
Members of the Public | |||
Kevin Kemps, Beyond Nuclear/Don't Waste Michigan Mike Mulligan | |||
Entergy Nuclear Operations, Inc. | |||
After the business part of the meeting ended, the NRC listened to comments and answered questions from the public. | |||
/RA/ John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20 | |||
==Enclosures:== | |||
: 1. List of Meeting Attendees for the February 29, 2012, Public Meeting | |||
: 2. List of Meeting Attendees for the March 21, 2012, Public Meeting | |||
cc w/encl: Distribution via List Serve DISTRIBUTION | |||
: See next page | |||
DOCUMENT NAME: PALISADES - PUBLIC MEETING | |||
==SUMMARY== | |||
.DOCX G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JGiessner:cs DATE 03/27/12 OFFICIAL RECORD COPY | |||
Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated March 27, 2012 | |||
==SUBJECT:== | |||
==SUMMARY== | |||
OF THE FEBRUARY 29, 2012, AND MARCH 21, 2012, PUBLIC MEETINGS REGARDING PALISADES NUCLEAR PLANT DISTRIBUTION | |||
: Breeda Reilly RidsNrrPMPalisades Resource | |||
RidsNrrDorlLpl3-1 Resource | |||
RidsNrrDirsIrib Resource | |||
Chuck Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck | |||
Allan Barker | |||
Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov}} |
Revision as of 07:24, 2 August 2018
ML12087A228 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 03/27/2012 |
From: | John Giessner Reactor Projects Region 3 Branch 4 |
To: | |
References | |
Download: ML12087A228 (13) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352
March 27, 2012
LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Palisades Nuclear Plant
SUBJECT:
SUMMARY
OF THE FEBRUARY 29, 2012, AND MARCH 21, 2012, PUBLIC MEETINGS REGARDING PALISADES NUCLEAR PLANT
On February 29, 2012, the U.S. Nuclear Regulatory Commission (NRC) held a Public Meeting at the Beach Haven Event Center in South Haven, Michigan. The meeting was held with members of the public to discuss recent performance at the Palisades Nuclear Plant.
Discussions were held between members of the public and NRC staff regarding the events that led to the issuance of two White findings and a Yellow finding during the fourth quarter of 2011.
The NRC discussed actions performed and schedul ed to address Palisades' performance in Column 3 of the Reactor Oversight Process (ROP) Action Matrix. Enclosure 1 is a list of attendees for the meeting, and a copy of the slides used by the NRC staff during the meeting are located in ADAMS (ML12058A491). On March 21, 2012, the NRC held a public meet ing to discuss the 2011 annual assessment results for Palisades Nuclear Plant. The meeting was held at the Beach Haven Event Center in South Haven, Michigan. Enclosure 2 is a list of attendees for the meeting, and copies of the slides used by licensee and the NRC staff during the meeting are located in ADAMS (ML12080A018 and ML12074A069). The meeting was started with the NRC providing an overview of the ROP and the results of the 2011 annual assessment for Palisades Nuclear Plant. The NRC's presentation was followed by a presentation provided by the Palisades Nuclear Plant staff giving an overview of the current and proposed actions to improve performance in 2012, including a description of the major issues. In addition, Palisades' staff discussed the actions that have been accomplished, or are planning to be accomplished, to mitigate the three new substantive cross-cutting issues that were identified by the NRC during the 2011 annual assessment.
Entergy Nuclear Operations, Inc.
After the business part of the meeting ended, the NRC listened to comments and answered questions from the public.
/RA/ John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20
Enclosures:
- 1. List of Meeting Attendees for the February 29, 2012, Public Meeting
- 2. List of Meeting Attendees for the March 21, 2012, Public Meeting
cc w/encl: Distribution via List Serve
PUBLIC MEETING PRINCIPAL ATTENDEES FEBRUARY 29, 2012 NRC attendees
C. Pederson, Acting Regional Administrator J. Uhle, Acting Deputy Regional Administrator J. Giessner, Chief, Division of Reactor Projects, Branch 4 T. Taylor, Palisades Senior Resident Inspector J. Ellegood, Senior Resident Inspector R. Krsek, Kewaunee Senior Resident Inspector J. Jandovitz, Project Engineer
Members of the Public Kevin Kemps, Beyond Nuclear/Don't Waste Michigan
Thomas Asperity, Saprodani Associates
Mike Mulligan
PUBLIC MEETING PRINCIPAL ATTENDEES MARCH 21, 2012 NRC Attendees
C. Pederson, Acting Regional Administrator J. Giessner, Chief, Division of Reactor Projects, Branch 4 T. Taylor, Palisades Senior Resident Inspector A. Scarbeary, Palisades Resident Inspector J. Ellegood, Senior Resident Inspector J. Cassidy, Senior Health Physicist S. Sheldon, Senior Reactor Inspector
R. Edwards, Reactor Engineer Entergy Attendees
A. Vitale, Site Vice President D. Hamilton, General Manager Plant Operations B. Davis, Engineering Director C. Arnone, Nuclear Safety Assurance Director
Members of the Public
Kevin Kemps, Beyond Nuclear/Don't Waste Michigan Mike Mulligan
Entergy Nuclear Operations, Inc.
After the business part of the meeting ended, the NRC listened to comments and answered questions from the public.
/RA/ John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20
Enclosures:
- 1. List of Meeting Attendees for the February 29, 2012, Public Meeting
- 2. List of Meeting Attendees for the March 21, 2012, Public Meeting
cc w/encl: Distribution via List Serve DISTRIBUTION
- See next page
DOCUMENT NAME: PALISADES - PUBLIC MEETING
SUMMARY
.DOCX G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JGiessner:cs DATE 03/27/12 OFFICIAL RECORD COPY
Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated March 27, 2012
SUBJECT:
SUMMARY
OF THE FEBRUARY 29, 2012, AND MARCH 21, 2012, PUBLIC MEETINGS REGARDING PALISADES NUCLEAR PLANT DISTRIBUTION
- Breeda Reilly RidsNrrPMPalisades Resource
RidsNrrDorlLpl3-1 Resource
RidsNrrDirsIrib Resource
Chuck Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck
Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov