==SUMMARY== | |||
OF OCTOBER 12, 2010, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT SUBMITTALS On October 12, 2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. | |||
The purpose of the meeting was to discuss outstanding issues relating to TVA's Final Safety Analysis Report (FSAR) submittals. | |||
The NRC staff and TVA discussed information regarding the review of the Fire Protection Report and outstanding issues in FSAR Sections 4, 9, and 15 (Reactor, Auxiliary Systems, and Accident Analysis, respectively). | |||
During the discussion on the Fire Protection Report, the NRC staff stated that those changes that were made to allow for dual unit operation were incomplete. | |||
TVA stated that they would develop a plan and schedule, at a later date, for resolving the problems identified in connection with identifying and justifying the changes to the Fire Protection Report. For the discussions on FSAR Sections 4,9, and 15, the NRC staff and TVA went over proposed requests for additional information for each section. For Section 4, the discussions focused on the NRC staff's questions on fuel thermal conductivity. | |||
In Section 9, TVA gave an overview of the design of the component cooling water and essential raw cooling water systems for duel unit operation. | |||
The NRC staff and TVA also discussed changing the wording in the FSAR on the spent fuel pool cooling system. For the Accident Analysis section discussion, the NRC staff was interested in discussing TVA's plans for the inadvertent emergency core cooling system and chemical and volume control system malfunction analysis. | |||
-2 Members of the public did not participate in the meeting. Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov. | |||
Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv | |||
-2 Members of the public did not participate in the Please direct any inquiries to me at 301-415-2048 or Docket No. 50-391 cc: Distribution via Listserv DISTRI BUTION: PUBLIC PMNS Resources RidsNrrPMWattsBar2 Resource RidsNrrDorlLp_WB Resource RidsNrrDorl Resource RHanna, RII ADAMS Accession No'.. ML 12054A055 IRAJ Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsRgn2MailCenter Resource LPWB RtF RidsNrrlLABClayton (Hard copy) RidsOpaMaii Resource RidsAcrsAcnw_MailCTR Resource MKotzala, EDO RidsOgcMailCenter Resource RidsNrrOd Resource JLedford, RII CSteger, NRR OFFICE LPWB\PM LPWB\LA LPWB\BC NAME JPoole BClayton DATE 03/07/12 03/07/12 03/14/12 OFFICIAL RECORD COpy}} |
Revision as of 08:56, 30 July 2018
ML12054A055 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 03/14/2012 |
From: | Justin Poole Watts Bar Special Projects Branch |
To: | |
Poole J C | |
References | |
Download: ML12054A055 (3) | |
Text
i-",II REGUl "I;, -iI' °11!! << 0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Ii; "1 : .tJ March 14, 2012 ****1' Tennessee Valley Authority Watts Bar Nuclear Power Plant, Unit 2
SUMMARY
OF OCTOBER 12, 2010, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT SUBMITTALS On October 12, 2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The purpose of the meeting was to discuss outstanding issues relating to TVA's Final Safety Analysis Report (FSAR) submittals.
The NRC staff and TVA discussed information regarding the review of the Fire Protection Report and outstanding issues in FSAR Sections 4, 9, and 15 (Reactor, Auxiliary Systems, and Accident Analysis, respectively).
During the discussion on the Fire Protection Report, the NRC staff stated that those changes that were made to allow for dual unit operation were incomplete.
TVA stated that they would develop a plan and schedule, at a later date, for resolving the problems identified in connection with identifying and justifying the changes to the Fire Protection Report. For the discussions on FSAR Sections 4,9, and 15, the NRC staff and TVA went over proposed requests for additional information for each section. For Section 4, the discussions focused on the NRC staff's questions on fuel thermal conductivity.
In Section 9, TVA gave an overview of the design of the component cooling water and essential raw cooling water systems for duel unit operation.
The NRC staff and TVA also discussed changing the wording in the FSAR on the spent fuel pool cooling system. For the Accident Analysis section discussion, the NRC staff was interested in discussing TVA's plans for the inadvertent emergency core cooling system and chemical and volume control system malfunction analysis.
-2 Members of the public did not participate in the meeting. Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv
-2 Members of the public did not participate in the Please direct any inquiries to me at 301-415-2048 or Docket No. 50-391 cc: Distribution via Listserv DISTRI BUTION: PUBLIC PMNS Resources RidsNrrPMWattsBar2 Resource RidsNrrDorlLp_WB Resource RidsNrrDorl Resource RHanna, RII ADAMS Accession No'.. ML 12054A055 IRAJ Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsRgn2MailCenter Resource LPWB RtF RidsNrrlLABClayton (Hard copy) RidsOpaMaii Resource RidsAcrsAcnw_MailCTR Resource MKotzala, EDO RidsOgcMailCenter Resource RidsNrrOd Resource JLedford, RII CSteger, NRR OFFICE LPWB\PM LPWB\LA LPWB\BC NAME JPoole BClayton DATE 03/07/12 03/07/12 03/14/12 OFFICIAL RECORD COpy