{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Chawla, MaheshSent:Thursday, January 31, 2013 3:00 PMTo:Alan I HassounCc:Widrevitz, Dan; Grover, Ravinder; Hardgrove, Matthew
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Chawla, Mahesh Sent: Thursday, January 31, 2013 3:00 PM To: Alan I Hassoun Cc: Widrevitz, Dan; Grover, Ravinder; Hardgrove, Matthew


==Subject:==
==Subject:==
LIC-109 Acceptance Review - Fermi 2 - LAR - To Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report - MF0446By letter dated December 21, 2012 (ADAMS Accession No. ML13004A134), Detroit Edison Co. submitted a license amendment request for Fermi 2 for proposed LAR to relocate Pressure and Temperature Curves to a PTLR. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.   
LIC-109 Acceptance Review - Fermi 2 - LAR - To Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report - MF0446By letter dated December 21, 2012 (ADAMS Accession No. ML13004A134), Detroit Edison Co. submitted a license amendment request for Fermi 2 for proposed LAR to relocate Pressure and Temperature Curves to a PTLR. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.   


Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.  
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff=s detailed technical review by separate correspondence.  


If you have any questions, please contact me at (301) 415-8371.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that
Hearing Identifier:  NRR_PMDA Email Number:  606  Mail Envelope Properties  (Mahesh.Chawla@nrc.gov20130131150000)  
 
impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff
=s detailed technical review by separate correspondence.
 
If you have any questions, please contact me at (301) 415-8371.  
 
Hearing Identifier:  NRR_PMDA Email Number:  606  Mail Envelope Properties  (Mahesh.Chawla@nrc.gov20130131150000)


==Subject:==
==Subject:==
LIC-109 Acceptance Review - Fermi 2 - LAR - To Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report - MF0446  Sent Date:  1/31/2013 3:00:21 PM  Received Date:  1/31/2013 3:00:00 PM From:    Chawla, Mahesh Created By:  Mahesh.Chawla@nrc.gov Recipients:    "Widrevitz, Dan" <Dan.Widrevitz@nrc.gov>  Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov>  Tracking Status: None  "Hardgrove, Matthew" <Matthew.Hardgrove@nrc.gov>  Tracking Status: None  "Alan I Hassoun" <hassouna@dteenergy.com>  Tracking Status: None  
LIC-109 Acceptance Review - Fermi 2 - LAR - To Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report - MF0446  Sent Date:  1/31/2013 3:00:21 PM  Received Date:  1/31/2013 3:00:00 PM From:    Chawla, Mahesh Created By:  Mahesh.Chawla@nrc.gov Recipients:    "Widrevitz, Dan" <Dan.Widrevitz@nrc.gov>  Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov>  Tracking Status: None  "Hardgrove, Matthew" <Matthew.Hardgrove@nrc.gov>  Tracking Status: None  "Alan I Hassoun" <hassouna@dteenergy.com>  Tracking Status: None  


Post Office:      Files    Size      Date & Time MESSAGE    2203      1/31/2013 3:00:00 PM   Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:      
Post Office:      Files    Size      Date & Time MESSAGE    2203      1/31/2013 3:00:00 PM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}
}}

Revision as of 06:32, 19 July 2018

2013/01/31 NRR E-mail Capture - LIC-109 Acceptance Review - Fermi 2 - LAR - to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report - MF0446
ML13036A312
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/31/2013
From: Chawla M L
Division of Operating Reactor Licensing
To: Hassoun A I
Detroit Edison, Co
References
TAC MF0446
Download: ML13036A312 (2)


Text

1 NRR-PMDAPEm Resource From: Chawla, Mahesh Sent: Thursday, January 31, 2013 3:00 PM To: Alan I Hassoun Cc: Widrevitz, Dan; Grover, Ravinder; Hardgrove, Matthew

Subject:

LIC-109 Acceptance Review - Fermi 2 - LAR - To Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report - MF0446By letter dated December 21, 2012 (ADAMS Accession No. ML13004A134), Detroit Edison Co. submitted a license amendment request for Fermi 2 for proposed LAR to relocate Pressure and Temperature Curves to a PTLR. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that

impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff

=s detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415-8371.

Hearing Identifier: NRR_PMDA Email Number: 606 Mail Envelope Properties (Mahesh.Chawla@nrc.gov20130131150000)

Subject:

LIC-109 Acceptance Review - Fermi 2 - LAR - To Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report - MF0446 Sent Date: 1/31/2013 3:00:21 PM Received Date: 1/31/2013 3:00:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients: "Widrevitz, Dan" <Dan.Widrevitz@nrc.gov> Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov> Tracking Status: None "Hardgrove, Matthew" <Matthew.Hardgrove@nrc.gov> Tracking Status: None "Alan I Hassoun" <hassouna@dteenergy.com> Tracking Status: None

Post Office: Files Size Date & Time MESSAGE 2203 1/31/2013 3:00:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: