{{#Wiki_filter:Dominion  
{{#Wiki_filter:Dominion Energy Kewaunee, Inc. 4D minion N490 Hwy 42, Kewaunee, WI 54216 Web Address: www.dom.com
Energy Kewaunee,  
NOV 0 7 2013 ATTN: Document Control Desk Serial No. 13-239 U. S. Nuclear Regulatory  
Inc. 4D minionN490 Hwy 42, Kewaunee,  
WI 54216Web Address:  
www.dom.com
NOV 0 7 2013ATTN: Document  
Control Desk Serial No. 13-239U. S. Nuclear Regulatory  
Commission  
Commission  
LIC/RR/R0
LIC/RR/R0 Washington, DC 20555-0001  
Washington,  
Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION INSPECTION
DC 20555-0001  
REPORT 0500030512013504 -RESPONSE  
Docket No.: 50-305License No.: DPR-43DOMINION
TO NRC REQUEST On January 24, 2013, the Nuclear Regulatory  
ENERGY KEWAUNEE,  
Commission (NRC) issued an inspection
INC.KEWAUNEE  
report for the Kewaunee Power Station (KPS) (Reference  
POWER STATIONINSPECTION
REPORT 0500030512013504  
-RESPONSE  
TO NRC REQUESTOn January 24, 2013, the Nuclear Regulatory  
Commission  
(NRC) issued an inspection
report for the Kewaunee  
Power Station (KPS) (Reference  
1) indicating  
1) indicating  
a preliminary
a preliminary
significance  
significance  
determination  
determination  
for a White finding.  
for a White finding. On April 4, 2013, the NRC issued the final significance  
On April 4, 2013, the NRC issued thefinal significance  
determination  
determination  
for a White finding and notice of violation  
for a White finding and notice of violation (Reference  
(Reference  
2).The April 4, 2013 letter (Reference  
2).The April 4, 2013 letter (Reference  
2) also informed  
2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting  
Dominion  
Energy Kewaunee,  
Inc.(DEK) the NRC would be conducting  
a supplemental  
a supplemental  
inspection  
inspection  
Line 59: Line 41:
for One or Two White Inputs in a Strategic  
for One or Two White Inputs in a Strategic  
Performance
Performance
Area," when NRC has been notified  
Area," when NRC has been notified by DEK of its readiness  
by DEK of its readiness  
for the inspection.
for the inspection.
On May 31, 2013, the NRC issued a letter describing  
On May 31, 2013, the NRC issued a letter describing  
the termination  
the termination  
of the ReactorOversight
of the Reactor Oversight
Process for KPS and commencement  
Process for KPS and commencement  
of the Decommissioning  
of the Decommissioning  
PowerReactor Inspection  
Power Reactor Inspection  
Program (Reference  
Program (Reference  
3). In that letter the NRC states that it willconduct the inspection  
3). In that letter the NRC states that it will conduct the inspection  
for the Emergency  
for the Emergency  
Preparedness  
Preparedness  
Line 77: Line 58:
on Corrective  
on Corrective  
Actions for Violations  
Actions for Violations  
and Deviations,"  
and Deviations," to verify appropriate  
toverify appropriate  
corrective  
corrective  
actions are being implemented  
actions are being implemented  
Line 86: Line 66:
the steps necessary  
the steps necessary  
to assure that the cause evaluation  
to assure that the cause evaluation  
andcorrective
and corrective
actions are of sufficient  
actions are of sufficient  
scope and breadth to address the identified
scope and breadth to address the identified
performance  
performance  
deficiencies.  
deficiencies.  
DEK requests  
DEK requests the NRC perform the inspection  
the NRC perform the inspection  
identified  
identified  
inReference
in Reference
3 starting  
3 starting on or after November 12, 2013.If you have questions  
on or after November  
12, 2013.If you have questions  
or require additional  
or require additional  
information,  
information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217.
please feel free to contact Mr.Richard P. Repshas at 920-388-8217.
Very truly yours, Site Vi e resident, Kewaunee Power Station  
Very truly yours,Site Vi e resident,  
Serial No. 13-239 Page 2 of 2 References:
Kewaunee  
1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee Power Station-NRC  
Power Station  
Serial No. 13-239Page 2 of 2References:
1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee
Power Station-NRC  
Emergency  
Emergency  
Preparedness  
Preparedness  
Inspection  
Inspection  
Report05000305/2012503;  
Report 05000305/2012503;  
Preliminary  
Preliminary  
White Finding,"  
White Finding," dated January 24, 2013. (ADAMS Accession
dated January 24, 2013. (ADAMSAccession
No. ML13024A422)
No. ML13024A422)
2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance
2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance
Determination  
Determination  
of A White Finding With Proposed  
of A White Finding With Proposed Followup and Notice of Violation;
Followup  
and Notice of Violation;
NRC Inspection  
NRC Inspection  
Report No. 05000305/2013504;  
Report No. 05000305/2013504;  
Kewaunee  
Kewaunee Power Station," dated April 4, 2013. (ADAMS Accession  
Power Station,"  
datedApril 4, 2013. (ADAMS Accession  
No. ML13094A270)
No. ML13094A270)
3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination  
3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination  
OfReactor Oversight  
Of Reactor Oversight  
Process For Kewaunee  
Process For Kewaunee Power Station And Commencement  
Power Station And Commencement  
Of Decommissioning
OfDecommissioning
Inspection  
Inspection  
Program,"  
Program," dated May 31, 2013. (ADAMS Accession No. ML13151A375)
dated May 31, 2013. (ADAMS Accession
No. ML13151A375)
Commitments  
Commitments  
made by this letter: NONEcc: Regional  
made by this letter: NONE cc: Regional Administrator, Region III U. S. Nuclear Regulatory  
Administrator,  
Region IIIU. S. Nuclear Regulatory  
Commission
Commission
2443 Warrenville  
2443 Warrenville  
RoadSuite 210Lisle, IL 60532-4352
Road Suite 210 Lisle, IL 60532-4352
Mr. K. D. FeintuchProject ManagerU.S. Nuclear Regulatory  
Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory  
Commission
Commission
One White Flint North, Mail Stop 08-Dl 511555 Rockville  
One White Flint North, Mail Stop 08-Dl 5 11555 Rockville  
PikeRockville,  
Pike Rockville, MD 20852-2738
MD 20852-2738
NRC Senior Resident Inspector Kewaunee Power Station
NRC Senior Resident  
Inspector
Kewaunee  
Power Station
}}
}}

Revision as of 19:36, 13 July 2018

Kewaunne Power Station, Response to NRC Inspection Report 05000305-13-504 Request
ML13322A416
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/07/2013
From: Jordan A J
Dominion, Dominion Energy Kewaunee
To:
Document Control Desk, NRC/RGN-III
References
Download: ML13322A416 (2)


See also: IR 05000305/2013504

Text

Dominion Energy Kewaunee, Inc. 4D minion N490 Hwy 42, Kewaunee, WI 54216 Web Address: www.dom.com

NOV 0 7 2013 ATTN: Document Control Desk Serial No.13-239 U. S. Nuclear Regulatory

Commission

LIC/RR/R0 Washington, DC 20555-0001

Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION INSPECTION

REPORT 0500030512013504 -RESPONSE

TO NRC REQUEST On January 24, 2013, the Nuclear Regulatory

Commission (NRC) issued an inspection

report for the Kewaunee Power Station (KPS) (Reference

1) indicating

a preliminary

significance

determination

for a White finding. On April 4, 2013, the NRC issued the final significance

determination

for a White finding and notice of violation (Reference

2).The April 4, 2013 letter (Reference

2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting

a supplemental

inspection

using Inspection

Procedure

95001, "Inspection

for One or Two White Inputs in a Strategic

Performance

Area," when NRC has been notified by DEK of its readiness

for the inspection.

On May 31, 2013, the NRC issued a letter describing

the termination

of the Reactor Oversight

Process for KPS and commencement

of the Decommissioning

Power Reactor Inspection

Program (Reference

3). In that letter the NRC states that it will conduct the inspection

for the Emergency

Preparedness

White finding using Inspection

Procedure

92702, "Follow-Up

on Corrective

Actions for Violations

and Deviations," to verify appropriate

corrective

actions are being implemented

instead of using Inspection

Procedure

95001.DEK has undertaken

the steps necessary

to assure that the cause evaluation

and corrective

actions are of sufficient

scope and breadth to address the identified

performance

deficiencies.

DEK requests the NRC perform the inspection

identified

in Reference

3 starting on or after November 12, 2013.If you have questions

or require additional

information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217.

Very truly yours, Site Vi e resident, Kewaunee Power Station

Serial No.13-239 Page 2 of 2 References:

1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee Power Station-NRC

Emergency

Preparedness

Inspection

Report 05000305/2012503;

Preliminary

White Finding," dated January 24, 2013. (ADAMS Accession

No. ML13024A422)

2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance

Determination

of A White Finding With Proposed Followup and Notice of Violation;

NRC Inspection

Report No. 05000305/2013504;

Kewaunee Power Station," dated April 4, 2013. (ADAMS Accession

No. ML13094A270)

3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination

Of Reactor Oversight

Process For Kewaunee Power Station And Commencement

Of Decommissioning

Inspection

Program," dated May 31, 2013. (ADAMS Accession No. ML13151A375)

Commitments

made by this letter: NONE cc: Regional Administrator, Region III U. S. Nuclear Regulatory

Commission

2443 Warrenville

Road Suite 210 Lisle, IL 60532-4352

Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory

Commission

One White Flint North, Mail Stop 08-Dl 5 11555 Rockville

Pike Rockville, MD 20852-2738

NRC Senior Resident Inspector Kewaunee Power Station